Exchange heat mattress sealing ventilation tester and test method
Technical field
The invention belongs to mattress the field of test technology, and in particular to a kind of heat exchange mattress sealing ventilation tester and test
Method.
Background technique
Exchange heat new product of the bedding product as company's a technique and equipment successful innovation, has obtained client and market
Approve.The second half of last year, we were also coupled to some complaints of client while product is introduced to the market energetically, below primary feedback
Both sides problem:1, the phenomenon that heat exchanging water pipe's blow-by, there are leaks;2, blocking inside heat exchanging water pipe, heat exchange water pump can not
Realize whole circulation or part pipeline since blocking cannot heat.In conjunction with both of these problems, we analyze existing production
Detection means of the product before shipment still has several drawbacks place.Existing detecting tool and method are as follows:Detecting tool is one
Shut-off valve series connection of a pressure reducing valve with pressure gauge with a manual switch.Operating method is after mattress completes, by people
Work blocks the water outlet of heat exchanging water pipe, while water inlet being terminated on shut-off valve, opens shut-off valve gas supply, closes cut-off later
Valve, sees whether pressure gauge had pressure drop in 1 minute, if any then determining pipeline gas leakage.But this test method has 2:
1, operative employee is possible to forget to close after opening shut-off valve, at this moment no matter pipeline whether gas leakage not can be appreciated that pressure drop, exist
The risk of missing inspection;2, such detection can not judge whether pipeline is unobstructed, can only detect sealing.
Summary of the invention
The object of the present invention is to provide a kind of heat exchange mattress sealing ventilation testers, ensure that the accuracy of quality testing simultaneously
Improve detection efficiency.
The present invention is by including that following technical solution realizes above-mentioned purpose or other purposes.
Present invention firstly provides a kind of heat exchange mattress sealing ventilation tester, including inlet end channel and outlet side channel,
Inlet end channel head end has been arranged in parallel sealing test channel and ventilation TCH test channel after total reduction valve;
Ventilation TCH test channel is provided with point pressure reducing valve one and solenoid valve one along airflow direction, and sealing test channel is along air-flow side
To being provided with point pressure reducing valve two and solenoid valve three;Inlet end channel tail end is installed the pressure gauge of signal piping pressure and is connected to be measured
The connector one of trial product;
Head end installation in outlet side channel connects the connector two of trial product to be measured, and setting Liang Tiao branch is logical on the channel of outlet side
Road, respectively two branch of one branch of outlet side and outlet side, one branch of outlet side are provided with solenoid valve two and stream along airflow direction
Solenoid valve four is arranged along airflow direction in meter, two branch of outlet side;
The solenoid valve one, solenoid valve two, solenoid valve three, solenoid valve four are respectively by the PLC control system control in tester
On-off processed.
Further, the connector one and connector two are quick coupling.
Further, the setting pressure of the total reduction valve, which is greater than, divides pressure reducing valve one and divides pressure reducing valve two, divides pressure reducing valve two
Setting pressure be greater than and divide the setting pressure of pressure reducing valve one.
Invention also improves a kind of method for carrying out heat exchange mattress sealing ventilation performance test using above-mentioned tester, packets
Include following steps,
S1, original state, solenoid valve one, solenoid valve two, solenoid valve three and solenoid valve four are in normally off;
S2, the hot-water line both ends for the mattress that exchanges heat are inserted into respectively on connector one and connector two;
S3, solenoid valve three are opened, and when pressure gauge reading reaches the setting pressure of point pressure reducing valve two, solenoid valve three is closed,
Product hot water line enters state of pressure keeping;
Pressure gauge reading is read after S4, PLC control system delay setting time, divides setting for pressure reducing valve two as pressure value is less than
It when constant-pressure, then alarms, then opens solenoid valve four and be vented, closed after being vented to setting duration;If pressure value is no less than point subtracting
The setting pressure of pressure valve two, then do not alarm, and then opens solenoid valve four and is vented, and closes after being vented to setting duration;
S5, if do not alarmed, solenoid valve four complete exhaust event and close after, solenoid valve one open, when pressure gauge reading reaches
When to the setting pressure for dividing pressure reducing valve one, PLC control system opens solenoid valve two, while reading flowmeter after the setting time that is delayed
Reading;The meter readings of reading and standard value compare, if measured value sets percentage alarm lower than standard value, in test
Only;It does not alarm when being not below standard value setting percentage such as measured value, display product test is qualified;Then PLC control system is closed
Close solenoid valve one and solenoid valve two.
Further, the total reduction valve sets pressure as 0.4~1.0MPa, it is described divide pressure reducing valve one set pressure as
0.1~0.4MPa, it is described divide pressure reducing valve two set pressure as 0.2~0.4MPa.
Further, the PLC control system reads pressure gauge reading after being delayed at least 2 seconds.
Further, the PLC control system reads meter readings after being delayed at least 2 seconds.
Further, the standard value be exchange heat mattress hot-water line it is indeformable when the flow that tests out.
Further, the reading and standard value that the flowmeter is read compare, as measured value is lower than 10% Times of standard value
It is alert.
The present invention is prominent and beneficial compared with prior art to be had the technical effect that:
The accuracy of detection is greatly improved in the present invention, even the leak source of aperture size also can be found out.Together
When the present invention by flowmeter apply flexibly for detection heat exchange mattress hot-water line cross-section variation it is whether overproof, therefore, it is determined that hose is
No local stoppages, it is ensured that the quality of shipment product.
In addition, the present invention realizes automatic detection using PLC control system, reviewer's working efficiency is greatly improved.Only
It needs for Inlet and outlet water end pipe of product hot-water line to be connected on the setting position of instrument, then presses instrument button, later 2 kinds of surveys
Examination is all automatically performed by instrument, and the waiting time of sealing test was also reduced to 10 seconds by original 1 minute.Reduce a large amount of
Manual action also avoids the quality risk as caused by the uncertainty of artificial detection.
Detailed description of the invention
Fig. 1 is the pipeline schematic diagram of tester in the embodiment of the present invention;
Fig. 2 is the PLC control system circuit diagram of tester in the embodiment of the present invention.
Appended drawing reference:J, total reduction valve;J1, divide pressure reducing valve one;J2, divide pressure reducing valve two;V1, solenoid valve one;V2, solenoid valve
Two;V3, solenoid valve three;V4, solenoid valve four;K1, connector one;K2, connector two;P, pressure gauge;F, flowmeter.
Specific embodiment
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
Inlet end and outlet side is arranged in a kind of heat exchange mattress sealing ventilation tester, as described in Figure 1, tester, connect into
The pipeline at gas end is defined as inlet end channel, and the pipeline for connecting outlet side is defined as outlet side channel, and inlet end channel head end connects
It connects inlet end and is being arranged in parallel sealing test channel and ventilation TCH test channel after total reduction valve J;Inlet end channel tail
The pressure gauge P of end installation signal piping pressure and one K1 of connector for connecting trial product to be measured, one K1 of connector use quick coupling, side
Just product is docked.
Wherein, ventilation TCH test channel is provided with one V1 of one J1 of point pressure reducing valve and solenoid valve along airflow direction, and sealing test is logical
Road is provided with three V3 of two J2 of point pressure reducing valve and solenoid valve along airflow direction.
Head end installation in outlet side channel connects two K2 of connector of trial product to be measured, and two K2 of connector equally uses quick coupling,
And it is located proximate to one K1 of connector setting.On the channel of outlet side be arranged two branched bottoms, respectively one branch of outlet side and go out
Two branch of gas end, one branch of outlet side are provided with solenoid valve two V2 and flowmeter F along airflow direction, and two branch of outlet side is along air-flow
Four V4 of solenoid valve is arranged in direction.
In conjunction with Fig. 2, above-mentioned one V1 of solenoid valve, two V2 of solenoid valve, three V3 of solenoid valve, four V4 of solenoid valve on-off respectively by surveying
The PLC control system control in instrument is tried, the pressure gauge P and flowmeter F on channel are coupled in PLC control system, for that will survey
The data feedback obtained is to PLC control system.
Wherein, the setting pressure of total reduction valve J divides pressure reducing valve two greater than dividing one J1 of pressure reducing valve and dividing pressure reducing valve two J2 here
The setting pressure of J2 is greater than the setting pressure for dividing one J1 of pressure reducing valve;Since caliber is 8mm in the present embodiment, total reduction valve J is set
Constant-pressure is adjusted to 0.4MPa, and one J1 of pressure reducing valve setting pressure is divided to be adjusted to 0.1MPa, divides two J2 of pressure reducing valve setting pressure adjustment
For 0.2MPa.Those skilled in the art can set different pressure according to caliber difference, can also be adjusted according to customer requirement
Pressure size.
The following are the methods for carrying out heat exchange mattress sealing ventilation performance test using above-mentioned tester, include the following steps,
S1, original state, one V1 of solenoid valve, two V2 of solenoid valve, three V3 of solenoid valve and four V4 of solenoid valve are in normally closed shape
State;
S2, the hot-water line both ends for the mattress that exchanges heat are inserted into respectively on two K2 of one K1 of connector and connector;
S3, three V3 of solenoid valve are opened, when pressure gauge P reading reaches the setting pressure of two J2 of point pressure reducing valve, solenoid valve three
V3 is closed, and product hot water line enters state of pressure keeping;
Pressure gauge P reading is read after S4, PLC control system delay setting time, divides pressure reducing valve two J2 as pressure value is less than
Setting pressure when, then alarm, then open four V4 of solenoid valve exhaust, be vented to setting duration after close;As pressure value is not small
It in the setting pressure for dividing two J2 of pressure reducing valve, does not then alarm, then opens four V4 of solenoid valve exhaust, closed after being vented to setting duration
It closes;
S5, if do not alarmed, four V4 of solenoid valve complete exhaust event and close after, one V1 of solenoid valve open, when pressure gauge P read
When number reaches the setting pressure of one J1 of point pressure reducing valve, PLC control system opens two V2 of solenoid valve, while reading after the setting time that is delayed
Flowmeter F is taken to read;(standard value is that the hot-water line of heat exchange mattress is tested when indeformable to the flowmeter F reading of reading with standard value
Flow out) comparison, if measured value sets percentage alarm lower than standard value, test stops;As measured value is not below standard
Value is not alarmed when setting percentage, and display product test is qualified;Then PLC control system closes one V1 of solenoid valve and solenoid valve two
V2。
Wherein, pressure gauge P reading is read after PLC control system is delayed 10 seconds in the present embodiment;Delay read flow after 2 seconds
Count F reading.The reading and standard value that flowmeter F is read compare, as measured value is lower than 10% alarm of standard value.The above is only
It is the preferred embodiment of the present invention, it is noted that for those skilled in the art, do not departing from this hair
Under the premise of bright technical principle, several improvement and replacement can also be made, these are improved and replacement also should be regarded as guarantor of the invention
Protect range.