CN109193947A - Power distribution room monitoring method, device, server and computer readable storage medium - Google Patents
Power distribution room monitoring method, device, server and computer readable storage medium Download PDFInfo
- Publication number
- CN109193947A CN109193947A CN201811231220.XA CN201811231220A CN109193947A CN 109193947 A CN109193947 A CN 109193947A CN 201811231220 A CN201811231220 A CN 201811231220A CN 109193947 A CN109193947 A CN 109193947A
- Authority
- CN
- China
- Prior art keywords
- power distribution
- distribution room
- data
- fault
- operation data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 61
- 238000012544 monitoring process Methods 0.000 title claims abstract description 24
- 238000012545 processing Methods 0.000 claims abstract description 27
- 230000008569 process Effects 0.000 claims description 26
- 238000004590 computer program Methods 0.000 claims description 20
- 230000011664 signaling Effects 0.000 claims description 10
- 230000005611 electricity Effects 0.000 claims description 9
- 238000012423 maintenance Methods 0.000 claims description 9
- 230000007613 environmental effect Effects 0.000 claims description 7
- 238000012806 monitoring device Methods 0.000 claims description 6
- 230000005764 inhibitory process Effects 0.000 claims description 5
- 238000013024 troubleshooting Methods 0.000 abstract description 7
- 230000006870 function Effects 0.000 description 14
- 238000004891 communication Methods 0.000 description 12
- 238000010586 diagram Methods 0.000 description 10
- 230000002159 abnormal effect Effects 0.000 description 6
- 230000006399 behavior Effects 0.000 description 6
- 238000007726 management method Methods 0.000 description 4
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 3
- 238000003745 diagnosis Methods 0.000 description 3
- 238000012795 verification Methods 0.000 description 3
- 108010001267 Protein Subunits Proteins 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 2
- 238000012512 characterization method Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000013480 data collection Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 208000033748 Device issues Diseases 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Classifications
-
- H02J13/0003—
-
- H02J13/0006—
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The embodiment of the present application is suitable for technical field of electric power, discloses a kind of power distribution room monitoring method, device, server and computer readable storage medium, wherein method includes: to obtain power distribution room operation data;According to operation data, judge whether power distribution room breaks down;When power distribution room breaks down, according to operation data, fault type is determined;According to fault type, corresponding manipulation instruction is issued, to execute corresponding failure processing operation.Troubleshooting efficiency and power supply reliability can be improved in the embodiment of the present application.
Description
Technical field
The application belongs to technical field of electric power more particularly to a kind of power distribution room monitoring method, device, server and calculating meter
Calculate readable storage medium storing program for executing.
Background technique
With the increase of user power utilization load, the type of user equipment is also gradually increased, and especially some precision instruments are set
Standby to have higher requirement to power supply quality, ensureing the reliability of power supply and improving power supply quality becomes each electricity consumption user electrician team
Cardinal task.
For a long time, user's power distribution room is due to being related to assets ownership and the problems such as existing management in power supply enterprise system,
Power supply enterprise for electricity consumption user power distribution room be all by all means until end of incoming cables, the daily operation management of power distribution room work all by
User independently undertakes oneself.However, the treatment effeciency of behavior adjustment management is lower, and often it is limited to the professional people of user itself outfit
Member's outfit is insufficient, detection means is limited, and the influence of the low equal factors of device intelligence automatization level is difficult to accomplish to shift to an earlier date for risk
The personnel specialty of precognition and prevention or even some operation managements work is insufficient, handles abnormal accident limited experience, may be tight
Lead to faulty operation in urgent thing part in a hurry, causes bigger accident, cause the power supply reliability of user lower.
Summary of the invention
In view of this, the embodiment of the present application provides a kind of power distribution room monitoring method, device, server and calculates readable
Storage medium, to solve the problems, such as that troubleshooting efficiency and power supply reliability are lower in the prior art.
The first aspect of the embodiment of the present application provides a kind of power distribution room monitoring method, comprising:
Obtain power distribution room operation data;
According to the operation data, judge whether the power distribution room breaks down;
When the power distribution room breaks down, according to the operation data, fault type is determined;
According to the fault type, corresponding manipulation instruction is issued, to execute corresponding failure processing operation.
With reference to first aspect, described that fault type is determined according to the operation data in a kind of feasible realization, packet
It includes:
The operation data and pre-stored failure cause informa are compared, judge whether the operation data meets
Default conventional fault condition;
When the operation data meets the default conventional fault condition, the fault type is conventional fault;
When the operation data does not meet the default conventional fault condition, the fault type is unconventional failure.
