Nothing Special   »   [go: up one dir, main page]

CN108532740A - Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building - Google Patents

Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building Download PDF

Info

Publication number
CN108532740A
CN108532740A CN201810373116.8A CN201810373116A CN108532740A CN 108532740 A CN108532740 A CN 108532740A CN 201810373116 A CN201810373116 A CN 201810373116A CN 108532740 A CN108532740 A CN 108532740A
Authority
CN
China
Prior art keywords
pipe structure
upper cover
chamber
building
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810373116.8A
Other languages
Chinese (zh)
Inventor
杨雷
郭劲松
刘力
温玉君
刘辉
樊玉萍
李尧
倪旭伟
姜爱荣
朱蓓玲
何宏涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN201810373116.8A priority Critical patent/CN108532740A/en
Publication of CN108532740A publication Critical patent/CN108532740A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0023Building characterised by incorporated canalisations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to upper cover architectural design and technical field of construction, standby pipe structure cavity configuration and its application process are hung under especially a kind of upper cover building, it is characterised in that:The lower surface on the plate ground is fixed in the pipe structure chamber suspension and the inside cavity space of the pipe structure chamber is used to carry the equipment installation of the upper cover building, mutually independent between the pipe structure chamber and building under the upper cover building and the lid.It is an advantage of the invention that:1)Required equipment installation is built for upper cover, centralized arrangement space is provided, be convenient for the arrangement of equipment installation;2)Upper cover exploitation is set from vertical direction spatial and pipeline arrangement, to divide fine limit with the lower building of lid and not interfere with each other, complete exterior escape platform is created for upper cover groups of building;3)Operable technical support is provided for upper cover exploitation;4)Sinking foundation pit needed for the installation equipment such as top exploitation staircase can be accommodated, space availability ratio is improved;5)The overall structure load of upper cover development architecture object is reduced, construction cost is saved.

Description

Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building
Technical field
The present invention relates to upper cover architectural design and technical field of construction, standby pipe is hung under especially a kind of upper cover building Structure cavity configuration and its application process are especially applicable to depot of urban railway transit vehicles upper cover Estate Development engineering design.
Background technology
Currently, under the lids such as such as depot of urban railway transit vehicles when the top exploitation upper cover building of building, on The equipment installation of lid building is often arranged by the way of flood equipment interlayer below the bottom of upper cover building.At this point, Upper cover building is very big to the load of its bottom plate together with flood equipment interlayer, and the bottom plate is located at the upper of the lower building of lid Side, therefore with the increase of service life, be very easy to impact the safety of structure for building lower building.Simultaneously as Provided with flood equipment interlayer, the ground elevation of the upper cover building first floor can be caused to improve again, not only considerably increase construction Cost, but also the use of upper cover building, such as the disengaging of people can be given to bring very big inconvenience.
Invention content
The purpose of the present invention is according to above-mentioned the deficiencies in the prior art, providing standby pipe is hung under a kind of upper cover building Structure cavity configuration and its application process, the equipment that lid building is put on by the following suspended tubes structure chamber of board bottom in upper cover building The arrangement space of pipeline greatly reduces the load above the lower building of lid, and while ensureing safety of structure, saving is built into This.
The object of the invention realization is completed by following technical scheme:
Hang standby pipe structure cavity configuration under a kind of upper cover building, the upper cover building construction is on plate ground, the plate The load for carrying the upper cover building, the building in the case where the lower section on the plate ground is provided with lid, it is characterised in that:The pipe structure The lower surface on the plate ground is fixed in chamber suspension and the inside cavity space of the pipe structure chamber is for carrying the upper cover building Equipment installation, it is mutually independent between the pipe structure chamber and building under the upper cover building and the lid.
The pipe structure chamber includes pipe structure chamber hanging screen, pipe structure bottom of chamber plate, and the suspension of pipe structure chamber hanging screen interval is fixed on described The both ends of the lower surface on plate ground, pipe structure bottom of chamber plate are fixedly connected with the pipe structure chamber hanging screen respectively, the pipe structure chamber hanging screen It is the pipe structure chamber with the space that pipe structure bottom of chamber plate is enclosed.
If the pipe structure intracavitary is divided into several cavity areas by the way that main pipe structure chamber davit is arranged.
The manhole or equipment foundation pit being connected with the pipe structure chamber are offered in the plate on the ground.
A kind of application process for being related to hanging standby pipe structure cavity configuration under above-mentioned upper cover building, it is characterised in that:Root According to the equipment installation of upper cover building needs are moved towards, is hung with below plate ground and matches with the trend of the equipment installation Pipe structure chamber, the pipe structure intracavitary be arranged in the pipe structure intracavitary arrange the forceful electric power cable of the upper cover building, weak-current cable, One or both of feed pipe, sewage pipe and rain pipe and two or more combinations.
Fireproof blocking is arranged between the interface in length and breadth of the pipe structure chamber in being criss-cross arranged in the pipe structure chamber.
The pipe structure cavity wall is painted with water-repellent paint and carries out looking for slope drainage sunk well in pipe structure bottom of chamber plate, and in the pipe Downpipe is arranged in structure intracavitary at a certain distance.
It is an advantage of the invention that:1)Required equipment installation is built for upper cover, centralized arrangement space is provided, be convenient for equipment installation Arrangement;2)Upper cover exploitation is set from vertical direction spatial and pipeline arrangement, to divide fine limit with vehicle base and not interfere with each other, be upper Lid groups of building create complete exterior escape platform;3)Operable technology branch is provided for vehicle base upper cover Estate Development Support;4)Pipe structure intracavitary can accommodate sinking foundation pit needed for the installation equipment such as top exploitation staircase, improve space availability ratio;5)By setting Pipe structure chamber is set to substitute the flood equipment interlayer needed originally, greatly reduces the overall structure load of upper cover development architecture object, is saved About construction cost.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the arrangement schematic diagram of the present invention when in use;
Fig. 3 is the installation site structural schematic diagram of the present invention.
Specific implementation mode
Feature of present invention and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, so as to In the understanding of technical staff of the same trade:
As shown in Figs. 1-3, figure label 1-15 is expressed as:The lower building 1 of lid, pipe structure chamber 2, plate 3, upper cover building 4, Pipe structure chamber hanging screen 5, pipe structure bottom of chamber plate 6, pipe structure chamber davit 7, frame column 8, Vierendeel girder 9, inspection hole 10, feed pipe 11, forceful electric power electricity Cable 12, weak-current cable 13, rain pipe 14, sewage pipe 15.
Embodiment:It is built applied to upper cover as shown in figure 3, hanging standby pipe structure cavity configuration in the present embodiment under upper cover building Among the development engineering design for building object 4.Upper cover building 4 builds in plate 3 top.In plate 3 lower section is additionally provided with lid Lower building 1, it can be depot of urban railway transit vehicles to build lower building 1.As shown in figure 3, the suspension of pipe structure chamber 2 is fixed on plate The lower surface on ground 3, the equipment installation for carrying upper cover building 4.Pipe structure chamber 2 and upper cover building 4 and lid time building 1 it Between it is mutually independent, i.e., pipe structure chamber 2 this construct space and have a style of one's own, building 1 is not interfere with each other down with upper cover building 4 and lid.
As shown in Figure 1, pipe structure chamber 2 is constructed by pipe structure chamber hanging screen 5, pipe structure bottom of chamber plate 6, pipe structure chamber davit 7.Pipe structure chamber The setting of the interval of hanging screen 5 with being fixed at plate 3 lower surface, the both ends of pipe structure bottom of chamber plate 6 respectively with the pipe structure chamber hanging screen 5 of both sides It is connected to a fixed, pipe structure chamber 2 is constituted to surround an enclosure space.In plate 3 lower section is arranged in pipe structure chamber 2, in plate under 3 Side is additionally provided with the Vierendeel girder 9 and frame column 8 for being used to support upper cover building 4.Pipe structure chamber 2 and Vierendeel girder 9 and frame column 8 it Between empty avoiding be arranged, avoid colliding between pipe structure chamber 2 and beam column construction.As shown in Figure 1, being also set up in the inside of pipe structure chamber 2 There are two pipe structure chamber davits 7, the top of pipe structure chamber davit 7 with plate 3 to be connected to a fixed, bottom end is connected with pipe structure bottom of chamber plate 6 It is fixed, to which pipe structure chamber 2 is divided into three subregions, in order to arrange the equipment pipe of different function type in three subregions Line to influence each other caused by avoiding between equipment installation, while also allowing for the partition management of equipment installation, facilitates technology The subsequent Maintenance and Repair of personnel.
As shown in Fig. 2, in plate offering manhole 10 on 3, manhole 10 is for plate between 3 tops and pipe structure chamber 2 Connection, make construction personnel can be by being reached inside pipe structure chamber 2 above manhole 10 from plate 3, to institute's cloth in pipe structure chamber 2 The equipment installation set is overhauled.
Hanging standby pipe structure cavity configuration in the present embodiment under upper cover building has following application process:
1)The arrangement of equipment installation for upper cover building 4:It is different that function is respectively set in three subregions of pipe structure chamber 2 Equipment installation.As shown in Fig. 2, arranging feed pipe 11 in the left side subregion of pipe structure chamber 2, feed pipe 11 is used for upper cover building 4 Water supply;Forceful electric power cable 12 and weak-current cable 13, forceful electric power cable 12 and weak-current cable 13 are arranged in the intermediate partition of pipe structure chamber 2 Power supply for upper cover building 4;Rain pipe 14, sewage pipe 15, rain pipe 14 and dirt are arranged in the right partition of pipe structure chamber 2 Water pipe 15 is used for the draining of upper cover building 4.To sum up, will be in pipe structure chamber 2 by the pipe structure chamber davit 7 in pipe structure chamber 2 Several subregions are separated into, so as to arrange the different equipment installation of function.For example, in order to avoid forceful electric power cable 12 and weak-current cable Harmful effect between 13, can ensureing structural strength and under the premise of stability, forceful electric power cable 12 and weak-current cable 13 it Between add pipe structure chamber davit 7, to realize the isolation subregion between strong and weak electricity.
2)The foundation pit that sinks needed for the installation equipment such as staircase can be accommodated by being provided for upper cover building 4:As shown in Fig. 2, as shown in Fig. 2, Manhole 10, for plate the connection between 3 tops and pipe structure chamber 2 of manhole 10 in plate are offered on 3.Manhole 10 is edge The extending direction arranged for interval of pipe structure chamber 2, and in plate on 3 remaining position, you can trepanning as staircase etc. to install equipment Required sinking foundation pit, to improve space availability ratio.
3)Complete exterior escape platform is created for upper cover building 4:Due to pipe structure chamber 2, this constructs space self-contained One is not interfere with each other with upper cover building 4 and lid time building 1, forming properties pure form complete plate ground safe escape face, Region is because that the reason of pipeline and equipment foundation pit becomes to isolate is imperfect with avoiding the plate of upper cover building 4.
The present embodiment is in the specific implementation:Since pipe structure chamber 2 is the equipment installation for carrying upper cover building 4, It moves towards the arrangement requirement that should meet the equipment installation of upper cover building 4.Therefore, preferably targetedly structure is responsible in setting to pipe structure chamber 2 Chamber or collocation branch pipe structure chamber.In being criss-cross arranged between supervisor's structure chamber and branch pipe structure chamber, with the trends of design with equipment installation Match.Closure can be set between supervisor's structure chamber and the interface in length and breadth of branch pipe structure chamber, the intensity of a fire is climing when to prevent fire from occurring Prolong, by the control of fire in minimum limit, ensures the safety of the person and property as much as possible.
To ensure the safety of the lower building of the equipment installation of upper cover building 4 and lid 1, need to standby pipe to plate be hung under 3 Structure chamber 3 itself carries out special fire protection design, it is proposed that the fire resistance limit of structure component of pipe structure chamber 2 is 2h, and pipe structure chamber davit 7 is cut Face size is not less than 300mmx300mm;Protective layer thickness is not less than 30mm, and flaw size is not more than 0.1mm;Pipe structure chamber hanging screen 5 Section thickness be not less than 150mm.
Since 3 lower sections are not outdoor state to pipe structure chamber 2 with being hung on plate, rainwater, sewage penetrate into the situation inside pipe structure chamber 2 It is few to occur.But to meet the standard of zero tolerance, the inside of pipe structure chamber 2 has also carried out water-proof drainage processing:To the inner wall powder of pipe structure chamber 2 Brush water-repellent paint, and slope drainage sunk well is looked in pipe structure bottom of chamber plate 6, floor drain is made every a distance, and fall along the setting of frame column 8 Water pipe is convenient for central drainage.
Although above example elaborates the design of the object of the invention and embodiment with reference to attached drawing, this Field those of ordinary skill will recognize, still can be right in the case where no disengaging claim limits the precondition of range The present invention makes various modifications and variations, therefore does not repeat one by one herein.

Claims (7)

1. hanging standby pipe structure cavity configuration under a kind of upper cover building, the upper cover building construction is on plate ground, the plate Ground carries the load of the upper cover building, the building in the case where the lower section on the plate ground is provided with lid, it is characterised in that:The pipe The suspension of structure chamber is fixed on the inside cavity space of the lower surface on the plate ground and the pipe structure chamber for carrying the upper cover building The equipment installation of object, it is mutually independent between the pipe structure chamber and building under the upper cover building and the lid.
2. hanging standby pipe structure cavity configuration under a kind of upper cover building according to claim 1, it is characterised in that:The pipe Structure chamber includes pipe structure chamber hanging screen, pipe structure bottom of chamber plate, and pipe structure chamber hanging screen interval hangs the lower surface for being fixed on the plate ground, institute The both ends for stating pipe structure bottom of chamber plate are fixedly connected with the pipe structure chamber hanging screen respectively, the pipe structure chamber hanging screen and pipe structure bottom of chamber plate The space enclosed is the pipe structure chamber.
3. hanging standby pipe structure cavity configuration under a kind of upper cover building according to claim 2, it is characterised in that:The pipe If structure intracavitary is divided into several cavity areas by the way that main pipe structure chamber davit is arranged.
4. hanging standby pipe structure cavity configuration under a kind of upper cover building according to claim 1, it is characterised in that:Described Plate offers the manhole or equipment foundation pit being connected with the pipe structure chamber on the ground.
5. the application process of standby pipe structure cavity configuration is hung under a kind of upper cover building being related to described in claim 1-4, it is special Sign is:According to the equipment installation of upper cover building needs are moved towards, is hung with below plate ground and is walked with the equipment installation To the pipe structure chamber to match, the forceful electric power electricity that the pipe structure intracavitary arranges the upper cover building is arranged in the pipe structure intracavitary One or both of cable, weak-current cable, feed pipe, sewage pipe and rain pipe and two or more combinations.
6. hanging the application process of standby pipe structure cavity configuration, feature under a kind of upper cover building according to claim 5 It is:Fireproof blocking is arranged between the interface in length and breadth of the pipe structure chamber in being criss-cross arranged in the pipe structure chamber.
7. hanging the application process of standby pipe structure cavity configuration, feature under a kind of upper cover building according to claim 5 It is:The pipe structure cavity wall is painted with water-repellent paint and carries out looking for slope drainage sunk well in pipe structure bottom of chamber plate, and in the pipe structure Downpipe is arranged in intracavitary at a certain distance.
CN201810373116.8A 2018-04-24 2018-04-24 Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building Pending CN108532740A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810373116.8A CN108532740A (en) 2018-04-24 2018-04-24 Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810373116.8A CN108532740A (en) 2018-04-24 2018-04-24 Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building

Publications (1)

Publication Number Publication Date
CN108532740A true CN108532740A (en) 2018-09-14

Family

ID=63478478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810373116.8A Pending CN108532740A (en) 2018-04-24 2018-04-24 Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building

Country Status (1)

Country Link
CN (1) CN108532740A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4372510A (en) * 1980-08-04 1983-02-08 The Budd Company Wire raceway for attachment under the floor of a railway car
US5842313A (en) * 1996-09-24 1998-12-01 American Access Technologies, Inc. Communications cable interconnection apparatus and associated method for an open office architecture
JPH11141740A (en) * 1997-11-07 1999-05-28 Kumagai Gumi Co Ltd Method for transferring existing piping in cut and cover tunnel making work
US6128872A (en) * 1997-11-28 2000-10-10 Comunica Plc Cable protection system
CN103206097A (en) * 2012-12-21 2013-07-17 广州市设计院 Large complex underground life support pipeline system and supporting structure
CN104518473A (en) * 2014-12-31 2015-04-15 上海市机械施工集团有限公司 Suspension protection structure and method of cable box culvert pipeline
CN206144018U (en) * 2016-09-26 2017-05-03 黑龙江施耐达建筑技术有限公司 Be suitable for opening type building bottom plate and building element of hoist and mount pendant
CN106906843A (en) * 2017-03-17 2017-06-30 中国建筑第八工程局有限公司 Underground pipe gallery and its construction method
CN206889858U (en) * 2017-04-06 2018-01-16 中铁七局集团第四工程有限公司 Ceiling mount bracket below interim pipeline
CN208346970U (en) * 2018-04-24 2019-01-08 上海市隧道工程轨道交通设计研究院 Standby pipe structure cavity configuration is hung under a kind of upper cover building

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4372510A (en) * 1980-08-04 1983-02-08 The Budd Company Wire raceway for attachment under the floor of a railway car
US5842313A (en) * 1996-09-24 1998-12-01 American Access Technologies, Inc. Communications cable interconnection apparatus and associated method for an open office architecture
JPH11141740A (en) * 1997-11-07 1999-05-28 Kumagai Gumi Co Ltd Method for transferring existing piping in cut and cover tunnel making work
US6128872A (en) * 1997-11-28 2000-10-10 Comunica Plc Cable protection system
CN103206097A (en) * 2012-12-21 2013-07-17 广州市设计院 Large complex underground life support pipeline system and supporting structure
CN104518473A (en) * 2014-12-31 2015-04-15 上海市机械施工集团有限公司 Suspension protection structure and method of cable box culvert pipeline
CN206144018U (en) * 2016-09-26 2017-05-03 黑龙江施耐达建筑技术有限公司 Be suitable for opening type building bottom plate and building element of hoist and mount pendant
CN106906843A (en) * 2017-03-17 2017-06-30 中国建筑第八工程局有限公司 Underground pipe gallery and its construction method
CN206889858U (en) * 2017-04-06 2018-01-16 中铁七局集团第四工程有限公司 Ceiling mount bracket below interim pipeline
CN208346970U (en) * 2018-04-24 2019-01-08 上海市隧道工程轨道交通设计研究院 Standby pipe structure cavity configuration is hung under a kind of upper cover building

Similar Documents

Publication Publication Date Title
CN106285074A (en) A kind of design specification of Logistics Park
CN104631857A (en) Mobile house
CN203613645U (en) Modular prefabricated movable house
CN208346970U (en) Standby pipe structure cavity configuration is hung under a kind of upper cover building
CN108532740A (en) Standby pipe structure cavity configuration and its application process are hung under a kind of upper cover building
CN205841102U (en) Steel reinforced concrete combination type tower
CN108660906A (en) A kind of composite structure and construction method of Cable-Stayed Bridge Structure and arch rope shell roof system
CN201541073U (en) Environment-friendly nonmetal buried flood protection prefabricated box-type substation
JP6112826B2 (en) Renovation method of existing apartment house and apartment house
CN207436253U (en) A kind of vestibule
CN202197015U (en) Lower box structure of half-buried box type transformer substation
CN105909006B (en) A kind of precast assembly prefabricated substation
CN203613826U (en) Mobile house
CN105292390B (en) Marine people occupies system and its method of construction
CN210658798U (en) Concrete partition wall for power distribution room
CN203866805U (en) Gravity-type offshore booster station
CN203613646U (en) Prefabricated house convenient for wiring
CN205976631U (en) But sled dressization mobility control room
DI MARI et al. What Future for the Skyscraper? A Sustainable Recovery of Rai Building
CN206859415U (en) A kind of primary equipment cabin
CN110091957A (en) It is a kind of to enclose well through the multi-functional of the long deck of multilayer
CN211172255U (en) Modularized movable permanent public toilet
CN209161244U (en) For efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material
CN203613827U (en) Integrally-movable mobile house
Commissioners Belfast Harbour Studios

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180914