CN107313773A - It is a kind of to determine method of the interior temporarily stall of seam to required plugging strength - Google Patents

It is a kind of to determine method of the interior temporarily stall of seam to required plugging strength Download PDF

Info

Publication number
CN107313773A
CN107313773A CN201710772281.6A CN201710772281A CN107313773A CN 107313773 A CN107313773 A CN 107313773A CN 201710772281 A CN201710772281 A CN 201710772281A CN 107313773 A CN107313773 A CN 107313773A
Authority
CN
China
Prior art keywords
mrow
msub
fracture
seam
intrinsic fracture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710772281.6A
Other languages
Chinese (zh)
Other versions
CN107313773B (en
Inventor
赵兵
李楠
杨玉琴
周福健
王博
袁立山
耿宇迪
张�雄
陈定斌
何晓波
胡文庭
罗攀登
方裕燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Original Assignee
China Petroleum and Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp filed Critical China Petroleum and Chemical Corp
Priority to CN201710772281.6A priority Critical patent/CN107313773B/en
Publication of CN107313773A publication Critical patent/CN107313773A/en
Application granted granted Critical
Publication of CN107313773B publication Critical patent/CN107313773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

Method of the interior temporarily stall of seam to required plugging strength is determined the invention discloses a kind of, wherein, including:Collect target reservoir, the data that open mode computation models different from intrinsic fracture are related;The different open mode computation models interacted based on intrinsic fracture and hydraulic fracture, are obtained each intrinsic fracture in target reservoir and open required a variety of net pressure p in different modalities1;To acquired a variety of net pressure p1Optimize, to obtain optimal net pressure p1’;The net pressure p that can be reached in man-made fracture when calculating temporarily stifled in without seam2;And determine seam in temporarily stall to required plugging strength be p1' and p2Difference.Scene is instructed quickly and easily to determine method of the interior temporarily stall of seam to required plugging strength the invention provides a kind of, so as to more reliably select well, select well and preferred diverting agent formula and consumption.

Description

It is a kind of to determine method of the interior temporarily stall of seam to required plugging strength
Technical field
Interior temporarily stall is stitched to the side of required plugging strength the present invention relates to petroleum works field, more particularly to a kind of determination Method.
Background technology
In the transformation of oil field unconventional reservoir, temporarily stall is provided for new vitality to fracturing technology in seam, drops Low improvement cost, improves transformation efficiency.Temporarily stall is specifically referred in fracturing process to fracturing technology in seam, and addition can drop Plugging material (fiber and Particles dispersed) is solved, is blocked in end or the seam of man-made fracture, the injection of follow-up fracturing fluid can be carried significantly Height seam in net pressure, when seam in net pressure reach the Opening pressure of intrinsic fracture when, substantial amounts of intrinsic fracture will be unlocked and Branch seam is produced there is provided the development degree in layer, and then improves transformation efficiency.After construction terminates, plugging material can degrade, and return Ground is drained into, so that the injury of reservoir will not be caused, the purpose of cleaning transformation is reached.
At present at the scene during practice of construction, also determined without reliable, quick method in seam temporarily stall to Required plugging strength.Site operation is more empirically, it is unclear which interval of which well is adapted to the interior temporarily stall of seam to such as The intrinsic fracture of some reservoirs is easier to open and realize and turn in seam, and these intrinsic fractures will make full use of;Some reservoirs Intrinsic fracture be difficult to be unlocked, now, to avoid using in seam temporarily stall to technique.Meanwhile, for preferred diverting agent formula And consumption reaches target plugging strength, lack effective instruct.
The content of the invention
It is an object of the invention to provide one kind scene can be instructed quickly and easily to determine the interior temporarily stall of seam to required envelope The method of stifled intensity.
To achieve the above object, specific skill of the interior temporarily stall to the method for required plugging strength is stitched in a kind of determination of the invention Art scheme is:
It is a kind of to determine method of the interior temporarily stall of seam to required plugging strength, wherein, including:Collect target reservoir and day The related data of right crack difference open mode computation model;The different unlatchings interacted based on intrinsic fracture and hydraulic fracture Mode computation model, obtains each intrinsic fracture in target reservoir and opens required a variety of net pressure p in different modalities1;It is right Acquired a variety of net pressure p1Optimize, to obtain optimal net pressure p1’;Manually split when calculating temporarily stifled in without seam The net pressure p that can be reached in seam2;And determine seam in temporarily stall to required plugging strength be p1' and p2Difference.
Temporarily advantage of the stall to the method for required plugging strength is in a kind of determination seam of the present invention:Refer to there is provided one kind The scene of leading quickly and easily determines method of the interior temporarily stall of seam to required plugging strength, so as to more reliably select well, select well And preferably diverting agent formula and consumption.
Brief description of the drawings
Method flow diagrams of the Fig. 1 for temporary stall plugging strength needed in determination seam of the invention;
Synthesis plates of the Fig. 2 for crack of the invention under different opening ways;
Fig. 3 is the sectional view of the software programming of the present invention.
Embodiment
In order to be better understood by the purpose of the present invention, structure and function, below in conjunction with the accompanying drawings, a kind of of the present invention is determined Temporarily the method for stall to required plugging strength does further detailed description in seam.
Temporarily stall refers to add temporarily stifled material in the end of fracture or seam in work progress to required plugging strength in seam Material is blocked, to lift net pressure until opening substantial amounts of intrinsic fracture.Fine pressure force value p1(temporarily stifled material opens a large amount of for addition Net pressure after the lifting of intrinsic fracture) with blocking up the fine pressure force value p that can be reached in material seam without temporary2Difference be seam in temporarily Stall is to required plugging strength (p1-p2),
As shown in figure 1, the present invention is provided in a kind of determination seam, temporarily stall is to the method for required plugging strength, and it includes:
The first step, collects target reservoir, the data that open mode computation models different from intrinsic fracture are related;
Second step, the different open mode computation models interacted based on intrinsic fracture and hydraulic fracture obtain target Each intrinsic fracture in reservoir opens required a variety of net pressure p in different modalities1
3rd step, to acquired a variety of net pressure p1Optimize, to obtain optimal net pressure p1’;
4th step, the net pressure p that can be reached in man-made fracture when calculating temporarily stifled in without seam2;And
5th step, it is determined that seam in temporarily stall to required plugging strength be p1' and p2Difference.
Specifically, in the above-mentioned first step, target reservoir, open modes calculating moulds different from intrinsic fracture are collected The related data of type, including data below:The maximum horizontal principal stress σ of target reservoir1, minimum horizontal principal stress σ3, rock tension Intensity To, intrinsic fracture face cohesive strength Sw, intrinsic fracture face coefficient of internal friction μw, intrinsic fracture trend and maximum horizontal principal stress The pressure drop Δ of angle theta, hydraulic fracture and intrinsic fracture intersection to crack tippnf
Further, in above-mentioned second step, based on extensional crack initiation and mole coulomb criterion, intrinsic fracture and waterpower are provided Crack four interactions pattern, intrinsic fracture includes following from the different open mode computation models that hydraulic fracture interacts Four kinds of patterns:
Pattern one, the computation model that intrinsic fracture shearing is opened:
Pattern two, the computation model that intrinsic fracture expansion is opened:
Pattern three, the computation model that hydraulic fracture is passed through and opened by intrinsic fracture:
Pattern four, the computation model that intrinsic fracture is opened by hydraulic fracture along the crack initiation of intrinsic fracture end:
Wherein, σ1For maximum horizontal principal stress, unit is MPa;σ3For minimum horizontal principal stress, unit is MPa;σ13For Horizontal principal stress is poor;pnetFor net pressure, unit is MPa;SwFor intrinsic fracture face cohesive strength, unit is MPa;μwIt is intrinsic fracture Face coefficient of internal friction, decimal;θ be intrinsic fracture trend with maximum horizontal principal stress angle, unit for °;To is rock body Tensile strength, unit is MPa;ΔpnfBe hydraulic fracture and intrinsic fracture intersection to the pressure drop of crack tip, unit is MPa.
Based on the different open mode computation models of above-mentioned intrinsic fracture, all intrinsic fractures in reservoir are plotted to plate It is interior, set up comprehensive plate under the different opening ways of intrinsic fracture.As shown in Fig. 2 comprehensive plate is with intrinsic fracture trend and maximum The angle of horizontal principal stress is that abscissa, horizontal principal stress difference are that ordinate is drawn and is directed to various intrinsic fracture regions, in synthesis The different open modes in the following crack of eight Regional Representative are formed in plate:
Region is 1.:Intrinsic fracture can be sheared and expand unlatching (region marked in Fig. 2 with sloped triangular shape);
Region is 2.:Intrinsic fracture can shear unlatching (region marked in Fig. 2 with Right deviation skew lines);
Region is 3.:Intrinsic fracture can be opened and (marked in Fig. 2 with rhombus along the crack initiation of intrinsic fracture end by hydraulic fracture Region);
Region is 4.:Intrinsic fracture can expand unlatching (region marked in Fig. 2 with left-leaning skew lines);
Region is 5.:Intrinsic fracture can not be unlocked in (region marked in Fig. 2 with del) under current net pressure;
Region is 6.:Intrinsic fracture can be opened (with rectangle mark in Fig. 2 by hydraulic fracture along the crack initiation of intrinsic fracture end The region of note);
Region is 7.:Intrinsic fracture can expand unlatching and be passed through by hydraulic fracture and open the (area marked in Fig. 2 with circle Domain);
Region is 8.:Intrinsic fracture can be passed through by hydraulic fracture and opened in (region marked in Fig. 2 with blank).
Base area stress data and intrinsic fracture intensive parameter, opening ways different to intrinsic fracture are drawn by intrinsic fracture Under synthesis plate in.By above-mentioned zone, when being optimized to acquired a variety of net pressures, by comprehensive plate to Family is visualized.
In addition, comprehensive plate speed-generating program under the different opening ways of establishment hydraulic fracture, as shown in figure 3, by soft The mode of part programming draws the comprehensive plate and acquired a variety of net pressures is optimized, so as to faster The comprehensive plate of generation.
Further, in the 3rd above-mentioned step, to acquired a variety of net pressure p1Optimize, to obtain optimal fine pressure Power p1', optimal net pressure p1' it is to make most intrinsic fractures in the intrinsic fracture in the way of shearing and open and expand unlatching The net pressure of unlatching.As shown in figure 3, program can be generated by above-mentioned synthesis plate, change net pressure p1, day is drawn repeatedly Synthesis plate region under the different opening ways in right crack 1. in, until a large amount of intrinsic fractures are to shear, expansion fashion is opened, read Take net pressure p1’。
Further, in the 4th above-mentioned step, what can be reached in man-made fracture when calculating temporarily stifled in without seam is net Pressure p2, after the interior fluid-flow pressure drop of seam and crack tip liquid hysteresis effect is considered, p2To rely on lifting construction discharge capacity And net pressure in the seam that can reach of fracturing fluid viscosity.Wherein, net pressure p in the seam is calculated by following formula2
Wherein, p2For net pressure in seam, unit is MPa;ptipFor fracture tip net pressure;κ is constant, and ellipse stitches it It is worth for 16/ π;E ' is rock plane modulus, E '=E/ (1- ν2);E is elastic modulus of rock, and unit is MPa;ν is Poisson's ratio;xf For fracture half-length, unit is m;μ is the apparent viscosity of injection liquid, and unit is mpa*s, and q is injection discharge capacity, and unit is m3/ min;hfRepresent that seam is high, unit is m.
Further, in above-mentioned 5th step, by by obtained optimal net pressure p1' and net pressure p2Subtract each other, p1-p2I.e. It can calculate and required plugging strength is temporarily blocked up in seam.
Temporarily stall instructs scene fast to the method for required plugging strength there is provided one kind in a kind of determination seam of the present invention Method of the interior temporarily stall to required plugging strength is stitched in speed, easily determination, so as to more reliably select well, select well and preferably temporary Blocking agent is formulated and consumption.
The present invention is further described by specific embodiment above, it should be understood that, here specifically Description, should not be construed as the restriction to the spirit and scope of the invention, and one of ordinary skilled in the art is reading this explanation The various modifications made after book to above-described embodiment, belong to the scope that the present invention is protected.

Claims (8)

1. a kind of determine method of the interior temporarily stall of seam to required plugging strength, wherein, including:
Collect target reservoir, the data that open mode computation models different from intrinsic fracture are related;
The different open mode computation models interacted based on intrinsic fracture and hydraulic fracture, obtain target reservoir in each Intrinsic fracture opens required a variety of net pressure p in different modalities1
To acquired a variety of net pressure p1Optimize, to obtain optimal net pressure p1’;
The net pressure p that can be reached in man-made fracture when calculating temporarily stifled in without seam2;And
It is determined that seam in temporarily stall to required plugging strength be p1' and p2Difference.
2. according to claim 1 determine method of the interior temporarily stall of seam to required plugging strength, wherein, target reservoir, The related data of open mode computation models different from intrinsic fracture include:The maximum horizontal principal stress σ of target reservoir1, it is minimum Horizontal principal stress σ3, Tensile Strength of Rock To, intrinsic fracture face cohesive strength Sw, intrinsic fracture face coefficient of internal friction μw, intrinsic fracture Trend and the pressure drop Δ p of maximum horizontal principal stress angle theta, hydraulic fracture and intrinsic fracture intersection to crack tipnf
3. according to claim 1 determine method of the interior temporarily stall of seam to required plugging strength, wherein, intrinsic fracture and water The different open mode computation models of power crack interaction include:
The computation model that intrinsic fracture shearing is opened:
<mrow> <msub> <mi>&amp;sigma;</mi> <mn>1</mn> </msub> <mo>-</mo> <msub> <mi>&amp;sigma;</mi> <mn>3</mn> </msub> <mo>&gt;</mo> <mfrac> <mrow> <mn>2</mn> <msub> <mi>S</mi> <mi>w</mi> </msub> <mo>-</mo> <mn>2</mn> <msub> <mi>&amp;mu;</mi> <mi>w</mi> </msub> <msub> <mi>p</mi> <mrow> <mi>n</mi> <mi>e</mi> <mi>t</mi> </mrow> </msub> </mrow> <mrow> <mi>s</mi> <mi>i</mi> <mi>n</mi> <mn>2</mn> <mi>&amp;theta;</mi> <mo>+</mo> <msub> <mi>&amp;mu;</mi> <mi>w</mi> </msub> <mi>c</mi> <mi>o</mi> <mi>s</mi> <mn>2</mn> <mi>&amp;theta;</mi> <mo>-</mo> <msub> <mi>&amp;mu;</mi> <mi>w</mi> </msub> </mrow> </mfrac> </mrow>
The computation model that intrinsic fracture expansion is opened:
<mrow> <mo>(</mo> <msub> <mi>&amp;sigma;</mi> <mn>1</mn> </msub> <mo>-</mo> <msub> <mi>&amp;sigma;</mi> <mn>3</mn> </msub> <mo>)</mo> <mo>&lt;</mo> <mfrac> <mrow> <mn>2</mn> <msub> <mi>p</mi> <mrow> <mi>n</mi> <mi>e</mi> <mi>t</mi> </mrow> </msub> </mrow> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>c</mi> <mi>o</mi> <mi>s</mi> <mn>2</mn> <mi>&amp;theta;</mi> <mo>)</mo> </mrow> </mfrac> </mrow>
The computation model that hydraulic fracture is passed through and opened by intrinsic fracture:
<mrow> <mo>(</mo> <msub> <mi>&amp;sigma;</mi> <mn>1</mn> </msub> <mo>-</mo> <msub> <mi>&amp;sigma;</mi> <mn>3</mn> </msub> <mo>)</mo> <mo>&lt;</mo> <mfrac> <mrow> <mn>2</mn> <mrow> <mo>(</mo> <msub> <mi>p</mi> <mrow> <mi>n</mi> <mi>e</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>o</mi> </msub> <mo>)</mo> </mrow> </mrow> <mrow> <mo>(</mo> <mn>1</mn> <mo>+</mo> <mi>c</mi> <mi>o</mi> <mi>s</mi> <mn>2</mn> <mi>&amp;theta;</mi> <mo>)</mo> </mrow> </mfrac> </mrow>
The computation model that intrinsic fracture is opened by hydraulic fracture along the crack initiation of intrinsic fracture end:
<mrow> <mo>(</mo> <msub> <mi>&amp;sigma;</mi> <mn>1</mn> </msub> <mo>-</mo> <msub> <mi>&amp;sigma;</mi> <mn>3</mn> </msub> <mo>)</mo> <mo>&lt;</mo> <mfrac> <mrow> <mn>2</mn> <mrow> <mo>(</mo> <msub> <mi>p</mi> <mrow> <mi>n</mi> <mi>e</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>o</mi> </msub> <mo>-</mo> <msub> <mi>&amp;Delta;p</mi> <mrow> <mi>n</mi> <mi>f</mi> </mrow> </msub> <mo>)</mo> </mrow> </mrow> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>cos</mi> <mn>2</mn> <mi>&amp;theta;</mi> <mo>)</mo> </mrow> </mfrac> </mrow>
Wherein, σ13It is poor for horizontal principal stress.
4. according to claim 3 determine method of the interior temporarily stall of seam to required plugging strength, wherein, optimal net pressure p1’ To make the net pressure that most intrinsic fractures in the intrinsic fracture are opened in the way of shearing unlatching and expansion unlatching.
5. in the determination seam described in any one in claim 1-4 method from temporary stall to required plugging strength, its In, the net pressure p that can be reached in man-made fracture when interior temporarily stifled without seam2To rely on lifting construction discharge capacity and fracturing fluid Net pressure in the seam that viscosity can reach.
6. according to claim 5 determine method of the interior temporarily stall of seam to required plugging strength, wherein, calculated by following formula Net pressure p in the seam2
<mrow> <msub> <mi>p</mi> <mn>2</mn> </msub> <mo>=</mo> <msup> <mrow> <mo>&amp;lsqb;</mo> <mfrac> <msup> <mi>E</mi> <mrow> <mo>&amp;prime;</mo> <mn>3</mn> </mrow> </msup> <msubsup> <mi>h</mi> <mi>f</mi> <mn>4</mn> </msubsup> </mfrac> <mrow> <mo>(</mo> <mrow> <msub> <mi>&amp;kappa;&amp;mu;qx</mi> <mi>f</mi> </msub> </mrow> <mo>)</mo> </mrow> <mo>+</mo> <msubsup> <mi>p</mi> <mrow> <mi>t</mi> <mi>i</mi> <mi>p</mi> </mrow> <mn>4</mn> </msubsup> <mo>&amp;rsqb;</mo> </mrow> <mrow> <mn>1</mn> <mo>/</mo> <mn>4</mn> </mrow> </msup> </mrow>
Wherein, ptipFor fracture tip net pressure;κ is constant;E ' is rock plane modulus, E '=E/ (1- ν2);E is rock elasticity Modulus;ν is Poisson's ratio;xfFor fracture half-length;μ is the apparent viscosity of injection liquid;Q is injection discharge capacity;hfRepresent that seam is high.
7. method of the interior temporarily stall to required plugging strength is stitched in the determination according to claim 3 or 4, wherein, in addition to:
It is that ordinate drafting is directed to as abscissa, horizontal principal stress difference to be moved towards using intrinsic fracture with the angle of maximum horizontal principal stress The synthesis plate of various intrinsic fractures, forms the different open modes in the following crack of eight Regional Representative in comprehensive plate:
Region is 1.:Intrinsic fracture can be sheared and expand unlatching;
Region is 2.:Intrinsic fracture can shear unlatching;
Region is 3.:Intrinsic fracture can be opened by hydraulic fracture along the crack initiation of intrinsic fracture end;
Region is 4.:Intrinsic fracture can expand unlatching;
Region is 5.:Intrinsic fracture can not be unlocked under current net pressure;
Region is 6.:Intrinsic fracture can be opened by hydraulic fracture along the crack initiation of intrinsic fracture end;
Region is 7.:Intrinsic fracture can expand unlatching and be passed through and opened by hydraulic fracture;
Region is 8.:Intrinsic fracture can be passed through and opened by hydraulic fracture;
When being optimized to acquired a variety of net pressures, visualized by comprehensive plate to user.
8. according to claim 7 determine method of the interior temporarily stall of seam to required plugging strength, wherein, pass through software programming Mode draw the comprehensive plate and acquired a variety of net pressures optimized.
CN201710772281.6A 2017-08-31 2017-08-31 Method for determining plugging strength required by temporary plugging steering in seam Active CN107313773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710772281.6A CN107313773B (en) 2017-08-31 2017-08-31 Method for determining plugging strength required by temporary plugging steering in seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710772281.6A CN107313773B (en) 2017-08-31 2017-08-31 Method for determining plugging strength required by temporary plugging steering in seam

Publications (2)

Publication Number Publication Date
CN107313773A true CN107313773A (en) 2017-11-03
CN107313773B CN107313773B (en) 2020-09-22

Family

ID=60177021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710772281.6A Active CN107313773B (en) 2017-08-31 2017-08-31 Method for determining plugging strength required by temporary plugging steering in seam

Country Status (1)

Country Link
CN (1) CN107313773B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108362860A (en) * 2018-02-08 2018-08-03 中国石油天然气股份有限公司 Indoor testing method for tight sandstone steering fracturing feasibility
CN109372466A (en) * 2018-10-10 2019-02-22 中国石油天然气股份有限公司华北油田分公司 The temporary stifled forward method of liquid-solid-liquid phase state conversion is realized using natural Temperature Field
CN110185427A (en) * 2019-05-10 2019-08-30 西南石油大学 Intrinsic fracture opens the acquisition methods on opportunity under the conditions of temporarily blocking up in a kind of seam
CN111980652A (en) * 2020-08-25 2020-11-24 中国石油大学(北京) Method for determining type, size combination and dosage of temporary plugging agent in seam
CN112065351A (en) * 2020-08-25 2020-12-11 中国石油大学(北京) Integrated determination method, device and equipment for temporary plugging body information in hydraulic fracture
CN113468831A (en) * 2021-07-19 2021-10-01 西南石油大学 Design method for using amount of temporary plugging material in fracturing fracture
CN114508334A (en) * 2020-11-17 2022-05-17 中国石油化工股份有限公司 Karst cave circular seam channel technology determination method based on three-dimensional ground stress field distribution
CN114592823A (en) * 2020-12-04 2022-06-07 中国石油天然气股份有限公司 Method for determining dosage of temporary blocking steering material and application

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020984A (en) * 2009-09-15 2011-04-20 中国石油天然气股份有限公司 Diversion fracturing temporary plugging agent in low-permeability oilfield joints and preparation method and application thereof
CN103306660A (en) * 2012-03-13 2013-09-18 中国石油化工股份有限公司 Shale gas reservoir hydraulic fracturing production increasing method
CN106869892A (en) * 2017-03-15 2017-06-20 西南石油大学 The determination methods of temporarily stifled crack initiation in a kind of refractured well seam

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020984A (en) * 2009-09-15 2011-04-20 中国石油天然气股份有限公司 Diversion fracturing temporary plugging agent in low-permeability oilfield joints and preparation method and application thereof
CN103306660A (en) * 2012-03-13 2013-09-18 中国石油化工股份有限公司 Shale gas reservoir hydraulic fracturing production increasing method
CN106869892A (en) * 2017-03-15 2017-06-20 西南石油大学 The determination methods of temporarily stifled crack initiation in a kind of refractured well seam

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
WARPINSKI, N.R.等: "Influence of Geologic Discontinuities on Hydraulic Fracture Propagation", 《JOURNAL OF PETROLEUM TECHNOLOGY》 *
王在玉等: "安塞油田暂堵压裂裂缝转向研究", 《辽宁化工》 *
苏良银等: "低渗透油田暂堵重复压裂堵剂用量优化与现场试验", 《断块油气田》 *
赵金洲等: "页岩储层压裂缝成网延伸的受控因素分析", 《西南石油大学学报(自然科学版)》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108362860A (en) * 2018-02-08 2018-08-03 中国石油天然气股份有限公司 Indoor testing method for tight sandstone steering fracturing feasibility
CN108362860B (en) * 2018-02-08 2021-04-30 中国石油天然气股份有限公司 Indoor testing method for tight sandstone steering fracturing feasibility
CN109372466A (en) * 2018-10-10 2019-02-22 中国石油天然气股份有限公司华北油田分公司 The temporary stifled forward method of liquid-solid-liquid phase state conversion is realized using natural Temperature Field
CN109372466B (en) * 2018-10-10 2020-10-27 中国石油天然气股份有限公司华北油田分公司 Temporary blocking steering method for realizing liquid-solid-liquid phase state conversion by utilizing natural geothermal field
CN110185427A (en) * 2019-05-10 2019-08-30 西南石油大学 Intrinsic fracture opens the acquisition methods on opportunity under the conditions of temporarily blocking up in a kind of seam
CN110185427B (en) * 2019-05-10 2020-06-30 西南石油大学 Method for acquiring natural crack opening time under condition of temporary plugging in crack
CN112065351A (en) * 2020-08-25 2020-12-11 中国石油大学(北京) Integrated determination method, device and equipment for temporary plugging body information in hydraulic fracture
CN111980652A (en) * 2020-08-25 2020-11-24 中国石油大学(北京) Method for determining type, size combination and dosage of temporary plugging agent in seam
CN114508334A (en) * 2020-11-17 2022-05-17 中国石油化工股份有限公司 Karst cave circular seam channel technology determination method based on three-dimensional ground stress field distribution
CN114508334B (en) * 2020-11-17 2024-05-31 中国石油化工股份有限公司 Karst cave seam-following communication technology determining method based on three-dimensional ground stress field distribution
CN114592823A (en) * 2020-12-04 2022-06-07 中国石油天然气股份有限公司 Method for determining dosage of temporary blocking steering material and application
CN114592823B (en) * 2020-12-04 2024-06-25 中国石油天然气股份有限公司 Method for determining use amount of temporary plugging steering material and application
CN113468831A (en) * 2021-07-19 2021-10-01 西南石油大学 Design method for using amount of temporary plugging material in fracturing fracture
CN113468831B (en) * 2021-07-19 2023-07-21 西南石油大学 Method for designing dosage of temporary plugging material in fracture

Also Published As

Publication number Publication date
CN107313773B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN107313773A (en) It is a kind of to determine method of the interior temporarily stall of seam to required plugging strength
CN106281272B (en) A kind of fracture-type reservoir bridge joint sealing agent and the preparation method and application thereof
CN103437746B (en) A kind of many seam volume fracturing methods in horizontal well multistage section
CN207260136U (en) Ultra-deep bored pile borehole cleaning system
CN103788936B (en) A kind of high strength Oil/gas Well diverting agent, preparation and application thereof
CN106194145A (en) A kind of the most stifled multistage degree of depth network acid fracturing method
CN204551427U (en) A kind of novel plastic band drain construction equipment
CN109267985A (en) Control method for using amount of temporary plugging agent for temporary plugging steering fracturing
CN101737029A (en) Crude oil extraction method capable of effectively utilizing ultra-low permeability reservoir bed
CN109933845A (en) A kind of unlatching range computation method of intrinsic fracture when temporarily stifled pressure break
CN106087994A (en) A kind of high pressure jet grouting pore-forming dado structure and construction method thereof
CN108505967A (en) Experimental provision is temporarily blocked up in a kind of oil/gas well eyelet and crack
CN110344809A (en) Horizontal well intersegment multi-slit temporary plugging acidification method
CN105838347B (en) It is a kind of improve compact oil reservoir percolation ability angry system and its application
CN107387035A (en) Gas injection High Pressure Drain system in a kind of well
CN106958437A (en) A kind of wellfracturing improves recovery ratio new method
CN203978409U (en) Tubing string for back-up sand separate stratum fracfturing technique
CN207513626U (en) A kind of ground extraction coal-bed gas device
CN206617152U (en) A kind of oil well work-in-progress control treatment process system
CN208089262U (en) Experimental provision is temporarily blocked up in a kind of oil/gas well eyelet and crack
CN105888604B (en) Method suitable for repeatedly transforming near-wellbore stratum permanent plugging of old well of low-pressure gas field
CN206815410U (en) A kind of experimental rig of indoor full automatic simulation cement mixing method
CN105863717A (en) Method for preventing rib spalling by injecting water to soft coal seam mining face
CN204921352U (en) Sump pit precipitation water pump end connection structure
CN110513094A (en) A kind of Variable Composition carbon dioxide acid fracturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant