CN106894442A CN201710121701.4A CN201710121701A CN106894442A CN 106894442 A CN106894442 A CN 106894442A CN 201710121701 A CN201710121701 A CN 201710121701A CN 106894442 A CN106894442 A CN 106894442A
Authority
CN
China
Prior art keywords
filler
soil
barricade
eps foam
foam plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710121701.4A
Other languages
Chinese (zh)
Inventor
李丽华
张蒋
余长道
肖衡林
马强
庄心善
裴尧尧
陈智
胡智
文贝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei University of Technology
Original Assignee
Hubei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Technology filed Critical Hubei University of Technology
Priority to CN201710121701.4A priority Critical patent/CN106894442A/en
Publication of CN106894442A publication Critical patent/CN106894442A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0241Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of reinforced sand soil barricade and construction method, it is made up of filler, the reinforcement and the part of shingle nail three arranged in filler;Excavate barricade substrate groove and carry out foundation construction in ground to be onstructed first, then on the basis of by building block come panel of building a wall, subsiding crack and expansion joint are set when panel is built a wall, GSZ is built between the building block of shingle nail at a certain distance, then eps foam plastic plate is pasted on shingle nail, and eps foam plastic plate is polished, finally backfilled using saponified residue coal ash soil light filling, the performance of filler should meet design requirement in compacting process in backfilling process, Manual is used near eps foam plastic plate, remaining position compacting is rolled using machine spreading, the compacting until each layer of GSZ muscle material laying of completion and filler pave, complete the construction of reinforced sand soil barricade.The present invention has simple structure, easy construction, through the premium properties such as durability, anti-aging.

Description

A kind of reinforced sand soil barricade and construction method
Technical field
The present invention relates to the retaining wall structure in Geotechnical Engineering, and in particular to a kind of reinforced sand soil barricade and construction party Method.
Background technology
Reinforced earth bulkhead is a kind of sustaining retaining structure built using reinforced earth technology, and reinforced earth is that one kind is added in soil The composite earth of bar strip, it is using the rubbing action between lacing wire and soil, the deformation condition for improving the soil body and the work for improving the soil body Cheng Xingneng, so as to reach the purpose of the stabilization soil body.Current reinforced earth bulkhead comes with some shortcomings in terms of engineer applied, such as fill out Material part needs to consume that substantial amounts of soil resource, lacing wire be high with the interface friction intensity between filler, panel is coupled weak with reinforced earth Deng these shortcomings have impact on the popularization and application of reinforced earth bulkhead.Mainly there is increasing to the preferable reinforcement measure of reinforced earth bulkhead at present Compactness, increase muscle material length and intensity of superimposed fill etc., but take these measure long construction periods and high cost.
The content of the invention
The present invention is for shortcoming and defect present on existing engineer applied aspect, there is provided a kind of reinforced sand soil barricade And its construction method technical scheme.
To achieve the above object, the present invention provides following technical scheme
A kind of reinforced sand soil barricade, is made up of filler, the reinforcement and the part of shingle nail three arranged in filler;Wall Panel uses blockwork structure;Eps foam plastic plate is set between shingle nail and filler;Described filler using saponified residue- Flyash-soil light filling;Reinforcement uses GSZ, makes drawing coefficient excursion for 0.54-0.85, and GSZ is direct It is pressed between the building block up and down of shingle nail.
As improvement, in saponified residue-flyash-soil that described filler is used:Saponified residue Particle size requirements exist Between 0.075-2mm, the content of the CaO of saponified residue is more than 45%.
As improvement, in saponified residue-flyash-soil that described filler is used:Flyash requirement SiO2And Al2O3's Content is more than 70%, and between 0.001-2mm, wherein particle of the particle diameter less than 0.074mm contains the particle size distribution of flyash Amount is greater than 45%;Radii of soil particles in filler is less than 2mm.
As improvement, the physical characteristic of saponified residue-flyash-soil three's mixture that described filler is used:Naturally Water content W scopes are 20%-50%, and proportion ρ scopes are 2.1-2.3, maximum dry density γmaxIt is 1170kg/m3
As improvement, in saponified residue-flyash-soil that described filler is used:Flyash is 1 with the mass ratio of soil: 1.5-1:2.5, saponification slag is 1 with the mass ratio of soil:2-1:3.5.
A kind of construction method of reinforced sand soil barricade, comprises the following steps:
A the foundation construction of () reinforced sand soil barricade, first excavates the size gear bigger than basic outer rim on ground to be onstructed Wall base kerve, sets blotter in barricade substrate groove, and basis is poured using C15 crushed stone concretes and formed, every on the basis of One subsiding crack expansion joint with together with is set every a segment distance, and plank is soaked as joint sealing material using pitch;
When the building block of () shingle nail installs first piece b, first one layer of cement mortar of pad on the basis of is answered, makes its that stabilization to be installed, Then with building block come panel of building a wall, cement mortar is filled in faulting of slab ends space between building block and basis;Dry is used between building block Cement mortar laid dry is docked, and is built by laying bricks or stones in facade layering;
C () eps foam plastic plate is installed, should cohere mortar by eps foam plastic plate using what is configured by design size Cohered with shingle nail, to keep extruding uniform during cohering;Milling tools should be also used afterwards by eps foam plastic plate Surface rubbing;
D the installation laying of () GSZ, the GSZ plane laying length, vertical spacing all should be wanted by design Ask and laid, the anchoring of its muscle material makes grid smooth through eps foam plastic plate, and is fixed on equidistantly distributed in building block In U-shaped steel disc crotch, by the way that GSZ is fixed between two building blocks of shingle nail in U-shaped steel disc crotch;
E () backfills filler, the performance of filler should meet design requirement in compacting process, away from eps foam plastic plate 50- Manual is carried out within 75cm, small-sized frog rammer compacting leveling afterwards paves GSZ muscle material in place, and away from EPS bubbles Compacting can be rolled with machine spreading beyond foam plastic plate 50-75cm, until completing each layer of GSZ muscle material laying and filler Pave compacting, that is, complete the construction of reinforced sand soil barricade.
As improvement, barricade substrate groove 25cm-35cm bigger than basic outer rim, the thickness of the blotter in step (a) It is 15-25cm.
As improvement, in the step (a), when panel is built a wall set subsiding crack and expansion joint, the subsiding crack and Together, its width is 1cm-2cm to expansion joint setting, can use the filling such as asphalt plank, cork sheet, pitch loose hemp fiber;Subsiding crack spacing, Earthen foundation is 10m-30m, and rock foundation can suitably increase.
Used as improvement, in the step (e), specific requirement is during backfill filler:Discharging equipment and eps foam plastics The distance of plate cannot be less than 1.0m, and discharging equipment can not be travelled on the muscle material band for do not cover filler, and must not disturb lower floor's muscle Material;The maximum depth of spread of filler is 30cm, and carries out layering on request and pave, within eps foam plastic plate 50-75cm Manual is carried out, small-sized frog rammer compacting leveling afterwards paves grid muscle material in place, and away from eps foam plastic plate 50- Compacting can be rolled beyond 75cm with machine spreading;The compacting that paves of every layer of filler all should be by the above with the laying in place of GSZ It is required that carrying out, the compacting until each layer of GSZ muscle material laying of completion and filler pave, and should be flattened, be checked, and it is right Shingle nail carries out gradient or vertical correction, after design requirement acceptance(check) to be achieved, can carry out applying for building above Work;Filler answers strict compaction in layers, and lift height is between 30cm and 15cm;Compacting criteria uses heavy compaction standard, away from EPS Within plastic foamboard 50-75cm, compactness is not less than 90%;Beyond eps foam plastic plate 50-75cm, away from barricade substrate In the groove bottom above 0.8m depth boundses of groove, compactness is more than 95%;Away from more than the groove bottom 0.8m of barricade substrate groove, compacting Degree is more than 90%.
Used as improvement, the saponified residue-flyash-soil light filling makes requirement and is:Saponification ground-slag is used in filler Coal Ash, the lowest temperature of construction is more than 5 degrees Celsius;The water content of flyash strictly to be controlled between 25%-40%;It is mixed Conjunction material is mixed and stirred and mixed and stirred using premixing place, can in time be made and be timely used, and mixes and stirs place flat, solid;Uniform mixing In saponification slag coal ash mixed material, the coal ash soil granule and the saponification slag granule more than 10mm of 25mm are not contain more than.
Compared with prior art, useful achievement of the invention is:
1st, reinforced sand soil barrier wall structure proposed by the present invention has the premium properties such as durability, anti-aging.
2nd, reinforced sand proposed by the present invention soil barrier wall structure is simple, easy construction.
3rd, present invention uses substantial amounts of saponification slag and flyash, recycling for saponification slag and flyash is realized, is saved About land resource, alleviates the pressure of industrial residue landfill, decreases the problem of its pollution environment.
