CN107589280A - A kind of testing wire clamp and complexes for relay protection small bus transition - Google Patents
A kind of testing wire clamp and complexes for relay protection small bus transition Download PDFInfo
- Publication number
- CN107589280A CN107589280A CN201710861174.0A CN201710861174A CN107589280A CN 107589280 A CN107589280 A CN 107589280A CN 201710861174 A CN201710861174 A CN 201710861174A CN 107589280 A CN107589280 A CN 107589280A
- Authority
- CN
- China
- Prior art keywords
- transition
- relay protection
- small bus
- wire clamp
- metal sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007704 transition Effects 0.000 title claims abstract description 86
- 238000012360 testing method Methods 0.000 title claims abstract description 34
- 239000002184 metal Substances 0.000 claims abstract description 59
- 230000006835 compression Effects 0.000 claims abstract description 16
- 238000007906 compression Methods 0.000 claims abstract description 16
- 238000009413 insulation Methods 0.000 claims abstract description 11
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims 4
- 230000014759 maintenance of location Effects 0.000 claims 3
- 210000003462 vein Anatomy 0.000 claims 2
- 238000012423 maintenance Methods 0.000 description 10
- 230000008901 benefit Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000004308 accommodation Effects 0.000 description 3
- 238000001125 extrusion Methods 0.000 description 3
- 230000001681 protective effect Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 239000000956 alloy Substances 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
Description
技术领域technical field
本发明涉及电力系统继电保护领域,具体涉及一种用于继电保护小母线过渡的试验线夹及成套装置。The invention relates to the field of relay protection of electric power systems, in particular to a test clamp and a complete set of devices for relay protection small busbar transition.
背景技术Background technique
变电站(发电厂)的保护用电压是通过屏顶小母线方式传输到各个保护装置,而所有保护屏柜的屏顶小母线是互相连接的,当需要更换其中一面保护屏柜时,就需要将屏顶电压小母线过渡,这就是本发明研究的症结所在。以前传统的电压小母线过渡时有以下几个难点:1、保护用电压小母线过渡时工作难度大,工作中注意力必须高度集中,一不小心容易造成电压短路或接地,导致变电站所有保护装置失压,造成继电保护的误动作,后果极为严重。2、电压小母线过渡工作项目多、耗时长。过渡小母线需要敷设二次电缆,将电缆两侧剖开,对线套号码管,最后二次电缆两侧需要专人仔细确认后再接入屏顶小母线,工作内容多且耗时长。3、小母线恢复时仍需要专人在电缆两侧共同拆除二次电缆。检修人员曾进行过核算,一条220kV线路更换保护,需拆除并更换两面保护屏柜,大约工期5天,但是如果需要电压小母线过渡,则工期需要6.5~7天,增加40%左右工作量(这里还不考虑本保护屏柜为所有保护电压源头的极端小母线方式)。The protection voltage of the substation (power plant) is transmitted to each protection device through the small bus bar on the top of the screen, and the small bus bars on the top of the screen are connected to each other. When one of the protective screen cabinets needs to be replaced, the Screen top voltage small busbar transition, Here it is the crux of the present invention's research. In the past, the traditional small voltage bus transition had the following difficulties: 1. It was difficult to work during the transition of the small voltage bus for protection. The attention must be highly concentrated during the work. If you are not careful, it is easy to cause voltage short circuit or grounding, which will cause all protection devices in the substation to fail. Loss of voltage, resulting in malfunction of relay protection, the consequences are extremely serious. 2. There are many work items and time-consuming for the transition of small voltage busbars. The transitional small busbar needs to lay secondary cables. The two sides of the cable are cut apart, and the number tube is aligned. Finally, both sides of the secondary cable need to be carefully confirmed by a special person before being connected to the small busbar on the top of the screen. The work involves a lot of work and takes a long time. 3. When the small busbar is restored, special personnel are still required to remove the secondary cables on both sides of the cable. The maintenance personnel have conducted calculations. To replace the protection of a 220kV line, it is necessary to remove and replace the protective screen cabinets on both sides, and the construction period is about 5 days. However, if the transition of the small voltage busbar is required, the construction period will take 6.5-7 days, which will increase the workload by about 40% ( It is not considered here that this protection screen cabinet is an extreme small bus way for all protection voltage sources).
发明内容Contents of the invention
本发明要解决的技术问题:继电保护小母线过渡一直是二次专业中工作复杂且风险系数很高的工作,且过渡时一般需要熟练的技术人员亲自管控,耗时长,以前的小母线过渡方法---过程繁琐、步骤多、易发生电压回路短路或接地,基于上述小母线过渡的种种不利因素,针对现有技术的上述问题,本发明提供一种能够实现电压小母线的快速过渡、明显缩短小母线过渡所需时间,大大方便了现场检修工作,缩短了检修工作时间,提高了小母线过渡效率,轻便可携带、安全风险低的用于继电保护小母线过渡的试验线夹及成套装置。The technical problem to be solved by the present invention: the relay protection small busbar transition has always been a complex and high-risk work in the secondary profession, and the transition generally requires skilled technicians to control it personally, which takes a long time. The previous small busbar transition Method --- The process is cumbersome, there are many steps, and the short circuit or grounding of the voltage circuit is prone to occur. Based on the various unfavorable factors of the above-mentioned small busbar transition, and in view of the above problems in the prior art, the present invention provides a method that can realize the rapid transition of the voltage small busbar, Significantly shorten the time required for the transition of small busbars, greatly facilitate the on-site maintenance work, shorten the maintenance work time, improve the transition efficiency of small busbars, and are portable and portable, with low safety risks for relay protection small busbar transition test clamps and complete set.
为了解决上述技术问题,本发明采用的技术方案为:In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:
一方面,本发明提供一种用于继电保护小母线过渡的试验线夹,包括金属套管和金属杆,所述金属杆和金属套管之间设有压缩弹簧,所述金属套管的外壁上设有插座,所述金属杆的中部插设于金属套管中且一端设有两个咬合臂、另一端设有绝缘手柄,所述两个咬合臂之间设有扭力弹簧且根部通过销轴与金属杆相连,所述金属套管及插座的外壁上设有绝缘套,且所述咬合臂的后侧抵靠在绝缘套的端部。On the one hand, the present invention provides a test clamp for relay protection small busbar transition, comprising a metal sleeve and a metal rod, a compression spring is arranged between the metal rod and the metal sleeve, and the metal sleeve has a There is a socket on the outer wall, the middle part of the metal rod is inserted into the metal sleeve, and one end is provided with two snapping arms, and the other end is provided with an insulating handle, and a torsion spring is provided between the two snapping arms, and the root passes through The pin shaft is connected with the metal rod, the metal sleeve and the outer wall of the socket are provided with an insulating sleeve, and the rear side of the engaging arm leans against the end of the insulating sleeve.
优选地,所述两个咬合臂的夹持面上设有相互咬合的夹持齿。Preferably, the clamping surfaces of the two engaging arms are provided with mutually engaging clamping teeth.
优选地,所述压缩弹簧套设于与金属套管上,且所述金属套管一端抵触在插座的根部、另一端抵触在金属杆的绝缘手柄上。Preferably, the compression spring is sheathed on the metal sleeve, and one end of the metal sleeve is in contact with the root of the socket, and the other end is in contact with the insulating handle of the metal rod.
优选地,所述绝缘套的前端设有伸缩容置腔、后端设有弹簧容置腔,所述两个咬合臂的根部布置于所述伸缩容置腔中,所述压缩弹簧布置于弹簧容置腔内。Preferably, the front end of the insulating sleeve is provided with a telescopic accommodating chamber, and the rear end is provided with a spring accommodating chamber, the roots of the two engaging arms are arranged in the telescopic accommodating chamber, and the compression spring is arranged in the spring inside the chamber.
优选地,所述绝缘手柄上设有基座,所述绝缘手柄通过基座与金属杆相连,所述咬合臂张开时基座的端部插设于弹簧容置腔中。Preferably, a base is provided on the insulating handle, the insulating handle is connected to the metal rod through the base, and the end of the base is inserted into the spring accommodating cavity when the occlusal arm is opened.
优选地,所述金属杆的端部设有螺纹段,所述基座和金属杆端部的螺纹段螺纹连接。Preferably, the end of the metal rod is provided with a threaded section, and the base is screwed to the threaded section at the end of the metal rod.
优选地,所述绝缘套的中部设有沿径向伸出布置的第一手持部。Preferably, the middle part of the insulating sleeve is provided with a first handle protruding radially.
优选地,所述绝缘手柄的端部设有沿径向伸出布置的第二手持部。Preferably, the end of the insulated handle is provided with a second handle extending radially.
优选地,所述第一手持部的前侧设有防滑纹,所述第二手持部的后端设有防滑纹。Preferably, anti-slip lines are provided on the front side of the first handle, and anti-slip lines are provided on the rear end of the second handle.
另一方面,本发明还提供一种用于继电保护小母线过渡的成套装置,包括至少一组过渡连接单元,所述过渡连接单元包括过渡线和两个前述用于继电保护小母线过渡的试验线夹,所述过渡线的两端均设有插头,且所述过渡线两端的插头各与一个用于继电保护小母线过渡的试验线夹的插座相连。On the other hand, the present invention also provides a complete set of equipment for relay protection small busbar transition, including at least one set of transition connection units, the transition connection unit includes a transition line and two aforementioned relay protection small busbar transition Both ends of the transition line are provided with plugs, and the plugs at both ends of the transition line are respectively connected to a socket of a test line clamp for relay protection small busbar transition.
本发明用于继电保护小母线过渡的试验线夹具有下述优点:The present invention is used for the test line clip of relay protection small busbar transition and has the following advantages:
1、本发明能够实现电压小母线的快速过渡、明显缩短小母线过渡所需时间,大大方便了现场检修工作,缩短了检修工作时间,提高了小母线过渡效率,轻便可携带、安全风险低。1. The present invention can realize the rapid transition of small voltage busbars, significantly shorten the time required for the transition of small busbars, greatly facilitate the on-site maintenance work, shorten the maintenance work time, improve the transition efficiency of small busbars, and is portable and portable with low safety risks.
2、本发明包括金属套管和金属杆,金属套管的外壁上设有插座,利用插座即可和过渡线快速连接,具有连接效率高的优点。2. The present invention includes a metal sleeve and a metal rod. The outer wall of the metal sleeve is provided with a socket, which can be quickly connected to the transition line by using the socket, and has the advantage of high connection efficiency.
3、本发明金属杆和金属套管之间设有压缩弹簧,金属杆的中部插设于金属套管中且一端设有两个咬合臂、另一端设有绝缘手柄,两个咬合臂之间设有扭力弹簧且根部通过销轴与金属杆相连,通过上述结构,实现了过渡线夹的长力矩设计,能够有效保证咬合力度,同时较长的结构设计对保护屏柜的双层小母线也适用,通过压缩弹簧的弹力能够确保两个咬合臂咬合牢固,在现场实际过渡中不会脱落,保障安全完成检修过渡工作。3. A compression spring is arranged between the metal rod and the metal sleeve of the present invention, the middle part of the metal rod is inserted in the metal sleeve and one end is provided with two occlusal arms, and the other end is provided with an insulating handle. There is a torsion spring and the root is connected to the metal rod through the pin shaft. Through the above structure, the long torque design of the transition clamp is realized, which can effectively ensure the bite force. Applicable, the elastic force of the compressed spring can ensure that the two occlusal arms are firmly occluded, and will not fall off during the actual transition on site, ensuring the safe completion of the maintenance transition work.
4、本发明试验线夹的金属套管及插座的外壁上设有绝缘套,专用全部绝缘化设计,金属部分全部绝缘密封,杜绝电压回路短路或接地现象,保障检修的安全性。4. The metal casing of the test wire clamp and the outer wall of the socket of the present invention are provided with an insulating sleeve, which is designed for all insulation, and all metal parts are insulated and sealed to prevent short circuit or grounding of the voltage circuit and ensure the safety of maintenance.
本发明用于继电保护小母线过渡的成套装置包括本发明用于继电保护小母线过渡的试验线夹,包括过渡线和两个前述用于继电保护小母线过渡的试验线夹,通过过渡线的两端的插头各与一个用于继电保护小母线过渡的试验线夹的插座相连,能够实现电压小母线的快速过渡,同样也具有本发明用于继电保护小母线过渡的试验线夹的前述优点。The complete set of devices for relay protection small busbar transition of the present invention includes the test line clamp for relay protection small busbar transition of the present invention, including the transition line and two aforementioned test line clamps for relay protection small busbar transition, through The plugs at both ends of the transition line are respectively connected to a socket of a test wire clamp for the transition of the relay protection small busbar, which can realize the rapid transition of the voltage small busbar, and also has the test line for the relay protection small busbar transition of the present invention The aforementioned advantages of clips.
附图说明Description of drawings
图1为本发明实施例的局部剖视结构示意图。Fig. 1 is a partial cross-sectional structural schematic diagram of an embodiment of the present invention.
图2为本发明实施例咬合臂夹紧状态的剖视结构示意图。Fig. 2 is a schematic cross-sectional structural view of the clamping state of the occlusal arm according to the embodiment of the present invention.
图3为本发明实施例咬合臂张开状态的剖视结构示意图。Fig. 3 is a schematic cross-sectional structural view of the occlusal arm in an open state according to an embodiment of the present invention.
图例说明:1、金属套管;11、插座;2、金属杆;21、咬合臂;211、夹持齿;22、绝缘手柄;221、基座;222、第二手持部;23、扭力弹簧;3、压缩弹簧;4、绝缘套;41、伸缩容置腔;42、弹簧容置腔;43、第一手持部。Legend description: 1. Metal sleeve; 11. Socket; 2. Metal rod; 21. Occupying arm; 211. Clamping teeth; 22. Insulated handle; 221. Base; 222. Second handle; 23. Torque Spring; 3. Compression spring; 4. Insulation sleeve; 41. Telescopic accommodation chamber; 42. Spring accommodation chamber; 43. First handle.
具体实施方式detailed description
如图1和图2所示,本实施例用于继电保护小母线过渡的试验线夹包括金属套管1和金属杆2,金属杆2和金属套管1之间设有压缩弹簧3,金属套管1的外壁上设有插座11,金属杆2的中部插设于金属套管1中且一端设有两个咬合臂21、另一端设有绝缘手柄22,两个咬合臂21之间设有扭力弹簧23且根部通过销轴与金属杆2相连,金属套管1及插座11的外壁上设有绝缘套4,且咬合臂21的后侧抵靠在绝缘套4的端部。本实施例的试验线夹通过插座11即可实现和继电保护小母线过渡的过渡线相连,试验线夹的夹持工作原理如下:在初始状态下,由于压缩弹簧3的推力作用,金属杆2向绝缘套4内缩,因此两个咬合臂21由于受到绝缘套4的挤压作用而克服扭力弹簧23的扭力呈闭合状态,如图2所示。在需要使用时,手持绝缘套4按压绝缘手柄22使得金属杆2向绝缘套4外伸出,压缩弹簧3被压缩使得行程变短,两个咬合臂21之间设有扭力弹簧23由于不再受到绝缘套4的挤压作用而张开,如图3所示;此时,如将屏顶小母线置于两个咬合臂21的开口之间再松开绝缘手柄22,即可恢复初始状态,且两个咬合臂21由于受到绝缘套4的挤压作用而克服扭力弹簧23的扭力呈闭合状态,从而将屏顶小母线咬合夹紧。本实施例的试验线夹具有轻便可携带,两侧线夹均绝缘,即装即用的特点,可以方便快捷的进行电压小母线的过渡,能够明显缩短电压小母线过渡所需时间,大大方便了现场检修工作,缩短检修工期,提高了小母线过渡效率,减少人力物力财力的支出,能够明显降低电压小母线过渡时的安全风险,显著改善过渡时电缆两侧人员操作不一致导致保护电压短路或接地现象,提高电力系统安全稳定运行水平,具有轻便可携带、安全风险低的优点。As shown in Fig. 1 and Fig. 2, the test clamp for relay protection small busbar transition in this embodiment includes a metal sleeve 1 and a metal rod 2, and a compression spring 3 is arranged between the metal rod 2 and the metal sleeve 1, The outer wall of the metal sleeve 1 is provided with a socket 11, the middle part of the metal rod 2 is inserted in the metal sleeve 1 and one end is provided with two snapping arms 21, and the other end is provided with an insulating handle 22, between the two snapping arms 21 A torsion spring 23 is provided and the root is connected to the metal rod 2 through a pin shaft. The outer wall of the metal sleeve 1 and the socket 11 is provided with an insulating sleeve 4 , and the rear side of the engaging arm 21 is against the end of the insulating sleeve 4 . The test line clamp of this embodiment can be connected with the transition line of the relay protection small bus transition through the socket 11. The clamping working principle of the test line clamp is as follows: in the initial state, due to the thrust of the compression spring 3, the metal rod 2 retracts toward the insulating sleeve 4, so the two engaging arms 21 are in a closed state against the torsion force of the torsion spring 23 due to the extrusion of the insulating sleeve 4, as shown in FIG. 2 . When needed to use, hold the insulating sleeve 4 and press the insulating handle 22 so that the metal rod 2 stretches out to the insulating sleeve 4, and the compression spring 3 is compressed so that the stroke becomes shorter. It is opened by the extrusion of the insulating sleeve 4, as shown in Figure 3; at this time, if the small bus bar of the screen top is placed between the openings of the two occlusal arms 21 and then the insulating handle 22 is released, the original state can be restored , and the two snapping arms 21 are in a closed state against the torsion force of the torsion spring 23 due to the extrusion of the insulating sleeve 4, thereby snapping and clamping the small bus bar of the panel top. The test line clamp of this embodiment is light and portable, the line clamps on both sides are insulated, and it is ready to use. It can conveniently and quickly carry out the transition of the small voltage bus, and can obviously shorten the time required for the transition of the small voltage bus, which is greatly convenient. On-site maintenance work shortens the maintenance period, improves the transition efficiency of small busbars, reduces the expenditure of human, material and financial resources, can significantly reduce the safety risk during the transition of small voltage busbars, and significantly improves the protective voltage short circuit or grounding caused by inconsistent operations of personnel on both sides of the cable during transition. Phenomenon, improve the level of safe and stable operation of the power system, has the advantages of light and portable, low safety risk.
本实施例中,两个咬合臂21的夹持面上设有相互咬合的夹持齿211,通过相互咬合的夹持齿211能够提高两个咬合臂21之间的咬合力,以及提高试验线夹的接触可靠性。In this embodiment, the clamping surfaces of the two occlusal arms 21 are provided with mutually occlusal clamping teeth 211, and the occlusal force between the two occlusal arms 21 can be improved by the mutually occlusal clamping teeth 211, and the test line can be improved. Clip contact reliability.
本实施例中,咬合臂21采用导电性能、机械性能良好的合金材料,保证过渡时的二次回路载流量需要且不会变形。In this embodiment, the engaging arm 21 is made of an alloy material with good electrical conductivity and mechanical properties, so as to ensure the current carrying capacity of the secondary circuit during the transition without deformation.
本实施例中,压缩弹簧3套设于与金属套管1上,且金属套管1一端抵触在插座11的根部、另一端抵触在金属杆2的绝缘手柄22上,通过上述结构能够克服在需要较大咬合力时,由于压缩弹簧3受力较大而容易发生扭曲的问题,能够确保弹簧3的大咬合力稳定性。In this embodiment, the compression spring 3 is sheathed on the metal sleeve 1, and one end of the metal sleeve 1 is in contact with the root of the socket 11, and the other end is in contact with the insulating handle 22 of the metal rod 2. Through the above structure, the When a large occlusal force is required, the compression spring 3 is easily twisted due to a large force, so the stability of the large occlusal force of the spring 3 can be ensured.
本实施例中,绝缘套4的前端设有伸缩容置腔41、后端设有弹簧容置腔42,两个咬合臂21的根部布置于伸缩容置腔41中,压缩弹簧3布置于弹簧容置腔42内,通过上述结构实现了金属部分全部绝缘密封,能够实现对压缩弹簧3的全覆盖式包裹以及两个咬合臂21包裹,杜绝电压回路短路或接地现象,保障检修的安全性。In this embodiment, the front end of the insulating sleeve 4 is provided with a telescopic accommodating chamber 41, and the rear end is provided with a spring accommodating chamber 42. The roots of the two engaging arms 21 are arranged in the telescopic accommodating chamber 41, and the compression spring 3 is arranged in the spring accommodating chamber 41. In the accommodating chamber 42, all the metal parts are insulated and sealed through the above structure, which can realize the full coverage wrapping of the compression spring 3 and the wrapping of the two occlusal arms 21, prevent the short circuit or grounding of the voltage circuit, and ensure the safety of maintenance.
本实施例中,绝缘手柄22上设有基座221,绝缘手柄22通过基座221与金属杆2相连,咬合臂21张开时基座221的端部插设于弹簧容置腔42中,通过上述结构,能够确保不论两个咬合臂21在打开还是在闭合状态,都可以确保弹簧容置腔42内部结构被基座221阻挡,从而有效提高绝缘密封性能,安全性更好。In this embodiment, the insulating handle 22 is provided with a base 221, and the insulating handle 22 is connected to the metal rod 2 through the base 221. The structure can ensure that no matter whether the two engaging arms 21 are in the open or closed state, the internal structure of the spring accommodation chamber 42 can be blocked by the base 221, thereby effectively improving the insulation and sealing performance, and the safety is better.
本实施例中,金属杆2的端部设有螺纹段,基座221和金属杆2端部的螺纹段螺纹连接,该结构连接牢固可靠,安装方便快捷,而且便于更换绝缘手柄22。In this embodiment, the end of the metal rod 2 is provided with a threaded section, and the base 221 is threadedly connected with the threaded section at the end of the metal rod 2 .
本实施例中,绝缘套4的中部设有沿径向伸出布置的第一手持部43,按压绝缘手柄22时第一手持部43可以起到固定的作用,操作更加方便快捷。In this embodiment, the middle part of the insulating sleeve 4 is provided with a first handle 43 protruding radially. When the insulating handle 22 is pressed, the first handle 43 can play a fixed role, and the operation is more convenient and quick.
本实施例中,绝缘手柄22的端部设有沿径向伸出布置的第二手持部222,按压绝缘手柄22时操作面积大,和第一手持部43配合使用更方便快捷。In this embodiment, the end of the insulating handle 22 is provided with a second handle 222 protruding radially. When the insulating handle 22 is pressed, the operating area is large, and it is more convenient and quick to use in conjunction with the first handle 43 .
本实施例中,第一手持部43的前侧设有防滑纹,第二手持部222的后端设有防滑纹,通过上述结构能够实现第一手持部43、第二手持部222的防滑,操作更省力和可靠。In this embodiment, the front side of the first handle 43 is provided with anti-slip lines, and the rear end of the second handle 222 is provided with anti-slip lines. Through the above-mentioned structure, the first handle 43 and the second handle 222 can be realized. Anti-slip, more labor-saving and reliable operation.
本实施例的用于继电保护小母线过渡的成套装置包括多组过渡连接单元,过渡连接单元包括过渡线和两个本实施例前述用于继电保护小母线过渡的试验线夹,过渡线的两端均设有插头,且过渡线两端的插头各与一个用于继电保护小母线过渡的试验线夹的插座11相连。本实施例的用于继电保护小母线过渡的成套装置能够方便快捷地完成小母线过渡,且试验线通过颜色不同区分不同的电压相别,本实施例中该试验线有10芯,满足正常双母接线的220kV或110kV电压等级的所有电压芯线的过渡需要(A630、B630、C630、L630、A640、B640、C640、L640、N600)。The complete set of devices for relay protection small bus transition in this embodiment includes multiple sets of transition connection units, the transition connection unit includes a transition line and two test clamps for relay protection small bus transition in this embodiment, the transition line There are plugs at both ends of the transition line, and the plugs at both ends of the transition line are connected to a socket 11 of a test clamp for relay protection small bus transition. The complete set of devices for relay protection small busbar transition in this embodiment can complete the small busbar transition conveniently and quickly, and the test line can distinguish different voltages through different colors. In this embodiment, the test line has 10 cores, which meets the normal Transition requirements for all voltage core wires of 220kV or 110kV voltage level of double busbar connection (A630, B630, C630, L630, A640, B640, C640, L640, N600).
以上所述仅是本发明的优选实施方式,本发明的保护范围并不仅局限于上述实施例,凡属于本发明思路下的技术方案均属于本发明的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理前提下的若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above descriptions are only preferred implementations of the present invention, and the protection scope of the present invention is not limited to the above-mentioned embodiments, and all technical solutions under the idea of the present invention belong to the protection scope of the present invention. It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principles of the present invention should also be regarded as the protection scope of the present invention.
Claims (10)
- A kind of 1. testing wire clamp for relay protection small bus transition, it is characterised in that:Including metal sleeve(1)And metallic rod (2), the metallic rod(2)And metal sleeve(1)Between be provided with compression spring(3), the metal sleeve(1)Outer wall be provided with Socket(11), the metallic rod(2)Middle part be inserted in metal sleeve(1)In and one end be provided with two engagement arms(21), it is another End is provided with insulated handle(22), described two engagement arms(21)Between be provided with torque spring(23)And root passes through bearing pin and metal Bar(2)It is connected, the metal sleeve(1)And socket(11)Outer wall be provided with insulation sleeve(4), and the engagement arm(21)After Side is resisted against insulation sleeve(4)End.
- 2. the testing wire clamp according to claim 1 for relay protection small bus transition, it is characterised in that:It is described two Engagement arm(21)Clamping face be provided with the clamping tooth that is mutually twisted(211).
- 3. the testing wire clamp according to claim 1 for relay protection small bus transition, it is characterised in that:The compression Spring(3)It is sheathed on and metal sleeve(1)On, and the metal sleeve(1)One end is contradicted in socket(11)Root, the other end Contradict in metallic rod(2)Insulated handle(22)On.
- 4. the testing wire clamp according to claim 1 for relay protection small bus transition, it is characterised in that:The insulation Set(4)Front end be provided with flexible accommodating cavity(41), rear end be provided with spring retention chamber(42), described two engagement arms(21)Root It is arranged in the flexible accommodating cavity(41)In, the compression spring(3)It is arranged in spring retention chamber(42)It is interior.
- 5. the testing wire clamp according to claim 4 for relay protection small bus transition, it is characterised in that:The insulation Handle(22)It is provided with pedestal(221), the insulated handle(22)Pass through pedestal(221)With metallic rod(2)It is connected, the occlusion Arm(21)Pedestal during opening(221)End be inserted in spring retention chamber(42)In.
- 6. the testing wire clamp according to claim 5 for relay protection small bus transition, it is characterised in that:The metal Bar(2)End be provided with thread segment, the pedestal(221)And metallic rod(2)The thread segment threaded connection of end.
- 7. the testing wire clamp according to claim 1 for relay protection small bus transition, it is characterised in that:The insulation Set(4)Middle part be provided with and extend radially the first Handheld Division of arrangement(43).
- 8. the testing wire clamp according to claim 7 for relay protection small bus transition, it is characterised in that:The insulation Handle(22)End be provided with and extend radially the second Handheld Division of arrangement(222).
- 9. the testing wire clamp according to claim 8 for relay protection small bus transition, it is characterised in that:Described first Handheld Division(43)Front side be provided with anti-slip veins, second Handheld Division(222)Rear end be provided with anti-slip veins.
- A kind of 10. complexes for relay protection small bus transition, it is characterised in that:Connected including at least one set of transition single Member, the transition connection unit include being used for the small mother of relay protection described in any one in transition wire and two claims 1~9 The testing wire clamp of line transition, the both ends of the transition wire are equipped with plug, and the plug at the transition wire both ends respectively with a use In the socket of the testing wire clamp of relay protection small bus transition(11)It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710861174.0A CN107589280B (en) | 2017-09-21 | 2017-09-21 | Test wire clamp and complete device for relay protection small bus transition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710861174.0A CN107589280B (en) | 2017-09-21 | 2017-09-21 | Test wire clamp and complete device for relay protection small bus transition |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107589280A true CN107589280A (en) | 2018-01-16 |
CN107589280B CN107589280B (en) | 2024-06-11 |
Family
ID=61047066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710861174.0A Active CN107589280B (en) | 2017-09-21 | 2017-09-21 | Test wire clamp and complete device for relay protection small bus transition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107589280B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109444546A (en) * | 2018-11-14 | 2019-03-08 | 江苏核电有限公司 | A kind of mutual inductor secondary winding directly hinders supplemental measurement tool |
CN114176656A (en) * | 2021-11-10 | 2022-03-15 | 南京市河西医院有限公司 | Guide needle and method based on FiberLift face lifting repair |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202616440U (en) * | 2012-06-12 | 2012-12-19 | 福建省电力有限公司检修分公司 | Junction device of charged testing experiment of metallic oxide lightning arrester |
CN102891378A (en) * | 2012-10-24 | 2013-01-23 | 四川省电力公司绵阳电业局 | Portable experiment wire clamp |
CN202957429U (en) * | 2012-11-14 | 2013-05-29 | 上海友邦电气(集团)股份有限公司 | Detachable bus plug |
CN103513066A (en) * | 2013-09-25 | 2014-01-15 | 国家电网公司 | Novel and special three-jaw testing wire clamp for relay protection |
CN203660095U (en) * | 2013-11-28 | 2014-06-18 | 国家电网公司 | Universal grounding wire clamp |
CN203787696U (en) * | 2014-04-15 | 2014-08-20 | 国家电网公司 | A test lead and a test lead plug |
CN203826594U (en) * | 2014-05-07 | 2014-09-10 | 赵占军 | Steerable ground rod wire clamp |
CN203932341U (en) * | 2014-06-19 | 2014-11-05 | 国家电网公司 | High and low pressure busbar grounding device |
CN204185032U (en) * | 2014-09-11 | 2015-03-04 | 中国南方电网有限责任公司超高压输电公司广州局 | A kind of shaking reaying protection test line draw off gear |
CN105490122A (en) * | 2015-12-29 | 2016-04-13 | 国网浙江省电力公司湖州供电公司 | Screen-top miniature bus bridging-connection cable |
CN205809114U (en) * | 2016-06-30 | 2016-12-14 | 国家电网公司 | A kind of reaying protection test line |
WO2017005788A1 (en) * | 2015-07-06 | 2017-01-12 | Phoenix Contact Gmbh & Co. Kg | Connection terminal |
CN106371050A (en) * | 2016-09-06 | 2017-02-01 | 国网山东省电力公司淄博供电公司 | a test rod |
CN206038722U (en) * | 2016-08-31 | 2017-03-22 | 国家电网公司 | A experimental fastener for relay protection testing |
CN206148639U (en) * | 2016-08-23 | 2017-05-03 | 六盘水师范学院 | A fork type portable grounding device |
CN207301122U (en) * | 2017-09-21 | 2018-05-01 | 国网湖南省电力公司 | A kind of testing wire clamp and complexes for relay protection small bus transition |
-
2017
- 2017-09-21 CN CN201710861174.0A patent/CN107589280B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202616440U (en) * | 2012-06-12 | 2012-12-19 | 福建省电力有限公司检修分公司 | Junction device of charged testing experiment of metallic oxide lightning arrester |
CN102891378A (en) * | 2012-10-24 | 2013-01-23 | 四川省电力公司绵阳电业局 | Portable experiment wire clamp |
CN202957429U (en) * | 2012-11-14 | 2013-05-29 | 上海友邦电气(集团)股份有限公司 | Detachable bus plug |
CN103513066A (en) * | 2013-09-25 | 2014-01-15 | 国家电网公司 | Novel and special three-jaw testing wire clamp for relay protection |
CN203660095U (en) * | 2013-11-28 | 2014-06-18 | 国家电网公司 | Universal grounding wire clamp |
CN203787696U (en) * | 2014-04-15 | 2014-08-20 | 国家电网公司 | A test lead and a test lead plug |
CN203826594U (en) * | 2014-05-07 | 2014-09-10 | 赵占军 | Steerable ground rod wire clamp |
CN203932341U (en) * | 2014-06-19 | 2014-11-05 | 国家电网公司 | High and low pressure busbar grounding device |
CN204185032U (en) * | 2014-09-11 | 2015-03-04 | 中国南方电网有限责任公司超高压输电公司广州局 | A kind of shaking reaying protection test line draw off gear |
WO2017005788A1 (en) * | 2015-07-06 | 2017-01-12 | Phoenix Contact Gmbh & Co. Kg | Connection terminal |
CN105490122A (en) * | 2015-12-29 | 2016-04-13 | 国网浙江省电力公司湖州供电公司 | Screen-top miniature bus bridging-connection cable |
CN205809114U (en) * | 2016-06-30 | 2016-12-14 | 国家电网公司 | A kind of reaying protection test line |
CN206148639U (en) * | 2016-08-23 | 2017-05-03 | 六盘水师范学院 | A fork type portable grounding device |
CN206038722U (en) * | 2016-08-31 | 2017-03-22 | 国家电网公司 | A experimental fastener for relay protection testing |
CN106371050A (en) * | 2016-09-06 | 2017-02-01 | 国网山东省电力公司淄博供电公司 | a test rod |
CN207301122U (en) * | 2017-09-21 | 2018-05-01 | 国网湖南省电力公司 | A kind of testing wire clamp and complexes for relay protection small bus transition |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109444546A (en) * | 2018-11-14 | 2019-03-08 | 江苏核电有限公司 | A kind of mutual inductor secondary winding directly hinders supplemental measurement tool |
CN114176656A (en) * | 2021-11-10 | 2022-03-15 | 南京市河西医院有限公司 | Guide needle and method based on FiberLift face lifting repair |
Also Published As
Publication number | Publication date |
---|---|
CN107589280B (en) | 2024-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202749745U (en) | Special-purpose grounding lead wire for intersecting interconnection box maintenance | |
CN107589280A (en) | A kind of testing wire clamp and complexes for relay protection small bus transition | |
CN207301122U (en) | A kind of testing wire clamp and complexes for relay protection small bus transition | |
CN213660651U (en) | A ground wire for preventing the ground end from falling off | |
CN101841136A (en) | Broken wire on-load processing device for low-voltage distribution insulated conductor and processing method thereof | |
CN204045767U (en) | A kind of cable termination ground protection pincers | |
CN104753002B (en) | Half fixed sealing type cable termination plug-in and pull-out device | |
CN204008724U (en) | Converting equipment dielectric voltage withstand test connection bar | |
CN106847440A (en) | Low-voltage insulation sheath | |
CN207801041U (en) | A kind of Quick connector plug for electrical wire | |
CN102570327B (en) | Airtight switch cabinet one-time rising test wire clamp | |
CN203387112U (en) | Portable cable protective layer protector defect remedying apparatus | |
CN211743552U (en) | American case becomes inlet wire cable earthing device | |
CN201562769U (en) | Ultrahigh voltage earth wire device | |
CN210779028U (en) | Looped netowrk cabinet T type cable head earthing device | |
CN201112596Y (en) | Special set of grounding wires for branch boxes | |
CN103956669A (en) | Ground wire special for middle switch cabinet | |
CN204905802U (en) | Cable connection structure that can set up in open | |
CN204241645U (en) | Be applied to device of plugging into of switch dolly mechanism characteristic test | |
CN204696638U (en) | Be crimped on the T-shaped shunting aluminium hydraulic pressed connecting pipe on mains supply line | |
CN203774486U (en) | Insulated wire puncture clamp | |
CN210111467U (en) | Suspended type uninterrupted power conductor sectionalizer | |
CN207925869U (en) | A kind of binding wire auxiliary tool | |
CN205565031U (en) | Novel special earth connection of looped netowrk cabinet cable | |
CN204886066U (en) | Prevent short circuit terminal box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |