Nothing Special   »   [go: up one dir, main page]

CN109345937A - A kind of energy cyclic balance simulation system - Google Patents

A kind of energy cyclic balance simulation system Download PDF

Info

Publication number
CN109345937A
CN109345937A CN201811259397.0A CN201811259397A CN109345937A CN 109345937 A CN109345937 A CN 109345937A CN 201811259397 A CN201811259397 A CN 201811259397A CN 109345937 A CN109345937 A CN 109345937A
Authority
CN
China
Prior art keywords
energy
module
count
scrap
transport device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811259397.0A
Other languages
Chinese (zh)
Other versions
CN109345937B (en
Inventor
杨小莉
林鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Kuaichang Robot Technology Co Ltd
Original Assignee
Hangzhou Kuaichang Robot Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Kuaichang Robot Technology Co Ltd filed Critical Hangzhou Kuaichang Robot Technology Co Ltd
Priority to CN201811259397.0A priority Critical patent/CN109345937B/en
Publication of CN109345937A publication Critical patent/CN109345937A/en
Application granted granted Critical
Publication of CN109345937B publication Critical patent/CN109345937B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of energy cyclic balance simulation system, the first count-down device of control module control the start and stop of each functional module;The start and stop of the second count-down device control transport device of transport device;First energy module generates energy source block and scrap in the unit time of setting, transport device will source block and scrap transport to recycling processing module and separated, and will source block collection send to the second energy module, the second energy module is that the second count-down device increases time quantum;Transport device is moved to control module, and the second count-down device is interacted with the first count-down device, and the second count-down device time quantum is corresponding to the transfer of the first count-down device, and the second inverse timing device indwelling has transport device to operate required minimum time quantum.By maintaining the normal operation of each functional module of the model system, the energy is generated in simcity, Resource recovery recycles, the processing of energy intensive utilization and waste, to effectively popularize the concept that urban energy recycles to school-ager.

Description

A kind of energy cyclic balance simulation system
Technical field
The present invention relates to teaching aid fields, and in particular to a kind of energy cyclic balance simulation system.
Background technique
One city maintains good operating, be unable to do without the lasting supply of the energy, and city is constantly being developed, comprehensive Energy consumption certainly will be continuously increased, and on the basis of using traditional fossil energy, the cleaning such as wind energy, solar energy, geothermal energy is utilized Replaceable new energy, but these energy remain unchanged and are unable to satisfy the development need of the mankind.Therefore it is energy saving, improve using energy source Intensive utilization effect carries out redevelopment utilization to the recovering energy source in waste, is equally essential, and this is seen It reads to society generalization, preferably since school-ager, in a manner of instructing in words and by deeds, them is allowed to establish energy conservation and environmental protection from childhood, like Protect the idea at home.
Summary of the invention
The purpose of the present invention is to provide a kind of energy cyclic balance simulation systems, by maintaining each function of the model system The normal operation of module can be used as teaching aid, and the energy generates in simcity, Resource recovery recycles, energy intensive utilization, And the processing of waste, to effectively popularize the concept that urban energy recycles to school-ager.
To achieve the above object, the present invention is implemented using following technological means:
A kind of energy cyclic balance simulation system comprising if control module, Ganlei's functional module, recycling processing module, first Energy module, the second energy module, transport device;
--- the first count-down device of control module controls the start and stop of each functional module, when the first count-down device time quantum survives, Each functional module is in that can start or starting state, and when time quantum is zeroed, each functional module is out of service;
--- the start and stop of the second count-down device control transport device of transport device, when the second count-down device time quantum survives, fortune Defeated device is in that can start or starting state, and when time quantum is zeroed, transport device is out of service;
--- the first energy module generates energy source block in the unit time of setting and scrap, transport device will source block and waste materials Block transport to recycling processing module separated, and will source block collection send to the second energy module, the second energy module is Second count-down device increases time quantum;
--- transport device is moved to control module, and the second count-down device is interacted with the first count-down device, by the second count-down device Time quantum is corresponding to be shifted to the first count-down device, and the second inverse timing device indwelling has transport device to operate the required minimum time Amount.
Further, the start and stop of the first count-down device of the control module also the first energy module, the first countdown When device time quantum survives, the first energy module within the unit time automatically by it is quantitative it is several can source blocks and scrap be moved to Turn area, and when transport device reaches the first energy module, the energy source block of area to be transferred and scrap are moved into transport device, time When amount zero, the first energy module is out of service.
Further, the transport device incudes the vehicle line in simulator by sensing device and is run.
Further, the transport device is run by the travel route that gray-scale sensor incudes specific gray scale.
Further, the vehicle line is additionally provided with lifting platform, and the lifting platform is produced in the unit time of setting Raw energy source block and scrap;Transport device is run along vehicle line and obtains the energy source block and scrap of lifting platform supply.
Further, the energy source block and scrap are distinguished by different gray scales, and the recycling processing module passes through Gray-scale sensor identification can source block and scrap, and by separating mechanism will source block be distinguish with scrap.
As a kind of effective scheme, second energy module is additionally provided with weighing apparatus/counter, by counting energy Weight/quantity of source block, by weight/quantity number ratios are that the second energy module is that the second count-down device increases time quantum.
As a kind of effective scheme, according to the type of types of functionality module, the unit time generates a certain amount of energy source block And scrap.
Further, the types of functionality module by automatically by it is quantitative it is several can source blocks and scrap be moved to Turn area.
The present invention has the advantages that simulator structure is simple, easy to assembly, at low cost, by preparing a plurality of types of function Energy module, and different school-agers can be directed to, the energy source block of the unit time generation of reasonable set types of functionality module, waste material Number of blocks and assembling mode construct the energy circulation model system in analog demenstration different scales city, and student can independently join It is constructed in design again with what is designed to model system, understands energy intensive utilization, resource in theory teaching and personal practice The environmental protection concept of management.
Detailed description of the invention
Fig. 1 is schematic diagram of the invention;
Fig. 2 is the schematic diagram of recycling processing module of the invention;
Fig. 3 is the schematic diagram of transport device of the invention.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
Embodiment
A kind of energy cyclic balance simulation system comprising control module 1, the first kind simcity functional module 21(road Lamp illumination), the second simcity class functional module 22(construction landscape), the third class simcity functional module 23(process work Factory), recycling processing module 6, the first energy module 31, the second energy module 32, transport device 8;
By the way that the first, second, third class functional module (21,22,23) is electrically connected with control module 1, it is preferred that inserted using heat The mode pulled out to newly-increased modules such as the first, second, third class functional module (21,22,23) or even the 4th class functional modules, with Control module 1 is electrically connected, and controls the first, second, third class function mould via the first count-down device 11 of control module 1 The start and stop of block (21,22,23), in the survival of 11 time quantum of the first count-down device, the first, second, third class functional module (21, 22,23) functional module is in that can start or starting state, and when time quantum is zeroed, each functional module is out of service;
Using a small-sized car body as transport device 8, the second count-down device 81 by being set to transport device 8 controls transport dress Set 8 start and stop, when 81 time quantum of the second count-down device survives, transport device 8 is in can start or starting state, time quantum zero When, transport device 8 is out of service;
First energy module 31 is by mechanical structures such as artificial or boom fixtures, and setting is at interval of certain unit time, outside 72 to the first area to be transferred 51 of energy source block 71 and scrap that setting quantity is taken out in the box body in portion, when transport device 8 reaches first When energy module 31, the energy source block 71 and scrap 72 that accumulate in the first area to be transferred 51 are sent to transport device 8, transport device 8 Will source block 71 and scrap 72 transport to recycling processing module 6 separated,
Transport device 8 is moved to control module 1, and the second count-down device 81 is interacted with the first count-down device 11, by the second countdown Needed for 81 time quantum of device is corresponding to be shifted to the first count-down device 11, and the second inverse timing device indwelling has transport device 8 to operate Minimum time quantum, such as set minimum time quantum needed for transport device 8 operates as 30 seconds one minute, and the second energy module 32 is the Two count-down devices 81 increase time quantum to after 30 seconds six minutes, and after transport device 8 is moved to control module 1, remaining time is At five minutes, then interacted with the first count-down device 11, and time of delivery amount Anisodus acutangulus ten seconds to the first count-down device 11, to ensure Model system can run well;
Transport device 8 send the collection of energy source block 71 after separation to the second energy module 32, and the second energy module 32 falls for second Timer 81 increases time quantum, and scrap 72, which is concentrated, to be stored, or is manually had enough to meet the need;
The first energy module of above scheme 31 is passed through in a manner of fixing the unit time and generating fixed sources of energy block 71, scrap 72 Energy source block 71 that the reasonable set unit time need to generate, scrap 72 cooperate the speed of service of transport device 8, to maintain model The dynamic equilibrium of system.This kind of scheme can be used as basic engineering, the energy and waste material generated simultaneously when simcity operates, to two After person's separation, simulation carries out energy recovery, recycles, to reach the stabilization operating state of model system entirety, underage child energy It participates and carries out rational design planning, the basic concept of the energy that undergoes operating;Certainly, the first countdown can also be set Velocity rate between 11 countdown speed of device and the second count-down device 81 is poor, such as 11 countdown speed ratio of the first count-down device the Two count-down devices 81 are fast again;Or weighing apparatus or counter are added to the second energy module 32, and make weighing apparatus according to transfer The weight or counter of energy source block 72 are suitably that the second count-down device 81 presses setting ratio according to the quantity for transferring energy source block 72 Increase time quantum, certainly, needing to cooperate the working line to transport device 8, the speed of service and the second energy module 32 is the The parameters such as the increased time quantum of two count-down device 81 are planned that student, which participates in, wherein can to maintain model system to stablize again Improve interest and logical thinking, planning control ability.
Further, the start and stop of the first count-down device 11 of the control module 1 also the first energy module 31, first falls When 11 time quantum of timer survives, the first energy module 31 is within the unit time automatically by quantitative several energy source blocks 71 and waste material Block 72 is moved to the first area to be transferred 51, and when transport device 8 reaches the first energy module 31, by the energy of the first area to be transferred 51 Block 71 and scrap 72 move to transport device 8, and when time quantum is zeroed, the first energy module 31 is out of service.The program is suitable for The mode that first energy module 31 setting mechanical structure progress energy source block 71 and scrap 72 automatically take out is applied.
Further, the transport device 8 is set to be run by the vehicle line 9 in induction simulator, In the present embodiment, transport device 8 is used as inductor by gray-scale sensor 82, and using black as 9 color of vehicle line, leads to It crosses travel route and is directly connected to recycling processing module 6, the first energy module 31, the second energy module 32, can be improved transport dress 8 operational efficiency is set, the time spent by conveying energy source block 71, scrap 72 of transport device 8 is reduced, to improve model system The stabilization operating state for entirety of uniting.
By the way that lifting platform 4 is arranged near 9 travel zone of vehicle line, make lifting platform 4 in the unit of setting Between generate can source block 71 and scrap 72;Transport device 8 is run along vehicle line 9 and obtains the energy of the supply of lifting platform 4 Block 71 and scrap 72, transport device 8 send to recycling processing module 6 and are separated after obtaining energy source block 71 and scrap 72, And will the collection of source block 71 send to the second energy module 32 and can be carried out different according to different 4 types of lifting platform certainly Energy source block 71 and 72 quantity of scrap, ratio are set, and to further increase the complexity of system, are more suitable for compared with good year The use of age section school-ager.
Further, the energy source block 71 and scrap 72 are distinguished by different gray scales, the recycling processing module 6 By gray-scale sensor 61 identify can source block 71 and scrap 72, and by push rod 62 will source block 71 and scrap 72 be subject to area Point, and through 63 kinetic energy source block 71 of track to transport device 8, scrap 72 is identified by gray-scale sensor 61, and controls push rod 62 It pushes away in track 63 to storing part.Highly sensitive recognition effect based on gray-scale sensor 61 can effectively to energy source block 71 and give up Material block 72 be subject to color differentiation, be precisely separating out can source block 71 and scrap 72, be especially suitable for two kinds of colors more than energy source block 71 and 72 type of scrap separation (simulate the energy and waste material of multiple types);Certainly, the side different using such as shape size Formula distinguishes energy source block 71 and scrap 72, and cooperates the easy structure such as funnel plate, carries out screening separation to the two, can equally reach To good treatment effect.
As a kind of effective scheme, according to the type of types of functionality module, the unit time generates a certain amount of energy source block 71 and scrap 72.By the above-mentioned plan of establishment, can as needed to types of functionality module within the unit time with can source block 71, Scrap 72 sets up ratio connection, as set the simcity first kind functional module 21(street lighting) one is generated in one minute Block energy source block 71, a lump waste materials block 72, the second simcity class functional module 22(construction landscape) two pieces are generated in one point of half Can source block 71, a lump waste materials block 72, the simcity third class functional module 23(processing factory) five pieces of energy are generated in two minutes Block 71, a lump waste materials block 72, suchlike set-up mode, and the first, second, third class functional module (21,22,23) are equal It, can be greatly respectively in such a way that mechanical structure automatically takes out energy source block 71, scrap 72 is transferred to the second area to be transferred 52 Increase the complexity of model system, the program is suitable for the use of more mature children.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned Embodiment is changed, modifies, replacement and variant.

Claims (9)

1. a kind of energy cyclic balance simulation system, which is characterized in that if adding including control module, Ganlei's functional module, recycling Work module, the first energy module, the second energy module, transport device;
--- the first count-down device of control module controls the start and stop of each functional module, when the first count-down device time quantum survives, Each functional module is in that can start or starting state, and when time quantum is zeroed, each functional module is out of service;
--- the start and stop of the second count-down device control transport device of transport device, when the second count-down device time quantum survives, fortune Defeated device is in that can start or starting state, and when time quantum is zeroed, transport device is out of service;
--- the first energy module generates energy source block in the unit time of setting and scrap, transport device will source block and waste materials Block transport to recycling processing module separated, and will source block collection send to the second energy module, the second energy module is Second count-down device increases time quantum;
--- transport device is moved to control module, and the second count-down device is interacted with the first count-down device, by the second count-down device Time quantum is corresponding to be shifted to the first count-down device, and the second inverse timing device indwelling has transport device to operate the required minimum time Amount.
2. circulating analog system in urban energy as described in claim 1, which is characterized in that the first of the control module falls The start and stop of timer also the first energy module, when the first count-down device time quantum survives, the first energy module is within the unit time Automatically quantitative several energy source blocks and scrap are moved to area to be transferred, and when transport device reaches the first energy module, it will The energy source block and scrap of area to be transferred move to transport device, and when time quantum is zeroed, the first energy module is out of service.
3. circulating analog system in urban energy as described in claim 1, which is characterized in that the transport device passes through induction Vehicle line in device induction simulator is run.
4. circulating analog system in urban energy as described in claim 1, which is characterized in that the transport device passes through gray scale The travel route of the specific gray scale of sensor sensing is run.
5. circulating analog system in urban energy as claimed in claim 3, which is characterized in that the vehicle line is additionally provided with Lifting platform, the lifting platform is generated in the unit time of setting can source block and scrap;Driving line of the transport device along setting Road is run and obtains the energy source block and scrap of lifting platform supply.
6. circulating analog system in urban energy as described in claim 1, which is characterized in that the energy source block and scrap are logical It crosses different gray scales to distinguish, the recycling processing module identifies energy source block and scrap by gray-scale sensor, and passes through separation Mechanism will source block be distinguish with scrap.
7. urban energy circulating analog system as claimed in any one of claims 1 to 6, which is characterized in that second energy Source module is additionally provided with weighing apparatus/counter, by statistics can source block weight/quantity, by weight/quantity number ratios are the Two energy modules are that the second count-down device increases time quantum.
8. urban energy circulating analog system as claimed in any one of claims 1 to 6, which is characterized in that according to types of functionality The type of module, unit time generate a certain amount of energy source block and scrap.
9. circulating analog system in urban energy as claimed in claim 8, which is characterized in that the types of functionality module passes through Automatically quantitative several energy source blocks and scrap are moved to area to be transferred.
CN201811259397.0A 2018-10-26 2018-10-26 Energy circulation balance simulation system Active CN109345937B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811259397.0A CN109345937B (en) 2018-10-26 2018-10-26 Energy circulation balance simulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811259397.0A CN109345937B (en) 2018-10-26 2018-10-26 Energy circulation balance simulation system

Publications (2)

Publication Number Publication Date
CN109345937A true CN109345937A (en) 2019-02-15
CN109345937B CN109345937B (en) 2020-10-30

Family

ID=65312152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811259397.0A Active CN109345937B (en) 2018-10-26 2018-10-26 Energy circulation balance simulation system

Country Status (1)

Country Link
CN (1) CN109345937B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5366227A (en) * 1994-04-18 1994-11-22 Patrick Duffy Recycling game
US6527273B1 (en) * 2001-05-17 2003-03-04 Ralph Dixson Road construction board game
CN2891156Y (en) * 2006-04-18 2007-04-18 上海市嘉定区第二中学 Energy transformation demonstrator
CN102236343A (en) * 2010-04-30 2011-11-09 新奥科技发展有限公司 Smart energy network system and control method thereof
CN103760903A (en) * 2014-01-20 2014-04-30 昆山鑫盛盟创科技有限公司 Intelligent tracking conveying management system for warehouses
CN104575119A (en) * 2014-05-29 2015-04-29 杨悦 Stepped interactive science popularizing system for education of sustainable development
CN106023044A (en) * 2016-08-03 2016-10-12 西安科技大学 Ecological city planning system
CN206601896U (en) * 2016-11-27 2017-10-31 何玉静 A kind of enterprise's Resource recovery recycles display systems
CN107812385A (en) * 2017-10-23 2018-03-20 深圳前海风车科技服务有限公司 Pass through the data processing method and device for guiding resource distribution of playing
CN207529227U (en) * 2017-12-07 2018-06-22 浙江理工大学 A kind of high efficiency logistics trolley of included sorting equipment

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5366227A (en) * 1994-04-18 1994-11-22 Patrick Duffy Recycling game
US6527273B1 (en) * 2001-05-17 2003-03-04 Ralph Dixson Road construction board game
CN2891156Y (en) * 2006-04-18 2007-04-18 上海市嘉定区第二中学 Energy transformation demonstrator
CN102236343A (en) * 2010-04-30 2011-11-09 新奥科技发展有限公司 Smart energy network system and control method thereof
CN103760903A (en) * 2014-01-20 2014-04-30 昆山鑫盛盟创科技有限公司 Intelligent tracking conveying management system for warehouses
CN104575119A (en) * 2014-05-29 2015-04-29 杨悦 Stepped interactive science popularizing system for education of sustainable development
CN106023044A (en) * 2016-08-03 2016-10-12 西安科技大学 Ecological city planning system
CN206601896U (en) * 2016-11-27 2017-10-31 何玉静 A kind of enterprise's Resource recovery recycles display systems
CN107812385A (en) * 2017-10-23 2018-03-20 深圳前海风车科技服务有限公司 Pass through the data processing method and device for guiding resource distribution of playing
CN207529227U (en) * 2017-12-07 2018-06-22 浙江理工大学 A kind of high efficiency logistics trolley of included sorting equipment

Also Published As

Publication number Publication date
CN109345937B (en) 2020-10-30

Similar Documents

Publication Publication Date Title
CN202956956U (en) Object sand table demonstration system for simulating intelligent traffic
CN202956646U (en) Intelligent control system for building rubbish recycling joint production line
CN109634245B (en) Unattended artificial intelligence control system for biochemical sludge dewatering and drying process
CN103249232A (en) Intelligent streetlamp illumination control system
CN109041378A (en) A kind of intelligent road-lamp and its centralized control system
CN109345937A (en) A kind of energy cyclic balance simulation system
CN106281996B (en) Modularized bioreactor for handling organic waste
CN105809987B (en) It is a kind of based on the wind light mutual complementing formula intelligent traffic light control system more acted on behalf of
CN203313474U (en) Intelligent illumination control system of street lamps
CN201229718Y (en) Light electromechanical integrated control real training system
Upadhyay et al. Sustainable Transportation: Policy, Planning, and Implementation
CN203278896U (en) Smart city terminal equipment
CN103853122B (en) A kind of construction refuse resource combined production line intelligence control system
CN107612988A (en) A kind of account book synchronization system and method based on Internet of Things
CN208341350U (en) A kind of magnetic field impulse mineralized waste processor
CN206764290U (en) A kind of model car wheel automatic assembling device
CN206365105U (en) A kind of energy efficient lighting system of Large Underground Parking Space
CN205992171U (en) A kind of atmosphere lamp control unit test system based on VT system
CN102496291A (en) Energy saving controller of traffic signal lamp
CN208022227U (en) A kind of self-induction rollgang
CN2927214Y (en) Traffic-light system with solar wireless control
CN207854248U (en) A kind of Novel balance lamp system
CN107627666A (en) Automatic glue for plastic cement box folding machine takes device
CN207204527U (en) A kind of energy-conserving intelligent photocuring system
CN202008757U (en) PLC (programmable logic controller) simulation control experimental plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A simulation system for energy cycle balance

Effective date of registration: 20230704

Granted publication date: 20201030

Pledgee: Shantou Branch of China Construction Bank Co.,Ltd.

Pledgor: SHANTOU KUAICHANG ROBOT TECHNOLOGY CO.,LTD.

Registration number: Y2023980047246

PE01 Entry into force of the registration of the contract for pledge of patent right