Nothing Special   »   [go: up one dir, main page]

CN101745630A - Method for pouring cast part - Google Patents

Method for pouring cast part Download PDF

Info

Publication number
CN101745630A
CN101745630A CN200810229935A CN200810229935A CN101745630A CN 101745630 A CN101745630 A CN 101745630A CN 200810229935 A CN200810229935 A CN 200810229935A CN 200810229935 A CN200810229935 A CN 200810229935A CN 101745630 A CN101745630 A CN 101745630A
Authority
CN
China
Prior art keywords
sliding plate
molten steel
pouring
lower skateboard
porous plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810229935A
Other languages
Chinese (zh)
Inventor
张世平
李恩林
李忠森
马锦明
李建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Heavy Machinery Co Ltd
Original Assignee
Angang Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Heavy Machinery Co Ltd filed Critical Angang Heavy Machinery Co Ltd
Priority to CN200810229935A priority Critical patent/CN101745630A/en
Publication of CN101745630A publication Critical patent/CN101745630A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The invention relates to a method for pouring a cast part, which comprises the steps of firstly carrying out drainage before pouring molten steel, and leading drainage sand to flow down but not enter into the molten steel; then closing a lower sliding plate, blowing argon through a ventilation plug arranged on the lower sliding plate, and leading the molten steel on a water port to be in the flowing state, and realizing the purification of the molten steel; and not blowing the argon when opening the lower sliding plate for pouring. The position of the ventilation plug on the lower sliding plate is as follows: a water supply inlet corresponds to the position of the lower sliding plate when the lower sliding plate is in the closing state, and the position is just the central position of the ventilation plug. The ventilation plug is connected with a gas guide tube, and the argon is introduced through the gas guide tube. Compared with the prior art, the method has the benefits that the method can effectively solve a ventilation sliding plate for the problem of solidification of the molten steel at the water port when the sliding plate is closed, and the method can realize the control of the pouring speed at the later stage of pouring by mounting the ventilation plug on the sliding plate and introducing the argon through the ventilation plug when the sliding plate is closed, thereby greatly improving the quality of a product.

Description

A kind of method of pouring cast part
Technical field
The present invention relates to a kind of method of metallurgy industry pouring cast part.
Background technology
In the prior art, all adopt the handgrip jar early stage when pouring into a mould steel-casting, though can control poring rate, but serious restriction is received in the fluctuation of liquid steel temperature and molten steel amount, particularly multiple tank closes the large-scale steel-casting that waters and can not produce, the promoting the use of on fining pot along with slide mechanism and ventilative commentaries on classics, the cast of large steel ingot and big foundry goods obtains fine solution, but the even control of liquid steel temperature and later stage point are annotated, requiring slide plate repeatedly to open waters and can't control, in case arrhea then the mouth of a river goes out molten steel just solidifies, require to open once more to water and cut eye after often needing to close, slide plate often occurs and open or not, do not close the slide plate bleed-out accident that causes, all constitute a serious threat for production and quality, be difficult to guarantee cast smoothly for one jar of a plurality of living-article of cast or polydisc steel ingot, casting quality is difficult to guarantee.Therefore, how to improve sled mechanism, improve slide plate switch number of times and improve, improving casting quality is a great problem.
Summary of the invention
The method of the pouring cast part of the problem of place, mouth of a river molten steel solidification when the purpose of this invention is to provide a kind of effective solution slide plate and closing, by porous plug is installed on slide plate, the logical argon gas of porous plug when slide plate is closed has been realized cast later stage control poring rate, has improved product quality greatly.
The present invention is achieved through the following technical solutions:
A kind of method of pouring cast part is characterized in that, this method may further comprise the steps:
1) before pouring molten steel, carries out drainage earlier, make under the drainage sand flow not enter in the molten steel;
2) close lower skateboard then,, make that molten steel is in flow regime above the mouth of a river, and realize purification molten steel by the porous plug blowing argon gas that is provided with on the lower skateboard;
When 3) the unlatching lower skateboard was poured into a mould, porous plug is blowing argon gas not.
Porous plug position on the described lower skateboard is: when lower skateboard was in closed condition, the position of the corresponding lower skateboard of filling pipe end promptly was the center of porous plug.
Described porous plug is connected with wireway, feeds argon gas by wireway.
Compared with prior art, the invention has the beneficial effects as follows:
Efficiently solve the ventilative slide plate of slide plate problem of place, mouth of a river molten steel solidification when closing, by porous plug is installed on slide plate, the logical argon gas of porous plug when slide plate is closed has been realized cast later stage control poring rate, has improved product quality greatly.
Description of drawings
Fig. 1 is the structural representation that the present invention adopts device.
Among the figure: the mouth of a river under the 1-pocket block 2-filling pipe end 3-upper slide 4-lower skateboard 5-porous plug 6-
The 7-wireway
The specific embodiment
See Fig. 1, a kind of ventilative slide plate comprises upper slide 3, lower skateboard 4, on lower skateboard 4, be provided with the porous plug 5 that is used for being blown into argon gas, when lower skateboard 4 is in closed condition, feed argon gas to porous plug 5 by wireway 7, make molten steel be in flow regime, promptly reached the noncondensing purpose of molten steel.
Porous plug position on the lower skateboard is: when lower skateboard was in closed condition, the position of the corresponding lower skateboard of filling pipe end promptly was the center of porous plug.
Adopt the method for above-mentioned ventilative slide plate pouring cast part, this method may further comprise the steps:
1) before pouring molten steel, carries out drainage earlier, make under the drainage sand flow not enter in the molten steel;
2) close lower skateboard then, by the porous plug blowing argon gas that is provided with on the lower skateboard, make that molten steel is in flow regime above the mouth of a river, and realize purification molten steel, even composition and temperature, cleaning molten steel make in the slag blanket of field trash attached to the molten steel top of argon gas bubbles come-up of molten steel molten steel inside.
When 3) the unlatching lower skateboard was poured into a mould, porous plug is blowing argon gas not.

Claims (3)

1. the method for a pouring cast part is characterized in that, this method may further comprise the steps:
1) before pouring molten steel, carries out drainage earlier, make under the drainage sand flow not enter in the molten steel;
2) close lower skateboard then,, make that molten steel is in flow regime above the mouth of a river, and realize purification molten steel by the porous plug blowing argon gas that is provided with on the lower skateboard;
When 3) the unlatching lower skateboard was poured into a mould, porous plug is blowing argon gas not.
2. the method for a kind of pouring cast part according to claim 1 is characterized in that, the porous plug position on the described lower skateboard is: when lower skateboard was in closed condition, the position of the corresponding lower skateboard of filling pipe end promptly was the center of porous plug.
3. the method for a kind of pouring cast part according to claim 1 and 2 is characterized in that, described porous plug is connected with wireway, feeds argon gas by wireway.
CN200810229935A 2008-12-19 2008-12-19 Method for pouring cast part Pending CN101745630A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810229935A CN101745630A (en) 2008-12-19 2008-12-19 Method for pouring cast part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810229935A CN101745630A (en) 2008-12-19 2008-12-19 Method for pouring cast part

Publications (1)

Publication Number Publication Date
CN101745630A true CN101745630A (en) 2010-06-23

Family

ID=42473608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810229935A Pending CN101745630A (en) 2008-12-19 2008-12-19 Method for pouring cast part

Country Status (1)

Country Link
CN (1) CN101745630A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101954477A (en) * 2010-11-09 2011-01-26 广东省韶铸集团有限公司 Method for improving pouring port alignment accuracy of bottom pouring boiler
CN102218527A (en) * 2011-05-12 2011-10-19 山西太钢不锈钢股份有限公司 Method for discharging ladle drainage sand
CN102784908A (en) * 2012-08-30 2012-11-21 南京钢铁集团冶金铸造有限公司 Non-drainage pouring technology for steel ladle
CN113365759A (en) * 2019-01-30 2021-09-07 杰富意钢铁株式会社 Method for controlling sliding gate nozzle device and method for manufacturing cast piece

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101954477A (en) * 2010-11-09 2011-01-26 广东省韶铸集团有限公司 Method for improving pouring port alignment accuracy of bottom pouring boiler
CN102218527A (en) * 2011-05-12 2011-10-19 山西太钢不锈钢股份有限公司 Method for discharging ladle drainage sand
CN102784908A (en) * 2012-08-30 2012-11-21 南京钢铁集团冶金铸造有限公司 Non-drainage pouring technology for steel ladle
CN113365759A (en) * 2019-01-30 2021-09-07 杰富意钢铁株式会社 Method for controlling sliding gate nozzle device and method for manufacturing cast piece

Similar Documents

Publication Publication Date Title
CN104249149B (en) A kind of channel-type sensing heating tundish and its casting method
CN107803467B (en) A kind of running gate system of large size valve casing class steel-casting
CN101745630A (en) Method for pouring cast part
CN108247033A (en) A kind of continuous casting production eddy flow filling pipe end
CN202555815U (en) Ladle sliding nozzle mechanism
CN204912747U (en) Crystallizer vortex immersion nozzle
CN201067795Y (en) Vacuum induction smelting steel ingot casting component
CN106493347B (en) Continuous casting tundish quick-change nozzle and the method with its dross inclusion adsorption
CN102319885A (en) Continuous casting method and device for double-nozzle cast ultra-thick plate blank
CN201333523Y (en) Ventilating slide plate
CN202037335U (en) Steel ladle sliding mechanism
CN204724813U (en) For the accident pendulum groove of continuous casting tundish
CN102764867B (en) Straight-through submerged nozzle with stirring effect
CN203030854U (en) Non-linear liquid steel flowing channel
CN213856964U (en) Argon blowing stream inoculation device for large nodular cast iron cylinder
CN103128238A (en) Method utilizing slab crystallizer to continuously pour square billets
CN2618706Y (en) Rotary crystallizer submersed nozzle
CN203917905U (en) A kind of continuous casting tundish and crystallizer molten steel flow control apparatus
CN202963436U (en) Double-vacuum cast steel ingot middle ladle
CN201728343U (en) Submerged nozzle blockage structure of intermediate tank
CN112404369A (en) Argon blowing stream inoculation device and method for large nodular cast iron cylinder
CN2805981Y (en) Apparatus for ejecting drainage sand for continuous casting large ladle gating
CN101987356A (en) Transition casting ladle for casting pouring
CN2609688Y (en) Continuous casting tundish water gap
CN205702418U (en) A kind of slag discrete group mould assembly funnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100623