With reference to first aspect, described according to the fault type in a kind of feasible realization, it issues corresponding manipulation and refers to
It enables, to execute corresponding failure processing operation, comprising:
When the fault type is the conventional fault, process flow information according to the pre-stored data issues the first behaviour
Control is instructed to the controlling terminal of the power distribution room, so that the controlling terminal is executed according to first manipulation instruction to corresponding
Terminal sends control instruction;
When the fault type is unconventional failure, fault message is committed to team of expert think tank;
Team of the expert think tank is received according to the fault message definite event type information;
According to the event type information, corresponding reply operation is executed.
With reference to first aspect, in a kind of feasible realization, described according to the event type information, execution is answered accordingly
To operation, comprising:
When the event type information is first kind event, process flow information according to the pre-stored data is issued described
First manipulation instruction to the power distribution room controlling terminal so that the controlling terminal is according to first manipulation instruction to corresponding
Execution terminal send control instruction;
When the event type information is the second class event, the second manipulation instruction is issued;
According to second manipulation instruction, fault message is sent to the corresponding operation maintenance personnel of the power distribution room.
With reference to first aspect, in a kind of feasible realization, the acquisition power distribution room operation data, comprising:
Obtain the operation data of the power distribution room acquired in real time;
The operation data includes telemetry, remote pulse data and remote signalling data, and the telemetry includes operating condition number
According to, power quality data and environmental data, the remote pulse data include electric energy data, and the remote signalling data includes that equipment is opened
Measure data and gate inhibition's status data in pass.
The second aspect of the embodiment of the present application provides a kind of power distribution room monitoring device, comprising:
Operation data obtains module, for obtaining power distribution room operation data;
Judgment module, for judging whether the power distribution room breaks down according to the operation data;
Determining module, for according to the operation data, determining fault type when the power distribution room breaks down;
Module is issued, for issuing corresponding manipulation instruction according to the fault type, to execute corresponding failure processing behaviour
Make.
In conjunction with second aspect, in a kind of feasible realization, the determining module includes:
Judging unit judges the fortune for the operation data and pre-stored failure cause informa to be compared
Whether row data meet default conventional fault condition;
First determination unit, for when the operation data meets the default conventional fault condition, the failure classes
Type is conventional fault;
Second determination unit, for when the operation data does not meet the default conventional fault condition, the failure
Type is unconventional failure.
In conjunction with second aspect, in a kind of feasible realization, the module that issues includes:
First issuance unit is used for when the fault type is the conventional fault, processing stream according to the pre-stored data
Journey information issues the controlling terminal of the first manipulation instruction to the power distribution room, so that the controlling terminal is according to first behaviour
Control instruction sends control instruction to the corresponding terminal that executes;
Unit is submitted, for when the fault type is unconventional failure, fault message to be committed to group of expert think tank
Team;
Receiving unit, for receiving team of the expert think tank according to the fault message definite event type information;
Execution unit, for executing corresponding reply operation according to the event type information.
In conjunction with second aspect, in a kind of feasible realization, the execution unit includes:
First issues subelement, is used for when the event type information is first kind event, place according to the pre-stored data
Procedure information is managed, the controlling terminal of first manipulation instruction to the power distribution room is issued, so that the controlling terminal is according to institute
It states the first manipulation instruction and sends control instruction to the corresponding terminal that executes;
Second issues subelement, for issuing the second manipulation instruction when the event type information is the second class event;
Transmission sub-unit, for it is corresponding that fault message to be sent to the power distribution room according to second manipulation instruction
Operation maintenance personnel.
In conjunction with second aspect, in a kind of feasible realization, the operation data obtains module and includes:
Real-time acquiring unit, for obtaining the operation data of the power distribution room acquired in real time;
The operation data includes telemetry, remote pulse data and remote signalling data, and the telemetry includes operating condition number
According to, power quality data and environmental data, the remote pulse data include electric energy data, and the remote signalling data includes that equipment is opened
Measure data and gate inhibition's status data in pass.
The third aspect of the embodiment of the present application provides a kind of server, including memory, processor and is stored in described
In memory and the computer program that can run on the processor, the processor are realized when executing the computer program
Such as the step of any one of above-mentioned first aspect the method.
The fourth aspect of the embodiment of the present application provides a kind of computer readable storage medium, the computer-readable storage medium
Matter is stored with computer program, and the side as described in above-mentioned any one of first aspect is realized when the computer program is executed by processor
The step of method.
Existing beneficial effect is the embodiment of the present application compared with prior art:
The embodiment of the present application is by according to power distribution room operation data, automatic discrimination fault type, and according to fault type from
It is dynamic to issue corresponding manipulation instruction, do not have to artificial monitoring and handle, improves troubleshooting efficiency;Pass through operation data automatic identification
Fault type issues corresponding manipulation instruction, and realization is automatically-monitored, does not need the operation maintenance personnel for being equipped with profession, improves confession
Electric reliability.
Detailed description of the invention
It in order to more clearly explain the technical solutions in the embodiments of the present application, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only some of the application
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is power distribution room operational system framework schematic block diagram provided by the embodiments of the present application;
Fig. 2 is a kind of schematic process flow diagram of power distribution room monitoring method provided by the embodiments of the present application,;
Fig. 3 is a kind of another schematic process flow diagram of power distribution room monitoring method provided by the embodiments of the present application;
Fig. 4 is a kind of structural schematic block diagram of power distribution room monitoring device provided by the embodiments of the present application;
Fig. 5 is the schematic diagram of server provided by the embodiments of the present application.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed
Body details, so as to provide a thorough understanding of the present application embodiment.However, it will be clear to one skilled in the art that there is no these specific
The application also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
The detailed description of road and method, so as not to obscure the description of the present application with unnecessary details.
Before introducing detailed process provided by the embodiments of the present application, the embodiment of the present application may relate to first system
Explanation is introduced in framework.
Referring to power distribution room operational system framework schematic block diagram shown in fig. 1, which includes team of expert think tank, cloud platform
It include intelligent gateway, telemetry-acquisition point, state-signal collection point and remote control output in each power distribution room at least one power distribution room
Point etc..Cloud platform and intelligent gateway communication connection, intelligent gateway and each collection point, output point communication connection.
Cloud platform is made of one or more servers, is specifically as follows highly-safe, highly reliable, fast response time
Business level cloud service platform, the Master Station Software of profession customization is installed, data acquisition may be implemented, data storage, abnormal accuse
The functions such as police, risk profile, fault diagnosis, event push, linkage under line, remote control command issue, data query.Intelligent network
Uplink may be implemented in pass and cloud platform carries out network communication, and downlink is communicated with each acquisition point device.Each acquisition point device
The real time execution floor data of power distribution room can be acquired in real time, and each terminal that executes can execute the control instruction that cloud platform issues.
Communication mode between intelligent gateway and cloud platform, between intelligent gateway and each intelligent terminal of power distribution room can be arbitrary.
For example, the communication mode between intelligent gateway and cloud platform is 4G wireless communication, the communication between intelligent gateway and each intelligent terminal
Mode is Internet of Things Network Communication.
Team of expert think tank relies on cloud platform and provides corresponding decision, commonly encounters some start from some unknown cause, qualitative unclear
Either Nature comparison serious accident when, cloud platform can not actively issue respective handling instruction, need the expert on backstage at this time
Team of think tank specifies that accident is qualitative and processing method according to corresponding data, then issues long-range behaviour manually by team of expert think tank
Control instruction, to carry out accident treatment.
It should be noted that each building block in the above-mentioned system architecture and system architecture referred to be it is exemplary,
The restriction of the system architecture to the embodiment of the present application, the specific manifestation form of each component part is not caused.For example, above-mentioned intelligence
Gateway may be replaced by other equipment for having communication function.
It, below will be to provided by the embodiments of the present application after having introduced the system architecture that the embodiment of the present application may relate to
Specific technical solution describes in detail.In order to illustrate technical solution described herein, carried out below by specific embodiment
Explanation.
Embodiment one
Fig. 2 is referred to, is a kind of schematic process flow diagram of power distribution room monitoring method provided by the embodiments of the present application, this method
It may comprise steps of:
Step S201, power distribution room operation data is obtained.
Specifically, Cloud Server obtains the operation data of power distribution room acquisition, which can be matched by being set in advance in
After each acquisition point device acquisition in electric room, Cloud Server is uploaded to by communication module.And operation data collected can be with
It is to acquire in real time, that is, Cloud Server gets the operating condition data of power distribution room in real time, round-the-clock in real time to realize to power distribution room
Monitoring.Certainly, operation data, which may not be, in real time acquires.
In one embodiment, this step, that is, the detailed process of above-mentioned acquisition power distribution room operation data can be such as are as follows: obtains
Take the operation data of the power distribution room acquired in real time;Operation data includes telemetry, remote pulse data and remote signalling data, telemetering number
According to including floor data, power quality data and environmental data, remote pulse data include electric energy data, and remote signalling data includes setting
Standby switching value data and gate inhibition's status data.
Wherein, floor data refers to the data of the base regime of characterization power distribution room, can include but is not limited to voltage, electricity
Stream, power and earthing detection etc..Power quality data can include but is not limited to frequency, harmonic wave, aberration rate and imbalance
Degree etc..Environmental data refers to through the collected data of environmental sensor, and G has including but not limited to temperature and humidity, smog, red
Outer detection and water level etc..
Its data collection point includes basic metering points of electric energy, further includes that bus bar, duplexure, all branch nodes are opened
Pass, ground fault monitoring point etc..
As can be seen that data collection point multi-panel is wide and data acquisition is comprehensive in real time, it can be subsequent fault diagnosis, failure
Processing provides strong data supporting, further increases the reliability and treatment effeciency of fault diagnosis and troubleshooting.
Step S202, according to operation data, judge whether power distribution room breaks down.When power distribution room breaks down, enter
Step S203, when there is no failures for power distribution room, then continuation carries out breakdown judge according to the operation data of acquisition.
It is understood that corresponding operation data can be abnormal when power distribution room breaks down, can typing in advance it is each
The corresponding zone of reasonableness numerical value of class operation data then can be determined that when operation data is not in the zone of reasonableness numerical value of the setting
Power distribution room currently breaks down.
Step S203, according to operation data, fault type is determined.
Determine break down after, Cloud Server need automatically according to operation data, determine fault type, with take with
The corresponding treatment measures of the fault type.
It should be noted that fault type may include conventional fault and unconventional rule.Conventional fault, which refers to, powered
Relatively common failure in journey, the qualitative and cause of the failure accident is all relatively more clear, and also forms accordingly fixed processing
Process.Unconventional failure refers to some qualitative abnormal accidents indefinite, cause is more complicated, the accident be difficult to by some or
Person several factors determine respective handling mode.
The cause and process flow of conventional fault are all that comparison is clear, fixed, can be by the place of all conventional rules
The relevant informations such as reason method, cause are integrated into Cloud Server.It therefore, specifically can be by pre- with Cloud Server by operation data
The cause informa etc. first stored is compared, and then can be conventional fault by fault verification when there is relevant failure, conversely,
It can be unconventional failure by fault verification if do not find related or consistent failure after comparison.
For example, causes of incident is that threephase load is unbalanced so as to cause power failure for three-phase imbalance accident.When
When the difference between threephase load data in operation data collected exceeds some preset reasonable value range, then
It can be three-phase imbalance accident by the fault verification, and three-phase imbalance accident belongs to conventional fault.
Step S204, according to fault type, corresponding manipulation instruction is issued, to execute corresponding failure processing operation.
After determining fault type, it can generate according to the process flow of corresponding failure type and issue corresponding behaviour
Control instruction, to carry out respective handling to the failure.
It when for conventional fault, then can be carried out according to the corresponding process flow of specific failure mode, for example, when being three-phase
When uneven accident, main purpose is to restore bulk supply as early as possible, it is necessary to one in that phase line of overload
A little lower loads of priority level execute processing of operating a switch, and restore bulk supply immediately after.And execute operate a switch processing can be specific
The intelligent gateway of manipulation instruction to power distribution room is issued by Cloud Server, intelligent gateway exports in real time after receiving the manipulation instruction
The corresponding signal that controls is to each execution unit.Execution unit includes all kinds of remote control switches, breaker etc..For example, duplexure is opened
Pass, on-load switch, reactive power compensator fling-cut switch, air-blower control switch and access control etc..
When for unconventional failure, then corresponding exception information can be committed to backstage team of expert think tank, by expert
Team of think tank determines that accident is qualitative and processing mode according to abnormal data information, then is taken by team of expert think tank either manually or by cloud
Business device issues corresponding remote control instruction, to carry out corresponding accident treatment.
The present embodiment is by according to power distribution room operation data, automatic discrimination fault type, and according to fault type it is automatic under
It sends out manipulation instruction corresponding, does not have to artificial monitoring and handle, improve troubleshooting efficiency;Pass through operation data automatic identification failure
Type issues corresponding manipulation instruction, and realization is automatically-monitored, does not need the operation maintenance personnel for being equipped with profession, improving power supply can
By property.
Embodiment two
Fig. 3 is referred to, is a kind of another schematic process flow diagram of power distribution room monitoring method provided by the embodiments of the present application,
This method may comprise steps of:
Step S301, power distribution room operation data is obtained.
Step S302, according to operation data, judge whether power distribution room breaks down.When power distribution room breaks down, enter
Step S303, when there is no failures for power distribution room, then continuation carries out breakdown judge according to the operation data of acquisition.
Step S303, operation data and pre-stored failure cause informa are compared, judge whether operation data accords with
Close default conventional fault condition;When operation data meets default conventional fault condition, fault type is conventional fault, into step
Rapid S304;When operation data does not meet default conventional fault condition, fault type is unconventional failure, enters step S305.
It is understood that above-mentioned failure cause informa refers to the relevant information for causing the failure cause of conventional fault.Example
Such as, the unbalanced accident of threephase load rise because threephase load it is unbalanced.It can be by the phase of the causes of incident of all kinds of conventional faults
It closes information and is stored in advance in Cloud Server, and is associated with corresponding fault type.
Above-mentioned default conventional fault condition refer to characterization failure whether be conventional fault condition, can be embodied in
It whether there is failure cause informa corresponding or associated with misoperation data in Cloud Server.
Step S304, process flow information according to the pre-stored data, the control for issuing the first manipulation instruction to power distribution room are whole
End, so that controlling terminal sends control instruction to the corresponding terminal that executes according to the first manipulation instruction.
It is understood that when failure is conventional fault, then it can be according to the processing stream for being previously integrated to Cloud Server
Cheng Jinhang respective handling.
Above-mentioned controlling terminal refers to the manipulation instruction issued with reception Cloud Server, and the manipulation instruction is exported in real time
It to the corresponding terminal for executing terminal, such as can be intelligent gateway.Above-mentioned execution terminal refers to specific execution manipulation instruction
Terminal may include all kinds of remote control switches and short circuit etc..
Step S305, fault message is committed to team of expert think tank.
When failure is unconventional failure, then it can be committed to backstage team of expert think tank, be carried out by team of expert think tank
Judgement and determining treatment measures.
Step S306, team of expert think tank is received according to fault message definite event type information.
It should be noted that above-mentioned event type information may include emergency and non-emergent event.Wherein, for one
It is a little need to analyze study and judge nature of occurence, find out causes of incident after can just make respective handling, and if hastily processing restores electricity
Be likely to result in the secondary damage of supply network, equipment, or even will cause more serious consequence, by this kind of event it is qualitative be tight
Urgent thing part.For example, power network line is short-circuit, ground fault, environment temperature exception or water level monitoring are abnormal etc..And for it is some not
As for the event for causing serious consequence, then qualitative is non-emergent event.For example, overload event, in situation without any processing
Under restore electricity may face the risk having a power failure again again, but have a power failure also be unlikely to cause serious consequence again.
Step S307, according to event type information, corresponding reply operation is executed.
It for non-emergent event, can be handled according to the process similar with conventional fault, that is, team of expert think tank is logical
It crosses Cloud Server and issues corresponding manipulation instruction to power distribution room, power distribution room executes corresponding processing according to the manipulation instruction.
For emergency, the O&M patrolman of the power distribution room near zone can be notified to carry out site inspection, visited
Processing, to reach the final purpose to restore electricity.
In one embodiment, above-mentioned according to event type information, the detailed process for executing corresponding reply operation can wrap
Include: when event type information is first kind event, process flow information according to the pre-stored data issues the first manipulation instruction extremely
The controlling terminal of power distribution room, so that controlling terminal sends control instruction to the corresponding terminal that executes according to the first manipulation instruction;When
When event type information is the second class event, the second manipulation instruction is issued;According to the second manipulation instruction, fault message is sent to
The corresponding operation maintenance personnel of power distribution room.
It should be noted that above-mentioned first kind event is non-emergent event, the second class event is emergency.
As can be seen that the present embodiment is by according to power distribution room operation data, automatic discrimination fault type, and according to failure classes
Type issues corresponding manipulation instruction automatically, does not have to artificial monitoring and handles, improves troubleshooting efficiency;It is automatic by operation data
It identifies fault type, issues corresponding manipulation instruction, realization is automatically-monitored, does not need the operation maintenance personnel for being equipped with profession, improves
Power supply reliability.For some qualitative accidents difficult, processing is complicated, pass through on-line off-line mutual association of team of expert think tank
Make, realizes that the conventional fault of power distribution room, unconventional failure automatically process, improve the intelligence and automation of operational system.
It should be noted that the something in common of the present embodiment and above-described embodiment one, reference can be made to corresponding contents above, herein
It repeats no more.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present application constitutes any limit
It is fixed.
Embodiment three
Fig. 4 is referred to, is a kind of structural schematic block diagram of power distribution room monitoring device provided by the embodiments of the present application, the device
May include:
Operation data obtains module 41, for obtaining power distribution room operation data;
Judgment module 42, for judging whether power distribution room breaks down according to operation data;
Determining module 43, for according to operation data, determining fault type when power distribution room breaks down;
Module 44 is issued, for corresponding manipulation instruction being issued, to execute corresponding failure processing operation according to fault type.
In a kind of feasible realization, above-mentioned determining module may include:
Judging unit judges that operation data is for operation data and pre-stored failure cause informa to be compared
It is no to meet default conventional fault condition;
First determination unit, for when operation data meets default conventional fault condition, fault type to be conventional fault;
Second determination unit, for when operation data does not meet default conventional fault condition, fault type to be unconventional
Failure.
In a kind of feasible realization, the above-mentioned module that issues may include:
First issuance unit is used for when fault type is conventional fault, process flow information according to the pre-stored data, under
The controlling terminal of the first manipulation instruction to power distribution room is sent out, so that controlling terminal executes terminal to corresponding according to the first manipulation instruction
Send control instruction;
Unit is submitted, for when fault type is unconventional failure, fault message to be committed to team of expert think tank;
Receiving unit, for receiving team of expert think tank according to fault message definite event type information;
Execution unit, for executing corresponding reply operation according to event type information.
In a kind of feasible realization, above-mentioned execution unit may include:
First issues subelement, is used for when event type information is first kind event, processing stream according to the pre-stored data
Journey information issues the controlling terminal of the first manipulation instruction to power distribution room, so that controlling terminal is according to the first manipulation instruction to corresponding
Execution terminal send control instruction;
Second issues subelement, for issuing the second manipulation instruction when event type information is the second class event;
Transmission sub-unit, for according to the second manipulation instruction, fault message to be sent to the corresponding operation maintenance personnel of power distribution room.
In a kind of feasible realization, above-mentioned operation data obtains module and may include:
Real-time acquiring unit, for obtaining the operation data of the power distribution room acquired in real time;
Operation data includes telemetry, remote pulse data and remote signalling data, and telemetry includes floor data, electric energy matter
It measures data and environmental data, remote pulse data includes electric energy data, remote signalling data includes facility switching amount data and gate inhibition's shape
State data.
It should be noted that the present embodiment is Installation practice corresponding with above-mentioned each embodiment of the method, related introduction
Illustrate to refer to above-mentioned each embodiment of the method, details are not described herein.
In the present embodiment, by according to power distribution room operation data, automatic discrimination fault type, and it is automatic according to fault type
Corresponding manipulation instruction is issued, does not have to artificial monitoring and handles, improve troubleshooting efficiency;Pass through the event of operation data automatic identification
Hinder type, issue corresponding manipulation instruction, realize automation, Intellectualized monitoring, does not need the operation maintenance personnel for being equipped with profession, improve
Power supply reliability.
Example IV
Fig. 5 is the schematic diagram for the server that one embodiment of the application provides.As shown in figure 5, the server 5 of the embodiment wraps
It includes: processor 50, memory 51 and being stored in the computer that can be run in the memory 51 and on the processor 50
Program 52.The processor 50 is realized when executing the computer program 52 in above-mentioned each power distribution room monitoring method embodiment
Step, such as step S101 to S104 shown in FIG. 1.Alternatively, realization when the processor 50 executes the computer program 52
Each module or the function of unit in above-mentioned each Installation practice, such as the function of module 41 to 44 shown in Fig. 4.
Illustratively, the computer program 52 can be divided into one or more modules or unit, it is one or
The multiple modules of person or unit are stored in the memory 51, and are executed by the processor 50, to complete the application.It is described
One or more modules or unit can be the series of computation machine program instruction section that can complete specific function, which uses
In implementation procedure of the description computer program 52 in the server 5.For example, the computer program 52 can be divided
It is cut into operation data to obtain module, judgment module, determining module and issue module, each module concrete function is as follows:
Operation data obtains module, for obtaining power distribution room operation data;Judgment module, for sentencing according to operation data
Whether disconnected power distribution room breaks down;Determining module, for according to operation data, determining failure classes when power distribution room breaks down
Type;Module is issued, for corresponding manipulation instruction being issued, to execute corresponding failure processing operation according to fault type.
The server may include, but be not limited only to, processor 50, memory 51.It will be understood by those skilled in the art that
Fig. 5 is only the example of server 5, does not constitute the restriction to server 5, may include than illustrating more or fewer portions
Part perhaps combines certain components or different components, such as the server can also include input-output equipment, network
Access device, bus etc..
Alleged processor 50 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 51 can be the internal storage unit of the server 5, such as the hard disk or memory of server 5.
The memory 51 is also possible to the External memory equipment of the server 5, such as the plug-in type being equipped on the server 5 is hard
Disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card
(Flash Card) etc..Further, the memory 51 can also both include the internal storage unit of the server 5 or wrap
Include External memory equipment.The memory 51 is for other programs needed for storing the computer program and the server
And data.The memory 51 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function
Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different
Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing
The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also
To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated
Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list
Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system
The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
Scope of the present application.
In embodiment provided herein, it should be understood that disclosed device, server and method, Ke Yitong
Other modes are crossed to realize.For example, device described above, server example are only schematical, for example, the mould
The division of block or unit, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple
Unit or assembly can be combined or can be integrated into another system, or some features can be ignored or not executed.It is another
Point, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device or
The INDIRECT COUPLING or communication connection of unit can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module or unit are realized in the form of SFU software functional unit and sell as independent product
Or it in use, can store in a computer readable storage medium.Based on this understanding, the application realizes above-mentioned reality
The all or part of the process in a method is applied, relevant hardware can also be instructed to complete by computer program, it is described
Computer program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that
The step of above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code, the computer program
Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Computer-readable Jie
Matter may include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk,
Magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM,
Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described
The content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practice
Subtract, such as does not include electric carrier signal and electricity according to legislation and patent practice, computer-readable medium in certain jurisdictions
Believe signal.
Embodiment described above is only to illustrate the technical solution of the application, rather than its limitations;Although referring to aforementioned reality
Example is applied the application is described in detail, those skilled in the art should understand that: it still can be to aforementioned each
Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified
Or replacement, the spirit and scope of each embodiment technical solution of the application that it does not separate the essence of the corresponding technical solution should all
Comprising within the scope of protection of this application.
Claims (10)
1. a kind of power distribution room monitoring method characterized by comprising
Obtain power distribution room operation data;
According to the operation data, judge whether the power distribution room breaks down;
When the power distribution room breaks down, according to the operation data, fault type is determined;
According to the fault type, corresponding manipulation instruction is issued, to execute corresponding failure processing operation.
2. power distribution room monitoring method according to claim 1, which is characterized in that it is described according to the operation data, it determines
Fault type, comprising:
The operation data and pre-stored failure cause informa are compared, it is default to judge whether the operation data meets
Conventional fault condition;
When the operation data meets the default conventional fault condition, the fault type is conventional fault;
When the operation data does not meet the default conventional fault condition, the fault type is unconventional failure.
3. power distribution room monitoring method according to claim 2, which is characterized in that it is described according to the fault type, it issues
Corresponding manipulation instruction, to execute corresponding failure processing operation, comprising:
When the fault type is the conventional fault, process flow information according to the pre-stored data issues the first manipulation and refers to
It enables to the controlling terminal of the power distribution room, so that the controlling terminal executes terminal to corresponding according to first manipulation instruction
Send control instruction;
When the fault type is unconventional failure, fault message is committed to team of expert think tank;
Team of the expert think tank is received according to the fault message definite event type information;
According to the event type information, corresponding reply operation is executed.
4. power distribution room monitoring method according to claim 3, which is characterized in that it is described according to the event type information,
Execute corresponding reply operation, comprising:
When the event type information is first kind event, process flow information according to the pre-stored data issues described first
Manipulation instruction to the power distribution room controlling terminal so that the controlling terminal is according to first manipulation instruction to holding accordingly
Row terminal sends control instruction;
When the event type information is the second class event, the second manipulation instruction is issued;
According to second manipulation instruction, fault message is sent to the corresponding operation maintenance personnel of the power distribution room.
5. power distribution room monitoring method according to any one of claims 1 to 4, which is characterized in that the acquisition power distribution room fortune
Row data, comprising:
Obtain the operation data of the power distribution room acquired in real time;
The operation data includes telemetry, remote pulse data and remote signalling data, and the telemetry includes floor data, electricity
Energy qualitative data and environmental data, the remote pulse data include electric energy data, and the remote signalling data includes facility switching amount
Data and gate inhibition's status data.
6. a kind of power distribution room monitoring device characterized by comprising
Operation data obtains module, for obtaining power distribution room operation data;
Judgment module, for judging whether the power distribution room breaks down according to the operation data;
Determining module, for according to the operation data, determining fault type when the power distribution room breaks down;
Module is issued, for corresponding manipulation instruction being issued, to execute corresponding failure processing operation according to the fault type.
7. power distribution room monitoring device according to claim 6, which is characterized in that the determining module includes:
Judging unit judges the operation number for the operation data and pre-stored failure cause informa to be compared
According to whether meeting default conventional fault condition;
First determination unit, for when the operation data meets the default conventional fault condition, the fault type is
Conventional fault;
Second determination unit, for when the operation data does not meet the default conventional fault condition, the fault type
For unconventional failure.
8. power distribution room monitoring device according to claim 7, which is characterized in that the module that issues includes:
First issuance unit, for when the fault type is the conventional fault, process flow according to the pre-stored data to be believed
Breath, issues the controlling terminal of the first manipulation instruction to the power distribution room, so that the controlling terminal refers to according to first manipulation
It enables to the corresponding terminal that executes and sends control instruction;
Unit is submitted, for when the fault type is unconventional failure, fault message to be committed to team of expert think tank;
Receiving unit, for receiving team of the expert think tank according to the fault message definite event type information;
Execution unit, for executing corresponding reply operation according to the event type information.
9. a kind of server, which is characterized in that in the memory and can be described including memory, processor and storage
The computer program run on processor, the processor are realized when executing the computer program as claim 1 to 5 is any
The step of item the method.
10. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer journey
Sequence is realized when the computer program is executed by processor such as the step of any one of claim 1 to 5 the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811231220.XA CN109193947A (en) | 2018-10-22 | 2018-10-22 | Power distribution room monitoring method, device, server and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811231220.XA CN109193947A (en) | 2018-10-22 | 2018-10-22 | Power distribution room monitoring method, device, server and computer readable storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109193947A true CN109193947A (en) | 2019-01-11 |
Family
ID=64942550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811231220.XA Pending CN109193947A (en) | 2018-10-22 | 2018-10-22 | Power distribution room monitoring method, device, server and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109193947A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111416437A (en) * | 2020-03-05 | 2020-07-14 | 嘉捷鑫源(北京)科技有限公司 | Self-networking electricity distribution room monitoring system based on L ORA |
CN112018884A (en) * | 2020-07-17 | 2020-12-01 | 郑州祥和集团有限公司 | Switching station auxiliary monitoring device with electric power work ticket management function |
CN115509797A (en) * | 2022-11-22 | 2022-12-23 | 北京优特捷信息技术有限公司 | Method, device, equipment and medium for determining fault category |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101826756A (en) * | 2010-04-30 | 2010-09-08 | 广州合立正通信息网络集成有限公司 | System and method for realizing fault positioning of power distributing substation equipment |
CN103021142A (en) * | 2012-12-28 | 2013-04-03 | 上海华兴数字科技有限公司 | Remote warning system of engineering machinery device and control method of remote warning system |
-
2018
- 2018-10-22 CN CN201811231220.XA patent/CN109193947A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101826756A (en) * | 2010-04-30 | 2010-09-08 | 广州合立正通信息网络集成有限公司 | System and method for realizing fault positioning of power distributing substation equipment |
CN103021142A (en) * | 2012-12-28 | 2013-04-03 | 上海华兴数字科技有限公司 | Remote warning system of engineering machinery device and control method of remote warning system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111416437A (en) * | 2020-03-05 | 2020-07-14 | 嘉捷鑫源(北京)科技有限公司 | Self-networking electricity distribution room monitoring system based on L ORA |
CN112018884A (en) * | 2020-07-17 | 2020-12-01 | 郑州祥和集团有限公司 | Switching station auxiliary monitoring device with electric power work ticket management function |
CN115509797A (en) * | 2022-11-22 | 2022-12-23 | 北京优特捷信息技术有限公司 | Method, device, equipment and medium for determining fault category |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2377222B1 (en) | Hybrid distribution network power restoration control | |
CN102299560B (en) | Realize substation automation load transfer function | |
CN102447305B (en) | Topological anti-misoperation system for power grid | |
CN103477607B (en) | Energy automation installation and the method for running energy automation installation | |
CN109193947A (en) | Power distribution room monitoring method, device, server and computer readable storage medium | |
CN109034424A (en) | A kind of substation equipment maintenance management method, device and terminal device | |
CN211958263U (en) | Internet of things intelligent power box and management system | |
CN103649860B (en) | Generate method and the alarm modules of the comprehensive alarm of the alarm of process control PC system | |
CN116523294A (en) | Knowledge graph-based power grid risk early warning and decision system, method and equipment | |
Hajian-Hoseinabadi | Availability comparison of various power substation automation architectures | |
CN109861393B (en) | Processing method for preventing error locking and execution terminal | |
CN108460517A (en) | A kind of power distribution network management-control method and device | |
CN209948789U (en) | Power distribution monitoring system | |
CN104730421A (en) | Diagnostic method and system for grid fault equipment | |
CN111192427A (en) | Residual current type electrical fire monitoring method and device | |
CN111817265B (en) | Low-voltage transformer area power distribution protection method and system | |
CN106602713A (en) | Centralized-distributed power alarm control system | |
CN108539740A (en) | A kind of power grid accident anticipation simulation system and its method | |
CN111751655B (en) | Fault self-healing method and device for distribution line, computer equipment and storage medium | |
CN118426813B (en) | Remote upgrade method and system for protecting device, program product and storage medium | |
CN106300676B (en) | A kind of implementation method of Centralized Monitoring substation remote signalling paraphrase function | |
CN106469902A (en) | 10KV phase-loss low-voltage intelligent tripping protection device | |
CN105372538B (en) | Detection method and device for power distribution network equipment | |
van der Linde | Using iec61499 to achieve smart grid automation through interconnected distribution reclosers | |
CN118282053B (en) | Comprehensive intelligent error prevention system for transformer substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190111 |