CN108676965A - A kind of production method of high building structure hot rolled circular steel - Google Patents

A kind of production method of high building structure hot rolled circular steel Download PDF

Info

Publication number
CN108676965A
CN108676965A CN201810495863.9A CN201810495863A CN108676965A CN 108676965 A CN108676965 A CN 108676965A CN 201810495863 A CN201810495863 A CN 201810495863A CN 108676965 A CN108676965 A CN 108676965A
Authority
CN
China
Prior art keywords
steel
building structure
hot rolled
high building
stove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810495863.9A
Other languages
Chinese (zh)
Inventor
徐瑞军
李建宇
汤伟
田志国
罗登
蒋凌枫
黄振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Valin Xiangtan Iron and Steel Co Ltd
Hunan Hualing Xiangtan Iron and Steel Co Ltd
Original Assignee
Hunan Hualing Xiangtan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Hualing Xiangtan Iron and Steel Co Ltd filed Critical Hunan Hualing Xiangtan Iron and Steel Co Ltd
Priority to CN201810495863.9A priority Critical patent/CN108676965A/en
Publication of CN108676965A publication Critical patent/CN108676965A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/06Deoxidising, e.g. killing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/04Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of bars or wire
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/068Decarburising
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/10Handling in a vacuum
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C33/00Making ferrous alloys
    • C22C33/04Making ferrous alloys by melting
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Steel (AREA)

Abstract

A kind of production method of high building structure hot rolled circular steel, the composition weight percent of steel is C=0.12% ~ 0.18%, Si=0.25%~0.50%, Mn=1.20%~1.70%, P≤0.025%, S≤0.015%, Al >=0.020%, carbon equivalent 0.41 ~ 0.45%, remaining is Fe and inevitable impurity;Critical process step includes:Smelting, LF stoves, VD stoves, continuous casting, heating, rolling, cooling.Its tensile strength of the steel of production is in 470 ~ 630Mpa, and yield strength is in 315 ~ 455 Mpa, and yield tensile ratio is 0.80 hereinafter, elongation percentage is 22% or more, and weld crack sensitivity coefficient is 0.28% hereinafter, subzero 20 DEG C of impacts Akv is in 47J or more.The high building structure has high intensity, good yield tensile ratio, extension property, low temperature impact properties, welding performance, anti-seismic performance etc. with hot rolled circular steel, can be good at the use demand for meeting the performances such as antidetonation, fire resisting, the welding of various high building structure hot rolled circular steels.

Description

A kind of production method of high building structure hot rolled circular steel
Technical field
The invention belongs to metallurgical technology fields, are related to a kind of production of high building structure hot rolled circular steel (Q345GJC) Method.
Technical background
With the continuous refreshing of the progress especially building height of Building technology, the requirement to construction material further carries Height will also have good to high building structure hot rolled circular steel other than requiring the performances such as good antidetonation, fire resisting Welding performance will include also low-temperature impact toughness with high impact toughness while with high intensity, preferable elongation percentage.
Exploitation has high building structure steel plate Q345GJC in the world at present, but there has been no high building structure circles The report of steel.There are the mass production of the following smooth surface disk reinforcing bar of 25mm specifications, the HPB300 that yield strength is 300Mpa grades in China; There is the exploitation of high building structure steel plate Q345GJC, but it is the height of the intensity rank of 345Mpa not have mating yield strength Layer round steel exploitation for building.High building structure is with hot rolled circular steel increasingly to high intensity, high-elongation, high impact toughness, antidetonation Direction is developed.Therefore the market demand that our iron and steel enterprises will develop according to domestic high building structure, research and development skyscraper are used Round steel reaches world-class levels.
Invention content
The present invention is intended to provide a kind of production method of high building structure hot rolled circular steel, represents steel grade Q345GJC Maximum specification is 150mm, minimum gauge 30mm, hot rolling tensile strength in 470 ~ 630MPa, yield strength 310~ 445MPa, for elongation percentage 22% or more, zero degree impacts AKV in 34J or more, can be good at meeting various high building structure steel Use demand.
The technical solution of invention:
The production method of high building structure hot rolled circular steel, the chemical composition weight percent of steel be C=0.12 ~ 0.18, Si= 0.25~0.50, Mn=1.20~1.70, P≤0.025, S≤0.015, Al >=0.020, carbon equivalent=0.41 ~ 0.45, remaining is Fe and inevitable impurity.Critical process step includes:
Converter smelting:Terminal point control C >=0.05%, P≤0.020%, height draw after-blow number ≯ 2 time of re-blowing;Tap 1/4 when toward ladle Middle addition alloy, using slag-stopping tapping;
LF stoves are smelted:Molten steel in LF stove conduction times >=20min, make white slag deoxidation and go to press from both sides by the min of total argon blowing time >=40, refining It is miscellaneous;150 ~ 300 meters/stove of Ca lines is fed before molten steel is outbound;
VD stoves are smelted:In the total argon blowing time >=40min of VD stoves;0.5tor is vacuumized hereinafter, protecting vacuum time >=15min, breaks sky Soft argon blowing time >=15min afterwards;Molten steel is outbound often to be poured and time determine hydrogen and is no less than 1 stove, is according to target worth [H]≤2.0ppm and is controlled;Molten steel Outbound upper continuous casting platform temperature even pours stove≤35 DEG C by middle packet degree of superheat desired value, opens and pours stove≤40 DEG C control;Middle Baogang's water overheat Degree, which is opened, pours stove≤40 DEG C, and stove≤35 DEG C are poured by company;Middle packet allusion quotation is pulled through 20-30 DEG C of temperature;
Continuous casting:It is cast using whole process protection, 15 DEG C~25 DEG C of middle packet degree of superheat desired value;
Heating:Between 1180~1220 DEG C of slab heating temperature, soaking time 90min ~ 240min;
Rolling:55 ~ 150mm specification sticks two wires:Using two-phase control rolling, first stage split rolling method, using suitable small pressure Passage is measured, second stage Continuous mill train shuts out finished product, 980~1020 DEG C of finishing temperature;
It is cooling:Directly cold bed cooling after rolling enters burial pit heat preservation not less than for 24 hours when cooling temperature is to 400~500 DEG C;20~55mm One line of specification stick:Roughing is rolled using 6 frame plain-barreled roll units, is subsequently rolled using the Continuous mill train of most 12 sorties according to different size Finished product round steel is made;1020 ~ 1080 DEG C of finishing temperature;Go out after finish to gauge unit after entering nibbling shear, enters cold bed later and cool down.
In the continuous casting process, strand size includes 150 mm × 150mm × 12m, the mm × 6 of 240 mm × 240 m, 300 mm×430 mm×6m。
In the heating process, soaking time is:150mm × 150mm square billet heating times >=90min, 240mm × 240mm square billet heating times >=120min, 300mm × 430mm square billet heating times >=240min.
Inventive principle:
The present invention is by using low-carbon high-manganese composition design, LF refining, the vacuum outgas of VD stoves, a series of smeltings such as roll rear slow cooling and New technology is rolled, the high intensity of ferrite+pearlitic structrure, good extension property, good yield tensile ratio and low are successfully developed Warm impact property, welding performance, representing steel grade, it represents steel grade Q345GJC hot rollings tensile strength in 470 ~ 630MPa, surrender Intensity is in 310 ~ 445MPa, and for the contraction percentage of area 22% or more, zero degree impacts AKV in 34J or more, can be good at meeting various The use demand of high building structure steel.
Design of Chemical Composition of the present invention to its intensity and extension property, low temperature impact properties, welding performance, anti-seismic performance, The emphasis such as strong flexor ratio performance consider that organization design is then ferrite+pearlitic structrure.
Using the composition design of low-carbon high-manganese.Although the raising of C content can improve intensity and reduce Ar3 temperature, dislike Change the extension property of steel, therefore final carbon content control is 0.24 ~ 0.27%;Manganese is weak carbide formation element, it can be reduced Austenite transformation temperature, fining ferrite grains, beneficial to improving armor plate strength and toughness, therefore, in composition design, manganese is set Lower limit 1.45% is counted, but when content is more than 1.70%, center segregation aggravates, and extension property is caused to reduce.
In order to ensure high intensity, high tenacity, molten steel must have higher degree of purity.P, S is objectionable impurities elements, is passed through When controlling converter tapping [P]≤0.020%, and by LF refining technique, the white slag retention time >=15min, make end phosphorus content≤ 0.025%, sulfur content≤0.015%, and reduce other impurities in molten steel.
The present invention improves the obdurability and low temperature impact properties, welding performance, anti-seismic performance of round steel in composition design, Again by cooling rate appropriate and burial pit slow cooling, to ensure its toughness while increasing round steel intensity.
Should have low-carbon-equivalent and low Pcm while meeting high intensity and excellent toughness using the composition design of low-carbon high-manganese Value.
Beneficial effects of the present invention:From wound low-carbon high-manganese, LF refining technology, VD stove vacuum outgas, P, S content are strictly controlled With the degree of purity of molten steel, the high building structure hot rolled circular steel Q345GJC of ferrite+pearlitic structrure is successfully developed;Profit With steel mill's existing equipment and process conditions, neither increase investment and production cost, and improve production efficiency, energy-saving consumption-reducing;Production Product are organized as ferrite+pearlitic structrure, have high intensity, good yield tensile ratio, extension property, low temperature impact properties, welding Performance, anti-seismic performance etc. can be good at meeting the property such as antidetonation, fire resisting, the welding of various high building structure hot rolled circular steels The use demand of energy.
Description of the drawings
Attached drawing 1 is the metallographic structure figure of the representative steel grade Q345GJC of the embodiment of the present invention.
Specific implementation mode
Present disclosure is described further with reference to embodiment:
Embodiment 1
A kind of production method of high building structure hot rolled circular steel, the composition weight percent of steel are:C=0.16, Si=0.37, Mn=1.52, P=0.015, S=0.002, Al=0.029, CEV=0.43, remaining is Fe and inevitable impurity.Critical process Step includes:
Converter smelting:Terminal C:0.08%, P:0.013%;Height draws the after-blow number 1 time of re-blowing;Tap 1/4 when be added into ladle Alloy;
LF stoves:Molten steel is in LF stove conduction time 28min, 52 min of total argon blowing time;180 meters of Ca lines are fed before molten steel is outbound.
VD stoves:In the total argon blowing time of VD stoves 50 minutes;Vacuum time 15min is protected, soft argon blowing time 18min after sky is broken;It is fixed [H] 1.2ppm;
Continuous casting:20 DEG C~21 DEG C, pulling rate 0.65m/min of the degree of superheat, strand size: 300*340*mm*6m;
Heating:Between 1180~1200 DEG C of slab heating temperature, time inside furnace 270min;
Rolling:Using two-phase control rolling, the first rank split rolling method, second stage Continuous mill train shuts out finished product, finishing temperature control At 1010 DEG C;
It is cooling:Directly cold bed cooling after rolling enters burial pit heat preservation, soaking time when until cooling temperature is between 400~500 DEG C 27h。
Round steel mechanical property is shown in Table 1.
Embodiment 2
A kind of production method of high building structure hot rolled circular steel, the composition weight percent of steel are C=0.17, Si=0.37, Mn=1.55, P=0.021, S=0.002, Al=0.029, CEV=0.44, remaining is Fe and inevitable impurity;Critical process Step includes:
Converter smelting:Terminal C:0.10%, P:0.017%;Height draws the after-blow number 1 time of re-blowing, and when tapping 1/4 is added into ladle Alloy;
LF stoves:Molten steel is in LF stoves conduction time 28min, total argon blowing time 68min;200 meters of Ca lines are fed before molten steel is outbound.
Continuous casting:30 DEG C~33 DEG C, 0.70 ~ 080m/min of pulling rate of the degree of superheat, strand size:240*240*mm*6m;
Heating:Between 1180~1200 DEG C of slab heating temperature, time inside furnace 150min;
Rolling:Using two-phase control rolling, the first rank split rolling method, second stage Continuous mill train shuts out finished product, finishing temperature control At 1020 DEG C;
It is cooling:Directly cold bed cooling after rolling enters burial pit heat preservation, soaking time when until cooling temperature is between 400~500 DEG C 28h。
Round steel mechanical property is shown in Table 1.
Example 3:
A kind of production method of high building structure hot rolled circular steel, the composition weight percent of steel are C=0.17, Si=0.40, Mn=1.49, P=0.019, S=0.004, Al=0.032, CEV=0.43, remaining is Fe and inevitable impurity;Critical process Step includes:
Converter smelting:Terminal C:0.09%, P:0.017%;Height draws the after-blow number 1 time of re-blowing, and when tapping 1/4 is added into ladle Alloy;
LF stoves:Molten steel is in LF stoves conduction time 22min, total argon blowing time 47min;200 meters of Ca lines are fed before molten steel is outbound.
Continuous casting:27 DEG C~31 DEG C, 1.60 ~ 1.70m/min of pulling rate of the degree of superheat, strand size:150*150*mm*12m;
Heating:Between 1020~1100 DEG C of slab heating temperature, time inside furnace 120min;
Rolling:1010 DEG C of open rollings are rolled, in thick after Continuous mill train, and finishing temperature control is at 1040 DEG C;
It is cooling:Directly cold bed cooling after rolling, until cooling temperature is sheared to fixed size scissors at 300~400 DEG C, bundling after the completion of shearing Packaging and storage, the natural cooling in storehouse.
Round steel mechanical property is shown in Table 1.
The mechanical property of round steel in 1 embodiment of table
From 1 test result of table as it can be seen that method using the present invention production high building structure hot rolled circular steel, when specification is When 100mm, 80mm, 40mm, yield strength is respectively 381Mpa, 364 Mpa, 372 Mpa, tensile strength be respectively 576Mpa, 549Mpa, 588 Mpa, it is respectively 32.5%, 30.5%, 33.5% to extend, and yield tensile ratio is respectively 0.66,0.66,0.63, subzero 20 DEG C impact Akv in 86 ~ 123J;Weld crack sensitivity coefficient is 25.5,26.8,26.3;The high building structure hot rolled circular steel With high intensity, good yield tensile ratio, extension property, low temperature impact properties, welding performance, anti-seismic performance etc., can be good at Meet the use demand of the performances such as antidetonation, fire resisting, the welding of various high building structure hot rolled circular steels.

Claims (3)

1. the production method of high building structure hot rolled circular steel, it is characterised in that:The chemical composition weight percent of steel be C= 0.12 ~ 0.18, Si=0.25~0.50, Mn=1.20~1.70, P≤0.025, S≤0.015, Al >=0.020, carbon equivalent=0.41 ~ 0.45, remaining is Fe and inevitable impurity;Critical process step includes:
Converter smelting:Terminal point control C >=0.05%, P≤0.020%, height draw after-blow number ≯ 2 time of re-blowing;Tap 1/4 when toward ladle Middle addition alloy, using slag-stopping tapping;
LF stoves are smelted:Molten steel in LF stove conduction times >=20min, make white slag deoxidation and go to press from both sides by the min of total argon blowing time >=40, refining It is miscellaneous;150 ~ 300 meters/stove of Ca lines is fed before molten steel is outbound;
VD stoves are smelted:In the total argon blowing time >=40min of VD stoves;0.5tor is vacuumized hereinafter, protecting vacuum time >=15min, breaks sky Soft argon blowing time >=15min afterwards;Molten steel is outbound often to be poured and time determine hydrogen and is no less than 1 stove, is according to target worth [H]≤2.0ppm and is controlled;Molten steel Outbound upper continuous casting platform temperature even pours stove≤35 DEG C by middle packet degree of superheat desired value, opens and pours stove≤40 DEG C control;Middle Baogang's water overheat Degree, which is opened, pours stove≤40 DEG C, and stove≤35 DEG C are poured by company;Middle packet allusion quotation is pulled through 20-30 DEG C of temperature;
Continuous casting:It is cast using whole process protection, 15 DEG C~25 DEG C of middle packet degree of superheat desired value;
Heating:Between 1180~1220 DEG C of slab heating temperature, soaking time 90min ~ 240min;
Rolling:55 ~ 150mm specification sticks two wires:Using two-phase control rolling, first stage split rolling method, using suitable small pressure Passage is measured, second stage Continuous mill train shuts out finished product, 980~1020 DEG C of finishing temperature;
It is cooling:Directly cold bed cooling after rolling enters burial pit heat preservation not less than for 24 hours when cooling temperature is to 400~500 DEG C;20~55mm One line of specification stick:Roughing is rolled using 6 frame plain-barreled roll units, is subsequently rolled using the Continuous mill train of most 12 sorties according to different size Finished product round steel is made;1020 ~ 1080 DEG C of finishing temperature;Go out after finish to gauge unit after entering nibbling shear, enters cold bed later and cool down.
2. the production method of high building structure hot rolled circular steel according to claim 1, it is characterised in that:The company In casting process, strand size include 150 mm × 150mm × 12m, the mm × 6 of 240 mm × 240 m, the mm of 300 mm × 430 × 6m。
3. the production method of high building structure hot rolled circular steel according to claim 1, it is characterised in that:Described adds In thermal process, square billet soaking time is:150mm × 150mm square billet heating times >=90min, the heating of 240mm × 240mm square billets Time >=120min, 300mm × 430mm square billet heating times >=240min.
CN201810495863.9A 2018-05-22 2018-05-22 A kind of production method of high building structure hot rolled circular steel Pending CN108676965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810495863.9A CN108676965A (en) 2018-05-22 2018-05-22 A kind of production method of high building structure hot rolled circular steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810495863.9A CN108676965A (en) 2018-05-22 2018-05-22 A kind of production method of high building structure hot rolled circular steel

Publications (1)

Publication Number Publication Date
CN108676965A true CN108676965A (en) 2018-10-19

Family

ID=63807586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810495863.9A Pending CN108676965A (en) 2018-05-22 2018-05-22 A kind of production method of high building structure hot rolled circular steel

Country Status (1)

Country Link
CN (1) CN108676965A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109988973A (en) * 2019-05-22 2019-07-09 湖南华菱湘潭钢铁有限公司 A kind of production method of axle head hot rolled circular steel
CN110129657A (en) * 2019-05-22 2019-08-16 湖南华菱湘潭钢铁有限公司 A kind of production method of track pin hot rolled circular steel
CN110760643A (en) * 2019-11-29 2020-02-07 新疆八一钢铁股份有限公司 RH smelting method of high-construction steel Q390GJEZ15 steel grade
CN112662943A (en) * 2020-11-30 2021-04-16 山东钢铁股份有限公司 Low-alloy high-strength hot-rolled round steel Q460D and preparation method thereof
CN112792127A (en) * 2020-12-18 2021-05-14 江苏永钢集团有限公司 Production process of CB890QL hot-rolled round steel for crawler crane boom
CN114921712A (en) * 2022-05-30 2022-08-19 湖南华菱湘潭钢铁有限公司 Production method of steel for high-pressure oil pipe joint
CN114918621A (en) * 2022-05-30 2022-08-19 湖南华菱湘潭钢铁有限公司 Production method of round steel for straightening-free boiler hanger rod
CN115323282A (en) * 2022-07-06 2022-11-11 包头钢铁(集团)有限责任公司 Q345GJC/D hot-rolled H-shaped steel for high-grade building structure and production method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041437A (en) * 2010-12-22 2011-05-04 南阳汉冶特钢有限公司 160mm-thick Q345E-Z35 steel plate for high-rise buildings and production method thereof
CN103014509A (en) * 2012-12-30 2013-04-03 南阳汉冶特钢有限公司 Novel low-cost Q345GJC/D steel plate for high-rise buildings and production method of steel plate
CN107746910A (en) * 2017-11-12 2018-03-02 湖南华菱湘潭钢铁有限公司 A kind of production method of CrNiMo alloys round steel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041437A (en) * 2010-12-22 2011-05-04 南阳汉冶特钢有限公司 160mm-thick Q345E-Z35 steel plate for high-rise buildings and production method thereof
CN103014509A (en) * 2012-12-30 2013-04-03 南阳汉冶特钢有限公司 Novel low-cost Q345GJC/D steel plate for high-rise buildings and production method of steel plate
CN107746910A (en) * 2017-11-12 2018-03-02 湖南华菱湘潭钢铁有限公司 A kind of production method of CrNiMo alloys round steel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
温利军 等: "Q345GJC建筑结构用高强度钢板开发", 《宝钢科技》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109988973A (en) * 2019-05-22 2019-07-09 湖南华菱湘潭钢铁有限公司 A kind of production method of axle head hot rolled circular steel
CN110129657A (en) * 2019-05-22 2019-08-16 湖南华菱湘潭钢铁有限公司 A kind of production method of track pin hot rolled circular steel
CN110760643A (en) * 2019-11-29 2020-02-07 新疆八一钢铁股份有限公司 RH smelting method of high-construction steel Q390GJEZ15 steel grade
CN112662943A (en) * 2020-11-30 2021-04-16 山东钢铁股份有限公司 Low-alloy high-strength hot-rolled round steel Q460D and preparation method thereof
CN112792127A (en) * 2020-12-18 2021-05-14 江苏永钢集团有限公司 Production process of CB890QL hot-rolled round steel for crawler crane boom
CN112792127B (en) * 2020-12-18 2022-07-05 江苏永钢集团有限公司 Production process of CB890QL hot-rolled round steel for crawler crane boom
CN114921712A (en) * 2022-05-30 2022-08-19 湖南华菱湘潭钢铁有限公司 Production method of steel for high-pressure oil pipe joint
CN114918621A (en) * 2022-05-30 2022-08-19 湖南华菱湘潭钢铁有限公司 Production method of round steel for straightening-free boiler hanger rod
CN115323282A (en) * 2022-07-06 2022-11-11 包头钢铁(集团)有限责任公司 Q345GJC/D hot-rolled H-shaped steel for high-grade building structure and production method thereof
CN115323282B (en) * 2022-07-06 2024-06-11 包头钢铁(集团)有限责任公司 Q345GJC/D hot rolled H-shaped steel for high-grade building structure and production method thereof

Similar Documents

Publication Publication Date Title
CN108676965A (en) A kind of production method of high building structure hot rolled circular steel
CN102703811B (en) Titanium micro-alloyed 400MPa grade high-strength steel bar and production method thereof
CN103361569B (en) A kind of Ultralow temperature weather-proof structural steel plate and production method thereof
CN102703812B (en) Titanium microalloyed 500-MPa high-strength steel bar and production method thereof
CN108546885B (en) L555M pipeline steel with excellent low-temperature toughness and manufacturing method thereof
CN102965574B (en) Titanium microalloying hot-rolling thick steel plate with low yield ratio and high strength and production process of steel plate
CN100463978C (en) Method for increasing toughness of low temperature steel plate
CN109988973A (en) A kind of production method of axle head hot rolled circular steel
WO2022022040A1 (en) Low temperature-resistant hot-rolled h-type steel for 355mpa marine engineering and preparation method therefor
CN101705423A (en) Low-cost steel plate for building structure and manufacturing method thereof
CN101348881B (en) Production method of low cost high performance X70 pipeline steel
CN104694822A (en) High-strength hot rolled steel plate with 700 MPa grade yield strength and manufacturing method thereof
CN105821325B (en) A kind of quenching and tempering type high/low temperature toughness pipe line steel and manufacture method
CN105821335B (en) The inexpensive ultralow temperature normalizing type pipe line steel and its production method of a kind of excellent weldability
CN102876970B (en) Steel with yield strength larger than or equal to 390 MPa for high-rise buildings and production method of steel
CN109957712A (en) Low-hardness X70M pipeline steel hot-rolled plate coil and manufacturing method thereof
CN112011737B (en) 390 MPa-grade-20-DEG C-resistant hot-rolled angle steel for bridge structure and production method thereof
WO2019184310A1 (en) S460g2+m steel plate for offshore weldable structure and production method therefor
CN108950388A (en) L485M pipeline steel with excellent low-temperature toughness and manufacturing method thereof
KR20200143466A (en) Yield strength 460 megapascal class hot rolled high toughness low temperature resistant H-beam and its manufacturing method
CN102644024B (en) Low-alloy low-yield-ratio steel for oceaneering structure and production method thereof
CN108728757A (en) Low-temperature L450M pipeline steel and manufacturing method thereof
CN113846269B (en) Cold-rolled high-weather-resistance steel plate with high strength and plasticity and preparation method thereof
CN114107825A (en) Low-carbon equivalent titanium-containing Q420MD steel plate and preparation method thereof
CN109536847A (en) 390MPa grades of welded tube hot rolled steel plates of yield strength and its manufacturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181019

WD01 Invention patent application deemed withdrawn after publication