CN108022296A - A kind of BIM interior decorations current floor and region design system and method - Google Patents
A kind of BIM interior decorations current floor and region design system and method Download PDFInfo
- Publication number
- CN108022296A CN108022296A CN201711194930.5A CN201711194930A CN108022296A CN 108022296 A CN108022296 A CN 108022296A CN 201711194930 A CN201711194930 A CN 201711194930A CN 108022296 A CN108022296 A CN 108022296A
- Authority
- CN
- China
- Prior art keywords
- floor
- region
- parameter
- metope
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/10—Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Evolutionary Computation (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Software Systems (AREA)
- Computer Graphics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the invention discloses a kind of BIM interior decorations current floor and region design system and method, wherein system includes:The BIM interior decorations current floor and region design parameter for user setting are prestored in the database;The parameter of floor is set by storey setting module;District management module divides the region of each floor according to the parameter of floor, and region is defined;Threedimensional model is generated according to the definition in the parameter of floor and region in the first effect generation module;And the selected current floor of user and region are determined by Pavement design module, and operational order input by user is gathered, current floor and the ground in region and the parameter of metope are set;The threedimensional model of corresponding ground and metope is generated according to the parameter of ground and metope in the second effect generation module;And the figure layer of each floor, the ground in each region and metope can be visualized in view management module.Greatly facilitate designer and divide floor modification design.
Description
Technical field
The present invention relates to design tool software technology field, more particularly to a kind of BIM interior decorations current floor and region
Design system and method
Background technology
As digitlization and the continuous of IT application process promote, in existing detail design, designer usually can apply
The tool software of existing architectural design field is designed, and accordingly generate finally in the form of electronic data present set
Count result.
In numerous Three-dimensional Design Software instruments, BIM, that is, Building Information Model (Building Information
Model), it is the design software of the three-dimensional digital model model of structure in project based on every relevant information data.
Sketchup is a set of design tool that region be directly facing designing scheme production process.The production process of the design tool can be abundant
The thought of design of expression teacher and fully meet the needs exchanged immediately with client so that designer can directly on computers into
Row is very intuitively conceived, and is the excellent tool of three-dimensional building designing scheme creation.
, can not be by defining the numeral of current floor and region at present in the engineering design software of above-mentioned interior decoration
Model efficiently defines the affiliated floor of institute's drawing area and service function of the rooms, so that material cannot be designed to whole construction and decoration
Material carries out the management of apparent classification.Floor modification is divided to design and be not easy to be easy to work order so as to be not easy to designer significantly
Position divides floor to be constructed and Material Takeoff.
For this reason, therefore there is an urgent need to the prior art is improved.
The content of the invention
For above-mentioned technical problem, an embodiment of the present invention provides a kind of BIM interior decorations current floor and region to design
System and method, the figure layer of current floor and region can be automatically linked in view management module and to divide floor, point room
Show, the very apparent visualized management for completing the design to entire building, greatly facilitates designer and divide floor to repair
Changing design and facilitating unit in charge of construction divides floor to be constructed and Material Takeoff.
The first aspect of the embodiment of the present invention provides a kind of BIM interior decorations current floor and region design system, described
System includes:
Database, for storing BIM interior decorations current floor and region design parameter for user setting;
Storey setting module, for setting the parameter of floor;
District management module, for dividing the region of each floor according to the parameter of the floor, and to the region into
Row definition;
First effect generation module, the definition for the parameter according to the floor and region generate threedimensional model;
Pavement design module, for determining the selected current floor of the user and region, and it is defeated to gather the user
The operational order entered, sets the ground of the current floor and region and the parameter of metope;
Second effect generation module, for generating the corresponding ground and metope according to the parameter on the ground and metope
Threedimensional model;
View management module, for visualizing the figure layer of each floor, the ground in each region and metope.
Alternatively, the storey setting module is specifically used for setting the parameter of the floor to include building numbering, aerial layer
Number, the underground number of plies, standard floor height, starting point absolute altitude, absolute altitude.
Alternatively, the district management module is specifically used for adding, delete, edit and defining each floor and region.
Alternatively, the parameter of the ground and metope includes title, surface layer, basic unit;
Wherein, the surface layer include type, Material Name, thickness, numbering, design typesetting, surface treatment, finished surface,
Generating mode;
The basic unit includes tolerance, original structure basic unit, finishing, interfacial agents, linked network, waterproof, moisture-proof, levelling, stickup.
Alternatively, the figure layer shown in the view management module further includes basic unit's figure of each ground and metope
Layer and surface layer figure layer.
Alternatively, the view management module and the storey setting module, the district management module and the paving
Installing meter module corresponds to link;
The view management module is specifically additionally operable to the parameter according to the floor, the defining of the region, the user
The operational order of input generates corresponding figure layer.
Alternatively, the threedimensional model that first effect generation module is specifically additionally operable to be generated is arranged in order displaying.
The second aspect of the embodiment of the present invention provides a kind of BIM interior decorations current floor and region design method, institute
The method of stating includes:
Prestore the BIM interior decorations current floor and region design parameter for user setting;
The parameter of floor is set;
The region of each floor is divided according to the parameter of the floor, and the region is defined;
Threedimensional model is generated according to the definition in the parameter of the floor and region;
Determine the selected current floor of the user and region, and gather the operational order input by user, set
The parameter on the ground and metope in the current floor and region;
The threedimensional model of the corresponding ground and metope is generated according to the parameter of the ground and metope;
Visualize the figure layer of each floor, the ground in each region and metope.
The third aspect of the embodiment of the present invention provides a kind of electronic equipment, including at least one processor;
And the memory being connected with least one processor communication;
Wherein, the memory storage has the instruction repertorie that can be performed by least one processor, described instruction journey
Sequence is performed by least one processor, so that at least one processor is able to carry out the of the as above embodiment of the present invention
Method described in two aspects.
The fourth aspect of the embodiment of the present invention provides one kind in BIM interior decorations current floor and region design system
The computer program product used, it is characterised in that the computer program product includes the first of the as above embodiment of the present invention
Function module described in aspect.
In technical solution provided in an embodiment of the present invention, by prestoring the BIM for user setting in the database
Interior decoration current floor and region design parameter;The parameter of floor is set by storey setting module;District management module according to
The parameter of the floor divides the region of each floor, and the region is defined;The root in the first effect generation module
Threedimensional model is generated according to the parameter of the floor and the definition in region;And determine that the user is selected by Pavement design module
Current floor and region, and the operational order input by user is gathered, ground and the wall of the current floor and region are set
The parameter in face;The corresponding ground and metope are generated according to the parameter of the ground and metope in the second effect generation module
Threedimensional model;And the figure of each floor, the ground in each region and metope can be visualized in view management module
Layer.Therefore relative to the prior art, the figure layer of current floor and region by being automatically linked to view pipe by the embodiment of the present invention
Floor, point room is divided to show in reason module, the very apparent visualized management for completing the design to entire building, greatly
It is big facilitate designer and divide floor modification design and facilitate unit in charge of construction divide floor to be constructed and Material Takeoff.
Brief description of the drawings
Fig. 1 is BIM interior decorations current floor and region design system one embodiment schematic diagram in the embodiment of the present invention;
Fig. 2 is storey setting one embodiment schematic diagram in the embodiment of the present invention;
Fig. 3 is district management one embodiment schematic diagram in the embodiment of the present invention;
Fig. 4 is threedimensional model one embodiment schematic diagram that floor is generated in the embodiment of the present invention;
Fig. 5 is Pavement design one embodiment schematic diagram in the embodiment of the present invention;
Fig. 6 is Pavement design effect one embodiment schematic diagram in the embodiment of the present invention;
Fig. 7 is view management interface one embodiment schematic diagram in the embodiment of the present invention;
Fig. 8 is BIM interior decorations current floor and region design method one embodiment schematic diagram in the embodiment of the present invention;
Fig. 9 is electronic equipment one embodiment schematic diagram in the embodiment of the present invention;
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, the every other implementation that those skilled in the art are obtained without creative efforts
Example, belongs to the scope of protection of the invention.
It should be noted that when element is expressed " being fixed on " another element, it can directly on another element,
Or there may be one or more elements placed in the middle therebetween.When an element is expressed " connection " another element, it can be with
It is directly to another element or there may be one or more elements placed in the middle therebetween.Used in this specification
The orientation or position of the instruction such as term " vertical ", " horizontal ", "left", "right", " on ", " under ", " interior ", " outer ", " bottom "
Relation is based on orientation shown in the drawings or position relationship, is for only for ease of the description present invention and simplifies description, without referring to
Show or imply that the device of meaning or element there must be specific orientation, with specific azimuth configuration and operation, therefore cannot manage
Solve as limitation of the present invention.In addition, term " first ", " second " etc. be only used for description purpose, and it is not intended that instruction or
Imply relative importance.
Unless otherwise defined, technical and scientific term all used in this specification is led with belonging to the technology of the present invention
The normally understood implication of technical staff in domain is identical.Used term is simply in the description of the invention in this specification
The purpose of description specific embodiment, is not intended to limitation the utility model.Term "and/or" used in this specification
Include the arbitrary and all combination of one or more relevant Listed Items.In addition, invention described below is different
As long as involved technical characteristic does not form conflict and be combined with each other each other in embodiment.
In the embodiment of the present invention, BIM interior decorations current floor and region design system can be complete soft as one
Part application program, runs in corresponding system platform;The BIM interior decorations current floor and region design system can also lead to
Cross conventional function module addition manner, be integrated into existing Sketchup softwares, as one of function module or
Feature card uses, with the application function of the expansion Sketchup softwares of adaptability, for designer provide to the parameter of material into
The function of row definition.Sketchup softwares are a very common, the very extensive 3D design tools of application range.But exist at present
The engineering design software of above-mentioned interior decoration, can not be by defining the mathematical model of current floor and region come efficiently fixed
The affiliated floor of adopted institute's drawing area and service function of the rooms, so that apparent classification cannot be carried out to whole construction and decoration designing material
Management., can be on the basis of Sketchup softwares in order to further make the more preferable designing material model of Sketchup softwares
On, provide corresponding function using BIM interior decorations current floor provided in an embodiment of the present invention and region design system.
Referring to Fig. 1, BIM interior decorations current floor and region design system one embodiment bag in the embodiment of the present invention
Include:Database 110, storey setting module 120, district management module 130, the first effect generation module 140, Pavement design module
150th, the second effect generation module 160, view management module 170.
Wherein, database 110 can be used for storage for the BIM interior decorations current floor of user setting and region design
Parameter;The database 110 can be specifically the database using any proper data storage type or storage architecture.The BIM
Interior decoration current floor and region design parameter refer to design relevant technique stream with BIM interior decorations current floor and region
Journey, design parameter etc..
The storey setting module 120 can be used for the parameter for setting floor;The parameter of the floor can include building and compile
Number, the ground number of plies, the underground number of plies, standard floor height, starting point absolute altitude, absolute altitude, as shown in Figure 2.Building numbering can be used for
A number belonging to floor is identified, which refers to the number of plies of the floor more than ground, the underground number of plies, that is, floor
In the number of plies of below ground, the standard floor height of the standard floor height, that is, each floor, starting point absolute altitude, that is, floor is relative to datum level (mark
High zero point) vertical height, absolute altitude refers to the mark using the datum level of a country Uniform provisions as zero point
It is high.
District management module 130 can be used for the parameter of the floor set according to user in the storey setting module 120
The region of each floor is divided, and the region is defined;For example, as shown in figure 3, floor is divided into -1F (i.e. successively
Underground first layer), 1F (ground first layer), 2F (the ground second layer) etc., and it is two regions that the -1F, 1F, which is respectively divided,
And be defined respectively, as definition should in -1F two regions be respectively store and it is spare, to define two regions in the 1F be meeting
With office and define this it is whole 2F handle official business etc..
The district management module 130 can also be specifically used for adding the region of above-mentioned each floor and each floor
Add, delete, edit and define.
First effect generation module 140 can be used for according to floor set in the storey setting module 120
Definition in parameter and district management module 130 to the region of each floor generates the threedimensional model of the floor;Preferably, it is described
The threedimensional model for the floor that first effect generation module 140 specifically can be used for being generated is arranged in order displaying, such as institute in Fig. 4
Show, 2F, 1F and -1F are down vertically arranged successively.
The Pavement design module 150 can be used for the floor for clicking on selection in the district management module 130 according to user
And region determines the selected current floor of the user and region, and the operational order input by user can be gathered, if
Put the ground of the current floor and region and the parameter of metope;
The parameter of the ground and metope includes project name, surface layer, basic unit, and the parameter of the ground and metope is corresponding
Block parameter can with as shown in figure 5, its it is corresponding shown in the interface of the Pavement design module 150, specifically, in surface layer
In can be according to demand in the following order and condition is listed:5. 1. the thickness → 4. numbering → of the Material Name of type → 2. → 3. is set
Count the generating mode of the finished surface of the surface treatment of typesetting → 6. → 7. → 8..
Can be according to demand in the following order and condition is listed in basic unit:1. tolerance → 2. original structure basic unit → is 3. repaiied
It is whole → 4. waterproof → 7. moisture-proof → 8. levelling → 9. the pasting → of the linked network of interfacial agents → 5. → 6. 10. illustrate.
Second effect generation module 160 can be used for corresponding described according to the generation of the parameter of the ground and metope
Face and the threedimensional model of metope, as shown in Figure 6.
It should be understood that 160 and first effect generation module 140 of the second effect generation module can be based on functionally
Division, it may belong to the function module of an entirety, i.e., second effect generation module 160 can give birth in first effect
The threedimensional model of the ground and metope is generated on the basis of the threedimensional model of the floor generated into module 140.It is appreciated that
, the threedimensional model of the ground and metope can be to be attached to the threedimensional model that above-mentioned first effect generation module 140 generates
On textures.
The view management module 170 can be used for the figure for visualizing each floor, the ground in each region and metope
Layer.As shown in fig. 7, the view management module 170 logically can show each floor, each region successively by hierarchical relationship
Ground and metope figure layer, and the figure layer shown in the view management module 170 can also include each ground
With the basic unit's figure layer and surface layer figure layer of metope.
The view management module 170 can be with the storey setting module 120, the district management module 130 and institute
Stating 150 correspondence establishment of Pavement design module has linking relationship, which can be according in the storey setting module
The parameter of the floor set in 120, in the district management module 130 definition in region, in the Pavement design module 150
Operational order that user is inputted (basic unit and the surface layer of changing ground and metope), generates corresponding figure layer, and user can be with
Open figure layer and check corresponding parameter.
Technical solution provided in an embodiment of the present invention uses the BIM prestored in database 110 for user setting
Interior decoration current floor and region design parameter;The parameter of floor is set by storey setting module 120;District management module
130 divide the region of each floor according to the parameter of the floor, and the region is defined;Mould is generated in the first effect
Threedimensional model is generated according to the definition in the parameter of the floor and region in block 140;And determined by Pavement design module 150 described
The selected current floor of user and region, and the operational order input by user is gathered, the current floor and area are set
The ground in domain and the parameter of metope;Generated and corresponded to according to the parameter of the ground and metope in the second effect generation module 160
The ground and metope threedimensional model;And each floor, Mei Yiqu can be visualized in view management module 170
The ground in domain and the figure layer of metope.Therefore the figure current floor and region is passed through relative to the prior art, the embodiment of the present invention
Layer, which is automatically linked in view management module 170, divides floor, point room to show, and very apparent complete to entire building
Design visualized management, greatly facilitate designer divide floor modification design and facilitate unit in charge of construction divide floor into
Row construction and Material Takeoff.
A kind of BIM interior decorations current floor and region design method are additionally provided in the embodiment of the present invention, such as Fig. 8 institutes
Show, the BIM interior decorations current floor and region design method include:
S100, prestore BIM interior decorations current floor and region design parameter for user setting;
S200, the parameter that floor is set;
S300, the region according to each floor of the parameter of floor division, and the region is defined;
S400, according to the definition in the parameter of the floor and region generate threedimensional model;
S500, determine the selected current floor of user and region, and gathers operational order input by user, sets current
The parameter on the ground and metope in floor and region;
S600, the threedimensional model according to the corresponding ground of the parameter of the ground and metope generation and metope;
S700, visualize each floor, the ground in each region and the figure layer of metope.
It should be noted that the BIM interior decorations current floor and region design method and BIM that are provided in above-described embodiment
Interior decoration current floor and region design system are all based on identical inventive concept.Therefore, BIM interior decorations current floor
And can have in region design method the step of each specific embodiment as performed by corresponding function module in function module
The function of body can also have corresponding method and step in the BIM interior decorations current floor and region design system,
This is repeated no more.
In conclusion in BIM interior decorations current floor provided in an embodiment of the present invention and region design system and BIM rooms
Current floor and region design method are fitted up, in BIM design softwares, due to can not be by defining current floor and area
The mathematical model in domain efficiently defines the affiliated floor of institute's drawing area and service function of the rooms, so that cannot be to whole building dress
Repair the drawbacks of designing material carries out apparent Classification Management, there is provided the abundant current building of BIM interior decorations for user setting
Layer and region design parameter.Floor modification design and unit in charge of construction is divided to divide floor to be applied so as to greatly facilitate designer
Work and Material Takeoff.
Fig. 9 is the hardware architecture diagram of electronic equipment provided by the embodiments of the present application, which includes:One or more
A processor 201 and memory 202.In Fig. 9 exemplified by one.Wherein, processor 201 and memory 202 can pass through
Bus or other modes connect, in Fig. 9 exemplified by being connected by bus.
Memory 202 is used as a kind of non-volatile computer readable storage medium storing program for executing, available for storage non-volatile software journey
Sequence, non-volatile computer executable program and module, such as BIM interior decorations current floor and area in the embodiment of the present invention
Corresponding programmed instruction/the module of domain design system.Processor 201 is stored in non-volatile soft in memory 202 by operation
Part program, instruction and module, so that the various function application of execute server and data processing, that is, realize above method reality
Apply BIM interior decorations current floor and region design system in example.
Memory 202 can include storing program area and storage data field, wherein, storing program area can store operation system
System, the required application program of at least one function;Storage data field can be stored according to BIM interior decorations current floor and area
Domain design system uses created data etc..In addition, memory 202 can include high-speed random access memory, may be used also
With including nonvolatile memory, a for example, at least disk memory, flush memory device or the storage of other nonvolatile solid states
Device.In certain embodiments, memory 202 is optional including relative to the remotely located memory of processor 201, these are long-range
Memory can pass through network connection to BIM interior decorations current floor and region design system.The example of above-mentioned network includes
But it is not limited to internet, intranet, LAN, mobile radio communication and combinations thereof.
Above-mentioned electronic equipment can perform the system or method that the embodiment of the present application is provided, and possesses and performs the system or method
Corresponding function module and beneficial effect.Not ins and outs of detailed description in the present embodiment, reference can be made to the embodiment of the present application
The system or method provided.
Also, system embodiment described above is only schematical, illustrate wherein described as separating component
Unit may or may not be physically separate, and thing is may or may not be as the component that unit is shown
Manage unit, you can with positioned at a place, or can also be distributed in multiple network unit.It can select according to the actual needs
Some or all of module therein is selected to realize the purpose of this embodiment scheme.
Through the above description of the embodiments, those of ordinary skill in the art can be understood that each embodiment
The mode of general hardware platform can be added by software to realize, naturally it is also possible to pass through hardware.Based on such understanding, the present invention
The part that substantially contributes in other words to the prior art of technical solution or all or part of the technical solution can be with
Embodied in the form of software product, which is stored in a storage medium, including some instructions are used
So that a computer equipment (can be personal computer, server, or network equipment etc.) performs each reality of the present invention
Apply all or part of step of the method.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage
(Read-Only Memory, ROM), random access memory (RandomAccess Memory, RAM), magnetic disc or CD
Etc. it is various can be with the medium of store program codes.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments
The present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to foregoing each implementation
Technical solution described in example is modified, or carries out equivalent substitution to which part technical characteristic;And these modification or
Replace, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical solution.
Claims (10)
1. a kind of BIM interior decorations current floor and region design system, it is characterised in that the system comprises:
Database, for storing BIM interior decorations current floor and region design parameter for user setting;
Storey setting module, for setting the parameter of floor;
District management module, for dividing the region of each floor according to the parameter of the floor, and determines the region
Justice;
First effect generation module, the definition for the parameter according to the floor and region generate threedimensional model;
Pavement design module, for determining the selected current floor of the user and region, and gathers described input by user
Operational order, sets the ground of the current floor and region and the parameter of metope;
Second effect generation module, for generating the three of the corresponding ground and metope according to the parameter on the ground and metope
Dimension module;
View management module, for visualizing the figure layer of each floor, the ground in each region and metope.
2. BIM interior decorations current floor according to claim 1 and region design system, it is characterised in that the building
Layer setup module be specifically used for setting the parameter of the floor include building numbering, the ground number of plies, the underground number of plies, standard floor height,
Starting point absolute altitude, absolute altitude.
3. BIM interior decorations current floor according to claim 1 and region design system, it is characterised in that the area
Domain management module is specifically used for adding, delete, edit and defining each floor and region.
4. BIM interior decorations current floor according to claim 1 and region design system, it is characterised in that describedly
The parameter of face and metope includes title, surface layer, basic unit;
Wherein, the surface layer includes type, Material Name, thickness, numbering, design typesetting, surface treatment, finished surface, generation
Mode;
The basic unit includes tolerance, original structure basic unit, finishing, interfacial agents, linked network, waterproof, moisture-proof, levelling, stickup.
5. BIM interior decorations current floor according to claim 4 and region design system, it is characterised in that described to regard
The figure layer shown in figure management module further includes the basic unit's figure layer and surface layer figure layer of each ground and metope.
6. BIM interior decorations current floor according to claim 5 and region design system, it is characterised in that described to regard
Figure management module and the storey setting module, the district management module and the Pavement design module is corresponding links;
The view management module is specifically additionally operable to the parameter according to the floor, the defining of the region, user input
Operational order generate corresponding figure layer.
7. BIM interior decorations current floor according to claim 1 and region design system, it is characterised in that described
The threedimensional model that one effect generation module is specifically additionally operable to be generated is arranged in order displaying.
8. a kind of BIM interior decorations current floor and region design method, it is characterised in that the described method includes:
Prestore the BIM interior decorations current floor and region design parameter for user setting;
The parameter of floor is set;
The region of each floor is divided according to the parameter of the floor, and the region is defined;
Threedimensional model is generated according to the definition in the parameter of the floor and region;
Determine the selected current floor of the user and region, and gather the operational order input by user, described in setting
The parameter on the ground and metope in current floor and region;
The threedimensional model of the corresponding ground and metope is generated according to the parameter of the ground and metope;
Visualize the figure layer of each floor, the ground in each region and metope.
9. a kind of electronic equipment, it is characterised in that including at least one processor;
And the memory being connected with least one processor communication;
Wherein, the memory storage has the instruction repertorie that can be performed by least one processor, described instruction program quilt
At least one processor performs, so that at least one processor is able to carry out method as claimed in claim 8.
10. a kind of computer program product used in BIM interior decorations current floor and region design system, its feature exist
In the computer program product includes the function module as described in claim 1-7 is any.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711194930.5A CN108022296A (en) | 2017-11-24 | 2017-11-24 | A kind of BIM interior decorations current floor and region design system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711194930.5A CN108022296A (en) | 2017-11-24 | 2017-11-24 | A kind of BIM interior decorations current floor and region design system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108022296A true CN108022296A (en) | 2018-05-11 |
Family
ID=62077103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711194930.5A Pending CN108022296A (en) | 2017-11-24 | 2017-11-24 | A kind of BIM interior decorations current floor and region design system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108022296A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109033598A (en) * | 2018-07-18 | 2018-12-18 | 于海涛 | A method of the batch setting absolute altitude based on Revit |
CN109360123A (en) * | 2018-10-22 | 2019-02-19 | 上海建工四建集团有限公司 | A kind of multi-specialized execution management method therefor and system based on room |
CN111310261A (en) * | 2020-01-23 | 2020-06-19 | 久瓴(上海)智能科技有限公司 | Method and device for generating interior wall facing brick model, computer equipment and storage medium |
CN111461487A (en) * | 2020-03-02 | 2020-07-28 | 广州高新工程顾问有限公司 | Indoor decoration engineering wisdom management system based on BIM |
CN112632682A (en) * | 2020-12-30 | 2021-04-09 | 青岛腾远设计事务所有限公司 | Method and device for generating floor surface layer model based on BIM forward design |
CN113140038A (en) * | 2021-05-13 | 2021-07-20 | 天讯方舟(北京)信息科技有限公司 | Real-time three-dimensional visualization method for large-scene urban building |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130303193A1 (en) * | 2012-05-10 | 2013-11-14 | Honeywell International Inc. | Bim-aware location based application |
CN104766362A (en) * | 2014-03-11 | 2015-07-08 | 北京博锐尚格节能技术股份有限公司 | 3D energy consumption display method, 3D energy consumption display device and 3D energy consumption display system |
CN104808610A (en) * | 2015-02-13 | 2015-07-29 | 上海同筑信息科技有限公司 | Machinery control system and machinery control method based on a BIM (building information model) |
CN106021821A (en) * | 2016-07-01 | 2016-10-12 | 江苏国泰新点软件有限公司 | Method and device for marking floors |
CN106094601A (en) * | 2016-08-22 | 2016-11-09 | 北京赛易科信息技术有限公司 | The control method of a kind of building intelligent system and building intelligent system |
CN106649938A (en) * | 2016-09-28 | 2017-05-10 | 杭州迪咖科技有限公司 | BIM-based fine decoration co-design method |
CN107169673A (en) * | 2017-06-09 | 2017-09-15 | 上海嘉实(集团)有限公司 | Management system/method, computer-readable recording medium and the terminal of construction project |
CN107256577A (en) * | 2017-06-19 | 2017-10-17 | 巧夺天宫(深圳)科技有限公司 | Fitting-up BIM, its construction method, device and electronic equipment |
-
2017
- 2017-11-24 CN CN201711194930.5A patent/CN108022296A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130303193A1 (en) * | 2012-05-10 | 2013-11-14 | Honeywell International Inc. | Bim-aware location based application |
CN104766362A (en) * | 2014-03-11 | 2015-07-08 | 北京博锐尚格节能技术股份有限公司 | 3D energy consumption display method, 3D energy consumption display device and 3D energy consumption display system |
CN104808610A (en) * | 2015-02-13 | 2015-07-29 | 上海同筑信息科技有限公司 | Machinery control system and machinery control method based on a BIM (building information model) |
CN106021821A (en) * | 2016-07-01 | 2016-10-12 | 江苏国泰新点软件有限公司 | Method and device for marking floors |
CN106094601A (en) * | 2016-08-22 | 2016-11-09 | 北京赛易科信息技术有限公司 | The control method of a kind of building intelligent system and building intelligent system |
CN106649938A (en) * | 2016-09-28 | 2017-05-10 | 杭州迪咖科技有限公司 | BIM-based fine decoration co-design method |
CN107169673A (en) * | 2017-06-09 | 2017-09-15 | 上海嘉实(集团)有限公司 | Management system/method, computer-readable recording medium and the terminal of construction project |
CN107256577A (en) * | 2017-06-19 | 2017-10-17 | 巧夺天宫(深圳)科技有限公司 | Fitting-up BIM, its construction method, device and electronic equipment |
Non-Patent Citations (2)
Title |
---|
葛广昊: "基于CityGML的大型建筑室内三维模型研究", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
金永来: "交互式室内3D地图的设计与实现", 《中国优秀硕士学位论文全文库 基础科学辑》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109033598A (en) * | 2018-07-18 | 2018-12-18 | 于海涛 | A method of the batch setting absolute altitude based on Revit |
CN109360123A (en) * | 2018-10-22 | 2019-02-19 | 上海建工四建集团有限公司 | A kind of multi-specialized execution management method therefor and system based on room |
CN109360123B (en) * | 2018-10-22 | 2021-07-27 | 上海建工四建集团有限公司 | Multi-professional construction management method and system based on room |
CN111310261A (en) * | 2020-01-23 | 2020-06-19 | 久瓴(上海)智能科技有限公司 | Method and device for generating interior wall facing brick model, computer equipment and storage medium |
CN111461487A (en) * | 2020-03-02 | 2020-07-28 | 广州高新工程顾问有限公司 | Indoor decoration engineering wisdom management system based on BIM |
CN111461487B (en) * | 2020-03-02 | 2021-05-18 | 广州高新工程顾问有限公司 | Indoor decoration engineering wisdom management system based on BIM |
CN112632682A (en) * | 2020-12-30 | 2021-04-09 | 青岛腾远设计事务所有限公司 | Method and device for generating floor surface layer model based on BIM forward design |
CN113140038A (en) * | 2021-05-13 | 2021-07-20 | 天讯方舟(北京)信息科技有限公司 | Real-time three-dimensional visualization method for large-scene urban building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108022296A (en) | A kind of BIM interior decorations current floor and region design system and method | |
CN107391862B (en) | Three-dimensional collaborative design method for prefabricated concrete structure | |
US9020783B2 (en) | Direct manipulation of composite terrain objects with intuitive user interaction | |
Batty et al. | Geographical information systems and urban design | |
CN107590355A (en) | Architectural design method, design system and electronic equipment based on BIM | |
CN106709660A (en) | BIM-based architectural design method | |
US9196085B2 (en) | Interactively shaping terrain through composable operations | |
Koenig et al. | Interactive urban synthesis: Computational methods for fast prototyping of urban design proposals | |
CN107577887A (en) | Wall surfacing design system, design method, electronic equipment and computer program product | |
Kim et al. | Multi-level modeling and access control for data sharing in collaborative design | |
US11263372B2 (en) | Method for providing details to a computer aided design (CAD) model, a computer program product and a server therefore | |
CN107918689A (en) | Ground surface finishing design system, design method, electronic equipment and computer program product | |
KR100777373B1 (en) | Methodology Using 4D CAD System for Civil Engineering Project by Integration of 3D Object and Schedule | |
CN108228984A (en) | Fit up project management system, its method, electronic equipment and computer program product | |
CN113420359B (en) | Method for automatically transmitting parameters to well placement based on REVIT (remote visual inspection) electric power engineering general diagram | |
Boguslawski et al. | Construction operators for modelling 3D objects and dual navigation structures | |
Shoaib Khan et al. | Methodology for voxel-based earthwork modeling | |
CN109558636A (en) | A kind of creation method based on Revit pipe gallery BIM model | |
Hajek | Creation of information-rich 3D model in Geographic Information System-case study at the castle kozel | |
CN108021744A (en) | Construction and decoration design method, design system and terminal based on Building Information Model | |
CN108009333A (en) | Interior decoration level sets system, method, equipment and computer program product | |
Ermolenko | Algorithm-aided Information Design: Hybrid Design approach on the edge of Associative Methodologies in AEC | |
CN107862149A (en) | A kind of interior decoration View Manager defines system, definition method and electronic equipment | |
Szeląg et al. | BIM in general construction | |
CN107908882A (en) | A kind of wall property matching system, matching process and electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||