Nothing Special   »   [go: up one dir, main page]

CN101572929B - Method, device and system for transmitting messages in switching process - Google Patents

Method, device and system for transmitting messages in switching process Download PDF

Info

Publication number
CN101572929B
CN101572929B CN2008101054249A CN200810105424A CN101572929B CN 101572929 B CN101572929 B CN 101572929B CN 2008101054249 A CN2008101054249 A CN 2008101054249A CN 200810105424 A CN200810105424 A CN 200810105424A CN 101572929 B CN101572929 B CN 101572929B
Authority
CN
China
Prior art keywords
notification message
enodeb
message
gateway
mme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008101054249A
Other languages
Chinese (zh)
Other versions
CN101572929A (en
Inventor
沈宇希
熊春山
张娟
姜怡华
徐晖
艾明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN2008101054249A priority Critical patent/CN101572929B/en
Publication of CN101572929A publication Critical patent/CN101572929A/en
Application granted granted Critical
Publication of CN101572929B publication Critical patent/CN101572929B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention discloses a method for transmitting a message in a switching process, comprising the following steps: a mobile management entity (MME) that a user terminal (UE) belongs to sends a first request massage for indicating to create a load to a target service gateway (TS-GW) when confirming that the UE switches from the jurisdiction of a source service gateway (SS-GW) to the jurisdiction of the TS-GW; the TS-GW receives the first request message and sends a second request message for indicating to update the load to a grouped data gateway (P-GW) that the UE belongs to; the P-GW generates a notification message for indicating to finish sending loading data and sends the notification message to a target base (T-eNodeB) that the switched UE belongs to, therefore, the condition that the T-eNodeB cannot judge when an S-eNodeB finishes the loading data transmission due to being incapable of obtaining the notification message is avoided in the process of switching the UE, the effective transmission of the loading data in the network is ensured, the waiting time of the T-eNodeB is reduced, and the system efficiency is improved; and furthermore, the service quality is ensured and the user experience is enhanced. The present invention also discloses a corresponding communication device and a communication system.

Description

A kind of method, Apparatus and system that in handoff procedure, transmits message
Technical field
The present invention relates to the communications field, particularly a kind of method, Apparatus and system that in handoff procedure, transmits message.
Background technology
Evolved packet system (Evolved Packet System, EPS) in, (User Equipment, UE can carry out the transmission of data to user terminal in moving process.When UE when a coverage moves to another coverage, may take place and to change for UE provides the network node of service, for example, (eNodeB) changes in the base station, Mobility Management Entity (Mobility Management Ebtity, MME) change, and gateway (Serving GW) changes.At this moment, UE need carry out switching flow the relevant information of self is transferred on the destination service node from the source service node, to guarantee the continuous transmission of data and signaling.
At present, defined UE performed switching flow under the situation that Serving GW does not change among the TS23.401, the content that wherein relates to the data forwarding part is: the Serving GW of UE ownership sends an End Marker message to source eNodeB, eNodeB is transmitted to target eNode B with it by the source, target eNode B will be given UE from the carrying data distributing that source eNodeB receives earlier, after receiving the End Marker message that sends from source eNodeB, just will send to UE from the carrying data that Serving GW receives, so just can guarantee that target eNode B can be with orderly the lining up of the data of collecting from different network nodes, avoid target eNode B because of not knowing when source eNodeB finishes to carry the traditional method that forwarding of data will wait for a period of time simultaneously, reduced the time-delay of handling.
But, when UE when a coverage moves to another coverage, if Serving GW also changes in handoff procedure, to there be network node to send End Marker message so, target eNode B then can can't judge when source eNodeB finishes to carry the transmission of data because of can not receive End Marker message, thereby causes efficiency of transmission to descend, like this, just influence service quality to a great extent, and then reduced user experience.
Summary of the invention
The embodiment of the invention provides a kind of method, Apparatus and system that transmits message in handoff procedure, when changing in order to the Serving GW in the UE ownership, guarantees the effective transmission of carrying data in network, improves system effectiveness.
The embodiment that the embodiment of the invention provides is as follows:
A kind of method that transmits message in handoff procedure comprises step:
The Mobility Management Entity MME of the current ownership of user terminal UE determines UE when the compass of competency of source gateway SS-GW switches to the compass of competency of destination service gateway T S-GW, sends to T S-GW to be used to indicate first request message of creating carrying;
Described T S-GW receives described first request message, and sends second request message that is used to indicate the renewal carrying to the packet data gateway P-GW of UE ownership;
Described P-GW produces and is used to indicate the notification message that finishes to send the carrying data, and this notification message mail to the target BS T-eNodeB that UE is belonged to after switching, described notification message perhaps carries the binding of End Marker information and abolishes indication Binding Revocation Indication message for finishing sign End Marker message.
A kind of communication system comprises:
Mobility Management Entity MME, current this MME that belongs to of user terminal UE, be used for determining that UE switches to the compass of competency of destination service gateway TS-GW from the compass of competency of source gateway SS-GW, and send first request message that is used to indicate the establishment carrying to TS-GW;
Destination service gateway TS-GW is used to receive described first request message, and sends second request message that is used to indicate the renewal carrying to the packet data gateway P-GW of UE ownership;
Packet data gateway P-GW, be used to produce and be used to indicate the notification message that finishes to send the carrying data, and this notification message mail to the target BS T-eNodeB that UE is belonged to after switching, described notification message perhaps carries the binding of End Marker information and abolishes indication Binding Revocation Indication message for finishing sign End Marker message.
In the embodiment of the invention, when UE when the compass of competency of SS-GW switches to the compass of competency of TS-GW, MME upgrades by the gateway of T S-GW notice P-GW current UE, P-GW generates and is used to indicate the notification message that finishes bearer data transmission, and this notification message is mail to the T-eNodeB that UE belongs to after switching.Like this, in the handoff procedure of UE, just avoided T-eNodeB can't judge because of can not receive notification message when S-eNodeB finishes the situation of bearer data transmission, thereby guaranteed the effective transmission of carrying data in network, reduced the time that T-eNodeB waits for, improved system effectiveness, and then guaranteed service quality to have promoted user experience.
Description of drawings
Fig. 1 is an EPS Solution Architecture schematic diagram in the embodiment of the invention;
Fig. 2 A is a MME functional structure chart in the embodiment of the invention;
Fig. 2 B is a TS-GW functional structure chart in the embodiment of the invention;
Fig. 2 C is a PDW-GW functional structure chart in the embodiment of the invention;
Fig. 3 is first kind of switching flow schematic diagram in the embodiment of the invention;
Fig. 4 sets up the tunnel schematic flow sheet in the embodiment of the invention;
Fig. 5 is second kind of switching flow schematic diagram in the embodiment of the invention.
Embodiment
In the EPS system, when UE moves to another coverage from a coverage, and when providing the Serving GW of service to change for UE, in order to make UE can finish handoff procedure smoothly, guarantee the effective transmission of carrying data in network, the Mobility Management Entity MME of the current ownership of user terminal UE determines UE when the compass of competency of source gateway SS-GW switches to the compass of competency of destination service gateway TS-GW, sends to TS-GW to be used to indicate first request message of creating carrying; Described TS-GW receives described first request message, and sends second request message that is used to indicate the renewal carrying to the packet data gateway P-GW of UE ownership; Described P-GW produces and is used to indicate the notification message that finishes to send the carrying data, and this notification message is mail to the target BS T-eNodeB that UE is belonged to after switching.
In actual applications, regulation according to 3GPP TS23.401 agreement, when UE switches and provides the Serving GW of service to change for UE,, UE do not change for providing the packet data gateway (Packet Data Network Gateway, PDN GW) of service.
Its detailed process is: when the Serving GW that service is provided for UE changes, each PDN GW (being designated hereinafter simply as P-GW) that UE connected can receive the renewal bearing request message, and P-GW can upgrade the parameter that comprises in the bearing request message according to this knows the change that whether has Serving GW (hereinafter to be referred as S-GW).In the present embodiment, P-GW can by in following two kinds of methods any one one of learn whether S-GW changes:
1) (renewal TEID) has taken place in Tunnel EndPoint Identifier to upgrade the address of the S-GW that bearing request message carries and Tunnel End Point Identifier.
2) carry a parameter of clearly indicating S-GW to change (Serving GW change Indication) in the renewal bearing request message.
After P-GW determines that S-GW changes, all carryings (Bearer) of the related UE of the renewal bearing request message that receives are sent the renewal of End marker message with notification path.
Below in conjunction with accompanying drawing the preferred embodiment of the present invention is elaborated.
Consult shown in Figure 1ly, in the present embodiment, the EPS system comprises Mobility Management Entity 10 (MME), destination service gateway 11 (TS-GW) and packet data gateway 12 (PDN-GW).
Mobility Management Entity 10 (MME), current this MME that belongs to of UE is used for determining that UE switches to the compass of competency of TS-GW from the compass of competency of SS-GW, and sends first request message that is used to indicate the establishment carrying to TS-GW;
Destination service gateway 11 (TS-GW) is used to receive described first request message, and sends second request message that is used to indicate the renewal carrying to the packet data gateway P-GW of UE ownership;
Packet data gateway 12 (P-GW) is used to produce be used to indicate and finishes to send the notification message that carries data, and this notification message is mail to the target BS T-eNodeB that UE is belonged to after switching.
Consult shown in Fig. 2 A, in the present embodiment, Mobility Management Entity 10 (MME) comprises determining unit 100, generation unit 101 and communication unit 102.
Determining unit 100 is used for determining that user terminal end UE switches to the compass of competency of destination service gateway TS-GW from the compass of competency of source gateway SS-GW;
Generation unit 101 is used to generate first request message of creating carrying in order to indication;
Communication unit 102 is used for sending described first request message to TS-GW.
Consult shown in Fig. 2 B, in the present embodiment, destination service gateway 11 (TS-GW) comprises receiving element 110, generation unit 111 and transmitting element 112.
Receiving element 110 is used to receive first request message of creating carrying in order to indication;
Generation unit 111 is used to generate in order to indicate more second request message of new bearer;
Transmitting element 112 is used for sending described second request message to the P-GW of user terminal UE ownership.
Consult shown in Fig. 2 C, in the present embodiment, packet data gateway 12 (P-GW) comprises receiving element 120, generation unit 121 and transmitting element 122.
Receiving element 120 is used to receive in order to indicate more second request message of new bearer;
Generation unit 121 is used to generate the notification message that finishes to send the carrying data in order to indication;
Transmitting element 122 is used for described notification message is mail to the target BS T-eNodeB that UE is belonged to after switching.
Based on the said system framework, when S-GW changed, the MME of UE ownership can change, and also can not change, and consulted shown in Figure 3ly, in the present embodiment, switched to T at UE by SS-GW
In the process of S-GW, the detailed process of first method of P-GW transmission End Marker message is as follows:
The MME of the current ownership of step 300:UE sends to TS-GW and creates bearing request message.In the present embodiment, the MME of the current ownership of UE can switch the front and back MME of service UE all the time for UE, also can be the target MME (T-MME) that UE switches the back ownership.
Step 310:TS-GW sends to P-GW and upgrades bearing request message.
Step 320:P-GW sends to TS-GW and upgrades bearing response message.
Step 330:TS-GW returns the establishment bearing response message to the MME of the current ownership of UE.
Step 340:P-GW sends End marker message to SS-GW, is used to notify all carrying data relevant with this P-GW of SS-GW end of transmission.
In the present embodiment, step 340 also can be carried out after step 320 at once.
On the other hand, in actual applications, non-roaming interface (S5) between S-GW and P-GW or/roaming interface (S8) is for using proxy mobile IP protocol (Proxy Mobility IP, during PMIP) interface, P-GW also can adopt the notification message indication SS-GW of PMIP type all carrying data relevant with this P-GW to finish, for example, in binding abolishment indication (Binding Revocation Indication) message, carry End Marker information.The transmission flow of the notification message of PMIP type is consistent with the transmission flow of End Marker message, and present embodiment is that example describes with End Marker message only.
After step 350:S-GW receives End Marker message, transmit this End marker message to source eNodeB (S-eNodeB).
Step 360:S-eNodeB again with End marker forwards to target eNode B (T-eNodeB), with all carrying data of notice T-eNodeB end of transmission, handoff procedure is finished smoothly.
Like this, T-eNodeB just can finish immediately and S-eNodeB between the data forwarding flow process, and continued post-treatment operations.
In the foregoing description, communication system has adopted direct pass-through mode that End Marker message is sent to T-eNodeB, promptly carry data and when switching, directly send to T-eNodeB by S-eNodeB, as shown in Figure 1, this direct pass-through mode only is applicable to the situation that has communication interface (X2) between S-eNodeB and the T-eNodeB.
Be different from the foregoing description, in another case, when between S-eNodeB and the T-eNodeB communication interface not being set, S-eNodeB sends the carrying data to T-eNodeB can only carry out transfer by S-GW, be that S-eNodeB will carry data and send to SS-GW, S-S-GW will carry data forwarding and give TS-GW, TS-GWG will carry data forwarding again and give T-eNodeB, this mode also is referred to as indirect forwarding (Indirect Forwarding) mode, when adopting Indirect Forwarding mode to send the carrying data, End Marker message also will be forwarded along the path that the carrying data send.
GTP tunnel between this moment T S-GW and the T-eNodeB is exactly a section of tunnel after UE switches.Therefore, if under the Indirect Forwarding situation when the TS-GW, the message of carrying End marker ends at TS-GW, so, is responsible for carrying the rearrangement of data by TS-GW rather than T-eNodeB.
Consult shown in Figure 4ly, when adopting Indirect Forwarding mode, communication system is set up and transmitted the employed tunnel of carrying data is to finish in the process of switching, and it is as follows wherein to set up the detailed process of transmitting tunnel segment:
The source MME (S-MME) of ownership sent RELOCATION REQUEST message (Forward Relocation Request) to the target MME (T-MME) that UE switches the back ownership before step 400:UE switched.
In actual applications, when UE switched, the MME of its ownership can not change yet, and present embodiment is that example describes with situation about changing only.
Step 410:T-MME sends to P-GW and creates bearing request message (Create Bearer Request).
Step 420:P-GW returns to T-MME and creates bearing response message (Create Bearer Response).
Step 430:T-MME sends handoff request message (Handover Request) to T-eNodeB.
Step 440:T-eNodeB returns handoff request acknowledgment message (Handover Request Ack) to T-MME.
Step 450:T-MME sends to P-GW once more and creates bearing request message.
Step 460:P-GW returns the establishment bearing response message to T-MME once more.
In the present embodiment, step 450 and 460 tunnels of being created are that TS-GW is used for the tunnel of forwarding indirectly.
Step 470:T-MME returns relocation response message (Forward Relocation Response) to S-MME.
Based on the foregoing description, consult shown in Figure 5ly, in the present embodiment, switch to by SS-GW in the process of TS-GW at UE, it is as follows that P-GW sends the detailed process of second method (promptly adopting Indirect Forwarding mode) of End Marker message:
The MME of the current ownership of step 500:UE sends to T S-GW and creates bearing request message.
Step 510:TS-GW sends to P-GW and upgrades bearing request message.
Step 520:P-GW sends to T S-GW and upgrades bearing response message.
Step 530:TS-GW returns the establishment bearing response message to the MME of the current ownership of UE.
After step 540:P-GW receives the renewal bearing request message of 510 steps, stop to send the carrying data, and send End marker message, be used to notify all carrying data relevant of SS-GW end of transmission at once with this P-GW to SS-GW to SS-GW.Follow-up carrying data P-GW will send to TS-GW.
In the present embodiment, step 540 also can be carried out after step 520 at once.
Equally, when the S5 interface between S-GW and the P-GW or S8 interface are the PMIP interface, P-GW also can adopt the notification message indication SS-GW of PMIP type all carrying data relevant with this P-GW to finish, for example, in Binding Revocation Indication message, carry End Marker information.The transmission flow of the notification message of PMIP type is consistent with the transmission flow of End Marker message,
Present embodiment is that example describes with End Marker message only.
After step 550:SS-GW receives End Marker message, transmit this End Marker message to S-eNodeB.
Step 560:S-eNodeB turns back to SS-GW by transmitting the tunnel with End marker message.
In the present embodiment, owing between S-eNodeB and the T-eNodeB communication interface (X2) is not set, therefore, S-eNodeB can't directly be forwarded to T-eNodeB with End Marker message, it can only be returned.
Step 570:SS-GW is sent to TS-GW with EndMarker message.
In the present embodiment, SS-GW is not provided with communication interface (X2) as if knowing in advance between SS-eNodeB and the T-eNodeB, End Marker message directly can be sent to TS-GW yet, and not send it to S-eNodeB earlier, promptly saves step 550 and step 560.
Step 580:TS-GW is sent to T-eNodeB with End Marker message.
Like this, T-eNodeB just can finish immediately and S-eNodeB between the data forwarding flow process, and continued post-treatment operations.
In the above-described embodiments, when TS-GW receives End Marker message and End Marker message can't be sent to T-eNodB because of certain reason, be that End Marker message ends at TS-GW, then TS-GW also can replace T-eNodB to finish follow-up processing operation, to avoid occurring time-delay in the system; As, will arrange in an orderly manner from the carrying data that different network nodes are collected.Do not repeat them here.
On the other hand, in the present embodiment, Fig. 3 and flow process shown in Figure 5 are all carried out according to standard agreement, if standard agreement changes, then corresponding flow process is also just improved thereupon, also repeats no more at this.
In sum, in the embodiment of the invention, when UE when the compass of competency of SS-GW switches to the compass of competency of TS-GW, MME upgrades by the gateway of TS-GW notice P-GW current UE, P-GW generates and is used to indicate the notification message that finishes bearer data transmission, and this notification message is mail to the T-eNodeB that UE belongs to after switching.Like this, in the handoff procedure of UE, just avoided T-eNodeB can't judge because of can not receive notification message when S-eNodeB finishes the situation of bearer data transmission, thereby guaranteed the effective transmission of carrying data in network, reduced the time that T-eNodeB waits for, improved system effectiveness, and then guaranteed service quality to have promoted user experience.
Obviously, those skilled in the art can carry out various changes and modification to the embodiment among the present invention and not break away from the spirit and scope of the present invention.Like this, if these in the embodiment of the invention are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the embodiment among the present invention also is intended to comprise these changes and modification interior.

Claims (13)

1. a method that transmits message in handoff procedure is characterized in that, comprises step:
The Mobility Management Entity MME of the current ownership of user terminal UE determines UE when the compass of competency of source gateway SS-GW switches to the compass of competency of destination service gateway TS-GW, sends to TS-GW to be used to indicate first request message of creating carrying;
Described TS-GW receives described first request message, and sends second request message that is used to indicate the renewal carrying to the packet data gateway P-GW of UE ownership;
Described P-GW produces and is used to indicate the notification message that finishes to send the carrying data, and this notification message mail to the target BS T-eNodeB that UE is belonged to after switching, described notification message perhaps carries the binding of End Marker information and abolishes indication Binding Revocation Indication message for finishing sign End Marker message.
2. the method for claim 1 is characterized in that, the MME of the current ownership of UE is always UE service is provided before and after UE switches, and perhaps, the MME of the current ownership of UE only switches the back at UE provides service for UE.
3. the method for claim 1, it is characterized in that, described TS-GW carries self networks address and Tunnel End Point Identifier in second request message, perhaps, in second request message, carry and be used for the parameter that clear and definite indicating service gateway changes, the renewal of gateway has taken place in communication system in order to notice P-GW.
4. as each described method of claim 1-3, it is characterized in that, comprise step when sending described notification message:
P-GW is sent to SS-GW with described notification message;
SS-GW is forwarded to the source base station S-eNodeB that UE belongs to described notification message before switching;
S-eNodeB is forwarded to the target BS T-eNodeB that UE belongs to described notification message after switching.
5. as each described method of claim 1-3, it is characterized in that, comprise step when sending described notification message:
P-GW is sent to SS-GW with described notification message;
SS-GW is forwarded to TS-GW with described notification message;
TS-GW is forwarded to the target BS T-eNodeB that UE belongs to described notification message after switching.
6. method as claimed in claim 5, it is characterized in that, SS-GW is sent to described notification message before the TS-GW, earlier described notification message is sent to the source base station S-eNodeB that UE belongs to before switching, if S-eNodeB returns this notification message by transmitting the tunnel, then SS-GW is sent to TS-GW with this notification message again.
7. method as claimed in claim 5 is characterized in that, if described notification message ends at TS-GW, then takes over T-eNodeB by TS-GW and finishes post-treatment operations.
8. a communication system is characterized in that, comprising:
Mobility Management Entity MME, current this MME that belongs to of user terminal UE, be used for determining that UE switches to the compass of competency of destination service gateway TS-GW from the compass of competency of source gateway SS-GW, and send first request message that is used to indicate the establishment carrying to TS-GW;
Destination service gateway TS-GW is used to receive described first request message, and sends second request message that is used to indicate the renewal carrying to the packet data gateway P-GW of UE ownership;
Packet data gateway P-GW, be used to produce and be used to indicate the notification message that finishes to send the carrying data, and this notification message mail to the target BS T-eNodeB that UE is belonged to after switching, described notification message perhaps carries the binding of End Marker information and abolishes indication Binding Revocation Indication message for finishing sign End Marker message.
9. communication system as claimed in claim 8 is characterized in that, described MME is always UE service is provided before and after UE switches, and perhaps, described MME only switches the back at UE provides service for UE.
10. communication system as claimed in claim 8, it is characterized in that, described T S-GW carries self networks address and Tunnel End Point Identifier in second request message, perhaps, in second request message, carry and be used for the parameter that clear and definite indicating service gateway changes, the renewal of gateway has taken place in communication system in order to notice P-GW.
11. as each described communication system of claim 8-10, it is characterized in that, described P-GW is sent to SS-GW with described notification message, SS-GW is forwarded to the source base station S-eNodeB that UE belongs to described notification message before switching, S-eNodeB is forwarded to described notification message the target BS T-eNodeB that UE belongs to again after switching.
12. as each described communication system of claim 8-10, it is characterized in that, described P-GW is sent to SS-GW with described notification message, and SS-GW is forwarded to TS-GW with described notification message, and TS-GW is forwarded to described notification message the target BS T-eNodeB that UE belongs to again after switching.
13. communication system as claimed in claim 12 is characterized in that, if described notification message ends at TS-GW, then takes over T-eNodeB by TS-GW and finishes post-treatment operations.
CN2008101054249A 2008-04-29 2008-04-29 Method, device and system for transmitting messages in switching process Active CN101572929B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101054249A CN101572929B (en) 2008-04-29 2008-04-29 Method, device and system for transmitting messages in switching process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101054249A CN101572929B (en) 2008-04-29 2008-04-29 Method, device and system for transmitting messages in switching process

Publications (2)

Publication Number Publication Date
CN101572929A CN101572929A (en) 2009-11-04
CN101572929B true CN101572929B (en) 2011-08-31

Family

ID=41232130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101054249A Active CN101572929B (en) 2008-04-29 2008-04-29 Method, device and system for transmitting messages in switching process

Country Status (1)

Country Link
CN (1) CN101572929B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102111748B (en) * 2009-12-28 2014-04-30 中兴通讯股份有限公司 Method and system for establishing local internet protocol (IP) connection
CN102754472B (en) * 2010-01-07 2015-05-27 华为技术有限公司 Method and system for machine-to-machine data transmission, and mobility management entity device
CN102378160B (en) * 2010-08-23 2015-11-25 中兴通讯股份有限公司 Based on carrying establishing method and the system of this locality access
CN102045802A (en) * 2010-12-22 2011-05-04 华为技术有限公司 Data transmitting method in serving gateway (SGW) changing switching process, packet data network (PDN) gateway (PGW) and base station
CN103581057B (en) * 2012-07-24 2018-07-20 中兴通讯股份有限公司 Message control method, system and node when a kind of aggregated links switching
JP6740474B2 (en) 2016-11-04 2020-08-12 華為技術有限公司Huawei Technologies Co.,Ltd. Method, device, and system for transmitting end markers
WO2018152846A1 (en) * 2017-02-27 2018-08-30 华为技术有限公司 Communication method and apparatus
CN109392025B (en) * 2017-08-11 2023-09-29 华为技术有限公司 Data transmission method and data transmission device

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
3GPP.Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN)
3GPP.Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Overall description;Stage 2(Release 8).《3GPP TS 36.300 V8.4.0》.2008,10.1.2.2. *
3GPP.General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 8).《3GPP TS 23.401 V8.1.0》.2008,4.3.8.2,5.5.1.1.3节. *
Overall description
Stage 2(Release 8).《3GPP TS 36.300 V8.4.0》.2008,10.1.2.2.

Also Published As

Publication number Publication date
CN101572929A (en) 2009-11-04

Similar Documents

Publication Publication Date Title
KR102289879B1 (en) UPF Relocation for PDU Session of Various SSC Modes in Cellular Networks
CN101572929B (en) Method, device and system for transmitting messages in switching process
EP2304999B1 (en) Method, apparatus and computer program for supporting a session identifier in case of a transfer between different radio access networks
CN101925042B (en) Method and system for controlling tunnel identifier allocation and devices
US20120314688A1 (en) Method for routing traffic within a network and a network
KR20190034572A (en) Method and apparatus for operating a wireless communication system in which mobility management and session management are separated
CN111866851B (en) Method and apparatus for managing packet data connections based on localized regions in a wireless communication system
JP5212524B2 (en) Mobile communication system and communication control method
KR20100047966A (en) Communication system and method for transffering data therein
CN110149166B (en) Transmission control method, device and system
CN112544108A (en) Method for providing anchor change for Ethernet PDU session and related network entity/node
US20140348134A1 (en) System and protocols for inter-mobility access gateway tunneling for fast handoff transition
EP2763463B1 (en) Supporting local access and voice communication in a local network
CN103796262A (en) Direct switching method and apparatus
US20160127959A1 (en) Pdn gateway device and mobile communication method
US9961045B2 (en) Service path changing method and apparatus
WO2015188357A1 (en) Bearer switching control device and control method
KR20110121044A (en) Wireless communication system and method for establishing connection between node in communication system and node in data service network
CN104853344A (en) Shunting gateway selection method and controller
JP2010068233A (en) Radio communication system, radio communication method and radio base station device
JP2015535409A (en) Method, apparatus and system for processing data domain services
KR100934086B1 (en) Handover Method of Wireless Access System and Gateway Supporting the Same
JP4642904B2 (en) Access gateway device, base station device, communication control system, and communication control method
CN108377526B (en) Data distribution method and device
EP3454588B1 (en) Method and device for transmitting messages

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INST OF TELECOMMUNICATION SCIENCE AND TECHNOLGOY

Free format text: FORMER OWNER: DATANG MOBILE COMMUNICATION EQUIPMENT CO., LTD.

Effective date: 20110429

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100083 NO. 29, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING TO: 100191 NO. 40, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20110429

Address after: 100191 Haidian District, Xueyuan Road, No. 40,

Applicant after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100083 Haidian District, Xueyuan Road, No. 29,

Applicant before: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right

Effective date of registration: 20210602

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right