CN106867549A - A kind of coke dry quenching boiler do not stop production realize maintenance method - Google Patents

A kind of coke dry quenching boiler do not stop production realize maintenance method Download PDF

Info

Publication number
CN106867549A
CN106867549A CN201710102594.0A CN201710102594A CN106867549A CN 106867549 A CN106867549 A CN 106867549A CN 201710102594 A CN201710102594 A CN 201710102594A CN 106867549 A CN106867549 A CN 106867549A
Authority
CN
China
Prior art keywords
coke
flashboard
dry quenching
coke dry
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710102594.0A
Other languages
Chinese (zh)
Other versions
CN106867549B (en
Inventor
刘湃
袁朝晖
杨俊峰
王明登
刘玉虎
段衍泉
郑亚杰
贾金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Acre Coking and Refractory Engineering Consulting Corp MCC
Original Assignee
Acre Coking and Refractory Engineering Consulting Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Acre Coking and Refractory Engineering Consulting Corp MCC filed Critical Acre Coking and Refractory Engineering Consulting Corp MCC
Priority to CN201710102594.0A priority Critical patent/CN106867549B/en
Publication of CN106867549A publication Critical patent/CN106867549A/en
Application granted granted Critical
Publication of CN106867549B publication Critical patent/CN106867549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/02Dry cooling outside the oven
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B45/00Other details

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)

Abstract

Do not stopped production the method for realizing maintenance the present invention relates to a kind of coke dry quenching boiler, and flashboard one is set at the inert gas entrance of coke dry quenching boiler, and flashboard two is set at the inert gas outlet of coke dry quenching boiler;Direction is circulated along inert gas, the forward and backward inertia cycle gas pipe of coke dry quenching boiler is connected additionally by by-pass line, and heat-exchanger rig is set on by-pass line, and the forward and backward two ends of by-pass line set flashboard three and flashboard four respectively;When dry coke quenching process system is normally produced, flashboard three and flashboard four are closed, and heat-exchanger rig is not involved in dry coke quenching production;When coke dry quenching boiler needs maintenance, coke dry quenching furnace is normally run;Flashboard one and flashboard two are closed, coke dry quenching boiler is isolated from dry coke quenching process system, can be overhauled after the cooling of coke dry quenching boiler burner hearth;The present invention realizes dry coke quenching process system during coke dry quenching boiler is overhauled and does not stop production, and its is easy to implement, and can ensure operation stability of the dry coke quenching process system during coke dry quenching boiler is overhauled.

Description

A kind of coke dry quenching boiler do not stop production realize maintenance method
Technical field
The present invention relates to coking technology field, more particularly to a kind of coke dry quenching boiler does not stop production the method for realizing maintenance.
Background technology
Dry coke quenching is the important technology and technique of energy-saving and emission-reduction in steel and iron industry, and it is burnt dry with red using inert gas Put out carried out in stove gas-solid mutually exchange heat by coke extinguish method.
Coke dry quenching boiler is an important component in whole dry coke quenching process system, and its effect is to reduce dry coke quenching The temperature of system. Inert recyclegas, produces steam to be used to heat supply or generating, obtains the heat of inertia recyclegas to reach The purpose for effectively utilizing.Whether coke dry quenching boiler operation will well directly influence the operation of dry coke quenching process system.
At present, coke dry quenching boiler has two kinds of design forms:One kind is medium temperature and medium pressure boiler, and one kind is high-temperature high-pressure boiler. The volume of two kinds of boilers is all higher than 30L, discharge pressure and is all higher than 0.1MPa, so coke dry quenching boiler must all be promulgated according to country 's《Safety Supervision on Special Equipment regulations》、《Boiler safety technology Supervision Code》Carry out periodic inspection.Have identical in two standards Regulation, i.e., boiler exterior inspection, carry out once every year;Boiler internal is checked, and is carried out once within every 2 years.It is domestic all of dry to put out Burnt boiler must be performed all according to this standard.
In every 2 years boiler internal inspection periods once, it is necessary to professional tests into boiler, it is necessary to which stop production inspection Repair;Red Jiao can not be loaded in coke dry quenching furnace, it is necessary to which cooling ensures that temperature reaches what personnel can enter in coke dry quenching boiler burner hearth Temperature.Coke dry quenching boiler cooling, boiler internal inspection, inspection finish the process that rear dry quenching system heats up again, even if in pot Stove is also required to carry out 15 days or so in the case of not having any problem.In addition, during dry coke quenching process system runs well, by There is booster phenomenon when circulating hot gases entrainment coke powder causes coke dry quenching boiler also, now coke dry quenching furnace can not continue to load Red Jiao, it is necessary to which blowing out cooling can enter the temperature of maintenance to ensure that coke dry quenching boiler temperature drops to personnel.When boiler tube bursting is overhauled Between it is general at 7 to 10 days or so.
During boiler internal inspection and boiler tube bursting are overhauled, coke dry quenching furnace can not load red Jiao, and the coke of coke oven output is only Can be processed by coke wet quenching system, and coke wet quenching system has as a drawback that:
1) coke wet quenching is big for environment pollution, is a kind of quenching of backwardness to airborne release a large amount of dust during coke wet quenching Technology;
2) coke dry quenching body is refractory brick marshalling structure, and coke dry quenching body cooling, this process temperature change that heats up are violent, The acute variation of temperature can crack the resistance to material of masonry, and this high temperature change directly affects making for the resistance to material of coke dry quenching body Use the life-span;
3) during dry coke quenching runs well, the steam that coke dry quenching boiler is produced can generate electricity or heat, in inspection of the boiler and During boiler tube bursting is overhauled, red burnt heat is not utilized being wasted in vain.
The content of the invention
Do not stop production the method for realizing maintenance the invention provides a kind of coke dry quenching boiler, realizes coke dry quenching boiler turn(a)round Between dry coke quenching process system do not stop production, its is easy to implement, and can ensure dry coke quenching process system coke dry quenching boiler overhaul during Operation stability.
In order to achieve the above object, the present invention is realized using following technical scheme:
A kind of coke dry quenching boiler do not stop production realize maintenance method, the coke dry quenching boiler be located at dry coke quenching process system In, dry coke quenching process system is by being sequentially connected by inertia cycle gas pipe and forms the coke dry quenching furnace of closed-loop system, once remove Dirt device, coke dry quenching boiler, secondary filter, circulating fan and feed water preheater composition;The method specifically includes following steps:
1) flashboard one is set at the inert gas entrance of coke dry quenching boiler, is set at the inert gas outlet of coke dry quenching boiler Flashboard two;Direction is circulated along inert gas, the forward and backward inertia cycle gas pipe of coke dry quenching boiler is additionally by bypass pipe Road is connected, and heat-exchanger rig is set on by-pass line, and the forward and backward two ends of by-pass line set flashboard three and flashboard four respectively;
2) when dry coke quenching process system is normally produced, flashboard three and flashboard four are closed, and heat-exchanger rig is not involved in dry coke quenching life Produce;It is open mode to keep flashboard one and flashboard two, it is red it is burnt loaded in coke dry quenching furnace by furnace roof charging apparatus, and flow from the bottom to top Dynamic inert gas heat exchange, the coke after cooling is drained into by coke dry quenching furnace bottom to be transported outward on the burnt belt of fortune;After red burnt heat exchange Inert gas is recycled by inertia cycle gas pipe, initially enters disposable dust remover dedusting, subsequently into dry coke quenching pot Stove and boiler heat exchange pipe exchange heat cooling, through secondary filter after, by carrying out reducing temperature twice in circulating fan feeding feed water preheater, Inert gas after reducing temperature twice reenters coke dry quenching furnace with red burnt heat exchange;
3) when coke dry quenching boiler needs maintenance, coke dry quenching furnace is normally run;Flashboard one and flashboard two are closed, by dry coke quenching pot Stove is isolated from dry coke quenching process system, can be overhauled after the cooling of coke dry quenching boiler burner hearth;Flashboard three and lock are opened simultaneously The cooling that exchanged heat in heat-exchanger rig is entered by by-pass line through the inert gas of one-time dedusting after plate four, with red burnt heat exchange, so After by secondary filter, then by carrying out reducing temperature twice in circulating fan feeding feed water preheater, the indifferent gas after reducing temperature twice Body reenters coke dry quenching furnace with red burnt heat exchange.
Inert gas can be cooled to 180 ± 20 DEG C by the heat-exchanger rig by 900 ± 50 DEG C.
The heat-exchanger rig is heat exchanger.
Before each flashboard open and close, the rotating speed of circulating fan is first reduced, after recovering former rotating speed again after all flashboard open and close in place.
Compared with prior art, the beneficial effects of the invention are as follows:
1) flashboard and by-pass line are set at coke dry quenching boiler two ends, by-pass line two ends also are provided with flashboard, are matched somebody with somebody using flashboard Close and open and close, coke dry quenching boiler can be isolated in the dry coke quenching process system of normal operation and be overhauled, disappear Except overhauling the influence stopped production to dry coke quenching production because of coke dry quenching boiler;
2) during coke dry quenching boiler is overhauled, the inert gas after being exchanged heat in coke dry quenching furnace all imported into heat-exchanger rig and enters Row heat exchange, it is ensured that heat transfer effect meets the requirement of dry coke quenching production;
3) heat-exchanger rig, a by-pass line and 4 flashboards are increased only in original dry coke quenching process system Realize, simple structure is easy to implement, be applicable not only to newly-increased dry coke quenching process system, be also applied for existing dry coke quenching technique system The transformation of system;
4) during coke dry quenching boiler is overhauled, larger temperature will not be produced to become in the production process of dry coke quenching process system Change, it is ensured that the stable operation of dry coke quenching process system, extend the service life of resistance to material.
Brief description of the drawings
Fig. 1 be coke dry quenching boiler of the present invention do not stop production realize maintenance method schematic.
In figure:1. the circulating fan 6. of 2. disposable dust remover of coke dry quenching furnace, 3. coke dry quenching boiler, 4. secondary filter 5. is given The flashboard two of 11. flashboard of water preheater 7. heat-exchanger rig, 8. flashboard, 3 9. flashboard, 4 10. by-pass line 1
Specific embodiment
Specific embodiment of the invention is described further below in conjunction with the accompanying drawings:
The method for realizing maintenance as shown in figure 1, a kind of coke dry quenching boiler of the present invention does not stop production, coke dry quenching boiler 3 sets In dry coke quenching process system, dry coke quenching process system is by being sequentially connected by inertia cycle gas pipe and forms closed-loop system Coke dry quenching furnace 1, disposable dust remover 2, coke dry quenching boiler 3, secondary filter 4, circulating fan 5 and feed water preheater 6 constitute;The party Method specifically includes following steps:
1) flashboard 1 is set at the inert gas entrance of coke dry quenching boiler 3, in the inert gas outlet of coke dry quenching boiler Place sets flashboard 2 12;Direction is circulated along inert gas, the forward and backward inertia cycle gas pipe of coke dry quenching boiler 3 is led in addition Cross by-pass line 10 to connect, heat-exchanger rig 7 is set on by-pass line 10, the forward and backward two ends of by-pass line 10 set the He of flashboard 38 respectively Flashboard 49;
2) when dry coke quenching process system is normally produced, flashboard 38 and flashboard 49 are closed, and heat-exchanger rig 7 is not involved in dry coke quenching Production;It is open mode to keep flashboard 1 and flashboard 2 12, it is red it is burnt loaded in coke dry quenching furnace 1 by furnace roof charging apparatus, with by Under supreme flowing inert gas heat exchange, coke after cooling drains into by the bottom of coke dry quenching furnace 1 and transported outward on the burnt belt of fortune;With red Jiao Inert gas after heat exchange is recycled by inertia cycle gas pipe, initially enters the dedusting of disposable dust remover 2, subsequently into Coke dry quenching boiler 3 and boiler heat exchange pipe exchange heat cooling, through secondary filter 4 after, in sending into feed water preheater 6 by circulating fan 5 Reducing temperature twice is carried out, the inert gas after reducing temperature twice reenters coke dry quenching furnace 1 with red burnt heat exchange;
3) when coke dry quenching boiler 3 needs maintenance, coke dry quenching furnace 1 is normally run;Flashboard 1 and flashboard 2 12 are closed, will be dry Quenching boiler 3 is isolated from dry coke quenching process system, can be overhauled after the cooling of the burner hearth of coke dry quenching boiler 3;Lock is opened simultaneously Heat-exchanger rig 7 is entered by by-pass line 10 through the inert gas of one-time dedusting after plate 38 and flashboard 49, with red burnt heat exchange Interior heat exchange cooling, then through secondary filter 4 after, then carry out reducing temperature twice, two in sending into feed water preheater 6 by circulating fan 5 Inert gas after secondary cooling reenters coke dry quenching furnace 1 with red burnt heat exchange.
Inert gas can be cooled to 180 ± 20 DEG C by the heat-exchanger rig 7 by 900 ± 50 DEG C.
The heat-exchanger rig 7 is heat exchanger.
Before the open and close of each flashboard 8,9,11,12, the rotating speed of circulating fan 5 is first reduced, treat the open and close of all flashboards 8,9,11,12 Recover former rotating speed after in place again.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto, Any one skilled in the art the invention discloses technical scope in, technology according to the present invention scheme and its Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.

Claims (4)

1. a kind of coke dry quenching boiler does not stop production the method for realizing maintenance, the coke dry quenching boiler in the dry coke quenching process system, Dry coke quenching process system is by being sequentially connected by inertia cycle gas pipe and forms the coke dry quenching furnace of closed-loop system, one-time dedusting Device, coke dry quenching boiler, secondary filter, circulating fan and feed water preheater composition;It is characterised in that it includes following steps:
1) flashboard one is set in the inertia recyclegas porch of coke dry quenching boiler, is exported in the inertia recyclegas of coke dry quenching boiler Place sets flashboard two;Direction is circulated along inert gas, the forward and backward inertia cycle gas pipe of coke dry quenching boiler is additionally by side Thread a pipe connection, heat-exchanger rig is set on by-pass line, the forward and backward two ends of by-pass line set flashboard three and flashboard four respectively;
2) when dry coke quenching process system is normally produced, flashboard three and flashboard four are closed, and heat-exchanger rig is not involved in dry coke quenching production;Protect To hold flashboard one and flashboard two be open mode, it is red it is burnt loaded in coke dry quenching furnace by furnace roof charging apparatus, and flow from the bottom to top Inert gas heat exchange, the coke after cooling is drained into by coke dry quenching furnace bottom to be transported outward on the burnt belt of fortune;With the inertia after red burnt heat exchange Gas is recycled by inertia cycle gas pipe, initially enters disposable dust remover dedusting, subsequently into coke dry quenching boiler with Boiler heat exchange pipe heat exchange cooling, through secondary filter after, by circulating fan feeding feed water preheater in carry out reducing temperature twice, it is secondary Inert gas after cooling reenters coke dry quenching furnace with red burnt heat exchange;
3) when coke dry quenching boiler needs maintenance, coke dry quenching furnace is normally run;Close flashboard one and flashboard two, by coke dry quenching boiler from Isolate in dry coke quenching process system, can be overhauled after the cooling of coke dry quenching boiler burner hearth;Flashboard three and flashboard four are opened simultaneously, The cooling that exchanged heat in heat-exchanger rig is entered by by-pass line through the inert gas of one-time dedusting with after red burnt heat exchange, then through two After secondary deduster, then reducing temperature twice is carried out by circulating fan feeding feed water preheater by circulating, the indifferent gas after reducing temperature twice Body reenters coke dry quenching furnace with red burnt heat exchange.
2. a kind of coke dry quenching boiler according to claim 1 do not stop production realize maintenance method, it is characterised in that it is described to change Inert gas can be cooled to 180 ± 20 DEG C by thermal by 900 ± 50 DEG C.
3. a kind of coke dry quenching boiler according to claim 1 do not stop production realize maintenance method, it is characterised in that it is described to change Hot charging is set to heat exchanger.
4. a kind of coke dry quenching boiler according to claim 1 do not stop production realize maintenance method, it is characterised in that each flashboard Before open and close, the rotating speed of circulating fan is first reduced, after recovering former rotating speed again after all flashboard open and close in place.
CN201710102594.0A 2017-02-24 2017-02-24 Method for realizing maintenance of dry quenching boiler without stopping production Active CN106867549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710102594.0A CN106867549B (en) 2017-02-24 2017-02-24 Method for realizing maintenance of dry quenching boiler without stopping production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710102594.0A CN106867549B (en) 2017-02-24 2017-02-24 Method for realizing maintenance of dry quenching boiler without stopping production

Publications (2)

Publication Number Publication Date
CN106867549A true CN106867549A (en) 2017-06-20
CN106867549B CN106867549B (en) 2022-10-18

Family

ID=59168360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710102594.0A Active CN106867549B (en) 2017-02-24 2017-02-24 Method for realizing maintenance of dry quenching boiler without stopping production

Country Status (1)

Country Link
CN (1) CN106867549B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108624339A (en) * 2018-05-11 2018-10-09 鞍钢股份有限公司 Winter dry quenching furnace annual repair heat preservation method
CN109575957A (en) * 2018-11-19 2019-04-05 包头钢铁(集团)有限责任公司 A kind of method of dry coke quenching auxiliary hot repair heat preservation decompression
CN112694899A (en) * 2020-12-16 2021-04-23 安徽东能换热装备有限公司 Dry quenching self-adaptive water supply preheating system and method
CN112780364A (en) * 2021-01-19 2021-05-11 山西太钢不锈钢股份有限公司 Method for prolonging running time of dry quenching steam turbine generator
CN113773866A (en) * 2020-06-09 2021-12-10 瑞安市阀门一厂 Air inlet closed-circuit system of dry quenching furnace
CN113930250A (en) * 2021-10-15 2022-01-14 包头钢铁(集团)有限责任公司 Method for preventing damage of superheater of dry quenching boiler

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2806649A1 (en) * 2009-07-31 2011-02-03 Curtiss-Wright Flow Control Corporation Seat and valve systems for use in delayed coker system
CN102424754A (en) * 2011-10-20 2012-04-25 山东道诚工程技术有限公司 Dry quenching device
CN203741268U (en) * 2014-03-07 2014-07-30 北京华泰焦化工程技术有限公司 Dry quenching equipment
CN104327864A (en) * 2014-11-15 2015-02-04 马钢(集团)控股有限公司 Cooling system and cooling method of recycle gas in inlet of coke dry quenching furnace
CN205347323U (en) * 2015-12-15 2016-06-29 福建三钢闽光股份有限公司 Coke oven crude gas sensible heat recovery system that does not stop production and to examine and repair steam pocket
CN106433700A (en) * 2016-11-11 2017-02-22 中冶焦耐(大连)工程技术有限公司 Coke dry quenching dust removal system and process capable of efficiently recovering heat energy

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2806649A1 (en) * 2009-07-31 2011-02-03 Curtiss-Wright Flow Control Corporation Seat and valve systems for use in delayed coker system
CN102424754A (en) * 2011-10-20 2012-04-25 山东道诚工程技术有限公司 Dry quenching device
CN203741268U (en) * 2014-03-07 2014-07-30 北京华泰焦化工程技术有限公司 Dry quenching equipment
CN104327864A (en) * 2014-11-15 2015-02-04 马钢(集团)控股有限公司 Cooling system and cooling method of recycle gas in inlet of coke dry quenching furnace
CN205347323U (en) * 2015-12-15 2016-06-29 福建三钢闽光股份有限公司 Coke oven crude gas sensible heat recovery system that does not stop production and to examine and repair steam pocket
CN106433700A (en) * 2016-11-11 2017-02-22 中冶焦耐(大连)工程技术有限公司 Coke dry quenching dust removal system and process capable of efficiently recovering heat energy

