CN109390938A - 一种智能园区需求侧短期负荷预测方法及其装置 - Google Patents
一种智能园区需求侧短期负荷预测方法及其装置 Download PDFInfo
- Publication number
- CN109390938A CN109390938A CN201811345114.4A CN201811345114A CN109390938A CN 109390938 A CN109390938 A CN 109390938A CN 201811345114 A CN201811345114 A CN 201811345114A CN 109390938 A CN109390938 A CN 109390938A
- Authority
- CN
- China
- Prior art keywords
- power load
- smoothing
- time series
- moment
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013277 forecasting method Methods 0.000 title claims abstract description 18
- 238000000034 method Methods 0.000 claims abstract description 6
- 238000009499 grossing Methods 0.000 claims description 75
- 238000012545 processing Methods 0.000 claims description 2
- 230000015556 catabolic process Effects 0.000 claims 1
- 230000001131 transforming effect Effects 0.000 claims 1
- 230000005611 electricity Effects 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 5
- 238000013439 planning Methods 0.000 description 2
- 208000027877 Disorders of Sex Development Diseases 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical compound C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Public Health (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811345114.4A CN109390938A (zh) | 2018-11-13 | 2018-11-13 | 一种智能园区需求侧短期负荷预测方法及其装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811345114.4A CN109390938A (zh) | 2018-11-13 | 2018-11-13 | 一种智能园区需求侧短期负荷预测方法及其装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109390938A true CN109390938A (zh) | 2019-02-26 |
Family
ID=65428625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811345114.4A Pending CN109390938A (zh) | 2018-11-13 | 2018-11-13 | 一种智能园区需求侧短期负荷预测方法及其装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109390938A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114006368A (zh) * | 2021-10-26 | 2022-02-01 | 广东电网有限责任公司 | 一种电力柔性负荷智能控制方法、系统及存储介质 |
CN114819292A (zh) * | 2022-04-06 | 2022-07-29 | 合肥工业大学 | 基于安全综合评价的园区微电网智能调度方法及系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101976841A (zh) * | 2010-10-21 | 2011-02-16 | 河北省电力研究院 | 电力系统各级负荷预测指标的均衡匹配方法 |
CN102855343A (zh) * | 2011-06-10 | 2013-01-02 | 阿自倍尔株式会社 | 负荷量预测装置、负荷量预测方法以及负荷量预测程序 |
JP2014165934A (ja) * | 2013-02-21 | 2014-09-08 | Central Research Institute Of Electric Power Industry | 自然エネルギー型分散電源群の合計発電出力の変動推定方法、変動推定装置及び変動推定プログラム |
CN106779147A (zh) * | 2016-11-18 | 2017-05-31 | 重庆邮电大学 | 一种基于自适应层次时间序列聚类的用电负荷预测方法 |
CN107453396A (zh) * | 2017-08-02 | 2017-12-08 | 安徽理工大学 | 一种分布式光伏电源出力的多目标优化调度方法 |
-
2018
- 2018-11-13 CN CN201811345114.4A patent/CN109390938A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101976841A (zh) * | 2010-10-21 | 2011-02-16 | 河北省电力研究院 | 电力系统各级负荷预测指标的均衡匹配方法 |
CN102855343A (zh) * | 2011-06-10 | 2013-01-02 | 阿自倍尔株式会社 | 负荷量预测装置、负荷量预测方法以及负荷量预测程序 |
JP2014165934A (ja) * | 2013-02-21 | 2014-09-08 | Central Research Institute Of Electric Power Industry | 自然エネルギー型分散電源群の合計発電出力の変動推定方法、変動推定装置及び変動推定プログラム |
CN106779147A (zh) * | 2016-11-18 | 2017-05-31 | 重庆邮电大学 | 一种基于自适应层次时间序列聚类的用电负荷预测方法 |
CN107453396A (zh) * | 2017-08-02 | 2017-12-08 | 安徽理工大学 | 一种分布式光伏电源出力的多目标优化调度方法 |
Non-Patent Citations (1)
Title |
---|
张君: "基于梯度优化自适应指数平滑法的风电场短期风速预测方法研究", 《机电工程》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114006368A (zh) * | 2021-10-26 | 2022-02-01 | 广东电网有限责任公司 | 一种电力柔性负荷智能控制方法、系统及存储介质 |
CN114006368B (zh) * | 2021-10-26 | 2025-01-28 | 广东电网有限责任公司 | 一种电力柔性负荷智能控制方法、系统及存储介质 |
CN114819292A (zh) * | 2022-04-06 | 2022-07-29 | 合肥工业大学 | 基于安全综合评价的园区微电网智能调度方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109447510B (zh) | 基于scuc的中长期电量安全校核方法、装置及系统 | |
CN110739696B (zh) | 智能配网环境中需求侧资源与可再生能源的集成调度方法 | |
CN111416352B (zh) | 一种多能源耦合系统的调度方法及计算设备 | |
CN114977330B (zh) | 建筑分布式光伏-蓄电池系统连续运行调度方法及平台 | |
CN111754024B (zh) | 一种基于回归分析的电力行业时间序列的预测方法和系统 | |
CN102074954A (zh) | 一种城乡配电网综合节能评估与决策方法 | |
CN101764406A (zh) | 基于发电损失和负荷供应充裕度的检修计划安全评估方法 | |
WO2023083235A1 (zh) | 一种分散式预测电网的优化方法及系统 | |
CN111340299A (zh) | 一种微电网多目标优化调度方法 | |
CN105140939B (zh) | 基于储能系统的主动负荷多目标协调控制方法 | |
CN108830479A (zh) | 一种计及电网全成本链的主配协同规划方法 | |
CN105787603A (zh) | 一种考虑需求侧资源的电网负荷预测方法和装置 | |
CN107221965A (zh) | 一种基于分布式设计的日前计划计算方法 | |
CN109412148A (zh) | 计及环境成本与实时电价的可平移负荷模型构建方法 | |
CN115205068A (zh) | 计及净负荷需求分布式的储能最优峰谷时段划分方法 | |
CN103887813A (zh) | 基于风功率预测不确定度的风电系统运行的控制方法 | |
CN109390938A (zh) | 一种智能园区需求侧短期负荷预测方法及其装置 | |
CN116307437A (zh) | 基于碳排放权兑换机制的虚拟电厂优化调度方法及系统 | |
CN103440597A (zh) | 可再生能源并网对电网经济运行影响的分析方法 | |
CN111193295A (zh) | 一种考虑动态重构的配网灵活性提升鲁棒优化调度方法 | |
CN108711886B (zh) | 一种园区配网时序运行样本生成方法 | |
CN104751253B (zh) | 基于b-样条基底展开曲线聚类的配电网潮流预测方法 | |
CN108921368A (zh) | 基于虚拟发电厂的均衡合作博弈控制器 | |
CN116526584B (zh) | 一种基于绿电溯源的虚拟电厂快速响应调控方法 | |
CN111178618A (zh) | 一种智能电网负荷预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 300452 209 (TG no.750), 2nd floor, animation building C, No.126, animation Middle Road, eco city, Binhai New Area, Tianjin Applicant after: STATE GRID (TIANJIN) INTEGRATION ENERGY SERVICE Co.,Ltd. Applicant after: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER Co. Applicant after: STATE GRID TIANJIN ENERGY SAVING SERVICE CO.,LTD. Applicant after: STATE GRID TIANJIN ELECTRIC POWER Co. Applicant after: STATE GRID CORPORATION OF CHINA Address before: 300384 Tianjin city Xiqing District Road No. 8 four Haitai branch Applicant before: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER Co. Applicant before: STATE GRID (TIANJIN) INTEGRATION ENERGY SERVICE Co.,Ltd. Applicant before: STATE GRID TIANJIN ENERGY SAVING SERVICE Co.,Ltd. Applicant before: STATE GRID TIANJIN ELECTRIC POWER Co. Applicant before: STATE GRID CORPORATION OF CHINA |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190226 |
|
RJ01 | Rejection of invention patent application after publication |