Nothing Special   »   [go: up one dir, main page]

CN102635388A - 煤层预裂爆破与水力压裂联作增透方法 - Google Patents

煤层预裂爆破与水力压裂联作增透方法 Download PDF

Info

Publication number
CN102635388A
CN102635388A CN201210043595XA CN201210043595A CN102635388A CN 102635388 A CN102635388 A CN 102635388A CN 201210043595X A CN201210043595X A CN 201210043595XA CN 201210043595 A CN201210043595 A CN 201210043595A CN 102635388 A CN102635388 A CN 102635388A
Authority
CN
China
Prior art keywords
blasting
coal
boring
coal seam
presplit blasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210043595XA
Other languages
English (en)
Inventor
王耀锋
刘志忠
李艳增
王魁军
高中宁
谢正红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG INSTITUTE OF CHINA COAL RESEARCH INSTITUTE
Original Assignee
SHENYANG INSTITUTE OF CHINA COAL RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG INSTITUTE OF CHINA COAL RESEARCH INSTITUTE filed Critical SHENYANG INSTITUTE OF CHINA COAL RESEARCH INSTITUTE
Priority to CN201210043595XA priority Critical patent/CN102635388A/zh
Publication of CN102635388A publication Critical patent/CN102635388A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

本发明涉及煤层预裂爆破与水力压裂联作增透方法,它包括有以下步骤:①在煤体中施工爆破孔;②实施预裂爆破;③在爆破孔影响范围外施工压裂钻孔并封孔;④采用水力压裂技术将压裂钻孔与爆破孔之间煤体压穿,破坏爆破孔周围的致密硬壳,使钻孔之间形成较多裂隙,并通过高压水携带出煤屑。本发明的有益效果是:本发明方法在减少措施钻孔20%~50%的前提下,增加煤体的卸压范围,煤层透气性提高20~100倍,瓦斯抽采效果提高20%以上,有效地减少爆破钻孔和措施钻孔,降低预抽时间1/3以上,最大限度降低瓦斯灾害。

Description

煤层预裂爆破与水力压裂联作增透方法
技术领域
本发明涉及一种煤层预裂爆破与水力压裂联作增透方法,特别适用于高瓦斯低透气性煤层瓦斯的强化抽采。
背景技术
我国煤矿多为高瓦斯低透气性矿井,在矿井各类重、特大事故中瓦斯事故所占比重最大,对矿井造成的损失最严重。随着煤炭生产的高效集约化生产和煤层开采深度增加,瓦斯涌出量越来越大,煤层渗透率降低,突出煤层的数量也呈增加趋势,煤与瓦斯突出矿井也随之增多。瓦斯灾害已经成为制约高效集约化生产发展和安全生产的重要因素。因此,如何有效解决低透煤层的抽采难题,对煤矿安全生产具有十分重要的意义。
国内外煤炭科研人员针对上述问题进行了广泛的研究,先后试验了多项增透技术措施,主要包括深孔松动爆破和深孔控制爆破、水力冲孔、水力割缝、加砂致裂预抽等。但这些方法多数存在钻孔施工工程量大、施工工序复杂和工程投入高、有效影响范围小、抽采时间长等问题,需要采取其他更为有效地卸压增透方法,扩大钻孔有效影响范围,提高本煤层瓦斯抽采效果。
目前已有专利“深孔控制卸压爆破防突技术、工艺与装备”,其发明专利号为CN91100058.5,公开日为1991年10月2日,公开号为CN1055036,其具体实施方案为:在掘进工作面布置直径为100~150mm的钻孔作为控制孔,控制孔起到控制爆破方向的作用,直径为40~50mm的装药孔为爆破孔,孔深均为20~30mm,装药封孔后连线爆破。其缺点是,钻孔布置多,预裂爆破卸压范围小,且在钻孔周边一定直径内容易形成致密硬壳,影响更大范围内的瓦斯抽采;同时由于没有将煤体排出,煤层透气性随时间逐渐降低。
现有发表的论文涉及“预裂爆破”均是对专利“深孔控制卸压爆破防突技术、工艺与装备”的具体应用或是在专利基础上进行改进,既有的缺点没有得到有效地改善。
发明内容
本发明要解决的技术问题是提供一种煤层预裂爆破与水力压裂联作增透方法,采用该方法能有效地提高煤层透气性,提高瓦斯抽采效果,有效地降低抽采时间,最大限度降低瓦斯灾害。
为了解决现有技术存在的问题,本发明采用的技术方案是:
煤层预裂爆破与水力压裂联作增透方法,包括有以下步骤:
①在煤体中施工爆破孔;②实施预裂爆破;③在爆破孔影响范围外施工压裂钻孔并封孔;④采用水力压裂技术将压裂钻孔与爆破孔之间煤体压穿,破坏爆破孔周围的致密硬壳,使钻孔之间形成较多裂隙,并通过高压水携带出煤屑。
所述的预裂爆破是普通预裂爆破、控制预裂爆破、深孔预裂爆破中的一种。
所述的煤体中的爆破孔的数量至少为一个。
所述的压裂钻孔是普通钻孔或者是具有定向作用的导向槽钻孔。
所述的爆破孔和压裂钻孔分别通过抽采系统管路连接到矿井瓦斯抽采系统进行煤层瓦斯预抽。
另外,所述的步骤③中还可以在压裂钻孔中预置导向槽。
所述的导向槽是具有宽度的煤缝或者是具有宽度的以导向槽中心为圆点的圆形割缝或者是分支钻孔。
所述的导向槽的数量至少为一个。
煤层预裂爆破与水力压裂联作增透方法可以应用于顺层钻孔的强化抽采,也可以应用于穿层钻孔的强化抽采。
本发明的有益效果是:本发明方法由于采用预裂爆破后在爆破孔影响范围外施工压裂钻孔,采用水力压裂技术将压裂钻孔与爆破孔之间煤体压穿,破坏爆破孔周围的致密硬壳,使钻孔之间形成较多裂隙,并通过高压水携带出大量煤屑。在减少措施钻孔20%~50%的前提下,增加煤体的卸压范围,煤层透气性提高20~100倍,瓦斯抽采效果提高20%以上,有效地减少爆破钻孔和措施钻孔,降低预抽时间1/3以上,最大限度降低瓦斯灾害。
附图说明
下面结合附图和具体实施例对本发明做进一步说明。
图1为本发明的顺层钻孔第一实施例的施工原理图;
图2为本发明的顺层钻孔第二实施例的施工原理图;
图3为本发明的顺层钻孔第三实施例的施工原理图;
图4为本发明的穿层钻孔第四实施例的施工原理图。
图中:1. 高压水力泵站,2. 截止阀,3. 高压胶管,4.炸药,5.封孔材料,6.预裂爆破影响范围,7.导向槽,8.压裂钻孔,9.爆破钻孔,10煤层。
具体实施方式:
下面参照附图并结合实例对本发明的具体实施方式做进一步的详细说明:
实施例一:
参见图1,在煤层中施工爆破钻孔9,然后在爆破钻孔9中装入炸药4并用封孔材料5封孔,然后连线放炮进行预裂爆破。预裂爆破后确认爆破成功后,在爆破钻孔9两侧大于爆破影响范围2~3倍距离或者10~15m处施工压裂钻孔8,压裂钻孔8深度大约为爆破钻孔9深度与爆破影响范围之和,采用封孔器或者水泥砂浆封孔,开启高压水力泵站1对压裂钻孔8进行水力压裂,直至压裂钻孔8与爆破钻孔9之间的煤体压穿,破坏爆破孔周围的致密硬壳,使钻孔之间形成较多裂隙,并通过高压水携带出大量煤屑。压裂结束后,压裂钻孔8与爆破钻孔9均封孔接入抽放系统开始抽采。
其中,施工顺序是首先施工爆破孔9,然后实施预裂爆破,再施工压裂钻孔8并封孔,然后实施水力压裂,将钻孔间煤体压穿。
其中,预裂爆破可以是普通预裂爆破、控制预裂爆破,也可以是深孔预裂爆破,或者其他形式的预裂爆破。
其中:煤体中的压裂钻孔8,可以是一个,也可以是若干个。
其中,爆破钻孔9和压裂钻孔8分别通过抽采系统管路连接到矿井瓦斯抽采系统进行煤层瓦斯预抽。
实施例二:
参见图2,在煤层中施工爆破钻孔9若干个,爆破钻孔9间距为爆破影响范围4~6倍距离或者20~30m,然后在爆破钻孔9中装入炸药4并用封孔材料5封孔,然后连线放炮进行预裂爆破。预裂爆破后确认爆破成功后,在爆破钻孔中间位置处施工压裂钻孔8,压裂钻孔8深度大约为爆破钻孔9深度与爆破影响范围之和,采用封孔器或者水泥砂浆封孔,开启高压水力泵站1对压裂钻孔8进行水力压裂,直至压裂钻孔8与爆破钻孔9之间的煤体压穿,破坏爆破孔周围的致密硬壳,使钻孔之间形成较多裂隙,并通过高压水携带出大量煤屑。压裂结束后,压裂钻孔8与爆破钻孔9均封孔接入抽放系统开始抽采。
其中,施工顺序是首先施工爆破孔9,然后实施预裂爆破,再施工压裂钻孔8并封孔,然后实施水力压裂,将钻孔间煤体压穿。
其中,预裂爆破可以是普通预裂爆破、控制预裂爆破,也可以是深孔预裂爆破,或者其他形式的预裂爆破。
其中:煤体中的爆破钻孔8,可以是一个,也可以是若干个。
其中,爆破钻孔9和压裂钻孔8分别通过抽采系统管路连接到矿井瓦斯抽采系统进行煤层瓦斯预抽。
实施例三:
参见图3,在煤层中施工爆破钻孔9若干个,爆破钻孔间距为爆破影响范围4~6倍距离或者20~30m,然后在爆破钻孔9中装入炸药4并用封孔材料5封孔,然后连线放炮进行预裂爆破。预裂爆破后确认爆破成功后,在爆破钻孔中间位置处施工压裂钻孔8,压裂钻孔8深度大约为爆破钻孔9深度与爆破影响范围之和,在压裂钻孔8中预置导向槽7,然后采用封孔器或者水泥砂浆封孔,开启高压水力泵站1对压裂钻孔8进行水力压裂,直至压裂钻孔8与爆破钻孔9之间的煤体压穿,破坏爆破孔周围的致密硬壳,使钻孔之间形成较多裂隙,并通过高压水携带出大量煤屑。压裂结束后,压裂钻孔8与爆破钻孔9均封孔接入抽放系统开始抽采。
其中,施工顺序是首先施工爆破孔9,然后实施预裂爆破,再施工压裂钻孔8并封孔,然后实施水力压裂,将钻孔间煤体压穿。
其中,预裂爆破可以是普通预裂爆破、控制预裂爆破,也可以是深孔预裂爆破,或者其他形式的预裂爆破。
其中:煤体中的爆破钻孔8,可以是一个,也可以是若干个。
其中:在煤体中预先形成导向槽7,可以是通过射流深穿透技术,也可以是通过水力割缝、水力扩孔技术,还可以是通过分支钻孔技术,或者其他可以形成导向槽7的技术。
其中:在煤体中预先形成的导向槽7,可以是一定宽度的煤缝,也可以是一定宽度的以导向槽中心为圆点的圆形割缝,或者是分支钻孔。
其中:煤体中的导向槽7,可以是一个,也可以是若干个
其中,爆破钻孔9和压裂钻孔8分别通过抽采系统管路连接到矿井瓦斯抽采系统进行煤层瓦斯预抽。
实施例四:
参见图4,用钻机从巷道向煤层施工爆破钻孔9,然后在爆破钻孔9煤层段处装入炸药4并用封孔材料5封孔,然后连线放炮进行预裂爆破。预裂爆破后确认爆破成功后,在爆破钻孔9两侧大于爆破影响范围2~3倍距离或者10~15m处施工压裂钻孔8,压裂钻孔8深度大约为爆破钻孔9深度与爆破影响范围之和,在压裂钻孔煤层段处预置导向槽7,采用封孔器或者水泥砂浆封孔,开启高压水力泵站1对压裂钻孔8进行水力压裂,直至压裂钻孔8与爆破钻孔9之间的煤体压穿,破坏爆破孔周围的致密硬壳,使钻孔之间形成较多裂隙,并通过高压水携带出大量煤屑。压裂结束后,压裂钻孔8与爆破钻孔9均封孔接入抽放系统开始抽采。
其中,施工顺序是首先施工爆破孔9,然后实施预裂爆破,再施工压裂钻孔8并封孔,然后实施水力压裂,将钻孔间煤体压穿。
其中,预裂爆破可以是普通预裂爆破、控制预裂爆破,也可以是深孔预裂爆破,或者其他形式的预裂爆破。
其中:煤体中的爆破钻孔8,可以是一个,也可以是若干个。
其中:在煤体中预先形成导向槽7,可以是通过射流深穿透技术,也可以是通过水力割缝、水力扩孔技术,还可以是通过分支钻孔技术,或者其他可以形成导向槽7的技术。
其中:在煤体中预先形成的导向槽7,可以是一定宽度的煤缝,也可以是一定宽度的以导向槽中心为圆点的圆形割缝,或者是分支钻孔。
其中:煤体中的导向槽7,可以是一个,也可以是若干个。
其中,爆破钻孔9和压裂钻孔8分别通过抽采系统管路连接到矿井瓦斯抽采系统进行煤层瓦斯预抽。
尽管上文对本发明进行了详细说明,但是本发明不限于此,本技术领域技术人员可以根据本发明的原理进行各种修改。因此,凡按照本发明原理所作的修改,都应当理解为落入本发明的保护范围。

Claims (8)

1.煤层预裂爆破与水力压裂联作增透方法,其特征在于包括有以下步骤:
①在煤体中施工爆破孔;②实施预裂爆破;③在爆破孔影响范围外施工压裂钻孔并封孔;④采用水力压裂技术将压裂钻孔与爆破孔之间煤体压穿,破坏爆破孔周围的致密硬壳,使钻孔之间形成较多裂隙,并通过高压水携带出煤屑。
2.根据权利要求1所述的煤层预裂爆破与水力压裂联作增透方法,其特征在于:所述的步骤③还包括:在压裂钻孔中预置导向槽。
3.根据权利要求2所述的煤层预裂爆破与水力压裂联作增透方法,其特征在于:所述的导向槽是具有宽度的煤缝或者是具有宽度的以导向槽中心为圆点的圆形割缝或者是分支钻孔。
4.根据权利要求3所述的煤层预裂爆破与水力压裂联作增透方法,其特征在于:所述的导向槽的数量至少为一个。
5.根据权利要求1或2所述的煤层预裂爆破与水力压裂联作增透方法,其特征在于:所述的预裂爆破是普通预裂爆破、控制预裂爆破、深孔预裂爆破中的一种。
6.根据权利要求1或2所述的煤层预裂爆破与水力压裂联作增透方法,其特征在于:所述的煤体中的爆破孔的数量至少为一个。
7.根据权利要求1或2所述的煤层预裂爆破与水力压裂联作增透方法,其特征在于:所述的压裂钻孔是普通钻孔或者是具有定向作用的导向槽钻孔。
8.根据权利要求1或2所述的煤层预裂爆破与水力压裂联作增透方法,其特征在于:所述的爆破孔和压裂钻孔分别通过抽采系统管路连接到矿井瓦斯抽采系统进行煤层瓦斯预抽。
CN201210043595XA 2012-02-24 2012-02-24 煤层预裂爆破与水力压裂联作增透方法 Pending CN102635388A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210043595XA CN102635388A (zh) 2012-02-24 2012-02-24 煤层预裂爆破与水力压裂联作增透方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210043595XA CN102635388A (zh) 2012-02-24 2012-02-24 煤层预裂爆破与水力压裂联作增透方法

Publications (1)

Publication Number Publication Date
CN102635388A true CN102635388A (zh) 2012-08-15

Family

ID=46619949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210043595XA Pending CN102635388A (zh) 2012-02-24 2012-02-24 煤层预裂爆破与水力压裂联作增透方法

Country Status (1)

Country Link
CN (1) CN102635388A (zh)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966372A (zh) * 2012-12-17 2013-03-13 中国矿业大学 一种复杂煤层割缝诱喷卸压增透方法
CN103953285A (zh) * 2014-04-10 2014-07-30 河南理工大学 顺层水力冲孔方法
CN104314606A (zh) * 2014-08-15 2015-01-28 中国矿业大学 一种钻孔内水力割缝与瓦斯爆炸致裂煤体联合强化抽采方法
CN104453898A (zh) * 2014-10-23 2015-03-25 山东科技大学 一种深孔爆破与静压注水相结合的煤层弱化方法
CN104564125A (zh) * 2014-12-02 2015-04-29 河南理工大学 软煤储层瓦斯强化抽采对比实验装置及实验方法
CN105370256A (zh) * 2015-10-15 2016-03-02 山东科技大学 一种分段预裂提高低透气性煤层高压注水湿润半径的方法
CN105804786A (zh) * 2016-03-15 2016-07-27 安徽理工大学 一种松软煤层底板穿层钻孔压冲增透方法
CN105971663A (zh) * 2016-07-19 2016-09-28 淮南宏昌科技有限责任公司 一种煤层高压水力割缝压裂的钻孔布置结构及增透方法
CN106226135A (zh) * 2016-08-03 2016-12-14 安徽理工大学 一种水力压裂试块导向槽制作装置及制作方法
CN107503728A (zh) * 2017-10-17 2017-12-22 湖南工学院 采用定向水压集中爆破提高煤层透气性的方法
CN107503726A (zh) * 2017-10-17 2017-12-22 湖南工学院 用于提高煤层透气性的定向水压集中爆破装置
CN108868591A (zh) * 2018-04-28 2018-11-23 安徽建筑大学 一种爆破致裂增水的方法
CN110359909A (zh) * 2019-07-01 2019-10-22 安徽理工大学 一种用于坚硬煤层遗留煤柱的软化方法
CN110541696A (zh) * 2019-07-15 2019-12-06 河南理工大学 一种油气井二氧化碳爆破-水力压裂改造增产方法
CN111287721A (zh) * 2020-03-04 2020-06-16 中联煤层气有限责任公司 一种高压气动力诱导起裂与水力压裂联作的压裂方法
CN113431497A (zh) * 2021-07-16 2021-09-24 辽宁工程技术大学 一种主钻孔-支孔柔性钢管射流一体化矿用钻具
CN113622915A (zh) * 2021-09-27 2021-11-09 中国矿业大学 一种超前预处理采煤工作面侵入硬岩体快速回采的方法
CN114810197A (zh) * 2022-05-19 2022-07-29 贵州一和科技有限公司 一种煤巷掘进面动静组合作用的瓦斯增透方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2209968C2 (ru) * 2001-09-06 2003-08-10 ОАО "Промгаз" Способ разупрочнения угольного пласта
CN101581231A (zh) * 2009-06-16 2009-11-18 煤炭科学研究总院沈阳研究院 穿层钻孔水力压裂疏松煤体瓦斯抽放方法
CN102121395A (zh) * 2011-01-24 2011-07-13 平顶山天安煤业股份有限公司十矿 低渗透单一煤层瓦斯综合治理一体化的方法
CN102155254A (zh) * 2011-02-28 2011-08-17 中国矿业大学 一种低透气性煤层脉冲压裂增透抽采瓦斯方法
CN102155257A (zh) * 2011-03-28 2011-08-17 河南理工大学 阶梯式钻孔卸压防突方法
CN102213077A (zh) * 2011-05-25 2011-10-12 煤炭科学研究总院沈阳研究院 三维旋转水射流煤层扩孔系统及扩孔与压裂增透方法
CN102337919A (zh) * 2011-09-01 2012-02-01 河南理工大学 “四期五用”钻孔高效抽采瓦斯工艺方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2209968C2 (ru) * 2001-09-06 2003-08-10 ОАО "Промгаз" Способ разупрочнения угольного пласта
CN101581231A (zh) * 2009-06-16 2009-11-18 煤炭科学研究总院沈阳研究院 穿层钻孔水力压裂疏松煤体瓦斯抽放方法
CN102121395A (zh) * 2011-01-24 2011-07-13 平顶山天安煤业股份有限公司十矿 低渗透单一煤层瓦斯综合治理一体化的方法
CN102155254A (zh) * 2011-02-28 2011-08-17 中国矿业大学 一种低透气性煤层脉冲压裂增透抽采瓦斯方法
CN102155257A (zh) * 2011-03-28 2011-08-17 河南理工大学 阶梯式钻孔卸压防突方法
CN102213077A (zh) * 2011-05-25 2011-10-12 煤炭科学研究总院沈阳研究院 三维旋转水射流煤层扩孔系统及扩孔与压裂增透方法
CN102337919A (zh) * 2011-09-01 2012-02-01 河南理工大学 “四期五用”钻孔高效抽采瓦斯工艺方法

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966372A (zh) * 2012-12-17 2013-03-13 中国矿业大学 一种复杂煤层割缝诱喷卸压增透方法
CN103953285A (zh) * 2014-04-10 2014-07-30 河南理工大学 顺层水力冲孔方法
CN103953285B (zh) * 2014-04-10 2016-08-17 河南理工大学 顺层水力冲孔方法
CN104314606B (zh) * 2014-08-15 2016-01-13 中国矿业大学 一种钻孔内水力割缝与瓦斯爆炸致裂煤体联合强化抽采方法
CN104314606A (zh) * 2014-08-15 2015-01-28 中国矿业大学 一种钻孔内水力割缝与瓦斯爆炸致裂煤体联合强化抽采方法
CN104453898A (zh) * 2014-10-23 2015-03-25 山东科技大学 一种深孔爆破与静压注水相结合的煤层弱化方法
CN104564125B (zh) * 2014-12-02 2016-06-22 河南理工大学 软煤储层瓦斯强化抽采对比实验装置及实验方法
CN104564125A (zh) * 2014-12-02 2015-04-29 河南理工大学 软煤储层瓦斯强化抽采对比实验装置及实验方法
CN105370256A (zh) * 2015-10-15 2016-03-02 山东科技大学 一种分段预裂提高低透气性煤层高压注水湿润半径的方法
CN105370256B (zh) * 2015-10-15 2018-09-21 山东科技大学 一种分段预裂提高低透气性煤层高压注水湿润半径的方法
CN105804786A (zh) * 2016-03-15 2016-07-27 安徽理工大学 一种松软煤层底板穿层钻孔压冲增透方法
CN105971663A (zh) * 2016-07-19 2016-09-28 淮南宏昌科技有限责任公司 一种煤层高压水力割缝压裂的钻孔布置结构及增透方法
CN106226135A (zh) * 2016-08-03 2016-12-14 安徽理工大学 一种水力压裂试块导向槽制作装置及制作方法
CN106226135B (zh) * 2016-08-03 2019-02-15 安徽理工大学 一种水力压裂试块导向槽制作装置及制作方法
CN107503728A (zh) * 2017-10-17 2017-12-22 湖南工学院 采用定向水压集中爆破提高煤层透气性的方法
CN107503726A (zh) * 2017-10-17 2017-12-22 湖南工学院 用于提高煤层透气性的定向水压集中爆破装置
CN107503726B (zh) * 2017-10-17 2020-06-26 湖南工学院 用于提高煤层透气性的定向水压集中爆破装置
CN108868591A (zh) * 2018-04-28 2018-11-23 安徽建筑大学 一种爆破致裂增水的方法
CN110359909A (zh) * 2019-07-01 2019-10-22 安徽理工大学 一种用于坚硬煤层遗留煤柱的软化方法
CN110541696A (zh) * 2019-07-15 2019-12-06 河南理工大学 一种油气井二氧化碳爆破-水力压裂改造增产方法
CN111287721A (zh) * 2020-03-04 2020-06-16 中联煤层气有限责任公司 一种高压气动力诱导起裂与水力压裂联作的压裂方法
CN113431497A (zh) * 2021-07-16 2021-09-24 辽宁工程技术大学 一种主钻孔-支孔柔性钢管射流一体化矿用钻具
CN113431497B (zh) * 2021-07-16 2023-12-22 辽宁工程技术大学 一种主钻孔-支孔柔性钢管射流一体化矿用钻具
CN113622915A (zh) * 2021-09-27 2021-11-09 中国矿业大学 一种超前预处理采煤工作面侵入硬岩体快速回采的方法
CN114810197A (zh) * 2022-05-19 2022-07-29 贵州一和科技有限公司 一种煤巷掘进面动静组合作用的瓦斯增透方法
CN114810197B (zh) * 2022-05-19 2022-10-25 贵州一和科技有限公司 一种煤巷掘进面动静组合作用的瓦斯增透方法

Similar Documents

Publication Publication Date Title
CN102635388A (zh) 煤层预裂爆破与水力压裂联作增透方法
CN103195466B (zh) 一种定向水压爆破提高煤层透气性的方法
CN102619552B (zh) 导向槽定向水力压穿增透及消突方法
CN103527198B (zh) 切眼坚硬顶板/顶煤水力致裂控制方法
CN103821516B (zh) 二次卸压防治冲击地压的方法
CN102242640B (zh) 煤矿井下石门揭煤的快速消突方法
WO2018201706A1 (zh) 底板顺层长钻孔分段压裂高效抽放煤巷条带瓦斯及区域消突方法
CN109209472B (zh) 一种冲孔、爆破、注水相互耦合的煤层卸压防突方法
CN102080525B (zh) 一种高压气体喷射掏穴卸压防突方法
CN103510957B (zh) 一种组合式石门揭煤方法
CN101614135B (zh) 钻、爆、抽三位一体瓦斯抽采方法
CN101666241B (zh) 一种区域瓦斯治理钻爆压抽一体化防突方法
CN103161493B (zh) 气液固三相耦合爆破弱化冲击地压及增透方法
CN107152303A (zh) 一种低透气高瓦斯煤层被掩护巷高效爆破卸压抽采的方法
CN102383828A (zh) 深孔水力致裂驱赶瓦斯浅孔抽采的增透与消突方法
CN101280688B (zh) 突出煤层掘进工作面沿顶钻进大循环区域性消突方法
CN102852506A (zh) 一种高压气动爆破卸压增透方法
CN108412453B (zh) 一种煤炭开采水与瓦斯共治系统及施工方法
CN103924956A (zh) 一种块煤开采用超前预裂方法
CN102678117A (zh) 基于聚能爆破的定向水力致裂方法
CN113153292B (zh) 煤矿井下采煤工作面水力压裂快速过坚硬岩石断层的方法
CN106761852A (zh) 广域水下煤岩深孔承压微爆注浆堵水方法
CN102518471A (zh) 煤矿高应力区域巷道冲击地压能量释放方法
CN101614134A (zh) 钻、爆、抽三位一体卸压防突方法
CN107120137B (zh) 一种煤巷掘进沿煤层底板深孔预裂爆破抽采方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120815