CN101413291B - Cumulative installation method of hoisting cable rods for cable dome towers - Google Patents

Cumulative installation method of hoisting cable rods for cable dome towers Download PDF

Info

Publication number
CN101413291B
CN101413291B CN2008102343621A CN200810234362A CN101413291B CN 101413291 B CN101413291 B CN 101413291B CN 2008102343621 A CN2008102343621 A CN 2008102343621A CN 200810234362 A CN200810234362 A CN 200810234362A CN 101413291 B CN101413291 B CN 101413291B
Authority
CN
China
Prior art keywords
cable
lifting
notochord
outer ring
bearing member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008102343621A
Other languages
Chinese (zh)
Other versions
CN101413291A (en
Inventor
郭正兴
宗钟凌
罗斌
王永泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2008102343621A priority Critical patent/CN101413291B/en
Publication of CN101413291A publication Critical patent/CN101413291A/en
Application granted granted Critical
Publication of CN101413291B publication Critical patent/CN101413291B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a method for cumulatively mounting a cable dome tower lifting cable rod, which comprises the following steps: mounting a lifting tower slightly higher than the mounting height of the vertex of a cable dome structure according to the design elevation of a cable dome and a corresponding position of a central bearing member; mounting a multipoint synchronous lifting device on the top of the tower; connecting an inner ring cable system of a notochord net with the central bearing member and connecting an outer ring cable system of the notochord net with an outer ring beam through auxiliary traction cables; evenly lifting the central bearing member through a lifting device on the top of the tower with the traction of an outer ring notochord and the lifting of the central bearing member in the lifting process, wherein the whole notochord net is lifted synchronously in a catenary mode; cumulatively and expansively mounting each ring cable, masts and stay cables positioned at different mounting heights while lifting the central bearing member; and after all the traction cables and the masts are mounted, forming outer ring stayed cables through tensioning by stages.

Description

Cable sky dome tower frame raising cable rod accumulation mounting method
Technical field
The present invention is a kind of installation of rope bar and prestressed stretch-draw shaping are carried out in Construction of Civil Engineering to the construction of novel rope dome steric strain structure method that is used for.The technical field that belongs to the cable dome structure construction and installation.
Background technology
Cable dome structure is a kind of novel full tension structure system, by at the notochord that winds up, form at the oblique cord of lower edge and the mast that links between the last quarter rope, must could produce the rigidity of structure of necessity by stretching rope, forms stable load system.Drag-line can be various ways such as the half parallel twisting of high-strength steel tow, many steel stranded wire assembled cables or rod iron pull bar.Domestic and international known cable dome structure construction and installation manufacturing process, its key step is: (1) places the center load-carrying member; (2) hang notochord, an end links to each other with outer-ring beam, and an end is connected with the center load-carrying member; (3) the center load-carrying member is supported or is lifted to a certain height by loop wheel machine by the interim pylon in center; (4) by ring mast, strop and oblique cord are installed; (5) stage by stage or the single tension oblique cord structure finally is shaped.Known cable dome structure construction and installation manufacturing process, all need notochord is carried out the traction of longer distance or center ring shelved certain altitude and use could making notochord hang than large traction to be installed on the outer-ring beam, this is to the ability and the sync pulling technical requirements height of pulling equipment, the tractive force of notochord in being pulled process is excessive and stressed also comparatively complicated simultaneously, finally cause difficulty of construction to strengthen, the security risk of construction strengthens, and the duration is longer.In addition, because during known cable dome structure construction and installation are shaped, the bracing frame height of pulling force ring is shelved at the center or height that loop wheel machine lifts immobilizes, regulated at will height easily, if it is unreasonable that center load-carrying member bracing frame or lift highly designs, the installation of part drag-line may need bigger external force to force traction in place, and this is stressed all unfavorable to drag-line, mast and node, difficulty of construction is bigger, the safety deficiency of installation operation.
Summary of the invention
Technical problem: the be shaped notochord that exists and oblique cord traction difficulty and tractive force are installed are strengthened for overcoming rope bar in the existing cable dome structure construction, center load-carrying member bearing height immobilizes, cause by unfavorable factors such as strop bar installation amount of high-altitude operation increasing and construction safety risk increasings, the present invention proposes a kind of cable sky dome tower frame raising cable rod accumulation mounting method, can not only reduce the distance and the difficulty of notochord traction, and can each strop bar be installed by the expansion while promoting of center load-carrying member, bearing height that can regulated at will center load-carrying member, the rope bar that conveniently is positioned at differing heights point is installed and traction stretch-draw, the installation difficulty of cable dome structure is significantly reduced, increased rope bar installation process safe.
Technical scheme: cable sky dome tower frame raising cable rod accumulation mounting method of the present invention, be according to the correspondence position setting of the design elevation of rope dome and center load-carrying member lifting pylon a little more than cable dome structure summit setting height(from bottom), at tower top the synchronous lifting means of multiple spot is set, strop system in the notochord net is linked to each other with the center load-carrying member, outer strop is to link to each other with outer-ring beam with the auxiliary traction rope, the lifting means of tower top evenly promotes the center load-carrying member, be accompanied by the traction of outer shroud notochord and the lifting of center load-carrying member in the lifting process, whole notochord net is the stretched wire wire and promotes synchronously thereupon, what be positioned at different setting height(from bottom)s while promoting respectively encircles strop, the expansion accumulation of mast and oblique cord is installed, after treating that all drag-lines and mast install, outer shroud oblique cord is carried out stretch-draw forming stage by stage.
This mounting method is divided into the following step:
The first step: the center load-carrying member of rope dome is installed on the precalculated position;
Second step: set up the lifting pylon, lifting means is installed and is linked to each other with the center load-carrying member through raising sling;
The 3rd step: each member spelling of notochord rope net, and interior ansa rope linked to each other with the center load-carrying member, the outer shroud notochord links to each other with outer-ring beam through the notochord drag cable;
The 4th step: the lifting means that promotes tower top drives raising sling the center load-carrying member is promoted, and in the lifting process, constantly adjusts notochord rope net catenary sag, simultaneously through notochord drag cable traction outer shroud notochord;
The 5th step: follow the hoisting depth of notochord rope net, ring oblique cord, middle ring oblique cord, middle ring mast and middle ring strop in installing respectively;
The 6th step: the outer shroud notochord is anchored on the outer-ring beam;
The 7th step: outer shroud mast and outer shroud strop are installed, and the outer shroud oblique cord are linked to each other with outer-ring beam by the oblique cord drag cable;
The 8th step: the outer shroud oblique cord is anchored on the outer-ring beam;
The 9th step: promote the center load-carrying member to rational position, stretch-draw outer shroud oblique cord to structure finally is shaped stage by stage;
The tenth step: remove and promote pylon, lifting means and raising sling.
The concrete operation method in second step is: according to the design elevation and the structural arrangement form of rope dome, heart load-carrying member correspondence position is set up the lifting pylon therein, promotes the pylon scaffolding height and regulates requirement a little more than rope dome design elevation with the hoisting depth that satisfies the center load-carrying member; Lifting means is installed promoting tower top, its installation site needs corresponding with the suspension centre of center load-carrying member, equipment to be hoisted install and fixing after, link to each other formation lifting system with the center load-carrying member through raising sling.
The concrete operation method in the 4th step is: the notochord rope net for the treatment of the rope dome installs, the lifting system install to be shaped, the outer shroud notochord with after outer-ring beam is connected, is implemented synchronous lifting by lifting means to the center load-carrying member through the notochord drag cable; In the lifting process, by lifting means the hoisting depth of center load-carrying member is controlled, implemented the adjustment of notochord rope net catenary sag, simultaneously, externally the ansa rope is implemented traction.
The concrete operation method in the 5th step is: according to the hoisting depth of center load-carrying member, regulate the catenary sag of notochord rope net, when in distance satisfies between the node of notochord rope net and grandstand or the ground, encircling oblique cord, middle ring oblique cord or middle ring mast installing space demand, promptly each rope bar is installed; Each rope bar erection sequence is a preface to satisfy installing space.
The concrete operation method in the 9th step is: in the stretching process, constantly adjust the hoisting depth of center load-carrying member by lifting means, with stretch-draw demand that satisfies the outer shroud oblique cord and the stretching force of adjusting the outer shroud oblique cord; Unload lift hoist cable before the stretch-draw of outer shroud oblique cord afterbody, not with condition that any supporting member links to each other under, the outer shroud oblique cord of rope dome is carried out final stretch-draw.
Beneficial effect: cable sky dome tower frame raising cable rod accumulation mounting method of the present invention according to the design elevation of rope dome and the correspondence position of center load-carrying member, is provided with the lifting pylon a little more than rope dome summit design elevation, and lifting means and raising sling is installed.By lifting, drive the notochord rope net that is attached thereto and promote the center load-carrying member.In the installation process, can change the hoisting depth of center load-carrying member easily, and cooperate with the drag cable auxiliary traction of outer shroud notochord and outer shroud oblique cord, can not only significantly reduce the distance of drawing and required drag cable power, reduced the difficulty of construction that the traction of notochord and oblique cord is in place, and follow the slow lifting of center load-carrying member and notochord rope net, near ground or see other rope bars are installed in the altitude range of table top, reduced the high-altitude installation work amount, and make things convenient for the in place and stretch-draw of drag-line, guaranteed the safety in the work progress.
Description of drawings
The present invention is described in more detail below in conjunction with drawings and Examples:
Fig. 1~Fig. 6 is a cable sky dome tower frame raising cable rod accumulation mounting method schematic diagram of the present invention.
Have among the figure: interior ansa rope 101, middle ansa rope 102, outer shroud notochord 103, interior ring oblique cord 201, middle ring oblique cord 202, outer shroud oblique cord 203, middle ring mast 301, outer shroud mast 302, middle ring strop 401, outer shroud strop 402, center load-carrying member 501, lifting pylon 601, lifting means 602, raising sling 603, notochord drag cable 701, oblique cord drag cable 702, outer-ring beam 801, grandstand 901, ground 902.
The specific embodiment
The present invention is the correspondence position according to the design elevation of rope dome and center load-carrying member, setting is a little more than the lifting pylon of rope dome summit design elevation, the center load-carrying member is evenly promoted, the traction and the center load-carrying member that are accompanied by whole notochord rope net in the lifting process promote, whole notochord rope net is also promoting simultaneously, and strop respectively thereupon, the expansion accumulation of mast and oblique cord is installed, rope bar erection sequence can by each mounting points overhead or the height of step surface adjust, after treating that all drag-lines and mast install, outer shroud oblique cord is carried out stretch-draw forming stage by stage.
Be specially center load-carrying member 501 and be positioned over ground, center, place, install and promote pylon 601 and lifting means 602, carry out putting rope and linking the node installation of outer shroud notochord 103, middle ansa rope 102 and interior ansa rope 101 simultaneously on ground, form notochord rope net, and utilize notochord drag cable 701 that outer shroud notochord 103 is connected in outer-ring beam 801 (Fig. 1); The lifting means 602 that promotes pylon 601 tops drives 603 pairs of center load-carrying members 501 of raising sling and promotes, notochord drag cable 701 traction outer shroud notochords 103 are adjusted notochord net stretched wire wire sag simultaneously, according to the differing heights of notochord rope net node, ring oblique cord 201, middle ring oblique cord 202, middle ring mast 301 and middle ring strop 401 in installing respectively; Continue lifting center load-carrying member 501, continue traction notochord drag cable 701, make the outer shroud notochord be anchored in outer-ring beam 801 (Fig. 2); Oblique cord drag cable 702 is connected with outer oblique cord 203 temporarily, and outer shroud mast 302 and outer shroud strop 402 (Fig. 3) are installed, and being positioned at the rope bar erection sequence that respectively encircles mounting points can change adjustment with the hoisting depth of notochord rope net; The outer oblique cord 203 of oblique cord drag cable 702 tractions puts in place, is anchored in outer-ring beam 801, promotes center load-carrying member 501 to rational position (Fig. 4); The outer oblique cord 203 (Fig. 5) of stretch-draw stage by stage; Finally be shaped up to structure, and remove lifting pylon 601, lifting means 602 and raising sling 603 (Fig. 6).

Claims (5)

1.一种索穹顶塔架提升索杆累积安装方法,其特征在于该安装方法分为下列步骤:1. A cable dome tower lifting cable rod cumulative installation method is characterized in that the installation method is divided into the following steps: 第一步:将索穹顶的中心承力构件(501)安装于预定位置;Step 1: install the central load-bearing member (501) of the cable dome at a predetermined position; 第二步:搭设提升塔架(601),在塔架顶部安装提升设备(602)并经提升吊索(603)与中心承力构件(501)相连;Step 2: set up a lifting tower (601), install a lifting device (602) on the top of the tower and connect it to the central load-bearing member (501) through a lifting sling (603); 第三步:脊索索网的各构件组拼,并将内环脊索(101)与中心承力构件(501)相连,外环脊索(103)经脊索牵引索(701)与外环梁(801)相连,中环脊索的一端与内环脊索相连,另一端与外环脊索相连;The third step: the components of the notochord cable net are assembled, and the inner ring notochord (101) is connected to the central load-bearing member (501), and the outer ring notochord (103) is connected to the outer ring beam (801) via the notochord traction cable (701) ), one end of the middle notochord is connected with the inner notochord, and the other end is connected with the outer notochord; 第四步:提升塔架(601)顶部的提升设备(602)带动提升吊索(603)对中心承力构件(501)进行提升,提升过程中,不断调整脊索索网悬链线垂度,同时经脊索牵引索(701)牵引外环脊索(103);Step 4: The hoisting equipment (602) on the top of the hoisting tower (601) drives the hoisting sling (603) to lift the central load-bearing member (501). Simultaneously pull the outer ring notochord (103) through the notochord traction cable (701); 第五步:跟随脊索索网的提升高度,分别安装内环斜索(201)、中环斜索(202)、中环桅杆(301)和中环环索(401);Step 5: Following the lifting height of the ridge cable net, install the inner ring cable (201), the middle ring cable (202), the middle ring mast (301) and the middle ring cable (401); 第六步:将外环脊索(103)锚固于外环梁(801)上;Step 6: Anchoring the outer ring notches (103) to the outer ring beam (801); 第七步:安装外环桅杆(302)和外环环索(402),并通过斜索牵引索(702)将外环斜索(203)与外环梁(801)相连;Step 7: Install the outer ring mast (302) and the outer ring cable (402), and connect the outer ring cable (203) to the outer ring beam (801) through the cable pull cable (702); 第八步:将外环斜索(203)锚固于外环梁(801)上;Step 8: Anchoring the outer ring cable (203) to the outer ring beam (801); 第九步:提升中心承力构件(501)至合理位置,分阶段张拉外环斜索(203)至结构最终成形;Step 9: Lift the central load-bearing member (501) to a reasonable position, and stretch the outer ring cable (203) in stages until the structure is finally formed; 第十步:拆除提升塔架(601)、提升设备(602)和提升吊索(603)。Step 10: Remove the lifting tower (601), lifting equipment (602) and lifting sling (603). 2.根据权利要求1所述的索穹顶塔架提升索杆累积安装方法,其特征在于第二步的具体操作方法为:根据索穹顶的设计标高和结构布置形式,在其中心承力构件(501)对应位置搭设提升塔架(601),提升塔架(601)搭设高度略高于索穹顶设计标高以满足中心承力构件(501)的提升高度调节要求;在提升塔架(601)顶部安装提升设备(602),其安装位置需与中心承力构件(501)的吊点相对应,待提升设备(602)安装并固定后,经提升吊索(603)与中心承力构件(501)相连,形成提升体系。2. cable dome tower according to claim 1 hoisting cable bar accumulative installation method, it is characterized in that the concrete operating method of second step is: according to the design elevation of cable dome and structural layout form, in its center load-bearing member ( 501) The lifting tower (601) is set up at the corresponding position, and the height of the lifting tower (601) is slightly higher than the design elevation of the cable dome to meet the lifting height adjustment requirements of the central load-bearing member (501); at the top of the lifting tower (601) Install the lifting device (602), and its installation position needs to correspond to the lifting point of the central load-bearing member (501). ) are connected to form a lifting system. 3.根据权利要求1所述的索穹顶塔架提升索杆累积安装方法,其特征在于第四步的具体操作方法为:待索穹顶的脊索索网安装完毕、提升体系安装成形、外环脊索(103)经脊索牵引索(701)与外环梁(801)连接后,通过提升设备(602)对中心承力构件(501)实施同步提升;提升过程中,由提升设备(602)对中心承力构件(501)的提升高度进行控制,实施脊索索网悬链线垂度的调整,同时,对外环脊索(103)实施牵引。3. The accumulative installation method for hoisting cable rods of cable dome towers according to claim 1, characterized in that the specific operation method of the fourth step is: the ridge cable net of the cable dome is to be installed, the lifting system is installed and formed, and the outer ring ridge cables are installed. (103) After the notochord traction cable (701) is connected to the outer ring beam (801), the central load-bearing member (501) is lifted synchronously by the lifting device (602); The lifting height of the load-bearing member (501) is controlled, the adjustment of the sag of the catenary line of the notochor cable net is implemented, and at the same time, the outer ring notochord (103) is pulled. 4.根据权利要求1所述的索穹顶塔架提升索杆累积安装方法,其特征在于第五步的具体操作方法为:根据中心承力构件(501)的提升高度,调节脊索索网的悬链线垂度,当脊索索网的节点与看台(901)或地面(902)之间距离满足内环斜索(201)、中环斜索(202)或中环桅杆(301)安装空间需求时,即对内环斜索(201)、中环斜索(202)或中环桅杆(301)进行安装;内环斜索(201)、中环斜索(202)或中环桅杆(301)的安装顺序以满足安装空间为序。4. The accumulative installation method for hoisting cable rods of a cable dome tower according to claim 1, characterized in that the specific operation method of the fifth step is: according to the lifting height of the central load-bearing member (501), adjust the hanging height of the ridge cable net. Chain line sag, when the distance between the nodes of the ridge cable network and the stand (901) or the ground (902) meets the installation space requirements of the inner ring cable (201), the middle ring cable (202) or the middle ring mast (301), That is, the inner ring cable (201), the middle ring cable (202) or the middle ring mast (301) are installed; the installation sequence of the inner ring cable (201), the middle ring cable (202) or the middle ring mast (301) meets The installation space is in order. 5.根据权利要求1所述的索穹顶塔架提升索杆累积安装方法,其特征在于第九步的具体操作方法为:张拉过程中,通过提升设备(602)不断调整中心承力构件(501)的提升高度,以满足外环斜索(203)的张拉需求并调整外环斜索(203)的张拉力;外环斜索(203)最后一级张拉之前卸载提升吊索(603),在不与任何支撑构件相连的条件下,对索穹顶的外环斜索(203)进行最终张拉。5. cable dome tower according to claim 1 promotes cable bar accumulative installation method, it is characterized in that the specific operation method of the 9th step is: in tensioning process, constantly adjust central load-bearing member ( 501) to meet the tension requirements of the outer ring cable (203) and adjust the tension of the outer ring cable (203); the outer ring cable (203) unloads the hoisting sling ( 603), the final tensioning of the outer ring cables (203) of the cable dome is performed without being connected to any support members.
CN2008102343621A 2008-11-12 2008-11-12 Cumulative installation method of hoisting cable rods for cable dome towers Expired - Fee Related CN101413291B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102343621A CN101413291B (en) 2008-11-12 2008-11-12 Cumulative installation method of hoisting cable rods for cable dome towers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102343621A CN101413291B (en) 2008-11-12 2008-11-12 Cumulative installation method of hoisting cable rods for cable dome towers

Publications (2)

Publication Number Publication Date
CN101413291A CN101413291A (en) 2009-04-22
CN101413291B true CN101413291B (en) 2010-07-07

Family

ID=40594008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102343621A Expired - Fee Related CN101413291B (en) 2008-11-12 2008-11-12 Cumulative installation method of hoisting cable rods for cable dome towers

Country Status (1)

Country Link
CN (1) CN101413291B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582095B (en) * 2009-06-19 2010-10-27 东南大学 Nonlinear Dynamic Finite Element Method for Determining Static Equilibrium State of Cable-strut System
CN102912989B (en) * 2012-11-14 2014-08-20 淮海工学院 Installation method for steel reticulated shell and cable dome combined structure
CN104420656A (en) * 2013-08-29 2015-03-18 上海宝冶集团有限公司 Traction tension forming mounting method of spherical rib annular type cable dome structure
CN103615064B (en) * 2013-11-27 2016-09-07 浙江精工钢结构集团有限公司 A kind of Cable dome and installation method thereof
CN103696494B (en) * 2013-12-11 2016-03-30 中冶天工上海十三冶建设有限公司 The computer of complex space trussed construction controls hydraulic synchronizing lifting construction method
CN104234200B (en) * 2014-09-24 2016-08-24 东南大学 A kind of suspen-shell structure rope leverage is by ring lifting installation method
CN106088601A (en) * 2016-07-11 2016-11-09 中建二局第二建筑工程有限公司华东分公司 The construction method of umbrella cable-membrane analysis
CN107130688B (en) * 2017-05-18 2019-06-21 中国建筑第八工程局有限公司 Suo Cheng network is without moulding bed construction method
CN111101600B (en) * 2019-11-20 2021-04-02 北京市建筑工程研究院有限责任公司 Construction method of double-oblique-arch hyperbolic paraboloid cable net structure with limited construction space
CN111042542A (en) * 2019-12-18 2020-04-21 中建科工集团有限公司 Cumulative lifting method for large-span unequal-height bidirectional curved surface net rack

Also Published As

Publication number Publication date
CN101413291A (en) 2009-04-22

Similar Documents

Publication Publication Date Title
CN101413291B (en) Cumulative installation method of hoisting cable rods for cable dome towers
CN201458596U (en) Crane with self-dismounting device
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN105401714A (en) Attached lifting scaffold and lifting method
CN104284857A (en) Heavy lifting apparatus and method
WO2021052142A1 (en) Cable-supported large-span structure and construction method therefor
CN116395578A (en) Method and device for erecting a power transmission tower
CN102493664B (en) Cable truss fixed jack oblique traction integral lifting construction method without support
CN104803303B (en) A single boom landing pole with a swinging balance arm
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN105645275B (en) Cable hoist and its construction method
CN109881590A (en) Bridge steel box girder aerial work platform and construction method
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN211037986U (en) Multistage lifting circular stage
CN205100531U (en) Lift scaffold support body assembly
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN205346600U (en) Big plate -girder hoist and mount specialized tool
RU2727300C2 (en) Mounting method of a nacelle in an upper part of a tower
CN204569237U (en) A kind of oscillating type pole equilibrium arm
CN118145476A (en) Box transformer substation lifting sling for wind power operation and maintenance and box changing method
CN201825635U (en) Hoisting structure of power station boiler
CN114776038B (en) Steel truss installation structure and step unloading method thereof
CN104085832A (en) Flexible component lifting device and lifting method thereof
CN112110349B (en) Self-hoisting tower structure special for wind power and application method thereof
CN211973127U (en) Temporary support dismantling device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100707

Termination date: 20211112