4th, the eps foam cushion that uses of the present invention significantly reduce the lateral deformation of panel, the sedimentation of filler and Suffered lateral pressure, improves the anti-seismic performance of barrier wall structure, increased the resistance to overturning of barrier wall structure, improves it and resists Shock stability, it is economic and environment-friendly;
5th, reinforced sand proposed by the present invention soil barrier wall structure use in proportion 2:3:Saponification slag-the fine coal of 6 mixing Ash-native filler reduces the deadweight of filler, the strength and stiffness of filler is drastically increased, while also improving muscle material and filler Between interface friction performance.
Brief description of the drawings
Fig. 1 is the cross-sectional view of present invention combination
Fig. 2 is the elevation of present invention combination
Fig. 3 is GSZ of the present invention and shingle nail connection diagram
In figure:1- shingle nails, 2-EPS plastic foamboards, 3- fillers, 4- GSZs, 5- bases, 6- building blocks, 7- sedimentations Seam.
Specific embodiment
Below in conjunction with the accompanying drawings, the present invention is further described:As shown in figure 1,
A kind of reinforced sand soil barricade, by filler 3, the reinforcement arranged in filler 3 and the part group of shingle nail 1 three Into;Shingle nail 1 uses the structure of blockwork 6;Eps foam plastic plate 3 is set between shingle nail 1 and filler 3;Described filler 3 is adopted With saponified residue-flyash-soil light filling;Reinforcement uses GSZ 4, makes drawing coefficient excursion for 0.54-0.85, GSZ 4 is directly born against between the building block up and down 6 of shingle nail 1.
In saponified residue-flyash-soil that described filler 3 is used:Saponified residue Particle size requirements 0.075-2mm it Between, the content of the CaO of saponified residue is more than 45%.
In saponified residue-flyash-soil that described filler 3 is used:Flyash requirement SiO2And Al2O3Content be more than 70%, between 0.001-2mm, wherein granule content of the particle diameter less than 0.074mm is greater than the particle size distribution of flyash 45%;Soil in mixed fillers 3 is gathered materials on the spot, and to carry out artificial screening, and grain diameter is less than 2mm.
The physical characteristic of saponified residue-flyash-soil three's mixture that described filler 3 is used:Natural moisture content W models It is 20%-50% to enclose, and specific gravity range is 2.1-2.3, optimal proportion ρ=2.21, optimum moisture content WoptIt is 35%, maximum dry is close Degree γmaxIt is 1170kg/m3
In saponified residue-flyash-soil that described filler 3 is used:Flyash is 1 with the mass ratio of soil:1.5-1: 2.5, optimum quality ratio is 1:2;Saponification slag is 1 with the mass ratio of soil:2-1:3.5, optimum quality ratio is 1:3, it can be deduced that three The optimum quality ratio of person:Saponification slag:Flyash:The mass ratio of soil is 2:3:6;
A kind of construction method of reinforced sand soil barricade, comprises the following steps:
A the basis 5 of () reinforced sand soil barricade is constructed, it is bigger than basic 5 outer rim first to excavate size on ground to be onstructed Barricade substrate groove, barricade substrate groove sets blotter than the basic big 25cm-35cm of 5 outer rim in barricade substrate groove, described broken The thickness of stone bed course is 15-25cm, and basis 5 is poured using C15 crushed stone concretes and formed, and is set every a segment distance on the basis of One expansion joint with together with of subsiding crack 7, and plank is soaked as joint sealing material using pitch;
When the building block 6 of () shingle nail 1 installs first piece b, first one layer of cement mortar of pad on basis 5 is answered, it is installed steady It is fixed, panel 1 of then being built a wall with building block 6, cement mortar is filled in faulting of slab ends space between building block 6 and basis 5;Adopted between building block 6 Docked with the laid dry of dry cement mortar, built by laying bricks or stones in facade layering;Subsiding crack 7 and expansion joint are set when panel 1 is built a wall, it is described Together with expansion joint setting, its width is 1cm-2cm to subsiding crack 7, can use the filling such as asphalt plank, cork sheet, pitch loose hemp fiber;It is heavy Drop 7 spacing of seam, earthen foundation is 10m-30m, and rock foundation can suitably increase.
C () eps foam plastic plate 3 is installed, should cohere mortar by eps foam plastic plate using what is configured by design size 3 are cohered with shingle nail 1, to keep extruding uniform during cohering;Milling tools should be also used afterwards by eps foam plastics The surface rubbing of plate 3;
D the installation laying of () GSZ 4, the plane laying length of the GSZ 4, vertical spacing all should be by design It is required that being laid, the anchoring of its muscle material makes grid smooth through eps foam plastic plate 3, and is fixed in building block 6 and equidistantly divides In the U-shaped steel disc crotch of cloth, by the way that GSZ 4 is fixed between two building blocks 6 of shingle nail 1 in U-shaped steel disc crotch.
E () backfills filler 3, the performance of filler 3 should meet design requirement, discharging equipment and eps foam in compacting process The distance of plastic plate 3 cannot be less than 1.0m, and discharging equipment can not be travelled on the muscle material band for do not cover filler 3, and must not be disturbed Lower layers of reinforcement material;The maximum depth of spread of filler 3 is 30cm, and carries out layering on request and pave, away from eps foam plastic plate 350- Manual is carried out within 75cm, small-sized frog rammer compacting leveling afterwards paves GSZ muscle material in place, and away from EPS bubbles Compacting can be rolled beyond foam plastic plate 350-75cm with machine spreading;The compacting that paves of every layer of filler 3 is in place with GSZ 4 Laying all should be carried out by requirements above, the compacting until each layer of GSZ muscle material laying of completion and filler 3 pave, and should be carried out Leveling, inspection, and gradient or vertical correction are carried out to shingle nail 1, after design requirement acceptance(check) to be achieved, can carry out Structure (building) builds the construction of thing above.
Filler 3 answers strict compaction in layers, and lift height is between 30cm and 15cm;Compacting criteria uses heavy compaction mark Standard, within eps foam plastic plate 50-75cm, compactness is not less than 90%;Beyond eps foam plastic plate 50-75cm, away from In the groove bottom above 0.8m depth boundses of barricade substrate groove, compactness is more than 95%;Away from the groove bottom 0.8m of barricade substrate groove More than, compactness is more than 90%.
Saponified residue-the flyash-soil light filling 3 makes requirement:In filler 3 using saponification slag-flyash- Soil, the lowest temperature of construction is more than 5 degrees Celsius;The water content of flyash strictly to be controlled between 25%-40%, water content Excessive, there may be liquefaction phenomenon, water content is too small, and flyash easily produces airborne dust, causes environmental pollution, it is desirable to contain for flyash Water rate control is 35%;Compound is mixed and stirred and mixed and stirred using premixing place, can in time be made and be timely used, and mixing and stirring place will put down It is smooth, solid, with mixing and stirring, with transport, with paving, be preferred with compacting;In the saponification slag coal ash mixed material of uniform mixing, be free of There are the coal ash soil granule more than 25mm and the saponification slag granule more than 10mm.
Filler 3 below should be flattened during arrangement GSZ muscle material, by muscle material and the fixed strain of shingle nail 1, in case Panel is extruded during compacting, layering is carried out according to the vertical spacing of GSZ 4 and be paved, is compacted;Filler 3 paves:Pave thickness Degree wants uniformity, surfacing, and sets the horizontal wall inscription not less than 3%.
Muscle material of the invention refers to GSZ 4.
Above-described embodiment is the present invention preferably implementation method, but embodiments of the present invention are not by above-described embodiment Limitation, it is other it is any without departing from Spirit Essence of the invention and the change, modification, replacement made under principle, combine, simplification, Equivalent substitute mode is should be, is included within protection scope of the present invention.

Claims (10)

1. a kind of reinforced sand soil barricade, is made up of filler, the reinforcement and the part of shingle nail three arranged in filler;Metope Plate uses blockwork structure;Eps foam plastic plate is set between shingle nail and filler;Described filler uses saponified residue-powder Coal ash-soil light filling;Reinforcement uses GSZ, makes drawing coefficient excursion for 0.54-0.85, and GSZ is directly pressed Between the building block up and down of shingle nail.
2. it is a kind of according to claims 1 reinforced sand soil barricade, it is characterised in that:The soap that described filler is used In change residue-flyash-soil:Between 0.075-2mm, the content of the CaO of saponified residue is more than saponified residue Particle size requirements 45%.
3. it is a kind of according to claims 1 reinforced sand soil barricade, it is characterised in that:The soap that described filler is used In change residue-flyash-soil:Flyash requirement SiO2And Al2O3Content be more than 70%, the particle size distribution of flyash exists Between 0.001-2mm, wherein granule content of the particle diameter less than 0.074mm is greater than 45%;Radii of soil particles in filler is less than 2mm。
4. it is a kind of according to claims 1 reinforced sand soil barricade, it is characterised in that:The soap that described filler is used Change the physical characteristic of residue-flyash-soil three's mixture:Natural moisture content W scopes are 20%-50%, and proportion ρ scopes are 2.1-2.3, maximum dry density γmaxIt is 1170kg/m3
5. it is a kind of according to claims 1 reinforced sand soil barricade, it is characterised in that:The soap that described filler is used In change residue-flyash-soil:Flyash is 1 with the mass ratio of soil:1.5-1:2.5, saponification slag is 1 with the mass ratio of soil:2-1: 3.5。
6. it is a kind of as described in claim any one of 1-5 reinforced sand soil barricade construction method, it is characterised in that including Following steps:
A the foundation construction of () reinforced sand soil barricade, first excavates the size barricade base bigger than basic outer rim on ground to be onstructed Kerve, sets blotter in barricade substrate groove, and basis is poured using C15 crushed stone concretes and formed, every one on the basis of Segment distance sets one subsiding crack expansion joint with together with, and soaks plank as joint sealing material using pitch;
When the building block of () shingle nail installs first piece b, first one layer of cement mortar of pad on the basis of is answered, make its that stabilization to be installed, then With building block come panel of building a wall, cement mortar is filled in faulting of slab ends space between building block and basis;Dry cement is used between building block Mortar laid dry is docked, and is built by laying bricks or stones in facade layering;
C () eps foam plastic plate is installed, should cohere mortar by eps foam plastic plate and wall using what is configured by design size Panel is cohered, and to keep extruding uniform during cohering;Milling tools should be also used afterwards by eps foam plastic sheet surface Polish;
D the installation laying of () GSZ, the GSZ plane laying length, vertical spacing all should be entered by design requirement Row laying, the anchoring of its muscle material makes grid smooth through eps foam plastic plate, and is fixed on the U-shaped of equidistantly distributed in building block In steel disc crotch, by the way that GSZ is fixed between two building blocks of shingle nail in U-shaped steel disc crotch;
(e) backfill filler, the performance of filler should meet design requirement in compacting process, away from eps foam plastic plate 50-75cm with Manual is inside carried out, small-sized frog rammer compacting leveling afterwards paves GSZ muscle material in place, and away from eps foam plastics Compacting can be rolled with machine spreading beyond plate 50-75cm, the pressure until each layer of GSZ muscle material laying of completion and filler pave It is real, that is, complete the construction of reinforced sand soil barricade.
7. a kind of construction method of reinforced sand as claimed in claim 6 soil barricade, it is characterised in that:Gear in step (a) Wall base kerve 25cm-35cm bigger than basic outer rim, the thickness of the blotter is 15-25cm.
8. a kind of construction method of reinforced sand as claimed in claim 6 soil barricade, it is characterised in that:In the step A in (), subsiding crack and expansion joint are set when panel is built a wall, together with expansion joint setting, its width is the subsiding crack 1cm-2cm, can use the filling such as asphalt plank, cork sheet, pitch loose hemp fiber;Subsiding crack spacing, earthen foundation is 10m-30m.
9. a kind of construction method of reinforced sand as claimed in claim 6 soil barricade, it is characterised in that:The step (e) In, specific requirement is during backfill filler:Discharging equipment cannot be less than 1.0m, unloader with the distance of eps foam plastic plate Tool can not be travelled on the muscle material band for do not cover filler, and must not disturb lower layers of reinforcement material;The maximum depth of spread of filler is 30cm, And layering is carried out on request to pave, and Manual, small-sized frog rammer compacting are carried out within eps foam plastic plate 50-75cm Leveling, afterwards paves grid muscle material in place, and can roll compacting with machine spreading beyond eps foam plastic plate 50-75cm; Pave compacting and the laying in place of GSZ of every layer of filler all should be carried out by requirements above, until completing each layer of geotechnological lattice Compacting that grid muscle material is laid and filler paves, and should be flattened, checked, and gradient or vertical correction are carried out to shingle nail, treat Reach after design requirement acceptance(check), the construction of building above can be carried out;Filler answers strict compaction in layers, lift height Between 30cm and 15cm;Compacting criteria uses heavy compaction standard, and within eps foam plastic plate 50-75cm, compactness is not Less than 90%;Beyond eps foam plastic plate 50-75cm, in the groove bottom above 0.8m depth boundses of barricade substrate groove, pressure Solidity is more than 95%;Away from more than the groove bottom 0.8m of barricade substrate groove, compactness is more than 90%.
10. a kind of construction method of reinforced sand as claimed in claim 6 soil barricade, it is characterised in that:The saponification is residual Slag-flyash-soil light filling makes requirement:Saponification slag coal ash soil is used in filler, the lowest temperature of construction is Celsius 5 It is more than degree;The water content of flyash strictly to be controlled between 25%-40%;Compound is mixed and stirred and mixed and stirred using premixing place, Can in time make and timely use, mix and stir place flat, solid;In the saponification slag coal ash mixed material of uniform mixing, do not contain Coal ash soil granule more than 25mm and the saponification slag granule more than 10mm.
CN201710121701.4A 2017-03-02 2017-03-02 A kind of reinforced sand soil barricade and construction method Pending CN106894442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710121701.4A CN106894442A (en) 2017-03-02 2017-03-02 A kind of reinforced sand soil barricade and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710121701.4A CN106894442A (en) 2017-03-02 2017-03-02 A kind of reinforced sand soil barricade and construction method

Publications (1)

Publication Number Publication Date
CN106894442A true CN106894442A (en) 2017-06-27

Family

ID=59185196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710121701.4A Pending CN106894442A (en) 2017-03-02 2017-03-02 A kind of reinforced sand soil barricade and construction method

Country Status (1)

Country Link
CN (1) CN106894442A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503370A (en) * 2017-08-14 2017-12-22 河海大学 The high barricade of one planting sand well combined type reinforced earth and preparation method
CN108222061A (en) * 2018-03-29 2018-06-29 中冶成都勘察研究总院有限公司 A kind of compound barricade of load retaining wall reinforcement
CN108978704A (en) * 2018-08-14 2018-12-11 中国十七冶集团有限公司 A kind of reinforced soil retaining wall and its construction method
CN109371989A (en) * 2018-10-26 2019-02-22 华中科技大学 A kind of combined type retaining structure and its construction method suitable for stability of slope supporting
CN111454567A (en) * 2020-04-16 2020-07-28 航锦科技股份有限公司 Preparation method for producing polyurethane imitation marble decorative material by using industrial saponified waste residue
CN111945775A (en) * 2020-08-18 2020-11-17 中南大学 Assembled expansive soil slope ecological shock attenuation reinforced earth double sided board unit and native barricade

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1442584A (en) * 2002-03-04 2003-09-17 天津市市政工程研究院 Reinforced earth retaining wall suitable for soft soil ground and its construction method
CN103774616A (en) * 2014-01-22 2014-05-07 安徽水安建设集团股份有限公司 Construction method for ecological retaining wall built by self-embedded blocks
CN205591237U (en) * 2016-05-09 2016-09-21 中铁西北科学研究院有限公司 A make up and prevent and treat structure for mountain area height is filled
CN106012733A (en) * 2016-05-09 2016-10-12 赵莹莹 Wrapping type reinforcement solidification method for roadbed of high filled embankment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1442584A (en) * 2002-03-04 2003-09-17 天津市市政工程研究院 Reinforced earth retaining wall suitable for soft soil ground and its construction method
CN103774616A (en) * 2014-01-22 2014-05-07 安徽水安建设集团股份有限公司 Construction method for ecological retaining wall built by self-embedded blocks
CN205591237U (en) * 2016-05-09 2016-09-21 中铁西北科学研究院有限公司 A make up and prevent and treat structure for mountain area height is filled
CN106012733A (en) * 2016-05-09 2016-10-12 赵莹莹 Wrapping type reinforcement solidification method for roadbed of high filled embankment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何思明等: "《强震带边坡位移控制设计与柔性防护技术》", 30 June 2015 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503370A (en) * 2017-08-14 2017-12-22 河海大学 The high barricade of one planting sand well combined type reinforced earth and preparation method
CN107503370B (en) * 2017-08-14 2019-11-15 河海大学 The high barricade of one seed sand well combined type reinforced earth and production method
CN108222061A (en) * 2018-03-29 2018-06-29 中冶成都勘察研究总院有限公司 A kind of compound barricade of load retaining wall reinforcement
CN108978704A (en) * 2018-08-14 2018-12-11 中国十七冶集团有限公司 A kind of reinforced soil retaining wall and its construction method
CN109371989A (en) * 2018-10-26 2019-02-22 华中科技大学 A kind of combined type retaining structure and its construction method suitable for stability of slope supporting
CN111454567A (en) * 2020-04-16 2020-07-28 航锦科技股份有限公司 Preparation method for producing polyurethane imitation marble decorative material by using industrial saponified waste residue
CN111945775A (en) * 2020-08-18 2020-11-17 中南大学 Assembled expansive soil slope ecological shock attenuation reinforced earth double sided board unit and native barricade
CN111945775B (en) * 2020-08-18 2021-08-17 中南大学 Assembled expansive soil slope ecological shock attenuation reinforced earth double sided board unit and native barricade

Similar Documents

Publication Publication Date Title
CN106894442A (en) A kind of reinforced sand soil barricade and construction method
CN101851928B (en) Method for improving and protecting collapsible loess slope project
CN110578290B (en) Bridge abutment back backfill structure and construction method thereof
CN100497828C (en) Hydraulic fill sand expansion polystyrene mixing light road bank stuffing construction method
CN107165013A (en) Geotechnical grid reinforcement foam concrete light road foundation fills structure and its method
CN107761501A (en) A kind of road construction method
CN108316333A (en) A kind of compound raft foundation of resistance to deformation and its construction method suitable for goaf building
CN109680586A (en) A kind of pavement asphalt laying method
Auvinen et al. Covering the highway E12 in the centre of Hämeenlinna–Innovative use of foamed glass as light weight material of approach embankment
CN107190758A (en) A kind of slope construction method
CN210657841U (en) Rigid and flexible seamless pavement base layer structure
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN103276716A (en) Method for stabilization and construction of transition section CFG and mattress cushion layer composite foundation
CN208039294U (en) A kind of compound raft foundation of resistance to deformation suitable for goaf building
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN216663671U (en) Highway road surface pavement structure
CN110804939A (en) Reinforced structure of abutment jump car
RU89121U1 (en) DEVELOPMENT OF ROAD CLOTHES
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
CN204780555U (en) Structure that repaired in bituminous paving hole groove
JP3519032B2 (en) Lightweight embankment method
CN109440572B (en) Construction method for laying temporary road in coal mine pit by prefabricated slab
CN204185743U (en) A kind of Desulphurization roadbed cement pavement structure
RU94238U1 (en) BUILDING ELEMENT BASED ON CELLULAR FRAME
RU94248U1 (en) BUILDING BLOCK

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627