CN101403305A - 隧道(洞)连续出碴、衬砌与开挖同步的施工方法 - Google Patents
隧道(洞)连续出碴、衬砌与开挖同步的施工方法 Download PDFInfo
- Publication number
- CN101403305A CN101403305A CNA2008101413010A CN200810141301A CN101403305A CN 101403305 A CN101403305 A CN 101403305A CN A2008101413010 A CNA2008101413010 A CN A2008101413010A CN 200810141301 A CN200810141301 A CN 200810141301A CN 101403305 A CN101403305 A CN 101403305A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- steel form
- inverted arch
- form chassis
- belt conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009412 basement excavation Methods 0.000 title claims abstract description 36
- 238000010276 construction Methods 0.000 title claims abstract description 36
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 102
- 239000010959 steel Substances 0.000 claims abstract description 102
- 238000011065 in-situ storage Methods 0.000 claims abstract description 7
- 230000001360 synchronised effect Effects 0.000 claims abstract description 5
- 238000005520 cutting process Methods 0.000 claims description 30
- 239000004567 concrete Substances 0.000 claims description 25
- 238000009415 formwork Methods 0.000 claims description 21
- 238000000034 method Methods 0.000 claims description 21
- 230000009172 bursting Effects 0.000 claims description 15
- 230000003137 locomotive effect Effects 0.000 claims description 4
- 239000000725 suspension Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 4
- 238000000465 moulding Methods 0.000 abstract 8
- 235000019994 cava Nutrition 0.000 abstract 1
- 230000032258 transport Effects 0.000 description 19
- 238000010586 diagram Methods 0.000 description 12
- 230000008093 supporting effect Effects 0.000 description 8
- 239000002689 soil Substances 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 3
- 238000005422 blasting Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000009416 shuttering Methods 0.000 description 2
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 210000000003 hoof Anatomy 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明提出的隧道(洞)连续出碴、衬砌与开挖同步的施工方法为:皮带输送机前端位于开挖工作区域,由开挖工作区域至钢模板台车衬砌区域的皮带输送机位于仰拱预制块(6)上或悬挂在隧道的顶部;在钢模板台车的前方皮带输送机位于仰拱预制块或现浇仰拱基础上,在通过模板台车时使输送机(7)位于模板台车门架(4)内一侧;在模板台车(2)前面具有工作架(14),其位于钢模板台车本身循环前接的轨道(12)上;皮带运输机穿过钢模板台车后其由衬砌作业区域至隧道口位于仰拱预制块上或悬挂在隧道的顶部。本发明可实现隧道施工中的皮带输送机连续出碴和模板台车随隧道开挖同步衬砌并使汽车或轨道运输机械运输隧道施工所需的设施及其它材料。
Description
技术领域
本发明属于隧道(洞)衬砌与出碴技术,主要涉及一种隧道(洞)连续出碴、衬砌与开挖同步的施工方法,以解决现有隧道(洞)内衬砌模板台车施工与皮带输送机出碴及运输车辆的空间干涉问题。
背景技术
目前隧道建造采用的工法主要有钻爆法(矿山法)、TBM法(tunnel隧道bore钻进machine机器,简称TBM,用于硬岩掘进称为TBM,用于软岩掘进称为盾构,为大型的全断面隧道施工设备)、浅埋暗挖法等三种。不管哪一种工法,其开挖弃碴运输都可以采用汽车运输、轨道运输、长距离连续皮带运输等三种方式中的任一种。在三种施工运输方式中,皮带运输是长距离运输最有效和经济的一种,故在目前长大隧道施工中越来越趋向于采用。
隧道建造除了断面开挖成形外还需要进行永久性支护,隧道永久性支护的方式一般有预制混凝土管片环支护(主要为TBM法)、混凝土浇注支护(衬砌)和纤维混凝土喷射支护3种,前两种支护方式采用的最多。采用混凝土浇注支护方式时需要钢模板台车作为支护结构内轮廓面的成形和支撑结构。而钢模板台车是一种大型的钢结构,在隧道内部占据相当大的空间,因此隧道开挖施工采用衬砌作为永久性支护时,特别是较小断面直径的TBM隧道,一般都在隧道开挖完成后再进行衬砌作业,以避免开挖运输工序和衬砌工序的相互干扰。但隧道建造的总工期会延长。
为了缩短隧道建造的总工期,隧道界很早就提出过同步衬砌工法,即隧道开挖和衬砌同步进行,该种工法在较大断面的、及采用轨道和汽车运输的隧道建造中得以实现。但在采用输送带作为碴土运输的隧道,特别是较小直径的隧道建造,同步衬砌还从未实现过,原因是输送带装置需要穿过钢模板台车,而钢模板台车需要一个循环接一个循环的向前移动,但输送带装置是固定的,并对安装精度敏感,稍有位置改动即引起皮带跑偏。因此在同步衬砌技术领域,长距离连续皮带运输与钢模板台车相互干涉问题一直未能解决。
除了皮带运输与钢模板台车本身的干涉,当采用皮带运输弃碴时,还需要配置辅助汽车或轨道运输用于运送隧道施工所需的其他材料,因此还需要保留汽车或轨道的运输通道,在狭窄的隧道空间条件下,即要解决皮带运输与钢模板台车本身的干涉,又要留出汽车或轨道的运输通道,使采用长距离连续皮带运输时的同步衬砌问题更复杂。过去设计过多种使输送带装置穿过钢模板台车的技术方案,因在实践中都不具备可行性,因而均未实际采用。
发明内容
本发明提出一种隧道(洞)皮带输送机连续出碴、模板台车衬砌与开挖同步的施工方法,其主要目的就在于实现隧道施工中的皮带输送机连续出碴和模板台车随隧道开挖同步衬砌,还可使汽车或轨道运输机械运输隧道施工所需的设施及其它材料。
本发明采取下述技术方案实现其发明目的:在隧道(洞)内设置皮带输送机并使皮带输送机前端位于开挖工作区域,由开挖工作区域至钢模板台车衬砌区域的皮带输送机位于TBM法施工已铺放的仰拱预制块上或在钻爆法施工时通过悬吊方式悬挂在隧道(洞)的顶部;在钢模板台车的前方皮带输送机位于已铺放的仰拱预制块或现浇仰拱基础上,在通过模板台车时使皮带输送机位于模板台车门架内一侧已铺放的仰拱预制块或现浇仰拱基础上;钢模板台车门架内的另一侧为汽车通道或轨道,供运输机械通过;利用钢模板台车本身循环前接的轨道,在钢模板台车前面设置一个先行于钢模板台车的钢结构工作架,用以处理欠挖作业及铺放防水板;皮带运输机穿过钢模板台车后其由衬砌作业区域至隧道(洞)口位于TBM法施工已铺放的仰拱预制块上或在钻爆法施工时仍然通过悬吊方式悬挂在隧道(洞)的顶部。
采用TBM法施工的隧道,在钢模板台车的后面,利用钢模板台车本身循环前接的轨道,设置一个跟随钢模板台车前行的钢结构会车平台,所述会车平台位于皮带运输机的上方,会车平台的两端具有坡道或坡轨,供运输汽车或有轨运输机械利用其会车,在所述会车平台上放置混凝土输送泵、混凝土运输车和牵引机车。
在TBM法施工的隧道,在TBM刀盘后面的隧道底部至洞口安装有仰拱预制块,皮带运输机从TBM出来后即放置在仰拱预制块上,向后顺延到模板台车的衬砌区域,由钢模板台车至隧道洞口,具有平行设置的皮带输送机、单车行走的通道或单轨;在模板台车前后隧道的会车点设置有简易会车支架,该支架的高度>运输车辆,将皮带输送机引至会车支架上,会车支架下供运输汽车会车或铺设双轨和道岔供有轨运输机械会车。
采用钻爆法施工的隧道,其隧道底部的仰拱基础采用现浇混凝土制作,即由自身具有循环前接轨道的移动栈桥进行浇注作业;在开挖面后方将皮带输送机悬挂在隧道(洞)顶部,与隧道施工的通风管平行,其下方利用移动栈桥进行隧道底部仰拱基础的现浇制作并使运输车辆从移动栈桥通过;皮带输送机在钢模板台车前即衬砌区域前方被向下引至地面,穿过钢模板台车时,其位于钢模板台车门架的一侧,从钢模板台车穿过后再向上引至隧道(洞)的顶部呈悬挂结构,以使无轨或有轨运输车辆的通行,并可制作仰拱基础两侧的排水沟等隧道设施。
钻爆法施工时,皮带输送机位于装载机、破碎机、刮板运输机后端接收并输送弃碴,在开挖区域皮带输送机位于地面上的长度为100~200米,后由吊索悬吊上引至隧道(洞)顶部并与隧道施工的通风管平行,输送机下方由移动栈桥随开挖面后进行隧道仰拱基础的混凝土现浇制作,在通过进行衬砌作业的钢模板台车前被下引过渡至已现浇制作好的仰拱基础上,穿过钢模板台车时皮带输送机位于模板台车门架一侧并与运输通道平行设置;通过钢模板台车后又由吊索悬吊上引至隧道(洞)顶部并与隧道施工的通风管平行;根据隧道施工规范和施工工艺的要求,综合考虑钻爆法施工进度的因素,在钢模板台车衬砌区域,输送带一次放置在仰拱基础面上的长度约为300~400m。模板台车在该区域段衬砌作业完成后,也即当钢模板台车移动至该段皮带输送机前端时,将钢模板台车前方的被悬挂在隧道(洞)顶部的皮带输送机放下置于地面仰拱基础上,该段输送带长度同样约为300~400米,同时将钢模板台车后部的位于地面仰拱基础上长度为300~400米的皮带输送机重新悬挂在隧道(洞)的顶部。
皮带输送机将碴土运送出隧道(洞)口后,不再受空间干涉问题的制约,是直接用皮带输送机将弃碴运送到弃碴场,还是先将碴土运送到转运场,然后再用自卸汽车从转运场转运至弃碴场,需要根据隧道(洞)外的场地布置、道路交通及经济效益情况综合考虑确定。
