Nothing Special   »   [go: up one dir, main page]

CN108193874A - A kind of stairway steel formwork for building - Google Patents

A kind of stairway steel formwork for building Download PDF

Info

Publication number
CN108193874A
CN108193874A CN201711492729.5A CN201711492729A CN108193874A CN 108193874 A CN108193874 A CN 108193874A CN 201711492729 A CN201711492729 A CN 201711492729A CN 108193874 A CN108193874 A CN 108193874A
Authority
CN
China
Prior art keywords
stair
bottom plate
welded
girder
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711492729.5A
Other languages
Chinese (zh)
Inventor
于海松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711492729.5A priority Critical patent/CN108193874A/en
Publication of CN108193874A publication Critical patent/CN108193874A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/062Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/06Forming boards or similar elements the form surface being of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a kind of stairway steel formworks for building, including two stair girders, stair beam and stair bottom plate, stair beam is provided among described two stair girders, the stair beam is welded on stair girder, perpendicular rib of marking time is provided on the stair girder, the perpendicular rib of marking time is welded on stair girder, and securing plate is provided on the stair girder, and the securing plate is welded on stair girder;Steel form of the present invention, before it is completely solved the drawbacks of wooden template, installing and dismounting and height adjust flexibly and easily, labor and material saving, being effectively improved construction quality reduces construction cost, improves work efficiency, concrete formation is high-quality, Novel beautiful, low cost, not corrosion-vulnerable, using construction period can be shortened when stairway steel formwork for building, high efficiency is brought, and when construction to unit in charge of construction, will not worry that template demoulds.

Description

A kind of stairway steel formwork for building
Technical field
The present invention relates to technical field of buildings, especially a kind of stairway steel formwork for building.
Background technology
At present mostly using wooden template during casting concrete, worker's formwork time is longer, and efficiency is low, constructs Mostly there are larger insecurity in journey, and form for seal is poor and there is the risk for the mould that rises, the concrete component poured It is of poor quality unsightly, wooden template after use has deformed more and recycling rate of waterused is low, and the number of turnover is easily stuck up more than 4 times Song, improper use are used in turn and do not exceed 10 times, need joist, back cord facility material more and easily degumming, rise and rouse, flake, opening It splits, when again assembled, plate stitch is difficult to handle, and thickness deviation is not easy to grasp, and leads to building structure interface dimensions deviation, cut quality Difference will use the small rack saw piece of alloy to cut, after use will brush releasing agent, and need to handle plate face, plank sheathing through water logging of daring not accept, It is exposed to the sun after immersion especially afraid of water, plank sheathing is easily deformed, and is uneven so as to cause concrete face.
At the construction field (site), most rambunctious is that carpenter uses plank sheathing operating process, if not strengthening the materials of plank sheathing Management is assembled in strict accordance with the blanking of plank sheathing construction diagrams, easily causes plank sheathing waste of material, increases engineering cost.
Invention content
The purpose of the invention is to above-mentioned technical disadvantages is overcome to provide a kind of stairway steel formwork for building.
The present invention solve the technical solution that uses of technical problem for:A kind of stairway steel formwork for building, including two stair Girder, stair beam and stair bottom plate are provided with stair beam among described two stair girders, and the stair beam is welded on On stair girder, perpendicular rib of marking time is provided on the stair girder, the perpendicular rib of marking time is welded on stair girder, the stair Securing plate is provided on girder, the securing plate is welded on stair girder, and the stair bottom plate back side is provided with perpendicular rib and horizontal stroke Rib, the perpendicular rib and cross rib are welded on the stair bottom plate back side, and noseplate and rear bottom plate are provided on the stair bottom plate, described Noseplate and rear bottom plate are respectively welded at stair bottom plate both ends, and the stair girder both ends are both provided with foundation bolt, describedly Foot bolt is connected stair bottom plate with stair girder by stair bottom plate preformed hole.
The foundation bolt bottom is provided with bottom plate, and the bottom plate is welded on foundation bolt, is matched on the foundation bolt There is double nut, the double nut is fixed on foundation bolt.
Lifting plate is provided on the stair beam, the lifting plate is welded on stair beam, is set on the lifting plate Hole for hoist is equipped with, the hole for hoist is the circular hole of diameter 40mm.
Step plate is set on the perpendicular rib of marking time, and the step plate, which is welded on, marks time on perpendicular rib.
The stair girder is provided at both ends with preformed hole, and the preformed hole is the circular hole of diameter 28mm.
The step plate is 3mm panels.
Bottom plate preformed hole is respectively equipped on the noseplate and rear bottom plate, the bottom plate preformed hole is diameter 28mm circular holes.
Advantageous effect is possessed by the present invention:
The present invention it is scientific and reasonable for structure, it is safe and convenient to use, stair punching block version for building during casting concrete more
Add securely, reduce the insecurity in work progress, worker's formwork is convenient and simple, when substantially reducing worker's formwork Between, and closure can effectively prevent well the mould that rises, template high recycling rate, environment-friendly high-efficiency may advantageously facilitate the green of unit in charge of construction Construction.
Stairway steel formwork for building fundamentally saves timber resources and a large amount of human resources, reduces raw material Waste, before it is completely solved the drawbacks of wooden template, installing and dismounting and height adjust flexible and convenient, labor and material saving, effectively Improving construction quality reduces construction cost, improves work efficiency, concrete formation is high-quality, Novel beautiful, low cost, no Using that can shorten construction period when stairway steel formwork for building, high efficiency, Er Qie are brought to unit in charge of construction for corrosion-vulnerable When construction, it will not worry that template demoulds.
Description of the drawings
Accompanying drawing 1 is the structural representation of the present invention.
Stair schematic diagram of the attached drawing 2 for the present invention.
Stair left view schematic diagram of the attached drawing 3 for the present invention.
Stair floor diagram of the attached drawing 4 for the present invention.
Stair chassis schematic diagram of the attached drawing 5 for the present invention.
Step plate schematic diagram of the attached drawing 6 for the present invention.
Foundation bolt schematic diagram of the attached drawing 7 for the present invention.
Lifting plate schematic diagram of the attached drawing 8 for the present invention.
Specific embodiment
1-8 is described below the present invention below in conjunction with the accompanying drawings.
As shown in figures 1-8, the present invention includes two stair girders 1, stair beam 2 and stair bottom plate 3, described two stair Stair beam 2 is provided among girder 1, the stair beam 2 is welded on stair girder 1, is provided on the stair girder 1 Mark time perpendicular rib 4, the perpendicular rib 4 of marking time is welded on stair girder 1, is provided with securing plate 6 on the stair girder 1, it is described plus Solid plate 6 is welded on stair girder 1, and 3 back side of stair bottom plate is provided with perpendicular rib 16 and cross rib 15, the perpendicular rib 16 and cross rib 15 are welded on 3 back side of stair bottom plate, and noseplate 12 and rear bottom plate 13, the noseplate 12 are provided on the stair bottom plate 3 3 both ends of stair bottom plate are respectively welded at rear bottom plate 13,1 both ends of stair girder are both provided with foundation bolt 7, the lower margin Bolt 7 is connected stair bottom plate 3 and stair girder 1 by bottom plate preformed hole 14.
7 bottom of foundation bolt is provided with bottom plate 11, and the bottom plate 11 is welded on foundation bolt 7, the lower margin spiral shell It is fixed on foundation bolt 7 equipped with double nut 8, the double nut 8 on bolt 7.
Lifting plate 9 is provided on the stair beam 2, the lifting plate 9 is welded on stair beam 2, the lifting plate 9 On be provided with hole for hoist 10, the hole for hoist 10 is the circular hole of diameter 40mm.
Step plate 5 is set on the perpendicular rib 4 of marking time, and the step plate 5, which is welded on, marks time on perpendicular rib 4.
Described two 1 both ends of stair girder are both provided with preformed hole 17, and the preformed hole 17 is the circular hole of diameter 28mm.
The step plate is 3mm panels.
Bottom plate preformed hole 14 is respectively equipped on the noseplate 12 and rear bottom plate 13, the bottom plate preformed hole 14 is diameter 28mm circular holes.
A kind of application method of stairway steel formwork for building, including step used below:
(1)Before stairway steel formwork for building, site construction personnel need first to understand stairway steel formwork each section for building Accessory and application method;
(2)Site construction personnel need first to clean out in building site using position, keep Land leveling as possible, avoid idler In entering and post specific warning indication board;
(3)In use, site construction personnel need that stairway steel formwork for building first is lifted into building site using position, stair are verified Whether data, inspection data are accurate;
(4)After to be checked, site construction personnel need that stair bottom plate 3 is lifted into prefabricated bottom end and is placed to finish, so Stairway steel formwork for building is lifted into prefabricated top again afterwards, foundation bolt 7 is passed through into bottom plate preformed hole 14 and preformed hole 17 It fixes and tightens double nut 8;
(5)After installing, whether verification check data are correct again for site construction personnel needs, can be poured after data are correct Concrete;
(6)Concreting finishes and after concrete setting, and site construction personnel can remove stairway steel formwork for building, tear open It is placed in maintaining at dry except stairway steel formwork for building can be smeared maintenance oil by rear site construction personnel;
(7)After maintenance, site construction personnel can recycle according to building site service condition.

Claims (7)

1. a kind of stairway steel formwork for building, it is characterised in that:Including two stair girders, stair beam and stair bottom plate, institute It states and stair beam is provided among two stair girders, the stair beam is welded on stair girder, on the stair girder Perpendicular rib of marking time is provided with, the perpendicular rib of marking time is welded on stair girder, and securing plate is provided on the stair girder, described to add Solid plate is welded on stair girder, and the stair bottom plate back side is provided with perpendicular rib and cross rib, and the perpendicular rib and cross rib are welded on building On the terraced bottom plate back side, noseplate and rear bottom plate are provided on the stair bottom plate, the noseplate and rear bottom plate are respectively welded at Stair bottom plate both ends, the stair girder both ends are both provided with foundation bolt, and the foundation bolt is by bottom plate preformed hole by building Terraced bottom plate is connected with stair girder.
2. a kind of stairway steel formwork for building according to claim 1, it is characterised in that:The foundation bolt bottom setting There is bottom plate, the bottom plate is welded on foundation bolt, and lower margin is fixed on equipped with double nut, the double nut on the foundation bolt On bolt.
3. a kind of stairway steel formwork for building according to claim 1, it is characterised in that:It is provided on the stair beam Plate is lifted, the lifting plate is welded on stair beam, and hole for hoist is provided on the lifting plate, and the hole for hoist is diameter The circular hole of 40mm.
4. a kind of stairway steel formwork for building according to claim 1, it is characterised in that:It sets and steps on the perpendicular rib of marking time Plate is walked, the step plate, which is welded on, marks time on perpendicular rib.
5. a kind of stairway steel formwork for building according to claim 1, it is characterised in that:The stair girder both ends setting There is preformed hole, the preformed hole is the circular hole of diameter 28mm.
6. a kind of stairway steel formwork for building according to claim 1, it is characterised in that:On the noseplate and rear bottom plate Bottom plate preformed hole is respectively equipped with, the bottom plate preformed hole is diameter 28mm circular holes.
7. a kind of stairway steel formwork for building according to claim 4, it is characterised in that:The step plate is 3mm panels.
CN201711492729.5A 2017-12-31 2017-12-31 A kind of stairway steel formwork for building Pending CN108193874A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711492729.5A CN108193874A (en) 2017-12-31 2017-12-31 A kind of stairway steel formwork for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711492729.5A CN108193874A (en) 2017-12-31 2017-12-31 A kind of stairway steel formwork for building

Publications (1)

Publication Number Publication Date
CN108193874A true CN108193874A (en) 2018-06-22

Family

ID=62587289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711492729.5A Pending CN108193874A (en) 2017-12-31 2017-12-31 A kind of stairway steel formwork for building

Country Status (1)

Country Link
CN (1) CN108193874A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962962A (en) * 2021-03-15 2021-06-15 山西三建集团有限公司 Building method of modularly assembled cast-in-place concrete stair template system
CN117646552A (en) * 2023-12-18 2024-03-05 中建二局第三建筑工程有限公司 Shaped stair tread steel template and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203361641U (en) * 2013-07-11 2013-12-25 中建七局(上海)有限公司 Combined type steel formwork of cast-in-place staircase
CN203361642U (en) * 2013-07-24 2013-12-25 中国建筑一局(集团)有限公司 Cast-in-place stair steel formwork of assembled structure
CN203742165U (en) * 2014-03-18 2014-07-30 南通华新建工集团有限公司 Fabricated structure cast-in-place staircase shaping formwork
CN204059960U (en) * 2014-07-30 2014-12-31 西安市建筑工程总公司 A kind of cast-in-situ stair shaping steel die plate
CN104878924A (en) * 2015-05-29 2015-09-02 成都市第二建筑工程公司 Stair step concrete pouring-molded template and stair cast-in-situ construction method
CN205894680U (en) * 2016-08-03 2017-01-18 上海宝冶集团有限公司 Closed staircase aluminum alloy template

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203361641U (en) * 2013-07-11 2013-12-25 中建七局(上海)有限公司 Combined type steel formwork of cast-in-place staircase
CN203361642U (en) * 2013-07-24 2013-12-25 中国建筑一局(集团)有限公司 Cast-in-place stair steel formwork of assembled structure
CN203742165U (en) * 2014-03-18 2014-07-30 南通华新建工集团有限公司 Fabricated structure cast-in-place staircase shaping formwork
CN204059960U (en) * 2014-07-30 2014-12-31 西安市建筑工程总公司 A kind of cast-in-situ stair shaping steel die plate
CN104878924A (en) * 2015-05-29 2015-09-02 成都市第二建筑工程公司 Stair step concrete pouring-molded template and stair cast-in-situ construction method
CN205894680U (en) * 2016-08-03 2017-01-18 上海宝冶集团有限公司 Closed staircase aluminum alloy template

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962962A (en) * 2021-03-15 2021-06-15 山西三建集团有限公司 Building method of modularly assembled cast-in-place concrete stair template system
CN117646552A (en) * 2023-12-18 2024-03-05 中建二局第三建筑工程有限公司 Shaped stair tread steel template and construction method

Similar Documents

Publication Publication Date Title
CN106320691B (en) Aluminum wood template construction method
CN202090591U (en) Lift type climbing formwork of building operations
CN206174146U (en) Assembly type structure's assembly node
CN106639319A (en) Rotten root prevention construction method for shear walls, columns and other concrete vertical structures
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN107905522A (en) A kind of exterior wall assembly plank sheathing monolithic construction method
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN102704684A (en) Construction method for high-strength shaping combined template of plank frame of shear wall
CN113482312A (en) Guide type double-layer structure elevator shaft operating platform and construction method based on platform
CN108193874A (en) A kind of stairway steel formwork for building
CN210396134U (en) Reinforcing tool for controlling horizontal joint quality of shear wall
CN205976167U (en) Based on cast -in -place floor structures of detachable positioning control spare
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN110080299A (en) A kind of shallow embedding mountain tunnel open-cut engineering method
CN213927071U (en) Simple and easy angle steel lintel strutting arrangement
CN109457960B (en) Adjustable universal mold for integrally assembling cast-in-situ stair steps
CN108222503A (en) A kind of combined large pier stud steel form
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN104295082A (en) Method for recycling anchor ring of steel beam of overhanging frame and anchor ring component used by method
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN104131635B (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN215926679U (en) Turnover steel anchoring part can be dismantled to girder steel anchor end of encorbelmenting of scaffold frame
CN106193578B (en) It is a kind of that modular system and construction technology are matched somebody with somebody based on groove type quarter bend
CN107747287A (en) A kind of combined road guardrail steel form
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180622

RJ01 Rejection of invention patent application after publication