CN108729353A - A kind of General reinforced cage binding moulding bed - Google Patents

A kind of General reinforced cage binding moulding bed Download PDF

Info

Publication number
CN108729353A
CN108729353A CN201810517326.XA CN201810517326A CN108729353A CN 108729353 A CN108729353 A CN 108729353A CN 201810517326 A CN201810517326 A CN 201810517326A CN 108729353 A CN108729353 A CN 108729353A
Authority
CN
China
Prior art keywords
holder
moulding bed
lacing film
film component
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810517326.XA
Other languages
Chinese (zh)
Inventor
闫兴非
姚嘉轶
文小东
张彦
张凯龙
宗霏
陈沣
陈锋
眭书剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Investment And Investment Building Industrialization Co Ltd
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Chengdu Investment And Investment Building Industrialization Co Ltd
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Investment And Investment Building Industrialization Co Ltd, Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Chengdu Investment And Investment Building Industrialization Co Ltd
Priority to CN201810517326.XA priority Critical patent/CN108729353A/en
Publication of CN108729353A publication Critical patent/CN108729353A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of General reinforced cages to bind moulding bed.It is made of supporting support, setting bracket and operating platform, supporting support includes moulding bed pedestal and mobile holder;Mobile holder includes that head film, bed die and middle part movement holder, each mobile holder can move or fix along the track on moulding bed pedestal;Setting bracket includes main reinforcement positioning component, main reinforcement lacing film component, loudspeaker muscle lacing film component, sleeve lacing film component and bed die assembly and is detachably secured to respectively in each respective holder.The present invention is moved and is fixed the steel reinforcement cage binding for realizing different bridge piers along track by each mobile holder, and the mounting hole of crossbeam fixes detachable stand, and stand can realize that the lacing film component any direction of each spacer bar is adjusted;The groove of opening is more convenient placement positioning fixed steel bars, prevents reinforcing bar from shifting;The mounting hole and fixing groove being arranged in stand are additionally operable to the setting and fixation of operating platform, can carry out position as needed and height is adjusted, improve steel reinforcement cage processing efficiency.

Description

A kind of General reinforced cage binding moulding bed
Technical field
The invention belongs to Architectural Equipment design fields, especially belong to concrete placing installation design and manufacturing technology neck Domain, more particularly to a kind of General reinforced cage for concreting bind moulding bed.
Background technology
Existing highway bridge construction is typically to pour construction in construction ground scene progress bridge pier, then carries out box girder webs Or will be completed after the synthesis construction of prefabricated profiled box beam, building technology is required to carry out large-scale cast in situs construction.
With being constantly progressive for bridge construction technology, bridge construction scale is increasing, for building ground scene progress bridge Bridge pier pours construction usually because the conditions such as environment limit, and construction is sufficiently complex, and construction cost is high, and the construction period is long.Especially exist When the live bridge pier of progress pours, reinforcing bar binding can only be constructed by artificial binding one by one, and time-consuming, and construction surface requires height, at Bottleneck in construction is poured for bridge pier.
And for the bridge pier of nonstandard construction, steel reinforcement cage and its ununified construction model of binding, steel reinforcement cage quality is difficult With control, construction quality is seriously affected.
Invention content
Deficiency discloses a kind of General reinforced binding moulding bed to the present invention according to prior art.The problem to be solved in the present invention It is to provide a kind of binding platform being suitable for the nonstandard steel reinforcement cage for building bridge pier, carrying out the binding of bridge pier steel reinforcement cage using the platform adds Then work is transported to construction site in Standard Factory Room and fixes completion bridge pier construction after pouring molding.
The invention is realized by the following technical scheme:
General reinforced cage binds moulding bed, is made of supporting support, setting bracket and operating platform, it is characterised in that:
The supporting support includes moulding bed pedestal and mobile holder;Moulding bed pedestal includes 2 to 3 retaining rails disposed in parallel Road, mobile holder include head film movement holder, bed die movement holder and middle part movement holder, and head film movement holder is located at moulding bed bottom Seat one end, bed die movement holder are located at the moulding bed pedestal other end, middle part movement holder have it is multigroup and positioned at head film movement holder and Between bed die moves holder, each mobile holder can be mobile or fixed in moulding bed pedestal upper edge track;
The setting bracket includes main reinforcement positioning component, main reinforcement lacing film component, loudspeaker muscle lacing film component, sleeve lacing film component With bed die assembly;Main reinforcement positioning component, main reinforcement lacing film component and sleeve lacing film component are removably fixed in the mobile branch in middle part respectively On frame, loudspeaker muscle lacing film component is removably fixed on head mould movement holder, and bed die assembly is removably fixed in bed die movement branch On frame.
Each mobile holder include have along the mobile or fixed crossbeam of track, crossbeam two it is vertically disposed vertical Frame, stand arbitrarily combine fixation by the mounting hole that uniform intervals on crossbeam are arranged.
Bottom-up uniform intervals are provided with mounting hole and fixing groove in the stand, and setting bracket passes through consolidating in stand Determine hole and fixing groove and be detachably fixed with each mobile holder to connect.
The operating platform includes operation console holder and the tablet that is fixed on operation console holder, and operation console holder is detachable It hangs in the stand of each mobile holder.
The beam-end is provided with the idler wheel moved along track and fixed lock.
Main ribs lacing film component, loudspeaker muscle lacing film component and sleeve lacing film component require to be arranged all in accordance with steel bar arrangement, It is used to support spacer bar;It is provided with to be used to support in each lacing film component circumferential direction and positions laterally disposed reinforcing bar and be open recessed Slot.
Main ribs positioning component requires to be arranged according to steel bar arrangement, is used to support spacer bar;Main reinforcement positioning component week It sets up and is useful for the through-hole that support positions laterally disposed reinforcing bar.
The bed die assembly be include pedestal and the screw rod positioning sleeve that is arranged perpendicular to pedestal, pedestal is by round panel and bottom The bearing rib in face is constituted, and screw rod positioning sleeve is installed on round panel surface and circumferentially requires to be arranged according to steel bar arrangement.
The head film movement holder and bed die movement holder are both provided with the hound of fixed support stand.
Helpfulness of the present invention:The present invention is adaptable to the bridge pier steel reinforcement cage binding processing and forming of nonstandard construction;Pass through Each mobile holder moves and fixes the steel reinforcement cage binding for realizing different length bridge pier, the fixation being arranged by girder space along track Detachable stand is fixed in hole, while setting mounting hole and fixing groove can realize that the lacing film component of each spacer bar is arbitrary in stand Direction is adjusted;It is used to support using the groove of opening and positions the more convenient placement positioning fixed steel bars of laterally disposed reinforcing bar, prevented Reinforcing bar shifts;The mounting hole and fixing groove being arranged in stand are additionally operable to the setting and fixation of operating platform, can carry out as needed Position and height are adjusted, and improve steel reinforcement cage processing efficiency.
Description of the drawings
Fig. 1 is moulding bed application state structural schematic diagram of the present invention;
Fig. 2 is Fig. 1 moulding bed positive structure diagrams;
Fig. 3 is Fig. 1 moulding bed overlooking structure diagrams;
Fig. 4 is moulding bed loudspeaker head end schematic diagram of the present invention;
Fig. 5 is loudspeaker muscle lacing film floor map of the present invention;
Fig. 6 is main reinforcement lacing film floor map of the present invention;
Fig. 7 is idler wheel of the present invention and fixing lock garnishment electrical schematic, i.e. schematic diagram is sent out in the portions D big in Fig. 1;
Fig. 8 is bed die assembly enlarged diagram of the present invention, the i.e. left parts Fig. 2 enlarged diagram;
Fig. 9 is another application state structural schematic diagram of the invention.
In figure, 1 is moulding bed pedestal, and 3 be mobile holder, and 3.1 be idler wheel, and 3.2 be lock, and 4 be stand, and 6 be main reinforcement positioning Component, 7 be positioning pin, and 8 be steel reinforcement cage, and 9 be operation console holder, and 10 be main reinforcement lacing film component, and 10.1 be main reinforcement lacing film groove, 11 It is sleeve lacing film component, 12 be crossbeam, and 13 be bed die assembly, and 13.1 be screw rod positioning sleeve, and 13.2 be round panel, and 13.3 be branch Gusset is supportted, 14 be hound, and 16 be loudspeaker muscle lacing film component, and 16.1 be loudspeaker muscle lacing film stomidium, and 16.2 be that loudspeaker muscle lacing film is recessed Slot.
Specific implementation mode
The present invention is further described With reference to embodiment, specific implementation mode be to the principle of the invention into One step illustrates, does not limit the invention in any way, and is protected without departing from the present invention with the same or like technology of the present invention Range.
In conjunction with attached drawing.
General reinforced cage binds moulding bed, is made of supporting support, setting bracket and operating platform.
Supporting support includes moulding bed pedestal 1 and mobile holder 3;Moulding bed pedestal 1 includes 2 to 3 retaining rails disposed in parallel Road, mobile holder 3 include that holder is moved at head film movement holder, bed die movement holder and middle part, and head film movement holder is located at moulding bed 1 one end of pedestal, bed die movement holder are located at 1 other end of moulding bed pedestal, and middle part movement holder has multigroup and moves branch positioned at head film Between frame and bed die movement holder, each mobile holder 3 can be mobile or fixed in 1 upper edge track of moulding bed pedestal;
Setting bracket includes main reinforcement positioning component 6, main reinforcement lacing film component 10, loudspeaker muscle lacing film component 16, sleeve lacing film group Part 11 and bed die assembly 13;Main reinforcement positioning component 6, main reinforcement lacing film component 10 and sleeve lacing film component 11 are removably fixed in respectively Middle part is moved on holder, and loudspeaker muscle lacing film component 16 is removably fixed on head mould movement holder, and bed die assembly 13 is detachably solid Due on bed die movement holder.
Each mobile holder 3 include have along the mobile or fixed crossbeam 12 of track, crossbeam 12 two it is vertically disposed vertical Frame 4, stand 4 arbitrarily combine fixation by the mounting hole that uniform intervals on crossbeam 12 are arranged.
Bottom-up uniform intervals are provided with mounting hole and fixing groove in stand 4, and setting bracket passes through the fixation in stand 4 Hole and fixing groove are detachably fixed with each mobile holder 3 to be connect.
Operating platform includes operation console holder 9 and the tablet that is fixed on operation console holder, and operation console holder 9 is detachably outstanding It is hung in the stand 4 of each mobile holder 3.
12 end set of crossbeam has the idler wheel 3.1 moved along track and fixed lock 3.2.
Main reinforcement lacing film component 10, loudspeaker muscle lacing film component 16 and sleeve lacing film component 11 require to set all in accordance with steel bar arrangement It sets, is used to support spacer bar;It is provided with to be used to support in each lacing film component circumferential direction and positions laterally disposed reinforcing bar and opening Groove.
Main reinforcement positioning component 6 requires to be arranged according to steel bar arrangement, is used to support spacer bar;Main reinforcement positioning component 6 is circumferential On be provided with the through-hole for being used to support and positioning laterally disposed reinforcing bar.
Bed die assembly 13 be include pedestal and the screw rod positioning sleeve that is arranged perpendicular to pedestal, pedestal is by 13.2 He of round panel The bearing rib 13.3 of bottom surface is constituted, and screw rod positioning sleeve 13.1 is installed on 13.2 surface of round panel circumferentially according to steel bar arrangement It is required that setting.
Head film movement holder and bed die movement holder are both provided with the hound 14 of fixed support stand.
As shown, Fig. 1 is a kind of a kind of application state structural schematic diagram of moulding bed of the present invention;Fig. 2 is that Fig. 1 moulding beds face knot Structure schematic diagram;Fig. 3 is Fig. 1 moulding bed overlooking structure diagrams;Fig. 4 is moulding bed loudspeaker head end schematic diagram of the present invention.It is indulged in steel reinforcement cage 8 Main reinforcement lacing film component 10, loudspeaker muscle lacing film component 16, sleeve lacing film component 11 and bed die assembly 13 are used to the reinforcing bar of arrangement Support sizing.Main reinforcement positioning component 6 is not used in figure.
As shown in Figure 1,2,3, 4, each mobile holder 3 of different number is used according to 8 length of steel reinforcement cage, and by main reinforcement lacing film Component 10, loudspeaker muscle lacing film component 16, sleeve lacing film component 11 and bed die assembly 13 are fixed on by pendant on column 4, are used Preceding adjusted according to 8 transverse diameter of steel reinforcement cage and is fixed at 4 spacing of column by the location hole on crossbeam 12, each setting bracket by pendant with Location hole suspension on column 4 is fixed, and screwing steel bars are supported by lacing film groove from end fix one by one.
Fig. 5 is loudspeaker muscle lacing film floor map of the present invention;Fig. 6 is main reinforcement lacing film floor map of the present invention.Each lacing film It is made of flat sheet or other materials.
Fig. 7 is idler wheel of the present invention and fixing lock garnishment electrical schematic, i.e. schematic diagram is sent out in the portions D big in Fig. 1;As shown, rolling Wheel 3.1 is fixedly installed on crossbeam both sides, and using supporting rack bolt fastening structure, movable pulley is connect by axis with supporting rack, mobile It is moved along track;Lock 3.2 is moved using the processing of button side, 3.2 bottom edges of lock along the limit of track lower edge.
Fig. 8 is bed die assembly enlarged diagram of the present invention, the i.e. left parts Fig. 2 enlarged diagram;Steel reinforcement cage 8 of the present invention is used for The non-at-scene prefabricated cast of bridge pier, i.e., under the conditions of batch production, according to bridge pier data are pre-formed and then operating is to the fixed peace in scene Dress, installation is using precast pier pedestal and foundation bolt connection structure, therefore 8 pedestal of steel reinforcement cage has reserved shank of bolt, into When row steel reinforcement cage 8 is processed, in order to which more accurately spacer bar, base portion use 13.1 spacer bar of screw rod positioning sleeve and pass through The suspension positioning of sleeve lacing film component 11, screw rod positioning sleeve 13.1 and the round panel 13.2 of bed die assembly 3 are welded and fixed.
Fig. 9 is another application state structural schematic diagram of the invention.Using main reinforcement positioning component 6 in steel reinforcement cage 8 in figure Portion's reinforcing bar carries out positioning support.Main reinforcement positioning component 6 uses through-hole structure, more preferable to the locator qualification of reinforcing bar, prevents stress from becoming Shape.
In order to reinforce the stability of both ends stand 4, also at both ends, hound 14 is arranged in movement holder 3 to the present invention, more effectively Ground sizing, fixed steel bars cage 8.

Claims (9)

1. a kind of General reinforced cage binds moulding bed, it is made of supporting support, setting bracket and operating platform, it is characterised in that:
The supporting support includes moulding bed pedestal and mobile holder;Moulding bed pedestal includes 2 to 3 trapped orbits disposed in parallel, Mobile holder includes head film movement holder, bed die movement holder and middle part movement holder, and head film movement holder is located at moulding bed pedestal One end, bed die movement holder are located at the moulding bed pedestal other end, and middle part movement holder has multigroup and moves holder and bottom positioned at head film Between mould moves holder, each mobile holder can be mobile or fixed in moulding bed pedestal upper edge track;
The setting bracket includes main reinforcement positioning component, main reinforcement lacing film component, loudspeaker muscle lacing film component, sleeve lacing film component and bottom Mould assembly;Main reinforcement positioning component, main reinforcement lacing film component and sleeve lacing film component are removably fixed in respectively on the mobile holder in middle part, Loudspeaker muscle lacing film component is removably fixed on head mould movement holder, and bed die assembly is removably fixed on bed die movement holder.
2. General reinforced cage according to claim 1 binds moulding bed, it is characterised in that:Each mobile holder includes edge Track mobile or fixed crossbeam has on crossbeam two vertically disposed stands, stand to pass through what uniform intervals on crossbeam were arranged Mounting hole arbitrarily combines fixation.
3. General reinforced cage according to claim 2 binds moulding bed, it is characterised in that:It is bottom-up uniform in the stand It is arranged at intervals with mounting hole and fixing groove, setting bracket is detachable by mounting hole in stand and fixing groove and each mobile holder It is fixedly connected.
4. General reinforced cage according to claim 2 binds moulding bed, it is characterised in that:The operating platform includes operation console Holder and the tablet being fixed on operation console holder, operation console holder detachable hang is in the stand of each mobile holder.
5. General reinforced cage according to claim 2 binds moulding bed, it is characterised in that:The beam-end is provided with along rail The idler wheel of road movement and fixed lock.
6. General reinforced cage according to claim 2 binds moulding bed, it is characterised in that:Main ribs lacing film component, loudspeaker Muscle lacing film component and sleeve lacing film component require to be arranged all in accordance with steel bar arrangement, are used to support spacer bar;Each lacing film component week It sets up and is useful for the groove that support positions laterally disposed reinforcing bar and is open.
7. General reinforced cage according to claim 2 binds moulding bed, it is characterised in that:Main ribs positioning component is according to steel Muscle arrangement requires setting, is used to support spacer bar;Be provided in main reinforcement positioning component circumferential direction be used to support positioning it is laterally disposed The through-hole of reinforcing bar.
8. General reinforced cage according to claim 2 binds moulding bed, it is characterised in that:The bed die assembly be include pedestal With the screw rod positioning sleeve being arranged perpendicular to pedestal, pedestal is made of the bearing rib of round panel and bottom surface, screw rod positioning sleeve peace It circumferentially requires to be arranged according to steel bar arrangement loaded on round panel surface.
9. General reinforced cage according to claim 2 binds moulding bed, it is characterised in that:The head film movement holder and bed die Mobile holder is both provided with the hound of fixed support stand.
CN201810517326.XA 2018-05-25 2018-05-25 A kind of General reinforced cage binding moulding bed Pending CN108729353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810517326.XA CN108729353A (en) 2018-05-25 2018-05-25 A kind of General reinforced cage binding moulding bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810517326.XA CN108729353A (en) 2018-05-25 2018-05-25 A kind of General reinforced cage binding moulding bed

Publications (1)

Publication Number Publication Date
CN108729353A true CN108729353A (en) 2018-11-02

Family

ID=63935369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810517326.XA Pending CN108729353A (en) 2018-05-25 2018-05-25 A kind of General reinforced cage binding moulding bed

Country Status (1)

Country Link
CN (1) CN108729353A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629833A (en) * 2018-12-19 2019-04-16 重庆大学 A kind of rapid constructing method of high-precision high quality reinforcing bar space net rack binding
CN110106792A (en) * 2019-06-11 2019-08-09 成都交投建筑工业化有限公司 Steel reinforcement cage binding device and manufacture craft
CN110206323A (en) * 2019-06-05 2019-09-06 上海建工四建集团有限公司 Framework of steel reinforcement formation system and its application method
CN110315637A (en) * 2019-04-01 2019-10-11 中铁大桥局集团有限公司 A kind of mobile steel moulding bed and preparation method thereof for making framework of steel reinforcement
CN110777655A (en) * 2019-07-31 2020-02-11 绍兴市城投建筑工业化制造有限公司 Adjustable bent cap steel reinforcement cage ligature platform
CN112281674A (en) * 2020-11-09 2021-01-29 成都交投建筑工业化有限公司 Construction method for horizontal turning and straightening of pier stud
CN112554070A (en) * 2020-12-15 2021-03-26 浙江交工集团股份有限公司 Bridge upright post bracket-free construction method
CN112647436A (en) * 2020-12-18 2021-04-13 浙江世润建创科技发展有限公司 Porous cast-in-situ box culvert bottom plate and construction method
CN113352025A (en) * 2021-06-07 2021-09-07 江苏宏伟除尘配件研发有限公司 Cage frame deformation-preventing welding device and using method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264590A (en) * 2014-09-30 2015-01-07 中交二航局第四工程有限公司 Pier column rebar prefabricating bed-jig capable of accurately positioning main rebars and stirrups simultaneously
CN105437367A (en) * 2015-12-25 2016-03-30 上海建工四建集团有限公司 Steel reinforcement tire carrier and manufacturing method for steel reinforcement cage
CN206438500U (en) * 2016-11-14 2017-08-25 山西省交通科学研究院 A kind of bridge pile foundation steel reinforcement cage space positioning system
CN208533372U (en) * 2018-05-25 2019-02-22 成都交投建筑工业化有限公司 A kind of General reinforced cage binding moulding bed

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264590A (en) * 2014-09-30 2015-01-07 中交二航局第四工程有限公司 Pier column rebar prefabricating bed-jig capable of accurately positioning main rebars and stirrups simultaneously
CN105437367A (en) * 2015-12-25 2016-03-30 上海建工四建集团有限公司 Steel reinforcement tire carrier and manufacturing method for steel reinforcement cage
CN206438500U (en) * 2016-11-14 2017-08-25 山西省交通科学研究院 A kind of bridge pile foundation steel reinforcement cage space positioning system
CN208533372U (en) * 2018-05-25 2019-02-22 成都交投建筑工业化有限公司 A kind of General reinforced cage binding moulding bed

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629833A (en) * 2018-12-19 2019-04-16 重庆大学 A kind of rapid constructing method of high-precision high quality reinforcing bar space net rack binding
CN109629833B (en) * 2018-12-19 2020-09-08 重庆大学 Rapid construction method for binding high-precision high-quality steel bar space net rack
CN110315637A (en) * 2019-04-01 2019-10-11 中铁大桥局集团有限公司 A kind of mobile steel moulding bed and preparation method thereof for making framework of steel reinforcement
CN110206323A (en) * 2019-06-05 2019-09-06 上海建工四建集团有限公司 Framework of steel reinforcement formation system and its application method
CN110206323B (en) * 2019-06-05 2023-05-30 上海建工四建集团有限公司 Reinforcement framework forming system and application method thereof
CN110106792A (en) * 2019-06-11 2019-08-09 成都交投建筑工业化有限公司 Steel reinforcement cage binding device and manufacture craft
CN110777655A (en) * 2019-07-31 2020-02-11 绍兴市城投建筑工业化制造有限公司 Adjustable bent cap steel reinforcement cage ligature platform
CN112281674A (en) * 2020-11-09 2021-01-29 成都交投建筑工业化有限公司 Construction method for horizontal turning and straightening of pier stud
CN112554070A (en) * 2020-12-15 2021-03-26 浙江交工集团股份有限公司 Bridge upright post bracket-free construction method
CN112647436A (en) * 2020-12-18 2021-04-13 浙江世润建创科技发展有限公司 Porous cast-in-situ box culvert bottom plate and construction method
CN113352025A (en) * 2021-06-07 2021-09-07 江苏宏伟除尘配件研发有限公司 Cage frame deformation-preventing welding device and using method thereof
CN113352025B (en) * 2021-06-07 2022-12-06 江苏宏伟除尘配件研发有限公司 Cage anti-deformation welding device

Similar Documents

Publication Publication Date Title
CN108729353A (en) A kind of General reinforced cage binding moulding bed
CN208533372U (en) A kind of General reinforced cage binding moulding bed
CN107268348B (en) Subway column check pit construction method
CN101343948B (en) Prefabricated casket beam reinforced bar binding stand and reinforced bar binding method using the same
JP6752160B2 (en) Mobile work vehicle
CN106884541B (en) Positioning assembly, positioning device and positioning method for reserved dowel bars in shear wall
CN103410102A (en) H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof
CN202954299U (en) Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN105317052B (en) Tower crane foundation bolt fixing method
CN114770706A (en) Novel light T-beam prefabricating equipment and prefabricating, installing and constructing method
JP2011157720A (en) Method for constructing railway reinforced concrete rigid-frame structure viaduct
CN107524096A (en) A kind of continuous girders by suspension grouting 0# blocks cast-in-place support and erection method
CN211472207U (en) Suspension beam system for hoisting prefabricated section box girder
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
CN215925691U (en) Bearing support for casting No. 0 block of bridge
CN211006346U (en) Cast-in-place support of side span of dismouting of being convenient for suitable for bridge
CN108797380B (en) Suspension construction device and construction method for suspension irrigation continuous beam bracket
CN110409320A (en) A kind of the concrete cast-in-situ bracket and its construction method of adjustable slope
CN215291438U (en) Independent bearing structure of post-cast strip
CN212295097U (en) Bolt mounting fixing frame
KR100933047B1 (en) Formwork system for concrete slab of filled steel pipe girder bridge
CN210658427U (en) Embedded positioning frame for hidden support main rib
CN207891754U (en) A kind of continuous girders by suspension grouting 0# block cast-in-place supports
CN113062149A (en) Light prefabricated ballast bed and construction method
CN207646620U (en) The movable construction platform of prefabricated wide cut beam slab

Legal Events