CN102367653A - 大跨度连续梁施工支架结构 - Google Patents

大跨度连续梁施工支架结构 Download PDF

Info

Publication number
CN102367653A
CN102367653A CN2011103949715A CN201110394971A CN102367653A CN 102367653 A CN102367653 A CN 102367653A CN 2011103949715 A CN2011103949715 A CN 2011103949715A CN 201110394971 A CN201110394971 A CN 201110394971A CN 102367653 A CN102367653 A CN 102367653A
Authority
CN
China
Prior art keywords
steel pipe
continuous beam
pipe post
highway
span continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103949715A
Other languages
English (en)
Inventor
杨绍德
吴月新
冯群忠
彭文忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN2011103949715A priority Critical patent/CN102367653A/zh
Publication of CN102367653A publication Critical patent/CN102367653A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种大跨度连续梁施工支架结构,跨高速公路段采用钢管支架(钢管支架由钢管立柱(2)和纵横向连接杆系(3)组成)与碗扣式满堂支架(7)相结合的组合结构,下部采用条形基础(1),条形基础(1)上为Φ800mm和Φ600mm的钢管立柱(2),钢管立柱(2)顶为双I40的工字钢制作的承重梁(4),承重梁(4)上为垂直于公路布置的贝雷梁(5),贝雷梁(5)上布置I16的工字钢(6),工字钢(6)上为碗扣式满堂支架(7);公路范围外全部采用碗扣式满堂支架(7)。钢管立柱(2)之间设置纵横向连接杆系(3)。贝雷梁(5)垂直公路布置。本发明支架的循环利用率高,安装与拆除方便,施工快速、成本低。

Description

大跨度连续梁施工支架结构
技术领域
本发明涉及一种大跨度连续梁施工支架结构。
背景技术
目前,铁路施工一般大跨度的连续梁设计均采用挂蓝悬灌的方法进行施工,即使采用支架现浇,也是整孔简支梁支架现浇施工,这样的施工速度慢,往往会影响工期。现在进入快速发展时代,采用大节段支架现浇施工是提高施工速度,缩短施工工期的发展趋势。
发明内容
本发明要解决的技术问题是,提供一种大跨度连续梁施工支架结构,以克服现有技术存在的施工速度慢,往往会影响工期等不足。
本发明解决其技术问题所采用的技术方案是:跨高速公路段采用钢管支架与碗扣式满堂支架相结合的组合结构,下部采用条形基础,条形基础上面为钢管立柱,钢管立柱顶部为双I40的工字钢制作的承重梁,承重梁上面为贝雷梁,贝雷梁上面布置I16的工字钢,工字钢上面为碗扣式满堂支架;公路范围外全部采用碗扣式满堂支架;所述的钢管支架由钢管立柱及纵横向连接杆系组成。
支架顶部采用150×150mm的方木作为箱梁底部分配梁,纵向采用100×100mm的方木作为调平方木,箱梁的底模、侧模、内模方木组合拼装而成。
贝雷梁垂直公路布置,减小斜交跨径。
贝雷梁采用2榀一组在现场预拼装后汽车吊整体吊装,安装速度快,缩短高速公路封道时间。
本发明的有益效果是,根据连续梁的分节段施工顺序搭设支架,支架的循环利用率高,安装与拆除方便、封锁公路时间短,需要的支架材料数量合理,施工快速、成本低。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1 是本本发明的结构示意图;
图2 是图1中的“第二部分”示意图;
图3 是图2中的A—A剖视图;
图4 是本发明的碗扣式满堂支架示意图、主视图;
图5是本发明的碗扣式满堂支架示意图、平面图。
具体实施方式
本发明的实施例:如图1中的“第二部分”及图2所示意,跨高速公路段采用钢管支架与碗扣式满堂支架7相结合的组合结构,下部采用条形基础1,条形基础1上面为钢管立柱2,钢管立柱2顶部为双I40的工字钢制作的承重梁4,承重梁4上面为贝雷梁5,贝雷梁5上面布置I16的工字钢6,工字钢6上面为碗扣式满堂支架7。
如图1中的“第一部分”、“第三部分”及图4、图5所示意,公路范围外全部采用碗扣式满堂支架7。
所述的钢管支架由钢管立柱2及纵横向连接杆系3组成。
钢管立柱2之间设置纵横向连接杆系3。
贝雷梁5垂直公路布置。
贝雷梁5采用2榀一组在现场预拼装后汽车吊整体吊装。
如图1中的“第二部分”及图2所示意,两侧布置的钢管立柱2采用Φ800mm结构,中间布置的钢管立柱2采用Φ600mm结构。
下面介绍施工方法。
1、碗扣式满堂支架施工
如图4、图5所示意,碗扣式满堂支架7由不同规格立杆、横杆、剪刀撑和上下顶托组合而成,采用规格为φ48×3.5mm不同长度立杆组装。纵向、横向排距及竖向步距根据受力计算而定。横向、纵向、竖向设置剪刀撑,将支架连结成一个整体,增加稳定性。每根立杆下垫木板或可调顶托,立杆顶部设置可调支撑,可调支撑的调节高度应不大于20cm,可调支撑上设工字钢6,工字钢6置于可调支撑顶托槽内应固定牢固,其左右不能留有空隙,防止摆动或倾倒。工字钢8采用I16,在工字钢8上纵向铺15×15cm方木9,最后铺设1.8cm厚的高强度竹胶板10作为箱梁底模。
2、钢管支架施工
公路上钢管支架先封闭半幅交通进行搭设,半幅搭设完成后再封闭另外半幅进行搭设。先浇筑条形基础1,预埋连接钢板;安装钢管立柱2,吊装对位后即可对称拧紧螺栓。
依次将钢管立柱2吊装就位后为了保证钢管支架的整体稳定性,在钢管立柱2之间设置纵横向连接杆系3,将各钢管立柱2连接成一整体。从条形基础1起沿钢管立柱2向上每间隔2m设置一道纵横向连接杆系3,纵横向连接杆系3采用[12.6的槽钢焊接而成。
钢管立柱2安装固定好后,在顶面焊接厚度为20mm的钢板,检查各钢管立柱2顶的标高,如果标高不在同一水面上,应用薄钢板进行调整,各支墩顶部标高的高差不大于2mm,承重梁4采取在加工场加工好后整体吊装到位,承重梁4轴线应与钢管立柱2轴线重合,承重梁4采用2根I40c工字钢并焊而成。在承重梁4形成的箱梁腹板宽度范围内的每根钢管立柱2顶用10mm钢板加焊在工字钢I40c两侧槽内,形成加强肋。
贝雷梁5在安装成整体前,为防止贝雷梁5倾倒,应采取临时防倾倒措施,待贝雷梁连接成整体后即可拆除临时固定连接。贝雷梁5吊装安设固定好后即进行工字钢6(分配横梁)安装,在安装工字钢6(分配横梁)时应在贝雷梁上标示出工字钢6(分配横梁)位置(连续梁支架搭设结构图详见附图)。工字钢6(分配横梁),在立杆空隙处用直径为20mm的钢筋将工字钢焊接成整体。
工字钢6以上是碗扣式满堂支架7。

Claims (5)

1.一种大跨度连续梁施工支架结构,其特征是:跨高速公路段采用钢管支架与碗扣式满堂支架(7)相结合的组合结构,下部采用条形基础(1),条形基础(1)上面为钢管立柱(2),钢管立柱(2)顶部为双I40的工字钢制作的承重梁(4),承重梁(4)上面为贝雷梁(5),贝雷梁(5)上面布置I16的工字钢(6),工字钢(6)上面为碗扣式满堂支架(7);公路范围外全部采用碗扣式满堂支架(7);所述的钢管支架由钢管立柱(2)及纵横向连接杆系(3)组成。
2.根据权利要求1所述的大跨度连续梁施工支架结构,其特征是:钢管立柱(2)之间设置纵横向连接杆系(3)。
3.根据权利要求1所述的大跨度连续梁施工支架结构,其特征是:贝雷梁(5)垂直于公路布置。
4.根据权利要求1所述的大跨度连续梁施工支架结构,其特征是:贝雷梁(5)采用2榀一组在现场预拼装后汽车吊整体吊装。
5.根据权利要求1所述的大跨度连续梁施工支架结构,其特征是:两侧布置的钢管立柱(2)采用Φ800mm结构,中间布置的钢管立柱(2)采用Φ600mm结构。
CN2011103949715A 2011-12-02 2011-12-02 大跨度连续梁施工支架结构 Pending CN102367653A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103949715A CN102367653A (zh) 2011-12-02 2011-12-02 大跨度连续梁施工支架结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103949715A CN102367653A (zh) 2011-12-02 2011-12-02 大跨度连续梁施工支架结构

Publications (1)

Publication Number Publication Date
CN102367653A true CN102367653A (zh) 2012-03-07

Family

ID=45760241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103949715A Pending CN102367653A (zh) 2011-12-02 2011-12-02 大跨度连续梁施工支架结构

Country Status (1)

Country Link
CN (1) CN102367653A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603878A (zh) * 2015-12-23 2016-05-25 中铁二十四局集团安徽工程有限公司 一种混凝土箱梁高空快速横移方法
CN106480826A (zh) * 2015-11-06 2017-03-08 中铁十二局集团有限公司 单线箱梁墩顶现浇横移施工工法
CN106758839A (zh) * 2016-12-27 2017-05-31 中铁二局集团有限公司 一种墩顶现浇节段施工的支架体系及其安装方法
CN109281256A (zh) * 2018-11-26 2019-01-29 中国铁建大桥工程局集团有限公司 一种预应力混凝土梁现浇施工用超大跨径支架及应用
CN110593110A (zh) * 2019-09-25 2019-12-20 中交二公局第五工程有限公司 适用于曲线和纵横坡的箱梁现浇支架及其施工方法
CN110761190A (zh) * 2019-10-18 2020-02-07 中铁八局集团第六工程有限公司 一种贝雷梁满堂架组合支架的施工方法
CN112696009A (zh) * 2020-12-07 2021-04-23 中铁二局第三工程有限公司 一种适用于建筑工程的盘扣式支架配套托梁平台
CN114000542A (zh) * 2021-12-08 2022-02-01 北京市市政四建设工程有限责任公司 一种钢管柱与贝雷梁组合支撑结构及支撑方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649604A (zh) * 2009-08-28 2010-02-17 中铁八局集团第一工程有限公司 一种斜拉桥1#块施工支架及其搭建方法
CN201521115U (zh) * 2009-04-15 2010-07-07 中铁二十二局哈尔滨铁路建设集团有限责任公司 一种梁柱式支架
CN101824800A (zh) * 2010-04-28 2010-09-08 中铁三局集团有限公司 一种桥位现浇预应力混凝土连续梁的施工方法
CN101935986A (zh) * 2010-10-09 2011-01-05 中铁八局集团第一工程有限公司 一种水上大跨度钢管桩现浇支架及其搭建方法
CN201722614U (zh) * 2010-05-26 2011-01-26 中铁一局集团有限公司 军用梁支架与碗扣式脚手架相组合的桥梁梁部施工支架
CN202482766U (zh) * 2011-12-02 2012-10-10 中铁五局(集团)有限公司 大跨度连续梁施工支架结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201521115U (zh) * 2009-04-15 2010-07-07 中铁二十二局哈尔滨铁路建设集团有限责任公司 一种梁柱式支架
CN101649604A (zh) * 2009-08-28 2010-02-17 中铁八局集团第一工程有限公司 一种斜拉桥1#块施工支架及其搭建方法
CN101824800A (zh) * 2010-04-28 2010-09-08 中铁三局集团有限公司 一种桥位现浇预应力混凝土连续梁的施工方法
CN201722614U (zh) * 2010-05-26 2011-01-26 中铁一局集团有限公司 军用梁支架与碗扣式脚手架相组合的桥梁梁部施工支架
CN101935986A (zh) * 2010-10-09 2011-01-05 中铁八局集团第一工程有限公司 一种水上大跨度钢管桩现浇支架及其搭建方法
CN202482766U (zh) * 2011-12-02 2012-10-10 中铁五局(集团)有限公司 大跨度连续梁施工支架结构

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480826A (zh) * 2015-11-06 2017-03-08 中铁十二局集团有限公司 单线箱梁墩顶现浇横移施工工法
CN105603878A (zh) * 2015-12-23 2016-05-25 中铁二十四局集团安徽工程有限公司 一种混凝土箱梁高空快速横移方法
CN106758839A (zh) * 2016-12-27 2017-05-31 中铁二局集团有限公司 一种墩顶现浇节段施工的支架体系及其安装方法
CN109281256A (zh) * 2018-11-26 2019-01-29 中国铁建大桥工程局集团有限公司 一种预应力混凝土梁现浇施工用超大跨径支架及应用
CN110593110A (zh) * 2019-09-25 2019-12-20 中交二公局第五工程有限公司 适用于曲线和纵横坡的箱梁现浇支架及其施工方法
CN110761190A (zh) * 2019-10-18 2020-02-07 中铁八局集团第六工程有限公司 一种贝雷梁满堂架组合支架的施工方法
CN110761190B (zh) * 2019-10-18 2021-10-01 中铁八局集团昆明铁路建设有限公司 一种贝雷梁满堂架组合支架的施工方法
CN112696009A (zh) * 2020-12-07 2021-04-23 中铁二局第三工程有限公司 一种适用于建筑工程的盘扣式支架配套托梁平台
CN114000542A (zh) * 2021-12-08 2022-02-01 北京市市政四建设工程有限责任公司 一种钢管柱与贝雷梁组合支撑结构及支撑方法

Similar Documents

Publication Publication Date Title
CN102367653A (zh) 大跨度连续梁施工支架结构
CN202954299U (zh) 用于连续刚构桥的大角度v型墩及0#块模板的支撑结构
CN208917702U (zh) 鱼腹式混凝土箱梁现浇施工模板支撑架
CN110593114A (zh) 基于大跨度箱梁多抱箍桁架支撑贝雷支架的箱梁施工方法
CN107905124A (zh) 一种对称式刚构连续梁施工工艺
CN104831639A (zh) 一种超宽变截面连续梁0#块固结及解除施工方法
CN202482766U (zh) 大跨度连续梁施工支架结构
CN210134353U (zh) 一种用于盖梁施工的牛腿式抱箍托架
CN112681160B (zh) 钢筋混凝土拱涵增大截面加固结构及施工方法
CN212895944U (zh) 基于主梁为贝雷梁的跨线斜交现浇施工装置
CN102080383B (zh) 悬空式预埋件、预留孔洞模板固定方法
CN204780635U (zh) 一种超宽变截面连续梁0#块固结及解除施工结构
CN211815595U (zh) 用于索塔的下塔柱拉压结构
CN204212058U (zh) 用于钢砼组合桁架梁施工中的钢桁梁拼装支架
CN202164551U (zh) 一种悬浇拱桥的挂篮
CN215164738U (zh) 一种系杆拱式快拼支架
CN104278640B (zh) 用于钢砼组合桁架梁施工中的钢桁梁拼装支架
CN212533734U (zh) 缆扣一体化塔架
CN210712576U (zh) 现浇大跨度箱梁多抱箍桁架支撑贝雷支架
CN211228134U (zh) 一种大悬臂预应力盖梁支架装置
CN202214674U (zh) 跨座式轨道交通工程支座锚箱安装调节装置
CN202064288U (zh) 单柱盖梁抱箍与三角支架组合施工支撑装置
CN210917010U (zh) 带有抛物线拱形塔帽的空间混合索网悬索桥的筒中筒桥塔
CN207714150U (zh) 附着式高空装配支架
CN219059775U (zh) 一种用于盖梁施工的支撑体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120307