A kind of brick automatic aligning warning device
Technical field
The present invention relates to a kind of alignment means, more particularly to a kind of brick automatic aligning warning device.
Background technique
Brick, as the basic material of building field, annual requirement is very big.Process of traditional brick in processing
In, need a large amount of labour to carry, unload and various processing.When transporting brick, need to hold up brick by pallet
It is transported, one layer of brick is placed on each pallet.Brick is just placed on pallet and is processed, during processing,
Brick can inevitably be generated broken and be rejected.Thus upper on pallet vacancy can be generated, the process stacked is piled up in the later period
In, vacancy influences the stacking and packaging of brick, influences processing efficiency.
Summary of the invention
Goal of the invention of the invention is: in view of the above problems, a kind of brick automatic aligning warning device is provided,
Can finished product brick marshalling be eliminated vacancy caused by broken brick, be convenient for post-production, and can not fill up in equipment
It when vacancy, alarms in advance, staff is reminded to handle.
The technical solution adopted by the invention is as follows:
A kind of brick automatic aligning warning device, including vertically disposed first conveyer belt and the second conveyer belt, the second conveyer belt
Top is provided with brick-pushing mechanism, and brick-pushing mechanism can push brick along the direction of transfer of the second conveyer belt, and brick-pushing mechanism is across the
One conveyer belt.
Further, the invention also discloses the preferred structures of a kind of brick automatic aligning warning device, described second to pass
One end of band is sent to be connected to the first conveyer belt side, one end of the first conveyer belt is flushed with the side of the second conveyer belt.
Further, the brick-pushing mechanism includes rack, and rack is set to the side of the first conveyer belt, with the second conveyer belt
One end is oppositely arranged;Including the second belt support, the second conveyer belt is set in the second belt support.
Further, the brick-pushing mechanism includes support column, and support column is set in the second belt support, support column with
It is provided with crossbeam above rack, crossbeam is parallel to the direction of transfer of the second conveyer belt.
Further, the first drive rod, the first sliding rail, the second drive rod, the are provided with above the support column and rack
Two sliding rails, the first drive rod, the first sliding rail, the second drive rod, the second sliding rail are parallel to crossbeam.
Further, the first pushing plate is provided on first sliding rail, the first pushing plate can be along the first sliding rail freedom
Mobile, the first drive rod is connected with the first pushing plate power, and the first pushing plate can push brick marshalling to form brick column.
Further, the second pushing plate is provided on second sliding rail, the second pushing plate can be along the second sliding rail freedom
Mobile, the second drive rod is connected with the second pushing plate power, and the second pushing plate can push brick marshalling to form brick column.
Further, Zhuan Lie testing agency is provided in the brick-pushing mechanism, Zhuan Lie testing agency can detect of brick column
Number, the brick-pushing mechanism include controller, and Zhuan Lie testing agency is connected by cable with controller signals, and the controller passes through
Cable connection has alarm.
Further, the Zhuan Lie testing agency includes optical inductor, and optical inductor is set to the first sliding rail and second and slides
On the lower edge of rail, optical inductor is arranged towards underface.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1. the vacancy that generated in the process of front can be filled up neat by the setting present apparatus;Convenient for the processing and packaging in later period;
2. alarming in advance by the way that the present apparatus is arranged when equipment can not fill up brick vacancy, staff is reminded to handle,
Guarantee going on smoothly for processing.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Marked in the figure: 1 is the first belt support, 2 be the first conveyer belt, and 3 be pallet, and 4 be brick, and 5 be rack, and 6 be first
Pushing plate, 7 be the first drive rod, and 8 be the first sliding rail, and 9 be the second pushing plate, and 10 be crossbeam, and 11 be the second drive rod, and 12 be
Two sliding rails, 13 be support column, and 14 be brick column, and 15 be the second conveyer belt, and 16 be the second belt support.
Specific embodiment
With reference to the accompanying drawing, the present invention is described in detail.
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
As shown in Figure 1, the present invention includes the first belt support 1, the first conveyer belt is provided in the first belt support 1
2, pallet 3 is provided on the first conveyer belt 2, several bricks 4 is placed on pallet 3, brick 4 arranges two in the transverse direction of conveyer belt
Row, brick 4 may find that defective or damaged brick 4 can be removed in the process of early period, so as to cause two rows
The quantity of brick column 14 is inconsistent.
It is provided with the second belt support 16 by first belt support 1, is provided in the second belt support 16
Second conveyer belt 15,15 direction of transfer of the second conveyer belt and the direction of transfer of the first conveyer belt 2 are perpendicular.Second conveyer belt 15 is tight
By the side of the first conveyer belt 2.
Organic frame 5 is arranged in the other side of first conveyer belt 2, is provided with support column 13 in the second belt support 16,
The height of support column 13 is identical as the height of rack 5.The top of support column 13 and rack 5 is provided with crossbeam 10, and crossbeam 10 is parallel
It is parallel in the direction of transfer of the second conveyer belt 15.
It is sliding that the top of support column 13 and rack 5 is provided with the first drive rod 7, the first sliding rail 8, the second drive rod 11, second
Rail 12, the first drive rod 7, the first sliding rail 8, the second drive rod 11, the second sliding rail 12 are parallel to crossbeam 10.
The first pushing plate 6 is provided on first sliding rail 8, the first pushing plate 6 can be moved freely along the first sliding rail 8,
First drive rod 7 is connected with 6 power of the first pushing plate, and the first pushing plate 6 can push 4 marshalling of brick to form brick column 14.
The second pushing plate 9 is provided on second sliding rail 12, the second pushing plate 9 can freely be moved along the second sliding rail 12
Dynamic, the second drive rod 11 is connected with 9 power of the second pushing plate, and the second pushing plate 9 can push 4 marshalling of brick to form brick column
14。
When specifically used, whole device powers on, starting device.
Pallet 3 is transported to the underface of the first sliding rail 8, the second sliding rail 12 by carrying out practically process, the first conveyer belt 2.This
When, the first pushing plate 6, the second pushing plate 9 are in the side of the first conveyer belt 2.Then, the first drive rod 7 starts, the first driving
Bar 7 drives the first pushing plate 6 to move along the direction of the second conveyer belt 15, and brick column 14 are pushed to the second transmission from pallet 3
With 15 top.First belt support, 1 side is provided with baffle, and the height of baffle is flushed with the top edge of pallet 3.Thus
Pallet 3 can be prevented to be pushed on the second conveyer belt 15 from the first conveyer belt 2.
Similarly, the second drive rod 11 starts, and the second drive rod 11 drives the second pushing plate 9 along the side of the second conveyer belt 15
To movement, brick column 14 are pushed to the top of the second conveyer belt 15 from pallet 3.
In this way, being achieved that the transfer of brick 4, brick 4 is transferred on the second conveyer belt 15 from the first conveyer belt 2.
Pneumatic linear actuator or screw drive mechanism can be used in first drive rod 7 and the second drive rod 11.
Embodiment 1:
On the basis of the above implementation, first drive rod 7 and the second drive rod 11 have controller by cable connection.
The controller can detect the number of brick column 14 by cable connection You Zhuanlie testing agency, Zhuan Lie testing agency.Described first
Conveyer belt 2 includes the first transmission tape controller, and the second conveyer belt 15 includes the second transmission tape controller, the first transmission tape controller
It is connected by cable with controller signals with the second transmission tape controller.
The number of each column brick column 14 on pallet 3 is sent to controller by Zhuan Lie testing agency, and controller is arranged according to each column brick
The move distance of 14 number control the first drive rod 7 and the second drive rod 11, until the alignment of the front end of two column masonries, and owns
Brick 4 is transferred on the second conveyer belt 15 from the first conveyer belt 2.Zhuan Lie testing agency is by the brick on the second conveyer belt 15 simultaneously
14 numbers of column are sent to controller.Then controller records 4 numbers of brick on the second conveyer belt 15 respectively.
Controller device by cable notify the first transmission tape controller by the brick 4 of next pallet 3 be conveyed through come.Brick column inspection
It surveys mechanism and the number of each column brick column 14 on pallet 3 is sent to controller, controller is by of the largest number of brick column 14 of brick
Number is sent to the second transmission tape controller, and it is all that the second transmission tape controller drives the second conveyer belt 15 movement and vacateing that can put down
The space of brick.Controller drives according to 14 numbers of brick column in the number and the second conveyer belt 15 of each column brick column 14, control first
The move distance of lever 7 and the second drive rod 11, until two column masonry marshallings and tight.
Above procedure is repeated, thus the vacancy generated in the process of front can be filled up neat;Convenient for the processing in later period
And packaging.
Embodiment 2:
On the basis of embodiment 1, the controller has alarm by cable connection.The Zhuan Lie testing agency includes multiple
Optical inductor, optical inductor are set on the lower edge of the first sliding rail 8 and the second sliding rail 12, and optical inductor is set towards underface
It sets.
Optical inductor by detection the first sliding rail 8 and second sliding rail the 12 to the first conveyer belt 2, the second conveyer belt 15 away from
From by just can determine that the number of brick apart from can determine whether lower section has brick.When the brick on the second conveyer belt 15
When number is less than preset value, controller is issued by alarm and is alarmed, and is reminded worker to handle, is prevented production line from breaking down.
Embodiment 3
On the basis of embodiment 1, the controller has alarm by cable connection.The Zhuan Lie testing agency includes several
Supersonic range finder, supersonic range finder are set on the lower edge of the first sliding rail 8 and the second sliding rail 12, ultrasonic distance measurement
Device is arranged towards underface.
Supersonic range finder passes through the first sliding rail 8 of detection and second sliding rail the 12 to the first conveyer belt 2, the second conveyer belt 15
Distance, by distance i.e. can determine whether lower section whether have brick, just can determine that the number of brick.Brick on the second conveyer belt 15
When block number is less than preset value, controller is issued by alarm and is alarmed, and worker is reminded to handle, and prevents production line from event occurs
Barrier.
In this way, alarming in advance when equipment can not fill up brick vacancy, staff is reminded to handle, guarantees processing
Go on smoothly.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.