CN108005040A - Minisize ecological natural flow station - Google Patents
Minisize ecological natural flow station Download PDFInfo
- Publication number
- CN108005040A CN108005040A CN201711208965.XA CN201711208965A CN108005040A CN 108005040 A CN108005040 A CN 108005040A CN 201711208965 A CN201711208965 A CN 201711208965A CN 108005040 A CN108005040 A CN 108005040A
- Authority
- CN
- China
- Prior art keywords
- fish
- water
- checkdam
- natural flow
- downstream
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 241000251468 Actinopterygii Species 0.000 claims abstract description 180
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 107
- 230000005012 migration Effects 0.000 claims abstract description 40
- 238000013508 migration Methods 0.000 claims abstract description 40
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 39
- 238000013461 design Methods 0.000 claims abstract description 6
- 230000032258 transport Effects 0.000 claims description 27
- 238000004891 communication Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 2
- 230000009182 swimming Effects 0.000 claims 2
- 238000005516 engineering process Methods 0.000 abstract description 3
- 241000519996 Teucrium chamaedrys Species 0.000 description 7
- 230000005611 electricity Effects 0.000 description 5
- 230000006870 function Effects 0.000 description 5
- 239000000203 mixture Substances 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 2
- 230000005465 channeling Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 235000013601 eggs Nutrition 0.000 description 1
- 238000004870 electrical engineering Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000017448 oviposition Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000007723 transport mechanism Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
- E02B8/085—Devices allowing fish migration, e.g. fish traps
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/06—Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
- E02B9/02—Water-ways
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/60—Ecological corridors or buffer zones
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Marine Sciences & Fisheries (AREA)
Abstract
The invention discloses a kind of minisize ecological natural flow station, belongs to hydraulic and hydroelectric engineering Building Design building technology field.A kind of operation smooth operation is provided, smaller suitable for water flow, reservoir water level is shallower, and moisture storage capacity is relatively also smaller and the minisize ecological natural flow station that is combined with fish pass system.The minisize ecological natural flow station includes generating system by piloting water behind shut off checkdam and dam, the minisize ecological natural flow station further includes capture systems and transport establishment, the migration shoal of fish in downstream river course lures the attracting trapping region in checkdam downstream of shutting off by the tail water that generating system by piloting water behind the dam is discharged, lure the migration shoal of fish of the attracting trapping region in checkdam downstream of shutting off to lure by the capture systems to collect, the migration shoal of fish after temptation is collected is transported to by the transport establishment in the river of the checkdam upstream side of shutting off.
Description
Technical field
The present invention relates to a kind of natural flow station, more particularly, to a kind of minisize ecological natural flow station, belongs to water conservancy water
Electrical engineering Building Design building technology field.
Background technology
Fish pass is the passage for fish migration.Described with popular language, some fish, which have from lower reaches of river, to be migrated to river
The habit of upstream oviposition is flowed, after river has blocked river since artificial origin has such as built checkdam, fish are upstream whirled
The passage of trip will be destroyed.In order to protect the habit of fish, it is necessary to which passing through dam builds artifical flume as fish migration
Passage, i.e. referred to as fish pass.Current enter fish pass from upstream, flow out fish pass from downstream, but fish are from downstream into fish pass, from upper
Fish pass is swum out of, thus fish pass upstream intake is referred to as fishway exit, and fish pass downstream water outlet is fish pass import.
In order to realize that fish pass crosses the purpose of fish, fish pass usually requires to meet claimed below:First, depth of water requirement, fish pass domestic demand
Keep 1.0~1.5m depth of waters;2nd, slope requirement, in order to enable fish along current upstream migration, flow rate of water flow in fish pass
It is less than the speed of fish migration, this requires fish pass needs to keep a gradient that is relatively slow and stablizing;3rd, when upper pond level becomes
During change, fishway exit needs the measure that can adapt to SEA LEVEL VARIATION, it is ensured that under various water levels, it is long-term in fish pass keep 1.0~
1.5m the depth of water.
In order to meet above-mentioned requirements, at present frequently with following two fishway exit arrangements in engineering:
1 existing program one
Fishway exit is arranged in checkdam upstream by the program, and sets multiple fishes at the same time along elevation in eulittoral zone
Road exports, and each outlet is controlled using 1 bulkhgead gate.The characteristics of structure, is:1st, fishway exit is arranged
In checkdam upstream;2nd, in upper pond level luffing area, fish pass multiple outlets along elevation arrangement, each fishway exit is on elevation
It is mutually linked;3rd, each fishway exit arranges the lower stream that sluices of 1 plate steel gate control.The major advantage of the structure is:
In upper pond level luffing area, each elevation section is arranged with fishway exit, when upper pond level is located at a certain elevation, only needs to open
The gate of corresponding elevation fishway exit, and close the gate of other fishway exits, you can meet 1.0~1.5m depth of waters in fish pass
It is required that.The major defect of the structure is:1st, fishway exit is arranged in upstream, longer to length along river, corresponding excavated volume
Or concrete works amount is larger, fish pass construction investment is larger;2nd, fishway exit quantity is more, and needs the feelings according to upper pond level
Condition, carries out each gate opening and closing in time, when upper pond level amplitude of fluctuation is larger, changes more frequent, fishway exit gate
Operation control is also relatively complicated.
2 existing programs two
Fishway exit is combined arrangement with checkdam by the program, and is set gradually along the water blocking axis of dam in eulittoral zone more
A fishway exit, each fishway exit is controlled using 1 bulkhgead gate.The advantages of structure, is:1st, by fishway exit with
Checkdam combines arrangement, is arranged successively along the water blocking axis of dam in each fishway exit horizontal direction, elevation is mutually linked on direction, phase
Adjacent fishway exit is connected by the linking channel in downstream, and lowest elevation fishway exit is connected by being connected channel with fish pass import;
2nd, for single fishway exit, upper middle part is provided with 1 plate work gate opening/closing, and downstream sets linking channel and next stage fish
Road outlet connects.The major defect of the structure is:1st, to adapt to the requirement of range of stage, upstream needs to set along the axis of dam more
A fishway exit, it is impossible to suitable for the checkdam of Narrow Valleys;2nd, since each fishway exit is both needed to set 1 plate work lock
Door, and need, according to the situation of upper pond level, to carry out each gate opening and closing in time, when upper pond level amplitude of fluctuation is larger,
When changing more frequent, the operation control of fishway exit gate is also relatively complicated.
Either above-mentioned any scheme, its have one it is obvious the characteristics of, that is, it is all deeper applied to reservoir water level,
In the larger large and medium-sized hydroelectric project of moisture storage capacity.And it is smaller in some water flows, reservoir water level is shallower, and moisture storage capacity is relatively also smaller
Mini engineering in and do not apply to.Therefore, find it is a kind of adapt to middle-size and small-size hydraulic and hydroelectric engineering cross fish system become in order to
Those skilled in the art are badly in need of the technical problem solved.
Furthermore for water channeling type micro generation station, since building for checkdam has blocked current, i.e., usual current are by drawing
Water system has been transported in the power plant building of downstream red switch cluster engine and has generated electricity, in order to meet checkdam and the big Power Plant in downstream it
Between section riverbed ecological water requirement, usually through the pipeline set in checkdam, in non-flood discharge period downstream riverbed water delivery.
Some engineerings just utilize checkdam interior conduit aerial drainage, and low power hydroelectric generator, that is, Midget plant hair is set in checkdam downstream
Electricity, not only ensure that the requirement that downstream ecology supplies water, but also achieve power benefit.But since checkdam has blocked current, have and whirl
Swim habit the shoal of fish just can not migration lay eggs to upstream.This is the technical problem that this small-sized water channeling type power station has to examine.
The content of the invention
The technical problems to be solved by the invention are:A kind of operation smooth operation, reservoir area smaller suitable for water flow are provided
Water level is shallower, and moisture storage capacity is relatively also smaller and the minisize ecological natural flow station that is combined with fish pass system.
Technical solution is used by solve above-mentioned technical problem:A kind of minisize ecological natural flow station, including shut off
Generating system by piloting water after checkdam and dam, the minisize ecological natural flow station further include capture systems and transport establishment, position
The migration shoal of fish in downstream river course lures checkdam downstream of shutting off by the tail water that generating system by piloting water behind the dam is discharged
The attracting trapping region of side, lures the migration shoal of fish of the attracting trapping region in checkdam downstream of shutting off to be lured by the capture systems
Puzzled collection, the migration shoal of fish after temptation collection are transported to the river of the checkdam upstream side of shutting off by the transport establishment
In.
The beneficial effects of the invention are as follows:The basis that the application passes through the generating system by piloting water behind existing shut off checkdam and dam
On add including capture systems and transport establishment composition minisize ecological natural flow station.Then diversion and power behind the dam is passed through
The migration shoal of fish in downstream river course is lured the attracting trapping region in checkdam downstream of shutting off by the tail water of system discharge, then
Lured by the capture systems and collect and be transported under the cooperation of the transport establishment checkdam upstream side of shutting off
In river.The application makes full use of generating system by piloting water is discharged behind dam tail water not only as ecological current, but also as luring migration
The evocating substance of the shoal of fish, then the capture systems of the application offer and whirling for the transport establishment shoal of fish of the realization with migration attribute are provided
Swim function.Especially adapt to that water flow is smaller, and reservoir water level is shallower, moisture storage capacity also less middle-size and small-size hydraulic and hydroelectric engineering relatively.
The minisize ecological natural flow station that the application provides not only remains the function of power generation, but also also achieves with migration habit
The migration function of the shoal of fish, and shoal of fish migration principle therein and the shoal of fish of the prior art are complete along the principle of the free migration of current
It is complete different, but collect what is realized with mechanical transport by traping, it ensure that the steady of fish system operation operation.
It is further that the transport establishment includes upper supporting row frame, lower supporting row frame and the rope containing fish gathering structure
Road conveyer, the cableway conveyer pass through the upper supporting row frame and the moveable cloth of lower supporting row frame
Put between the dam crest of the checkdam that shuts off and the attracting trapping region of the capture systems;Pass through diversion and power system behind the dam
The migration shoal of fish that the tail water temptation of system discharge is collected, is transported by the fish gathering structure under the cooperation of the cableway conveyer
Into the river of the checkdam upstream side of shutting off.
Such scheme it is preferable that, the fish gathering structure is strip collection fish tank, the cableway conveyer
Including transporting cableway and power source, the liftable strip collection fish tank being packed on the transport cableway, in the power source
Cooperation lower edge transport cableway be reciprocally moveable.
It is further that the capture systems include being arranged in the fish screen of attracting trapping region and catch up with fish corral, described
Fish screen described in the arrangement of fish gathering structure movement and described catch up between fish corral.
Such scheme it is preferable that, behind the dam generating system by piloting water include along water (flow) direction order arrange hair
Electric water drainage tube, micro generation station body, tail water gather run-off and the attracting trapping region, the micro generation station sheet
The upstream side generating power by water current that body is introduced by the electrical generation water drainage tube, the tail water that the micro generation station body passes through discharge
Gather run-off with the tail water to connect, the tail water gathers run-off and passes through spill stream and the attracting trapping region
Connection.
It is further that the tail water, which gathers run-off, includes the run-off and positioned at the run-off downstream of catchmenting of catchmenting
Downflow weir, downstream and the attracting trapping region sequential communication of the described run-off that catchments by the downflow weir.
Such scheme it is preferable that, be also associated with what is connected with downstream water in the downstream of the attracting trapping region
Attracting passage.
It is further to be set on the bottom plate of the attracting passage and help migration protrusion.
It is further to be additionally provided with the checkdam that shuts off on being disposed with supporting row frame position and put fish structure, lured
The migration shoal of fish of the puzzled collection in the fish gathering structure passes through the water put fish structure and be put into checkdam upstream side of shutting off
In body.
Be further, it is described put fish structure include being arranged on the checkdam upstream side of shutting off put fish hole and with this
The fishpond of putting of fish hole connection is put, the upstream side for putting fishpond has the open design connected with upstream water body.
Brief description of the drawings
Fig. 1 is the attracting operating mode schematic diagram of minisize ecological natural flow station of the present invention;
Fig. 2 is the fish gathering operating mode schematic diagram of minisize ecological natural flow station of the present invention;
Fig. 3 is the fortune fish operating mode schematic diagram of minisize ecological natural flow station of the present invention;
Fig. 4 puts fish operating mode schematic diagram for minisize ecological natural flow station of the present invention.
In figure mark for:Shut off generating system by piloting water 2 behind checkdam 1, dam, capture systems 3, transport establishment 4, attracting capture
Area 5, upper supporting row frame 6, lower supporting row frame 7, fish gathering structure 8, transport cableway 10, fish screen 11, catch up with fish corral 12, electrical generation water drainage
Pipe 13, micro generation station body 14, tail water gather run-off 15, the run-off 16 that catchments, downflow weir 17, attracting passage 18, help and whirl
Trip protrusion 1, put fish structure 20, put fish hole 21, put fishpond 22.
Embodiment
As shown in Figure 1, Figure 2, be a kind of operation smooth operation provided by the invention shown in Fig. 3 and Fig. 4, suitable for water flow compared with
Small, reservoir water level is shallower, and moisture storage capacity is relatively also smaller and the minisize ecological natural flow station that is combined with fish pass system.Described
Minisize ecological natural flow station includes generating system by piloting water 2 behind shut off checkdam 1 and dam, the minisize ecological natural flow station
Capture systems 3 and transport establishment 4 are further included, the migration shoal of fish in downstream river course passes through generating system by piloting water 2 behind the dam
The tail water of discharge lures the attracting trapping region 5 in 1 downstream of checkdam of shutting off, and lures the attracting in 1 downstream of checkdam of shutting off
The migration shoal of fish of trapping region 5 is lured by the capture systems 3 and collected, and the migration shoal of fish after temptation is collected passes through the transport
Mechanism 4 is transported in the river of 1 upstream side of checkdam of shutting off.The application by behind existing shut off checkdam and dam diversion send out
The minisize ecological natural flow station including capture systems and transport establishment's composition is added on the basis of electric system.Then by described
The migration shoal of fish in downstream river course is lured checkdam downstream of shutting off by the tail water that generating system by piloting water 2 is discharged behind dam
Attracting trapping region 5, then lured by the capture systems 3 and collect and be transported under the cooperation of the transport establishment 4 described cut
In the river for flowing 1 upstream side of checkdam.The application makes full use of the tail water that generating system by piloting water 2 is discharged behind dam to be both used as ecological water
Stream, but be used as lure the evocating substance of the migration shoal of fish, then be equipped with the application offer capture systems 3 and transport establishment 4 realize have
There is the migration function of the shoal of fish of migration attribute.Especially adaptation water flow is smaller, and reservoir water level is shallower, and moisture storage capacity is relatively also less
Middle-size and small-size hydraulic and hydroelectric engineering.The minisize ecological natural flow station that the application provides not only remains the function of power generation, but also
Realize the migration of the shoal of fish with migration habit, and shoal of fish migration principle therein and shoal of fish edge of the prior art
The principle of the free migration of current is entirely different, but collects what is realized with mechanical transport by traping, and ensure that fish system was transported
Row operates steady.
In the above embodiment, smaller in order to adapt to the water flow that the application is directed to, reservoir water level is shallower, and moisture storage capacity is opposite
Also the realistic situation of less middle-size and small-size hydraulic and hydroelectric engineering, while simplify capture systems 3 and transporter described herein again
The structure of structure 4, to facilitate construction and/or the maintenance, repair of making, installation, and postorder, while also reduces and throws time cost, institute
The transport establishment 4 stated includes upper supporting row frame 6, lower supporting row frame 7 and the cableway conveyer containing fish gathering structure 8, described
Cableway conveyer is movably arranged in the gear that shuts off by the upper supporting row frame 6 and the lower supporting row frame 7
Between the dam crest of dam 1 and the attracting trapping region 5 of the capture systems 3, pass through the tail of the discharge of generating system by piloting water 2 behind the dam
The migration shoal of fish that water temptation is collected, described cut is transported to by the fish gathering structure 8 under the cooperation of the cableway conveyer
In the river for flowing 1 upstream side of checkdam;At this time, the fish gathering structure 8 is preferably strip collection fish tank, and the cableway transports
Device includes transporting cableway 10 and power source, the liftable strip collection fish tank being packed on the transport cableway 10, in institute
The cooperation lower edge transport cableway for stating power source is reciprocally moveable.And the capture systems 3 then include being arranged in attracting trapping region 5
Fish screen 11 and catch up with fish corral 12, the fish screen 11 described in the arrangement of the activity of fish gathering structure 8 catches up with fish corral 12 with described
Between.
Further, for the ease of attracting and fish is put, is also associated with the downstream of the attracting trapping region 5 and downstream water
The attracting passage 18 of body connection, sets on the bottom plate of the attracting passage 18 and helps migration protrusion 1.The row of support on being disposed with
It is additionally provided with the checkdam 1 that shuts off at 6 position of frame and puts fish structure 20, the migration in the fish gathering structure 8 is collected in temptation
The shoal of fish is put into the water body for 1 upstream side of checkdam of shutting off by the fish structure 20 of putting.At this time, described fish structure 20 of putting
Preferred embodiment includes being arranged on putting fish hole 21 and putting fishpond with what this put that fish hole 21 is connected for 1 upstream side of checkdam of shutting off
22, the upstream side for putting fishpond 22 has the open design connected with upstream water body.
The design feature at existing micro generation station is used for reference, for the ease of attracting and collects temptation to checkdam downstream of shutting off
The migration shoal of fish of side, generating system by piloting water 2 includes the electrical generation water drainage tube 13 along water (flow) direction order arrangement, micro- behind the dam
Type power station body 14, tail water gather run-off 15 and the attracting trapping region 5, and the micro generation station body 14 passes through
The upstream side generating power by water current that the electrical generation water drainage tube 13 introduces, the micro generation station body 14 by the tail water of discharge with
The tail water gathers run-off 15 and connects, and the tail water gathers run-off 15 and captured by spill stream and the attracting
Area 5 connects.At this time, the preferred embodiment that the tail water gathers run-off 15 be include catchmenting run-off 16 and positioned at this catchment it is excessive
Flow the downflow weir 17 in 16 downstream of pond, downstream and the attracting of the run-off 16 that catchments by the downflow weir 17
5 sequential communication of trapping region.
In conclusion the technical solution that the application provides has following beneficial effect:
1st, using including put fish hole and put fishpond composition fish system of putting instead of fishway exit structure, it is low to put the fishpond depth of water
In upstream minimum operation water level, while upper pond level luffing requirement is met, the quantities of fishway exit is also greatly saved;
2nd, it instead of using the fortune fish system formed including lower framed bent, upper framed bent and fortune fish cable and wear dam channel and downstream canal
Road, when water-head is larger in checkdam upstream and downstream, will greatly save the quantities of Channel of Downstream;
3rd, cross fish structure and arrangement is combined with Midget plant, arrangement is more compact, being capable of effectively save Narrow Valleys checkdam
Horizontal space;Tail water attracting after being generated electricity using Midget plant, without letting out fish flow under special again, can cross fish by saving
Flow is used to generate electricity, and increases engineering power benefit;
4th, compared with traditional fish pass, without carrying out complicated operating gate, operation behaviour further according to variation of water level situation
Make more simple.
Embodiment one
The key structural feature of the present embodiment:
A. cross fish structure and combined arrangement with checkdam, Midget plant;
B. cross fish structure by attracting system, fish collection system, transport fish system and put fish system and form;
C. attracting system includes penstock, control valve, Midget plant, afterbay, downflow weir, attracting channel composition,
Tail water attracting after being generated electricity with Midget plant;
D. fish collection system by fish screen, catch up with fish corral, collection fish tank sum aggregate fish hawser form.Wherein fish screen is arranged in downflow weir
Downstream, top exceed the level of tail water;Fish corral is caught up with to be arranged in fish screen downstream, using the layout pattern similar to lever, upstream end
Fixed, downstream is connected by fish gathering hawser with lower framed bent;Between collection fish tank is arranged in fish screen and catches up with fish corral, by transporting fish cable
Rope is connected with fortune fish system;
E. fish system is transported by being arranged on the lower framed bent in checkdam downstream, is arranged on the upper framed bent and fortune fish cable of checkdam dam crest
Rope composition;
F. put fish system mainly to be formed by being arranged on putting fish hole and putting fishpond in checkdam, wherein putting the bottom elevation in fishpond
Less than upstream minimum operation water level elevation.
The concrete operations mode of the present embodiment
1st, attracting operating mode, as shown in Figure 1
Upper water circulates excess pressure steel pipe, and control valve, lets out to afterbay under Midget plant, then by being let out under downflow weir,
Through fish screen and in horizontality catch up with fish corral after, to attracting channel.Fish in downstream river course can be along direction of flow, through luring
Fish channel and after catching up with fish corral, reaches fish screen and catches up between fish corral.
2nd, fish gathering operating mode, as shown in Figure 2
After certain time attracting, fish corral pull-up will be caught up with by fish gathering hawser, then carried fish tank is collected by transporting fish hawser
Rise, you can by fish screen and catch up with the fish between fish corral to be collected into collection fish tank.
3rd, fish operating mode is transported, as shown in Figure 3
By transporting fish hawser, collection fish tank can be transported to upper framed bent from lower framed bent.
4th, fish operating mode is put, as shown in Figure 4
When collecting fish tank and reaching upper framed bent setting position, you can by transport fish hawser will collect fish tank by put fish hole transfer to
Fishpond is put, that is, completes the work that fish are carried to upstream from checkdam downstream.
After fish is put in completion, then lifted fish tank is collected by transporting fish hawser, be shipped back between fish screen catches up with fish corral, then pass through collection
Fish hawser will catch up with fish corral to transfer to water level position, cross fish system and be restored to attracting state again.
Claims (10)
1. generating system by piloting water (2), its feature exist after a kind of minisize ecological natural flow station, including the checkdam that shuts off (1) and dam
In:The minisize ecological natural flow station further includes capture systems (3) and transport establishment (4), whirling in downstream river course
Swimming fish group lures the attracting in the checkdam that shuts off (1) downstream to catch by the tail water that generating system by piloting water (2) behind the dam is discharged
Area (5) is obtained, lures the migration shoal of fish of the attracting trapping region (5) in the checkdam that shuts off (1) downstream to pass through the capture systems (3)
Temptation is collected, and the migration shoal of fish after temptation is collected is transported to described checkdam (1) upstream side of shutting off by the transport establishment (4)
River in.
2. minisize ecological natural flow station according to claim 1, it is characterised in that:The transport establishment (4) includes
Upper supporting row frame (6), lower supporting row frame (7) and the cableway conveyer containing fish gathering structure (8), the cableway conveyer
The checkdam (1) that shuts off is arranged in by the way that the upper supporting row frame (6) and the lower supporting row frame (7) are moveable
Between dam crest and the attracting trapping region (5) of the capture systems (3);The tail discharged by generating system by piloting water (2) behind the dam
The migration shoal of fish that water temptation is collected, is transported to described by the fish gathering structure (8) under the cooperation of the cableway conveyer
Shut off in the river of checkdam (1) upstream side.
3. minisize ecological natural flow station according to claim 2, it is characterised in that:The fish gathering structure (8) is length
Bar shaped collection fish tank, the cableway conveyer includes transporting cableway (10) and power source, liftable to be packed in the transport
Strip collection fish tank on cableway (10), transports cableway in the cooperation lower edge of the power source and is reciprocally moveable.
4. minisize ecological natural flow station according to claim 2, it is characterised in that:The capture systems (3) include
It is arranged in the fish screen (11) of attracting trapping region (5) and catches up with fish corral (12), described in the arrangement of described fish gathering structure (8) activity
Fish screen (11) and described catch up between fish corral (12).
5. minisize ecological natural flow station according to any one of claims 1 to 4, it is characterised in that:Behind the dam
Generating system by piloting water (2) includes the electrical generation water drainage tube (13), micro generation station body (14), tail along water (flow) direction order arrangement
Water gathers run-off (15) and the attracting trapping region (5), and the micro generation station body (14) passes through the electrical generation water
The upstream side generating power by water current that drainage tube (13) introduces, the micro generation station body (14) by the tail water of discharge with it is described
Tail water gathers run-off (15) connection, and the tail water gathers run-off (15) and passes through spill stream and the attracting trapping region
(5) connect.
6. minisize ecological natural flow station according to claim 5, it is characterised in that:The tail water gathers run-off
(15) catchment run-off (16) and the downflow weir (17) positioned at the run-off that catchments (16) downstream, the overflow of catchmenting are included
Downstream and described attracting trapping region (5) sequential communication of the pond (16) by the downflow weir (17).
7. minisize ecological natural flow station according to claim 6, it is characterised in that:In the attracting trapping region (5)
Downstream is also associated with the attracting passage (18) connected with downstream water.
8. minisize ecological natural flow station according to claim 7, it is characterised in that:At the bottom of the attracting passage (18)
Set on plate and help migration protrusion (19).
9. minisize ecological natural flow station according to claim 2, it is characterised in that:Supporting row frame (6) on being disposed with
It is additionally provided with the checkdam that shuts off (1) at position and puts fish structure (20), whirling in the fish gathering structure (8) is collected in temptation
Swimming fish group is put into the water body of the checkdam that shuts off (1) upstream side by the fish structure (20) of putting.
10. minisize ecological natural flow station according to claim 9, it is characterised in that:Described puts fish structure (20) bag
Include and be arranged on putting fish hole (21) and putting fishpond (22) with what this put that fish hole (21) is connected for described checkdam (1) upstream side of shutting off,
The upstream side for putting fishpond (22) has the open design connected with upstream water body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711208965.XA CN108005040A (en) | 2017-11-27 | 2017-11-27 | Minisize ecological natural flow station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711208965.XA CN108005040A (en) | 2017-11-27 | 2017-11-27 | Minisize ecological natural flow station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108005040A true CN108005040A (en) | 2018-05-08 |
Family
ID=62054116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711208965.XA Pending CN108005040A (en) | 2017-11-27 | 2017-11-27 | Minisize ecological natural flow station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108005040A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736254A (en) * | 2019-02-22 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | High dam integrates fish pass structure and its crosses fish method |
CN109736255A (en) * | 2019-02-22 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | The fish lift device and its attracting fish method of fish gathering are carried out using hydropower station tail water |
CN109736253A (en) * | 2019-02-22 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | A kind of fish-collecting box and its attracting fish method using tail water fish gathering |
CN110016883A (en) * | 2019-02-22 | 2019-07-16 | 长江勘测规划设计研究有限责任公司 | A kind of device and its attracting fish method of hydropower station tail water fish gathering |
CN110106823A (en) * | 2019-02-22 | 2019-08-09 | 长江勘测规划设计研究有限责任公司 | Fish-aggregating device and its attracting fish method suitable for built power station |
CN110453657A (en) * | 2019-08-28 | 2019-11-15 | 王正军 | A kind of layout structure in novel composite ecological power station |
CN113605320A (en) * | 2021-07-26 | 2021-11-05 | 谭统伟 | Ecological dykes and dams of hydraulic engineering |
CN113693036A (en) * | 2021-08-20 | 2021-11-26 | 中国电建集团华东勘测设计研究院有限公司 | Novel fish gathering station structure |
CN116289787A (en) * | 2022-12-08 | 2023-06-23 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish three-field two-channel interconnection intercommunication and reservoir ecological trap avoiding system |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU1817800C (en) * | 1990-11-05 | 1993-05-23 | Борис Федорович Калашников | Fish way |
JPH0853831A (en) * | 1994-08-12 | 1996-02-27 | Dam Suigenchi Kankyo Seibi Center | Lift type fishway device |
CN1982542A (en) * | 2005-12-16 | 2007-06-20 | 水利部中国科学院水工程生态研究所 | Method for getting fishes through dam |
CN104912041A (en) * | 2015-06-17 | 2015-09-16 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish passing system for high dam of canyon river reach |
CN105421307A (en) * | 2015-12-25 | 2016-03-23 | 中水北方勘测设计研究有限责任公司 | Rail type fish passing structure applied to medium and high-water-head barrage hubs |
CN205688411U (en) * | 2016-06-01 | 2016-11-16 | 中国电建集团贵阳勘测设计研究院有限公司 | Upstream and downstream fish dam-crossing alternating current device |
CN106149646A (en) * | 2016-08-25 | 2016-11-23 | 上海交通大学 | Waterwheel-type fish pass |
US9629343B1 (en) * | 2016-08-31 | 2017-04-25 | Joe Sallaberry | Salmon migration lift device |
CN107059760A (en) * | 2017-05-27 | 2017-08-18 | 华电郑州机械设计研究院有限公司 | The high dam length of Hydraulic and Hydro-Power Engineering is defeated to cross fish system |
CN207512709U (en) * | 2017-11-27 | 2018-06-19 | 中国电建集团成都勘测设计研究院有限公司 | Minisize ecological natural flow station |
-
2017
- 2017-11-27 CN CN201711208965.XA patent/CN108005040A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU1817800C (en) * | 1990-11-05 | 1993-05-23 | Борис Федорович Калашников | Fish way |
JPH0853831A (en) * | 1994-08-12 | 1996-02-27 | Dam Suigenchi Kankyo Seibi Center | Lift type fishway device |
CN1982542A (en) * | 2005-12-16 | 2007-06-20 | 水利部中国科学院水工程生态研究所 | Method for getting fishes through dam |
CN104912041A (en) * | 2015-06-17 | 2015-09-16 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish passing system for high dam of canyon river reach |
CN105421307A (en) * | 2015-12-25 | 2016-03-23 | 中水北方勘测设计研究有限责任公司 | Rail type fish passing structure applied to medium and high-water-head barrage hubs |
CN205688411U (en) * | 2016-06-01 | 2016-11-16 | 中国电建集团贵阳勘测设计研究院有限公司 | Upstream and downstream fish dam-crossing alternating current device |
CN106149646A (en) * | 2016-08-25 | 2016-11-23 | 上海交通大学 | Waterwheel-type fish pass |
US9629343B1 (en) * | 2016-08-31 | 2017-04-25 | Joe Sallaberry | Salmon migration lift device |
CN107059760A (en) * | 2017-05-27 | 2017-08-18 | 华电郑州机械设计研究院有限公司 | The high dam length of Hydraulic and Hydro-Power Engineering is defeated to cross fish system |
CN207512709U (en) * | 2017-11-27 | 2018-06-19 | 中国电建集团成都勘测设计研究院有限公司 | Minisize ecological natural flow station |
Non-Patent Citations (2)
Title |
---|
金弈;康建民;喻卫奇;谭奇林;: "旬阳水电站的鱼道设计", 水力发电, vol. 37, no. 12, pages 233 - 238 * |
陈静;郎建;周小波;王泽溪;张连明;张湘隆;: "雅鲁藏布江藏木水电站鱼道工程设计与研究", 水电站设计, vol. 33, no. 01, pages 52 - 58 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541312A (en) * | 2019-02-22 | 2022-05-27 | 长江勘测规划设计研究有限责任公司 | Fish lifting machine device for collecting fish by utilizing tail water of hydropower station and fish collecting method thereof |
CN110016883B (en) * | 2019-02-22 | 2023-12-15 | 长江勘测规划设计研究有限责任公司 | Hydropower station tail water fish collecting device and fish collecting method thereof |
CN109736254A (en) * | 2019-02-22 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | High dam integrates fish pass structure and its crosses fish method |
CN110016883A (en) * | 2019-02-22 | 2019-07-16 | 长江勘测规划设计研究有限责任公司 | A kind of device and its attracting fish method of hydropower station tail water fish gathering |
CN114541312B (en) * | 2019-02-22 | 2024-04-16 | 长江勘测规划设计研究有限责任公司 | Fish collecting method of fish lift device for collecting fish by utilizing tail water of hydropower station |
CN109736255B (en) * | 2019-02-22 | 2024-04-05 | 长江勘测规划设计研究有限责任公司 | Fish lifting machine device for collecting fish by utilizing tail water of hydropower station and fish collecting method thereof |
CN109736255A (en) * | 2019-02-22 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | The fish lift device and its attracting fish method of fish gathering are carried out using hydropower station tail water |
CN109736254B (en) * | 2019-02-22 | 2023-10-24 | 长江勘测规划设计研究有限责任公司 | High dam comprehensive fish passing facility and fish passing method thereof |
CN109736253A (en) * | 2019-02-22 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | A kind of fish-collecting box and its attracting fish method using tail water fish gathering |
CN110106823A (en) * | 2019-02-22 | 2019-08-09 | 长江勘测规划设计研究有限责任公司 | Fish-aggregating device and its attracting fish method suitable for built power station |
CN109736253B (en) * | 2019-02-22 | 2023-12-01 | 长江勘测规划设计研究有限责任公司 | Fish collecting box for collecting fish by utilizing tail water and fish collecting method thereof |
CN110106823B (en) * | 2019-02-22 | 2023-12-01 | 长江勘测规划设计研究有限责任公司 | Fish collecting device and method suitable for built hydropower station |
CN110453657A (en) * | 2019-08-28 | 2019-11-15 | 王正军 | A kind of layout structure in novel composite ecological power station |
CN113605320A (en) * | 2021-07-26 | 2021-11-05 | 谭统伟 | Ecological dykes and dams of hydraulic engineering |
CN113693036A (en) * | 2021-08-20 | 2021-11-26 | 中国电建集团华东勘测设计研究院有限公司 | Novel fish gathering station structure |
CN116289787A (en) * | 2022-12-08 | 2023-06-23 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish three-field two-channel interconnection intercommunication and reservoir ecological trap avoiding system |
CN116289787B (en) * | 2022-12-08 | 2024-05-24 | 中国电建集团贵阳勘测设计研究院有限公司 | Fish three-field two-channel interconnection intercommunication and reservoir ecological trap avoiding system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108005040A (en) | Minisize ecological natural flow station | |
CN108086262A (en) | Fish system is crossed in cut-off dam hydraulic engineering | |
CN109469030B (en) | Fish gathering and transporting system for diversion type power generation high dam | |
CN101260661A (en) | Automatic irrigation and drainage method and system for agricultural land | |
CN207512709U (en) | Minisize ecological natural flow station | |
CN105257454B (en) | A kind of water channeling type swirling water current electricity generation system | |
CN109736255A (en) | The fish lift device and its attracting fish method of fish gathering are carried out using hydropower station tail water | |
CN109736253A (en) | A kind of fish-collecting box and its attracting fish method using tail water fish gathering | |
CN109371932A (en) | Waterpower vertical shaft type crosses fish structure | |
CN207512708U (en) | Fish system is crossed in cut-off dam hydraulic engineering | |
CN209429074U (en) | Waterpower vertical shaft type crosses fish structure | |
CN217378806U (en) | Fish passing system for realizing multiple ecological benefits | |
CN110184992A (en) | A kind of new city cavernous body and drainage method based on water system connection | |
CN105248335A (en) | Schizothoracinae fish fertilized egg incubation method | |
CN205329652U (en) | Irrigated area canal system system | |
CN209493909U (en) | A kind of aqueduct is across reservoir point water intaking structure | |
CN203583433U (en) | River lifting irrigation multifunctional landscape waterfall dam | |
CN207484433U (en) | Compound fish channel structure on Narrow Valleys landform dam | |
CN109930568B (en) | Pump valve pipeline type fish passing facility | |
CN210459143U (en) | Utilize integrated configuration of river levee and lock to realize crossing fish function | |
KR20090081304A (en) | Multilevel hydroelectric powergeneration system having tunnel-type water reserving equipment | |
CN211113531U (en) | Automatic carry water conservancy device of crossing dam | |
CN207484431U (en) | For the export structure of fish pass system | |
CN206744337U (en) | A kind of descending device of safe and efficient fish | |
De S. Hewavisenthi | Mahaweli water resources project |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180508 |