CN109460298A - A kind of data processing method and device - Google Patents
A kind of data processing method and device Download PDFInfo
- Publication number
- CN109460298A CN109460298A CN201811300529.XA CN201811300529A CN109460298A CN 109460298 A CN109460298 A CN 109460298A CN 201811300529 A CN201811300529 A CN 201811300529A CN 109460298 A CN109460298 A CN 109460298A
- Authority
- CN
- China
- Prior art keywords
- data center
- virtual data
- built
- resource
- preset rules
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
- G06F9/5077—Logical partitioning of resources; Management or configuration of virtualized resources
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of data processing method provided in an embodiment of the present invention and device, belong to cloud computing technical field of data administration.This method comprises: determining whether virtual data center to be built meets preset rules;If so, constructing the virtual data center to be built and configuring corresponding resource for the virtual data center;If being unsatisfactory for preset rules, destination virtual data center corresponding to the parent of the virtual data center to be built is obtained;The virtual data center to be built described in the resource construction configured according to the destination virtual data center.And then effectively overcome when single VDC existing in the prior art that have resource excessive, it has not been convenient to which the technical issues of distinguishing and when multiple VDC have that respectively to occupy resource data opaque, the technical issues of not intercommunication.
Description
Technical field
The present invention relates to cloud computing technical field of data administration, in particular to a kind of data processing method and device.
Background technique
When the management platform of mainstream cloud computing at present is managed typical data center (Data Center abbreviation: DC), all
It uses virtual data center (Virtual Data Center abbreviation: VDC).Virtual data center is will by virtualization technology
Physical resource (server, memory and network etc.) is abstract to be integrated into single logical resource, and dynamic carries out resource allocation and tune
Degree to improve the service efficiency of system and the availability and measurability of flexibility and application software, and will substantially reduce
The operation cost of data center.However in the case that in business, user demand, increasingly complicated data volume is increasing, in data
The physical resource of the heart can be more and more.When being managed by VDC, single VDC or multiple VDC management will cause some problems.
It is excessive there is resource when single VDC, it has not been convenient to the situation of differentiation;It is opaque that respectively occupancy resource data is had when multiple VDC,
The case where not intercommunication.
Summary of the invention
A kind of data processing method provided in an embodiment of the present invention and device, can overcome above-mentioned technical problem.
To achieve the goals above, technical solution used in the embodiment of the present invention is as follows:
In a first aspect, a kind of data processing method provided in an embodiment of the present invention, comprising: determine virtual data to be built
Whether center meets preset rules;If so, constructing the virtual data center to be built and matching for the virtual data center
Set corresponding resource;If being unsatisfactory for preset rules, target corresponding to the parent of the virtual data center to be built is obtained
Virtual data center;The virtual data to be built described in the resource construction configured according to the destination virtual data center
Center.
With reference to first aspect, the embodiment of the invention provides the first possible embodiment of first aspect, the structures
It builds the virtual data center to be built and configures corresponding resource for the virtual data center, comprising: it is defeated to obtain user
The the first building instruction entered;The virtual data center to be built is constructed according to the first building instruction;Obtain user's base
Inputted resource information is instructed in first building;It is that virtual data center configuration corresponds to according to the resource information
Resource.
With reference to first aspect, the embodiment of the invention provides second of possible embodiments of first aspect, described true
Whether fixed virtual data center to be built meets preset rules, comprising: determines corresponding to virtual data center to be built
Whether parent is empty;If it is empty, then determine that the virtual data center to be built meets preset rules.
With reference to first aspect, the embodiment of the invention provides the third possible embodiment of first aspect, described
The virtual data center to be built described in the resource construction configured according to the destination virtual data center, comprising: obtain
The resource that the destination virtual data center is configured;The virtual data center is constructed, by the destination virtual data center
The target resource in resource configured is added to the virtual data center.
With reference to first aspect, described to obtain the embodiment of the invention provides the 4th kind of possible embodiment of first aspect
Take destination virtual data center corresponding to the parent of the virtual data center to be built, comprising: obtain user's input
Parent information corresponding to the virtual data center to be built;Determine destination virtual data corresponding to the parent information
Center.
Second aspect, a kind of data processing equipment provided in an embodiment of the present invention, comprising: judging unit, for determine to
Whether the virtual data center of building meets preset rules;First construction unit, for if so, building is described to be built virtual
Data center simultaneously configures corresponding resource for the virtual data center;Data processing unit, if for being unsatisfactory for preset rules,
Obtain destination virtual data center corresponding to the parent of the virtual data center to be built;Second construction unit, is used for
The virtual data center to be built described in the resource construction configured according to the destination virtual data center.
In conjunction with second aspect, the embodiment of the invention provides the first possible embodiment of second aspect, described
One construction unit is also used to: if meeting preset rules, obtaining the first building instruction of user's input;Referred to according to first building
It enables and constructs the virtual data center to be built;It obtains user and inputted resource information is instructed based on first building;
It is that the virtual data center configures corresponding resource according to the resource information.
It is described to sentence the embodiment of the invention provides second of possible embodiment of second aspect in conjunction with second aspect
Disconnected unit is also used to: determining whether parent corresponding to virtual data center to be built is empty;If it is empty, then determine it is described to
The virtual data center of building meets preset rules.
In conjunction with second aspect, the embodiment of the invention provides the third possible embodiment of second aspect, described
Two construction units are also used to: obtaining the resource that the destination virtual data center is configured;The virtual data center is constructed, it will
The target resource in resource that the destination virtual data center is configured is added to the virtual data center.
In conjunction with second aspect, the embodiment of the invention provides the 4th kind of possible embodiment of second aspect, the numbers
Be also used to according to processing unit: if being unsatisfactory for preset rules, the virtual data center institute to be built for obtaining user's input is right
The parent information answered;Determine destination virtual data center corresponding to the parent information.
Compared with prior art, the embodiment of the present invention bring it is following the utility model has the advantages that
A kind of data processing method provided in an embodiment of the present invention and device pass through determination virtual data center to be built
Whether preset rules are met;If so, constructing the virtual data center to be built and being virtual data center configuration pair
The resource answered;If being unsatisfactory for preset rules, destination virtual corresponding to the parent of the virtual data center to be built is obtained
Data center;In the virtual data to be built described in the resource construction configured according to the destination virtual data center
The heart, and then the resource allocation that destination virtual data center is configured gives the virtual data center to be built, without
Other resources other than destination virtual data center are distributed to the virtual data center to be built, so that VDC
Administrator can judge the required resource of the virtual data center by primary virtual data center, apply without being concerned about
The resource used is specifically disposed, and presses allocated resources to realize, is guaranteed that application resource uses and is not conflicted.And by according to
Corresponding hierarchical relationship more efficient, efficiently can carry out integrated planning to the resource in system;And it can clearly show corresponding layer
Grade relationship, the ease for use of lifting system promote O&M ability.And then meeting when effectively overcoming single VDC existing in the prior art
It is excessive that there are resources, it has not been convenient to which the technical issues of distinguishing and when multiple VDC have that respectively to occupy resource data opaque, not mutually
Logical technical problem.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate
Appended attached drawing, is described in detail below.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the flow chart for the data processing method that first embodiment of the invention provides;
Fig. 2 is the operation chart of the setting virtual data center in data processing method shown in FIG. 1;
Fig. 3 is the operation chart of the sub- grade virtual data center of setting in data processing method shown in FIG. 1;
Fig. 4 is the functional block diagram for the data processing equipment that second embodiment of the invention provides;
Fig. 5 is the structural block diagram for a kind of electronic equipment that third embodiment of the invention provides.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.Therefore,
The model of claimed invention is not intended to limit to the detailed description of the embodiment of the present invention provided in the accompanying drawings below
It encloses, but is merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, those of ordinary skill in the art are not having
Every other embodiment obtained under the premise of creative work is made, shall fall within the protection scope of the present invention.
Referring to Fig. 1, being the flow chart for the data processing method that first embodiment of the invention provides.The data processing method
Platform is managed applied to cloud computing, detailed process shown in FIG. 1 will be described in detail below.
Step S101, determines whether virtual data center to be built meets preset rules.
As an implementation, step S101 comprises determining that parent corresponding to virtual data center to be built is
No is empty;If it is empty, then determine that the virtual data center to be built meets preset rules.
Wherein, parent refers to the upper level of the virtual data center.By judging whether the virtual data center has upper one
Grade determines whether the virtual data center is primary virtual data center.
Step S102, if so, constructing the virtual data center to be built and being virtual data center configuration pair
The resource answered.
As an implementation, step S102 includes: the first building instruction for obtaining user's input;According to described first
Building instruction constructs the virtual data center to be built;It obtains user and inputted resource is instructed based on first building
Information;It is that the virtual data center configures corresponding resource according to the resource information.
Optionally, the first building instruction includes but is not limited to the title of virtual data center to be built, ownership clothes
Business device or administrator information etc..
Optionally, the resource includes but is not limited to processor, memory, memory space, available partition, Internet resources and use
Family management etc..
When in the present embodiment, by being empty by parent corresponding to virtual data center to be built, constructed void
Intend data center as primary virtual data center.So that it is virtual to construct sub- grade to the primary virtual data center again in the later period
When data center, the resource allocation that primary virtual data center is distributed is to sub- grade virtual data center, so that VDC is managed
Reason person can judge the required resource of the virtual data center by primary virtual data center, without being concerned about that application makes
Resource is specifically disposed, and presses allocated resources to realize, is guaranteed that application resource uses and is not conflicted.
For example, as shown in Fig. 2, the name of virtual data center is arranged by operation interface shown on terminal device
Title, attribution server, administrator information and the corresponding resource distribution of progress.
Wherein, terminal device can be user terminal (for example, computer), be also possible to server.
It certainly, in actual use, can also be after establishing virtual data center, in the virtual data having built up
The heart such as is deleted or is to look at the operation.For example, determining deleted virtual data center when deleting virtual data center
It whether include sub- grade;If so, deleting the virtual data center again after deleting virtual data center corresponding to the sub- grade.Such as
Fruit does not have sub- grade, then directly deletes the virtual data center and persistence, and then discharge the resource being configured.Either deleting
When except virtual data center, the deleted whether related virtual data center of virtual data center is determined, if it is not,
The virtual data center is directly deleted, if so, after then first deleting with the associated virtual data center of virtual data center, then into
Row is deleted.
Step S103, if being unsatisfactory for preset rules, corresponding to the parent of the acquisition virtual data center to be built
Destination virtual data center.
As an implementation, step S103 includes: the virtual data center to be built for obtaining user's input
Corresponding parent information;Determine destination virtual data center corresponding to the parent information.
Optionally, the virtual data center to be built can have multiple parents, the parent information inputted according to user
Database is searched, to determine a target parent from database, and then determines the corresponding destination virtual of target parent
Data center.Wherein, the superior and the subordinate's information and related information of each virtual data center are stored in the database.
In actual use, parent letter can be inputted in the specified input frame of user in the operation interface by obtaining
Breath, using the parent information as target parent.It can also obtain user by way of drop-down list and be selected from drop-down list
Parent information, using the parent information as target parent.
For example, as shown in figure 3, input frame corresponding to " higher level VDC " of the available user in operation interface
Higher level's information (i.e. parent information) of input, so that the higher level's information inputted according to user finds the corresponding void of higher level's information
Quasi- data center.
In the present embodiment, by when being unsatisfactory for preset rules, continuing to construct virtual data center, to be built into more
The virtual data center of level allows VDC administrator to pass through primary virtual data center to judge the virtual data center
Required resource, without be concerned about using resource specifically dispose, thus realize press allocated resources, guarantee application
Resource, which uses, not to conflict.And by that more efficient, efficiently can be carried out to the resource in system whole according to corresponding hierarchical relationship
Body planning;And can clearly show corresponding hierarchical relationship, the ease for use of lifting system promotes O&M ability.And then effectively overcome
It is excessive there is resource when single VDC existing in the prior art, it has not been convenient to which the technical issues of distinguishing and when multiple VDC have
The technical issues of respectively occupancy resource data is opaque, not intercommunication.
Step S104, it is to be built described virtual described in the resource construction configured according to the destination virtual data center
Data center.
In the present embodiment, by the resource allocation that is configured destination virtual data center to be built described virtual
Data center, without other resources other than destination virtual data center to be distributed to the virtual data to be built
Center, so that VDC administrator can judge the required money of the virtual data center by primary virtual data center
Source, without be concerned about using resource specifically dispose, press allocated resources to realize, guarantee application resource using not
Conflict.
As an implementation, step S104 includes: the resource for obtaining the destination virtual data center and being configured;Structure
The virtual data center is built, the target resource in resource that the destination virtual data center is configured is added to the void
Quasi- data center.
A kind of data processing method provided by the invention, it is default by the way that whether determination virtual data center to be built meets
Rule;If so, constructing the virtual data center to be built and configuring corresponding resource for the virtual data center;If no
Meet preset rules, obtains destination virtual data center corresponding to the parent of the virtual data center to be built;According to
The virtual data center to be built described in the resource construction that the destination virtual data center is configured, so target is empty
The resource allocation that quasi- data center is configured is to the virtual data center to be built, without will be in destination virtual data
Other resources other than the heart distribute the virtual data center to be built, so that VDC administrator can pass through one
Grade virtual data center judges the required resource of the virtual data center, without be concerned about using resource specific portion
Allocated resources are pressed to realize by administration, guarantee that application resource uses and do not conflict.And by according to corresponding hierarchical relationship,
Integrated planning more efficient, efficiently can be carried out to the resource in system;And it can clearly show corresponding hierarchical relationship, lifting system
Ease for use, promoted O&M ability.And then effectively overcome when single VDC existing in the prior art that have a resource excessive, no
The technical issues of the technical issues of facilitating differentiation and when multiple VDC, have that respectively to occupy resource data opaque, not intercommunication.
Second embodiment
Corresponding to the data processing method in first embodiment, Fig. 4 is shown using at data shown in first embodiment
The one-to-one data processing equipment of reason method.As shown in figure 4, the data processing equipment 400 includes judging unit 410, the
One construction unit 420, data processing unit 430 and the second construction unit 440.Wherein, judging unit 410, the first construction unit
420, the realization function of data processing unit 430 and the second construction unit 440 and step corresponding in first embodiment poly- one are a pair of
It answers, to avoid repeating, the present embodiment is not described in detail one by one.
Judging unit 410, for determining whether virtual data center to be built meets preset rules.
Optionally, the judging unit 410 is also used to: whether determining parent corresponding to virtual data center to be built
For sky;If it is empty, then determine that the virtual data center to be built meets preset rules.
First construction unit 420, for if so, the building virtual data center to be built and be the virtual data
The corresponding resource of center configuration.
Optionally, first construction unit 420 is also used to: if meeting preset rules, obtaining the first structure of user's input
Build instruction;The virtual data center to be built is constructed according to the first building instruction;It obtains user and is based on described first
Building instructs inputted resource information;It is that the virtual data center configures corresponding resource according to the resource information.
Data processing unit 430, if obtaining the father of the virtual data center to be built for being unsatisfactory for preset rules
Destination virtual data center corresponding to grade.
Optionally, the data processing unit 430 is also used to: if being unsatisfactory for preset rules, obtaining the described of user's input
Parent information corresponding to virtual data center to be built;It determines in destination virtual data corresponding to the parent information
The heart.
Second construction unit 440, to structure described in the resource construction for being configured according to the destination virtual data center
The virtual data center built.
Second construction unit 440 is also used to: obtaining the resource that the destination virtual data center is configured;Building institute
Virtual data center is stated, the target resource in resource that the destination virtual data center is configured is added to the virtual number
According to center.
3rd embodiment
As shown in figure 5, being the schematic diagram of electronic equipment 300.The electronic equipment 300 includes memory 302, processor
304, the computer program 303 that can be run in the memory 302 and on the processor 304, the computer are stored in
The data processing method in first embodiment is realized when program 303 is executed by processor 304, to avoid repeating, herein not
It repeats again.Alternatively, realizing data processing equipment described in second embodiment when the computer program 303 is executed by processor 304
In each module/unit function, to avoid repeating, details are not described herein again.
Illustratively, computer program 303 can be divided into one or more module/units, one or more mould
Block/unit is stored in memory 302, and is executed by processor 304, to complete the present invention.One or more module/units
It can be the series of computation machine program instruction section that can complete specific function, the instruction segment is for describing computer program 303
Implementation procedure in electronic equipment 300.For example, computer program 303 can be divided into the judgement list in second embodiment
First 410, first construction unit 420, data processing unit 430 and the second construction unit 440, the concrete function of each unit such as first
Described in embodiment or second embodiment, it will not repeat them here.
Electronic equipment 300 can be the equipment such as desktop PC, notebook, palm PC or smart phone.
Wherein, memory 302 may be, but not limited to, random access memory (Random Access Memory,
RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-
Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory,
EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory,
EEPROM) etc..Wherein, memory 302 is for storing program, and the processor 304 is after receiving and executing instruction, described in execution
The method of program, the flow definition that aforementioned any embodiment of the embodiment of the present invention discloses can be applied in processor 304, or
It is realized by processor 304.
Processor 304 may be a kind of IC chip, the processing capacity with signal.Above-mentioned processor 304 can
To be general processor, including central processing unit (Central Processing Unit, CPU), network processing unit (Network
Processor, NP) etc.;It can also be digital signal processor (Digital Signal Processor, DSP), dedicated integrated
Circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components.It may be implemented or execute disclosed each method, step and the logic diagram in the embodiment of the present invention.It is general
Processor can be microprocessor or the processor is also possible to any conventional processor etc..
It is understood that structure shown in fig. 5 is only a kind of structural schematic diagram of electronic equipment 300, electronic equipment 300
It can also include than more or fewer components shown in Fig. 5.Each component shown in Fig. 5 can use hardware, software or its group
It closes and realizes.
Fourth embodiment
The embodiment of the present invention also provides a kind of storage medium, and instruction is stored on the storage medium, when described instruction exists
The data processing side in first embodiment is realized when running on computer, when the computer program is executed by processor
Method, to avoid repeating, details are not described herein again.Alternatively, realizing second embodiment institute when the computer program is executed by processor
The function of each module/unit in data processing equipment is stated, to avoid repeating, details are not described herein again.
Through the above description of the embodiments, those skilled in the art can be understood that the present invention can lead to
Hardware realization is crossed, the mode of necessary general hardware platform can also be added to realize by software, based on this understanding, this hair
Bright technical solution can be embodied in the form of software products, which can store in a non-volatile memories
In medium (can be CD-ROM, USB flash disk, mobile hard disk etc.), including some instructions are used so that computer equipment (can be with
It is personal computer, server or the network equipment etc.) method that executes each implement scene of the present invention.
In conclusion a kind of data processing method provided by the invention and device, pass through determination virtual data to be built
Whether center meets preset rules;If so, constructing the virtual data center to be built and matching for the virtual data center
Set corresponding resource;If being unsatisfactory for preset rules, target corresponding to the parent of the virtual data center to be built is obtained
Virtual data center;The virtual data to be built described in the resource construction configured according to the destination virtual data center
Center, and then the resource allocation that destination virtual data center is configured gives the virtual data center to be built, thus nothing
Other resources other than destination virtual data center need to be distributed to the virtual data center to be built, so that
VDC administrator can judge the required resource of the virtual data center by primary virtual data center, without being concerned about
Using resource specifically dispose, press allocated resources to realize, guarantee application resource using not conflicting.And pass through
According to corresponding hierarchical relationship, integrated planning more efficient, efficiently can be carried out to the resource in system;And it can clearly show correspondence
Hierarchical relationship, the ease for use of lifting system, promoted O&M ability.And then effectively overcome single VDC existing in the prior art
When to have resource excessive, it has not been convenient to the technical issues of distinguishing and when multiple VDC, have that respectively to occupy resource data opaque,
The technical issues of not intercommunication.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should also be noted that similar label and letter exist
Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing
It is further defined and explained.
Claims (10)
1. a kind of data processing method characterized by comprising
Determine whether virtual data center to be built meets preset rules;
If so, constructing the virtual data center to be built and configuring corresponding resource for the virtual data center;
If being unsatisfactory for preset rules, obtain in destination virtual data corresponding to the parent of the virtual data center to be built
The heart;
The virtual data center to be built described in the resource construction configured according to the destination virtual data center.
2. the method according to claim 1, wherein described construct the virtual data center to be built and be
The virtual data center configures corresponding resource, comprising:
Obtain the first building instruction of user's input;
The virtual data center to be built is constructed according to the first building instruction;
It obtains user and inputted resource information is instructed based on first building;
It is that the virtual data center configures corresponding resource according to the resource information.
3. the method according to claim 1, wherein whether determination virtual data center to be built meets
Preset rules, comprising:
Determine whether parent corresponding to virtual data center to be built is empty;
If it is empty, then determine that the virtual data center to be built meets preset rules.
4. being configured the method according to claim 1, wherein described according to the destination virtual data center
The virtual data center to be built described in resource construction, comprising:
Obtain the resource that the destination virtual data center is configured;
The virtual data center is constructed, the target resource in resource that the destination virtual data center is configured is added to
The virtual data center.
5. the method according to claim 1, wherein the father for obtaining the virtual data center to be built
Destination virtual data center corresponding to grade, comprising:
Obtain parent information corresponding to the virtual data center to be built of user's input;
Determine destination virtual data center corresponding to the parent information.
6. a kind of data processing equipment characterized by comprising
Judging unit, for determining whether virtual data center to be built meets preset rules;
First construction unit, for if so, constructing the virtual data center to be built and matching for the virtual data center
Set corresponding resource;
Data processing unit, if the parent institute for obtaining the virtual data center to be built is right for being unsatisfactory for preset rules
The destination virtual data center answered;
Second construction unit, it is to be built described in the resource construction for being configured according to the destination virtual data center described in
Virtual data center.
7. device according to claim 6, which is characterized in that first construction unit is also used to:
If meeting preset rules, the first building instruction of user's input is obtained;
The virtual data center to be built is constructed according to the first building instruction;
It obtains user and inputted resource information is instructed based on first building;
It is that the virtual data center configures corresponding resource according to the resource information.
8. device according to claim 6, which is characterized in that the judging unit is also used to:
Determine whether parent corresponding to virtual data center to be built is empty;
If it is empty, then determine that the virtual data center to be built meets preset rules.
9. device according to claim 6, which is characterized in that second construction unit is also used to:
Obtain the resource that the destination virtual data center is configured;
The virtual data center is constructed, the target resource in resource that the destination virtual data center is configured is added to
The virtual data center.
10. device according to claim 6, which is characterized in that the data processing unit is also used to:
If being unsatisfactory for preset rules, parent information corresponding to the virtual data center to be built of user's input is obtained;
Determine destination virtual data center corresponding to the parent information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811300529.XA CN109460298A (en) | 2018-11-01 | 2018-11-01 | A kind of data processing method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811300529.XA CN109460298A (en) | 2018-11-01 | 2018-11-01 | A kind of data processing method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109460298A true CN109460298A (en) | 2019-03-12 |
Family
ID=65609231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811300529.XA Pending CN109460298A (en) | 2018-11-01 | 2018-11-01 | A kind of data processing method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109460298A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102541619A (en) * | 2010-12-23 | 2012-07-04 | 国际商业机器公司 | Management device and method for virtual machine |
US20140337837A1 (en) * | 2013-05-13 | 2014-11-13 | Vmware, Inc. | Automated scaling of applications in virtual data centers |
CN104199741A (en) * | 2014-08-29 | 2014-12-10 | 曙光信息产业(北京)有限公司 | Virtual data management method for cloud computing environment |
CN107113192A (en) * | 2014-12-29 | 2017-08-29 | 株式会社Ntt都科摩 | resource management in cloud system |
CN107919991A (en) * | 2017-11-21 | 2018-04-17 | 郑州云海信息技术有限公司 | A kind of virtual data center creates and quota collocation method and device |
CN108701059A (en) * | 2016-02-19 | 2018-10-23 | 华为技术有限公司 | Multi-tenant resource allocation methods and system |
-
2018
- 2018-11-01 CN CN201811300529.XA patent/CN109460298A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102541619A (en) * | 2010-12-23 | 2012-07-04 | 国际商业机器公司 | Management device and method for virtual machine |
US20140337837A1 (en) * | 2013-05-13 | 2014-11-13 | Vmware, Inc. | Automated scaling of applications in virtual data centers |
CN104199741A (en) * | 2014-08-29 | 2014-12-10 | 曙光信息产业(北京)有限公司 | Virtual data management method for cloud computing environment |
CN107113192A (en) * | 2014-12-29 | 2017-08-29 | 株式会社Ntt都科摩 | resource management in cloud system |
CN108701059A (en) * | 2016-02-19 | 2018-10-23 | 华为技术有限公司 | Multi-tenant resource allocation methods and system |
CN107919991A (en) * | 2017-11-21 | 2018-04-17 | 郑州云海信息技术有限公司 | A kind of virtual data center creates and quota collocation method and device |
Non-Patent Citations (3)
Title |
---|
华为技术有限公司: "CloudOpera ServiceCenter 6.0.0 租户指南 01", 《HTTPS://SUPPORT.HUAWEI.COM/ENTERPRISE/ZH/DOC/EDOC1000163505?SECTION=K003》 * |
华为技术有限公司: "FusionCloud 6.0.0 解决方案描述 04", 《HTTPS://SUPPORT.HUAWEI.COM/ENTERPRISE/ZH/DOC/EDOC1000163661》 * |
华为技术有限公司: "FusionCloud V100R006C10 验收手册(基础包) 03", 《HTTPS://SUPPORT.HUAWEI.COM/ENTERPRISE/ZH/DOC/EDOC1000181295?SECTION=I001》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220342693A1 (en) | Custom placement policies for virtual machines | |
CN108614726B (en) | Virtual machine creation method and device | |
CN105103506B (en) | For the method and system for the non-homogeneous bandwidth request allocation bandwidth in system for cloud computing | |
US20170149630A1 (en) | Techniques for analytics-driven hybrid concurrency control in clouds | |
WO2016090946A1 (en) | Method and device for mapping virtual data centre resources | |
CN106856438B (en) | Network service instantiation method, device and NFV system | |
US20220156115A1 (en) | Resource Allocation Method And Resource Borrowing Method | |
WO2020215752A1 (en) | Graph computing method and device | |
CN111309440B (en) | Method and equipment for managing and scheduling multiple types of GPUs | |
CN106325999A (en) | Method and device for distributing resources of host machine | |
CN113674131A (en) | Hardware accelerator equipment management method and device, electronic equipment and storage medium | |
CN104754008A (en) | Network storage node, network storage system and device and method for network storage node | |
KR20220025746A (en) | Dynamic allocation of computing resources | |
CN110858160A (en) | Resource scheduling method and device, storage medium and processor | |
CN108833592A (en) | Cloud host schedules device optimization method, device, equipment and storage medium | |
CN114070847B (en) | Method, device, equipment and storage medium for limiting current of server | |
EP4012573A1 (en) | Graph reconstruction method and apparatus | |
CN109460298A (en) | A kind of data processing method and device | |
CN107977270A (en) | Peers distribution method, peers distribution system and computer installation | |
CN115150268A (en) | Network configuration method and device of Kubernetes cluster and electronic equipment | |
CN111427682B (en) | Task allocation method, system, device and equipment | |
Awasare et al. | Survey and comparative study on resource allocation strategies in cloud computing environment | |
CN110033145B (en) | Financial sharing job order separating method and device, equipment and storage medium | |
CN108206838B (en) | A kind of SiteServer LBS, method and device | |
US11855908B2 (en) | Resource allocation in cloud computing systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190312 |
|
RJ01 | Rejection of invention patent application after publication |