CN108149538A - A kind of concrete layer structure with permeable hole and its pour mold and casting method - Google Patents

A kind of concrete layer structure with permeable hole and its pour mold and casting method Download PDF

Info

Publication number
CN108149538A
CN108149538A CN201810052674.4A CN201810052674A CN108149538A CN 108149538 A CN108149538 A CN 108149538A CN 201810052674 A CN201810052674 A CN 201810052674A CN 108149538 A CN108149538 A CN 108149538A
Authority
CN
China
Prior art keywords
concrete
layer structure
concrete layer
aqueduct
permeable hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810052674.4A
Other languages
Chinese (zh)
Inventor
李冠杰
张立霞
王可
姚臻
李旭光
窦泽红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Urban Expressway Management And Maintenance Co Ltd
Original Assignee
Changchun Urban Expressway Management And Maintenance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Urban Expressway Management And Maintenance Co Ltd filed Critical Changchun Urban Expressway Management And Maintenance Co Ltd
Priority to CN201810052674.4A priority Critical patent/CN108149538A/en
Publication of CN108149538A publication Critical patent/CN108149538A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of concrete layer structure with permeable hole and its mold and casting method are poured, the concrete layer structure upper surface is provided with guiding gutter, and inside is provided with permeable hole, is set in permeable hole by aqueduct;The mold that pours is made of crossbeam, longeron, vertical beam and aqueduct, network that its middle cross beam and longeron are welded into simultaneously is provided with guiding gutter with concrete layer structure upper surface and matches, vertical beam is welded below the intersection point of crossbeam and longeron, and aqueduct is nested on vertical beam;The casting method pours mold described in using, be cased with aqueduct pour on mold frame casting concrete and to carry out upper surface smooth, treat that concrete gradually solidifies after smooth, the mold that pours that crossbeam, longeron and vertical beam are formed is gone out from concrete upper surface, by aqueduct indwelling in concrete.The bearing capacity and water permeable ability of concrete layer structure of the present invention greatly improve, and pour the simply repeatable utilization of mold, casting method short time limit easy to operate.

Description

A kind of concrete layer structure with permeable hole and its pour mold and casting method
Technical field
The invention belongs to sponge urban road pavement technique fields, and in particular to a kind of concrete layer knot with permeable hole Structure and its pour mold and casting method.
Background technology
In sponge urban road construction, existing road has road by mat formation pervious concrete or water-permeable brick etc. Penetrating power.Existing pervious concrete is mutually to be bonded by coarse aggregate surface cladding a thin layer cement mortar and to form hole uniform The honeycomb structure of distribution, therefore there is ventilative, permeable and light-weight, but the bearing capacity one of this pervious concrete As it is not high, and easily block, be not easily cleaned, durability is poor, especially in northern area, since winter temperature is relatively low, easily Cause thaw collapse and frost heaving failure.
For this problem, related technical personnel have developed a kind of concrete layer structure with permeable hole, i.e., original Concrete layer structure casting process in, poured by using mold, make equably to be placed in concrete layer structure Water hole enables the rainwater of concrete layer superstructure siltation or sewage to pass through permeable hole infiltration downwards so as to improve the infiltration on road surface Power achievees the purpose that recharge of groundwater.But the water guide that traditional concreting mold with permeable hole is plastic material Pipe connects and the water guide tube frame of composition, in casting process, by the way that water guide tube frame is fixed on the position of concrete layer, so After-pouring concrete makes water guide tube frame in the concrete layer, and water guide tube frame is the permeable hole of concrete and permeable logical Road makes the ponding on concrete layer be oozed under aqueduct, and this method will improve concrete layer structure to a certain extent Water permeable ability, and bearing capacity is improved, and can preferably adapt to extreme weather;But this concreting mold and There are still defects for casting method:
1st, existing water guide tube frame is retained in concrete layer structure after the completion of concreting, is become with saturating The component part of the concrete layer structure in water hole so that existing water guide tube frame can not repeat to use;
2nd, existing water guide tube frame due to being that more aqueducts are formed by connecting, the frame structure formed each other Non-deformability is poor;
3rd, in order to improve the non-deformability of water guide tube frame, the often connection reinforcement between adjacent or similar aqueduct Rib so that entire frame structure becomes complicated, can not reuse in addition, cause existing aqueduct framework cost higher, no Conducive to popularization and application.
Invention content
The defects of in the presence of for the above-mentioned prior art, the present invention provides a kind of concrete layer knots with permeable hole Structure and its mold and casting method are poured, the concrete layer structure is described with higher water permeable ability and bearing capacity It pours mould structure simply and may be reused, the casting method is easy to operate, and cost is relatively low and the duration is shorter.With reference to saying Bright book attached drawing, technical scheme is as follows:
A kind of concrete layer structure with permeable hole, the concrete layer main structure body is made of concrete 1, in coagulation The upper surface of soil layer construction, transversely with longitudinal direction several linear guiding gutters 2 are distributed with respectively, transversely with genesis analysis The intersecting position of guiding gutter 2 is provided with permeable hole 3, and the permeable hole 3 is vertically through concrete layer structure, in the permeable hole 3 It is interior to be equipped with aqueduct 4.
The guiding gutter 2 transversely equidistantly distributes respectively with longitudinal direction.
The aqueduct 4 is PP pipes, PE is managed or pvc pipe.
A kind of concrete layer structure with permeable hole pours mold, and the mold that pours is by crossbeam 5, longeron 6, vertical beam 7 and aqueduct 4 form, the crossbeam 5, longeron 6 and vertical beam 7 are welded together to form and pour mold frame;The crossbeam 5 and vertical Beam 6 and the guiding gutter 2 of the concrete layer structure upper surface match, and the vertical beam 7 is located at crossbeam 5 and intersects vertically with longeron 6 Position below, the aqueduct 4 is nested on vertical beam 7;
The length of the length aqueduct 4 of the vertical beam 7 and the thickness of concrete layer structure poured in advance are identical.
A kind of casting method of the concrete layer structure with permeable hole, the casting method are used such as claim 4 institute That states pours mold, and detailed process is as follows:
Step 1:After the crossbeam 5 for pouring mold, longeron 6 and vertical beam 7 are welded, formation pours mold frame, is pouring mould Aqueduct 4 is nested on the vertical beam 7 for having frame;
Step 2:It will be cased with the position for pouring mold frame and being laid on concrete layer structure to be poured of aqueduct 4;
Step 3:Casting concrete on mold frame is poured to what is laid;
Step 4:The concrete poured on mold frame progress is smooth, the vertical beam for pouring mold frame is completely disposed at In concrete, the upper surface of crossbeam 5 and longeron 6 exposes to the upper surface of concrete, and the lower surface of crossbeam 5 and longeron 6 is embedding sleeping On the upper surface of concrete;
Step 5:Concrete after will be smooth is stood, and treats that concrete gradually solidifies, and removes 7 institute of crossbeam 5, longeron 6 and vertical beam Composition pours mold frame, and 4 indwelling of aqueduct ultimately forms the concrete layer knot with permeable hole in concrete Structure.Compared with prior art, the beneficial effects of the present invention are:
1st, the concrete layer structure of the present invention with permeable hole carries energy compared with existing concrete pavement structure Power higher is suitable for Route for pedestrians, park pavement, parking lot and other other places more demanding to bearing capacity, and permeable Ability and water holding capacity are stronger, also have higher freezing tolerance,;
2nd, the concrete layer structure of the present invention with permeable hole pour abrasive article structures it is simpler and stablize, mold It is reusable, save cost;
3rd, the casting method of the concrete layer structure of the present invention with permeable hole is simple and convenient, and pours the work of implementation Phase is shorter.
Description of the drawings
Fig. 1 is the schematic diagram of the concrete layer structure of the present invention with permeable hole;
Fig. 2 is the partial enlarged view at A in Fig. 1;
Fig. 3 is the partial enlarged view at B in Fig. 1;
Fig. 4 is the structure diagram for pouring mold of the concrete layer structure of the present invention with permeable hole.
In figure:
1- concrete;2- guiding gutters;3- permeable hole 4- aqueducts.
5- crossbeams;6- longerons;7- vertical beams;
Specific embodiment
For the technical solution that the present invention is further explained and its caused advantageous effect, specific embodiment of the invention It is as follows:
As shown in Figure 1, Figure 2 and Figure 3, the invention discloses a kind of concrete layer structure with permeable hole, the coagulations Soil layer construction main body is made of concrete 1;In the upper surface of concrete layer structure, transversely equally spacedly it is distributed respectively with longitudinal direction There are several linear guiding gutters 2, guiding gutter 2 transversely is mutually perpendicular to, and guiding gutter transversely with guiding gutter 2 along longitudinal direction 2 quantity is identical with the quantity of guiding gutter 2 along longitudinal direction;In the concrete layer structure, guiding gutter 2 transversely with along vertical To the position that intersects vertically of guiding gutter 2 be provided with permeable hole 3, the permeable hole 3 is vertically through entire concrete layer structure; It is equipped with aqueduct 4 with being penetrated through in the permeable hole 3,4 both ends of aqueduct are concordant with lower edge on permeable hole 3, aqueduct 4 Outer diameter is identical with the internal diameter size of permeable hole 3;The aqueduct 4 is PP pipes, PE pipes, pvc pipe or other plastic material pipes Part.
As shown in figure 4, mold is poured the invention also discloses the foregoing concrete layer structure with permeable hole, The mold that pours is made of crossbeam 5, longeron 6, vertical beam 7 and aqueduct 4, and the crossbeam 5, longeron 6 and vertical beam 7 weld together Formation pours mold frame.The crossbeam 5, longeron 6 and vertical beam 7 use a diameter of 1 centimetre of plain bar, the crossbeam 5 With 6 perpendicular setting of longeron, and the crossbeam 5 is identical with the quantity of longeron 6;The quantity of the crossbeam 5 and concrete layer structure The quantity of the guiding gutter 2 of upper surface transversely is identical, the quantity of the longeron 6 the leading along longitudinal direction with concrete layer structure upper surface The quantity of sink 2 is identical, and the shape and the external surface shape of crossbeam 5 and longeron 6 of the guiding gutter 2 match.The vertical beam 7 Below the position to intersect vertically in crossbeam 5 and longeron 6, the quantity of the vertical beam 7 and 3 phase of permeable hole in concrete layer structure Together, the aqueduct 4 is nested on vertical beam 7, and the length of the vertical beam 7 is 10 centimetres -20 centimetres, and the length of the vertical beam 7 is led The length of water pipe 4 and the thickness of concrete layer structure poured in advance are identical, the outer diameter of vertical beam 7 and the internal diameter of aqueduct 4 Size is identical.
The invention also discloses the casting method of the foregoing concrete layer structure with permeable hole, the sides of pouring Method is completed using mold is poured as previously described, and detailed process is as follows:
Step 1:After the crossbeam 5 for pouring mold, longeron 6 and vertical beam 7 are welded, formation pours mold frame, is pouring mould Aqueduct 4 is nested on the vertical beam 7 for having frame;
Step 2:It will be cased with the position for pouring mold frame and being laid on concrete layer structure to be poured of aqueduct 4;
Step 3:Casting concrete on mold frame is poured to what is laid;
Step 4:The concrete poured on mold frame progress is smooth, the vertical beam for pouring mold frame is completely disposed at In concrete, the upper surface of crossbeam 5 and longeron 6 exposes to the upper surface of concrete, and the lower surface of crossbeam 5 and longeron 6 is embedding sleeping On the upper surface of concrete;
Step 5:After concrete after will be smooth stands 2 hours~5 hours, concrete gradually solidifies, and removes crossbeam 5, indulges What beam 6 and vertical beam 7 were formed pours mold frame, and 4 indwelling of aqueduct so far completes described carry in concrete The casting process of the concrete layer structure of permeable hole, entire duration more previous casting process greatly shorten.
In above-mentioned casting process, in step 4, the part for crossbeam 5 and longeron 6 for pouring mold frame is embedded at coagulation Within soil, a part is exposed to except concrete so that is solidified and is removed the concrete upper surface after pouring mold frame and is formed Transverse and longitudinal alternating and uniform guiding gutter 2;The vertical beam 7 for pouring mold frame is placed in concrete together with aqueduct 4 is covered, shape Into the permeable hole 3 of perforation concrete layer structure;In step 5, on the one hand 4 indwelling of aqueduct is conducive to rainwater in concrete Or sewage permeates downwards along the permeable hole of concrete layer structure, a small amount of rainwater is on the other hand made to store formation in aqueduct slow Punching, another further aspect is also beneficial to pour mold frame to be taken out from concrete.
Pour mold using of the present invention, by casting method of the present invention, pour to be formed with saturating The concrete layer structure in water hole, in actual use, the rainwater or sewage of concrete layer structure can pass through permeable hole 3 Be seeped into underground under the aqueduct 4 that is embedded in concrete, for recharge of groundwater;The rainwater that could not and ooze at present can also be temporary It is stored in aqueduct 4, after band temperature raising, the water kept in aqueduct 4 will be evaporated in air, be imitated for reducing heat island It should.

Claims (5)

1. a kind of concrete layer structure with permeable hole, it is characterised in that:
The concrete layer main structure body is made of concrete (1), in the upper surface of concrete layer structure, is transversely divided with longitudinal direction Several linear guiding gutters (2) are not distributed with, are provided in the position transversely intersected with the guiding gutter of genesis analysis (2) permeable Hole (3), the permeable hole (3) through concrete layer structure, are equipped with aqueduct (4) in the permeable hole (3) vertically.
2. a kind of concrete layer structure with permeable hole as described in claim 1, it is characterised in that:
The guiding gutter (2) transversely equidistantly distributes respectively with longitudinal direction.
3. a kind of concrete layer structure with permeable hole as described in claim 1, it is characterised in that:
The aqueduct (4) is PP pipes, PE is managed or pvc pipe.
4. a kind of concrete layer structure with permeable hole as described in claim 1 pours mold, it is characterised in that:
The mold that pours is made of crossbeam (5), longeron (6), vertical beam (7) and aqueduct (4), the crossbeam (5), longeron (6) It is welded together to form with vertical beam (7) and pours mold frame;On the crossbeam (5) and longeron (6) and the concrete layer structure The guiding gutter (2) on surface matches, and the vertical beam (7) is described below the position that crossbeam (5) and longeron (6) intersect vertically Aqueduct (4) is nested on vertical beam (7);
The length of the length aqueduct (4) of the vertical beam (7) and the thickness of concrete layer structure poured in advance are identical.
5. a kind of casting method of the concrete layer structure with permeable hole as described in claim 1, it is characterised in that:
For the casting method using mold is poured as claimed in claim 4, detailed process is as follows:
Step 1:After crossbeam (5), longeron (6) and vertical beam (7) welding for pouring mold, formation pours mold frame, is pouring Aqueduct (4) is nested on the vertical beam (7) of mold frame;
Step 2:It will be cased with the position for pouring mold frame and being laid on concrete layer structure to be poured of aqueduct (4);
Step 3:Casting concrete on mold frame is poured to what is laid;
Step 4:The concrete poured on mold frame progress is smooth, the vertical beam for pouring mold frame is completely disposed at coagulation In soil, the upper surface of crossbeam (5) and longeron (6) exposes to the upper surface of concrete, and the lower surface of crossbeam (5) and longeron (6) It is embedding to crouch on the upper surface of concrete;
Step 5:Concrete after will be smooth is stood, and treats that concrete gradually solidifies, and removes crossbeam (5), longeron (6) and vertical beam (7) What is formed pours mold frame, and aqueduct (4) indwelling ultimately forms the concrete layer with permeable hole in concrete Structure.
CN201810052674.4A 2018-01-19 2018-01-19 A kind of concrete layer structure with permeable hole and its pour mold and casting method Pending CN108149538A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810052674.4A CN108149538A (en) 2018-01-19 2018-01-19 A kind of concrete layer structure with permeable hole and its pour mold and casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810052674.4A CN108149538A (en) 2018-01-19 2018-01-19 A kind of concrete layer structure with permeable hole and its pour mold and casting method

Publications (1)

Publication Number Publication Date
CN108149538A true CN108149538A (en) 2018-06-12

Family

ID=62461567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810052674.4A Pending CN108149538A (en) 2018-01-19 2018-01-19 A kind of concrete layer structure with permeable hole and its pour mold and casting method

Country Status (1)

Country Link
CN (1) CN108149538A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440563A (en) * 2019-01-03 2019-03-08 湖南大学 Through-hole water-permeable brick and preparation method thereof based on building waste crushed material
CN109940741A (en) * 2019-04-16 2019-06-28 浙江中浩项目管理有限公司 A kind of concrete grass planting parking stall construction method and its construction mould
US11939729B2 (en) 2018-11-13 2024-03-26 Imperial College Innovations Limited High strength porous cement-based materials

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW466289B (en) * 1999-06-17 2001-12-01 Ruei-Wen Chen Construction method of an environmental permeable concrete pavement
CN2463439Y (en) * 2001-02-27 2001-12-05 陈瑞文 Aqueduct for environmental protection porous concrete pavement
CN104652214A (en) * 2015-01-19 2015-05-27 薛志东 Paving method of water-permeable pavement
CN204608550U (en) * 2015-01-19 2015-09-02 万理晴国际控股股份有限公司 A kind of permeable pipe support unit
CN105484122A (en) * 2015-12-18 2016-04-13 路金铭 Ecological permeable pavement and construction method thereof
CN207919272U (en) * 2018-01-19 2018-09-28 长春市城建维护股份有限公司 A kind of concrete layer structure with permeable hole and its pour mold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW466289B (en) * 1999-06-17 2001-12-01 Ruei-Wen Chen Construction method of an environmental permeable concrete pavement
CN2463439Y (en) * 2001-02-27 2001-12-05 陈瑞文 Aqueduct for environmental protection porous concrete pavement
CN104652214A (en) * 2015-01-19 2015-05-27 薛志东 Paving method of water-permeable pavement
CN204608550U (en) * 2015-01-19 2015-09-02 万理晴国际控股股份有限公司 A kind of permeable pipe support unit
CN105484122A (en) * 2015-12-18 2016-04-13 路金铭 Ecological permeable pavement and construction method thereof
CN207919272U (en) * 2018-01-19 2018-09-28 长春市城建维护股份有限公司 A kind of concrete layer structure with permeable hole and its pour mold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11939729B2 (en) 2018-11-13 2024-03-26 Imperial College Innovations Limited High strength porous cement-based materials
CN109440563A (en) * 2019-01-03 2019-03-08 湖南大学 Through-hole water-permeable brick and preparation method thereof based on building waste crushed material
CN109440563B (en) * 2019-01-03 2024-01-30 湖南大学 Through-hole water permeable brick based on construction waste crushed material and manufacturing method thereof
CN109940741A (en) * 2019-04-16 2019-06-28 浙江中浩项目管理有限公司 A kind of concrete grass planting parking stall construction method and its construction mould

Similar Documents

Publication Publication Date Title
CN207919282U (en) A kind of permeable pavement structure
CN107905254A (en) Construction method of comprehensive pipe gallery formwork supporting integrated hydraulic internal formwork trolley
CN108149538A (en) A kind of concrete layer structure with permeable hole and its pour mold and casting method
CN102392549A (en) Construction working method for seamless prestressed-concrete self-waterproof clean water reservoir
CN110438914A (en) Water tank culvert and its construction method are crossed on soft soil foundation
CN202627166U (en) Novel water-discharging ecological zone for town road
CN207919272U (en) A kind of concrete layer structure with permeable hole and its pour mold
CN103343503B (en) Bridge-type prefabricated reinforced concrete trough slab wear resistant road surface structural system and construction method
CN114703770A (en) Box culvert construction process
CN107542065B (en) Construction method for overturning and lifting small steel die of high-steep-clearance groove
CN209443368U (en) The overhead anti-ponding structure in bridge floor edge
CN109680572B (en) Construction method of integrated comprehensive pipeline of concrete side mould of road bed
CN111021406A (en) High-gravity concrete retaining wall structure and construction method thereof
CN110067169B (en) Construction method of water-permeable prefabricated assembled concrete road
CN210104468U (en) Water-permeable prefabricated assembled concrete road
CN203768753U (en) Bridge type steel plate pavement system
CN104088352A (en) Ground rainwater comprehensive utilization structure
CN209723194U (en) Drainage system of freeway
CN206090636U (en) Structure is handled to leading stagnant water in basement bottom plate post -cast strip
CN105040677A (en) Connecting method of foundation pit precast pile and cast-in-situ superposed lining wall through stirrups
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
CN206233347U (en) A kind of prefabricated assembled tunnel drainage gutter
CN110644316B (en) Sponge-type prefabricated pavement and construction method thereof
CN111236170A (en) Quick construction method for buried rock concrete gravity dam
CN211713564U (en) Sponge permeable pavement with rainwater collection and guiding functions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180612

RJ01 Rejection of invention patent application after publication