CN109537861A - The building scaffold and its mounting process of combination safe frame are installed - Google Patents

The building scaffold and its mounting process of combination safe frame are installed Download PDF

Info

Publication number
CN109537861A
CN109537861A CN201910017159.7A CN201910017159A CN109537861A CN 109537861 A CN109537861 A CN 109537861A CN 201910017159 A CN201910017159 A CN 201910017159A CN 109537861 A CN109537861 A CN 109537861A
Authority
CN
China
Prior art keywords
plate
welded
inserted link
frame
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910017159.7A
Other languages
Chinese (zh)
Inventor
王伟
马建平
张大立
杨磊
刁川
杨正茂
陈宇
杨凡
张玉蓉
王红卫
徐光明
孙灵
赵勇
姚志刚
王文胜
卿恩容
何姣
马文雨
舒宁
范双
彭诗苡
陆灿
姚信飞
张中
邓欣吉
徐国杰
刘强
陈本宽
杨世富
王松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 4 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Original Assignee
No 4 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group filed Critical No 4 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority to CN201910017159.7A priority Critical patent/CN109537861A/en
Publication of CN109537861A publication Critical patent/CN109537861A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62BDEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
    • A62B1/00Devices for lowering persons from buildings or the like
    • A62B1/20Devices for lowering persons from buildings or the like by making use of sliding-ropes, sliding-poles or chutes, e.g. hoses, pipes, sliding-grooves, sliding-sheets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/155Platforms with an access hatch for getting through from one level to another

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种安装有组合安全框的建筑脚手架及其安装工艺,包括插杆组合件、复位拉簧、插座和插孔;所述架体为焊管构成的方形架式的脚手架,在其顶面所设有的安全框的前后焊管件的顶部分别安装有前枕座和后枕座;所述安全框的底面采用一块长方板结构的安全框底板进行封底,并且在此安全框底板的偏后区域位置开设有长方形槽口结构的逃离槽;所述侧挡固定架为架体的侧面加固性焊接件,逃离板两个功能,一是向下旋转用来将施工过程中由高处取下的物件实现下滑排出,二是用来使被困在围栏顶部的人员可以被下部人员操作时,实现逃离,并且这两个功能结构具有较好的合理性,便于操作,并且这两个功能结构能够体现出两个使用特性,因此综合结构性良好。The invention discloses a building scaffold with a combined safety frame and an installation process thereof, including a rod assembly, a reset tension spring, a socket and an insertion hole; the frame body is a square frame-type scaffold composed of welded pipes, in which A front pillow seat and a rear pillow seat are respectively installed on the top of the front and rear welded pipe fittings of the safety frame provided on the top surface; There is an escape groove with a rectangular notch structure at the position of the rear area; the side block fixing frame is the side reinforcement welding part of the frame body, and the escape plate has two functions. The objects removed at the place can be slid down and discharged, and the second is to enable the people trapped at the top of the fence to escape when they are operated by the lower personnel, and these two functional structures have better rationality and are easy to operate. A functional structure can reflect two usage characteristics, so the comprehensive structure is good.

Description

The building scaffold and its mounting process of combination safe frame are installed
Technical field
The present invention relates to scaffolding structure technical fields, and more specifically, in particular to one kind is equipped with combination safe frame Building scaffold and its mounting process.
Background technique
The existing building scaffold for being equipped with combination safe frame in use, also has security risk, for example, people Station in top protection column area to work such as top cross bar type objects pendant or maintenances when, top cross bar due to installing not in advance Securely, situations such as or being broken, if at this moment not note that these objects may fall after by artificial pulling force, to manually making At harm, or human body pressing against, compression personnel inconvenience is fled from this time, meanwhile, when top staff constructs, removed by top Object is also inconvenient for being directly sent on ground, some objects are not easy to directly leave again, easy to damage.
Therefore, existing this kind of scaffolding structure technology all exists: the problems such as security risk, inconvenient junk.
Summary of the invention
(1) technical problem:
In conclusion the present invention provides a kind of building scaffold and its mounting process for being equipped with combination safe frame, pass through Structure and functional improvement, all exist to solve existing above-mentioned this kind of scaffolding structure technology: security risk, inconvenient junk Deng problem.
(2) technical solution:
The present invention provides a kind of designs of building scaffold for being equipped with combination safe frame, are mainly used for protection The scaffold of column structure improves safety, has the function of to flee from, while having the function of sliding object again.Provided by the invention It is equipped in the building scaffold and its mounting process of combination safe frame, specifically includes: frame body, safe frame, preceding pillow, rear pillow Seat, flees from slot, the area Tui Zhan, flees from plate, inserted link guide holder at side block fixed frame, slide plate, extension bar slot, protective pad, safe frame bottom plate, Inserted link sub-assembly, reset tension spring, socket and jack;The frame body is the scaffold for the rectangular posture that welded tube is constituted, in its top surface Preceding pillow and rear pillow are separately installed at the top of the front and back welded tube part for the safe frame being equipped with;The bottom surface of the safe frame uses The safe frame bottom plate of one piece of rectangular hardened structure carries out back cover, and herein the regional location to the rear of safe frame bottom plate offer it is rectangular Shape notch arrangement flees from slot, and this flees from Tui Zhan area platform of the front area there are 80 cm widths of slot;The side It keeps off fixed frame and is the lateral reinforcement weldment of frame body, and be also welded with one slide-plate between the right and left side block fixed frame, And this slide plate is the welding of front lower tilting.
Preferably, the preceding pillow and rear pillow are columned rubber bodies structure, they are located at entire scaffold peace The top of full frame, in front and back to claim pattern to be distributed.
Preferably, it is equipped at one by way of articulated shaft rotatable engagement in the vallecular cavity for fleeing from slot and flees from plate, and The inserted link guide holder for fleeing from the underrun welding of plate is sliding combined with inserted link sub-assembly at one again.
Preferably, the socket of director's strip structure is welded on the bottom surface in the area Tui Zhan, and after this socket Jack everywhere is uniformly offered on end face.
Preferably, the extension bar slot of one of rectangular slot mouth structure is offered on the slide plate, the width of this extension bar slot is greater than Inserted link guide holder and the common width of inserted link sub-assembly.
Preferably, the inclined surface top side position of the slide plate is also equipped with the protective pad at one with damping characteristics, this is anti- The width of protection pad is slightly larger than the width for fleeing from plate.
Preferably, the inserted link sub-assembly is made of four guide rods and a welding rod, the rear end of four guide rods It is welded on pull rod jointly.
Preferably, also point is welded with four reset tension springs, and this four reset tension springs on the rear end face of the inserted link guide holder It is set on the guide rod of inserted link sub-assembly again, and point is welded in inserted link sub-assembly to the other end of reset tension spring again On welding rod.
Its installation method, comprising the following steps:
1) welding of chassis part and the assembling of accessory, using welding machine according to drawing by the connecting pipe of scaffold each position into Row welding assembly, it is 1.2 centimetres of tubing, the plate that most bottom side backplane level uses with a thickness of 3 cm thicks that pipe fitting, which selects wall thickness, It realizes that weldering is reinforced, due to the structure that this structure is two sections or more (containing 2 sections), is welded with side diagonal brace, and side in two sides Diagonal brace is welded using interleaved mode, and surrounding butt welding must also be added for improving the stull pipe fitting of intensity the bottom of at, and slide plate is adopted The extension bar slot of one of rectangular slot mouth structure is outputed with the side of gas cutting or wire cutting, and extension bar slot notch is formed by burr It polishes, is mounted in plate face after protective pad is inflated, then slide plate is welded on frame body by way of tilting 55 degree of angles Inside.
2) safe fence welding and assembling, the fence of this structure use the gas cutting baffle with a thickness of 2 centimetres, the welding of formation Square frame structure forms protective fence, then two rubber pillows at the top of safe frame fence is installed, and two rubber pillows are using real The column of heart filled type, rubber pillow must be mounted on protective fence top side in such a way that double bolt or rivet are fixed When preventing from being pushed by top object, there is the swing compared with amplitude in portion, and female component is made of No. 45 steel, is welded to The bottom side of safe fence.
3) safe fence flees from the installation of plate, and the bottom plate before the assembling of above-mentioned safety protective fence is passed through gas cutting or wire cutting Mode cut out a rectangular notch, axle sleeve is mounted on to notch two sides by way of inlaying, will be with rotary shaft It flees from plate to be mounted in the axle sleeve of notch, makes to flee from plate and install, and fleeing from board bottom side for group by welding The inserted link sub-assembly welding assembly installed, and tensile fatigue test and right is carried out by cupping machine to inserted link sub-assembly Inserted link part compression strength in inserted link sub-assembly is tested, and guarantees safety, and after installation, the position at place needs and fence The jack forming position mutual induction of the welded socket in bottom side guarantees that inserted link can have using the centre distance of tool ruler measurement inserted link Effect is inserted into jack.
4) castor selection and installation, select four self-locking nylon castors, detect the sliding effect and self-locking performance of castor, After detection, then they are welded on to the bottom position of chassis by welding, frame body is stood using horizontal plane and is surveyed Examination, watches four castors whether in same level, watches the mobile effect of chassis, if flexibly, castor welds weld bond position Whether set qualified.
5) component finally assembles, and assembled protective fence part is hung to the top of chassis by way of lifting, downwards Plate is fled from rotation, and whether viewing flees from flexible when plate falls, and whether lower backwardness can be corresponding with each structural orientation on bottom slide, It is artificial to utilize the ladder welded on chassis, by the way of welding, spot welding, then benefit are realized into four azimuths of fence and chassis It is welded entirely with the mode of welding, welding slag is gone to complete the assembling of two large divisions.
(3) the utility model has the advantages that
The present invention provides a kind of building scaffolds and its mounting process for being equipped with combination safe frame, by protective fence Bottom plate on slot, and be mounted with that is fled from a plate by way of rotatable engagement in slot, this flees from two functions of plate, one It is to be rotated down for will realize discharge of gliding by the object that eminence is removed in work progress, second is that being used to make to be trapped in fence top When the personnel in portion can be operated by lower part personnel, realization is fled from, and the two functional structures have preferable reasonability, are convenient for Operation, and the two functional structures can embody two using characteristic, therefore compages are good.
Detailed description of the invention
Fig. 1 is the structural schematic diagram in the embodiment of the present invention;
Fig. 2 is the rotary viewing angle schematic diagram drawn in the embodiment of the present invention by Fig. 1;
Fig. 3 is the portion A enlarged diagram in the embodiment of the present invention.
Fig. 4 is planar structure schematic diagram in the embodiment of the present invention.
Fig. 5 is side structure schematic diagram in the embodiment of the present invention.
Fig. 6 is top protection fence overlooking structure diagram in the embodiment of the present invention.
Fig. 7 is bottom viewing angle constructions schematic diagram in the embodiment of the present invention.
Fig. 8 is the portion B enlarged structure schematic diagram in the embodiment of the present invention.
Fig. 9 is to flee from structural schematic diagram when plate is rotated down in the embodiment of the present invention.
Figure 10 is to flee from plate and inserted link sub-assembly schematic diagram in the embodiment of the present invention.
Figure 11 is only inserted link sub-assembly spring distributed architecture schematic diagram in the embodiment of the present invention.
In Fig. 1 into Figure 11, the corresponding relationship of component names or lines and accompanying drawing number are as follows:
Frame body -1, safe frame -2, preceding pillow -3, rear pillow -4, side block fixed frame -5, slide plate -6, extension bar slot -601, protection Pad -7, flees from slot -801, the area Tui Zhan -802, flees from plate -9, inserted link guide holder -901, inserted link sub-assembly-at safe frame bottom plate -8 902, reset tension spring -903, socket -10, jack -1001.
Specific embodiment
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for Illustrate the present invention, but cannot be used to limit the scope of the invention.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term " on ", The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and should not be understood as instruction or Imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Fig. 1 is please referred to Figure 11.
In order to solve to be equipped with operation existing for the building scaffold and its mounting process of combination safe frame in the prior art The big problem of noise, the invention proposes it is a kind of be equipped with combination safe frame building scaffold and its mounting process, for pair Be equipped with combination safe frame building scaffold and its mounting process carry out noise reduction, comprising: frame body 1, safe frame 2, preceding pillow 3, Afterwards pillow 4, side block fixed frame 5, slide plate 6, extension bar slot 601, protective pad 7, safe frame bottom plate 8, flee from slot 801, the area Tui Zhan 802, Flee from plate 9, inserted link guide holder 901, inserted link sub-assembly 902, reset tension spring 903, socket 10 and jack 1001;The frame body 1 is The scaffold for the rectangular posture that welded tube is constituted, the top of welded tube part is installed respectively before and after the safe frame 2 that its top surface is equipped with There are preceding pillow 3 and rear pillow 4;The bottom surface of the safe frame 2 carries out back cover using the safe frame bottom plate 8 of one piece of rectangular hardened structure, And what the regional location to the rear of safe frame bottom plate 8 offered rectangular slot mouth structure herein flees from slot 801, and this flees from slot There are 802 platforms of the area Tui Zhan of 80 cm widths for 801 front area;The side block fixed frame 5 is the lateral reinforcement of frame body 1 Property weldment, and one slide-plate 6 is also welded between the right and left side block fixed frame 5, and this slide plate 6 is front lower tilting Welding.
Wherein, the preceding pillow 3 and rear pillow 4 are columned rubber bodies structure, they are located at entire scaffold peace The top of full frame 2, in front and back to claim pattern to be distributed, when for picking up construction, the object that building top may be fallen, Yi Jishi Working hour, due to the object that misoperation may be fallen downwards again when artificial hand jacks up upwards, when object rod piece is fallen, just by Two pillow supports, form buffering, so that fence safety frame 2 be made to form a safe space, worker returns to the area Tui Zhan at this time 802, it waits for rescue, reduces the probability that staff weighs wounded.
Wherein, it is equipped with by way of articulated shaft rotatable engagement at one in the vallecular cavity for fleeing from slot 801 and flees from plate 9, And flee from the inserted link guide holder 901 of the underrun welding of plate 9 and be sliding combined with inserted link sub-assembly 902 at one, this flees from plate Two functions, first is that being rotated down for will realize discharge of gliding by the object that eminence is removed in work progress, second is that being used to make When being trapped in the personnel at the top of fence can be operated by lower part personnel, realization is fled from, and the implementation for fleeing from the movement of plate 9 is other by bottom Staff pulls the rod assembly in inserted link sub-assembly 902 to complete.
Wherein, the socket 10 of director's strip structure is welded on the bottom surface in the area Tui Zhan 802, and after this socket 10 Jack 1001 everywhere are uniformly offered on end face.
Wherein, the extension bar slot 601 of one of rectangular slot mouth structure is offered on slide plate 6, the width of this extension bar slot 601 is greater than Inserted link guide holder 901 and the common width of inserted link sub-assembly 902, inserted link guide holder 901 and inserted link sub-assembly 902 are with fleeing from plate 9 Lower backwardness, two components can be received into extension bar slot 601, prevent two components hits, structurally reasonable.
Wherein, the inclined surface top side position of slide plate 6 is also equipped with the protective pad 7 at one with damping characteristics, this protective pad 7 Width be slightly larger than and flee from the width of plate 9, flee from plate 9 for pick up top, realize buffering, improve safety.
Wherein, inserted link sub-assembly 902 is made of four guide rods and a welding rod, and the rear end of four guide rods is common It is welded on pull rod, the pulling action of four rod pieces, You Yigen pull rod once pulls realization, due to being four guide rods, realizes Guiding pulls, therefore pulls effect more steady, this description scheme is as shown in figure 11.
Wherein, also point is welded with four reset tension springs 903, and this four reset tension springs on the rear end face of inserted link guide holder 901 903 again be set on the guide rod of inserted link sub-assembly 902, and the other end of reset tension spring 903 again point be welded in it is slotting On the welding rod of bar sub-assembly 902, this description scheme is as shown in figure 11, the pull rod sub-assembly of pull-out, can be in the work of spring Under, return is realized, improve reasonable structure.
Its installation method the following steps are included:
1) welding of chassis part and the assembling of accessory, using welding machine according to drawing by the connecting pipe of scaffold each position into Row welding assembly, it is 1.2 centimetres of tubing, the plate that most bottom side backplane level uses with a thickness of 3 cm thicks that pipe fitting, which selects wall thickness, It realizes that weldering is reinforced, due to the structure that this structure is two sections or more (containing 2 sections), is welded with side diagonal brace, and side in two sides Diagonal brace is welded using interleaved mode, and surrounding butt welding must also be added for improving the stull pipe fitting of intensity the bottom of at, and slide plate is adopted The extension bar slot of one of rectangular slot mouth structure is outputed with the side of gas cutting or wire cutting, and extension bar slot notch is formed by burr It polishes, is mounted in plate face after protective pad is inflated, then slide plate is welded on frame body by way of tilting 55 degree of angles Inside.
2) safe fence welding and assembling, the fence of this structure use the gas cutting baffle with a thickness of 2 centimetres, the welding of formation Square frame structure forms protective fence, then two rubber pillows at the top of safe frame fence is installed, and two rubber pillows are using real The column of heart filled type, rubber pillow must be mounted on protective fence top side in such a way that double bolt or rivet are fixed When preventing from being pushed by top object, there is the swing compared with amplitude in portion, and female component is made of No. 45 steel, is welded to The bottom side of safe fence.
3) safe fence flees from the installation of plate, and the bottom plate before the assembling of above-mentioned safety protective fence is passed through gas cutting or wire cutting Mode cut out a rectangular notch, axle sleeve is mounted on to notch two sides by way of inlaying, will be with rotary shaft It flees from plate to be mounted in the axle sleeve of notch, makes to flee from plate and install, and fleeing from board bottom side for group by welding The inserted link sub-assembly welding assembly installed, and tensile fatigue test and right is carried out by cupping machine to inserted link sub-assembly Inserted link part compression strength in inserted link sub-assembly is tested, and guarantees safety, and after installation, the position at place needs and fence The jack forming position mutual induction of the welded socket in bottom side guarantees that inserted link can have using the centre distance of tool ruler measurement inserted link Effect is inserted into jack.
4) castor selection and installation, select four self-locking nylon castors, detect the sliding effect and self-locking performance of castor, After detection, then they are welded on to the bottom position of chassis by welding, frame body is stood using horizontal plane and is surveyed Examination, watches four castors whether in same level, watches the mobile effect of chassis, if flexibly, castor welds weld bond position Whether set qualified.
5) component finally assembles, and assembled protective fence part is hung to the top of chassis by way of lifting, downwards Plate is fled from rotation, and whether viewing flees from flexible when plate falls, and whether lower backwardness can be corresponding with each structural orientation on bottom slide, It is artificial to utilize the ladder welded on chassis, by the way of welding, spot welding, then benefit are realized into four azimuths of fence and chassis It is welded entirely with the mode of welding, welding slag is gone to complete the assembling of two large divisions.
The embodiment of the present invention is given for the purpose of illustration and description, and is not exhaustively or by this to send out It is bright to be limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Choosing Selecting and describe embodiment is and to make those skilled in the art to more preferably illustrate the principle of the present invention and practical application It will be appreciated that the present invention is to design various embodiments suitable for specific applications with various modifications.

Claims (9)

1. a kind of building scaffold for being equipped with combination safe frame, for the rotational structure by fleeing from sliding type, for improving The convenience when safety and blanking of scaffold characterized by comprising frame body (1), safe frame (2), preceding pillow (3), Afterwards pillow (4), side block fixed frame (5), slide plate (6), extension bar slot (601), protective pad (7), safe frame bottom plate (8), flee from slot (801), the area Tui Zhan (802), flee from plate (9), inserted link guide holder (901), inserted link sub-assembly (902), is inserted reset tension spring (903) Seat (10) and jack (1001);The frame body (1) is the scaffold for the rectangular posture that welded tube is constituted, in the peace that its top surface is equipped with Preceding pillow (3) and rear pillow (4) are separately installed at the top of the front and back welded tube part of full frame (2);It adopts the bottom surface of the safe frame (2) Back cover is carried out with the safe frame bottom plate (8) of one piece of rectangular hardened structure, and the regional location to the rear of safe frame bottom plate (8) is opened herein Fleeing from slot (801) equipped with rectangular slot mouth structure, and this flees from the front area of slot (801) there are 80 cm widths The area Tui Zhan (802) platform;The side block fixed frame (5) is the lateral reinforcement weldment of frame body (1), and in the right and left side block It is also welded between fixed frame (5) one slide-plate (6), and this slide plate (6) is the welding of front lower tilting.
2. the building scaffold according to claim 1 for being equipped with combination safe frame, which is characterized in that the preceding pillow (3) and rear pillow (4) is columned rubber bodies structure, they are located at the top of entire scaffold safe frame (2), before being in Afterwards to claim pattern to be distributed.
3. the building scaffold according to claim 1 for being equipped with combination safe frame, which is characterized in that described to flee from slot (801) it is equipped at one by way of articulated shaft rotatable engagement in vallecular cavity and flees from plate (9), and the bottom surface for fleeing from plate (9) is logical The inserted link guide holder (901) for crossing welding is sliding combined with inserted link sub-assembly (902) at one again.
4. the building scaffold according to claim 1 for being equipped with combination safe frame, which is characterized in that the area Tui Zhan (802) it is welded with the socket (10) of director's strip structure on bottom surface, and is uniformly opened on the rear end face of this socket (10) Equipped with jack everywhere (1001).
5. the building scaffold according to claim 1 for being equipped with combination safe frame, which is characterized in that the slide plate (6) On offer the extension bar slot (601) of one of rectangular slot mouth structure, the width of this extension bar slot (601) is greater than inserted link guide holder (901) and the common width of inserted link sub-assembly (902).
6. the building scaffold according to claim 1 for being equipped with combination safe frame, which is characterized in that the slide plate (6) Inclined surface top side position be also equipped with the protective pad (7) at one with damping characteristics, the width of this protective pad (7) is slightly larger than escaping Width from plate (9).
7. the building scaffold according to claim 1 for being equipped with combination safe frame, which is characterized in that the inserted link combination Part (902) You Sigen guide rod and a welding rod are constituted, and the rear end of four guide rods is welded on pull rod jointly.
8. the building scaffold according to claim 1 for being equipped with combination safe frame, which is characterized in that the inserted link guiding Also point is welded with four reset tension springs (903) on the rear end face of seat (901), and this four reset tension springs (903) are set with again On the guide rod of inserted link sub-assembly (902), and point is welded in inserted link sub-assembly to the other end of reset tension spring (903) again (902) on welding rod.
9. it is a kind of according to claim 1~any one of 8 described in be equipped with combination safe frame building scaffold installation Method, which comprises the following steps:
1) welding of chassis part and the assembling of accessory are welded the connecting pipe of scaffold each position according to drawing using welding machine Assembling is connect, it is 1.2 centimetres of tubing that pipe fitting, which selects wall thickness, and most bottom side backplane level uses to be realized with a thickness of the plate of 3 cm thicks Weldering is reinforced, and due to the structure that this structure is two sections or more, is welded with side diagonal brace in two sides, and skew back support uses and intersects Mode is welded, and surrounding butt welding must also be added for improving the stull pipe fitting of intensity the bottom of at, and slide plate is cut using gas cutting or line The side cut outputs the extension bar slot of one of rectangular slot mouth structure, and extension bar slot notch is formed by burr and is polished, will It is mounted in plate face after protective pad inflation, then slide plate is welded on to the inside of frame body by way of tilting 55 degree of angles;
2) safe fence welding and assembling, the fence of this structure use the gas cutting baffle with a thickness of 2 centimetres, the welding box of formation Body structure forms protective fence, then two rubber pillows at the top of safe frame fence is installed, and two rubber pillows are filled out using solid The column of formula is filled, rubber pillow must be mounted on protective fence top side top in such a way that double bolt or rivet are fixed, When preventing from being pushed by top object, there is the swing compared with amplitude, female component is made of No. 45 steel, is welded to safety The bottom side of fence;
3) safe fence flees from the installation of plate, and the bottom plate before the assembling of above-mentioned safety protective fence is passed through gas cutting or the side of wire cutting Formula cuts out a rectangular notch, and axle sleeve is mounted on to notch two sides by way of inlaying, by fleeing from rotary shaft Plate is mounted in the axle sleeve of notch, is made to flee from plate and is installed, and will be assembled fleeing from board bottom side by welding Inserted link sub-assembly welding assembly, and tensile fatigue test is carried out by cupping machine to inserted link sub-assembly, and to inserted link Inserted link part compression strength in sub-assembly is tested, and guarantees safety, and after installation, the position at place needs and fence bottom side The jack forming position mutual induction of welded socket guarantees that inserted link can be effective using the centre distance of tool ruler measurement inserted link It is inserted into jack;
4) castor selection and installation, select four self-locking nylon castors, detect the sliding effect and self-locking performance of castor, detect After, then they are welded on to the bottom position of chassis by welding, frame body is stood using horizontal plane and is tested, is seen See that four castors whether in same level, watch the mobile effect of chassis, if flexibly, whether castor welds weld bond position It is qualified;
5) component finally assembles, and assembled protective fence part is hung to the top of chassis by way of lifting, is rotated down Flee from plate, viewing is fled from whether flexible when plate falls, and whether lower backwardness can be corresponding with each structural orientation on bottom slide, manually Using the ladder welded on chassis, by the way of welding, spot welding is realized at four azimuths of fence and chassis, recycle weldering The mode connect is welded entirely, and welding slag is gone to complete the assembling of two large divisions.
CN201910017159.7A 2019-01-08 2019-01-08 The building scaffold and its mounting process of combination safe frame are installed Pending CN109537861A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910017159.7A CN109537861A (en) 2019-01-08 2019-01-08 The building scaffold and its mounting process of combination safe frame are installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910017159.7A CN109537861A (en) 2019-01-08 2019-01-08 The building scaffold and its mounting process of combination safe frame are installed

Publications (1)

Publication Number Publication Date
CN109537861A true CN109537861A (en) 2019-03-29

Family

ID=65834629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910017159.7A Pending CN109537861A (en) 2019-01-08 2019-01-08 The building scaffold and its mounting process of combination safe frame are installed

Country Status (1)

Country Link
CN (1) CN109537861A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006440A (en) * 2021-02-26 2021-06-22 中建二局第一建筑工程有限公司 Portable quick installation operation platform of assembled steel construction frame component
CN117359150A (en) * 2023-12-01 2024-01-09 四川众和讯智能科技有限公司 Automatic production line for guardrail welding and processing method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0782880A (en) * 1993-09-10 1995-03-28 Japan Steels Internatl Kk Folding up type stage for the uppermost step of suspended scaffold
US20050077107A1 (en) * 2003-09-29 2005-04-14 Libert Scott D. Scaffold system with telescoping access ladder and resiliently hinged scaffold access hatch deck
CN201620593U (en) * 2010-02-01 2010-11-03 胡永君 Spring-board frame for building construction
CN206418743U (en) * 2017-01-14 2017-08-18 盐城市农业机械试验鉴定站 A kind of scaffold with concealed type multifunctional returning face plate
CN107237487A (en) * 2017-06-21 2017-10-10 上海森大机械制造有限公司 A kind of movable Scaffold
CN207959867U (en) * 2018-02-05 2018-10-12 天津源美脚手架有限公司 One kind carrying turnover plate type portable type scaffold
CN208280552U (en) * 2018-03-29 2018-12-25 周淑华 A kind of construction safety platform with decrease of noise functions
CN209568679U (en) * 2019-01-08 2019-11-01 贵州建工集团第四建筑工程有限责任公司 The building scaffold of combination safe frame is installed

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0782880A (en) * 1993-09-10 1995-03-28 Japan Steels Internatl Kk Folding up type stage for the uppermost step of suspended scaffold
US20050077107A1 (en) * 2003-09-29 2005-04-14 Libert Scott D. Scaffold system with telescoping access ladder and resiliently hinged scaffold access hatch deck
CN201620593U (en) * 2010-02-01 2010-11-03 胡永君 Spring-board frame for building construction
CN206418743U (en) * 2017-01-14 2017-08-18 盐城市农业机械试验鉴定站 A kind of scaffold with concealed type multifunctional returning face plate
CN107237487A (en) * 2017-06-21 2017-10-10 上海森大机械制造有限公司 A kind of movable Scaffold
CN207959867U (en) * 2018-02-05 2018-10-12 天津源美脚手架有限公司 One kind carrying turnover plate type portable type scaffold
CN208280552U (en) * 2018-03-29 2018-12-25 周淑华 A kind of construction safety platform with decrease of noise functions
CN209568679U (en) * 2019-01-08 2019-11-01 贵州建工集团第四建筑工程有限责任公司 The building scaffold of combination safe frame is installed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006440A (en) * 2021-02-26 2021-06-22 中建二局第一建筑工程有限公司 Portable quick installation operation platform of assembled steel construction frame component
CN117359150A (en) * 2023-12-01 2024-01-09 四川众和讯智能科技有限公司 Automatic production line for guardrail welding and processing method

Similar Documents

Publication Publication Date Title
CN109537861A (en) The building scaffold and its mounting process of combination safe frame are installed
CN209568679U (en) The building scaffold of combination safe frame is installed
CN205857669U (en) A kind of attached lifting scaffold support body
CN209837869U (en) Construction guardrail
CN110206329B (en) Civil engineering is with construction protector
CN212897455U (en) Prevent portable scaffold frame that topples
JP4663929B2 (en) Simple suspension scaffold device
CN215804339U (en) Folded cascade roofing cat ladder
CN212311348U (en) Adjustable crane span structure pressure equipment
CN212671385U (en) Noise absorption board for building site
CN212052485U (en) Green belt isolation guardrail for municipal works
CN212743321U (en) Safety hanging chair
CN215407359U (en) Protective device for inward-picking of disc buckle scaffold
CN210067510U (en) Safety belt/safety rope hook device
CN220437251U (en) Vehicle-mounted hoisting control table
CN211341702U (en) Guardrail structure
CN209780180U (en) Insulating scaffold for power transmission line construction
CN211058353U (en) Gravity assembled strutting arrangement for building
CN203334645U (en) Section steel cantilever scaffold device
CN217975291U (en) Adjustable inclined plane operation platform
US20030214206A1 (en) Tool box drawing table
CN212689731U (en) Novel construction rail guard is built in room
CN219708956U (en) Main support high-strength pipe of tower crane
CN219241260U (en) Portable construction operation platform for walk-up building
CN205873684U (en) Plain type removes lug

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190329

RJ01 Rejection of invention patent application after publication