Nothing Special   »   [go: up one dir, main page]

CN109268930A - Hanging stove automatic water supply system and have its hanging stove - Google Patents

Hanging stove automatic water supply system and have its hanging stove Download PDF

Info

Publication number
CN109268930A
CN109268930A CN201811247023.7A CN201811247023A CN109268930A CN 109268930 A CN109268930 A CN 109268930A CN 201811247023 A CN201811247023 A CN 201811247023A CN 109268930 A CN109268930 A CN 109268930A
Authority
CN
China
Prior art keywords
water
heating
wall
heating circulation
circulation line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811247023.7A
Other languages
Chinese (zh)
Inventor
马曾文
张霞
梁桂源
李良潭
林梓华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201811247023.7A priority Critical patent/CN109268930A/en
Publication of CN109268930A publication Critical patent/CN109268930A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D15/00Other domestic- or space-heating systems
    • F24D15/02Other domestic- or space-heating systems consisting of self-contained heating units, e.g. storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/04Gas or oil fired boiler

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

本发明公开了一种壁挂炉自动补水系统及具有其的壁挂炉,壁挂炉自动补水系统包括:具有采暖进水口和采暖出水口的采暖循环管路,与采暖循环管路相连通的循环水泵,具有补水进水口和补水出水口的补水管路,用于检测采暖循环管路水压的水压检测装置,以及安装在补水出水口与采暖循环管路的连接处的切换阀;切换阀根据水压检测装置检测的水压开闭补水管路的补水出水口和采暖循环管路。本发明利用壁挂炉的循环水泵和补水管路共同作用进行增压补水,无需外置循环水泵,而且切换阀根据水压检测装置检测控制补水管路与采暖循环管路的开闭,不会出现增压过小或过大的情况,增压压力可控,保证了机组的良好运行。The invention discloses an automatic water replenishing system for a wall-hung boiler and a wall-hanging furnace therewith. The automatic water replenishing system of the wall-hung boiler comprises: a heating circulation pipeline with a heating water inlet and a heating water outlet, and a circulating water pump connected with the heating circulation pipeline, a water supply pipe having a hydration water inlet and a water supply outlet, a water pressure detecting device for detecting the water pressure of the heating circulation pipeline, and a switching valve installed at a joint of the water supply outlet and the heating circulation pipeline; the switching valve is based on water The water pressure opening and closing water supply line of the pressure detecting device detects the water supply outlet and the heating circulation line of the water supply line. The invention utilizes the circulating water pump and the water supply pipeline of the wall-hung boiler to jointly perform pressurized water supply, and does not need an external circulating water pump, and the switching valve detects and controls the opening and closing of the water supply pipeline and the heating circulation pipeline according to the water pressure detecting device, and does not appear When the supercharging pressure is too small or too large, the supercharging pressure can be controlled to ensure the good operation of the unit.

Description

A kind of wall-hung boiler automatic water replenishing system and the wall-hung boiler with it
Technical field
The present invention relates to heating system technical field more particularly to a kind of wall-hung boiler automatic water replenishing system and with its wall Hang furnace.
Background technique
The hydraulic pressure that the heating water of burnt gas wall hanging furnace needs to reach certain could operate normally, and usually require that hydraulic pressure exists Between 0.1-0.2MPa, if hydraulic pressure is too low, to avoid dry combustion method, excessive low water level protection will occur in system, and user should carry out moisturizing at this time. The hydraulic pressure in industry generally using tap water fills the water heating system at present, but since water supply pipe complexity hydraulic pressure is low, It can not meet moisturizing to the hydraulic demand of 0.1-0.2MPa, moisturizing can not be carried out to unit.To meet moisturizing requirement, user is often A water circulating pump can be increased on water supply pipe, be pressurized using water circulating pump and carry out moisturizing, but water circulating pump boost pressure Not easy to control, hydraulic pressure too great Yi makes the damage of components in unit, and unit is caused not to be available, and causes unnecessary economic damage It loses.
Summary of the invention
The first object of the present invention is to provide a kind of wall-hung boiler automatic water replenishing system, be increased with solving existing water circulating pump The problem of pressure of pressure is not easy to control, and unit is be easy to cause to damage.
To achieve the above object, technical solution proposed by the present invention is as follows: a kind of wall-hung boiler automatic water replenishing system, comprising: Heating circulation line with heating water inlet and heating water outlet;The water circulating pump being connected with the heating circulation line, The water circulating pump is between the heating water inlet and the heating water outlet;With moisturizing water inlet and moisturizing water outlet Water pipe, the moisturizing water outlet is connected with the heating circulation line, and the moisturizing water outlet and the heating The junction of circulation line is between heating water inlet and the water circulating pump;For detecting the heating circulation line hydraulic pressure Device for detecting water pressure;It is mounted on the switching valve of the junction of the moisturizing water outlet and the heating circulation line, it is described to cut It changes valve and the moisturizing water outlet and the heating circulation line is opened and closed according to the hydraulic pressure that the device for detecting water pressure detects.
The wall-hung boiler automatic water replenishing system provided according to the present invention, it is common using the water circulating pump and water pipe of wall-hung boiler Effect carries out pressurization moisturizing, is not necessarily to external water circulating pump, and switching valve detects control water pipe according to device for detecting water pressure It is not in the too small or excessive situation of pressurization, boost pressure is controllable, ensure that the good of unit with the opening and closing of heating circulation line Good luck row.
In addition, a kind of wall-hung boiler automatic water replenishing system according to the above embodiment of the present invention, can also have following additional Technical characteristic:
When the hydraulic pressure of an example according to the present invention, the device for detecting water pressure detection is less than or equal to the first preset value, The switching valve opens the moisturizing water outlet and closes the heating circulation line;The hydraulic pressure of the device for detecting water pressure detection When more than or equal to the second preset value, the switching valve closes the moisturizing water outlet and opens the heating circulation line.
An example according to the present invention, further includes heating heat exchanger;The heating circulation line and the water pipe It is connected respectively by pipeline with the heating heat exchanger.
An example according to the present invention, the heating circulation line are connected with the first pipeline and the second pipeline;Described One pipeline one end is connected with the heating circulation line, and the two connectivity part be located at the heating water inlet and water circulating pump it Between, the first pipe other end is connected with the heating heat exchanger;Second pipeline one end and the heating circulation line It is connected, and the two connectivity part is between the water circulating pump and the heating water outlet, the other end and the heating heat-exchange Device is connected.
An example according to the present invention, further includes outlet pipeline, described outlet pipeline one end and the heating heat exchanger It is connected, the other end is equipped with hot water outlet.
An example according to the present invention is equipped with the first temperature-detecting device on the outlet pipeline.
An example according to the present invention is equipped with water flow amount detecting device on the outlet pipeline.
An example according to the present invention, the device for detecting water pressure are mounted on the water pipe.
An example according to the present invention is equipped with check valve on the water pipe.
An example according to the present invention is equipped with second temperature detection device on the heating circulation line.
An example according to the present invention is equipped with safety temp.-limiting device on the heating circulation line.
An example according to the present invention, the heating circulation line are connected with water tank.
The second object of the present invention is to provide a kind of wall-hung boiler have such as the described in any item walls of above-mentioned technical proposal Hang furnace automatic water replenishing system.
An example according to the present invention, the wall-hung boiler include furnace body, blower and main heat exchanger, are equipped in the furnace body Combustion chamber, the main heat exchanger are mounted in the furnace body, the assembling on the furnace body and for be connected furnace body with Extraneous airflow circulating.
An example according to the present invention, the heating circulation line include the bringing-up section being connected and heat exchanging segment, described Bringing-up section is placed in the combustion chamber, the heat exchanging segment and the thermally conductive connection of the main heat exchanger.
The advantages of above additional aspect, will be set forth in part in the description, and partially will become from the following description bright It is aobvious, or practice through the invention recognizes.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the wall-hung boiler automatic water replenishing system of the embodiment of the present invention one;
Fig. 2 is the structural schematic diagram of the wall-hung boiler of the embodiment of the present invention two.
In attached drawing, parts list represented by the reference numerals are as follows:
1. blower;2. main heat exchanger;3. expansion tank;4. ignition electrode;5. fire testing needle;6. burner;7. water circulating pump;8. Regulating valve;9. check valve;10. device for detecting water pressure;11. water flow amount detecting device;12. heating water inlet;13. moisturizing is intake Mouthful;14. fuel gas inlet;15. moisturizing water outlet;16. heating water outlet;17. the first temperature-detecting device;18. heating heat exchanger; 19. triple valve;20. gas ratio valve;21. second temperature detection device;22. safety temp.-limiting device;23. blast switch;24. first Pipeline;25. the second pipeline.
Embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
Embodiment one
In conjunction with shown in attached drawing 1, a kind of wall-hung boiler automatic water replenishing system is present embodiments provided, comprising: heating circulation line, The components such as water circulating pump 7, water pipe, device for detecting water pressure 10, regulating valve 8.
The heating circulation line of the present embodiment has heating water inlet 12 (can also be referred to as heating water return outlet) and heating Water outlet 16, the water body entered by heating water inlet 12 are discharged by passing through heating water outlet 16 after a series of heat exchange, and And turned again at heating water inlet 12 by structures such as circulation line (not shown)s, complete a water circulation, water circulation Power provided by above-mentioned water circulating pump 7, water circulating pump 7 between heating water inlet 12 and heating water outlet 16, and It is arranged close to heating water inlet 12.Heat exchanging process about heating circulation line can be described in the following embodiments, and Specific fit system about water circulating pump 7 and heating circulation line belongs to the conventional known common sense of those skilled in the art, because This present embodiment is not described above-mentioned two aspect.
The water pipe of the present embodiment has moisturizing water inlet 13 and moisturizing water outlet 15, and moisturizing water outlet 15 is followed with heating Endless tube road is connected, and moisturizing water outlet 15 and heating circulation line most of the time are in normal open state, and moisturizing water outlet 15 So, work as heating circulation line between heating water inlet 12 and water circulating pump 7 in junction with heating circulation line When not running, the water body in water pipe can be driven to carry out pressurized treatment to heating circulation line by water circulating pump 7.
Since moisturizing water outlet 15 and heating circulation line most of the time are in normal open state, the water of the present embodiment Pressure detection device 10 may be mounted on water pipe, and device for detecting water pressure 10 is used to detect heating circulation line hydraulic pressure, and will Heating circulation line hydraulic pressure is sent to the control system of wall-hung boiler in real time, and control system may include the control circuits such as PLC, control System carries out data processing and comparison, and the movement of following switching valves is driven according to processing and comparison result, and about wall-hung boiler The data receiver of control system, processing and to send the processes such as instruction be also technology more mature in the prior art, therefore this Embodiment is not specifically described its specific work process or circuit structure etc..
The switching valve of the present embodiment is mounted on the junction of moisturizing water outlet 15 Yu heating circulation line, and switching valve is threeway Valve 19, the hydraulic pressure opening and closing moisturizing water outlet 15 and heating circulation line detected according to device for detecting water pressure 10, the tool of switching valve Body process is as follows:
When the hydraulic pressure that device for detecting water pressure 10 detects is less than or equal to the first preset value (such as 0.1MPa), control system is sentenced Surely it needs to carry out heating circulation line ftercompction, and then drives switching valve to open moisturizing water outlet 15 and close heating circulation pipe Road can so promote the water body in water pipe by water circulating pump 7, water body is introduced into adopting of being in close state In warm circulation line, ftercompction is carried out to heating circulation line.
When the hydraulic pressure that device for detecting water pressure 10 detects is more than or equal to the second preset value (such as 0.2MPa), control system is sentenced System is determined without ftercompction, and then drives switching valve to close moisturizing water outlet 15, and open heating circulation line, heating circulation line Restore to work normally.
As can be seen from the above description, the wall-hung boiler automatic water replenishing system of the present embodiment utilizes 7 He of water circulating pump of wall-hung boiler Water pipe collective effect carries out pressurization moisturizing, is not necessarily to external water circulating pump 7, and switching valve is examined according to device for detecting water pressure 10 The opening and closing of observing and controlling water pipe and heating circulation line is not in the too small or excessive situation of pressurization, and boost pressure is controllable, It ensure that the good operation of unit.
On the basis of above structure, the wall-hung boiler automatic water replenishing system of the present embodiment further includes heating heat exchanger 18 and goes out Water lines, heating heat exchanger 18 are plate heat exchanger, and heating circulation line and water pipe pass through pipeline and heating heat-exchange respectively Device 18 is connected, and outlet pipeline one end is connected with heating heat exchanger 18, and the other end is equipped with hot water outlet.Heating heat exchanger 18 is right It carries out carrying out heat exchange from heating circulation line and the water body of water pipe water body sum in it, and is controlled by above-mentioned control System processed, temperature needed for the water body in it is adjusted to user, and use is conveyed to as domestic hot-water by outlet pipeline Family.
In addition, the first temperature-detecting device 17 is installed on the outlet pipeline of the present embodiment, the first temperature-detecting device 17 It can be temperature sensor, guarantee that the temperature of the domestic water of outlet pipeline output reaches preset requirement.And in outlet pipeline On water flow amount detecting device 11 is installed, water flow amount detecting device 11 is water flow sensor, so that the water of outlet pipeline output Flow is controllable.
Specifically, heating heat exchanger 18 and the type of attachment of heating circulation line are as follows: heating circulation line is connected with One pipeline 24 and the second pipeline 25;First pipeline, 24 one end is connected with heating circulation line, and the two connectivity part is located at heating Between water inlet 12 and water circulating pump 7, the first pipe other end is connected with heating heat exchanger 18;Second pipeline, 25 one end and heating Circulation line is connected, and is connected particular by triple valve 19, and the two connectivity part is located at water circulating pump 7 and heating water outlet Between 16, the other end is connected with heating heat exchanger 18.The heating heat exchanger 18 of the structure meets user demand in addition to output Outside domestic water, additionally it is possible to carry out certain temperature to the water body in heating circulation line and adjust, more save and utilize heat energy Source.
In addition, the water body reflux of water pipe, the present embodiment are equipped with check valve 9 on water pipe, make in order to prevent Water lines water body can only one-way flow, water body flows to heating circulation line direction.
In addition, the present embodiment is also equipped with second temperature detection device 21 and heating circulation line on heating circulation line On safety temp.-limiting device 22 is installed, second temperature detection device 21 can be temperature sensor, and specific installation site is in heating Circulation line is carried out by wall-hung boiler in the line segments after heat exchange.Second temperature detection device 21 hands over heating circulation line heat Temperature real-time perfoming after changing detects and feeds back to control system, controls its output temperature convenient for control system, and safety temp.-limiting Device 22 greatly improves the security performance of heating circulation line.
In addition, in order to guarantee the good water circulation of heating circulation line, the heating circulation line of the present embodiment is connected with water Case, water tank specifically can be expansion tank 3, to accommodate the breathing amount with water in compensation system.
Embodiment two
A kind of wall-hung boiler is present embodiments provided, there is the wall-hung boiler automatic water replenishing system as described in above-described embodiment.
Specifically, the wall-hung boiler of the present embodiment is burnt gas wall hanging furnace, and wall-hung boiler includes furnace body, blower in conjunction with shown in attached drawing 2 1 and main heat exchanger 2;It is equipped with combustion chamber in furnace body, burner 6 is installed in combustion chamber, burner 6 is equipped with ignition electrode 4 and inspection fire The components such as needle 5,6 bottom of burner are connected with admission line, and admission line is equipped with fuel gas inlet 14, and sets on admission line There is gas ratio valve 20.
The main heat exchanger 2 of the present embodiment is mounted in furnace body, and is located at the top of burner 6.The blower 1 of the present embodiment It is mounted on furnace body, blower 1 is equipped with blast switch 23, and blower 1 is respectively communicated with extraneous and furnace body inner cavity combustion chamber, for being connected Furnace body and extraneous airflow circulating.
Correspondingly, in order to cooperate above-mentioned wall hanging furnace structure, the heating circulation line of the present embodiment includes being connected Bringing-up section and heat exchanging segment, bringing-up section are placed in combustion chamber, heat exchanging segment and the thermally conductive connection of main heat exchanger 2.
Specifically, the water circulation path of the heating circulation line of the present embodiment is as follows: being entered by heating water inlet 12 Water body flows into above-mentioned first segment by the water body that heating water inlet 12 and moisturizing water outlet 15 enter jointly first, by burning Device 6 heats;Heat exchange processing is then carried out by main heat exchanger 2 by second segment;Subsequently, part water body passes through heating water outlet 16 Water outlet carries out water circulation, and another part water body is entered by pipeline and carries out heat exchange processing in heating heat exchanger 18.
And the advantages of wall-hung boiler about the present embodiment, is embodied by the automatic water replenishing system of embodiment one, therefore this reality Example is applied not repeat its advantages.
In the description of the present invention, it is to be understood that, term " on ", "lower", "left", "right", "inner", "outside" etc. indicate Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the device of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Bu Nengli Solution is limitation of the present invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicit includes one or more of the features.In the description of the present invention, the meaning of " plurality " is two or more, unless otherwise Clear specific restriction.
In the present invention unless specifically defined or limited otherwise, the terms such as term " installation ", " connected ", " connection " are answered It is interpreted broadly, for example, it may be being fixedly connected, may be a detachable connection, or is integral etc..For the common of this field For technical staff, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned Embodiment is changed, modifies, replacement and variant.

Claims (15)

1.一种壁挂炉自动补水系统,其特征在于,包括:A wall-suspension automatic water replenishing system, comprising: 具有采暖进水口(12)和采暖出水口(16)的采暖循环管路;a heating circulation line having a heating water inlet (12) and a heating water outlet (16); 与所述采暖循环管路相连通的循环水泵(7),所述循环水泵(7)位于所述采暖进水口(12)和所述采暖出水口(16)之间;a circulating water pump (7) communicating with the heating circulation line, the circulating water pump (7) being located between the heating water inlet (12) and the heating water outlet (16); 具有补水进水口(13)和补水出水口(15)的补水管路,所述补水出水口(15)与所述采暖循环管路相连通,且所述补水出水口(15)与所述采暖循环管路的连接处位于采暖进水口(12)和所述循环水泵(7)之间;a water replenishing pipeline having a hydration water inlet (13) and a water replenishing water outlet (15), the hydration water outlet (15) is in communication with the heating circulation pipeline, and the hydration water outlet (15) and the heating The connection of the circulation line is located between the heating water inlet (12) and the circulating water pump (7); 用于检测所述采暖循环管路水压的水压检测装置(10);a water pressure detecting device (10) for detecting the water pressure of the heating circulation pipeline; 安装在所述补水出水口(15)与所述采暖循环管路的连接处的切换阀(8),所述切换阀(8)根据所述水压检测装置(10)检测的水压开闭所述补水出水口(15)和所述采暖循环管路。a switching valve (8) installed at a junction of the makeup water outlet (15) and the heating circulation line, the switching valve (8) being opened and closed according to the water pressure detected by the water pressure detecting device (10) The hydration water outlet (15) and the heating circulation pipeline. 2.根据权利要求1所述的壁挂炉自动补水系统,其特征在于,所述水压检测装置(10)检测的水压小于等于第一预设值时,所述切换阀(8)打开所述补水出水口(15)并关闭所述采暖循环管路;所述水压检测装置(10)检测的水压大于等于第二预设值时,所述切换阀(8)关闭所述补水出水口(15)并开启所述采暖循环管路。The wall-suspension automatic water replenishing system according to claim 1, wherein the switching valve (8) is opened when the water pressure detected by the water pressure detecting device (10) is less than or equal to a first preset value. a water supply outlet (15) and closing the heating circulation line; when the water pressure detected by the water pressure detecting device (10) is greater than or equal to a second preset value, the switching valve (8) closes the water supply The nozzle (15) opens the heating circulation line. 3.根据权利要求1所述的壁挂炉自动补水系统,其特征在于,还包括采暖换热器(18);所述采暖循环管路和所述补水管路分别通过管路与所述采暖换热器(18)相连通。3 . The boiler automatic water replenishing system according to claim 1 , further comprising a heating heat exchanger ( 18 ); wherein the heating circulation pipeline and the water replenishing pipeline are respectively exchanged with the heating through pipelines The heaters (18) are connected. 4.根据权利要求3所述的壁挂炉自动补水系统,其特征在于,所述采暖循环管路连接有第一管路(24)和第二管路(25);所述第一管路(24)一端与所述采暖循环管路相连通,且两者连通处位于所述采暖进水口(12)和循环水泵(7)之间,所述第一管另一端与所述采暖换热器(18)相连通;所述第二管路(25)一端与所述采暖循环管路相连通,且两者连通处位于所述循环水泵(7)和所述采暖出水口(16)之间,另一端与所述采暖换热器(18)相连通。The wall-suspension automatic water replenishing system according to claim 3, wherein the heating circulation line is connected with a first line (24) and a second line (25); the first line ( 24) one end is connected to the heating circulation pipeline, and the communication between the two is located between the heating water inlet (12) and the circulating water pump (7), and the other end of the first pipe and the heating heat exchanger (18) communicating; one end of the second conduit (25) is in communication with the heating circulation pipeline, and the communication between the two is located between the circulating water pump (7) and the heating water outlet (16) The other end is in communication with the heating heat exchanger (18). 5.根据权利要求3或4所述的壁挂炉自动补水系统,其特征在于,还包括出水管路,所述出水管路一端与所述采暖换热器(18)相连通,另一端设有热水出口。The wall-suspension automatic water replenishing system according to claim 3 or 4, further comprising a water outlet pipe, wherein one end of the water outlet pipe is connected to the heating heat exchanger (18), and the other end is provided Hot water outlet. 6.根据权利要求5所述的壁挂炉自动补水系统,其特征在于,所述出水管路上安装有第一温度检测装置(17)。The wall-hung boiler automatic water supply system according to claim 5, wherein the outlet pipe is provided with a first temperature detecting device (17). 7.根据权利要求5所述的壁挂炉自动补水系统,其特征在于,所述出水管路上安装有水流量检测装置(11)。The wall-hung boiler automatic water supply system according to claim 5, wherein a water flow detecting device (11) is installed on the outlet pipe. 8.根据权利要求1-4任一项所述的壁挂炉自动补水系统,其特征在于,所述水压检测装置(10)安装在所述补水管路上。The wall-hung boiler automatic water supply system according to any one of claims 1 to 4, characterized in that the water pressure detecting device (10) is installed on the water supply pipe. 9.根据权利要求1-4任一项所述的壁挂炉自动补水系统,其特征在于,所述补水管路上安装有单向阀(9)。The wall-suspension automatic water replenishing system according to any one of claims 1 to 4, characterized in that the check valve is provided with a check valve (9). 10.根据权利要求1-4任一项所述的壁挂炉自动补水系统,其特征在于,所述采暖循环管路上安装有第二温度检测装置(21)。The wall-hung boiler automatic water supply system according to any one of claims 1 to 4, characterized in that the heating cycle line is provided with a second temperature detecting device (21). 11.根据权利要求1-4任一项所述的壁挂炉自动补水系统,其特征在于,所述采暖循环管路上安装有安全限温器(22)。The wall-suspension automatic water replenishing system according to any one of claims 1 to 4, characterized in that the heating circulation pipe is provided with a safety temperature limiter (22). 12.根据权利要求1-4任一项所述的壁挂炉自动补水系统,其特征在于,所述采暖循环管路连接有水箱。The wall-suspension automatic water replenishing system according to any one of claims 1 to 4, characterized in that the heating circulation line is connected with a water tank. 13.一种壁挂炉,其特征在于,其具有如权利要求1-12任一项所述的壁挂炉自动补水系统。A wall-hung boiler, characterized in that it has a wall-hung boiler automatic water supply system according to any one of claims 1-12. 14.根据权利要求13所述的壁挂炉,其特征在于,所述壁挂炉包括炉体、风机(1)和主换热器(2);所述炉体内设有燃烧室;所述主换热器(2)安装在所述炉体内;所述风机(1)安装在所述炉体上并用于导通炉体与外界的气流循环。The wall-hung boiler according to claim 13, wherein the fireplace comprises a furnace body, a fan (1) and a main heat exchanger (2); the furnace body is provided with a combustion chamber; The heat exchanger (2) is installed in the furnace body; the fan (1) is mounted on the furnace body and is used to circulate the airflow of the furnace body and the outside. 15.根据权利要求14所述的壁挂炉,其特征在于,所述采暖循环管路包括相连通的加热段和换热段,所述加热段置于所述燃烧室内,所述换热段与所述主换热器(2)导热连接。The wall-hung boiler according to claim 14, wherein the heating circulation line comprises a heating section and a heat exchange section which are in communication, the heating section is placed in the combustion chamber, and the heat exchange section is The main heat exchanger (2) is thermally connected.
CN201811247023.7A 2018-10-24 2018-10-24 Hanging stove automatic water supply system and have its hanging stove Pending CN109268930A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811247023.7A CN109268930A (en) 2018-10-24 2018-10-24 Hanging stove automatic water supply system and have its hanging stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811247023.7A CN109268930A (en) 2018-10-24 2018-10-24 Hanging stove automatic water supply system and have its hanging stove

Publications (1)

Publication Number Publication Date
CN109268930A true CN109268930A (en) 2019-01-25

Family

ID=65193425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811247023.7A Pending CN109268930A (en) 2018-10-24 2018-10-24 Hanging stove automatic water supply system and have its hanging stove

Country Status (1)

Country Link
CN (1) CN109268930A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306790A (en) * 2019-12-09 2020-06-19 珠海格力电器股份有限公司 Wall-mounted stove
CN112484315A (en) * 2020-12-11 2021-03-12 万家乐热能科技有限公司 Zero-cold-water wall-mounted furnace with automatic water replenishing function and control method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201875806U (en) * 2010-11-22 2011-06-22 盛水祥 Dual-purpose wall-hung furnace for plate-type heat exchanger
CN202813573U (en) * 2012-08-18 2013-03-20 佛山市顺德区奇林电气有限公司 Wall-hanging stove water heating system with automatic water replenishing function
CN105972814A (en) * 2016-06-13 2016-09-28 珠海格力电器股份有限公司 Gas wall-mounted furnace and water supplementing control method, control device and control system
CN209279261U (en) * 2018-10-24 2019-08-20 珠海格力电器股份有限公司 Hanging stove automatic water supply system and have its hanging stove

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201875806U (en) * 2010-11-22 2011-06-22 盛水祥 Dual-purpose wall-hung furnace for plate-type heat exchanger
CN202813573U (en) * 2012-08-18 2013-03-20 佛山市顺德区奇林电气有限公司 Wall-hanging stove water heating system with automatic water replenishing function
CN105972814A (en) * 2016-06-13 2016-09-28 珠海格力电器股份有限公司 Gas wall-mounted furnace and water supplementing control method, control device and control system
CN209279261U (en) * 2018-10-24 2019-08-20 珠海格力电器股份有限公司 Hanging stove automatic water supply system and have its hanging stove

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306790A (en) * 2019-12-09 2020-06-19 珠海格力电器股份有限公司 Wall-mounted stove
CN112484315A (en) * 2020-12-11 2021-03-12 万家乐热能科技有限公司 Zero-cold-water wall-mounted furnace with automatic water replenishing function and control method thereof

Similar Documents

Publication Publication Date Title
CN105737252A (en) Hot-water supply system
CN205561228U (en) Gas water heater
CN206771717U (en) Water heater with small fluctuation of outlet water temperature
CN107289621A (en) A kind of gas-heating water heater and its control method with energy saver mode
CN111503899A (en) Rapid heating temperature control method of gas heat exchange equipment
CN105972814B (en) Gas wall-mounted furnace and water supplementing control method, control device and control system
CN207035515U (en) A kind of fuel gas water heating system
CN104180425A (en) Household dual-energy high-power central heater
CN209027086U (en) A kind of gas-heating water heater
CN109268930A (en) Hanging stove automatic water supply system and have its hanging stove
CN113124559A (en) Wall-hanging stove control system convenient to bathing and heating move simultaneously
CN205825411U (en) A kind of gas heater of band heating function
CN207674732U (en) A kind of gas-heating water heater with energy saver mode
CN110440455A (en) Heating combustion method and system for gas wall-mounted boiler and wall-mounted boiler
CN209279261U (en) Hanging stove automatic water supply system and have its hanging stove
CN205860456U (en) Gas wall-mounted furnace
CN109631320A (en) A kind of zero cold water gas heater with water tank
KR20110133073A (en) Heat pipe boiler, heating control system and circulation pump control controller
CN210070003U (en) Water mixing device
CN209027098U (en) Zero cold water structure of one kind and dual-purpose stove
CN209623110U (en) A kind of burnt gas wall hanging furnace
CN208238225U (en) A kind of gas-heating water heater of band automatic water supplement function
CN204006282U (en) The hot radiator of a kind of high-power central authorities of family expenses Dual-energy source
CN209623083U (en) A kind of gas-heating water heater
CN205170811U (en) Pot at bottom of energy -conserving direct combustion formula of making wine gas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190125