CN106940941A - Substation Operating virtual scene update method, device and simulation operations training system - Google Patents

Substation Operating virtual scene update method, device and simulation operations training system Download PDF

Info

Publication number
CN106940941A
CN106940941A CN201710363752.8A CN201710363752A CN106940941A CN 106940941 A CN106940941 A CN 106940941A CN 201710363752 A CN201710363752 A CN 201710363752A CN 106940941 A CN106940941 A CN 106940941A
Authority
CN
China
Prior art keywords
virtual
substation
simulation
model
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710363752.8A
Other languages
Chinese (zh)
Other versions
CN106940941B (en
Inventor
李军锋
夏爽
熊山
刘晓
温满华
郝腾飞
李晓莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Training and Evaluation Center of Guangdong Power Grid Co Ltd
Original Assignee
Education and Training Assessment Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Education and Training Assessment Center of Guangdong Power Grid Co Ltd filed Critical Education and Training Assessment Center of Guangdong Power Grid Co Ltd
Priority to CN201710363752.8A priority Critical patent/CN106940941B/en
Publication of CN106940941A publication Critical patent/CN106940941A/en
Application granted granted Critical
Publication of CN106940941B publication Critical patent/CN106940941B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of Substation Operating virtual scene update method, device and simulation operations training system, wherein, Substation Operating virtual scene update method comprises the following steps:When transient process currently occurs in confirmation Virtual Substation system or transient process terminates to enter stable state, transient emulation, generation emulation data are carried out to Virtual Substation system;According to emulation data, simulation system, a device model parameter for secondary simulation system are changed;When with secondary simulation system combined operation occurs for a simulation system after confirmation changes device model parameter, control primary equipment model, the action of secondary device model;Result based on action, updates primary equipment model, the model attributes data of secondary device model;According to the model attributes data of renewal, the corresponding current virtual scene for updating Virtual Substation system in training terminal.The present invention can realize the renewal of the combined operation virtual scene of primary and secondary system.

Description

Substation Operating virtual scene update method, device and simulation operations training system
Technical field
The present invention relates to Simulating technique in Electric Power System field, more particularly to a kind of Substation Operating virtual scene renewal side Method, device and simulation operations training system.
Background technology
Electric analog training system of the country based on three-dimensional range passes through the exploration at initial stage at present, there is now many set systems and throws Enter to use.But electrical equipment numerous types in power system, device wiring is complicated, operation is related to primary equipment and secondary device etc. Numerous equipment.
Therefore in implementation process, inventor has found that at least there are the following problems in conventional art:Tradition is existing at present System can only simulate the local scene and equipment of power system mostly, can only provide the outdoor scene roaming of equipment-patrolling, it is impossible to real The renewal of the combined operation virtual scene of existing primary and secondary system, therefore real power station running environment and operating mode can not be realized Simulation, causes in the training process of Substation Operating, operator is in virtual scene during operation equipment, it is impossible to understand a certain behaviour Oppose which circuit or equipment is impacted, there is which type of influence, and line related transient process such as how information, influence Actual result of training.
The content of the invention
Based on this, it is necessary to can not realize real power station running environment and Work condition analogue for conventional art, cause shadow There is provided a kind of Substation Operating virtual scene update method, device and simulation operations training for the problem of ringing actual result of training System.
To achieve these goals, on the one hand, the embodiments of the invention provide a kind of renewal of Substation Operating virtual scene Method, comprises the following steps:
When transient process currently occurs in confirmation Virtual Substation system or transient process terminates to enter stable state, to virtual change Electric power station system carries out transient emulation, generation emulation data;Emulate data include in Virtual Substation system simulation system with The operation power parameter of secondary simulation system;
According to emulation data, simulation system, a device model parameter for secondary simulation system are changed;
According to default secondary simulation system protective condition, the once simulation system after confirming to change device model parameter When with secondary simulation system combined operation occurs for system, related primary equipment model, secondary simulation in simulation system of control Related secondary device model action in system;
Result based on action, updates primary equipment model, the model attributes data of secondary device model;
According to the model attributes data of renewal, the corresponding current virtual for updating Virtual Substation system in training terminal Scape.
On the one hand, the embodiment of the present invention additionally provides a kind of Substation Operating virtual scene updating device, including:
Transient emulation unit, for confirm Virtual Substation system currently there is transient process or transient process terminate into When entering stable state, transient emulation, generation emulation data are carried out to Virtual Substation system;Emulating data includes Virtual Substation system In simulation system and secondary simulation system operation power parameter;
Device parameter unit is changed, for according to emulation data, changing simulation system, an equipment for secondary simulation system Model parameter;
Control action unit, for according to default secondary simulation system protective condition, confirming to change device model When with secondary simulation system combined operation occurs for simulation system after parameter, in simulation system of control it is related once Related secondary device model action in device model, secondary simulation system;
Update attribute data cell, for the result based on action, updates primary equipment model, the mould of secondary device model Type attribute data;
Virtual scene updating block, for the model attributes data according to renewal, corresponding update virtually becomes in training terminal The current virtual scene of electric power station system.
On the other hand, the embodiment of the present invention additionally provides a kind of substation simulation operation training system, including is sequentially connected Training terminal, simulator and model storage;
Training terminal exports simulation operations order to simulator, and model is triggered according to simulation operations order by simulator Currently there is transient process in Virtual Substation system in storage device;Simulation operations order includes failure setting command and emulation Control command;
Simulator when confirming that transient process currently occurs in Virtual Substation system or transient process terminates to enter stable state, Transient emulation, generation emulation data are carried out to Virtual Substation system;Emulating data includes a mould in Virtual Substation system The operation power parameter of plan system and secondary simulation system;And according to emulation data, change simulation system, a secondary simulation system The device model parameter of system;And according to default secondary simulation system protective condition, confirming to change device model parameter When with secondary simulation system combined operation occurs for a simulation system afterwards, related primary equipment in simulation system of control Related secondary device model action in model, secondary simulation system;Result based on action, updates primary equipment model, two The model attributes data of secondary device model;It is corresponding to update Virtual Substation system in training terminal according to model attributes data Current virtual scene.
The invention has the advantages that and beneficial effect:
Substation Operating virtual scene update method of the present invention, device and simulation operations training system, can will be virtual Reality immersion formula interaction training courseware, the three-dimensional visual simulation scene and transformer station first and second built according to actual transformer station are System is combined, the dynamic process that imitating substation is run as needed in equipment simulating operation, and transient process is represented in real time and is made Into circuit or equipment influence, realize the training of omnibearing integrated.The present invention is capable of the actual motion of true reappearance transformer station Situation, realizes the renewal of the combined operation virtual scene of primary and secondary system, and is not only to simulate one or several scenes, The present invention can make training on operation truer.By the linkage simulation of first and second system, training is set more to press close to work real Border, can be achieved directly to apply mechanically training scene in routine duties, result of training is more notable.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of Substation Operating virtual scene update method embodiment 1 of the present invention;
Fig. 2 be in Substation Operating virtual scene update method embodiment 1 of the present invention once, electrical secondary system combined operation Simulation flow schematic diagram;
Fig. 3 is the structural representation of Substation Operating virtual scene updating device embodiment 1 of the present invention;
Fig. 4 is the structural representation of substation simulation operation training system embodiment 1 of the present invention;
Fig. 5 is the system architecture schematic diagram of substation simulation operation training system embodiment 2 of the present invention;
Fig. 6 is immersion Substation Training Simulator in substation simulation operation training system embodiment 2 of the present invention Configuration diagram;
Fig. 7 is that the framework of integrated linkage simulation system in substation simulation operation training system embodiment 2 of the present invention shows It is intended to.
Embodiment
For the ease of understanding the present invention, the present invention is described more fully below with reference to relevant drawings.In accompanying drawing Give the preferred embodiment of the present invention.But, the present invention can be realized in many different forms, however it is not limited to this paper institutes The embodiment of description.On the contrary, the purpose that these embodiments are provided be make to the disclosure more it is thorough comprehensively.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more phases The arbitrary and all combination of the Listed Items of pass.
Substation Operating virtual scene update method of the present invention, device and the concrete application of simulation operations training system one Scape explanation:
Primary system can refer to the high voltage electric equipment for the production process for being directly used in production, conveying and distribution electric energy.It Generator, transformer, breaker, disconnecting switch, automatic switch, contactor, knife-like switch, bus, transmission line of electricity, electricity can be included Power cable, reactor, motor etc..It is connected with each other by primary equipment, constitutes and generate electricity, transmission of electricity, distribution or carry out other and produced The electric loop of journey is referred to as primary circuit or primary connection system.
The work that electrical secondary system can refer to primary equipment is monitored, controlled, adjusting, protecting and being operation, maintenance Personnel provide the low voltage electrical equipment needed for operating condition or production command signal.Such as fuse, controlling switch, relay, control Cable processed etc..It is connected with each other by secondary device, constitutes the electric loop for being monitored, control, adjusting and protecting to primary equipment Referred to as secondary circuit or secondary connection system.
Operation of power networks includes transient state and stable state two states, is stable state when being usually in stable running status, during stable state The parameters such as voltage, electric current and each equipment it is stable in order;If substation topology structure or fortune under steady state conditions, a reactor Row state is changed, such as unexpected voltage is raised, increase, equipment catastrophic failure cause electric network state to change suddenly for load, This moment power network changed has been put into transient process, in this process it is possible that overvoltage, excessively stream, overheat etc. Situations such as, in the actual motion of transformer station, electrical secondary system meeting starting protection measure after these situations are monitored is cut off once The faulty line of system and certain related section or a few sections of circuits;Transient process is temporary transient, is elapsed over time gradually Tend to stable state, therefore reached that stable i.e. transient process terminates to enter steady-state process again through circuit after a period of time.
Specifically, the change of primary system can cause the isoparametric change of voltage on circuit, electric current, electrical secondary system collection After to the Parameters variation of primary system if protective condition is reached starting protection, control primary system associative operation.
In actual substation operation, certain device fails causes electrical secondary system starting protection mechanism linkage cut-out once System, field service personnel can carry out fault location, analysis reason and exclusion according to the action of electrical secondary system and the data of record Failure etc., and traditional electric analog training system can only simulate the local scene and equipment of power system mostly, can only carry For the outdoor scene roaming of equipment-patrolling, it is impossible to realize the linkage of primary and secondary system, therefore real power station operation can not be realized Environment and Work condition analogue.
Substation Operating virtual scene update method embodiment 1 of the present invention:
Real power station running environment and Work condition analogue can not be realized in order to solve conventional art, causes to influence actual training The problem of effect, the invention provides a kind of Substation Operating virtual scene update method embodiment 1;Fig. 1 is power transformation of the present invention The schematic flow sheet of operation virtual scene update method of standing embodiment 1;As shown in figure 1, may comprise steps of:
Step S110:Confirming that transient process currently occurs in Virtual Substation system or transient process terminates to enter stable state When, transient emulation, generation emulation data are carried out to Virtual Substation system;Emulating data is included in Virtual Substation system once The operation power parameter of simulation system and secondary simulation system;
Specifically, Virtual Substation system can refer to three based on actual transformer station built using virtual reality technology Dimension module (i.e. transformer station's three-dimensional simulation system), can realize three-dimensional artificial, roaming and the operation of substation line and equipment;It is empty Intending transformer substation system includes a simulation system and secondary simulation system;Transient emulation, which can refer to, to be calculated transient process. When transient process or not up to stable state occurs in Virtual Substation system, transient emulation process is triggered, current system is carried out temporary State is emulated.
Step S120:According to emulation data, simulation system, a device model parameter for secondary simulation system are changed;
Specifically, can be according to the model object of simulation result and Virtual Substation system (i.e. during emulation Each model data of underlying model library storage) interact, device model image parameter is changed, and read in next emulation cycle Enter and using the first and second device model parameter changed.
Step S130:According to default secondary simulation system protective condition, after confirming to change device model parameter When with secondary simulation system combined operation occurs for simulation system, related primary equipment mould in simulation system of control Related secondary device model action in type, secondary simulation system;
Specifically, can be by checking that (preferably, related data can be secondary system to the related data in electrical secondary system The data of each sensor in system) contrasted with the protective condition of electrical secondary system, determine whether there is related first and second combined operation Situation occurs, and has, controls related first and second device action and update its state, otherwise ensures that current state is constant.
Step S140:Result based on action, updates primary equipment model, the model attributes data of secondary device model;
Specifically, model attributes data can include the product attribute data, status attribute data, connection of device model Attribute of a relation data and fault attribute data.Because the present invention is emulated to Virtual Substation system, respective virtual is built Scene is again based on underlying model storehouse (model library for storing each model data), therefore when in renewal Virtual Substation system After the model attributes data of each device model, corresponding first and second state can also reflect Substation Training Simulator institute structure In the virtual environment built, the integrative simulation of first and second linkage is realized.
Step S150:According to the model attributes data of renewal, Virtual Substation system works as in corresponding renewal training terminal Preceding virtual scene.
Specifically, can be according to it have updated the model after attribute, real-time update builds current virtual scene and push To terminating layer.The state for each equipment that more new state is changed in virtual scene, so that by corresponding first and second system State change reflection is into the virtual environment constructed by immersion Substation Training Simulator and is presented to student, so as to realize The integrative simulation of first and second system interlink.
Substation Operating virtual scene update method of the present invention, the three-dimensional visual simulation that can be built according to actual transformer station Scene and the system of transformer station first and second are combined, the dynamic mistake that imitating substation is run as needed in equipment simulating operation Journey, represents circuit or equipment influence that transient process is caused, realizes the training of omnibearing integrated in real time.
In a specific embodiment, operation power parameter includes voltage, electric current, phase and power factor;
Confirm that the step of transient process currently occurs in Virtual Substation system includes:
Virtual Substation system be in stable state when, contrast identification Virtual Substation system current topological structure with it is previous Whether secondary topological structure is compared changes;
Or
Virtual Substation system be in stable state when, contrast identification Virtual Substation system current operating conditions with it is previous Whether secondary running status is compared changes;
When changing, confirm that transient process currently occurs in Virtual Substation system;
And
Confirm that Virtual Substation system current transient process terminates to include the step of entering stable state:
When Virtual Substation system is in transient process, comparative analysis current power operational factor and a preceding electric power Operational factor, obtains Parameters variation data;
Got parms the convergence error of delta data, and Virtual Substation system current transient process is judged according to convergence error Whether terminate and stable state can be entered.
Specifically, various embodiments of the present invention can confirm that a simulation system (priority setting confirmation primary system) and Whether electrical secondary system (confirming simultaneously) is in steady-state operation, electrical secondary system if sensor breaks down, at this moment primary system In stable state, but electrical secondary system is that, in transient state, this transient state will also result in the action of primary system when serious.Such as voltage sensor It is broken suddenly, 10kV voltage measures 20kV result suddenly, at this moment electrical secondary system will enter transient state, if electrical secondary system Protection magnitude of voltage is located between 10~20kV, then electrical secondary system will control a circuit trip protection, and this is power station operation Real situation, and traditional training system does not account for these, it is impossible to realize the combined operation virtual field of primary and secondary system The renewal of scape.
Fig. 2 be in Substation Operating virtual scene update method embodiment 1 of the present invention once, electrical secondary system combined operation Simulation flow schematic diagram;As shown in Fig. 2 can be opened up by contrasting first and second system in identifying system in stable state at system Flutter whether structure or running status change compared with upper one emulates the moment, transient state mistake whether occur with this decision-making system Journey, or the result (i.e. operation power parameter) and basis that two emulate the moment in comparative analysis when system has been in transient process Convergence error, which determines whether to reach, have been arrived stable state and need to exit transient process;When transient process occur or being also not up to stable state, touch Hair system carries out transient emulation flow, and transient emulation is carried out to current system.
In a specific embodiment, currently there is transient process or transient process knot in confirmation Virtual Substation system When beam enters stable state, step is also included before the step of carrying out transient emulation to Virtual Substation system:
Model attributes data are changed in the simulation operations order exported according to training terminal;
According to the model attributes data of change, change the topological structure or running status of Virtual Substation system, trigger empty Intend transformer substation system and transient process occur;Simulation operations order includes failure setting command and simulation control command.
Specifically, training terminal can be interacted by C/S or B/S patterns with Virtual Substation system, pass through point The arbitrary equipment object of a simulation system or secondary simulation system is selected, by the essential attribute, the state that change the device object Attribute, annexation attribute etc. dynamically change wire topologies or running status, artificially cause transient process, cause one, two Subsystem is acted, or causes equipment fault by changing fault attribute, causes first and second system acting to go out to examine to give student Topic.
In a specific embodiment, device model parameter includes the electric current of model of power transmission system in primary equipment model Voltage parameter, the power parameter of transformer, the temperature rise parameter of switch and tie point, and phase induced current is passed in secondary device model The measurement parameter of sensor, voltage sensor and temperature sensor.
In a specific embodiment, according to default secondary simulation system protective condition, confirmation changes equipment mould The step of with secondary simulation system combined operation occurs for a simulation system after shape parameter includes:
Obtain the data of each sensor in secondary device model;
Check whether the data of each sensor meet default secondary simulation system protective condition, and according to the result of inspection It is confirmed whether occur combined operation.
Specifically, can be by checking that the data of the sensor of each in electrical secondary system and the protective condition of electrical secondary system are entered Row contrast, which determines whether there is related first and second combined operation situation, to be occurred, and is had, is controlled related first and second device action and update The folding of its state, such as switch, the start and stop of motor, otherwise ensure that current state is constant.Wherein, it is preferred that default two Secondary simulation system protective condition can be according to the actual related protection mechanism enabled of electrical secondary system in power network actual moving process Set.
In a specific embodiment, model attributes data include the product attribute data of device model, status attribute Data, annexation attribute data and fault attribute data;
Product attribute data include any one or any combination in data below:It is rated voltage, rated current, specified Power, resistance to voltage levels and maximum discharge capacity;Status attribute data include any one or any combination in data below: The closure state of switch, the start and stop state of motor, the light on and off state of lamp;Annexation attribute data includes Virtual Substation system In annexation between each device model;Fault attribute data are included in optional during training terminal operation Virtual Substation system The fault data taken.
Specifically, each model object must be at least in transformer station's three-dimensional simulation system in various embodiments of the present invention Possess product essential attribute, status attribute, annexation attribute, four attributes of fault attribute.Essential attribute is used for properties of product Judgement and reference, such as rated voltage, rated current, rated power, resistance to voltage levels, maximum discharge capacity as product by The attribute for describing its performance that producer directly provides, can be obtained from the nameplate of Related product;Status attribute is used for each system Between interaction and linkage state transmission, such as switch closure state, the start and stop state of motor, the light on and off state attribute of lamp; Annexation attribute is used for the annexation for building single model object during big system;Chosen when fault attribute is set a question for training Failure, also gives student to conclude mode and understands the possible failure of product.
Substation Operating virtual scene update method of the present invention, is capable of the practical operation situation of true reappearance transformer station, and It is not one or several scenes of simulation, makes training on operation truer.The linkage simulation of first and second system is realized simultaneously, makes training Instruction more presses close to reality of work, can be achieved directly to apply mechanically training scene in routine duties, result of training is more notable.
Substation Operating virtual scene updating device embodiment 1 of the present invention:
Based on the technical scheme of each embodiment of above Substation Operating virtual scene update method, while in order to solve tradition Technology can not realize real power station running environment and Work condition analogue, and the problem of causing to influence actual result of training, the present invention is also There is provided a kind of Substation Operating virtual scene updating device embodiment 1, Fig. 3 updates for Substation Operating virtual scene of the present invention The structural representation of device embodiment 1;As shown in figure 3, can include:
Transient emulation unit 310, for currently there is transient process or transient process knot in confirmation Virtual Substation system When beam enters stable state, transient emulation, generation emulation data are carried out to Virtual Substation system;Emulating data includes Virtual Substation The operation power parameter of a simulation system and secondary simulation system in system;
Device parameter unit 320 is changed, for according to emulation data, simulation system of change, secondary simulation system Device model parameter;
Control action unit 330, for according to default secondary simulation system protective condition, confirming to change equipment mould When with secondary simulation system combined operation occurs for simulation system after shape parameter, related one in simulation system of control Related secondary device model action in secondary device model, secondary simulation system;
Update attribute data cell 340, for the result based on action, updates primary equipment model, secondary device model Model attributes data;
Virtual scene updating block 350, it is corresponding to update virtual in training terminal for the model attributes data according to renewal The current virtual scene of transformer substation system.
In a specific embodiment, Update attribute data cell 340, the emulation for being exported according to training terminal is grasped Make order change model attributes data;And according to the model attributes data of change, change the topological structure of Virtual Substation system Or running status, trigger Virtual Substation system transient process occur;Simulation operations order includes failure setting command and emulation Control command.
It should be noted that each unit module in Substation Operating virtual scene updating device embodiment 1 of the present invention, energy Enough correspondences realize the method and step of each embodiment of above Substation Operating virtual scene update method, and here is omitted.
Substation Operating virtual scene updating device of the present invention, can be by virtual reality immersion formula interaction training courseware, root The three-dimensional visual simulation scene and the system of transformer station first and second that factually border transformer station builds are combined, in equipment simulating operation The dynamic process of imitating substation operation as needed, represents circuit or equipment influence that transient process is caused, realizes complete in real time The training of orientation integration.The present invention is capable of the practical operation situation of true reappearance transformer station, realizes primary and secondary system The renewal of combined operation virtual scene, can make training on operation truer.The linkage simulation of first and second system is realized simultaneously, Training is more pressed close to reality of work, can be achieved directly to apply mechanically training scene in routine duties, result of training is more notable.
Substation simulation operation training system embodiment 1 of the present invention:
In order to further illustrate technical scheme, while real power station operation can not be realized by solving conventional art Environment and Work condition analogue, it is the problem of causing to influence actual result of training, special empty can actually perform Substation Operating of the present invention Exemplified by the substation simulation operation training system for intending each embodiment of scene update method, the specific reality of technical solution of the present invention is illustrated Existing process.Therefore, present invention also offers a kind of substation simulation operation training system embodiment 1;Fig. 4 is transformer station of the present invention The structural representation of simulation operations training system embodiment 1;As shown in figure 4, can include be sequentially connected training terminal 410, Simulator 420 and model storage 430;
Training terminal 410 exports simulation operations order to simulator 420, is ordered by simulator 420 according to simulation operations Order triggers the Virtual Substation system in model storage 430 transient process currently occur;
Simulator 420 is confirming that transient process currently occurs in Virtual Substation system or transient process terminates to enter stable state When, transient emulation, generation emulation data are carried out to Virtual Substation system;Emulating data is included in Virtual Substation system once The operation power parameter of simulation system and secondary simulation system;And according to emulation data, change simulation system, a secondary simulation The device model parameter of system;And according to default secondary simulation system protective condition, confirming to change device model ginseng It is related in simulation system of control once to set when with secondary simulation system combined operation occurs for a simulation system after number Related secondary device model action in standby model, secondary simulation system;Result based on action, renewal primary equipment model, The model attributes data of secondary device model;It is corresponding to update Virtual Substation system in training terminal according to model attributes data Current virtual scene.
Specifically, the invention provides a kind of system interlink behaviour of transformer station first and second based on immersion virtual emulation Make training system.Virtual reality immersion formula interaction training courseware and the system of transformer station first and second can be combined is comprehensive Integrated training method.Which is capable of the practical operation situation of the true transformer station of true reappearance real world, rather than simulation One or several scenes, make training truer.Simultaneously by realizing the linkage of first and second system, make the training of student more Press close to routine work actual, or even can realize that will train scene directly covers in routine work, result of training to be more notable.
In a specific embodiment, model storage is used to store the transient process number in transformer station's actual motion According to by emulate obtain transient process data.
Specifically, the data in transient process storehouse of the invention can include two parts:A part is obtained by emulation, separately A part is surveyed by actual motion.The transformer substation system of various embodiments of the present invention is built based on true transformer station, the transformer station In day-to-day operation, the transient process and wire topologies of appearance can all be recorded by overall control center, can import the partial data In analogue system, the actual motion part of detecting in transient process storehouse is built.Another part is built imitative by related simulation software True mode, data are obtained by emulating, so that training process is referred to.
Substation simulation operation training system embodiment 2 of the present invention:
In order to further illustrate technical scheme, while real power station operation can not be realized by solving conventional art Environment and Work condition analogue, the problem of causing to influence actual result of training, are trained present invention also offers a kind of operation of substation simulation Exercising system embodiment 2;Substation simulation operation training system embodiment 2 and the phase of substation simulation operation training system embodiment 1 Than having further expanded the framework of substation simulation operation training system, and refined training terminal, simulator and model The internal structure deployment of storage device, illustrates technical solution of the present invention from substation simulation operation training system actual moving process Implementation process.Fig. 5 is the system architecture schematic diagram of substation simulation operation training system embodiment 2 of the present invention;
As shown in figure 5, substation simulation operation training system embodiment 2 of the present invention can architecturally include three layers:Eventually End layer, simulation calculation layer and model layer.
First, terminating layer can include student's terminal and teacher's terminal;
Wherein, student's terminal is used for the interaction of student and system, can be immersed in student in virtual scene, by right Interacting for student and system is realized in the perception of student's limb motion;Specifically, student's terminal that the present invention is respectively implemented can pass through VR(Virtual Reality:Virtual reality technology) glasses and immersion Substation Training Simulator interact and realize mould Near-ring border, can represent the 3D solid scene of simulation in the student visual field;Obtained in real time by sensor the head of student, hand, Eye and other human body behavior act data, and interaction is carried out by the virtual scene in acquisition and the data and system that perceive, Realize student and virtual unit and the body feeling interaction of scene, and schematic diagram of extraction system, secondary principle figure, facility information Deng archives, for training operation reference.
It is preferred that, student's terminal can be realized including simulated environment, the natural function such as technical ability and speech communication;Above-mentioned functions Cooperation realizes that student's immersion virtual emulation is experienced, and by perceiving student's limb motion and then being interacted with analogue system, Wherein natural technical ability can include the head rotation of people, the human body behavior act such as eyes, gesture.Simulated environment is dynamic real-time 3 D stereo photorealism, simulates student's local environment;Natural technical ability is the head rotation of student, eyes, gesture or other people The perception of body behavior act, and interacted by the result and system of perception;Speech communication is simulating reality transformer station Middle scene and the wireless telecommunications of control centre.
Further, teacher's terminal can be realized including functions such as system demonstration, examination assessment and speech communications.Specifically , system demonstration can show primary system, electrical secondary system and student's current window simultaneously.Examination, which is assessed, is used for system administration control System, fault scenes setting, evaluation of result etc.;Speech communication is used for interacting between teacher and student.Meanwhile, teacher's terminal can be with The monitoring of the operation of analogue system is controlled for teacher, send global simulation control command (start such as training, suspend, it is extensive It is multiple, terminate, reset), teacher's operational order, failure setting command and give assessment training.
It is preferred that, teacher's terminal of various embodiments of the present invention can pass through C/S or B/S patterns and immersion substation simulation Training system is interacted, and goes out the position of current virtual scene by student's current window scene fixation and recognition, and is shown in real time Show the related simulation system of scene correspondence and secondary simulation system and current student's form scene.Teacher is by clicking one The arbitrary equipment object of secondary simulation system or secondary simulation system, by change the essential attribute of the device object, status attribute, Annexation attribute etc. dynamically changes wire topologies, artificially causes transient process, causes first and second system acting, or Cause equipment fault by changing fault attribute, cause first and second system acting to be set the examination questions set the paper to give student.
2nd, simulation calculation layer is the core of whole system, can include immersion Substation Training Simulator and one Change linkage simulation system.
1st, immersion Substation Training Simulator is used for management and interaction to student's terminal and teacher's terminal, realizes empty Intend three-dimensional artificial, roaming and the operation of reality, the function such as failure setting and simulation;Simultaneously by checking that each in electrical secondary system is passed The data of sensor determine whether there is related one or two connection to monitor the state of primary system according to the protective condition of electrical secondary system Operational circumstances are moved, are had, control a related secondary device to act, otherwise ensure that current state is constant;Fig. 6 becomes for the present invention The configuration diagram of immersion Substation Training Simulator in power station simulation operation training system embodiment 2;As shown in Figure 6:
It is preferred that, immersion Substation Training Simulator can include virtual scene emulation module, scheduler module and friendship Mutual module.
Wherein, virtual scene emulation module can utilize VR skills by transformer station's three-dimensional simulation system of calling model layer Art, builds the virtual three-dimensional model of transformer station, realizes three-dimensional artificial, roaming and the operation of substation line and equipment;Emulated The equipment state of virtual scene is updated in journey as needed and the virtual scene after renewal is pushed into terminal, i.e., simultaneously to student Terminal and teacher's terminal push virtual scene.
Scheduler module, the electric network model for setting up transformer station, progress steady parameter, simulated failure situation, simultaneously Evaluation and instruction of setting a question, the generation examination task of teacher's terminal are received, mould is changed by interactive module according to examination task The attribute of type simultaneously pushes to student's terminal by virtual scene emulation module according to the model generation task scene after modification attribute;
Interactive module, for terminal and virtual scene to be interacted into the modification changed into model attributes, by model Attribute inspect and contrast update virtual scene in relevant device state and the virtual scene after renewal is passed through into virtual scene Emulation module pushes to terminating layer and realizes virtual interacting.
Specifically, interactive module can be by the interactive command of receiving terminal layer to selecting correspondence of the equipment in model layer Model object is interacted, and the association attributeses such as the parameter or state of model object is changed, then by all models in model layer Attribute data is read, and is contrasted with model attributes in current virtual scene, and virtual field is updated when stateful change The state of model in scape;Check that the data of each sensor and the protective condition of electrical secondary system are contrasted in electrical secondary system simultaneously Determine whether there is related first and second combined operation situation to occur, have, control related first and second device action and update it in void Intend the state of model in scene;The model after attribute, which will finally be have updated, transfers to virtual scene emulation module to update current virtual Scape simultaneously pushes to terminating layer.Pass through the organic unity phase interworking of virtual scene emulation module, scheduler module and interactive module three Conjunction realizes that immersion interactive simulation is emulated.
2nd, whether the topological structure that integrated linkage simulation system is used for identifying system model changes, if changing Then control system enters transient process, triggers Transient simulation, and first and second equipment operational factor is changed according to simulation result, Here the change of the topological structure of system model includes circuit switching, load switching, equipment work or the state change stopped, set Standby whether break down etc. can cause the situation of system transient modelling process, be the topological structure of broad sense.Fig. 7 is transformer station of the present invention The configuration diagram of integrated linkage simulation system in simulation operations training system embodiment 2;As shown in Figure 7:
It is preferred that, integrated linkage simulation system can include system topological state recognition module, system transient modelling emulation mould Block and model state interactive module.
Wherein, system topological state recognition module at system in stable state when contrast identifying system in first and second system open up Flutter whether structure changes compared with upper one emulates the moment, transient process whether occur with this decision-making system, or in system The result at two emulation moment and determined whether when being in transient process in comparative analysis according to convergence error up to having arrived stable state And transient process need to be exited;
It is preferred that, system topological state recognition module can differentiate the change of system topological state caused by the operation of operator Change the state change with line parameter circuit value, and preserve the state parameter before change and enter as primary condition triggering transient emulation module The calculating of row transient emulation process, obtains the parameters such as the transient voltage electric current of circuit.
When there is transient process or is also not up to stable state in system, triggering system transient modelling emulation module work, to current system System carries out transient emulation, during emulation, is interacted according to simulation result with the model object in model layer, modification is set Standby model object parameter, the Current Voltage parameter of such as power transmission cable model, the active power of transformer, reactive power, power because The primary equipment such as temperature rise parameter of the parameters such as element, switch and tie point model and corresponding current sensor, voltage sensor, temperature Spend the secondary device models such as the measurement parameter of sensor;
Further, system transient modelling emulation module can receive the trigger command of system topological state recognition module and initial Condition, and control system enters transient state, and control exits transient state and enters stable state at the end of transient process;In transient emulation process In can in real time will emulation data transfer give model state interactive module.And model state interactive module can be imitative with reception system transient state The emulation data of true module, and according to emulation data real-time update model attributes.
The first and second device model parameter changed is in next emulation cycle by immersion substation simulation training system System is read in, and is determined whether by checking that the data of the sensor of each in electrical secondary system and the protective condition of electrical secondary system carry out contrast There is related first and second combined operation situation, have, control related first and second device action and update its state, such as switch Folding, start and stop of motor etc., otherwise ensure that current state is constant;Finally updated by immersion Substation Training Simulator The state of the equipment of each in virtual scene, so that the state reflection of corresponding first and second system is arrived into immersion substation simulation In virtual environment constructed by training system and student is presented to, realizes the integrative simulation of first and second system interlink.It is above-mentioned The algorithm flow that process is used can be as shown in Figure 2.
It should be noted that each model object at least has in transformer station's three-dimensional simulation system in various embodiments of the present invention Standby product essential attribute, status attribute, annexation attribute, four attributes of fault attribute.Essential attribute is used for properties of product Judge and refer to, such as rated voltage, rated current, rated power, resistance to voltage levels, maximum discharge capacity are as product by factory The attribute for describing its performance that family directly provides, can be obtained from the nameplate of Related product;Status attribute be used for each system it Between interaction and linkage state transmission, such as switch closure state, the start and stop state of motor, the light on and off state attribute of lamp;Even Connect the annexation that attribute of a relation is used to build single model object during big system;Event is chosen when fault attribute is set a question for training Barrier, also gives student to conclude mode and understands the possible failure of product.The scene simulation of whole model can use Untiy3D tri- Tie up engine exploitation.
3rd, model layer is the basal layer of whole system, is called for analog simulation layer, can include three-dimensional simulation system of transformer station System, simulation system, secondary simulation system and transient state storehouse.
Wherein, transformer station's three-dimensional simulation system is the three-dimensional entity model of true transformer station;Simulation system is power transformation The primary system principle model stood;Secondary simulation system is the electrical secondary system principle model of transformer station.
Further, the transient process data that transient process storehouse is used in deposit operation, so that student is during instruction is accompanied, Operate before certain equipment, understand transient process caused by the operation institute meeting by calling the data in transient process storehouse, assess and judge Whether the operation is suitable, estimates operation consequence.
It is preferred that, transient process storehouse can include the transient process data of real transformer station central control system activity and emulation is obtained The transient process data obtained.It is available for the consequence for carrying out calling corresponding data to understand its operation during a certain operation in student training.Tool For body, the transient process storehouse in various embodiments of the present invention can include two parts:A part by emulation gained, another part by Actual motion is surveyed.The transformer substation system of the present invention is based on true transformer station structure, in transformer station's day-to-day operation, appearance it is temporary State process and wire topologies can all be recorded by overall control center, can be imported in analogue system the partial data, be built transient state Actual motion part of detecting in procedure library.Another part builds simulation model by related simulation software, is obtained by emulating Data, so that training process is referred to.
Substation simulation operation training system embodiment 2 of the present invention, full side is built by building integration first floor system structure The linkage platform system of position integration, can be by virtual reality immersion formula interaction training courseware and transformer station first and second with one kind The omnibearing integrated training method that system is combined, the practical operation situation of the true transformer station of true reappearance real world, together When by the linkage of first and second system, realize transformer station's three-dimensional simulation operating system, transforming plant primary system, substation secondary The state of system three is unified, and making the training of student, more to press close to routine work actual, or even can realize that will to train scene direct From cover to cover apply mechanically in routine duties, significantly heighten result of training.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.One of ordinary skill in the art will appreciate that realizing above-mentioned implementation All or part of step in example method can be by program to instruct the hardware of correlation to complete, and described program can be deposited Be stored in a computer read/write memory medium, the program upon execution, including the step described in above method, described storage Medium, such as:ROM/RAM, magnetic disc, CD etc..
Embodiment described above only expresses the several embodiments of the present invention, and it describes more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of Substation Operating virtual scene update method, it is characterised in that comprise the following steps:
When transient process currently occurs in confirmation Virtual Substation system or transient process terminates to enter stable state, to the virtual change Electric power station system carries out transient emulation, generation emulation data;The emulation data include a mould in the Virtual Substation system The operation power parameter of plan system and secondary simulation system;
According to the emulation data, a simulation system, the device model parameter of the secondary simulation system are changed;
According to default secondary simulation system protective condition, the mould after confirming to change the device model parameter When with the secondary simulation system combined operation occurs for plan system, primary equipment mould related in a simulation system is controlled Related secondary device model action in type, the secondary simulation system;
Based on the result of the action, the primary equipment model, the model attributes data of the secondary device model are updated;
According to the model attributes data of the renewal, the corresponding current virtual for updating Virtual Substation system described in training terminal Scene.
2. Substation Operating virtual scene update method according to claim 1, it is characterised in that the operation power ginseng Number includes voltage, electric current, phase and power factor;
Confirm that the step of transient process currently occurs in the Virtual Substation system includes:
When the Virtual Substation system is in stable state, the current topological structure of the contrast identification Virtual Substation system with Whether a preceding topological structure is compared changes;
Or
When the Virtual Substation system is in stable state, the current operating conditions of the contrast identification Virtual Substation system with Whether a preceding running status is compared changes;
When changing, confirm that transient process currently occurs in the Virtual Substation system;
And
Confirm that the Virtual Substation system current transient process terminates to include the step of entering stable state:
When the Virtual Substation system is in transient process, comparative analysis current power operational factor and a preceding electric power Operational factor, obtains Parameters variation data;
The convergence error of the Parameters variation data is obtained, judges that the Virtual Substation system is current according to the convergence error Whether transient process terminates and can enter stable state.
3. Substation Operating virtual scene update method according to claim 1 or 2, it is characterised in that confirming virtually When transient process currently occurs in transformer substation system or transient process terminates to enter stable state, the Virtual Substation system is carried out temporary Also include step before the step of state is emulated:
The model attributes data are changed in the simulation operations order exported according to training terminal;
According to the model attributes data of the change, change the topological structure or running status of the Virtual Substation system, draw Sending out Virtual Substation system described there is transient process;The simulation operations order includes failure setting command and Simulation Control is ordered Order.
4. Substation Operating virtual scene update method according to claim 3, it is characterised in that the device model ginseng Number includes the Current Voltage parameter of model of power transmission system in the primary equipment model, the power parameter of transformer, switch and connected Corresponding current sensor in the temperature rise parameter of contact, and the secondary device model, voltage sensor and temperature sensor Measurement parameter.
5. Substation Operating virtual scene update method according to claim 4, it is characterised in that according to default secondary Simulation system protective condition, confirmation changes the simulation system after the device model parameter and the secondary simulation The step of combined operation occurs for system includes:
Obtain the data of each sensor in the secondary device model;
Check whether the data of each sensor meet the default secondary simulation system protective condition, and according to the inspection Whether results verification occurs the combined operation.
6. Substation Operating virtual scene update method according to claim 1, it is characterised in that
The model attributes data include the product attribute data, status attribute data, annexation attribute of the device model Data and fault attribute data;
The product attribute data include any one or any combination in data below:It is rated voltage, rated current, specified Power, resistance to voltage levels and maximum discharge capacity;The status attribute data include any one or any in data below Combination:The closure state of switch, the start and stop state of motor, the light on and off state of lamp;The annexation attribute data is comprising described Annexation in Virtual Substation system between each device model;The fault attribute data are grasped included in the training terminal The fault data that can be chosen when making the Virtual Substation system.
7. a kind of Substation Operating virtual scene updating device, it is characterised in that including:
Transient emulation unit, for confirming that transient process currently occurs in Virtual Substation system or transient process terminates to enter steady During state, transient emulation, generation emulation data are carried out to the Virtual Substation system;The emulation data include the virtual change The operation power parameter of a simulation system and secondary simulation system in electric power station system;
Device parameter unit is changed, for according to the emulation data, changing a simulation system, the secondary simulation system The device model parameter of system;
Control action unit, for according to default secondary simulation system protective condition, confirming to change the device model When with the secondary simulation system combined operation occurs for the simulation system after parameter, a simulation system is controlled Related secondary device model action in middle related primary equipment model, the secondary simulation system;
Update attribute data cell, for the result based on the action, updates the primary equipment model, the secondary device The model attributes data of model;
Virtual scene updating block, it is corresponding to update empty described in training terminal for the model attributes data according to the renewal Intend the current virtual scene of transformer substation system.
8. Substation Operating virtual scene updating device according to claim 7, it is characterised in that
The Update attribute data cell, the simulation operations order for being exported according to the training terminal is changed the model and belonged to Property data;And according to the model attributes data of the change, change the topological structure or operation shape of the Virtual Substation system State, triggers the Virtual Substation system transient process occur;The simulation operations order includes failure setting command and emulation Control command.
9. a kind of substation simulation operation training system, it is characterised in that including be sequentially connected training terminal, simulator with And model storage;
The training terminal exports simulation operations order to the simulator, by the simulator according to simulation operations order The Virtual Substation system in the model storage is triggered transient process currently occur;The simulation operations order includes event Hinder setting command and simulation control command;
The simulator when confirming that transient process currently occurs in Virtual Substation system or transient process terminates to enter stable state, Transient emulation, generation emulation data are carried out to the Virtual Substation system;The emulation data include the Virtual Substation The operation power parameter of a simulation system and secondary simulation system in system;And according to the emulation data, change described one The device model parameter of secondary simulation system, the secondary simulation system;And according to default secondary simulation system protective condition, With the secondary simulation system linkage behaviour occurs for the simulation system after confirmation changes the device model parameter When making, related in primary equipment model related in the simulation system, the secondary simulation system secondary set is controlled Standby model action;Based on the result of the action, the primary equipment model, the model attributes of the secondary device model are updated Data;According to the model attributes data, the current virtual of Virtual Substation system described in the training terminal is accordingly updated Scene.
10. substation simulation operation training system according to claim 9, it is characterised in that the model storage is used Transient process data in storage transformer station actual motion and the transient process data by emulating acquisition.
CN201710363752.8A 2017-05-22 2017-05-22 Substation Operating virtual scene update method, device and simulation operations training system Active CN106940941B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710363752.8A CN106940941B (en) 2017-05-22 2017-05-22 Substation Operating virtual scene update method, device and simulation operations training system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710363752.8A CN106940941B (en) 2017-05-22 2017-05-22 Substation Operating virtual scene update method, device and simulation operations training system

Publications (2)

Publication Number Publication Date
CN106940941A true CN106940941A (en) 2017-07-11
CN106940941B CN106940941B (en) 2018-02-02

Family

ID=59465061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710363752.8A Active CN106940941B (en) 2017-05-22 2017-05-22 Substation Operating virtual scene update method, device and simulation operations training system

Country Status (1)

Country Link
CN (1) CN106940941B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107464467A (en) * 2017-08-22 2017-12-12 国网安徽省电力公司宣城供电公司 Substation relay protection experience system
CN107464486A (en) * 2017-09-21 2017-12-12 内蒙古农业大学 A kind of power system simulation experiments method and device
CN110059387A (en) * 2019-04-10 2019-07-26 广州供电局有限公司 Substation simulation scene generating means
CN110070776A (en) * 2019-04-26 2019-07-30 中国南方电网有限责任公司超高压输电公司大理局 A kind of breaker protection virtual framework training system based on virtual reality technology
CN111580648A (en) * 2020-04-24 2020-08-25 岭东核电有限公司 Simulation drilling method and device based on virtual reality
CN112750204A (en) * 2019-10-30 2021-05-04 孙景芝 Data content real-time updating system
CN112825215A (en) * 2019-11-20 2021-05-21 中广核(北京)仿真技术有限公司 Nuclear power plant anti-anthropogenic training system and method based on virtual reality technology
CN113408761A (en) * 2021-07-14 2021-09-17 喻海帅 Communication infrastructure maintenance skill training system based on VR virtual reality technology
CN113885913A (en) * 2021-09-30 2022-01-04 珠海虎江科技有限公司 Upgrading method of virtual reality display equipment, computer device and computer readable storage medium
CN114186422A (en) * 2021-12-14 2022-03-15 福建省电力有限公司泉州电力技能研究院 Power cable training simulation system based on multiple time scales
CN114567661A (en) * 2022-02-25 2022-05-31 阿波罗智联(北京)科技有限公司 Control method and device for traffic lighting device, electronic equipment and medium
CN116979523A (en) * 2023-08-14 2023-10-31 广东工业大学 Scene-based substation secondary system simulation method and computer equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070282588A1 (en) * 2006-05-31 2007-12-06 Powersmiths International, Inc. Electric power system training simulation software and process for electric power system training
CN102054386A (en) * 2011-01-07 2011-05-11 广东电网公司电力科学研究院 Transformer station simulation training system based on mixed digital/analogy simulation technology
CN102663912A (en) * 2012-03-14 2012-09-12 福建省电力有限公司培训中心 Computer simulation systems for integrated dispatching and monitoring of regional power network
CN103794109A (en) * 2012-11-01 2014-05-14 同济大学 Electric power control system with simulation training function, and simulation training method thereof
CN105810062A (en) * 2016-04-15 2016-07-27 国网江苏省电力公司盐城供电公司 10kV typical customer transformer substation intelligent simulation training system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070282588A1 (en) * 2006-05-31 2007-12-06 Powersmiths International, Inc. Electric power system training simulation software and process for electric power system training
CN102054386A (en) * 2011-01-07 2011-05-11 广东电网公司电力科学研究院 Transformer station simulation training system based on mixed digital/analogy simulation technology
CN102663912A (en) * 2012-03-14 2012-09-12 福建省电力有限公司培训中心 Computer simulation systems for integrated dispatching and monitoring of regional power network
CN103794109A (en) * 2012-11-01 2014-05-14 同济大学 Electric power control system with simulation training function, and simulation training method thereof
CN105810062A (en) * 2016-04-15 2016-07-27 国网江苏省电力公司盐城供电公司 10kV typical customer transformer substation intelligent simulation training system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107464467A (en) * 2017-08-22 2017-12-12 国网安徽省电力公司宣城供电公司 Substation relay protection experience system
CN107464486A (en) * 2017-09-21 2017-12-12 内蒙古农业大学 A kind of power system simulation experiments method and device
CN110059387A (en) * 2019-04-10 2019-07-26 广州供电局有限公司 Substation simulation scene generating means
CN110070776A (en) * 2019-04-26 2019-07-30 中国南方电网有限责任公司超高压输电公司大理局 A kind of breaker protection virtual framework training system based on virtual reality technology
CN112750204B (en) * 2019-10-30 2022-04-05 广东致创数字科技有限公司 Data content real-time updating system
CN112750204A (en) * 2019-10-30 2021-05-04 孙景芝 Data content real-time updating system
CN112825215A (en) * 2019-11-20 2021-05-21 中广核(北京)仿真技术有限公司 Nuclear power plant anti-anthropogenic training system and method based on virtual reality technology
CN111580648A (en) * 2020-04-24 2020-08-25 岭东核电有限公司 Simulation drilling method and device based on virtual reality
CN113408761A (en) * 2021-07-14 2021-09-17 喻海帅 Communication infrastructure maintenance skill training system based on VR virtual reality technology
CN113408761B (en) * 2021-07-14 2022-06-10 喻海帅 Communication infrastructure maintenance skill training system based on VR virtual reality technology
CN113885913A (en) * 2021-09-30 2022-01-04 珠海虎江科技有限公司 Upgrading method of virtual reality display equipment, computer device and computer readable storage medium
CN114186422A (en) * 2021-12-14 2022-03-15 福建省电力有限公司泉州电力技能研究院 Power cable training simulation system based on multiple time scales
CN114567661A (en) * 2022-02-25 2022-05-31 阿波罗智联(北京)科技有限公司 Control method and device for traffic lighting device, electronic equipment and medium
CN116979523A (en) * 2023-08-14 2023-10-31 广东工业大学 Scene-based substation secondary system simulation method and computer equipment

Also Published As

Publication number Publication date
CN106940941B (en) 2018-02-02

Similar Documents

Publication Publication Date Title
CN106940941B (en) Substation Operating virtual scene update method, device and simulation operations training system
Thomas et al. Power system SCADA and smart grids
CN103123758B (en) A kind of dispatching automation numeral physical mixed simulation training system
CN105005658B (en) Transformer station's integrated system apparatus logic emulation mode
CN102663912B (en) Computer simulation systems for integrated dispatching and monitoring of regional power network
CN102054377B (en) Remote simulation training system for electrical tests of transformer
CN103632581B (en) Electric energy acquisition terminal debugging O&M analog simulation method
CN202159106U (en) Intelligent tester with intelligent power grid self-healing control technology
CN106971663B (en) A kind of wind power plant analogue system and method
CN104505941B (en) The monitoring system and the simulative running system of intelligent substation network
CN108241771A (en) Secondary device modeling method based on electromagnetic transient simulation platform
CN108877368A (en) A kind of grid simulation Training Methodology based on the application of more scenes
CN107516895A (en) Power distribution network rapid simulation method and device, storage medium and computer equipment thereof
CN105718686B (en) One kind being based on event driven power distribution network analogue system and its emulation mode
CN109191591A (en) Substation Training Simulator construction method based on augmented reality
CN105093017B (en) Intelligent substation GOOSE integrated testabilities device and its method of testing
Wong et al. Modeling and co-simulation of IEC61850-based microgrid protection
CN105847076A (en) Signal testing system, method and device for substation control level equipment of transformer substation
CN105680441A (en) Simulated replacement technique-based simulated point-alignment device
CN110233477A (en) Steady control analogue system based on three lines of defence emulation
CN109754662A (en) A kind of intelligent substation O&M method based on simulation training system
CN102200559B (en) Regional remote spare power source automatic transfer test method and related equipment
CN107976598A (en) The test method of SOE signals is lost after intelligent substation line fault
CN103235218A (en) RTDS-based (real-time digital simulator) arc protector function test platform
KR100969155B1 (en) Functional testing method of bus protective ied using uml test model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510080 Room 1206-1209, No. 8, Shui Jungang 6, Dongfeng East Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: Training and Evaluation Center of Guangdong Power Grid Co., Ltd.

Address before: 510520, Guangdong, Guangzhou province Yuexiu District Dongfeng East Road water all Gang No. 8, No. 1206-1209, room 6

Patentee before: EDUCATION AND TRAINING ASSESSMENT CENTER, GUANGDONG POWER GRID CORP.

CP03 Change of name, title or address