CN101649604A - Construction bracket of 1# block of inclined pull bridge and constructing method thereof - Google Patents
Construction bracket of 1# block of inclined pull bridge and constructing method thereof Download PDFInfo
- Publication number
- CN101649604A CN101649604A CN200910104720A CN200910104720A CN101649604A CN 101649604 A CN101649604 A CN 101649604A CN 200910104720 A CN200910104720 A CN 200910104720A CN 200910104720 A CN200910104720 A CN 200910104720A CN 101649604 A CN101649604 A CN 101649604A
- Authority
- CN
- China
- Prior art keywords
- distribution beam
- anchor
- block
- bei leiliang
- wedge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a construction bracket of a 1# block of an inclined pull bridge, comprising Bailey beams, I-shaped steel distribution beams and WJD bowl buckles, wherein the Bailey beams areconnected on a lower pylon, the I-shaped steel distribution beams are arranged on the two Bailey beams, and the WJD bowl buckles are arranged on the two I-shaped steel distribution beams. The construction bracket is characterized in that one end of the two Bailey beams far away from the lower pylon is respectively provided with a front supporting point distribution beam; one end of four inclined pull ropes and four steel twisted wires is respectively connected with a wedge-shaped block by the front supporting point distribution beams, the other end is anchored on an upper transverse beam, andan anchor point is provided with a lifting jack; and the end of the two Bailey beams, close to the lower pylon, is respectively provided with a back hanging point distribution beam. The invention alsorelates to a method for constructing the construction bracket of the 1# block of the inclined pull bridge. The invention has the following advantages of simple construction, easy operation, good stability of the bracket and low manufacturing cost; under an environmental condition that the bottom surface of a beam body of the inclined pull bridge is a water area or has a farther distance away fromthe ground, the 1# block can be successfully cast in situ, and the quality of concrete can be ensured.
Description
Technical field
Building support and the building method thereof that the present invention relates to are specially a kind of construction bracket of 1 # block of inclined pull bridge and building method thereof.
Background technology
The girder piece of cable stayed bridge king-tower upper end is called the 0# piece, and the girder piece that is connected with 0# piece two ends is called the 1# piece respectively.The construction of cable-stayed bridge main-beam 1# piece, when the 0# piece did not have enough length that Hanging Basket is installed, general solution has two kinds: a kind of was to set up floor stand from ground, set up template again on floor stand, laid reinforcing bar, finished the 1# block concrete and built.The available condition of the method is: require the ground of 1# piece correspondence to need more than water level, and ground and beam height difference are little.But the method timbering material consumption is surprising, has increased project cost.Another kind method is the pre-buried multilayer gusset plate of tower pier under king-tower, forms an angle-table bracket form, and set up template on angle-table bracket, and the laying reinforcing bar is finished the 0# piece and the 1# block concrete is built.Though the method does not have extraneous other condition restriction, need a large amount of timbering materials equally, increased project cost equally.Yet, in bridge construction, run into the big and situation of cushion cap below water level of main pylon pier cushion cap end face and the girder discrepancy in elevation through regular meeting.When running into such condition restriction, reduce project cost, shorten the construction period, just must take new job practices.
Summary of the invention
The purpose of this invention is to provide a kind of construction bracket of 1 # block of inclined pull bridge, its structure is simple and clear, reliable and stable, and is with low cost, and easy construction is specially adapted to the 0# block length and is not enough to the installation Hanging Basket, and the 1# piece construction when higher of beam body and ground relative relief.
A kind of construction bracket of 1 # block of inclined pull bridge of the present invention, comprise symmetry be connected the Bei Leiliang on both sides before and after the lower king-post strut top, respectively be laid on i iron distribution beam on the two shellfish thunder beams, be laid on WJD bowl button on the two i iron distribution beam respectively, it is characterized in that:
End away from lower king-post strut below two Bei Leiliang is respectively equipped with the front fulcrum distribution beam; One end of four skew cables passes respectively that the front fulcrum distribution beam is connected with wedge, other end anchor on the top rail of upper king-post strut 18, and one jack is set at the anchor point place; One end of four steel strand passes respectively that the front fulcrum distribution beam is connected with wedge, other end anchor on the anchor block that is located on the top rail, and another jack is set at the anchor point place;
End near lower king-post strut below two Bei Leiliang is respectively equipped with the back hanging point distribution beam, and this back hanging point distribution beam is connected with the lower end of suspension rod, and the upper end of this suspension rod is passed the pre-buried via hole that is located on the 0# piece and is connected with the suspension rod anchor beam, to strengthen the rear fulcrum of this support.
Described a kind of construction bracket of 1 # block of inclined pull bridge, its described Bei Leiliang is connected with pre-buried cloudy head in being located at lower king-post strut by bearing pin, forms a fulcrum; Front fulcrum distribution beam and wedge that suspension cable and steel strand pass below the Bei Leiliang form another fulcrum, thereby make shellfish Lei Liang two ends form the stabilising system of two fulcrums.
Bei Leiliang (being assembled by shellfish thunder beam sheet), WJD bowl button support, i iron, jack that this support adopts are frock general in the construction work and equipment, build efficient and convenient, reliable and stable, with low cost.
The present invention also provides a kind of building method of construction bracket of 1 # block of inclined pull bridge, this method is easy to operation, safety factor is higher, can be the waters in cable stayed bridge beam body bottom surface or under the higher ambient conditions, carry out the cast-in-place of 1# piece smoothly, guarantee quality of concrete apart from ground.
The building method of a kind of construction bracket of 1 # block of inclined pull bridge of the present invention, its step is as follows:
The first step: when lower king-post strut is constructed, pre-buried cloudy head is embedded in the concrete, when the 0# piece is constructed, the pre-buried via hole that default suspension rod passes;
Second step: assembly unit Bei Leiliang on pre-buried cloudy head, node connects with bearing pin, after the installation of shellfish thunder beam, away from an end of lower king-post strut the front fulcrum distribution beam that is welded with wedge is installed at Bei Leiliang;
The 3rd step: with an end of four skew cables pass respectively that the front fulcrum distribution beam is connected with wedge, other end anchor on the top rail of upper king-post strut, and one jack is set at the anchor point place; One end of four steel strand passes respectively that the front fulcrum distribution beam is connected with wedge, other end anchor on the anchor block that is located on the top rail, and another jack is set at the anchor point place; Then, tighten up suspension cable, tighten up steel strand, satisfy the requirement of support Design absolute altitude up to Bei Leiliang with another jack with jack;
The 4th step: lay i iron on Bei Leiliang, set up WJD bowl button support on i iron, WJD bowl button support is made up of subiculum, column, pop-up, cross bar, and its erection method is conventional erection method.
The 5th step: the suspension rod anchor beam is installed on the 0# piece of having built, the back hanging point distribution beam is installed below Bei Leiliang, and the pre-buried via hole that passes on the 0# piece with suspension rod connects both, and tighten up suspension rod;
The 6th step: on WJD bowl button support, masterplate, assembling reinforcement are installed and build the 1# block concrete.
The present invention compares with prior art and has the following advantages:
(1) support is made up of former and later two fulcrums, is not cantilever support, simple structure, and easy operating, support stability is good;
(2) supporting structure is simple, and material usage is few, and most of material is the existing material of universal building material and bridge construction, and is cheap.
(3) building method is simple and easy to do, safety factor is higher, can be the waters in cable stayed bridge beam body bottom surface or under the higher ambient conditions, carries out the cast-in-place of 1# piece apart from ground smoothly, guarantees quality of concrete.
Description of drawings
Fig. 1 is the structural representation of support of the present invention.
Fig. 2 is the I-I view of Fig. 1.
Fig. 3 is the II-II view of Fig. 1.
Fig. 4 is the A portion enlarged diagram of Fig. 1.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of construction bracket of 1 # block of inclined pull bridge of the present invention, comprise that symmetry is connected the shellfish thunder beam 5 on both sides before and after lower king-post strut 16 tops, Bei Leiliang and is connected with pre-buried the moon 12 in being located at lower king-post strut by bearing pin 13, form a fulcrum; The WJD bowl button 3 of on two shellfish thunder beams, laying i iron distribution beam 4 respectively, on two i iron distribution beam, laying respectively; End away from lower king-post strut below two shellfish thunder beams 5 is respectively equipped with front fulcrum distribution beam 7; One end of four skew cables 1 passes respectively that the front fulcrum distribution beam is connected with wedge 8, other end anchor on the top rail 17 of upper king-post strut 18, and a jack 10 is set at the anchor point place; One end of four steel strand 2 passes respectively that the front fulcrum distribution beam is connected with wedge 8, other end anchor on the anchor block 19 that is located on the top rail 17, and another jack 10 is set at the anchor point place; The front fulcrum distribution beam 7 that suspension cable and steel strand pass below the shellfish thunder beam 5 forms another fulcrum with wedge 8, thereby makes shellfish Lei Liang two ends form the stabilising system of two fulcrums;
End near lower king-post strut below two shellfish thunder beams 5 is respectively equipped with back hanging point distribution beam 9, this back hanging point distribution beam is connected with the lower end of suspension rod 11, the upper end of this suspension rod is passed the pre-buried via hole that is located on the 0# piece 14 and is connected with suspension rod anchor beam 6, to strengthen the rear fulcrum of this support.
The building method of a kind of construction bracket of 1 # block of inclined pull bridge of the present invention, its step is as follows:
The first step: when lower king-post strut 16 construction, pre-buried the moon 12 is embedded in the concrete, when 14 constructions of 0# piece, the pre-buried via hole that default suspension rod passes;
Second step: assembly unit shellfish thunder beam 5 on pre-buried the moon 12, node connects with bearing pin 13, after the installation of shellfish thunder beam, away from an end of lower king-post strut the front fulcrum distribution beam 7 that is welded with wedge 8 is installed at Bei Leiliang 5;
The 3rd step: with an end of four skew cables 1 pass respectively that the front fulcrum distribution beam is connected with wedge 8, other end anchor on the top rail 17 of upper king-post strut 18, and a jack 10 is set at the anchor point place; One end of four steel strand 2 passes respectively that the front fulcrum distribution beam is connected with wedge 8, other end anchor on the anchor block 19 that is located on the top rail 17, and another jack 10 is set at the anchor point place; Then, tighten up suspension cable 1, tighten up steel strand 2, satisfy the requirement of support Design absolute altitude up to Bei Leiliang 5 with another jack 10 with jack 10;
The 4th step: lay i iron 4 on Bei Leiliang 5, set up WJD bowl button support 3 on i iron 4, WJD bowl button support 3 is made up of subiculum, column, pop-up, cross bar, and its erection method is conventional erection method.
The 5th step: suspension rod anchor beam 6 is installed on the 0# piece 14 of having built, back hanging point distribution beam 9 is installed below Bei Leiliang 5, and the pre-buried via hole that passes on the 0# piece 14 with suspension rod 11 connects both, and tighten up suspension rod 11;
The 6th step: on WJD bowl button support 3, masterplate, assembling reinforcement are installed and build 1# piece 15 concrete.
Claims (2)
1, a kind of construction bracket of 1 # block of inclined pull bridge, comprise symmetry be connected the Bei Leiliang (5) on both sides before and after lower king-post strut (16) top, respectively be laid on i iron distribution beam (4) on the two shellfish thunder beams, be laid on WJD bowl button (3) on the two i iron distribution beam respectively, it is characterized in that:
End away from lower king-post strut below two Bei Leiliang (5) is respectively equipped with front fulcrum distribution beam (7); One end of four skew cables (1) passes respectively that the front fulcrum distribution beam is connected with wedge (8), other end anchor on the top rail (17) of upper king-post strut (18), and a jack (10) is set at the anchor point place; One end of four steel strand (2) passes respectively that the front fulcrum distribution beam is connected with wedge (8), other end anchor on the anchor block (19) that is located on the top rail (17), and another jack (10) is set at the anchor point place;
End near lower king-post strut below two Bei Leiliang (5) is respectively equipped with back hanging point distribution beam (9), this back hanging point distribution beam is connected with the lower end of suspension rod (11), the upper end of this suspension rod is passed the pre-buried via hole that is located on the 0# piece (14) and is connected with suspension rod anchor beam (6), to strengthen the rear fulcrum of this support.
2, a kind of construction bracket of 1 # block of inclined pull bridge according to claim 1 is characterized in that: described Bei Leiliang (5) is connected by bearing pin (13) the pre-buried cloudy head (12) interior with being located at lower king-post strut (16), forms a fulcrum; The front fulcrum distribution beam (7) that suspension cable (1) and steel strand (2) pass below the Bei Leiliang (5) forms another fulcrum with wedge (8), thereby makes Bei Leiliang (5) two ends form the stabilising system of two fulcrums.
3, the building method of a kind of construction bracket of 1 # block of inclined pull bridge as claimed in claim 1, its step is as follows:
The first step: when lower king-post strut (16) is constructed, pre-buried cloudy head (12) is embedded in the concrete, when 0# piece (14) is constructed, the pre-buried via hole that default suspension rod passes;
Second step: go up assembly unit Bei Leiliang (5) at pre-buried cloudy head (12), node connects with bearing pin (13), after Bei Leiliang (5) installation, away from an end of lower king-post strut the front fulcrum distribution beam (7) that is welded with wedge (8) is installed at Bei Leiliang (5);
The 3rd step: with an end of two skew cables (1) pass respectively that the front fulcrum distribution beam is connected with wedge (8), other end anchor on the top rail (17) of upper king-post strut (18), and a jack (10) is set at the anchor point place; One end of two steel strand (2) passes respectively that the front fulcrum distribution beam is connected with wedge (8), other end anchor on the anchor block (19) that is located on the top rail (17), and another jack (10) is set at the anchor point place; Then, tighten up suspension cable (1), tighten up steel strand (2), satisfy the requirement of support Design absolute altitude up to Bei Leiliang (5) with another jack (10) with jack (10);
The 4th step: go up laying i iron (4) at Bei Leiliang (5), set up WJD bowl button support (3) on i iron (4), WJD bowl button support (3) is made up of subiculum, column, pop-up, cross bar, and its erection method is conventional erection method.
The 5th step: at the 0# piece (14) of having built suspension rod anchor beam (6) go up to be installed, back hanging point distribution beam (9) is installed below Bei Leiliang (5), and the pre-buried via hole that passes on the 0# piece (14) with suspension rod (11) connects both, and tighten up suspension rod (11);
The 6th step: go up installation masterplate, assembling reinforcement and build 1# piece (15) concrete at WJD bowl button support (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101047201A CN101649604B (en) | 2009-08-28 | 2009-08-28 | Construction bracket of 1# block of inclined pull bridge and constructing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101047201A CN101649604B (en) | 2009-08-28 | 2009-08-28 | Construction bracket of 1# block of inclined pull bridge and constructing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101649604A true CN101649604A (en) | 2010-02-17 |
CN101649604B CN101649604B (en) | 2011-04-13 |
Family
ID=41671921
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101047201A Expired - Fee Related CN101649604B (en) | 2009-08-28 | 2009-08-28 | Construction bracket of 1# block of inclined pull bridge and constructing method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101649604B (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102277836A (en) * | 2011-06-14 | 2011-12-14 | 中铁五局集团建筑工程有限责任公司 | Construction method of tilting concrete tower base |
CN102367653A (en) * | 2011-12-02 | 2012-03-07 | 中铁五局(集团)有限公司 | Support structure for large-span continuous beam construction |
CN102505639A (en) * | 2011-11-23 | 2012-06-20 | 中铁大桥局集团第二工程有限公司 | Method for constructing 0 and 1 sections of beam body of cable-stayed bridge with no bracket |
CN102535343A (en) * | 2012-02-02 | 2012-07-04 | 中铁大桥局股份有限公司 | Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge |
CN102733314A (en) * | 2012-07-21 | 2012-10-17 | 中铁十八局集团轨道交通工程有限公司 | Walking mechanism for moving hanging basket by front clamp type jack and construction method of walking mechanism |
CN103898835A (en) * | 2014-03-02 | 2014-07-02 | 葛洲坝集团第一工程有限公司 | Bridge back-pulling-resistant bearing construction support and construction method |
CN104195956A (en) * | 2014-09-11 | 2014-12-10 | 中铁八局集团第一工程有限公司 | Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof |
CN104775365A (en) * | 2015-02-28 | 2015-07-15 | 张跃平 | Cable-stayed bridge construction method |
CN106567332A (en) * | 2016-09-30 | 2017-04-19 | 武船重型工程股份有限公司 | Turning-over method for steel pylon |
CN110629678A (en) * | 2019-10-23 | 2019-12-31 | 中国电建集团成都勘测设计研究院有限公司 | Cable-stayed bridge's cable auxiliary stand |
CN112593485A (en) * | 2020-12-11 | 2021-04-02 | 保利长大工程有限公司 | Steel tower cable-stayed support for large cantilever bent cap |
CN113718654A (en) * | 2021-09-01 | 2021-11-30 | 中电建路桥集团有限公司 | Installation structure for ropeless beam section of bridge tower area |
CN114657882A (en) * | 2022-03-25 | 2022-06-24 | 南通大学 | Super-huge type 0# block cast-in-place box girder bracket structure and mounting method thereof |
CN115012535A (en) * | 2022-06-16 | 2022-09-06 | 浙江东南网架股份有限公司 | Novel cable-through frame beam-column connecting joint |
CN118186909A (en) * | 2024-01-04 | 2024-06-14 | 中铁广州工程局集团有限公司 | Cable-stayed bridge section construction device adopting temporary cables and construction method thereof |
-
2009
- 2009-08-28 CN CN2009101047201A patent/CN101649604B/en not_active Expired - Fee Related
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102277836A (en) * | 2011-06-14 | 2011-12-14 | 中铁五局集团建筑工程有限责任公司 | Construction method of tilting concrete tower base |
CN102505639A (en) * | 2011-11-23 | 2012-06-20 | 中铁大桥局集团第二工程有限公司 | Method for constructing 0 and 1 sections of beam body of cable-stayed bridge with no bracket |
CN102367653A (en) * | 2011-12-02 | 2012-03-07 | 中铁五局(集团)有限公司 | Support structure for large-span continuous beam construction |
CN102535343A (en) * | 2012-02-02 | 2012-07-04 | 中铁大桥局股份有限公司 | Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge |
CN102733314A (en) * | 2012-07-21 | 2012-10-17 | 中铁十八局集团轨道交通工程有限公司 | Walking mechanism for moving hanging basket by front clamp type jack and construction method of walking mechanism |
CN103898835A (en) * | 2014-03-02 | 2014-07-02 | 葛洲坝集团第一工程有限公司 | Bridge back-pulling-resistant bearing construction support and construction method |
CN104195956A (en) * | 2014-09-11 | 2014-12-10 | 中铁八局集团第一工程有限公司 | Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof |
CN104195956B (en) * | 2014-09-11 | 2016-09-07 | 中铁八局集团第一工程有限公司 | Falsework formula waters continuous beam cast-in-place support and building method thereof |
CN104775365A (en) * | 2015-02-28 | 2015-07-15 | 张跃平 | Cable-stayed bridge construction method |
CN106567332B (en) * | 2016-09-30 | 2018-07-03 | 武船重型工程股份有限公司 | A kind of turn-over method of cable wire tower |
CN106567332A (en) * | 2016-09-30 | 2017-04-19 | 武船重型工程股份有限公司 | Turning-over method for steel pylon |
CN110629678A (en) * | 2019-10-23 | 2019-12-31 | 中国电建集团成都勘测设计研究院有限公司 | Cable-stayed bridge's cable auxiliary stand |
CN112593485A (en) * | 2020-12-11 | 2021-04-02 | 保利长大工程有限公司 | Steel tower cable-stayed support for large cantilever bent cap |
CN112593485B (en) * | 2020-12-11 | 2021-07-23 | 保利长大工程有限公司 | Steel tower cable-stayed support for large cantilever bent cap |
CN113718654A (en) * | 2021-09-01 | 2021-11-30 | 中电建路桥集团有限公司 | Installation structure for ropeless beam section of bridge tower area |
CN113718654B (en) * | 2021-09-01 | 2022-11-22 | 中电建路桥集团有限公司 | Installation structure for ropeless beam section of bridge tower area |
CN114657882A (en) * | 2022-03-25 | 2022-06-24 | 南通大学 | Super-huge type 0# block cast-in-place box girder bracket structure and mounting method thereof |
CN115012535A (en) * | 2022-06-16 | 2022-09-06 | 浙江东南网架股份有限公司 | Novel cable-through frame beam-column connecting joint |
CN115012535B (en) * | 2022-06-16 | 2023-12-29 | 浙江东南网架股份有限公司 | Novel cable-through frame beam column connection node |
CN118186909A (en) * | 2024-01-04 | 2024-06-14 | 中铁广州工程局集团有限公司 | Cable-stayed bridge section construction device adopting temporary cables and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN101649604B (en) | 2011-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101649604B (en) | Construction bracket of 1# block of inclined pull bridge and constructing method thereof | |
CN100543235C (en) | The method and system of erecting steel trusses by stay cable auxiliary complete cantilever | |
CN100543234C (en) | A kind of closure method of large-span continuous steel truss arch | |
CN101586328B (en) | Anchor ear angle-table bracket building method for bridge sidespan closure segment construction | |
CN106012797A (en) | All-ground-anchor type single-tower double-span cable-stayed bridge structure and construction method thereof | |
CN206553961U (en) | The short light-duty expanded letter combined type Hanging Basket of tower cable-stayed bridge | |
CN103437300A (en) | Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket | |
CN201106155Y (en) | Inclined guy cable auxiliary full cantaliver crane trussed steel beam device | |
CN106012872B (en) | Continuous rigid frame bridge without dorsal funciculus oblique pull reinforcement system and construction method | |
CN106522112A (en) | Cable-stayed bridge side span beam section erecting system and method thereof | |
CN203247495U (en) | Pedestrian rope bridge | |
CN103898834B (en) | A kind of steel tube concrete combination beam and truss-like Sarasota cable-stayed bridge and construction method thereof | |
CN112554043A (en) | Transverse self-balancing antisymmetric cable-stayed bridge structure system | |
CN107268422A (en) | Across the self-anchored type suspension cable arched girder co-operative system bridge such as one kind | |
CN209456892U (en) | Cable-stayed bridge steel overhangs structure of sidewalk | |
CN115419104A (en) | Cable crane combined type anchorage structure and using method thereof | |
CN204385629U (en) | A kind of support for the construction of suspension bridge king-tower top rail | |
CN207032062U (en) | Tower with suspended cable available for Large-span Steel Box Beam construction | |
CN211666206U (en) | Overhanging and landing dual-purpose scaffold | |
CN218479026U (en) | Pedestrian suspension bridge without side cable and anchorage | |
CN205171343U (en) | Combination beam self anchored suspension bridge | |
CN214459535U (en) | Construction system of asymmetric cantilever beam of cable-stayed bridge | |
CN105220609B (en) | Combined beam self-anchored suspension bridge and construction process thereof | |
CN103485271B (en) | A kind of mountainous rural area People's Bank of China prestressed cable-truss bridge | |
CN101709565A (en) | Double-deck continuous steel girder bridge for rigid suspended cable stiffening |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110413 Termination date: 20140828 |
|
EXPY | Termination of patent right or utility model |