CN109193947A - Power distribution room monitoring method, device, server and computer readable storage medium - Google Patents

Power distribution room monitoring method, device, server and computer readable storage medium Download PDF

Info

Publication number
CN109193947A
CN109193947A CN201811231220.XA CN201811231220A CN109193947A CN 109193947 A CN109193947 A CN 109193947A CN 201811231220 A CN201811231220 A CN 201811231220A CN 109193947 A CN109193947 A CN 109193947A
Authority
CN
China
Prior art keywords
power distribution
distribution room
data
fault
operation data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811231220.XA
Other languages
Chinese (zh)
Inventor
赵军平
龚贝
吴非
魏兴龙
唐义锋
曾雄威
王冬
苏浩波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN SHENBAO ELECTRIC APPLIANCE INSTRUMENT CO Ltd
Original Assignee
SHENZHEN SHENBAO ELECTRIC APPLIANCE INSTRUMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SHENBAO ELECTRIC APPLIANCE INSTRUMENT CO Ltd filed Critical SHENZHEN SHENBAO ELECTRIC APPLIANCE INSTRUMENT CO Ltd
Priority to CN201811231220.XA priority Critical patent/CN109193947A/en
Publication of CN109193947A publication Critical patent/CN109193947A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J13/0003
    • H02J13/0006

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The embodiment of the present application is suitable for technical field of electric power, discloses a kind of power distribution room monitoring method, device, server and computer readable storage medium, wherein method includes: to obtain power distribution room operation data;According to operation data, judge whether power distribution room breaks down;When power distribution room breaks down, according to operation data, fault type is determined;According to fault type, corresponding manipulation instruction is issued, to execute corresponding failure processing operation.Troubleshooting efficiency and power supply reliability can be improved in the embodiment of the present application.

Description

Power distribution room monitoring method, device, server and computer readable storage medium
Technical field
The application belongs to technical field of electric power more particularly to a kind of power distribution room monitoring method, device, server and calculating meter Calculate readable storage medium storing program for executing.
Background technique
With the increase of user power utilization load, the type of user equipment is also gradually increased, and especially some precision instruments are set Standby to have higher requirement to power supply quality, ensureing the reliability of power supply and improving power supply quality becomes each electricity consumption user electrician team Cardinal task.
For a long time, user's power distribution room is due to being related to assets ownership and the problems such as existing management in power supply enterprise system, Power supply enterprise for electricity consumption user power distribution room be all by all means until end of incoming cables, the daily operation management of power distribution room work all by User independently undertakes oneself.However, the treatment effeciency of behavior adjustment management is lower, and often it is limited to the professional people of user itself outfit Member's outfit is insufficient, detection means is limited, and the influence of the low equal factors of device intelligence automatization level is difficult to accomplish to shift to an earlier date for risk The personnel specialty of precognition and prevention or even some operation managements work is insufficient, handles abnormal accident limited experience, may be tight Lead to faulty operation in urgent thing part in a hurry, causes bigger accident, cause the power supply reliability of user lower.
Summary of the invention
In view of this, the embodiment of the present application provides a kind of power distribution room monitoring method, device, server and calculates readable Storage medium, to solve the problems, such as that troubleshooting efficiency and power supply reliability are lower in the prior art.
The first aspect of the embodiment of the present application provides a kind of power distribution room monitoring method, comprising:
Obtain power distribution room operation data;
According to the operation data, judge whether the power distribution room breaks down;
When the power distribution room breaks down, according to the operation data, fault type is determined;
According to the fault type, corresponding manipulation instruction is issued, to execute corresponding failure processing operation.
With reference to first aspect, described that fault type is determined according to the operation data in a kind of feasible realization, packet It includes:
The operation data and pre-stored failure cause informa are compared, judge whether the operation data meets Default conventional fault condition;
When the operation data meets the default conventional fault condition, the fault type is conventional fault;
When the operation data does not meet the default conventional fault condition, the fault type is unconventional failure.
With reference to first aspect, described according to the fault type in a kind of feasible realization, it issues corresponding manipulation and refers to It enables, to execute corresponding failure processing operation, comprising:
When the fault type is the conventional fault, process flow information according to the pre-stored data issues the first behaviour Control is instructed to the controlling terminal of the power distribution room, so that the controlling terminal is executed according to first manipulation instruction to corresponding Terminal sends control instruction;
When the fault type is unconventional failure, fault message is committed to team of expert think tank;
Team of the expert think tank is received according to the fault message definite event type information;
According to the event type information, corresponding reply operation is executed.
With reference to first aspect, in a kind of feasible realization, described according to the event type information, execution is answered accordingly To operation, comprising:
When the event type information is first kind event, process flow information according to the pre-stored data is issued described First manipulation instruction to the power distribution room controlling terminal so that the controlling terminal is according to first manipulation instruction to corresponding Execution terminal send control instruction;
When the event type information is the second class event, the second manipulation instruction is issued;
According to second manipulation instruction, fault message is sent to the corresponding operation maintenance personnel of the power distribution room.
With reference to first aspect, in a kind of feasible realization, the acquisition power distribution room operation data, comprising:
Obtain the operation data of the power distribution room acquired in real time;
The operation data includes telemetry, remote pulse data and remote signalling data, and the telemetry includes operating condition number According to, power quality data and environmental data, the remote pulse data include electric energy data, and the remote signalling data includes that equipment is opened Measure data and gate inhibition's status data in pass.
The second aspect of the embodiment of the present application provides a kind of power distribution room monitoring device, comprising:
Operation data obtains module, for obtaining power distribution room operation data;
Judgment module, for judging whether the power distribution room breaks down according to the operation data;
Determining module, for according to the operation data, determining fault type when the power distribution room breaks down;
Module is issued, for issuing corresponding manipulation instruction according to the fault type, to execute corresponding failure processing behaviour Make.
In conjunction with second aspect, in a kind of feasible realization, the determining module includes:
Judging unit judges the fortune for the operation data and pre-stored failure cause informa to be compared Whether row data meet default conventional fault condition;
First determination unit, for when the operation data meets the default conventional fault condition, the failure classes Type is conventional fault;
Second determination unit, for when the operation data does not meet the default conventional fault condition, the failure Type is unconventional failure.
In conjunction with second aspect, in a kind of feasible realization, the module that issues includes:
First issuance unit is used for when the fault type is the conventional fault, processing stream according to the pre-stored data Journey information issues the controlling terminal of the first manipulation instruction to the power distribution room, so that the controlling terminal is according to first behaviour Control instruction sends control instruction to the corresponding terminal that executes;
Unit is submitted, for when the fault type is unconventional failure, fault message to be committed to group of expert think tank Team;
Receiving unit, for receiving team of the expert think tank according to the fault message definite event type information;
Execution unit, for executing corresponding reply operation according to the event type information.
In conjunction with second aspect, in a kind of feasible realization, the execution unit includes:
First issues subelement, is used for when the event type information is first kind event, place according to the pre-stored data Procedure information is managed, the controlling terminal of first manipulation instruction to the power distribution room is issued, so that the controlling terminal is according to institute It states the first manipulation instruction and sends control instruction to the corresponding terminal that executes;
Second issues subelement, for issuing the second manipulation instruction when the event type information is the second class event;
Transmission sub-unit, for it is corresponding that fault message to be sent to the power distribution room according to second manipulation instruction Operation maintenance personnel.
In conjunction with second aspect, in a kind of feasible realization, the operation data obtains module and includes:
Real-time acquiring unit, for obtaining the operation data of the power distribution room acquired in real time;
The operation data includes telemetry, remote pulse data and remote signalling data, and the telemetry includes operating condition number According to, power quality data and environmental data, the remote pulse data include electric energy data, and the remote signalling data includes that equipment is opened Measure data and gate inhibition's status data in pass.
The third aspect of the embodiment of the present application provides a kind of server, including memory, processor and is stored in described In memory and the computer program that can run on the processor, the processor are realized when executing the computer program Such as the step of any one of above-mentioned first aspect the method.
The fourth aspect of the embodiment of the present application provides a kind of computer readable storage medium, the computer-readable storage medium Matter is stored with computer program, and the side as described in above-mentioned any one of first aspect is realized when the computer program is executed by processor The step of method.
Existing beneficial effect is the embodiment of the present application compared with prior art:
The embodiment of the present application is by according to power distribution room operation data, automatic discrimination fault type, and according to fault type from It is dynamic to issue corresponding manipulation instruction, do not have to artificial monitoring and handle, improves troubleshooting efficiency;Pass through operation data automatic identification Fault type issues corresponding manipulation instruction, and realization is automatically-monitored, does not need the operation maintenance personnel for being equipped with profession, improves confession Electric reliability.
Detailed description of the invention
It in order to more clearly explain the technical solutions in the embodiments of the present application, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only some of the application Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is power distribution room operational system framework schematic block diagram provided by the embodiments of the present application;
Fig. 2 is a kind of schematic process flow diagram of power distribution room monitoring method provided by the embodiments of the present application,;
Fig. 3 is a kind of another schematic process flow diagram of power distribution room monitoring method provided by the embodiments of the present application;
Fig. 4 is a kind of structural schematic block diagram of power distribution room monitoring device provided by the embodiments of the present application;
Fig. 5 is the schematic diagram of server provided by the embodiments of the present application.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, so as to provide a thorough understanding of the present application embodiment.However, it will be clear to one skilled in the art that there is no these specific The application also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, so as not to obscure the description of the present application with unnecessary details.
Before introducing detailed process provided by the embodiments of the present application, the embodiment of the present application may relate to first system Explanation is introduced in framework.
Referring to power distribution room operational system framework schematic block diagram shown in fig. 1, which includes team of expert think tank, cloud platform It include intelligent gateway, telemetry-acquisition point, state-signal collection point and remote control output in each power distribution room at least one power distribution room Point etc..Cloud platform and intelligent gateway communication connection, intelligent gateway and each collection point, output point communication connection.
Cloud platform is made of one or more servers, is specifically as follows highly-safe, highly reliable, fast response time Business level cloud service platform, the Master Station Software of profession customization is installed, data acquisition may be implemented, data storage, abnormal accuse The functions such as police, risk profile, fault diagnosis, event push, linkage under line, remote control command issue, data query.Intelligent network Uplink may be implemented in pass and cloud platform carries out network communication, and downlink is communicated with each acquisition point device.Each acquisition point device The real time execution floor data of power distribution room can be acquired in real time, and each terminal that executes can execute the control instruction that cloud platform issues. Communication mode between intelligent gateway and cloud platform, between intelligent gateway and each intelligent terminal of power distribution room can be arbitrary. For example, the communication mode between intelligent gateway and cloud platform is 4G wireless communication, the communication between intelligent gateway and each intelligent terminal Mode is Internet of Things Network Communication.
Team of expert think tank relies on cloud platform and provides corresponding decision, commonly encounters some start from some unknown cause, qualitative unclear Either Nature comparison serious accident when, cloud platform can not actively issue respective handling instruction, need the expert on backstage at this time Team of think tank specifies that accident is qualitative and processing method according to corresponding data, then issues long-range behaviour manually by team of expert think tank Control instruction, to carry out accident treatment.
It should be noted that each building block in the above-mentioned system architecture and system architecture referred to be it is exemplary, The restriction of the system architecture to the embodiment of the present application, the specific manifestation form of each component part is not caused.For example, above-mentioned intelligence Gateway may be replaced by other equipment for having communication function.
It, below will be to provided by the embodiments of the present application after having introduced the system architecture that the embodiment of the present application may relate to Specific technical solution describes in detail.In order to illustrate technical solution described herein, carried out below by specific embodiment Explanation.
Embodiment one
Fig. 2 is referred to, is a kind of schematic process flow diagram of power distribution room monitoring method provided by the embodiments of the present application, this method It may comprise steps of:
Step S201, power distribution room operation data is obtained.
Specifically, Cloud Server obtains the operation data of power distribution room acquisition, which can be matched by being set in advance in After each acquisition point device acquisition in electric room, Cloud Server is uploaded to by communication module.And operation data collected can be with It is to acquire in real time, that is, Cloud Server gets the operating condition data of power distribution room in real time, round-the-clock in real time to realize to power distribution room Monitoring.Certainly, operation data, which may not be, in real time acquires.
In one embodiment, this step, that is, the detailed process of above-mentioned acquisition power distribution room operation data can be such as are as follows: obtains Take the operation data of the power distribution room acquired in real time;Operation data includes telemetry, remote pulse data and remote signalling data, telemetering number According to including floor data, power quality data and environmental data, remote pulse data include electric energy data, and remote signalling data includes setting Standby switching value data and gate inhibition's status data.
Wherein, floor data refers to the data of the base regime of characterization power distribution room, can include but is not limited to voltage, electricity Stream, power and earthing detection etc..Power quality data can include but is not limited to frequency, harmonic wave, aberration rate and imbalance Degree etc..Environmental data refers to through the collected data of environmental sensor, and G has including but not limited to temperature and humidity, smog, red Outer detection and water level etc..
Its data collection point includes basic metering points of electric energy, further includes that bus bar, duplexure, all branch nodes are opened Pass, ground fault monitoring point etc..
As can be seen that data collection point multi-panel is wide and data acquisition is comprehensive in real time, it can be subsequent fault diagnosis, failure Processing provides strong data supporting, further increases the reliability and treatment effeciency of fault diagnosis and troubleshooting.
Step S202, according to operation data, judge whether power distribution room breaks down.When power distribution room breaks down, enter Step S203, when there is no failures for power distribution room, then continuation carries out breakdown judge according to the operation data of acquisition.
It is understood that corresponding operation data can be abnormal when power distribution room breaks down, can typing in advance it is each The corresponding zone of reasonableness numerical value of class operation data then can be determined that when operation data is not in the zone of reasonableness numerical value of the setting Power distribution room currently breaks down.
Step S203, according to operation data, fault type is determined.
Determine break down after, Cloud Server need automatically according to operation data, determine fault type, with take with The corresponding treatment measures of the fault type.
It should be noted that fault type may include conventional fault and unconventional rule.Conventional fault, which refers to, powered Relatively common failure in journey, the qualitative and cause of the failure accident is all relatively more clear, and also forms accordingly fixed processing Process.Unconventional failure refers to some qualitative abnormal accidents indefinite, cause is more complicated, the accident be difficult to by some or Person several factors determine respective handling mode.
The cause and process flow of conventional fault are all that comparison is clear, fixed, can be by the place of all conventional rules The relevant informations such as reason method, cause are integrated into Cloud Server.It therefore, specifically can be by pre- with Cloud Server by operation data The cause informa etc. first stored is compared, and then can be conventional fault by fault verification when there is relevant failure, conversely, It can be unconventional failure by fault verification if do not find related or consistent failure after comparison.
For example, causes of incident is that threephase load is unbalanced so as to cause power failure for three-phase imbalance accident.When When the difference between threephase load data in operation data collected exceeds some preset reasonable value range, then It can be three-phase imbalance accident by the fault verification, and three-phase imbalance accident belongs to conventional fault.
Step S204, according to fault type, corresponding manipulation instruction is issued, to execute corresponding failure processing operation.
After determining fault type, it can generate according to the process flow of corresponding failure type and issue corresponding behaviour Control instruction, to carry out respective handling to the failure.
It when for conventional fault, then can be carried out according to the corresponding process flow of specific failure mode, for example, when being three-phase When uneven accident, main purpose is to restore bulk supply as early as possible, it is necessary to one in that phase line of overload A little lower loads of priority level execute processing of operating a switch, and restore bulk supply immediately after.And execute operate a switch processing can be specific The intelligent gateway of manipulation instruction to power distribution room is issued by Cloud Server, intelligent gateway exports in real time after receiving the manipulation instruction The corresponding signal that controls is to each execution unit.Execution unit includes all kinds of remote control switches, breaker etc..For example, duplexure is opened Pass, on-load switch, reactive power compensator fling-cut switch, air-blower control switch and access control etc..
When for unconventional failure, then corresponding exception information can be committed to backstage team of expert think tank, by expert Team of think tank determines that accident is qualitative and processing mode according to abnormal data information, then is taken by team of expert think tank either manually or by cloud Business device issues corresponding remote control instruction, to carry out corresponding accident treatment.
The present embodiment is by according to power distribution room operation data, automatic discrimination fault type, and according to fault type it is automatic under It sends out manipulation instruction corresponding, does not have to artificial monitoring and handle, improve troubleshooting efficiency;Pass through operation data automatic identification failure Type issues corresponding manipulation instruction, and realization is automatically-monitored, does not need the operation maintenance personnel for being equipped with profession, improving power supply can By property.
Embodiment two
Fig. 3 is referred to, is a kind of another schematic process flow diagram of power distribution room monitoring method provided by the embodiments of the present application, This method may comprise steps of:
Step S301, power distribution room operation data is obtained.
Step S302, according to operation data, judge whether power distribution room breaks down.When power distribution room breaks down, enter Step S303, when there is no failures for power distribution room, then continuation carries out breakdown judge according to the operation data of acquisition.
Step S303, operation data and pre-stored failure cause informa are compared, judge whether operation data accords with Close default conventional fault condition;When operation data meets default conventional fault condition, fault type is conventional fault, into step Rapid S304;When operation data does not meet default conventional fault condition, fault type is unconventional failure, enters step S305.
It is understood that above-mentioned failure cause informa refers to the relevant information for causing the failure cause of conventional fault.Example Such as, the unbalanced accident of threephase load rise because threephase load it is unbalanced.It can be by the phase of the causes of incident of all kinds of conventional faults It closes information and is stored in advance in Cloud Server, and is associated with corresponding fault type.
Above-mentioned default conventional fault condition refer to characterization failure whether be conventional fault condition, can be embodied in It whether there is failure cause informa corresponding or associated with misoperation data in Cloud Server.
Step S304, process flow information according to the pre-stored data, the control for issuing the first manipulation instruction to power distribution room are whole End, so that controlling terminal sends control instruction to the corresponding terminal that executes according to the first manipulation instruction.
It is understood that when failure is conventional fault, then it can be according to the processing stream for being previously integrated to Cloud Server Cheng Jinhang respective handling.
Above-mentioned controlling terminal refers to the manipulation instruction issued with reception Cloud Server, and the manipulation instruction is exported in real time It to the corresponding terminal for executing terminal, such as can be intelligent gateway.Above-mentioned execution terminal refers to specific execution manipulation instruction Terminal may include all kinds of remote control switches and short circuit etc..
Step S305, fault message is committed to team of expert think tank.
When failure is unconventional failure, then it can be committed to backstage team of expert think tank, be carried out by team of expert think tank Judgement and determining treatment measures.
Step S306, team of expert think tank is received according to fault message definite event type information.
It should be noted that above-mentioned event type information may include emergency and non-emergent event.Wherein, for one It is a little need to analyze study and judge nature of occurence, find out causes of incident after can just make respective handling, and if hastily processing restores electricity Be likely to result in the secondary damage of supply network, equipment, or even will cause more serious consequence, by this kind of event it is qualitative be tight Urgent thing part.For example, power network line is short-circuit, ground fault, environment temperature exception or water level monitoring are abnormal etc..And for it is some not As for the event for causing serious consequence, then qualitative is non-emergent event.For example, overload event, in situation without any processing Under restore electricity may face the risk having a power failure again again, but have a power failure also be unlikely to cause serious consequence again.
Step S307, according to event type information, corresponding reply operation is executed.
It for non-emergent event, can be handled according to the process similar with conventional fault, that is, team of expert think tank is logical It crosses Cloud Server and issues corresponding manipulation instruction to power distribution room, power distribution room executes corresponding processing according to the manipulation instruction.
For emergency, the O&M patrolman of the power distribution room near zone can be notified to carry out site inspection, visited Processing, to reach the final purpose to restore electricity.
In one embodiment, above-mentioned according to event type information, the detailed process for executing corresponding reply operation can wrap Include: when event type information is first kind event, process flow information according to the pre-stored data issues the first manipulation instruction extremely The controlling terminal of power distribution room, so that controlling terminal sends control instruction to the corresponding terminal that executes according to the first manipulation instruction;When When event type information is the second class event, the second manipulation instruction is issued;According to the second manipulation instruction, fault message is sent to The corresponding operation maintenance personnel of power distribution room.
It should be noted that above-mentioned first kind event is non-emergent event, the second class event is emergency.
As can be seen that the present embodiment is by according to power distribution room operation data, automatic discrimination fault type, and according to failure classes Type issues corresponding manipulation instruction automatically, does not have to artificial monitoring and handles, improves troubleshooting efficiency;It is automatic by operation data It identifies fault type, issues corresponding manipulation instruction, realization is automatically-monitored, does not need the operation maintenance personnel for being equipped with profession, improves Power supply reliability.For some qualitative accidents difficult, processing is complicated, pass through on-line off-line mutual association of team of expert think tank Make, realizes that the conventional fault of power distribution room, unconventional failure automatically process, improve the intelligence and automation of operational system.
It should be noted that the something in common of the present embodiment and above-described embodiment one, reference can be made to corresponding contents above, herein It repeats no more.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present application constitutes any limit It is fixed.
Embodiment three
Fig. 4 is referred to, is a kind of structural schematic block diagram of power distribution room monitoring device provided by the embodiments of the present application, the device May include:
Operation data obtains module 41, for obtaining power distribution room operation data;
Judgment module 42, for judging whether power distribution room breaks down according to operation data;
Determining module 43, for according to operation data, determining fault type when power distribution room breaks down;
Module 44 is issued, for corresponding manipulation instruction being issued, to execute corresponding failure processing operation according to fault type.
In a kind of feasible realization, above-mentioned determining module may include:
Judging unit judges that operation data is for operation data and pre-stored failure cause informa to be compared It is no to meet default conventional fault condition;
First determination unit, for when operation data meets default conventional fault condition, fault type to be conventional fault;
Second determination unit, for when operation data does not meet default conventional fault condition, fault type to be unconventional Failure.
In a kind of feasible realization, the above-mentioned module that issues may include:
First issuance unit is used for when fault type is conventional fault, process flow information according to the pre-stored data, under The controlling terminal of the first manipulation instruction to power distribution room is sent out, so that controlling terminal executes terminal to corresponding according to the first manipulation instruction Send control instruction;
Unit is submitted, for when fault type is unconventional failure, fault message to be committed to team of expert think tank;
Receiving unit, for receiving team of expert think tank according to fault message definite event type information;
Execution unit, for executing corresponding reply operation according to event type information.
In a kind of feasible realization, above-mentioned execution unit may include:
First issues subelement, is used for when event type information is first kind event, processing stream according to the pre-stored data Journey information issues the controlling terminal of the first manipulation instruction to power distribution room, so that controlling terminal is according to the first manipulation instruction to corresponding Execution terminal send control instruction;
Second issues subelement, for issuing the second manipulation instruction when event type information is the second class event;
Transmission sub-unit, for according to the second manipulation instruction, fault message to be sent to the corresponding operation maintenance personnel of power distribution room.
In a kind of feasible realization, above-mentioned operation data obtains module and may include:
Real-time acquiring unit, for obtaining the operation data of the power distribution room acquired in real time;
Operation data includes telemetry, remote pulse data and remote signalling data, and telemetry includes floor data, electric energy matter It measures data and environmental data, remote pulse data includes electric energy data, remote signalling data includes facility switching amount data and gate inhibition's shape State data.
It should be noted that the present embodiment is Installation practice corresponding with above-mentioned each embodiment of the method, related introduction Illustrate to refer to above-mentioned each embodiment of the method, details are not described herein.
In the present embodiment, by according to power distribution room operation data, automatic discrimination fault type, and it is automatic according to fault type Corresponding manipulation instruction is issued, does not have to artificial monitoring and handles, improve troubleshooting efficiency;Pass through the event of operation data automatic identification Hinder type, issue corresponding manipulation instruction, realize automation, Intellectualized monitoring, does not need the operation maintenance personnel for being equipped with profession, improve Power supply reliability.
Example IV
Fig. 5 is the schematic diagram for the server that one embodiment of the application provides.As shown in figure 5, the server 5 of the embodiment wraps It includes: processor 50, memory 51 and being stored in the computer that can be run in the memory 51 and on the processor 50 Program 52.The processor 50 is realized when executing the computer program 52 in above-mentioned each power distribution room monitoring method embodiment Step, such as step S101 to S104 shown in FIG. 1.Alternatively, realization when the processor 50 executes the computer program 52 Each module or the function of unit in above-mentioned each Installation practice, such as the function of module 41 to 44 shown in Fig. 4.
Illustratively, the computer program 52 can be divided into one or more modules or unit, it is one or The multiple modules of person or unit are stored in the memory 51, and are executed by the processor 50, to complete the application.It is described One or more modules or unit can be the series of computation machine program instruction section that can complete specific function, which uses In implementation procedure of the description computer program 52 in the server 5.For example, the computer program 52 can be divided It is cut into operation data to obtain module, judgment module, determining module and issue module, each module concrete function is as follows:
Operation data obtains module, for obtaining power distribution room operation data;Judgment module, for sentencing according to operation data Whether disconnected power distribution room breaks down;Determining module, for according to operation data, determining failure classes when power distribution room breaks down Type;Module is issued, for corresponding manipulation instruction being issued, to execute corresponding failure processing operation according to fault type.
The server may include, but be not limited only to, processor 50, memory 51.It will be understood by those skilled in the art that Fig. 5 is only the example of server 5, does not constitute the restriction to server 5, may include than illustrating more or fewer portions Part perhaps combines certain components or different components, such as the server can also include input-output equipment, network Access device, bus etc..
Alleged processor 50 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 51 can be the internal storage unit of the server 5, such as the hard disk or memory of server 5. The memory 51 is also possible to the External memory equipment of the server 5, such as the plug-in type being equipped on the server 5 is hard Disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, the memory 51 can also both include the internal storage unit of the server 5 or wrap Include External memory equipment.The memory 51 is for other programs needed for storing the computer program and the server And data.The memory 51 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed Scope of the present application.
In embodiment provided herein, it should be understood that disclosed device, server and method, Ke Yitong Other modes are crossed to realize.For example, device described above, server example are only schematical, for example, the mould The division of block or unit, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple Unit or assembly can be combined or can be integrated into another system, or some features can be ignored or not executed.It is another Point, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device or The INDIRECT COUPLING or communication connection of unit can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module or unit are realized in the form of SFU software functional unit and sell as independent product Or it in use, can store in a computer readable storage medium.Based on this understanding, the application realizes above-mentioned reality The all or part of the process in a method is applied, relevant hardware can also be instructed to complete by computer program, it is described Computer program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that The step of above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code, the computer program Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Computer-readable Jie Matter may include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk, Magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described The content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practice Subtract, such as does not include electric carrier signal and electricity according to legislation and patent practice, computer-readable medium in certain jurisdictions Believe signal.
Embodiment described above is only to illustrate the technical solution of the application, rather than its limitations;Although referring to aforementioned reality Example is applied the application is described in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope of each embodiment technical solution of the application that it does not separate the essence of the corresponding technical solution should all Comprising within the scope of protection of this application.

Claims (10)

1. a kind of power distribution room monitoring method characterized by comprising
Obtain power distribution room operation data;
According to the operation data, judge whether the power distribution room breaks down;
When the power distribution room breaks down, according to the operation data, fault type is determined;
According to the fault type, corresponding manipulation instruction is issued, to execute corresponding failure processing operation.
2. power distribution room monitoring method according to claim 1, which is characterized in that it is described according to the operation data, it determines Fault type, comprising:
The operation data and pre-stored failure cause informa are compared, it is default to judge whether the operation data meets Conventional fault condition;
When the operation data meets the default conventional fault condition, the fault type is conventional fault;
When the operation data does not meet the default conventional fault condition, the fault type is unconventional failure.
3. power distribution room monitoring method according to claim 2, which is characterized in that it is described according to the fault type, it issues Corresponding manipulation instruction, to execute corresponding failure processing operation, comprising:
When the fault type is the conventional fault, process flow information according to the pre-stored data issues the first manipulation and refers to It enables to the controlling terminal of the power distribution room, so that the controlling terminal executes terminal to corresponding according to first manipulation instruction Send control instruction;
When the fault type is unconventional failure, fault message is committed to team of expert think tank;
Team of the expert think tank is received according to the fault message definite event type information;
According to the event type information, corresponding reply operation is executed.
4. power distribution room monitoring method according to claim 3, which is characterized in that it is described according to the event type information, Execute corresponding reply operation, comprising:
When the event type information is first kind event, process flow information according to the pre-stored data issues described first Manipulation instruction to the power distribution room controlling terminal so that the controlling terminal is according to first manipulation instruction to holding accordingly Row terminal sends control instruction;
When the event type information is the second class event, the second manipulation instruction is issued;
According to second manipulation instruction, fault message is sent to the corresponding operation maintenance personnel of the power distribution room.
5. power distribution room monitoring method according to any one of claims 1 to 4, which is characterized in that the acquisition power distribution room fortune Row data, comprising:
Obtain the operation data of the power distribution room acquired in real time;
The operation data includes telemetry, remote pulse data and remote signalling data, and the telemetry includes floor data, electricity Energy qualitative data and environmental data, the remote pulse data include electric energy data, and the remote signalling data includes facility switching amount Data and gate inhibition's status data.
6. a kind of power distribution room monitoring device characterized by comprising
Operation data obtains module, for obtaining power distribution room operation data;
Judgment module, for judging whether the power distribution room breaks down according to the operation data;
Determining module, for according to the operation data, determining fault type when the power distribution room breaks down;
Module is issued, for corresponding manipulation instruction being issued, to execute corresponding failure processing operation according to the fault type.
7. power distribution room monitoring device according to claim 6, which is characterized in that the determining module includes:
Judging unit judges the operation number for the operation data and pre-stored failure cause informa to be compared According to whether meeting default conventional fault condition;
First determination unit, for when the operation data meets the default conventional fault condition, the fault type is Conventional fault;
Second determination unit, for when the operation data does not meet the default conventional fault condition, the fault type For unconventional failure.
8. power distribution room monitoring device according to claim 7, which is characterized in that the module that issues includes:
First issuance unit, for when the fault type is the conventional fault, process flow according to the pre-stored data to be believed Breath, issues the controlling terminal of the first manipulation instruction to the power distribution room, so that the controlling terminal refers to according to first manipulation It enables to the corresponding terminal that executes and sends control instruction;
Unit is submitted, for when the fault type is unconventional failure, fault message to be committed to team of expert think tank;
Receiving unit, for receiving team of the expert think tank according to the fault message definite event type information;
Execution unit, for executing corresponding reply operation according to the event type information.
9. a kind of server, which is characterized in that in the memory and can be described including memory, processor and storage The computer program run on processor, the processor are realized when executing the computer program as claim 1 to 5 is any The step of item the method.
10. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer journey Sequence is realized when the computer program is executed by processor such as the step of any one of claim 1 to 5 the method.
CN201811231220.XA 2018-10-22 2018-10-22 Power distribution room monitoring method, device, server and computer readable storage medium Pending CN109193947A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811231220.XA CN109193947A (en) 2018-10-22 2018-10-22 Power distribution room monitoring method, device, server and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811231220.XA CN109193947A (en) 2018-10-22 2018-10-22 Power distribution room monitoring method, device, server and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN109193947A true CN109193947A (en) 2019-01-11

Family

ID=64942550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811231220.XA Pending CN109193947A (en) 2018-10-22 2018-10-22 Power distribution room monitoring method, device, server and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN109193947A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111416437A (en) * 2020-03-05 2020-07-14 嘉捷鑫源(北京)科技有限公司 Self-networking electricity distribution room monitoring system based on L ORA
CN112018884A (en) * 2020-07-17 2020-12-01 郑州祥和集团有限公司 Switching station auxiliary monitoring device with electric power work ticket management function
CN115509797A (en) * 2022-11-22 2022-12-23 北京优特捷信息技术有限公司 Method, device, equipment and medium for determining fault category

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101826756A (en) * 2010-04-30 2010-09-08 广州合立正通信息网络集成有限公司 System and method for realizing fault positioning of power distributing substation equipment
CN103021142A (en) * 2012-12-28 2013-04-03 上海华兴数字科技有限公司 Remote warning system of engineering machinery device and control method of remote warning system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101826756A (en) * 2010-04-30 2010-09-08 广州合立正通信息网络集成有限公司 System and method for realizing fault positioning of power distributing substation equipment
CN103021142A (en) * 2012-12-28 2013-04-03 上海华兴数字科技有限公司 Remote warning system of engineering machinery device and control method of remote warning system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111416437A (en) * 2020-03-05 2020-07-14 嘉捷鑫源(北京)科技有限公司 Self-networking electricity distribution room monitoring system based on L ORA
CN112018884A (en) * 2020-07-17 2020-12-01 郑州祥和集团有限公司 Switching station auxiliary monitoring device with electric power work ticket management function
CN115509797A (en) * 2022-11-22 2022-12-23 北京优特捷信息技术有限公司 Method, device, equipment and medium for determining fault category

Similar Documents

Publication Publication Date Title
EP2377222B1 (en) Hybrid distribution network power restoration control
CN102299560B (en) Realize substation automation load transfer function
CN102447305B (en) Topological anti-misoperation system for power grid
CN103477607B (en) Energy automation installation and the method for running energy automation installation
CN109193947A (en) Power distribution room monitoring method, device, server and computer readable storage medium
CN109034424A (en) A kind of substation equipment maintenance management method, device and terminal device
CN211958263U (en) Internet of things intelligent power box and management system
CN103649860B (en) Generate method and the alarm modules of the comprehensive alarm of the alarm of process control PC system
CN116523294A (en) Knowledge graph-based power grid risk early warning and decision system, method and equipment
Hajian-Hoseinabadi Availability comparison of various power substation automation architectures
CN109861393B (en) Processing method for preventing error locking and execution terminal
CN108460517A (en) A kind of power distribution network management-control method and device
CN209948789U (en) Power distribution monitoring system
CN104730421A (en) Diagnostic method and system for grid fault equipment
CN111192427A (en) Residual current type electrical fire monitoring method and device
CN111817265B (en) Low-voltage transformer area power distribution protection method and system
CN106602713A (en) Centralized-distributed power alarm control system
CN108539740A (en) A kind of power grid accident anticipation simulation system and its method
CN111751655B (en) Fault self-healing method and device for distribution line, computer equipment and storage medium
CN118426813B (en) Remote upgrade method and system for protecting device, program product and storage medium
CN106300676B (en) A kind of implementation method of Centralized Monitoring substation remote signalling paraphrase function
CN106469902A (en) 10KV phase-loss low-voltage intelligent tripping protection device
CN105372538B (en) Detection method and device for power distribution network equipment
van der Linde Using iec61499 to achieve smart grid automation through interconnected distribution reclosers
CN118282053B (en) Comprehensive intelligent error prevention system for transformer substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111