Nothing Special   »   [go: up one dir, main page]

CN102230313A - Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof - Google Patents

Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof Download PDF

Info

Publication number
CN102230313A
CN102230313A CN 201110060626 CN201110060626A CN102230313A CN 102230313 A CN102230313 A CN 102230313A CN 201110060626 CN201110060626 CN 201110060626 CN 201110060626 A CN201110060626 A CN 201110060626A CN 102230313 A CN102230313 A CN 102230313A
Authority
CN
China
Prior art keywords
chain block
platform
pier
base
promotes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110060626
Other languages
Chinese (zh)
Other versions
CN102230313B (en
Inventor
张廷坤
税明东
王生
方雨田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN 201110060626 priority Critical patent/CN102230313B/en
Publication of CN102230313A publication Critical patent/CN102230313A/en
Application granted granted Critical
Publication of CN102230313B publication Critical patent/CN102230313B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a freeway bridge thin-wall hollow-pier chain block hoisting operation platform and a construction method thereof. The chain block hoisting operation platform (1) comprises a base (1-4), an upper-frame (1-1), a middle support (1-2) and a platform chain block (1-3), wherein the base (1-4) is connected with the middle support (1-2), and the middle support (1-2) is connected with the upper-frame (1-1); a VC (polyvinyl chloride) pipe (9) is arranged at the position which is 10cm below the top of a first formwork section (2) and 10cm below the top of a second formwork section (3) is provided with a PVC (polyvinyl chloride) pipe (9); steel bars are arranged in the PVC pipe; the upper surface of the chain block (1-3) is fixed on the steel bars in the PVC pipe, and the lower surface of the chain block (1-3) is connected with the base (1-4) through wire cables; and in the pier shaft (7) construction process, the PVC pipe is preburied in the pier shaft so as to reserve a plug hole for the supporting steel bars. The support operation platform system and the pier shaft formwork are separated, so that the operation efficiency and degree of safety are enhanced, and the invention is economical and reasonable.

Description

Bridge thin-walled hollow pier Chain block promotes job platform and job practices thereof
Technical field
The present invention relates to a kind of bridge on highway hollow pier Chain block and promote job platform and job practices thereof.
Background technology
Socioeconomic fast development impels high-grade highway, railway construction progressively to strengthen in the input scale of mountain terrain.Cross over locations such as deep valley at bridge, the high pier construction is inevitable.Existing high pier construction technology is divided from its method, and 3 classes are arranged: a kind of is climbing formwork for construction; A kind of is slding form operation; A kind of is over-form construction.In these three kinds of high pier constructions, creeping formwork, slding form operation all need bigger deadweight and operate control to require height, in present high pier construction, no longer are main stream approach therefore.And before turn over method constructing and overhanging model, be to create job platform, be to adopt welding support on template substantially, the guardrail of setting up defences around, the welding of template and support is connected as a single entity in this method, promotes that operation is quite inconvenient, efficient is low and degree of safety is not high.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of bridge thin-walled hollow pier Chain block to promote job platform and job practices thereof, to overcome the low and not high deficiency of degree of safety of operation inconvenience, efficient that prior art exists.
The technical solution adopted for the present invention to solve the technical problems is: the hollow high pier Chain block of a cover bridge is installed outside pier shaft is promoted job platform, this job platform is made up of base, upper frame, intermediate support and platform Chain block.Promoting on the job platform, carrying out the over-form construction of Bridge High-pier, promptly finishing the process of assembling reinforcement in the Bridge High-pier construction, formwork erection, concreting, the demoulding.Convenient in order to turn over modulo operation, reserve a determining deviation between intermediate support and the template, promote job platform both as template is installed and concrete is built operating platform, temporary fixed skeleton when can be used as reinforcement installation again, but also the fully-enclosed safe protector during as pier construction promotes power that job platform provides by Chain block and integral elevating.
Concrete structure of the present invention is as follows: it comprises base, upper frame, intermediate support and platform Chain block; Base connects intermediate support, and intermediate support connects upper frame; At 10cm place under the first segment template top, pvc pipe is placed at 10cm place under the second joint template top, is provided with reinforcing bar in pvc pipe, be consolidated in above the Chain block on the reinforcing bar in the pvc pipe, below by wire rope connection base; Base comprises base inner frame, chassis outer side framework, is provided with the steel pipe hole seat of band latch above the i iron of chassis outer side framework; Be provided with the steel pipe hole seat of band latch above the outside i iron of upper frame.
The seat inner frame encircle pier shaft, with the pier shaft clear distance be 5cm.
Base adopts i iron to make, and i iron adopts No. 18.
Upper frame is done with the I-shaped steel, and i iron adopts No. 10.
Job practices of the present invention is as follows: it comprises following steps: the first, and Chain block promotes the job platform on-site consolidation; The second, Chain block promotes that job platform is in place, formwork erection, pour into, turn over mould; The 3rd, Chain block promotes job platform and removes.
Hollow pier Chain block of the present invention promotes job platform and constructs that not only speed of application is fast, labour intensity is low, and mounting system separates with template system, has improved safety, and is practical, also is better than additive method on cost.
Description of drawings
Fig. 1 promotes job platform schematic diagram, elevation for Chain block of the present invention;
Fig. 2 is I-I sectional view of Fig. 1.
The specific embodiment
Embodiments of the invention: Chain block promotes the job platform structure and is described as follows: Chain block promotes job platform 1 and partly is made up of base 1-4, upper frame 1-1, intermediate support 1-2 and platform Chain block 1-3.
Base 1-4 comprises base inner frame 1-4-1, chassis outer side framework 1-4-2, is provided with the steel pipe hole seat 1-4-3 of band latch above the i iron of chassis outer side framework 1-4-2; Be provided with the steel pipe hole seat of band latch above the outside i iron of upper frame 1-1.
Base inner frame 1-4-1 encircles pier shaft 7, with pier shaft 7 clear distances be 5cm.The steel pipe hole seat 1-4-3 of the band latch that the i iron of chassis outer side framework 1-4-2 welds above is in order to fixed bearing top intermediate support 1-2, i.e. connection system for guide rail.
Base 1-4 i iron adopts No. 18.
Moving up of this platform 1 is by hanging above the platform Chain block 1-3 in being consolidated on the reinforcing bar that penetrates pre-buried pvc pipe 9 on the pier shaft, realizing below by wire rope connection base 1-4.
Upper frame 1-1 is identical with the form of base 1-4, all is welded with the i iron assembly unit, and just the i iron model is less than base.Base 1-4 i iron 1-4-1 adopts No. 18, and the upper frame i iron adopts and can satisfy instructions for use No. 10.
Upper frame 1-1 outside i iron and base 1-4 consistent size, otherwise intermediate support is difficult to install.
Intermediate support 1-2 connects base 1-4 and upper frame 1-1, adopt big, the lightweight steel pipe of rigidity to make connection system for guide rail, promptly use φ 48mm, the fastener type steel pipe of wall thickness 3.0mm supports, like this, base 1-4, upper frame 1-1 and intermediate support 1-2 have just formed the frame space of a sealing.The framework outside and base are divided into anti-fall safety net, for the constructor provides a monolithic, totally enclosed construction operation space.
The platform Chain block 1-3 that this platform 1 promotes by 4 5t provides power, and 4 platform Chain block 1-3 are symmetrically distributed in the pier shaft both sides.
Platform Chain block 1-3 lower end links on the i iron of base 1-4 inboard, the upper end be cemented in pier shaft 7 steel bars in concrete and link to each other.Reinforcing bar position: 10cm place at 10cm place under first segment template 2 tops, under the second joint template, 3 tops.During pier shaft 7 constructions, pre-buried pvc pipe 9 is reserved jack for the supporting reinforcing bar in pier shaft 7, and bar gauge is determined by calculating, is generally Φ 25 and gets final product.Fig. 2 is seen in the plan-position of supporting reinforcing bar preformed hole.
Chain block promotes job platform 1 general structure and sees Fig. 1.
The overall height of this platform 1 is determined according to actual conditions, to satisfy the constructing operation requirement.
Bridge thin-walled hollow pier Chain block promotes the job platform job practices and may further comprise the steps:
The first, Chain block promotes job platform 1 on-site consolidation.
, behind certain altitude, begin to install Chain block and promote job platform 1 in Bridge Pier Construction.Consider that these platform 1 overall dimensions are bigger, whole transhipment or lifting inconvenience, therefore, this platform 1 base 1-4 and the directly assembly unit on cushion cap 8 of intermediate support 1-2 connection system for guide rail.
The concrete assembly unit process that promotes job platform at assembly unit Chain block on the cushion cap 8 is as follows: at first use auxiliary operating desk of steel leveling, this platform of assembly unit 1 base 1-4 on operating desk then on cushion cap 8.Every side is installed the main support crossbeam of 2 i iron as intermediate support 1-2 on base 1-4, and intermediate support 1-2 is made up of connection system for guide rail, adopts welding and then layering assembly unit connection system for guide rail between the i iron of base 1-4.Base 1-4 comprises base inner frame 1-4-1, chassis outer side framework 1-4-2, base inner frame 1-4-1 encircles pier shaft, with the pier shaft clear distance be 5cm, be welded with the steel pipe hole seat 1-4-3 of band latch above the i iron of chassis outer side framework 1-4-2, in order to fixed bearing top intermediate support 1-2, i.e. connection system for guide rail.Base 1-4 i iron adopts No. 18.Upper frame 1-1 adopts No. 10 i iron to be welded, the equally also corresponding steel pipe hole seat that is welded with the band latch above the outside i iron of upper frame 1-1.Upper frame 1-1 outside i iron and base 1-4 consistent size, otherwise intermediate support is difficult to install.Inboard i iron planar dimension refers to one-sided than the big 20cm(of pier shaft sectional dimension) about, to satisfy the needs of climbing shuttering.
The second, platform is 1 in place, formwork erection, pour into, turn over mould.
Undertaken by following order, the platform 1 that assembly unit is good is in place, and fixes with cushion cap 8; Elder generation's assembling reinforcement 4, upright again pier shaft external mold, the promptly upright first segment template 2 and the second joint template 3 are used interim constraint 6 fixedly the first segment template 2 and the second joint template 3; Lay pvc pipe 9, promptly 10cm place under first segment template 2 tops saves placement pvc pipe 9 in 10cm place under template 3 tops second.During pier shaft 7 constructions, pre-buried pvc pipe 9 is reserved jack for the supporting reinforcing bar in pier shaft 7, and bar gauge is determined by calculating, is generally Φ 25 and gets final product.Fig. 2 is seen in the plan-position of supporting reinforcing bar preformed hole.Because pier shaft is hollow high pier, so also will found internal mold.Concrete perfusion, assembling reinforcement 4(reinforcing bar is one section one section colligation, assembling reinforcement herein 4 is to prepare for concrete perfusion next time), solidify back first segment template 2 demouldings Deng concrete perfusion, with external mold electric block 5 first segment template 2 is hung up, upright first segment template 2 on the second joint template 3 is used fixedly first segment template 2 of interim constraint 6, promptly finishes and turns over mould.Upright internal mold, pvc pipe 9 is placed at the 10cm place under first segment template 2 tops; Concrete perfusion.Before platform 1 promoted, at first the reinforcing bar that penetrates at place, pre-buried pvc pipe 9 holes hung 5t platform Chain block 1-3 upper end on this reinforcing bar, and the lower end links the place, permanent position on base 1-4, and symmetry is unclamped following wire rope then.At this moment, under special messenger's commander,, slowly promote, keep synchronously, platform 1 is in lifting process steadily and safe condition all the time by four operators while operating platform Chain block 1-3.Platform 1 suitably slows down the rate of climb near both allocations the time, after platform 1 rising puts in place, regulate platform 1, make and be in level, Lift-on/Lift-off System is installed then, is put down platform 1 gently, it is hung reposefully on embedded bar, filling hardwood piece keeps the steady and safety of platform 1 in work progress with center rest between platform 1 base 1-4 i iron and pier shaft 7 then.Enter next circulation.
The 3rd, platform 1 is removed.
Pier construction is finished, and platform 1 is from top to bottom successively removed, and by tower crane respective members is hung to ground.
Chain block promotes the job platform advantage:
1) platform 1 separates with template system, has improved efficiency of construction and degree of safety.
2) utilize self system improving template, reduce the time that takies tower crane, accelerated construction speed.
3) simple to operate, just hold and apply with support.
4) the totally closed operation space has guaranteed construction safety.

Claims (9)

1. a bridge thin-walled hollow pier Chain block promotes job platform, and it is characterized in that: it comprises base (1-4), upper frame (1-1), intermediate support (1-2) and platform Chain block (1-3); Base (1-4) connects intermediate support (1-2), and intermediate support (1-2) connects upper frame (1-1); The 10cm place placement pvc pipe (9) at 10cm place under first segment template (2) top, under second joint template (3) top, in pvc pipe (9), be provided with reinforcing bar, be consolidated in above the Chain block (1-3) on the reinforcing bar in the pvc pipe (9), connect base (1-4) below by wire rope; Base (1-4) comprises base inner frame (1-4-1), chassis outer side framework (1-4-2), is provided with the steel pipe hole seat (1-4-3) of band latch above the i iron of chassis outer side framework (1-4-2); Be provided with the steel pipe hole seat of band latch above the outside i iron of upper frame (1-1).
2. bridge thin-walled hollow pier Chain block according to claim 1 promotes job platform, and it is characterized in that: base inner frame (1-4-1) is encircled pier shaft (7), with pier shaft (7) clear distance be 5cm.
3. bridge thin-walled hollow pier Chain block according to claim 1 promotes job platform, it is characterized in that: base (1-4) adopts i iron to make, and i iron adopts No. 18.
4. bridge thin-walled hollow pier Chain block according to claim 1 promotes job platform, it is characterized in that: upper frame (1-1) is done with the I-shaped steel, and i iron adopts No. 10.
5. one kind promotes the job practices of job platform as the described bridge thin-walled hollow of the arbitrary claim of claim 1~4 pier Chain block, and it is characterized in that: it comprises following steps: the first, and Chain block promotes the job platform on-site consolidation; The second, Chain block promotes that job platform is in place, formwork erection, pour into, turn over mould; The 3rd, Chain block promotes job platform and removes.
6. bridge thin-walled hollow pier Chain block according to claim 5 promotes the job platform job practices, it is characterized in that: in first step,, begin to install Chain block and promote job platform behind certain altitude in Bridge Pier Construction; Consider that these platform overall dimensions are bigger, whole transhipment or lifting inconvenience are directly gone up assembly unit at cushion cap (8) with base (1-4), intermediate support (1-2) and upper frame (1-1).
7. bridge thin-walled hollow pier Chain block according to claim 6 promotes the job platform job practices, it is characterized in that: the concrete assembly unit process that goes up assembly unit Chain block lifting job platform at cushion cap (8) is as follows:
At first go up with auxiliary operating desk of steel leveling at cushion cap (8), the base (1-4) of this platform 1 of assembly unit on operating desk then, go up every side at base (1-4) the main support crossbeam of 2 i iron as intermediate support (1-2) is installed, intermediate support (1-2) is made up of connection system for guide rail, adopt welding between the i iron of base inner frame (1-4-1), chassis outer side framework (1-4-2), and then layering assembly unit connection system for guide rail; Base inner frame (1-4-1) is encircled pier shaft (7), with the pier shaft clear distance be 5cm, being welded with the steel pipe hole seat (1-4-3) of band latch above the i iron of chassis outer side framework (1-4-2), is connection system for guide rail in order to fixed bearing top intermediate support (1-2); The equally also corresponding steel pipe hole seat that is welded with the band latch above the outside i iron of upper frame (1-1); Upper frame (1-1) outside i iron and base 1-4 consistent size.
8. bridge thin-walled hollow pier Chain block according to claim 5 promotes the job platform job practices, it is characterized in that: in second step, carry out operation by following order, the Chain block that the first step assembly unit is good promotes the accurate back in place of job platform and fixes with cushion cap (8); Elder generation's assembling reinforcement (4), upright again pier shaft external mold, the promptly upright first segment template (2) and the second joint template (3) are used interim constraint (6) fixedly the first segment template (2) and the second joint template (3); Lay pvc pipe (9), promptly at 10cm place under first segment template (2) top, pvc pipe (9) is placed at 10cm place under second joint template (3) top, i.e. during pier shaft (7) construction, pre-buried pvc pipe (9) is a supporting reinforcing bar reservation jack in pier shaft (7); Concrete perfusion, assembling reinforcement (4), concrete perfusion solidifies back first segment template (2) demoulding, with external mold electric block (5) first segment template (2) is hung up, go up upright first segment template (2) in the second joint template (3), with the fixing first segment template (2) of interim constraint (6), promptly finish and turn over mould; Upright internal mold, pvc pipe (9) is placed at the 10cm place under first segment template (2) top; Concrete perfusion; Before Chain block promotes the job platform lifting, the reinforcing bar that penetrates at pre-buried pvc pipe (9) hole place at first, platform Chain block (1-3) upper end is hung on this reinforcing bar, the lower end links on base (1-4), symmetry is unclamped following wire rope then, and is synchronous by operating platform Chain block (1-3) lifting simultaneously of four operators and maintenance; Chain block promotes job platform and suitably slow down the rate of climb near both allocation the time, regulate platform after rising puts in place and be in level, Lift-on/Lift-off System is installed then, put down Chain block gently and promote job platform, it is hung reposefully on embedded bar, filling hardwood piece keeps the steady and safety of platform in work progress with center rest between base inner frame (1-4-1) that Chain block promotes job platform base (1-4) and pier shaft (7) then.
9. bridge thin-walled hollow pier Chain block according to claim 5 promotes the job platform job practices, it is characterized in that: at third step, treat that pier construction finishes, Chain block promotes job platform and from top to bottom successively removes, and by tower crane respective members is hung to ground.
CN 201110060626 2011-03-14 2011-03-14 Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof Active CN102230313B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110060626 CN102230313B (en) 2011-03-14 2011-03-14 Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110060626 CN102230313B (en) 2011-03-14 2011-03-14 Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof

Publications (2)

Publication Number Publication Date
CN102230313A true CN102230313A (en) 2011-11-02
CN102230313B CN102230313B (en) 2012-12-05

Family

ID=44842912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110060626 Active CN102230313B (en) 2011-03-14 2011-03-14 Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN102230313B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561196A (en) * 2012-01-04 2012-07-11 浙江永峰模具制造有限公司 Turnover construction process of high-pier forms
CN104695331A (en) * 2013-12-10 2015-06-10 陈天贵 Construction building hoist
CN104846745A (en) * 2015-03-19 2015-08-19 南通大学 Urban high-pier support-free formwork turnover construction method
CN106567337A (en) * 2016-11-04 2017-04-19 中交路桥华南工程有限公司 Transportation platform of steel truss girders and construction method of transportation platform
CN109944164A (en) * 2019-03-13 2019-06-28 中建市政工程有限公司 Self-elevating hollow thin-wall pier roller die system and construction method thereof
CN110080118A (en) * 2019-06-04 2019-08-02 中交一公局第一工程有限公司 Vertical transport for slding form operation rises system and its construction method certainly
CN111519545A (en) * 2020-05-22 2020-08-11 中交第四航务工程局有限公司 Pier and capping beam integrated construction platform and construction method thereof
CN111705677A (en) * 2020-07-07 2020-09-25 中国十七冶集团有限公司 A smooth frame that rises for high pier stud turns over mould construction
CN112726517A (en) * 2020-10-21 2021-04-30 云南建投第一勘察设计有限公司 Construction method of aqueduct above bridge
CN113882276A (en) * 2021-11-19 2022-01-04 中冶建工集团有限公司 Working platform for erecting bridge pier and construction method thereof
CN113914232A (en) * 2021-11-25 2022-01-11 中铁广州工程局集团桥梁工程有限公司 High main tower inner formwork and scaffold integrated construction system and method
CN113914595A (en) * 2021-11-24 2022-01-11 广西长兴工程建设有限公司 Assembled cylinder mound operation platform
CN114319717A (en) * 2020-09-30 2022-04-12 华中科技大学 Prefabricated assembled steel-concrete composite beam

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06128912A (en) * 1992-10-20 1994-05-10 Mitsui Constr Co Ltd Construction method of reinforced concrete structure and construction device of concrete structure
CN201103104Y (en) * 2007-10-11 2008-08-20 武汉通联路桥机械技术有限公司 Three supporting legs automatically spanning rotation type mobile mould frame bridging machine
CN201506686U (en) * 2009-05-19 2010-06-16 汕头市达濠市政建设有限公司 Span pier gantry
CN201972095U (en) * 2011-03-14 2011-09-14 中铁五局(集团)有限公司 Chain block lifting platform for thin-walled hollow piers of bridges

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06128912A (en) * 1992-10-20 1994-05-10 Mitsui Constr Co Ltd Construction method of reinforced concrete structure and construction device of concrete structure
CN201103104Y (en) * 2007-10-11 2008-08-20 武汉通联路桥机械技术有限公司 Three supporting legs automatically spanning rotation type mobile mould frame bridging machine
CN201506686U (en) * 2009-05-19 2010-06-16 汕头市达濠市政建设有限公司 Span pier gantry
CN201972095U (en) * 2011-03-14 2011-09-14 中铁五局(集团)有限公司 Chain block lifting platform for thin-walled hollow piers of bridges

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20040731 孟海滨 ZF自升平台式模板翻模的施工工艺 第30卷, 第13期 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561196A (en) * 2012-01-04 2012-07-11 浙江永峰模具制造有限公司 Turnover construction process of high-pier forms
CN104695331A (en) * 2013-12-10 2015-06-10 陈天贵 Construction building hoist
CN104846745A (en) * 2015-03-19 2015-08-19 南通大学 Urban high-pier support-free formwork turnover construction method
CN106567337A (en) * 2016-11-04 2017-04-19 中交路桥华南工程有限公司 Transportation platform of steel truss girders and construction method of transportation platform
CN109944164A (en) * 2019-03-13 2019-06-28 中建市政工程有限公司 Self-elevating hollow thin-wall pier roller die system and construction method thereof
CN110080118A (en) * 2019-06-04 2019-08-02 中交一公局第一工程有限公司 Vertical transport for slding form operation rises system and its construction method certainly
CN111519545A (en) * 2020-05-22 2020-08-11 中交第四航务工程局有限公司 Pier and capping beam integrated construction platform and construction method thereof
CN111705677A (en) * 2020-07-07 2020-09-25 中国十七冶集团有限公司 A smooth frame that rises for high pier stud turns over mould construction
CN114319717A (en) * 2020-09-30 2022-04-12 华中科技大学 Prefabricated assembled steel-concrete composite beam
CN112726517A (en) * 2020-10-21 2021-04-30 云南建投第一勘察设计有限公司 Construction method of aqueduct above bridge
CN113882276A (en) * 2021-11-19 2022-01-04 中冶建工集团有限公司 Working platform for erecting bridge pier and construction method thereof
CN113914595A (en) * 2021-11-24 2022-01-11 广西长兴工程建设有限公司 Assembled cylinder mound operation platform
CN113914232A (en) * 2021-11-25 2022-01-11 中铁广州工程局集团桥梁工程有限公司 High main tower inner formwork and scaffold integrated construction system and method

Also Published As

Publication number Publication date
CN102230313B (en) 2012-12-05

Similar Documents

Publication Publication Date Title
CN102230313B (en) Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof
CN202359506U (en) Double hoop supporting system for pier column capping beam
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN101892742B (en) High low building-cross deformation joint low section shear wall construction method
CN103452039B (en) Cast-in-situs type Inverted T beam and bridge pier and Bridge Pier Construction technique thereof
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN106592826A (en) Construction method for cylindrical frame supporting type hydraulic-climbing integral steel platform formwork shear steel plate layer
CN205676844U (en) A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN102605717A (en) Pier-top longitudinal support scaffolding method
CN113235913A (en) Construction equipment and method for hanging, splicing and lifting building vertical template
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN109162437A (en) Integral steel platform and its construction method for more steel plate shear force walls
CN102720360B (en) Combination device of secondary high building supported lifted and poured cement formwork and building material lifting and lifting box
CN207512610U (en) A kind of assembled bridge pier construction operation platform
CN106948267B (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN212452263U (en) Pier stud reinforcing bar construction tower cage and construction structure
CN206956979U (en) A kind of Linear shear wall with fore-set
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN215717173U (en) Construction equipment for hanging, splicing and lifting vertical templates of building
CN209799320U (en) Integral steel platform for multi-cylinder steel plate shear wall
CN212358013U (en) Cable tower operation platform template separation lift system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant