Nothing Special   »   [go: up one dir, main page]

CN107787047A - Resource allocation methods, relevant device and computer-readable medium - Google Patents

Resource allocation methods, relevant device and computer-readable medium Download PDF

Info

Publication number
CN107787047A
CN107787047A CN201711165668.1A CN201711165668A CN107787047A CN 107787047 A CN107787047 A CN 107787047A CN 201711165668 A CN201711165668 A CN 201711165668A CN 107787047 A CN107787047 A CN 107787047A
Authority
CN
China
Prior art keywords
resource
information
resource block
ray
sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711165668.1A
Other languages
Chinese (zh)
Inventor
马骥超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jinli Communication Equipment Co Ltd
Original Assignee
Shenzhen Jinli Communication Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jinli Communication Equipment Co Ltd filed Critical Shenzhen Jinli Communication Equipment Co Ltd
Priority to CN201711165668.1A priority Critical patent/CN107787047A/en
Publication of CN107787047A publication Critical patent/CN107787047A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0048Allocation of pilot signals, i.e. of signals known to the receiver

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the present invention provides a kind of resource allocation methods, relevant device and computer-readable medium, wherein, resource allocation methods include:Network equipment generation first resource distribution information, the first resource distribution information includes the first resource information for the distribution of a variety of first configured informations, the first resource information is used to indicate at least one first resource block for carrying a variety of first configured informations, and at least one First ray corresponding to the first resource block, one First ray of one first resource block is used to represent a kind of first configured information, and first configured information includes hybrid automatic repeat-request response message and the first scheduling request information;The network equipment sends the first resource to terminal device and distributes information.Resource allocation when can realize hybrid automatic repeat-request response message and scheduling request information simultaneous transmission using the embodiment of the present invention.

Description

Resource allocation methods, relevant device and computer-readable medium
Technical field
The present invention relates to communication technical field, more particularly to a kind of resource allocation methods, relevant device and computer-readable Medium.
Background technology
Physical uplink control channel (the Physical Uplink Control of new radio (New Radio, NR) CHannel, PUCCH) in the physical uplink control signaling that is carried may include hybrid automatic repeat-request-confirmation response (Automatic Repeat Request-Acknowledgement, HARQ-ACK) information, CSI (Channel State Information) report and (may also include Beamforming information) and dispatch request (Scheduling Request, SR) information, whether HARQ-ACK information is for correct to network equipment instruction terminal equipment received data, generally with transmission Block (transport block, TB) is that unit is fed back, and SR information is used to whether there is to network equipment instruction terminal equipment Dispatch request.When HARQ-ACK information and SR information during the simultaneous transmission within same dispatching cycle, then a variety of possibilities be present, For example HARQ-ACK information is 1bit (the data receiver situation for feeding back 1 TB), SR information is 1bit, then needs four kinds not The information content corresponding to same transmission signal sign.If HARQ-ACK information, which is 2bit, (feeds back 2 TB data receiver feelings Condition), SR information is 1bit, then needs the information content corresponding to eight kinds of different transmission signals signs.At present in 5G, for Resource distribution mode when HARQ-ACK information and SR information simultaneous transmissions does not determine finally also.
The content of the invention
The embodiment of the present invention provides a kind of resource allocation methods, relevant device and computer-readable medium, can realize mixed Close resource allocation when HARQ response message and scheduling request information simultaneous transmission.
First aspect, it is proposed that a kind of resource allocation methods, network equipment generation first resource distribution information, described first Resource allocation information includes the first resource information for the distribution of a variety of first configured informations, and the first resource information is used to indicate Carry at least one first resource block of a variety of first configured informations, and corresponding to the first resource block it is at least one First ray, a First ray of a first resource block are used to representing a kind of first configured information, described the One configured information includes hybrid automatic repeat-request response message and the first scheduling request information;
The network equipment sends the first resource to terminal device and distributes information.
Second aspect, it is proposed that a kind of resource allocation methods, terminal device receive the first resource point that the network equipment is sent With information, the first resource distribution information includes the first resource letter that the network equipment is the distribution of a variety of first configured informations Breath, the first resource information are used to indicate at least one first resource block for carrying a variety of first configured informations, and At least one First ray corresponding to the first resource block, a First ray of a first resource block are used for A kind of first configured information is represented, first configured information includes hybrid automatic repeat-request response message and the first scheduling please Seek information;
The terminal device determines to need the first configured information fed back;
The first of the first configured information for determining to feed back for representing the needs according to first resource distribution information Resource block and First ray, and the First ray is sent by the first resource block.
Above-mentioned first aspect and second aspect, respectively from the angle of the network equipment and terminal device, are situated between respectively Continued a kind of resource allocation methods, when can realize hybrid automatic repeat-request response message and scheduling request information simultaneous transmission Resource allocation.
With reference to first aspect or second aspect, the network equipment generation Secondary resource distribution information, second money Source distribution information includes the Secondary resource information for the distribution of the second configured information, and the Secondary resource information is used to indicate carrying institute The Secondary resource block of the second configured information, and the second sequence corresponding to the Secondary resource block are stated, the Secondary resource block Second sequence is used to represent second configured information, and second configured information is used to indicate including periodic feedback The second scheduling request information of dispatch request be present
The network equipment sends the Secondary resource distribution information.
The terminal device receives the Secondary resource distribution information that the network equipment is sent.
With reference to first aspect or second aspect, the first resource information is included at least one first resource block The Resource Block identification of each first resource block, and at least one First ray corresponding to the first resource block are initial Cyclic shift.
Optionally, it is described to be determined according to first resource distribution information for representing first instruction for needing to feed back The first resource block and First ray of information, including:
The terminal device obtains the sequence number of First ray corresponding to the first resource block;
The terminal device is searched and the resource block number of the first resource block and first sequence from object listing Cyclic shift interval corresponding to the sequence number of row;
Terminal device institute according to corresponding to each Resource Block identification of the first resource block, the first resource block The initial cycle displacement of at least one First ray and the cyclic shift interval are stated, it is determined that needing to feed back for representing described The first configured information first resource block and First ray.
With reference to first aspect or second aspect, the first resource information also includes institute corresponding to the first resource block State the cyclic shift interval of at least one First ray.
With reference to first aspect or second aspect, the first resource information includes target identification, the target identification pair Answer the target resource in resource collection, the target resource in the resource collection includes at least one first resource block In each first resource block Resource Block identification, and at least one First ray corresponding to the first resource block just Beginning cyclic shift.
The third aspect, there is provided a kind of network equipment, including for performing the unit of method as described in relation to the first aspect.
Fourth aspect, there is provided a kind of terminal device, including for performing the unit of the method as described in second aspect.
5th aspect, there is provided a kind of network equipment, including processor, transceiver and memory, the processor, transmitting-receiving Device and memory are connected with each other, wherein, the memory is used to store computer program, and the computer program refers to including program Order, the processor are arranged to call described program instruction, perform the method as described in any one of first aspect.
6th aspect, there is provided a kind of terminal device, including processor, transceiver and memory, the processor, transmitting-receiving Device and memory are connected with each other, wherein, the memory is used to store computer program, and the computer program refers to including program Order, the processor are arranged to call described program instruction, perform the method as described in any one of second aspect.
7th aspect, there is provided a kind of computer-readable recording medium, the computer-readable storage medium are stored with computer Program, the computer program include programmed instruction, and described program instruction makes the computing device when being executed by a processor Method as described in any one of first aspect.
Eighth aspect, there is provided a kind of computer-readable recording medium, the computer-readable storage medium are stored with computer Program, the computer program include programmed instruction, and described program instruction makes the computing device when being executed by a processor Method as described in any one of second aspect.
In the above method, the network equipment is that a variety of first configured informations distribute first resource information, and is referred to terminal device Show at least one first resource block for carrying a variety of first configured informations, and at least one first corresponding to first resource block Sequence, a First ray of a first resource block are used to represent a kind of first configured information, and first configured information includes Hybrid automatic repeat-request response message and the first scheduling request information, so as to realize hybrid automatic repeat-request response message and Resource allocation during scheduling request information simultaneous transmission.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, it is required in being described below to embodiment to use Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the present invention, general for this area For logical technical staff, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of access net system provided in an embodiment of the present invention;
Fig. 2 is a kind of interaction figure of resource allocation methods provided in an embodiment of the present invention;
Fig. 3 is a kind of sequence cyclic shift schematic diagram provided in an embodiment of the present invention;
Fig. 4 a are a kind of resource allocation schematic diagrames provided in an embodiment of the present invention;
Fig. 4 b are another resource allocation schematic diagrames provided in an embodiment of the present invention;
Fig. 5 is a kind of schematic block diagram of network equipment provided in an embodiment of the present invention;
Fig. 6 is a kind of schematic block diagram of terminal device provided in an embodiment of the present invention;
Fig. 7 is a kind of schematic block diagram for network equipment that another embodiment of the present invention provides;
Fig. 8 is a kind of schematic block diagram for terminal device that another embodiment of the present invention provides.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is part of the embodiment of the present invention, rather than whole embodiments.Based on this hair Embodiment in bright, the every other implementation that those of ordinary skill in the art are obtained under the premise of creative work is not made Example, belongs to the scope of protection of the invention.
It should be appreciated that ought be in this specification and in the appended claims in use, term " comprising " and "comprising" instruction Described feature, entirety, step, operation, the presence of element and/or component, but it is not precluded from one or more of the other feature, whole Body, step, operation, element, component and/or its presence or addition for gathering.
It is also understood that the term used in this description of the invention is merely for the sake of the mesh for describing specific embodiment And be not intended to limit the present invention.As used in description of the invention and appended claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singulative, "one" and "the" are intended to include plural form.
It will be further appreciated that the term "and/or" used in description of the invention and appended claims is Refer to any combinations of one or more of the associated item listed and be possible to combine, and including these combinations.
As used in this specification and in the appended claims, term " if " can be according to context quilt Be construed to " when ... " or " once " or " in response to determining " or " in response to detecting ".Similarly, phrase " if it is determined that " or " if detecting [described condition or event] " can be interpreted to mean according to context " once it is determined that " or " in response to true It is fixed " or " once detecting [described condition or event] " or " in response to detecting [described condition or event] ".
As shown in figure 1, Fig. 1, which is the embodiment of the present invention, provides a kind of schematic diagram of access net system.As shown in figure 1, originally connect Networking system includes the network equipment 110 and terminal device 120.Wherein, the network equipment 110 can be the terminal device 120 distribute the resource for transmitting a variety of first configured informations, and first configured information includes HARQ-ACK information and SR information.
In the embodiment of the present application, the network equipment 110 is primarily referred to as connecting the transferring equipment between access network and core net, That is, the network equipment will be sent to core net from the uplink information that access network receives, and, it is descending by being received from core net Message is sent to access network.The network equipment can generally include:Macro base station (macro eNodeB/NodeB), micro-base station (micro ENodeB/NodeB), femto base station, Home eNodeB (home eNodeB/NodeB), distributed base station etc., do not make to have herein Body limits.
In the embodiment of the present application, terminal device 120 is logic entity, can be specifically user equipment (User Equipment any one) and in Internet of Things (Internet of Things, IoT) equipment etc..Wherein, Yong Hushe Standby can be smart mobile phone (smart phone), intelligent watch (smart watch), and Intelligent flat etc., internet of things equipment can To be wearable device (wearable device, WD), instrument and environment monitoring equipment etc., it is not especially limited herein.
In the embodiment of the present application, the terminal device 120 can access (frequency by frequency division multiple access Division multiple access, FDMA) technology is linked into the network equipment 110.The frequency division multiple access access technology Including:Single-carrier frequency division multiple access (single-carrier frequency-division multiple access, SC- FDMA), OFDM (orthogonal frequency division multiple access, OFDMA) or its His frequency division multiple access access technology, is not limited specifically herein.
The first resource information of the embodiment of the present invention can be the resource distributed for HARQ-ACK PUCCH format 0 Information.
The Secondary resource information of the embodiment of the present invention can be for the information of the resource of SR PUCCH distribution.
Referring to Fig. 2, Fig. 2 is that the embodiment of the present invention provides a kind of interaction figure of resource allocation methods.The resource of the present embodiment Distribution method includes:
S101, network equipment generation first resource distribution information, the first resource distribution information include being a variety of first The first resource information of configured information distribution, the first resource information are used to indicate to carry a variety of first configured informations At least one first resource block, and at least one First ray corresponding to the first resource block, a first resource One First ray of block is used to represent a kind of first configured information, and first configured information includes mixed automatic retransfer Request-reply information and the first scheduling request information;
Optionally, the network equipment also generates Secondary resource distribution information, and the Secondary resource distribution information includes being second The Secondary resource information of configured information distribution, the Secondary resource information are used to indicate to carry the second of second configured information Resource block, and the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block are used to represent Second configured information, second configured information include the second tune for being used to indicate to have dispatch request of periodic feedback Spend solicited message.
In one embodiment, PUCCH physical uplink control signaling can carry HARQ-ACK information, CSI is reported (may Also include wave beam forming (beamforming) information), and SR information.For NR PUCCH, determine at least support at present Two kinds of transmission modes:One kind is short duration transmission, i.e. PUCCH time-domain position is last in a time slot (slot) On the up symbol of transmission, 1~2 symbol, abbreviation short PUCCH are supported;Another kind is that long duration are passed Defeated, i.e. PUCCH time-domain position, to lift covering, supports 4~14 symbol, abbreviation long on multiple up symbol PUCCH。
According to PUCCH carry UCI bits difference, be divided into no more than 2bit and more than 2bit, wherein, when no more than During 2bit, UCI is HARQ-ACK information.And when the HARQ-ACK information no more than 2bit and SR information simultaneous transmissions, support Use short PUCCH (short PUCCH formats of the UCI no more than 2bit is defined or is PUCCH Format 0 again). The first resource information distributed of the embodiment of the present invention can be the resource distributed for PUCCH Format 0, and the first instruction is believed Breath is HARQ-ACK information and SR information, and HARQ-ACK information is used to represent whether terminal device is correctly decoded PDSCH and is held The business datum of load, such as, can be fed back with transmission block (transport block, TB) for unit, a TB is needed 1bit HARQ-ACK information is wanted, two TB are the HARQ-ACK information for needing 2bit.SR information is used to represent that terminal device is It is no dispatch request to be present.
It is no more than 2bit short PUCCH (i.e. PUCCH Format 0) for UCI, the HARQ-ACK letters that UCI is included Breath is represented by way of sequence selection, i.e., different sequences represents different HARQ-ACK information.
The sequence of the embodiment of the present invention is that the sequence that cyclic shift obtains is carried out based on basic sequence, wherein, basic sequence Sequence length be 12 resource elements (Resource Element, RE), followed as shown in figure 3, the basic sequence there are 12 Ring shifts (cyclic shift, CS), and the sequence length of the sequence after cyclic shift remains as 12 RE.Support 12RE at present The sequence-continuous-open mappings of length are on a RB, wherein different cyclic shifts (namely corresponding different sequence) can be used for point Dispensing same UE or different UE different UCI information.
It is to use 2 for PUCCH format 0mIndividual cyclic shift sends m bit HARQ-ACK information, such as 1bit HARQ-ACK uses 2 cyclic shifts, i.e. 2 sequences, and 2bit HARQ-ACK uses 4 cyclic shifts, i.e. 4 sequences.
From the angle for improving resource utilization, only SR PUCCH reserve 1 PUCCH resource (1 PUCCH resource here Refer to 1RB+1CS), the Secondary resource information of the embodiment of the present invention is the resource information for SR PUCCH distribution, and second refers to Show that information includes the SR information for being used to indicate to have dispatch request of terminal device periodic feedback, for carrying second instruction Information represents second instruction for Secondary resource block, a Secondary resource block and second sequence (i.e. above-mentioned 1RB+1CS) Information.
It can be shared for the PUCCH resources distributed of PUCCH Format 0 by way of dynamically distributes, in order to simultaneously Reflect (Discontinuous Transmission, DTX) information, HARQ-ACK information and SR information, HARQ-ACK information is Need 4 PUCCH resources to send ACK/NACK/SR information during 1bit, 8 PUCCH resources are needed when HARQ-ACK is 2bit To send ACK/NACK/SR information.As shown in following table one, when to be HARQ-ACK information be 1bit, corresponding to each sequence ACK/NACK/SR information:
Table one
As shown in following table two, when to be HARQ-ACK information be 2bit, the ACK/NACK/SR information corresponding to each sequence:
Table two
Above-mentioned different sequence Sequence#0~Sequence#8 can be represented, it is necessary to say by different RB different CS Bright, the corresponding relation in above-mentioned table one and table two between sequence index value and the first configured information is only for example, can be with It is other corresponding relations, the embodiment of the present invention is not construed as limiting to this.
A PUCCH resource needed for SR PUCCH be it is reserved, can be in a RB.And HARQ-ACK PUCCH Resource needed for format 0 is more, may be in same RB, it is also possible to be distributed in multiple RB.Mapped in one RB Sequence number can be at least one.When RB number of distribution is more, the CS intervals of a RB institutes sequence of mapping are also bigger, Receptivity is also better.Particularly when the delay extension (delay spread) of fading channel is larger, 1 is only distributed RB possibly can not meet performance requirement (now minimum CS distances are 1), and larger delay expansion can be resisted by now distributing multiple RB The channel condition of exhibition, but shortcoming is to may require that more RB resources.
Optionally, each first resource block that the network equipment is distributed by first resource information to terminal device instruction At least one First ray corresponding to Resource Block identification, first resource block and first resource block is that the network equipment is PUCCH The resource that format 0 is distributed.
Wherein, the number of First ray corresponding to each first resource block can be with identical or different.If each first money The number of First ray corresponding to source block is identical, and the cyclic shift interval in a RB between each sequence is identical, then and first The initial cycle that resource information can include at least one First ray corresponding to each first resource block shifts, wherein circulation moves Bit interval can be obtained by inquiring about object listing, can store a variety of corresponding relations in object listing, and the corresponding relation can be with It is RB number of first resource block, between the sequence number and cyclic shift interval of First ray corresponding to a first resource block Corresponding relation.Wherein, terminal device and the network equipment can configure the object listing, by inquiring about the object listing Know at least one First ray corresponding to distributed first resource block and each first resource block.
For example CS number and circulated during HARQ-ACK and SR simultaneous transmissions that following table three is 1bit, in RB quantity, each RB Corresponding relation between shift intervals:
Table three
Again for example, CS number and followed when following table four is 2bit HARQ-ACK and SR simultaneous transmissions, in RB quantity, each RB Corresponding relation between ring shift intervals:
Table four
Optionally, the cyclic shift interval of at least one First ray can be by tabling look-up corresponding to each first resource block Obtain, can also notify to obtain to terminal device by the network equipment, for example pass through downlink physical control channel (Downlink Control Information, DCI) notice.
Optionally, the network equipment indicates target identification by first resource information to terminal device, and the target identification corresponds to Target resource in resource collection, the resource collection include the one-to-one relationship between multiple marks and multiple resources.Such as Mark 1 corresponding to resource be:RB1, RB3, each RB initial cycle displacement is CS0, cyclic shift interval 6;Identify 2 correspondences Resource be:RB4, RB6, each RB initial cycle displacement is CS3, cyclic shift interval 6;Etc..Target identification can be with It is mark 1 or mark 2.
S102, the network equipment send the first resource to terminal device and distribute information.
Optionally, the network equipment also sends generated Secondary resource to terminal device and distributes information, wherein first resource Distribution information can be the resource information of dynamically distributes, and Secondary resource distribution information can be the resource information of semi-static distribution. It is different with the transmission cycle of Secondary resource distribution information that first resource distributes information.
Wherein, the network equipment is that the semi-persistent resource of SR PUCCH distribution is that Secondary resource distributes information, is HARQ-ACK The dynamic resource that PUCCH format 0 are distributed is first resource distribution information.
The network equipment sends descending PDSCH schedule information by PDCCH and is HARQ-ACK PUCCH format 0 First resource distribution information etc. of distribution, terminal device is likely to be received the PDCCH, or, terminal device missing inspection should PDCCH.If terminal device receives PDCCH, step S103~S106 is performed, if the terminal device missing inspection PDCCH, terminal Whether equipment then has SR requests to determine whether to send the second sequence on the Secondary resource block distributed for SR PUCCH according to current.
The network equipment receives the target sequence carried by target resource block, and the target resource block can be first resource Block, i.e. terminal device receive after PDCCH sent in corresponding first resource block corresponding to First ray.The target resource block is also Can be Secondary resource block, i.e. terminal device missing inspection PDCCH, and send the second sequence in Secondary resource block when there is SR requests. The network equipment can further obtain the Target indication information represented by the target sequence of target resource block, the Target indication information Can be the first configured information or the second configured information.It is further alternative, when terminal device does not send any sequence, network The energy intensity of equipment detection received signal is less than certain threshold value, then the network equipment determines that terminal device please in the absence of SR Ask, and be DTX.
Optionally, the network equipment has reserved CS0 as SR PUCCHs of the Sequence#0 to UE0 in RB X, is moved in RB Y State is assigned with CS1 as the 2bit HARQ-ACK PUCCH format 0 of Sequence#1 to UE0 etc..The network equipment receives The up PUCCH that UE0 is sent, have sent CS0, i.e., terminal device have sent Sequence#0, then basis if being detected in RB X The resource sequence of table two and configured information mapping table, the network equipment understand that UE0 has SR demands (Positive SR), and UE It is not received by the descending scheduling signal (PDCCH) of (missing inspection) network equipment transmission;If the network equipment detects transmission in RB Y CS1, i.e. terminal device have sent Sequence#1, then according to the resource sequence of table two and configured information mapping table, network Equipment understands that the corresponding 2 TB decoded results received of UE0 feedbacks are ACK, and UE does not have SR demands (Negative SR).
S103, terminal device receive the first resource distribution information that the network equipment is sent.
Optionally, terminal device also receives the Secondary resource distribution information of network equipment transmission.
Wherein first resource distribution information can be the resource information of dynamically distributes, and Secondary resource distribution information can be half The resource information of static allocation.It is different with the transmission cycle of Secondary resource distribution information that first resource distributes information.
S104, the terminal device determine to need the first configured information fed back.
S105, the terminal device according to the first resource distribute information determine for represent it is described need to feed back the The first resource block and First ray of one configured information.
Optionally, it is described to be determined according to first resource distribution information for representing first instruction for needing to feed back The first resource block and First ray of information, including:
The terminal device determines each first resource block pair according to the number of at least one first resource block The sequence number for the First ray answered;
The terminal device is searched and the resource block number of the first resource block and first sequence from object listing Cyclic shift interval corresponding to the sequence number of row;
Terminal device institute according to corresponding to each Resource Block identification of the first resource block, the first resource block The initial cycle displacement of at least one First ray and the cyclic shift interval are stated, it is determined that needing to feed back for representing described The first configured information first resource block and First ray.
Wherein, can be according to for the determination of the sequence number of First ray corresponding to each first resource block The number of one resource block is calculated, and can also table look-up to obtain from the object listing according to the number of first resource block.
S106, the First ray is sent by the first resource block.
In one embodiment, terminal device determines to need the first configured information fed back, such as, 1bit HARQ-ACK Four kinds of possible first configured informations, i.e. ACK/NACK/SR information then be present in information.2bit HARQ-ACK information then has eight Possible first configured information of kind, i.e. ACK/NACK/SR information.Terminal device need according to specific PDSCH decoded results with And asked with the presence or absence of SR, it is determined that needing the first configured information fed back.Terminal device determines to use further according to resource allocation information In the first resource block and First ray of the first configured information for representing needs feedback, by the first resource block send this One sequence.
Optionally, simultaneous transmission is needed as an example with 1bit HARQ-ACK and SR here, as shown in fig. 4 a, net Network equipment distributes to UE0 SR PUCCH using RB X CS3 as Sequence#0, and the network equipment is distributed by Secondary resource to be believed Breath is designated as the channel resource of above-mentioned SR PUCCH distribution.The network equipment using RB Y CS0 as Sequence#1, by RB Z's CS0 distributes to as Sequence#2, using RB M CS0 as Sequence#3, using RB N CS0 as Sequence#4 UE0 HARQ-ACK PUCCH format 0.The initial cycle displacement of wherein each RB assigned sequences is 0, i.e. CS0.Network Equipment is designated as the channel resource of the above-mentioned distribution of HARQ-ACK PUCCH format 0 by first resource distribution information, such as First resource distribution information is carried by DCI to notify to UE0.
If UE0 receives the DCI that the network equipment issues, the PUCCH resource of distribution is got, that is, gets first resource point With information, and corresponding PDSCH decoded result is correct, and UE0, without SR demands, therefore according to table one, UE0 is by the time slot RB Y send CS0 sequences, i.e. Sequence#1.The PUCCH that network equipment detection UE0 is sent, CS0 sequences are detected in RB Y, That is Sequence#1, according to table one, the network equipment understands that the corresponding TB decoded results received of UE0 feedbacks are ACK, and UE0 does not have SR demands (Negative SR).
If the DCI (i.e. PDCCH) that the UE0 missing inspections network equipment issues, therefore the PUCCH resource of distribution is not got, Do not get first resource distribution information, only receive Secondary resource distribution information, UE0 sends week according to pre-configured SR Phase, need to send SR signals in the time slot, and UE0 has SR demands, therefore according to table one, UE0 is by the RB X transmissions of the time slot CS3 sequences, i.e. Sequence#0.The PUCCH that network equipment detection UE0 is sent, detects CS3 sequences, i.e., in RB X Sequence#0, according to table one, the network equipment understands UE0 missing inspections PDCCH, and UE1 has SR demands (Positive SR).
Optionally, simultaneous transmission is needed as an example with 2bit HARQ-ACK and SR here, as shown in Figure 4 b, net Network equipment distributes to UE1 SR PUCCH using RB X CS3 as Sequence#0, and the network equipment is assigned with RB Y Sequence#1 and #2, RB Z are assigned with Sequence#3 and #4, RB M are assigned with Sequence#5 and #6, RB N are assigned with HARQ-ACK PUCCH formats 0 of the Sequence#7 and #8 to UE1, wherein the initial cycle displacement of each RB assigned sequences Be 1, i.e. CS1, and according to table four, cyclic shift interval 6.The network equipment passes through the resource allocation information of the dynamically distributes DCI is notified to UE1.
UE1 receives the DCI that the network equipment issues, and gets the PUCCH resource of distribution, and corresponding PDSCH 2 TB Decoded result TB0 it is correct, TB1 mistakes, and UE2 has a SR demands, corresponding Sequence#6.Therefore according to table two, UE1 is at this The RB M of gap send CS7 sequences.The PUCCH that network equipment detection UE1 is sent, detects CS7 sequences, i.e., in RB M Sequence#6, according to table two, the network equipment understands that the corresponding TB0 decoded results that receive of UE1 feedbacks are ACK, TB1 decoded results For NACK, and UE2 has SR demands (Positive SR).
In the above method, the network equipment is that a variety of first configured informations distribute first resource information, and is referred to terminal device Show at least one first resource block for carrying a variety of first configured informations, and at least one first corresponding to first resource block Sequence, a First ray of a first resource block are used to represent a kind of first configured information, and first configured information includes Hybrid automatic repeat-request response message and the first scheduling request information, so as to realize hybrid automatic repeat-request response message and Resource allocation during scheduling request information simultaneous transmission.
The embodiment of the present invention also provides a kind of network equipment, and the network equipment is used to perform network in the method described in Fig. 2 The function that equipment performs.Specifically, it is a kind of schematic block diagram of network equipment provided in an embodiment of the present invention referring to Fig. 5.This reality Applying the network equipment of example includes:Generation unit 410 and transmitting element 420.
Generation unit 410 is used to generating first resource distribution information, and first resource distribution information is included for a variety of the The first resource information of one configured information distribution, the first resource information are used to indicate to carry a variety of first configured informations At least one first resource block, and at least one First ray corresponding to the first resource block, first money One First ray of source block is used to represent a kind of first configured information, and first configured information includes the automatic weight of mixing Pass request-reply information and the first scheduling request information;
Transmitting element 420 is used to send the first resource distribution information to terminal device.
Alternatively, the generation unit 410 is additionally operable to generate Secondary resource distribution information, and the Secondary resource distributes information Including the Secondary resource information distributed for the second configured information, the Secondary resource information is used to indicate carrying second instruction The Secondary resource block of information, and the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block Arrange for representing second configured information, the instruction that is used for that second configured information includes periodic feedback please in the presence of scheduling The second scheduling request information asked.
The transmitting element 420 is additionally operable to send the Secondary resource distribution information to terminal device.
Optionally, the first resource information includes the money of each first resource block at least one first resource block Source block identifies, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
Optionally, the first resource information also includes at least one First ray corresponding to the first resource block Cyclic shift interval.
Optionally, the first resource information includes target identification, and the target identification corresponds to the target in resource collection Resource, the target resource in the resource collection include each first resource block at least one first resource block Resource Block identification, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
Optionally, the network equipment also includes receiving unit and acquiring unit;
Receiving unit, for receiving the target sequence carried by target resource block;
Acquiring unit, the Target indication information that the target sequence for obtaining the target resource block represents are described Target indication information is the configured information of one kind first in a variety of first configured informations, or the Target indication information is Second configured information.
The embodiment of the present invention also provides a kind of terminal device, and the terminal device is used to perform terminal in the method described in Fig. 2 The function that equipment performs.Specifically, it is a kind of schematic block diagram of terminal device provided in an embodiment of the present invention referring to Fig. 6.This reality Applying the terminal device of example includes:Receiving unit 510, processing unit 520 and transmitting element 530.
Receiving unit 510 is used for the first resource distribution information for receiving network equipment transmission, the first resource distribution letter Breath includes the first resource information that the network equipment is the distribution of a variety of first configured informations, and the first resource information is used to refer to Show at least one first resource block for carrying a variety of first configured informations, and at least one corresponding to the first resource block Individual First ray, a First ray of a first resource block is used to represent a kind of first configured information, described First configured information includes hybrid automatic repeat-request response message and the first scheduling request information;
Processing unit 520 is used to determine to need the first configured information fed back;It is true that information is distributed according to the first resource The fixed first resource block and First ray for being used to represent first configured information for needing to feed back;
Transmitting element 530, for sending the First ray by the first resource block.
Alternatively, receiving unit 510 is additionally operable to receive Secondary resource distribution information, and the Secondary resource distribution information includes For the Secondary resource information of the second configured information distribution, the Secondary resource information is used to indicate to carry second configured information Secondary resource block, and the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block uses In representing second configured information, there is dispatch request in the instruction that is used for that second configured information includes periodic feedback Second scheduling request information.
Alternatively, the first resource information includes the money of each first resource block at least one first resource block Source block identifies, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
It is described to be determined according to first resource distribution information for representing first configured information for needing to feed back First resource block and First ray, including:
The terminal device obtains the sequence number of First ray corresponding to the first resource block;
The terminal device is searched and the resource block number of the first resource block and first sequence from object listing Cyclic shift interval corresponding to the sequence number of row;
Terminal device institute according to corresponding to each Resource Block identification of the first resource block, the first resource block The initial cycle displacement of at least one First ray and the cyclic shift interval are stated, it is determined that needing to feed back for representing described The first configured information first resource block and First ray
Alternatively, the first resource information also includes at least one First ray corresponding to the first resource block Cyclic shift interval.
Optionally, the first resource information includes target identification, and the target identification corresponds to the target in resource collection Resource, the target resource in the resource collection include each first resource block at least one first resource block Resource Block identification, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
Referring to Fig. 7, Fig. 7 is a kind of schematic block diagram for network equipment that another embodiment of the present invention provides.As depicted The network equipment in the present embodiment can include:One or more processors 601;Memory 604 and transceiver 606.It is above-mentioned Processor 601, memory 604 and transceiver 606 are connected by bus 605.Memory 602 is used to store computer program, The computer program includes programmed instruction, and processor 601 is used for the programmed instruction for performing the storage of memory 602.Wherein, handle Device 601 is arranged to call described program instruction to perform:
Processor 601 is used to generate first resource distribution information, and the first resource distribution information includes being a variety of first The first resource information of configured information distribution, the first resource information are used to indicate to carry a variety of first configured informations At least one first resource block, and at least one First ray corresponding to the first resource block, a first resource One First ray of block is used to represent a kind of first configured information, and first configured information includes mixed automatic retransfer Request-reply information and the first scheduling request information;
Transceiver 606 is used to send the first resource distribution information to terminal device.
Alternatively, processor 601 is additionally operable to generate Secondary resource distribution information, and the Secondary resource distribution information is including being The Secondary resource information of second configured information distribution, the Secondary resource information are used to indicate to carry second configured information Secondary resource block, and the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block are used for Represent second configured information, second configured information includes be used to indicate to have dispatch request the of periodic feedback Two scheduling request informations.
Optionally, the first resource information includes the money of each first resource block at least one first resource block Source block identifies, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
Optionally, the first resource information also includes at least one First ray corresponding to the first resource block Cyclic shift interval.
Optionally, the first resource information includes target identification, and the target identification corresponds to the target in resource collection Resource, the target resource in the resource collection include each first resource block at least one first resource block Resource Block identification, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
Transceiver 606 is additionally operable to the target sequence carried by target resource block;
Processor 601 is additionally operable to obtain the Target indication information that the target sequence of the target resource block represents, institute Target indication information is stated as the configured information of one kind first in a variety of first configured informations, or the Target indication information For second configured information.
It should be appreciated that in embodiments of the present invention, alleged processor 601 can be CPU (Central Processing Unit, CPU), the processor can also be other general processors, digital signal processor (Digital Signal Processor, DSP), application specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-Programmable Gate Array, FPGA) or other FPGAs Device, discrete gate or transistor logic, discrete hardware components etc..General processor can be microprocessor or this at It can also be any conventional processor etc. to manage device.
The memory 604 can include read-only storage and random access memory, and to processor 901 provide instruction and Data.The a part of of memory 604 can also include nonvolatile RAM.For example, memory 604 can also be deposited Store up the information of device type.
In the specific implementation, the executable present invention of processor 601, transceiver 606 described in the embodiment of the present invention is implemented Implementation described by the embodiment for the resource allocation methods as shown in Figure 2 that example provides, it also can perform the embodiment of the present invention The implementation of the described network equipment, will not be repeated here.
Referring to Fig. 8, Fig. 8 is a kind of schematic block diagram for terminal device that another embodiment of the present invention provides.As depicted Terminal device in the present embodiment can include:One or more processors 701;One or more input equipments 702, one or Multiple output equipments 703, memory 704 and transceiver 706.Above-mentioned processor 701, input equipment 702, output equipment 703, Memory 704 and transceiver 706 are connected by bus 705.Memory 702 is used to store computer program, the computer Program includes programmed instruction, and processor 701 is used for the programmed instruction for performing the storage of memory 702.Wherein, processor 701 by with Put for calling described program instruction to perform:
The first resource distribution information that the network equipment is sent is received, the first resource distribution information is set including the network The standby first resource information for the distribution of a variety of first configured informations, the first resource information are used to indicating carrying described a variety of the At least one first resource block of one configured information, and at least one First ray corresponding to the first resource block, one One First ray of the first resource block is used to represent a kind of first configured information, and first configured information includes Hybrid automatic repeat-request response message and the first scheduling request information;
It is determined that need the first configured information fed back;Information is distributed according to the first resource to determine to be used to represent the need The first resource block and First ray of the first configured information to be fed back;
The First ray is sent by the first resource block.
Alternatively, the Secondary resource distribution information that the network equipment is sent is received, the Secondary resource distribution information is including being The Secondary resource information of second configured information distribution, the Secondary resource information are used to indicate to carry second configured information Secondary resource block, and the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block are used for Represent second configured information, second configured information includes be used to indicate to have dispatch request the of periodic feedback Two scheduling request informations.
Alternatively, the first resource information includes the money of each first resource block at least one first resource block Source block identifies, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
It is described to be determined according to first resource distribution information for representing first configured information for needing to feed back First resource block and First ray, including:
The terminal device obtains the sequence number of First ray corresponding to the first resource block;
The terminal device is searched and the resource block number of the first resource block and first sequence from object listing Cyclic shift interval corresponding to the sequence number of row;
Terminal device institute according to corresponding to each Resource Block identification of the first resource block, the first resource block The initial cycle displacement of at least one First ray and the cyclic shift interval are stated, it is determined that needing to feed back for representing described The first configured information first resource block and First ray
Alternatively, the first resource information also includes at least one First ray corresponding to the first resource block Cyclic shift interval.
Optionally, the first resource information includes target identification, and the target identification corresponds to the target in resource collection Resource, the target resource in the resource collection include each first resource block at least one first resource block Resource Block identification, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
It should be appreciated that in embodiments of the present invention, alleged processor 701 can be CPU (Central Processing Unit, CPU), the processor can also be other general processors, digital signal processor (Digital Signal Processor, DSP), application specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-Programmable Gate Array, FPGA) or other FPGAs Device, discrete gate or transistor logic, discrete hardware components etc..General processor can be microprocessor or this at It can also be any conventional processor etc. to manage device.
Input equipment 702 can include Trackpad, fingerprint adopt sensor (finger print information that is used to gathering user and fingerprint Directional information), microphone etc., output equipment 703 can include display (LCD etc.), loudspeaker etc..
The memory 704 can include read-only storage and random access memory, and to processor 701 provide instruction and Data.The a part of of memory 704 can also include nonvolatile RAM.For example, memory 704 can also be deposited Store up the information of device type.
In the specific implementation, processor 701, input equipment 702, output equipment 703 described in the embodiment of the present invention with And transceiver 706 can perform the embodiment of the retransfer scheduling method provided in an embodiment of the present invention as shown in Fig. 2 and Fig. 4, The implementation of terminal device described by the executable embodiment of the present invention, will not be repeated here.
A kind of computer-readable recording medium, the computer-readable storage medium are provided in another embodiment of the invention Matter is stored with computer program, and the computer program includes programmed instruction, and described program instruction is realized when being executed by processor:
First resource distribution information is generated, the first resource distribution information is included for the distribution of a variety of first configured informations First resource information, the first resource information are used to indicate at least one first money for carrying a variety of first configured informations Source block, and at least one First ray corresponding to the first resource block, one described of a first resource block One sequence is used to representing a kind of first configured information, first configured information include hybrid automatic repeat-request response message and First scheduling request information;
The first resource distribution information is sent to terminal device.
Alternatively, Secondary resource distribution information is generated, the Secondary resource distribution information is included for the second configured information point The Secondary resource information matched somebody with somebody, the Secondary resource information are used to indicate the Secondary resource block for carrying second configured information, with And the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block are used to represent that described second refers to Show information, second configured information includes the second dispatch request letter for being used to indicate to have dispatch request of periodic feedback Breath;
Send the Secondary resource distribution information.
Optionally, the first resource information includes the money of each first resource block at least one first resource block Source block identifies, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
Optionally, the first resource information also includes at least one First ray corresponding to the first resource block Cyclic shift interval.
Optionally, the first resource information includes target identification, and the target identification corresponds to the target in resource collection Resource, the target resource in the resource collection include each first resource block at least one first resource block Resource Block identification, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
A kind of computer-readable recording medium, the computer-readable storage medium are provided in another embodiment of the invention Matter is stored with computer program, and the computer program includes programmed instruction, and described program instruction is realized when being executed by processor:
The first resource distribution information that the network equipment is sent is received, the first resource distribution information is set including the network The standby first resource information for the distribution of a variety of first configured informations, the first resource information are used to indicating carrying described a variety of the At least one first resource block of one configured information, and at least one First ray corresponding to the first resource block, one One First ray of the first resource block is used to represent a kind of first configured information, and first configured information includes Hybrid automatic repeat-request response message and the first scheduling request information;
It is determined that need the first configured information fed back;Information is distributed according to the first resource to determine to be used to represent the need The first resource block and First ray of the first configured information to be fed back;
The First ray is sent by the first resource block.
Alternatively, Secondary resource distribution information is received, the Secondary resource distribution information also includes being the second configured information The Secondary resource information of distribution, the Secondary resource information are used to indicate the Secondary resource block for carrying second configured information, And the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block are used to represent described second Configured information, second configured information include the second dispatch request letter for being used to indicate to have dispatch request of periodic feedback Breath.
Alternatively, the first resource information includes the money of each first resource block at least one first resource block Source block identifies, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
Alternatively, the first resource information also includes at least one First ray corresponding to the first resource block Cyclic shift interval.
Optionally, the first resource information includes target identification, and the target identification corresponds to the target in resource collection Resource, the target resource in the resource collection include each first resource block at least one first resource block Resource Block identification, and the initial cycle displacement of at least one First ray corresponding to the first resource block.
The computer-readable recording medium can be the internal storage unit of the terminal described in foregoing any embodiment, example Such as the hard disk or internal memory of terminal.The computer-readable recording medium can also be the External memory equipment of the terminal, such as The plug-in type hard disk being equipped with the terminal, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, the computer-readable recording medium can also be wrapped both Including the internal storage unit of the terminal also includes External memory equipment.The computer-readable recording medium is described for storing Other programs and data needed for computer program and the terminal.The computer-readable recording medium can be also used for temporarily When store the data that has exported or will export.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein Member and algorithm steps, it can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware With the interchangeability of software, the composition and step of each example are generally described according to function in the above description.This A little functions are performed with hardware or software mode actually, application-specific and design constraint depending on technical scheme.Specially Industry technical staff can realize described function using distinct methods to each specific application, but this realization is not It is considered as beyond the scope of this invention.
It is apparent to those skilled in the art that for convenience of description and succinctly, foregoing description is The specific work process of system, terminal and unit, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
In several embodiments provided herein, it should be understood that disclosed system, terminal and method, can be with Realize by another way.For example, device embodiment described above is only schematical, for example, the unit Division, only a kind of division of logic function, can there is other dividing mode, such as multiple units or component when actually realizing Another system can be combined or be desirably integrated into, or some features can be ignored, or do not perform.In addition, shown or beg for The mutual coupling of opinion or direct-coupling or communication connection can be the INDIRECT COUPLINGs by some interfaces, device or unit Or communication connection or electricity, the connection of mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize scheme of the embodiment of the present invention according to the actual needs Purpose.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also It is that unit is individually physically present or two or more units are integrated in a unit.It is above-mentioned integrated Unit can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and is used as independent production marketing or use When, it can be stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially The part to be contributed in other words to prior art, or all or part of the technical scheme can be in the form of software product Embody, the computer software product is stored in a storage medium, including some instructions are causing a computer Equipment (can be personal computer, server, or network equipment etc.) performs the complete of each embodiment methods described of the present invention Portion or part steps.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can store journey The medium of sequence code.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, various equivalent modifications can be readily occurred in or replaced Change, these modifications or substitutions should be all included within the scope of the present invention.Therefore, protection scope of the present invention should be with right It is required that protection domain be defined.

Claims (18)

  1. A kind of 1. resource allocation methods, it is characterised in that including:
    Network equipment generation first resource distribution information, the first resource distribution information are included for a variety of first configured informations point The first resource information matched somebody with somebody, the first resource information are used to indicating carrying at least one the of a variety of first configured informations One resource block, and at least one First ray corresponding to the first resource block, an institute of a first resource block State First ray to be used to represent a kind of first configured information, first configured information is believed including hybrid automatic repeat-request response Breath and the first scheduling request information;
    The network equipment sends the first resource to terminal device and distributes information.
  2. 2. the method as described in claim 1, it is characterised in that methods described also includes:
    The network equipment generation Secondary resource distribution information, the Secondary resource distribution information are included for the second configured information point The Secondary resource information matched somebody with somebody, the Secondary resource information are used to indicate the Secondary resource block for carrying second configured information, with And the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block are used to represent that described second refers to Show information, second configured information includes the second dispatch request letter for being used to indicate to have dispatch request of periodic feedback Breath;
    The network equipment sends the Secondary resource distribution information.
  3. 3. method as claimed in claim 1 or 2, it is characterised in that the first resource information includes described at least one the The Resource Block identification of each first resource block in one resource block, and described at least one first corresponding to the first resource block The initial cycle displacement of sequence.
  4. 4. method as claimed in claim 3, it is characterised in that the first resource information also includes the first resource block pair The cyclic shift interval at least one First ray answered.
  5. 5. method as claimed in claim 1 or 2, it is characterised in that the first resource information includes target identification, the mesh Target resource in the corresponding resource collection of mark mark, the target resource in the resource collection include described at least one the The Resource Block identification of each first resource block in one resource block, and described at least one first corresponding to the first resource block The initial cycle displacement of sequence.
  6. 6. method as claimed in claim 2, it is characterised in that methods described also includes:
    The network equipment receives the target sequence carried by target resource block;
    The network equipment obtains the Target indication information that the target sequence of the target resource block represents, the target refers to It is the configured information of one kind first in a variety of first configured informations to show information, or the Target indication information is described the Two configured informations.
  7. A kind of 7. resource allocation methods, it is characterised in that including:
    Terminal device receives the first resource distribution information that the network equipment is sent, and the first resource distribution information includes the net Network equipment is the first resource information of a variety of first configured informations distribution, and the first resource information is used to indicate that carrying is described more At least one first resource block of the first configured information of kind, and at least one First ray corresponding to the first resource block, One First ray of one first resource block is used to represent a kind of first configured information, first configured information Including hybrid automatic repeat-request response message and the first scheduling request information;
    The terminal device determines to need the first configured information fed back;
    The terminal device distributes information according to the first resource and determined for representing that first instruction for needing to feed back is believed The first resource block and First ray of breath, and the First ray is sent by the first resource block.
  8. 8. method as claimed in claim 7, it is characterised in that methods described also includes:
    The terminal device receives the Secondary resource distribution information that the network equipment is sent, and the Secondary resource distributes packet The Secondary resource information for the distribution of the second configured information is included, the Secondary resource information is used to indicate carrying the second instruction letter The Secondary resource block of breath, and the second sequence corresponding to the Secondary resource block, second sequence of the Secondary resource block For representing second configured information, there is dispatch request in second configured information including periodic feedback for instruction The second scheduling request information.
  9. 9. method as claimed in claim 7 or 8, it is characterised in that the first resource information includes described at least one the The Resource Block identification of each first resource block in one resource block, and described at least one first corresponding to the first resource block The initial cycle displacement of sequence.
  10. 10. method as claimed in claim 9, it is characterised in that described to determine to be used for according to first resource distribution information The first resource block and First ray of first configured information for needing to feed back are represented, including:
    The terminal device is according to corresponding to the number of at least one first resource block determines each first resource block The sequence number of First ray;
    The terminal device is searched and the resource block number of the first resource block and the First ray from object listing Cyclic shift interval corresponding to sequence number;
    The terminal device according to corresponding to the Resource Block identification of each first resource block, the first resource block extremely The initial cycle displacement of a few First ray and the cyclic shift interval, it is determined that for represent it is described need to feed back the The first resource block and First ray of one configured information.
  11. 11. method as claimed in claim 9, it is characterised in that the first resource information also includes the first resource block The cyclic shift interval of corresponding at least one First ray.
  12. 12. method as claimed in claim 7 or 8, it is characterised in that the first resource information includes target identification, described Target identification corresponds to the target resource in resource collection, and the target resource in the resource collection includes described at least one The Resource Block identification of each first resource block in first resource block, and described at least one corresponding to the first resource block The initial cycle displacement of one sequence.
  13. 13. a kind of network equipment, it is characterised in that including for performing the side as described in claim 1-6 any claims The unit of method.
  14. 14. a kind of terminal device, it is characterised in that including for performing the side as described in claim 7-12 any claims The unit of method.
  15. A kind of 15. network equipment, it is characterised in that including processor, transceiver and memory, the processor, transceiver and Memory is connected with each other, wherein, the memory is used to store computer program, and the computer program includes programmed instruction, The processor is arranged to call described program instruction, performs the method as described in claim any one of 1-6.
  16. A kind of 16. terminal device, it is characterised in that including processor, transceiver and memory, the processor, transceiver and Memory is connected with each other, wherein, the memory is used to store computer program, and the computer program includes programmed instruction, The processor is arranged to call described program instruction, performs the method as described in claim any one of 7-12.
  17. A kind of 17. computer-readable recording medium, it is characterised in that the computer-readable storage medium is stored with computer program, The computer program includes programmed instruction, and described program instruction makes the computing device such as right when being executed by a processor It is required that the method described in any one of 1-6.
  18. A kind of 18. computer-readable recording medium, it is characterised in that the computer-readable storage medium is stored with computer program, The computer program includes programmed instruction, and described program instruction makes the computing device such as right when being executed by a processor It is required that the method described in any one of 7-12.
CN201711165668.1A 2017-11-20 2017-11-20 Resource allocation methods, relevant device and computer-readable medium Withdrawn CN107787047A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711165668.1A CN107787047A (en) 2017-11-20 2017-11-20 Resource allocation methods, relevant device and computer-readable medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711165668.1A CN107787047A (en) 2017-11-20 2017-11-20 Resource allocation methods, relevant device and computer-readable medium

Publications (1)

Publication Number Publication Date
CN107787047A true CN107787047A (en) 2018-03-09

Family

ID=61430373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711165668.1A Withdrawn CN107787047A (en) 2017-11-20 2017-11-20 Resource allocation methods, relevant device and computer-readable medium

Country Status (1)

Country Link
CN (1) CN107787047A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108923959A (en) * 2018-06-15 2018-11-30 青岛宇硕云联信息科技有限公司 Exchange method, interactive device, electronic equipment and interactive system
WO2019109799A1 (en) * 2017-12-05 2019-06-13 中兴通讯股份有限公司 Method and device for transmitting information
WO2019192355A1 (en) * 2018-04-04 2019-10-10 华为技术有限公司 Communication method, apparatus, and system
CN110351042A (en) * 2018-04-04 2019-10-18 华为技术有限公司 A kind of information transferring method, device and readable storage medium storing program for executing
CN110351057A (en) * 2018-04-04 2019-10-18 中兴通讯股份有限公司 Information transmission, information determine method and device, storage medium and electronic device
CN110417519A (en) * 2018-04-28 2019-11-05 华为技术有限公司 A kind of data transmission method and device
CN110830213A (en) * 2018-08-10 2020-02-21 华为技术有限公司 Method and device for determining uplink control channel resources
WO2020173295A1 (en) * 2019-02-27 2020-09-03 华为技术有限公司 Random access method and apparatus
WO2021046784A1 (en) * 2019-09-12 2021-03-18 Nokia Shanghai Bell Co., Ltd. Apparatuses and methods for providing and receiving feedback information
WO2021159514A1 (en) * 2020-02-14 2021-08-19 Oppo广东移动通信有限公司 Resource allocation method and device and readable storage medium
CN114866200A (en) * 2021-01-20 2022-08-05 展讯通信(上海)有限公司 Method and device for sending uplink control channel, server and terminal equipment

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019109799A1 (en) * 2017-12-05 2019-06-13 中兴通讯股份有限公司 Method and device for transmitting information
CN110351057B (en) * 2018-04-04 2022-03-01 中兴通讯股份有限公司 Information transmission method, information determination method, information transmission device, information determination device, storage medium, and electronic device
CN110351017B (en) * 2018-04-04 2022-03-29 华为技术有限公司 Communication method, device and system
CN110351042A (en) * 2018-04-04 2019-10-18 华为技术有限公司 A kind of information transferring method, device and readable storage medium storing program for executing
CN110351017A (en) * 2018-04-04 2019-10-18 华为技术有限公司 A kind of communication means, device and system
CN110351057A (en) * 2018-04-04 2019-10-18 中兴通讯股份有限公司 Information transmission, information determine method and device, storage medium and electronic device
WO2019192355A1 (en) * 2018-04-04 2019-10-10 华为技术有限公司 Communication method, apparatus, and system
US11451347B2 (en) 2018-04-04 2022-09-20 Huawei Technologies Co., Ltd. Communication method, apparatus, and system
CN110351042B (en) * 2018-04-04 2020-12-15 华为技术有限公司 Information transmission method and device and readable storage medium
CN110417519A (en) * 2018-04-28 2019-11-05 华为技术有限公司 A kind of data transmission method and device
CN108923959A (en) * 2018-06-15 2018-11-30 青岛宇硕云联信息科技有限公司 Exchange method, interactive device, electronic equipment and interactive system
CN110830213A (en) * 2018-08-10 2020-02-21 华为技术有限公司 Method and device for determining uplink control channel resources
WO2020173295A1 (en) * 2019-02-27 2020-09-03 华为技术有限公司 Random access method and apparatus
CN114365561A (en) * 2019-09-12 2022-04-15 上海诺基亚贝尔股份有限公司 Apparatus and method for providing and receiving feedback information
WO2021046784A1 (en) * 2019-09-12 2021-03-18 Nokia Shanghai Bell Co., Ltd. Apparatuses and methods for providing and receiving feedback information
CN114365561B (en) * 2019-09-12 2024-12-06 上海诺基亚贝尔股份有限公司 Apparatus and method for providing and receiving feedback information
WO2021159514A1 (en) * 2020-02-14 2021-08-19 Oppo广东移动通信有限公司 Resource allocation method and device and readable storage medium
CN114866200A (en) * 2021-01-20 2022-08-05 展讯通信(上海)有限公司 Method and device for sending uplink control channel, server and terminal equipment
CN114866200B (en) * 2021-01-20 2024-11-08 展讯通信(上海)有限公司 Uplink control channel transmission method, device, server and terminal equipment

Similar Documents

Publication Publication Date Title
CN107787047A (en) Resource allocation methods, relevant device and computer-readable medium
US12149365B2 (en) Method and device for transmitting uplink control information
EP3824589B1 (en) Method and device for transmitting uplink control information
EP4236136A2 (en) Uplink transmission method and corresponding equipment
WO2022206095A1 (en) Method for indication by collaboration information between terminal devices in sidelink communication, and device
CN110505697B (en) Transmission method, terminal and base station for hybrid automatic repeat request
JP5569652B2 (en) Method for determining scheduled component carrier, user terminal, base station, and system
CN103391583B (en) A kind of transfer resource distribution method, Apparatus and system and base station equipment
US11039430B2 (en) Method and device for setting control and data channel transmission time in wireless communication system
TW202205905A (en) Base station apparatus and user equipment apparatus
CN110278062A (en) Resource instruction determines method and device
CN103314631A (en) Method for sending sounding reference symbol, e-nodeb and user equipment
CN105578608A (en) Downlink control information transmitting and receiving method and device
US11330595B2 (en) Method for sending control information, method for receiving control information, and apparatus
CN108024345A (en) A kind of transfer resource of ascending control information determines method and device
CN107889231A (en) Exempt from method, the network equipment and the terminal device of transmission uplink information authorized
US12177855B2 (en) Method and apparatus for transmitting downlink control information
CN107615849A (en) Ascending control information sending and receiving methods, apparatus and system
WO2021032015A1 (en) Feedback information transmission method and communication apparatus
US20220360360A1 (en) Method and device for rate matching for multicast and broadcast services
CN107113792A (en) A kind of sending method of control information, detection method, base station and user equipment
EP3648390A1 (en) Communication method and device
CN107005977A (en) A kind of transmission method of information and base station and user equipment
EP4145752B1 (en) System and method for resource block determination for multicast and broadcast transmissions
EP3113401B1 (en) Information transmission method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180309

WW01 Invention patent application withdrawn after publication