Nothing Special   »   [go: up one dir, main page]

CN108425321A - A kind of installation method of Novel variable-section bridge linear controller - Google Patents

A kind of installation method of Novel variable-section bridge linear controller Download PDF

Info

Publication number
CN108425321A
CN108425321A CN201810146103.7A CN201810146103A CN108425321A CN 108425321 A CN108425321 A CN 108425321A CN 201810146103 A CN201810146103 A CN 201810146103A CN 108425321 A CN108425321 A CN 108425321A
Authority
CN
China
Prior art keywords
angle steel
steel
design
installation
installation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810146103.7A
Other languages
Chinese (zh)
Other versions
CN108425321B (en
Inventor
刘阳
洪小文
王孝钧
黄世宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810146103.7A priority Critical patent/CN108425321B/en
Publication of CN108425321A publication Critical patent/CN108425321A/en
Application granted granted Critical
Publication of CN108425321B publication Critical patent/CN108425321B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of installation method of Novel variable-section bridge linear controller and goes out to design axis coordinate position in the pier stud position surveying and locating for having poured completion after bridge reinforcement installation;Installation form, template connects, and one block of steel plate is respectively welded in the axial centerline of vertical angle steel and transverse direction angle steel in stiff skeleton surrounding with the vertical angle steel processed in advance with lateral angle steel spot welding respectively after installation is complete;Using total powerstation and prism bar construction lofting is carried out according to design axis coordinate, and the coordinate position of design axis is drawn on the steel plate, simultaneously red line mark is arranged in four axis points of connection, then the actual range at crossing point of axes positional distance pier stud edge to be poured is measured with steel tape;It is adjusted according to design offset distance and protective layer thickness deviation, the axial location of split bolt adjusting template.Purpose is that solve traditional variable cross-section bridge Linear Control workflow mostly easy tos produce disturbance with shape steel bracket, the problem more difficult to Thin-Wall Piers Linear Control.

Description

A kind of installation method of Novel variable-section bridge linear controller
Technical field
The present invention relates to engineering construction field, specially a kind of installation side of Novel variable-section bridge linear controller Method.
Background technology
With the fast development of highway communication, mountainous area highway is more and more, and the ratio that bridge tunnel accounts for highway is more next Bigger, because topography is precipitous, relative fall is larger, Bridges in Mountainous Areas towards developing across, directions Gao Dun greatly, or even occur hundred meters of height with On.
Conventionally employed three-dimensional fix method, using space coordinate control pier shaft quadrangle, measuring instrument uses total powerstation. Before bearing platform construction, pier shaft cross hairs is released first, shape steel bracket is carried out, pier shaft embedded bar is accurately positioned and is ensured entire Pier shaft reinforcing bar does not shift in work progress, not skewed;Measuring accurate on pier shaft goes out four control points of template before template installation, Using the inclination of perpendicular measurement module when template is installed, template directly measures pier shaft quadrangle after installation is complete using total powerstation Coordinate and the theoretical coordinate of calculating compare, and template is adjusted using jack.
But tradition variable cross-section bridge Linear Control one side workflow is relatively more, another aspect shape steel bracket is easy production Raw disturbance, it is more difficult to Thin-Wall Piers Linear Control.
Invention content
The present invention provides a kind of installation method of Novel variable-section bridge linear controller, it is therefore intended that solves the above-mentioned back of the body The traditional variable cross-section bridge Linear Control workflow proposed in scape technology mostly easy tos produce disturbance with shape steel bracket, to thin The more difficult problem of wall pier Linear Control.
To achieve the above object, the present invention provides a kind of installation method of Novel variable-section bridge linear controller, packet Include following steps:
Step 1 goes out to design axis coordinate bit after bridge reinforcement installation in the pier stud position surveying and locating for having poured completion It sets;
Step 2, installation form, template are vertical with what is processed in advance respectively in stiff skeleton surrounding after installation is complete Angle steel is connected with lateral angle steel spot welding, and one block of steel plate is respectively welded in the axial centerline of vertical angle steel and lateral angle steel;
Step 3 carries out construction lofting according to design axis coordinate using total powerstation and prism bar, and draws on the steel plate Design axis coordinate position, connection four axis points simultaneously be arranged red line mark, then with steel tape measure crossing point of axes position away from Actual range from pier stud edge to be poured;
Step 4 is adjusted according to design offset distance and protective layer thickness deviation, the axial location of split bolt adjusting template It is whole.
Preferably, the length of the steel plate is 10cm, width 10cm, thickness 1cm.
Preferably, Work tool and material include vertical angle steel, steel plate, lateral angle steel, red line, color mark pen, steel tape, Total powerstation and prism bar.
Preferably, after step 1 is fully completed to step 4, construction lofting is repeated according still further to first step construction way, directly To reaching design and code requirement.
Preferably, the vertical angle steel is shifted to an earlier date pre-buried good by design position, transverse direction angle steel medial axis position setting Steel plate in advance at the construction field (site) complete welding.
As can be seen from the above technical solutions, compared with prior art, the present invention has the following advantages:
1) lateral angle steel of the invention uses spot welding with vertical Bolted angle connection, easy to disassemble.
2) present invention can efficiently solve the linear irregularity phenomenon of hollow thin-walled high pier, can reuse, and it is same to save cost Shi Tigao construction qualities.
Description of the drawings
Fig. 1 illustrates the structural schematic diagram of the present invention;
It illustrates:1. vertical angle steel, 2. steel plates, 3. lateral angle steel, 4. red lines.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described the application principle of the present invention.
Embodiment one
As shown in Figure 1, a kind of installation method of Novel variable-section bridge linear controller, includes the following steps:
Step 1 goes out to design axis coordinate bit after bridge reinforcement installation in the pier stud position surveying and locating for having poured completion It sets;
Step 2, installation form, template are vertical with what is processed in advance respectively in stiff skeleton surrounding after installation is complete Angle steel 1 is connected with lateral 3 spot welding of angle steel, and one block of steel is respectively welded in the axial centerline of vertical angle steel 1 and lateral angle steel 3 Plate 2;
Step 3 carries out construction lofting according to design axis coordinate using total powerstation and prism bar, and draws on the steel plate Design axis coordinate position, connection four axis points simultaneously be arranged red line 4 mark, then with steel tape measure crossing point of axes position away from Actual range from pier stud edge to be poured;
Step 4 is adjusted according to design offset distance and protective layer thickness deviation, the axial location of split bolt adjusting template It is whole.
Wherein, the length of the steel plate 2 is 10cm, width 10cm, thickness 1cm;Work tool and material include vertical Angle steel, steel plate, lateral angle steel, red line, color mark pen, steel tape, total powerstation and prism bar;When step 1 to step 4 whole After the completion, construction lofting is repeated according still further to first step construction way, until reaching design and code requirement;The vertical angle steel 1 It is pre-buried good to shift to an earlier date by design position, and the steel plate 2 of 3 medial axis position of transverse direction angle steel setting completes weldering at the construction field (site) in advance It connects.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment including a series of elements includes not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including institute State in the process, method, article or equipment of element that there is also other identical elements.
The above is made skilled artisans appreciate that or realizing this hair in the specific embodiment party of the present invention It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (5)

1. a kind of installation method of Novel variable-section bridge linear controller, which is characterized in that include the following steps:
Step 1 goes out to design axis coordinate position after bridge reinforcement installation in the pier stud position surveying and locating for having poured completion;
Step 2, installation form, template is after installation is complete, in stiff skeleton surrounding respectively with the vertical angle steel processed in advance (1) it is connected with transverse direction angle steel (3) spot welding, and one is respectively welded in the axial centerline of vertical angle steel (1) and lateral angle steel (3) Block steel plate (2);
Step 3 carries out construction lofting according to design axis coordinate using total powerstation and prism bar, and draws design on the steel plate The coordinate position of axis connects four axis points and red line (4) mark is arranged, then measures crossing point of axes positional distance with steel tape The actual range at pier stud edge to be poured;
Step 4 is adjusted according to design offset distance and protective layer thickness deviation, the axial location of split bolt adjusting template.
2. a kind of installation method of Novel variable-section bridge linear controller according to claim 1, which is characterized in that The length of the steel plate (2) is 10cm, width 10cm, thickness 1cm.
3. a kind of installation method of Novel variable-section bridge linear controller according to claim 1, which is characterized in that Work tool and material include vertical angle steel, steel plate, lateral angle steel, red line, color mark pen, steel tape, total powerstation and prism bar.
4. a kind of installation method of Novel variable-section bridge linear controller according to claim 1, which is characterized in that After step 1 is fully completed to step 4, construction lofting is repeated according still further to first step construction way, until reaching design and rule Model requirement.
5. a kind of installation method of Novel variable-section bridge linear controller according to claim 1, which is characterized in that It is pre-buried good that the vertical angle steel (1) is shifted to an earlier date by design position, the steel plate (2) of described transverse direction angle steel (3) medial axis position setting Complete welding at the construction field (site) in advance.
CN201810146103.7A 2018-02-12 2018-02-12 Installation method of novel variable-cross-section bridge linear control device Active CN108425321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810146103.7A CN108425321B (en) 2018-02-12 2018-02-12 Installation method of novel variable-cross-section bridge linear control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810146103.7A CN108425321B (en) 2018-02-12 2018-02-12 Installation method of novel variable-cross-section bridge linear control device

Publications (2)

Publication Number Publication Date
CN108425321A true CN108425321A (en) 2018-08-21
CN108425321B CN108425321B (en) 2020-01-10

Family

ID=63156858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810146103.7A Active CN108425321B (en) 2018-02-12 2018-02-12 Installation method of novel variable-cross-section bridge linear control device

Country Status (1)

Country Link
CN (1) CN108425321B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778607A (en) * 2019-03-14 2019-05-21 中铁隧道集团一处有限公司 Continuous rigid frame PC track girder precise measurement positioning device and erection localization method
CN113073570A (en) * 2021-04-12 2021-07-06 平阳县政府投资项目建设中心 Construction method for controlling perpendicularity of equal-section thin-wall pier based on two-point distance method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220742A (en) * 2011-04-20 2011-10-19 重庆交通建设(集团)有限责任公司 Construction method of deformable template of variable cross-section high pier
CN103174068A (en) * 2013-04-12 2013-06-26 北京交通大学 Straddle type single-rail traffic rigid frame system manufacturing construction method and linear control system
CN104457716A (en) * 2014-11-28 2015-03-25 中铁建生态环境设计研究有限公司 Measurement and control method for bridge construction
CN205295954U (en) * 2015-12-29 2016-06-08 浙江大学城市学院 Hollow high mound support template structure
CN106702910A (en) * 2016-12-29 2017-05-24 中交第三航务工程局有限公司 Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220742A (en) * 2011-04-20 2011-10-19 重庆交通建设(集团)有限责任公司 Construction method of deformable template of variable cross-section high pier
CN103174068A (en) * 2013-04-12 2013-06-26 北京交通大学 Straddle type single-rail traffic rigid frame system manufacturing construction method and linear control system
CN104457716A (en) * 2014-11-28 2015-03-25 中铁建生态环境设计研究有限公司 Measurement and control method for bridge construction
CN205295954U (en) * 2015-12-29 2016-06-08 浙江大学城市学院 Hollow high mound support template structure
CN106702910A (en) * 2016-12-29 2017-05-24 中交第三航务工程局有限公司 Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778607A (en) * 2019-03-14 2019-05-21 中铁隧道集团一处有限公司 Continuous rigid frame PC track girder precise measurement positioning device and erection localization method
CN109778607B (en) * 2019-03-14 2023-08-22 中铁隧道集团一处有限公司 Accurate measurement and positioning device and erection and positioning method for continuous rigid frame PC track beam
CN113073570A (en) * 2021-04-12 2021-07-06 平阳县政府投资项目建设中心 Construction method for controlling perpendicularity of equal-section thin-wall pier based on two-point distance method

Also Published As

Publication number Publication date
CN108425321B (en) 2020-01-10

Similar Documents

Publication Publication Date Title
CN109515252B (en) Trackless measurement construction method for subway contact network
CN108914782A (en) A kind of large size open web type highway steel box girder stayed-cable bridge manufacturing method
CN103711080B (en) Utilize the method for locating between coordinate method of comparison determination steel pipe arch bridge arch rib
CN102996143A (en) Construction method of fully pouring tunnel invert
CN102680942A (en) Blast furnace frame measuring positioning method based on total station
CN103388343A (en) Super-long and large horizontal embedded part reverse construction method
CN102966041A (en) Spatial stay-cable positioning method of multispan continuous S-shaped landscape bridge
CN106638318A (en) Method for positioning anchor point of beam end of cable stayed bridge and installation method of cable guide pipe
CN108425321A (en) A kind of installation method of Novel variable-section bridge linear controller
CN113622316A (en) Steel truss girder multipoint traction type pushing construction system and construction method thereof
CN103344214B (en) 1.6-degree parabolic extralarge pier measuring and pier body linear control method
CN103425841A (en) Method and system for generating construction-method instruction of straddle type monorail traffic multi-system girder bridge
CN110700083A (en) Installation measurement control method for prefabricated bridge pier stud
CN115387221A (en) High pier line type control method for high altitude area
CN111576232A (en) Linear control construction method for precast beam top plate
CN104594508A (en) Multidimensional space steel structure installation joint positioning construction method
CN107905108B (en) Tubular arch bolted web member hole group's accuracy control method
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN105040992B (en) Reverse inverted-insertion type construction method for structural steel columns
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN105804039B (en) A kind of vertical ship lift balance weight track Fast Installation adjusting apparatus and its application process
CN105673019B (en) A kind of vertical shaft lower horizontal section top concrete slip-form construction method
CN108611982A (en) A kind of Thin-wall Hollow Pier template alignment control localization method
CN110685306B (en) Positioning and measuring method for Y-shaped steel structural column of subway open-cut station
CN111041996A (en) Construction method for installing stay cable and cable pipe by axial method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant