Nothing Special   »   [go: up one dir, main page]

CN102424101B - Technology for launching ship with airbags - Google Patents

Technology for launching ship with airbags Download PDF

Info

Publication number
CN102424101B
CN102424101B CN201110368392.3A CN201110368392A CN102424101B CN 102424101 B CN102424101 B CN 102424101B CN 201110368392 A CN201110368392 A CN 201110368392A CN 102424101 B CN102424101 B CN 102424101B
Authority
CN
China
Prior art keywords
air bag
ship
pier
pressure
launching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110368392.3A
Other languages
Chinese (zh)
Other versions
CN102424101A (en
Inventor
郭连镇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Northeast Institute of oceanographic engineering Co., Ltd.
Original Assignee
NANJING BEST SHIPPING AND MARINE ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING BEST SHIPPING AND MARINE ENGINEERING DESIGN Co Ltd filed Critical NANJING BEST SHIPPING AND MARINE ENGINEERING DESIGN Co Ltd
Priority to CN201110368392.3A priority Critical patent/CN102424101B/en
Publication of CN102424101A publication Critical patent/CN102424101A/en
Application granted granted Critical
Publication of CN102424101B publication Critical patent/CN102424101B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a technology for launching a ship with airbags. The technology comprises the following processes: 1, arranging the airbags; 2, inflating and inspecting the airbags: arranging pressure meters, inspecting a compressed air source, and inflating the airbags according to a sequence that airbags are sequentially, eudipleurally and synchronously inflated from the stern to the stem until the airbags are full of air; and 3, carrying out real-time monitoring on the air pressure in each airbag. The technology of the invention has the advantages of launching flow standardization and launching quality guarantee.

Description

The technique of launching ship with airbags
Technical field
The present invention relates to a kind of technique of launching ship with airbags.
Background technology
At present, launching is an important node in ship building process, and mark building berth carries and hull main structure completes, and the fitting-out installations of project such as machine, pipe, electricity complete, and substantially possess debugging condition.In traditional Launching processing, air bag launching can only be served as supplementing of water under dock, arine railway, is used for realizing water under spitkit.And lower water process is subject to the impact of uncontrollable factor larger, often there will be that halfway in lower water process stops, balloon rupture, with the collision of building berth bulkhead wall or lower water after stroke cross the problems such as far away.
Summary of the invention
For the problems referred to above, the invention provides the technique of the launching ship with airbags of Water flow-path under a kind of specification, the lower water quality of guarantee.
In order to achieve the above object, the present invention has taked following technical scheme: a kind of technique of launching ship with airbags, and boats and ships are bulge carrier, comprise the following steps:
A, lay air bag:
(1), lay before air bag, to using air bag inflate one by one inspection, stop Lou or insecure air bag such as damage enters scene, newly the preferential cloth of air bag is placed on stem stern region;
(2), divide the each half of port and starboard to be laid to bow stern both direction by ship midship in qualified air bag according to ship type;
(3), lay before air bag, also need determine lay the position of air bag and do mark, lay by mark;
(4), adopt while laying air bag gantry crane, tower crane or wheel crane to coordinate handling, air bag crosses hull bottom midship line and adopts 1.5 tons of small winch tractions, air bag is placed and will be ensured straightly and longitudinally vertical with ship, inflation inlet will be convenient to manual operation and manometric checking;
The inflation of B, air bag and inspection:
(1), install one by one cut-and-dried compression indicator before airbag aeration, manometric pressure is 0-0.25MPa;
(2), check compressed air gas source, the valve of opening on gas bag collector checks bleed pressure and moisture situation by venting, puts residual until gaseous state is normal if there is water to open sufficient valve;
(3), by preprepared with joint 1/2 " sebific duct is connected air source of the gas with wanted air bag, inflate;
(4), airbag aeration order: from ship stern to stem successively symmetrical synchronously carrying out until air bag is full of gas entirely;
(5), air bag inflation pressure:
(a), stop inflation when pressure rises to 0.05MPa for the first time, check whether air bag and each pier position collide, the squareness that air bag and hull bottom are longitudinal, if pinpoint the problems adjustment immediately;
(b), pressure rises to 0.1MPa and stops inflation for the second time, checks that air bag pressurized situation and ship state change, and report immediately on scene commander if note abnormalities and process;
(c), pressure starts inflation from first air bag contacting with boat body plane of stern for the third time, progressively increases air pressure to bow air bag;
(d), first air bag contacting with hull of stern to the gasbag pressure of midships section rises to 0.15-0.18MPa;
(e), the gasbag pressure of midships section to 1 cargo hold antetheca rises to 0.15MPa;
(f) when, bow to the gasbag pressure of bow rises to 0.13MPa, whether boarding ship lifts, if ship is not lifted, regulate the pressure of air bag until ship is lifted, only have in the time that ship entirety is lifted, will spend rapidly pier complete removal, after flower pier has all been torn open, observe whole ship state, if apart from the long colored pier that stays 30m distance of Time Of Launching, treat formally to descend water to remove to ensure safety for first 2 hours;
(g), launching moves: boats and ships are by winch control, and when bow gasbag pressure rises to 0.18-0.20MPa, air bag rolls and makes accommodation move 5-10m, winch walk back, ship starts when mobile on ship workmen and cuts cable ship is free to slide into water.
Further improvement of the present invention is: when the dismounting of flower pier will make ship lift after airbag aeration completes, can carry out, flower pier is removed and is all taked manual operation, the method of the dilatory traction of Manila rope in adopting while tearing colored pier open, the coherent building berth Po Qiang both sides that are put into of timber wedge that remove from flower pier, receipts pier is made in order, and often tearing a colored pier open all will be smoothly by clean the cleaning of pier bit plane, and slag thing transports out of building berth, if find, overlap crator or acute angle ironware necessarily polish flat, anti-damage air bag;
The present invention compares with similar technology, and tool has the following advantages:
Specification of the present invention and the clear and definite flow process of launching ship with airbags operation, successfully ensured water the smooth safety from pusher tug to nearly 30 boats and ships of 76500DWT bulge carrier.And can realize and lowest water level round-the-clock lower water the highest in the Changjiang river, do not need to wait for the tide phase.Compare with slipway launching with dock, saved a large amount of capital construction expenses, promoted the competitive power that shipyard is managed.
Detailed description of the invention:
In order to deepen the understanding of the present invention, below in conjunction with embodiment and accompanying drawing, the invention will be further described, and this embodiment only, for explaining the present invention, does not form limiting the scope of the present invention.
A technique for launching ship with airbags, boats and ships are bulge carrier, comprise the following steps:
A, lay air bag:
(1), lay before air bag, building berth should clean out, building berth is without sharp object; Lay before air bag, to using air bag inflate one by one inspection, stop Lou or insecure air bag such as damage enters scene, newly the preferential cloth of air bag is placed on stem stern region;
(2), divide the each half of port and starboard to be laid to bow stern both direction by ship midship in qualified air bag according to ship type;
(3), lay before air bag, also need determine lay the position of air bag and do mark, lay by mark;
(4) while, laying air bag, adopt gantry crane, tower crane or wheel crane to coordinate handling, air bag crosses hull bottom midship line and adopts 1.5 tons of small winch tractions, air bag placement will ensure straight and longitudinally vertical with ship, inflation inlet will be convenient to manual operation and manometric checking, until by all air bags of scheme cloth foot;
Before airbag aeration, prepare traction system, by 80mm steel wire penetrating chain pipe, the bollard (112t) that hangs over stem deck is upper, and this steel rope is connected on movable pulley by 80t shackle, each one of left and right; 80mm steel rope is connected to fixed pulley and earth anchor, be connected by buckle winch and earth anchor, each one of left and right with 80mm steel rope; Pull-out winch cable, on assembly pulley (movable pulley and fixed pulley) at least around more than 3 groups, the each one group of winch in left and right; Before airbag aeration, the traction of stem traction system puts in place, and makes winch stressed, determines that the preparation of stem traction system puts in place, can start airbag aeration.
The inflation of B, air bag and inspection:
(1), install one by one cut-and-dried compression indicator before airbag aeration, manometric pressure is 0-0.25MPa;
(2), check compressed air gas source, the valve of opening on gas bag collector checks bleed pressure and moisture situation by venting, puts residual until gaseous state is normal if there is water to open sufficient valve;
(3), by preprepared with joint 1/2 " sebific duct is connected air source of the gas with wanted air bag, inflate;
(4), airbag aeration order: from ship stern to stem successively symmetrical synchronously carrying out until air bag is full of gas entirely;
(5), air bag inflation pressure:
(a), stop inflation when pressure rises to 0.05MPa for the first time, check whether air bag and each pier position collide, the squareness that air bag and hull bottom are longitudinal, if pinpoint the problems adjustment immediately;
(b), pressure rises to 0.1MPa and stops inflation for the second time, checks that air bag pressurized situation and ship state change, and report immediately on scene commander if note abnormalities and process;
(c), pressure starts inflation from first air bag contacting with boat body plane of stern for the third time, progressively increases air pressure to bow air bag;
(d), first air bag contacting with hull of stern to the gasbag pressure of midships section rises to 0.15-0.18MPa;
(e), the gasbag pressure of midships section to 1 cargo hold antetheca rises to 0.15MPa;
(f) when, bow to the gasbag pressure of bow rises to 0.13MPa, whether boarding ship lifts, if ship is not lifted, regulate the pressure of air bag until ship is lifted, only have in the time that ship entirety is lifted, will spend rapidly pier complete removal, after flower pier has all been torn open, observe whole ship state, if apart from the long colored pier that stays 30m distance of Time Of Launching, treat formally to descend water to remove to ensure safety for first 2 hours; When will making ship lift after airbag aeration completes, the dismounting of flower pier can carry out, flower pier is removed and is all taked manual operation, the method of the dilatory traction of Manila rope in adopting while tearing colored pier open, the coherent building berth Po Qiang both sides that are put into of timber wedge that remove from flower pier, receipts pier is made in order, and often tearing a colored pier open all will be smoothly by clean the cleaning of pier bit plane, and slag thing transports out of building berth, if find, overlap crator or acute angle ironware necessarily polish flat, anti-damage air bag;
(g), launching moves: boats and ships are by winch control, and when bow gasbag pressure rises to 0.18-0.20MPa, air bag rolls and makes accommodation move 5-10m, winch walk back, ship starts when mobile on ship workmen and cuts cable ship is free to slide into water.
While walking to gate after launching a ship, gate bottom uses steel boxboard by smooth groove place mat because waterproof measure construction need have together with the groove of gate bottom formed objects area, this plate claims rebound, No. 1 building berth has three rebounds, every rebound is 10000x1560x400mm, and rebound should place at sluice gate place in advance, and gate is completed after hanging and moving immediately, after gate hangs and moves, to place appropriately, must not affect to put and launch a ship.
When ship is by winch control, Qi Nang Roll is moving makes accommodation move gas cutting hawser on 5-10m (observing water level situation and determine) ship, ship is free to slide into water, after freely entering water, ship drifts about in water by inertia, after being used to the high point of impact peak value, on ship, cast anchor stop ship to, boats and ships cast anchor and bring ship the stop of into preprepared pier mooring with tugboat after ship are stable, band cable personnel have coordinated mooring task, after launching, immediately the air bag rolling in river is reclaimed: the air bag in water is debarked by Ren Gong Tui Roll by repair ship horizontal sliding to building berth, the air bag of building berth all moves in sluice gate, and warehouse-in is reclaimed in venting in order, as prescribed is deposited, hang out rebound, lifting gate recovers former primary state.
The applicable ship type of the present invention is single deck, tail type, single-blade, single rudder, 100,000 tons of following bulge carriers that advanced by diesel-engined drive screw propeller with weather tightness hatch cover.There is the first line style of ball nose; Be provided with forecastle, afterbody; Full ship is provided with 5 cargo holds, and cargo area is double bottom and the single shell structure with bottom side tank, top side tank, Bunker Fuel Oil.Full ship is established 9 road watertight transcerse bulkheads altogether, lays respectively at rib position 8,11,35,71,109,145,183, No. 217.Set gradually aft peak, cabin, 5 cargo holds, fresh water tank (left and right), the first Peak Tanks ballast tank of holding concurrently.
Specification of the present invention and the clear and definite flow process of launching ship with airbags operation, successfully ensured water the smooth safety from pusher tug to nearly 30 boats and ships of 76500DWT bulge carrier.And can realize and lowest water level round-the-clock lower water the highest in the Changjiang river, do not need to wait for the tide phase.Compare with slipway launching with dock, saved a large amount of capital construction expenses, promoted the competitive power that shipyard is managed.

Claims (2)

1. a technique for launching ship with airbags, described boats and ships are bulge carrier, it is characterized in that: comprise the following steps:
A, lay air bag:
(1), lay before air bag, to using air bag inflate one by one inspection, stop Lou or insecure air bag such as damage enters scene, newly the preferential cloth of air bag is placed on stem stern region;
(2), divide the each half of port and starboard to be laid to bow stern both direction by ship midship in qualified air bag according to ship type;
(3), lay before air bag, also need determine lay the position of air bag and do mark, lay by mark;
(4), adopt while laying air bag gantry crane, tower crane or wheel crane to coordinate handling, air bag crosses hull bottom midship line and adopts 1.5 tons of small winch tractions, air bag is placed and will be ensured straightly and longitudinally vertical with ship, inflation inlet will be convenient to manual operation and manometric checking;
The inflation of B, air bag and inspection:
(1), install one by one cut-and-dried compression indicator before airbag aeration, manometric pressure is 0-0.25MPa;
(2), check compressed air gas source, the valve of opening on gas bag collector checks bleed pressure and moisture situation by venting, puts residual until gaseous state is normal if there is water to open sufficient valve;
(3), by preprepared with joint 1/2 " sebific duct is connected air source of the gas with wanted air bag, inflate;
(4), airbag aeration order: from ship stern to stem successively symmetrical synchronously carrying out until air bag is full of gas entirely;
(5), air bag inflation pressure:
(a), stop inflation when pressure rises to 0.05MPa for the first time, check whether air bag and each pier position collide, the squareness that air bag and hull bottom are longitudinal, if pinpoint the problems adjustment immediately;
(b), pressure rises to 0.1MPa and stops inflation for the second time, checks that air bag pressurized situation and ship state change, and report immediately on scene commander if note abnormalities and process;
(c), pressure starts inflation from first air bag contacting with boat body plane of stern for the third time, progressively increases air pressure to bow air bag;
(d), first air bag contacting with hull of stern to the gasbag pressure of midships section rises to 0.15-0.18MPa;
(e), the gasbag pressure of midships section to 1 cargo hold antetheca rises to 0.15MPa;
(f) when, bow to the gasbag pressure of bow rises to 0.13MPa, whether boarding ship lifts, if ship is not lifted, regulate the pressure of air bag until ship is lifted, only have in the time that ship entirety is lifted, will spend rapidly pier complete removal, after flower pier has all been torn open, observe whole ship state, if apart from the long colored pier that stays 30m distance of Time Of Launching, treat formally to descend water to remove to ensure safety for first 2 hours;
(g), launching moves: boats and ships are by winch control, and when bow gasbag pressure rises to 0.18-0.20MPa, air bag rolls and makes accommodation move 5-10m, winch walk back, ship starts when mobile on ship workmen and cuts cable ship is free to slide into water.
2. the technique of launching ship with airbags according to claim 1, it is characterized in that: when the dismounting of flower pier will make ship lift after airbag aeration completes, can carry out, flower pier is removed and is all taked manual operation, the method of the dilatory traction of Manila rope in adopting while tearing colored pier open, the coherent building berth Po Qiang both sides that are put into of timber wedge that remove from flower pier, receipts pier is made in order, often tearing a colored pier open all will be smoothly by clean the cleaning of pier bit plane, slag thing transports out of building berth, if find, overlap crator or acute angle ironware necessarily polish flat, anti-damage air bag.
CN201110368392.3A 2011-11-19 2011-11-19 Technology for launching ship with airbags Active CN102424101B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110368392.3A CN102424101B (en) 2011-11-19 2011-11-19 Technology for launching ship with airbags

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110368392.3A CN102424101B (en) 2011-11-19 2011-11-19 Technology for launching ship with airbags

Publications (2)

Publication Number Publication Date
CN102424101A CN102424101A (en) 2012-04-25
CN102424101B true CN102424101B (en) 2014-07-16

Family

ID=45958165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110368392.3A Active CN102424101B (en) 2011-11-19 2011-11-19 Technology for launching ship with airbags

Country Status (1)

Country Link
CN (1) CN102424101B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102849180B (en) * 2012-09-18 2014-12-31 渤海装备辽河重工有限公司 Launching process of jack-up offshore drilling platform by airbag
CN103803036B (en) * 2012-11-14 2016-06-01 中国石油化工股份有限公司 Large ship utilizes the technique of water under air bag
CN103274017B (en) * 2013-03-01 2016-06-01 广西科技大学 Hull Attitute detecting device in water process under a kind of boats and ships air bag
CN111268045A (en) * 2020-02-27 2020-06-12 广船国际有限公司 Method for adjusting ship undocking floating state
CN114802641B (en) * 2022-03-28 2023-05-02 宜昌一凡船舶设计有限公司 Ship land leveling construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01197196A (en) * 1988-02-02 1989-08-08 Mitsubishi Heavy Ind Ltd Launching way recovery method
CN101537875B (en) * 2008-05-05 2012-07-04 中交一航局第二工程有限公司 Process for shipping and launching wharfboat by floating same on vertical quay wall with assistance of airbag
KR100940795B1 (en) * 2008-10-28 2010-02-04 곽대진 Method for launching and transporting heavy weight structures using air bags
CN101857076A (en) * 2010-04-27 2010-10-13 通州海通船舶修造有限公司 Method for launching inland-river chemical carrier through airbag

Also Published As

Publication number Publication date
CN102424101A (en) 2012-04-25

Similar Documents

Publication Publication Date Title
CN102424101B (en) Technology for launching ship with airbags
CN107719580B (en) Horizontal building berth method on 10 10,000 tons ships of one kind
CN101537875B (en) Process for shipping and launching wharfboat by floating same on vertical quay wall with assistance of airbag
CN104002932B (en) Marine fault boats and ships are carried out the ship type of rapid uplift maintenance
CN106167078B (en) A kind of ship and drilling platforms floating aid system and construction method
CN103112553A (en) Self-propelled semi-submersible type maintenance vessel
CN104229099B (en) A kind of ocean engineering ship carries the system and method for lower water
CN101492140A (en) Sling apparatus for aluminum alloy catamaran and whole-boat set afloat process
CN204078021U (en) Marine fault boats and ships are carried out to the new herbicide of rapid uplift maintenance
CN103738477A (en) Method for replacing upper anchor cable of mooring anchor legs
CN103422483A (en) Float-over mounting method for jacket in shallow water
CN111017131A (en) Marine ball leaning system
CN103803036B (en) Large ship utilizes the technique of water under air bag
CN201193095Y (en) Launching arrangement of pontoon at vertical wall by means of floating gasbag
CN105984557B (en) Submarine off-lying sea maintenance vessel and its application method
CN104097750A (en) Multifunctional maintenance ship
CN107856819A (en) Floating shipyard and floating type warship maintenance and method of construction
CN201882241U (en) Lightweight portable floating dock
CN106628041B (en) The anti-sinking of ship, pontoon, operation at sea platform, rollover, back-off system
CN204802046U (en) Anti sinking prevents toppling gasbag device
CN205916302U (en) Boats and ships and drilling platform help superficial system
CN110104133A (en) Pontoon docking Multifunctional floating harbour
JP6681191B2 (en) Floating structure construction method and floating structure of floating structure
CN102963509A (en) Traction method for enabling parallel built ships of 300,000 dry docks to undock
CN211810127U (en) Ship through-lock leaning ball

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 226000 No. 266 Century Avenue, Nantong High-tech Zone, Jiangsu Province

Patentee after: Nantong Northeast Institute of oceanographic engineering Co., Ltd.

Address before: 226000 Yongxing Road, Gangzha District, Nantong, Jiangsu Province, No. 14

Patentee before: Nanjing Best Shipping and Marine Engineering Design Co., Ltd.