本发明提出的方法可有效解决隧道施工时的皮带输送机出碴、钢模板台车随隧道开挖同步衬砌及运输作业存在的空间干涉问题,使皮带输送机连续出碴、钢模板台车随隧道开挖同步衬砌、车辆运输的同时作业得以实现,从而提高隧道施工的效率,缩短隧道施工周期。
附图说明
图1~图6为TBM法施工皮带输送机与钢模板台车、工作架及与会车平台、会车支架空间位置示意图。
其中:
图1为皮带输送机穿越钢模板台车基本布置示意图。
图2为钢模板台车脱模前移时与输送带基本布置示意图。
图3为钢模板台车后面会车平台与输送带布置示意图。
图4为钢模板台车前面工作架与输送带布置示意图。
图5为钢模板台车前后隧道中会车点简易支架与输送带布置示意图。
图6-1、6-2为输送带穿越钢模板台车及衬砌区域纵断面示意图。
图7~图11为钻爆法施工皮带输送机与钢模板台车、工作架及移动栈桥施工、输送带悬挂空间位置示意图。
其中:
图7为钻爆法施工输送带穿越钢模板台车基本布置示意图。
图8为钻爆法施工钢模板台车脱模前移时与输送带基本布置示意图。
图9为钢模板台车前面输送带悬挂及移动栈桥施工示意图。
图10为输送带穿越钢模板台车及衬砌区域纵断面示意图。
图11为钢模板台车后面输送带悬挂及水沟施工示图。
图中,1、通风管,2、钢模板台车,3、衬砌混凝土,4、钢模板台车门架,5、边墙基础,6、预制仰拱块,7、皮带输送机,8、轨道车辆,9、模板脱模间隙,11、会车平台,12、钢模板台车循环前接的轨道,13、会车平台两端坡轨,14、工作架,15、简易会车支架,16、牵引机车,17、混凝土输送车,18、混凝土输送泵,19、辅助运输轨线,20、单开道岔,21、隧道底部浇注基础,22、运输汽车,23、移动栈桥,24、倾卸汽车,25、吊索,26、移动栈桥下部施作的仰拱基础,28、移动栈桥前悬挂的输送带,31、开挖面碴土,32、装载机,33、破碎机及刮板输送机,34、输送带及前部延伸装置,35、临时循环轨道,36、需要制作的仰拱基础。
具体实施方式
结合附图对本发明方法加以说明,但不构成对本发明的任何限制:
如图1所示,TBM法隧道开挖为圆形断面,在TBM设备内部的隧道底部即铺设预制仰拱块6,在TBM设备后面,在仰拱块两侧人工浇注边墙基础5,边墙基础上铺设供钢模板台车行走的钢结构模板循环前接的轨道12,图中,钢模板台车外轮廓面是浇注的混凝土边墙及拱顶,与仰拱块6、边墙基础5一道作为隧道的永久性支护,钢模板台车门架4内部左侧为长距离连续皮带运输机7,向外连续输送TBM刀盘开挖的弃碴,门架内右侧为辅助运输的轨道,供有轨运输机械运输施工设施及材料,也可为运输汽车的通道。
如图2所示,钢模板台车为脱模状态,模板总成已经脱离衬砌内轮廓面,在该状态下,钢模板台车在临时轨道上向前行驶平移到下一个工位。如图所示,在该状态下,钢模板台车的结构空间与门架内部的长距离连续皮带运输机和辅助运输车辆不发生空间干涉。
如图3所示,跟随钢模板台车后面的会车平台11,其行走在钢模板台车的临时轨道12上,并位于输送带的上方,钢模板台车衬砌作业浇注混凝土时,为其提供混凝土的混凝土输送泵18、混凝土输送车17及牵引机车16位于会车平台的左侧,右侧为不能中断的辅助运输通道,泵送混凝土期间仍然保持辅助运输通道的畅通。平台下面左侧为皮带运输机7,右侧为运输机械通道并在其前、后两端设有坡道或坡轨13,如果辅助运输采用汽车,则平台为单纯的承力平台,该实施例中为坡轨,与平台上右侧所设置的轨道相连,供车辆爬上平台,平台上铺设道岔和轨道双线。混凝土输送车等从隧道外沿辅助轨道驶进后爬上平台,顺单开道岔驶到左侧(结合图6)。
如图4所示,钢模板台车前面的工作架14,其行驶在钢模板台车临时轨道12上,随钢模板台车一起前移,工作架负责提供操作平台,人工在操作平台上,在开挖的隧道内表面安装防水板,使衬砌混凝土与地层隔开,防止地下水渗透衬砌混凝土。
如图5所示,图5表示钢模板台车前后隧道的会车点,由于隧道很长,隧道内底部左侧已经被长距离皮带输送机占据,右侧的辅助轨线为单线,需要会车点交汇相向行驶的车辆。图中,设置的简易会车支架15,皮带输送机被引上会车支架,支架的下部空间为会车双线,该实施例中为轨道会车双线及道岔。
钢模板台车前的会车点会被前移,前移作业时,TBM及输送带停止作业,待架子前移完成后才开始继续开挖。该段时间很短,可以同时进行设备维修等其它工序工作。
图7表示在钻爆法施工时输送带穿越钢模板台车基本布置示意图,钻爆法隧道断面为马蹄形,仰拱基础现浇,钢模板台车利用在现浇仰拱基础上的临时轨道行走。输送带7放置在钢模板台车门架4内部的一侧,另一侧为汽车辅助运输通道。
图8给出了钢模板台车脱模前移时与皮带输送机及运输车辆互不干涉的示意。
如图9所示,其给出了采用钻爆法施工时隧道中皮带输送机、移动栈桥空间位置的示意。如图9所示,在开挖面后部,装载机爆破下来的碴土装载到破碎机进料口,大块的石头被破碎后从出料口卸到刮板输送机上,以便抬高再卸入皮带输送机7,输送机前端与破碎及刮板机随开挖面循环向前移动,输送带在平置段的长度为100~200m,即长距离皮带输送机从开挖掌子面的破碎机后顺延-向后输送弃碴。其后部被吊索25悬吊在隧道(洞)顶部与隧道施工的通风管1平行,输送机的下方利用移动栈桥23进行隧道底部仰拱基础26的现浇制作,与输送机不发生空间干涉,运输车辆从移动栈桥上通过。结合图10,皮带输送机在穿过钢模板台车前被放到制作好的现浇仰拱基础2上通过钢模板台车2,与钢模板台车的衬砌循环作业不发生空间干涉。在钢模板台车衬砌区域,输送带一次放置在仰拱基础面上的长度为300~400米左右,与衬砌模板台车每循环前行一次的长度一致,与衬砌模板台车的月进度相当;如图11所示,输送带在通过钢模板台车后,在已经进行混凝土衬砌的区域仍然将皮带输送机用吊索25悬挂在隧道(洞)顶部,以便在保持运输、会车通道的同时,制作仰拱基础两侧的排水沟等隧道设施。钢模板台车前面输送带的放下和模板台车后面输送带的重新悬挂在集中的时间里同时进行,每个月需要停止开挖1天,输送带停止工作,将钢模板台车前面悬挂输送带根据坡度要求逐渐放下,同时将钢模板台车后面已经在基础面上的输送带重新悬挂至符合要求的坡度。
如图9所示,在钻爆法施工中进行底部仰拱浇注作业时,皮带输送机悬挂在开挖拱顶的下面,保证了碴土运输的需要。材料运输车通过该区段时,要保证既不与现浇混凝土作业发生干涉,又不破坏还没有达到养生强度的现浇混凝土仰拱块;图11表示钢模板台车后面水沟施工及汽车运输通道及输送带悬挂方式。
Claims (1)
1、一种隧道(洞)皮带输送机连续出碴、模板台车衬砌与开挖同步的施工方法,其特征是:在隧道(洞)内设置皮带输送机(7)并使皮带输送机前端位于开挖工作区域,由开挖工作区域至钢模板台车衬砌区域的皮带输送机位于TBM法施工已铺放的仰拱预制块(6)上或在钻爆法施工时通过悬吊方式悬挂在隧道(洞)的顶部;在钢模板台车的前方皮带输送机位于已铺放的仰拱预制块或现浇仰拱基础上,在通过模板台车时使输送机(7)位于模板台车门架(4)内一侧已铺放或已浇注的仰拱上;钢模板台车门架(4)内的另一侧为汽车通道或轨道,供运输机械通过;利用钢模板台车本身循环前接的轨道(12),在模板台车(2)前面设置一个跟随模板台车前行的钢结构工作架(14),用以处理欠挖作业及铺放防水板;皮带运输机(7)穿过钢模板台车后其由衬砌作业区域至隧道(洞)口位于TBM法施工已铺放的仰拱预制块上或在钻爆法施工时仍然通过悬吊方式悬挂在隧道(洞)的顶部;
采用TBM法施工的隧道,在钢模板台车(2)的后面,利用钢模板台车本身循环前接的轨道(12),设置一个跟随钢模板台车前行的钢结构会车平台(11),所述会车平台(11)位于皮带运输机(7)的上方,会车平台的两端具有坡道或坡轨(13),供运输汽车或有轨运输机械利用其会车,在所述会车平台上放置混凝土输送泵(18)、混凝土运输车(17)及牵引机车(16);
在TBM法施工的隧道,在TBM刀盘后面的隧道底部至洞口安装有仰拱预制块(6),皮带运输机(7)从TBM出来后即放置在仰拱预制块上,向后顺延到模板台车的衬砌区域,由钢模板台车至隧道洞口,具有平行设置的皮带输送机(7)、单车行走的通道或单轨;在钢模板台车前后隧道的会车点设置有简易会车支架(15),该支架的高度>运输车辆高度,将皮带输送机引至会车支架上,会车支架下供运输汽车会车或铺设双轨和道岔供有轨运输机械会车;
采用钻爆法施工的隧道,其隧道底部的仰拱基础采用现浇混凝土制作,即由自身具有循环前接轨道的移动栈桥(23)进行浇注作业;在开挖面后方将皮带输送机悬挂在隧道(洞)顶部,与隧道施工的通风管(1)平行,其下方利用移动栈桥进行隧道底部仰拱基础的现浇制作并使运输车辆从移动栈桥通过;皮带输送机(7)在钢模板台车前即衬砌区域前方被向下引至地面,穿过钢模板台车时,其位于钢模板台车门架(4)的一侧,从钢模板台车穿过后再向上引至隧道(洞)的顶部呈悬挂结构,以使无轨或有轨运输车辆的通行,并可制作仰拱基础两侧的排水沟等隧道设施;
采用钻爆法施工时,皮带输送机位于装载机、破碎机、刮板运输机后端接收并输送弃碴,在开挖区域其位于地面上的长度为100~200米,后由吊索(25)悬吊上引至隧道(洞)顶部并与隧道施工的通风管(1)平行,输送机下方由移动栈桥(23)随开挖面后进行隧道仰拱基础的混凝土现浇制作,在通过进行衬砌作业的模板台车(2)前被下引过渡至已现浇制作好的仰拱基础上,穿过模板台车时输送机位于模板台车门架(4)一侧并与运输通道平行设置;通过模板台车后又由吊索(25)悬吊上引至隧道(洞)顶部并与隧道施工的通风管(1)平行;皮带输送机在衬砌区域位于地面仰拱基础上的长度为300~400米,模板台车在该区域段衬砌作业完成后,也即当钢模板台车(2)移动至该段皮带输送机前端时,将钢模板台车前方的被悬挂在隧道(洞)顶部的皮带输送机放下置于地面仰拱基础上,该段输送带长度为300~400米,同时将钢模板台车后部的位于地面仰拱基础上长度为300~400米的皮带输送机重新悬挂在隧道(洞)的顶部。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101413010A CN101403305B (zh) | 2008-09-08 | 2008-09-08 | 隧道连续出碴、衬砌与开挖同步的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101413010A CN101403305B (zh) | 2008-09-08 | 2008-09-08 | 隧道连续出碴、衬砌与开挖同步的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101403305A true CN101403305A (zh) | 2009-04-08 |
CN101403305B CN101403305B (zh) | 2010-08-11 |
Family
ID=40537438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101413010A Expired - Fee Related CN101403305B (zh) | 2008-09-08 | 2008-09-08 | 隧道连续出碴、衬砌与开挖同步的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101403305B (zh) |
Cited By (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858221A (zh) * | 2010-05-11 | 2010-10-13 | 中铁西南科学研究院有限公司 | 适用钻爆施工隧道连续皮带出碴方法及其实施系统和设备 |
CN101915105A (zh) * | 2010-08-09 | 2010-12-15 | 中国科学院武汉岩土力学研究所 | 一种tbm施工隧道极强或强岩爆洞段的联合掘进方法 |
CN101598025B (zh) * | 2009-06-22 | 2011-04-20 | 中国水利水电第七工程局有限公司 | 多功能装配式液压驱动移动栈桥 |
CN102230383A (zh) * | 2011-06-14 | 2011-11-02 | 中交隧道工程局有限公司 | 全液压隧道仰拱栈桥式移动模架 |
CN102230381A (zh) * | 2011-06-02 | 2011-11-02 | 中铁五局集团第一工程有限责任公司 | 一种空心针梁衬砌台车 |
CN101929341B (zh) * | 2010-01-12 | 2012-07-04 | 中铁隧道集团二处有限公司 | Tbm同步衬砌施工方法 |
CN102587928A (zh) * | 2012-03-15 | 2012-07-18 | 中国铁建重工集团有限公司 | 一种环形切削成拱预支护隧道施工成套设备 |
CN102704948A (zh) * | 2012-06-07 | 2012-10-03 | 中铁十一局集团第四工程有限公司 | 用于长大箱涵的模板台车施工工艺 |
CN103437781A (zh) * | 2013-08-16 | 2013-12-11 | 石家庄铁道大学 | 开敞式tbm直接侧卸料混凝土喷射系统 |
CN103742160A (zh) * | 2014-01-17 | 2014-04-23 | 上海隧道工程股份有限公司 | 一种隧道内上部结构的安装装置 |
CN104018855A (zh) * | 2014-06-26 | 2014-09-03 | 湖南五新重型装备有限公司 | 一种内通式针梁衬砌台车 |
CN104832202A (zh) * | 2015-05-15 | 2015-08-12 | 东北大学 | 一次性衬砌的液压可伸缩移动衬车 |
CN105756682A (zh) * | 2016-02-25 | 2016-07-13 | 北京市政建设集团有限责任公司 | 一种结合钻注法的暗挖隧道机械化施工方法 |
CN105781587A (zh) * | 2016-04-30 | 2016-07-20 | 山西省交通科学研究院 | 一种隧道开挖拱顶紧急支护设备及方法 |
CN106121681A (zh) * | 2016-08-29 | 2016-11-16 | 中国葛洲坝集团第工程有限公司 | 湿喷混凝土衬砌设备组合台车 |
CN106150509A (zh) * | 2016-08-05 | 2016-11-23 | 中铁工程装备集团有限公司 | 一种双线隧道非钻爆机械化施工方法 |
CN106246203A (zh) * | 2016-08-03 | 2016-12-21 | 中国十七冶集团有限公司 | 一种用于隧道初期支护的模筑混凝土模板支架 |
CN106608491A (zh) * | 2015-10-22 | 2017-05-03 | 中铁二局集团有限公司 | 大坡率出入口通道可调式传送带出渣方法 |
CN107435558A (zh) * | 2017-09-22 | 2017-12-05 | 中国水利水电第四工程局有限公司 | 一种小断面隧道开挖施工用运输机构及施工方法 |
CN108266218A (zh) * | 2018-03-20 | 2018-07-10 | 上海市城市建设设计研究总院(集团)有限公司 | 地下隧道或廊道的预制叠合式通风管道结构 |
CN108590745A (zh) * | 2018-04-03 | 2018-09-28 | 上海隧道工程有限公司 | 盾构法隧道施工的运输方法及其运输结构 |
CN108756892A (zh) * | 2018-04-03 | 2018-11-06 | 中南大学 | 作业平台及其用于隧道施工的连续作业系统和作业方法 |
JP2019039258A (ja) * | 2017-08-28 | 2019-03-14 | 株式会社フジタ | テレスコピックセントル式のトンネルの2次覆工工法 |
CN109538238A (zh) * | 2018-12-07 | 2019-03-29 | 中铁四局集团有限公司 | 一种隧道拱部预制管片施工装置及控制方法 |
CN109809144A (zh) * | 2019-03-28 | 2019-05-28 | 西安中铁工程装备有限公司 | 一种局部包裹式连续输送带运输系统及运输方法 |
CN109826653A (zh) * | 2018-03-27 | 2019-05-31 | 中建三局集团有限公司 | 同步施工模板台车及其施工方法 |
CN109915164A (zh) * | 2019-03-01 | 2019-06-21 | 北京市轨道交通建设管理有限公司 | 一种隧道联络通道的土体转运方法 |
CN110617070A (zh) * | 2019-10-15 | 2019-12-27 | 中铁五局集团第一工程有限责任公司 | 一种隧道施工方法 |
CN110645019A (zh) * | 2019-10-15 | 2020-01-03 | 中铁五局集团第一工程有限责任公司 | 一种集成式隧道施工设备 |
CN110645020A (zh) * | 2019-10-15 | 2020-01-03 | 中铁五局集团第一工程有限责任公司 | 一种施工设备行走方法 |
CN110656958A (zh) * | 2019-10-15 | 2020-01-07 | 中铁五局集团第一工程有限责任公司 | 一种平稳式施工装置 |
CN111140254A (zh) * | 2019-12-19 | 2020-05-12 | 中建三局基础设施建设投资有限公司 | 一种长距离隧道全圆二衬仰拱施工模板体系及模板转运方法 |
CN111379565A (zh) * | 2020-04-10 | 2020-07-07 | 中铁十八局集团有限公司 | 一种tbm会车平台拖车安装方法 |
CN111717600A (zh) * | 2020-06-11 | 2020-09-29 | 山东省煤炭技术服务有限公司 | 煤炭井下运输装置 |
CN111894622A (zh) * | 2020-08-05 | 2020-11-06 | 中国铁建重工集团股份有限公司 | 钻爆法施工出碴系统 |
CN111963220A (zh) * | 2020-08-31 | 2020-11-20 | 中铁六局集团有限公司 | 隧道无轨运输施工系统 |
CN112696214A (zh) * | 2021-01-20 | 2021-04-23 | 山东省公路桥梁建设有限公司 | 一种隧道施工方法 |
CN113931646A (zh) * | 2021-10-13 | 2022-01-14 | 中煤第三建设(集团)有限责任公司 | 煤矿特长斜井敞开式tbm施工防治水系统及方法 |
JP2022027989A (ja) * | 2017-08-28 | 2022-02-14 | 株式会社フジタ | テレスコピックセントル式のトンネルの2次覆工工法に用いられるガントリー台車 |
CN117935577A (zh) * | 2024-03-21 | 2024-04-26 | 中铁四局集团有限公司 | 一种小直径圆形水工隧道通行施工系统及通行指挥方法 |
-
2008
- 2008-09-08 CN CN2008101413010A patent/CN101403305B/zh not_active Expired - Fee Related
Cited By (63)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101598025B (zh) * | 2009-06-22 | 2011-04-20 | 中国水利水电第七工程局有限公司 | 多功能装配式液压驱动移动栈桥 |
CN101929341B (zh) * | 2010-01-12 | 2012-07-04 | 中铁隧道集团二处有限公司 | Tbm同步衬砌施工方法 |
CN101858221A (zh) * | 2010-05-11 | 2010-10-13 | 中铁西南科学研究院有限公司 | 适用钻爆施工隧道连续皮带出碴方法及其实施系统和设备 |
CN101858221B (zh) * | 2010-05-11 | 2012-02-08 | 中铁西南科学研究院有限公司 | 适用钻爆施工隧道连续皮带出碴方法及其实施系统和设备 |
CN101915105A (zh) * | 2010-08-09 | 2010-12-15 | 中国科学院武汉岩土力学研究所 | 一种tbm施工隧道极强或强岩爆洞段的联合掘进方法 |
CN101915105B (zh) * | 2010-08-09 | 2012-07-04 | 中国科学院武汉岩土力学研究所 | 一种tbm施工隧道极强或强岩爆洞段的联合掘进方法 |
CN102230381B (zh) * | 2011-06-02 | 2013-03-20 | 中铁五局集团第一工程有限责任公司 | 一种空心针梁衬砌台车 |
CN102230381A (zh) * | 2011-06-02 | 2011-11-02 | 中铁五局集团第一工程有限责任公司 | 一种空心针梁衬砌台车 |
CN102230383A (zh) * | 2011-06-14 | 2011-11-02 | 中交隧道工程局有限公司 | 全液压隧道仰拱栈桥式移动模架 |
CN102230383B (zh) * | 2011-06-14 | 2013-07-03 | 中交隧道工程局有限公司 | 全液压隧道仰拱栈桥式移动模架 |
CN102587928A (zh) * | 2012-03-15 | 2012-07-18 | 中国铁建重工集团有限公司 | 一种环形切削成拱预支护隧道施工成套设备 |
CN102587928B (zh) * | 2012-03-15 | 2013-04-10 | 中国铁建重工集团有限公司 | 一种环形切削成拱预支护隧道施工成套设备 |
CN102704948A (zh) * | 2012-06-07 | 2012-10-03 | 中铁十一局集团第四工程有限公司 | 用于长大箱涵的模板台车施工工艺 |
CN102704948B (zh) * | 2012-06-07 | 2015-02-04 | 中铁十一局集团第四工程有限公司 | 用于长大箱涵的模板台车施工工艺 |
CN103437781A (zh) * | 2013-08-16 | 2013-12-11 | 石家庄铁道大学 | 开敞式tbm直接侧卸料混凝土喷射系统 |
CN103742160B (zh) * | 2014-01-17 | 2015-12-02 | 上海隧道工程股份有限公司 | 一种隧道内上部结构的安装装置 |
CN103742160A (zh) * | 2014-01-17 | 2014-04-23 | 上海隧道工程股份有限公司 | 一种隧道内上部结构的安装装置 |
CN104018855B (zh) * | 2014-06-26 | 2016-01-20 | 湖南五新隧道智能装备股份有限公司 | 一种内通式针梁衬砌台车 |
CN104018855A (zh) * | 2014-06-26 | 2014-09-03 | 湖南五新重型装备有限公司 | 一种内通式针梁衬砌台车 |
CN104832202A (zh) * | 2015-05-15 | 2015-08-12 | 东北大学 | 一次性衬砌的液压可伸缩移动衬车 |
CN106608491A (zh) * | 2015-10-22 | 2017-05-03 | 中铁二局集团有限公司 | 大坡率出入口通道可调式传送带出渣方法 |
CN105756682A (zh) * | 2016-02-25 | 2016-07-13 | 北京市政建设集团有限责任公司 | 一种结合钻注法的暗挖隧道机械化施工方法 |
CN105781587B (zh) * | 2016-04-30 | 2017-07-21 | 山西省交通科学研究院 | 一种隧道开挖拱顶紧急支护设备及方法 |
CN105781587A (zh) * | 2016-04-30 | 2016-07-20 | 山西省交通科学研究院 | 一种隧道开挖拱顶紧急支护设备及方法 |
CN106246203A (zh) * | 2016-08-03 | 2016-12-21 | 中国十七冶集团有限公司 | 一种用于隧道初期支护的模筑混凝土模板支架 |
CN106150509A (zh) * | 2016-08-05 | 2016-11-23 | 中铁工程装备集团有限公司 | 一种双线隧道非钻爆机械化施工方法 |
CN106121681B (zh) * | 2016-08-29 | 2018-07-27 | 中国葛洲坝集团第一工程有限公司 | 湿喷混凝土衬砌设备组合台车 |
CN106121681A (zh) * | 2016-08-29 | 2016-11-16 | 中国葛洲坝集团第工程有限公司 | 湿喷混凝土衬砌设备组合台车 |
JP7166424B2 (ja) | 2017-08-28 | 2022-11-07 | 株式会社フジタ | テレスコピックセントル式のトンネルの2次覆工工法に用いられるガントリー台車 |
JP2019039258A (ja) * | 2017-08-28 | 2019-03-14 | 株式会社フジタ | テレスコピックセントル式のトンネルの2次覆工工法 |
JP2022027989A (ja) * | 2017-08-28 | 2022-02-14 | 株式会社フジタ | テレスコピックセントル式のトンネルの2次覆工工法に用いられるガントリー台車 |
JP6998701B2 (ja) | 2017-08-28 | 2022-02-10 | 株式会社フジタ | テレスコピックセントル式のトンネルの2次覆工工法 |
CN107435558A (zh) * | 2017-09-22 | 2017-12-05 | 中国水利水电第四工程局有限公司 | 一种小断面隧道开挖施工用运输机构及施工方法 |
CN108266218A (zh) * | 2018-03-20 | 2018-07-10 | 上海市城市建设设计研究总院(集团)有限公司 | 地下隧道或廊道的预制叠合式通风管道结构 |
CN109826653B (zh) * | 2018-03-27 | 2020-10-27 | 中建三局集团有限公司 | 同步施工模板台车及其施工方法 |
CN109826653A (zh) * | 2018-03-27 | 2019-05-31 | 中建三局集团有限公司 | 同步施工模板台车及其施工方法 |
CN108590745A (zh) * | 2018-04-03 | 2018-09-28 | 上海隧道工程有限公司 | 盾构法隧道施工的运输方法及其运输结构 |
CN108756892B (zh) * | 2018-04-03 | 2023-08-18 | 中南大学 | 作业平台及其用于隧道施工的连续作业系统和作业方法 |
CN108756892A (zh) * | 2018-04-03 | 2018-11-06 | 中南大学 | 作业平台及其用于隧道施工的连续作业系统和作业方法 |
CN108590745B (zh) * | 2018-04-03 | 2020-05-12 | 上海隧道工程有限公司 | 盾构法隧道施工的运输方法及其运输结构 |
CN109538238B (zh) * | 2018-12-07 | 2024-05-10 | 中铁四局集团有限公司 | 一种隧道拱部预制管片施工装置及控制方法 |
CN109538238A (zh) * | 2018-12-07 | 2019-03-29 | 中铁四局集团有限公司 | 一种隧道拱部预制管片施工装置及控制方法 |
CN109915164A (zh) * | 2019-03-01 | 2019-06-21 | 北京市轨道交通建设管理有限公司 | 一种隧道联络通道的土体转运方法 |
CN109915164B (zh) * | 2019-03-01 | 2020-06-19 | 中铁十四局集团有限公司 | 一种隧道联络通道的土体转运方法 |
CN109809144A (zh) * | 2019-03-28 | 2019-05-28 | 西安中铁工程装备有限公司 | 一种局部包裹式连续输送带运输系统及运输方法 |
CN110617070B (zh) * | 2019-10-15 | 2020-12-11 | 中铁五局集团第一工程有限责任公司 | 一种隧道施工方法 |
CN110656958A (zh) * | 2019-10-15 | 2020-01-07 | 中铁五局集团第一工程有限责任公司 | 一种平稳式施工装置 |
CN110645019A (zh) * | 2019-10-15 | 2020-01-03 | 中铁五局集团第一工程有限责任公司 | 一种集成式隧道施工设备 |
CN110645020A (zh) * | 2019-10-15 | 2020-01-03 | 中铁五局集团第一工程有限责任公司 | 一种施工设备行走方法 |
CN110617070A (zh) * | 2019-10-15 | 2019-12-27 | 中铁五局集团第一工程有限责任公司 | 一种隧道施工方法 |
CN110656958B (zh) * | 2019-10-15 | 2021-02-26 | 中铁五局集团第一工程有限责任公司 | 一种平稳式施工装置 |
CN110645020B (zh) * | 2019-10-15 | 2021-02-26 | 中铁五局集团第一工程有限责任公司 | 一种施工设备行走方法 |
CN110645019B (zh) * | 2019-10-15 | 2021-02-26 | 中铁五局集团第一工程有限责任公司 | 一种集成式隧道施工设备 |
CN111140254A (zh) * | 2019-12-19 | 2020-05-12 | 中建三局基础设施建设投资有限公司 | 一种长距离隧道全圆二衬仰拱施工模板体系及模板转运方法 |
CN111379565B (zh) * | 2020-04-10 | 2021-10-12 | 中铁十八局集团有限公司 | 一种tbm会车平台拖车安装方法 |
CN111379565A (zh) * | 2020-04-10 | 2020-07-07 | 中铁十八局集团有限公司 | 一种tbm会车平台拖车安装方法 |
CN111717600A (zh) * | 2020-06-11 | 2020-09-29 | 山东省煤炭技术服务有限公司 | 煤炭井下运输装置 |
CN111894622A (zh) * | 2020-08-05 | 2020-11-06 | 中国铁建重工集团股份有限公司 | 钻爆法施工出碴系统 |
CN111963220A (zh) * | 2020-08-31 | 2020-11-20 | 中铁六局集团有限公司 | 隧道无轨运输施工系统 |
CN112696214A (zh) * | 2021-01-20 | 2021-04-23 | 山东省公路桥梁建设有限公司 | 一种隧道施工方法 |
CN113931646A (zh) * | 2021-10-13 | 2022-01-14 | 中煤第三建设(集团)有限责任公司 | 煤矿特长斜井敞开式tbm施工防治水系统及方法 |
CN113931646B (zh) * | 2021-10-13 | 2024-03-29 | 中煤第三建设(集团)有限责任公司 | 煤矿特长斜井敞开式tbm施工防治水系统及方法 |
CN117935577A (zh) * | 2024-03-21 | 2024-04-26 | 中铁四局集团有限公司 | 一种小直径圆形水工隧道通行施工系统及通行指挥方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101403305B (zh) | 2010-08-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101403305B (zh) | 隧道连续出碴、衬砌与开挖同步的施工方法 | |
CN101929341B (zh) | Tbm同步衬砌施工方法 | |
EP0334262B1 (en) | Method and apparatus for enlarging tunnels | |
CN104747199B (zh) | 一种具有管片安装功能的敞开式tbm | |
CN100494635C (zh) | 矸石充填采空区的方法 | |
CN201284653Y (zh) | Tbm法隧道施工中钢模板台车和皮带输送机的布置结构 | |
CN103628893A (zh) | 钻爆盾构机 | |
CN202703579U (zh) | 大坡度斜井有轨运输施工装置 | |
JP2017048588A (ja) | 掘削物の搬出システムおよび搬出方法 | |
JP6605944B2 (ja) | シールドトンネル内部の構築方法 | |
CN201284654Y (zh) | 钻爆法隧道施工中钢模板台车和皮带输送机的布置结构 | |
CN211115999U (zh) | 一种穿越破碎带围岩的岩石开采装置 | |
CN102518449A (zh) | 铺设内弧面仰拱预制块隧道、洞tbm同步衬砌台车 | |
CN110821508A (zh) | 一种穿越破碎带围岩的岩石开采装置及开采方法 | |
CN106321116B (zh) | 一种隧洞洞挖及衬砌混凝土平行作业的施工方法 | |
EP0431909B1 (en) | Improvements in and relating to forming a passageway through the ground | |
CN202417521U (zh) | 铺设内弧面仰拱预制块隧道、洞tbm同步衬砌台车 | |
JP6549411B2 (ja) | シールドトンネルの床版構築方法 | |
JP3831900B2 (ja) | トンネル施工方法 | |
US4396313A (en) | Method of forming flooring in tunnels | |
JP2899880B1 (ja) | トンネル施工装置 | |
CN114151090B (zh) | 一种用于两台相向施工的tbm的拆卸及运输方法 | |
JP3996597B2 (ja) | オープンシールド機およびこれを使用するオープンシールド工法 | |
CN210317319U (zh) | 一种煤矿用小断面盾构掘进机 | |
CN208486883U (zh) | 一种隧道环向盲沟切割台车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100811 |
|
CF01 | Termination of patent right due to non-payment of annual fee |