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108624339A (en) * 2018-05-11 2018-10-09 鞍钢股份有限公司 Winter dry quenching furnace annual repair heat preservation method
CN108624339B (en) * 2018-05-11 2020-09-29 鞍钢股份有限公司 Winter dry quenching furnace annual repair heat preservation method
CN109575957A (en) * 2018-11-19 2019-04-05 包头钢铁(集团)有限责任公司 A kind of method of dry coke quenching auxiliary hot repair heat preservation decompression
CN113773866A (en) * 2020-06-09 2021-12-10 瑞安市阀门一厂 Air inlet closed-circuit system of dry quenching furnace
CN112694899A (en) * 2020-12-16 2021-04-23 安徽东能换热装备有限公司 Dry quenching self-adaptive water supply preheating system and method
CN112780364A (en) * 2021-01-19 2021-05-11 山西太钢不锈钢股份有限公司 Method for prolonging running time of dry quenching steam turbine generator
CN113930250A (en) * 2021-10-15 2022-01-14 包头钢铁(集团)有限责任公司 Method for preventing damage of superheater of dry quenching boiler

Also Published As

Publication number Publication date
CN106867549B (en) 2022-10-18

Similar Documents

Publication Publication Date Title
CN106867549A (en) A kind of coke dry quenching boiler do not stop production realize maintenance method
CN107677136B (en) Ceramic kiln waste heat comprehensive recycling system
CN107014217A (en) Coke-oven plant's coke-stove gas is utilized and smoke processing system and its processing method
CN104279865B (en) A kind of brick-making method of tunnel cave
CN101829649A (en) Drying oven for spraying
CN105403061B (en) It is a kind of to recycle the energy saving kiln that cooling residual heat improves combustion-supporting air temperature
CN203462084U (en) Waste-heat utilization system of heat treatment production line
CN103063044B (en) Rotary hearth furnace smoke waste heat utilization system and rotary hearth furnace fume afterheat Application way
CN204128354U (en) A kind of brick making device of tunnel cave
CN107699255B (en) High-efficiency control method and device for dust removal of cyclone dust collector during low-load production of coke dry quenching
CN206502779U (en) A kind of coke dry quenching boiler, which does not stop production, realizes the structure of maintenance
CN104132554B (en) A kind of energy saver opening smoke hood type silicon system mineral heating furnace flue and recycle
CN207002775U (en) Hot blast stove system of blast furnace
CN203582903U (en) Malleable cast iron heat accumulating type tunnel annealing furnace production line
CN203518644U (en) Waste heat utilization device of radiant tube thermal treatment furnace
CN203657497U (en) Waste heat recovery device of reclaimed sand calcining furnace
CN100439846C (en) Method and equipment for applicating smoke residued heat of rotating kilm
CN205223311U (en) Collection device to cast iron pipe annealing kiln gas
CN205228190U (en) Cyclic utilization cooling waste heat improves energy -conserving kiln of combustion -supporting wind -warm syndrome degree
CN104359314B (en) The energy-saving heating furnace system of a kind of Mist heat recovering and flue gas waste heat recovery method
CN202945289U (en) Dual-purpose furnace for decontaminating, heating and tempering oil pipe
CN209027304U (en) A kind of recyclable device to discharge for Industrial Stoves from heat load
CN102954484B (en) Compact thermal stress compensation formula radiant tube heat exchange device
CN206875996U (en) Coke-oven plant's coke-stove gas utilizes and smoke processing system
CN206582859U (en) A kind of air preheater suitable for cement kiln synergic processing house refuse

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant