Nothing Special   »   [go: up one dir, main page]

CN106788926A - A kind of wireless communications method and device for reducing network delay - Google Patents

A kind of wireless communications method and device for reducing network delay Download PDF

Info

Publication number
CN106788926A
CN106788926A CN201510831297.0A CN201510831297A CN106788926A CN 106788926 A CN106788926 A CN 106788926A CN 201510831297 A CN201510831297 A CN 201510831297A CN 106788926 A CN106788926 A CN 106788926A
Authority
CN
China
Prior art keywords
short
term
gap
last
lte subframes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510831297.0A
Other languages
Chinese (zh)
Other versions
CN106788926B (en
Inventor
蒋琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Langbo Communication Technology Co Ltd
Original Assignee
Shanghai Langbo Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Langbo Communication Technology Co Ltd filed Critical Shanghai Langbo Communication Technology Co Ltd
Priority to CN201510831297.0A priority Critical patent/CN106788926B/en
Priority to CN201910734251.5A priority patent/CN110557237B/en
Publication of CN106788926A publication Critical patent/CN106788926A/en
Application granted granted Critical
Publication of CN106788926B publication Critical patent/CN106788926B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • H04L5/0055Physical resource allocation for ACK/NACK
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0446Resources in time domain, e.g. slots or frames
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/21Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of wireless communications method and device for reducing network delay.UE sends upward signal.The upward signal takes some or all of wideband symbol of the first gap in short-term.Wherein, the duration of the first gap in short-term be less than 1 millisecond, first in short-term gap be located in a LTE subframes in the time domain, a LTE subframes include N number of gap in short-term.First wideband symbol number in short-term in gap and first in short-term position of the gap in a LTE subframes it is relevant.And if first in short-term gap be last gap and including last wideband symbol in a LTE subframes in short-term in N number of gap in short-term, the first wideband symbol number in short-term in gap is not less than K.The present invention by designing location mode of the new gap in short-term in LTE subframes, and corresponding upward signal and uplink reference signals mapping mode, it is ensured that the channel estimation and transmission performance of upward signal, while avoiding the conflict of the signal and SRS in gap in short-term.

Description

A kind of wireless communications method and device for reducing network delay
Technical field
The present invention relates to the transmission plan in wireless communication system, more particularly to based on Cellular Networks The control channel method and apparatus of low latency transmission.
Background technology
At 3GPP (3rd Generation Partner Project, third generation cooperative partner program) In RAN (Radio Access Network, wireless access network) #63 plenary session, LTE is reduced The delay of network this problem comes into question.The delay of LTE network includes eating dishes without rice or wine to postpone, signal transacting Time delay, the transmission delay between node etc..With the upgrading of wireless access network and core net, transmission Time delay is can be effectively reduced.With the application of the new semiconductor for possessing higher height reason speed, signal Treatment time delay is significantly reduced.
In LTE (LTE-Long Term Evolution, Long Term Evolution), TTI (Transmission Time Interval, Transmission Time Interval) or subframe or PRB (Physical Resource Block, Physical Resource Block) (Pair) is corresponded in time ms (milli-second, Millisecond).One LTE subframe includes two time slots (Time Slot)-be respectively the first time slot With the second time slot.LTE existing systems PUCCH (Physical Upl ink Control Channel, Physical Uplink Control Channel) be transmitted in the way of PRB pairs, i.e., one PUCCH transmission when A whole LTE subframes are occupied on domain.The control information of existing PUCCH transmission includes SR (Scheduling Request, dispatch request), HARQ (Hybrid Automatic Repeat ReQuest, hybrid automatic repeat-request) ACK/NACK (confirmation), CSI (Channel State Information, channel condition information).Wherein, CSI includes CQI (Channel Quality again Indicator, channel quality indicate), (Precoding Matrix Indicator, prelist PMI Code matrix is indicated), RI (Rank Indicator, exponent number indicate), PTI (Precoding Type Indicator, precoding type indicate), CRI (CSI-RS Resource Indicator, CSI Reference signal resource is indicated).
For shorter TTI, if a problem for needing research is upward signal, particularly up control Signaling processed is transmitted in the way of gap in short-term, and gap is less than the length of a LTE time slot, then in short-term The resource allocation and transmission means of existing PUCCH will be unable to use.
Regarding to the issue above, the invention provides solution.It should be noted that not conflicting In the case of, embodiment and implementation in the UE (User Equipment, user equipment) of the application Feature in example may apply in base station, and vice versa.Further, in the case where not conflicting, Feature in embodiments herein and embodiment can arbitrarily be mutually combined.
The content of the invention
For in gap in short-term uplink control channel resource distribution, one intuitively method be to continue to use biography The upstream control signaling transmission means of system, i.e. PUCCH is still in a PRB to upper transmission.So The immediate problem for bringing is that from from the point of view of PUCCH transmission, methods described does not bring low prolonging The transmission low latency gain of slow system.Ascending control channel is exactly mapped to one by another method In short-term in gap, but this kind of method needs to solve the problems, such as three below.First problem is gap in short-term Distribution in a LTE subframe and (Sounding Reference Signal are visited with SRS Survey reference signal) relation.Second Problem corresponds to the multiplexing of control signalings to ensure multiple UE, For gap in short-term, it is necessary to redesign new sTTI-PUCCH (Short TTI PUCCH, in short-term gap Ascending control channel) resource, and corresponding orthogonal CDM (Code Division Multiplexing, Code division multiplexing) coding method.3rd problem is exactly the sTTI-PUCCH of different user, and STTI-PUCCH in different gaps in short-term, the relation with uplink reference signals.
Solution in the present invention has taken into full account above mentioned problem, and based on by ascending control channel A mode in short-term in gap is mapped to, corresponding solution is given.
The invention discloses a kind of method in UE for supporting low latency radio communication, wherein, including such as Lower step:
- step A. sends upward signal.The upward signal take first in short-term the part of gap or Whole wideband symbols.
Wherein, first in short-term gap duration be less than 1 millisecond, first in short-term gap it is upper in time domain In a LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term is included just Integer wideband symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE Position in subframe is relevant.
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap and first last wideband symbol that gap includes in a LTE subframes in short-term, the first gap in short-term In wideband symbol number be not less than K;If first in short-term gap be last in N number of gap in short-term One gap and first last wideband symbol for not including in gap in short-term in a LTE subframes in short-term, First wideband symbol number in short-term in gap is not less than K-1.The K is removed in N number of gap in short-term Go the minimum value of the first N-1 wideband symbol numbers in short-term in gap of gap in short-term.
- third condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, and last wideband symbol of a LTE subframes is reserved for SRS, and target gap in short-term Compare, first has lacked last wideband symbol of a LTE subframes in gap in short-term.The mesh Gap is last gap in short-term in the 2nd LTE subframes to mark in short-term.Wherein described second LTE subframes Do not include keeping for the wideband symbol of SRS.
- fourth condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, last wideband symbol of reference signal in the upward signal in a LTE subframes Outside wideband symbol on transmit.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Used as one embodiment, the wideband symbol is SC-FDMA (Single Carrier-Frequency Division Multiple Access, single-carrier frequency division multiple access) symbol Number.
Used as one embodiment, the wideband symbol is OFDM (Orthogonal Frequency Division Multiplexing, OFDM) symbol.
Used as one embodiment, the wideband symbol is the OFDM symbol based on sub-band filter.
Used as one embodiment, the subcarrier spacing of the wideband symbol is 15kHz.
Used as one embodiment, the subcarrier spacing of the wideband symbol is 3.75kHz.
As one embodiment, first in short-term gap meet { first condition, second condition, Article 3 Part, fourth condition }.
As one embodiment, first in short-term gap to be only used for low latency comprising wideband symbol wireless The transmission of communication system upward signal.
Used as one embodiment, last wideband symbol of a LTE subframes is reserved for SRS refers to last wideband symbol of a LTE subframes by the specific downlink signaling configuration of cell It is SRS.Used as a sub- embodiment of the present embodiment, the specific downlink signaling of cell is SoundingRS-UL-ConfigCommon IE (Information Element, information unit).
Used as one embodiment, last wideband symbol of a LTE subframes is reserved for SRS refers to that last wideband symbol of a LTE subframes is configured to by the specific downlink signalings of UE SRS.Used as a sub- embodiment of the present embodiment, the specific downlink signalings of UE include {SoundingRS-UL-ConfigDedicated,SoundingRS-UL-ConfigDedicatedA At least one of periodic-r10 }.
Used as one embodiment, gap carries the descending biography of positive integer in short-term described in the present invention Defeated piece (Transport Block).
Above-mentioned first essence of first condition that gap meets in short-term is:When design first in short-term gap one , it is necessary to consider the last of LTE subframes during the wideband symbol number of position and occupancy in individual LTE subframes Whether one wideband symbol is reserved for SRS.And whether SRS is included for the LTE subframes, The design of different gaps in short-term is provided, preferably using frequency spectrum resource.
Above-mentioned first essence of second condition that gap meets in short-term is:In a LTE subframe, if There is SRS, then last in short-term gap do not include and keep for the wideband symbol of SRS, and last Individual gap in short-term includes at least one wideband symbol for being used for uplink signal transmissions.The benefit for so designing It is that last wideband symbol that guarantee is not in addition to SRS is uplink reference signals Situation, with the situation that uplink reference signals in guarantee system can not make full use of.
Above-mentioned first essence of third condition that gap meets in short-term is:System can be with according to whether reserved SRS flexibly configures the wideband symbol number for uplink signal transmissions that gap in short-term is included, and carries The flexibility of system high and spectrum efficiency.
Above-mentioned first essence of fourth condition that gap meets in short-term is:Guarantee is not in up reference Signal is located at last wideband symbol of gap in short-term, and the uplink reference signals are described short The situation of unique uplink reference signals of time slot, it is ensured that the channel estimating performance of uplink reference signals, And can be earlier beginning channel estimation and demodulation, and then fully demonstrate the characteristic of low latency.
Specifically, according to an aspect of the present invention, it is characterised in that the step A is also included Following steps:
- step A0. receives the first signaling, and first signaling indicates target sub-band set.It is described Target sub-band set includes positive integer subband.
- step A1. receives downlink data.The upward signal is included for the lower line number According to HARQ-ACK information.
Wherein, the frequency domain resource shared by the upward signal belongs to target sub-band set.
Used as one embodiment, the upward signal is transmitted on physical layer control channel.As this One sub- embodiment of embodiment, the physical layer control channel is PUCCH.As the embodiment Another sub- embodiment, the physical layer control channel is sTTI-PUCCH.Wherein, it is described STTI-PUCCH is used for transmitting uplink control information, and positioned at a corresponding wideband symbol of gap in short-term It is interior.
Used as one embodiment, the upward signal is in physical layer data channel.As this One sub- embodiment of embodiment, the physical layer data channel is PUSCH.As the embodiment Another sub- embodiment, the physical layer data channel is sTTI-PUSCH.Wherein, it is described STTI-PUSCH is used to transmit upstream data information, and positioned at a corresponding wideband symbol of gap in short-term It is interior.
Used as one embodiment, the target sub-band set is located at a system bandwidth for LTE carrier waves It is interior.
Used as one embodiment, the target sub-band set includes the frequency band of positive integer PRB.
Used as one embodiment, the target sub-band set is by E subband group continuous on frequency domain Into.E is positive integer.
As one embodiment, the target sub-band set by two with affiliated LTE carrier centers frequently The subband subset of point symmetry is combined into.Described two subband subclass connect comprising D on frequency domain Continuous subband composition.D is positive integer.
Used as one embodiment, the frequency band shared by the subband is a frequency band of PRB.
Used as one embodiment, the frequency band shared by the subband is F continuous subcarrier.Institute It is positive integer to state F, and equal at least one of { 2,3,4,6 }.
Used as one embodiment, the frequency domain resource shared by the upward signal is target sub-band set In a subband.
Used as one embodiment, the frequency domain resource shared by the upward signal is distributed in target sub-band G son of set takes.The G be greater than 1 positive integer and, and the value of G and gap institute in short-term Comprising the wideband symbol number for uplink signal transmissions, and the resource list shared by upward signal The number of position is relevant.
Used as a sub- embodiment of the embodiment, the resource units are the RE (Resource of LTE Element, Resource Unit).
Used as a sub- embodiment of the embodiment, the resource units are that frequency domain occupies 3.75kHz, Time domain occupies one Resource Unit of SC-FDMA symbols of LTE system.
As a sub- embodiment of the embodiment, the gap in short-term included for upward signal The wideband symbol number of transmission is S, and the number of the Resource Unit shared by the upward signal is M. Wherein M is equal to the product of S and G, and each subband in the G subband is included and belonged to S Resource Unit of row signal.
Used as one embodiment, the frequency domain resource shared by the upward signal is a PRB correspondence Frequency band.
Used as a sub- embodiment of the embodiment, the corresponding frequency band of one PRB is by positive integer Individual continuous subband composition.
Used as one embodiment, first signaling is high-level signaling.
Used as a sub- embodiment of the embodiment, first signaling is indicated in target sub-band set The number of subband and initial frequency domain position.
Used as a sub- embodiment of the embodiment, first signaling is indicated in target sub-band set, Subband number and initial frequency domain position that one son is included with subclass.Another subband subclass The subband number for being included it is identical with the subband subclass being instructed to, and another subband subclass Comprising subband, on frequency domain position, the subband included with the subband subclass being instructed to, Center frequency point on affiliated LTE carrier waves is symmetrical.
The advantage of above-mentioned target sub-band set is to reduce as far as possible and existing LTE system PUCCH It is particularly up on the premise of reducing interference, it is ensured that low latency wireless communication system upward signal The frequency diversity gain of control signaling.By an ascending control channel of UE, many height are distributed to Transmission is taken, frequency diversity gain is effectively obtained, and then ensure the robust of ascending control channel Property.
Specifically, according to an aspect of the present invention, it is characterised in that the HARQ-ACK letters Breath takes M resource units.The M is unrelated just with wideband symbol number in first in short-term gap Integer.
As one embodiment, the resource units be LTE RE (Resource Element, Resource Unit).
Used as one embodiment, the resource units are that frequency domain occupies 3.75kHz, and time domain occupies LTE One Resource Unit of SC-FDMA symbols of system.
Used as one embodiment, the M resource units are distributed in the first DMRS in short-term in gap Outside wideband symbol on.
Used as one embodiment, the HARQ-ACK information is by length for the characteristic sequence of M is signified Show.M modulation symbol of the characteristic sequence is mapped on the M resource units respectively.Institute State characteristic sequence be by { CDM, OS (Orthogonal Sequence, orthogonal sequence) } at least One of it is described.The HARQ-ACK information is transmitted on physical layer control channel.
Used as one embodiment, M Resource Unit corresponding to the HARQ-ACK information is in institute The index in target sub-band set is stated, the starting with the downlink data corresponding to HARQ-ACK information Frequency domain position is related.
Specifically, according to an aspect of the present invention, it is characterised in that the upward signal is also wrapped Include CSI.The CSI includes at least one of { CQI, PMI, RI, PTI, CRI }.It is described CSI takes Q resource units.The Q is unrelated with wideband symbol number in first in short-term gap Positive integer.
Used as one embodiment, the CSI-RS index that the CRI is used to indicate UE to configure refers to Show.
Used as one embodiment, the Q resource units are distributed in the first DMRS in short-term in gap Outside wideband symbol on.
Used as one embodiment, the CSI is as length indicated by the characteristic sequence of Q.The spy Q modulation symbol for levying sequence is mapped on the Q resource units respectively.The characteristic sequence It is described by least one of { CDM, OS (Orthogonal Sequence, orthogonal sequence) }. The HARQ-ACK information is transmitted on physical layer control channel.
Specifically, according to an aspect of the present invention, it is characterised in that the step A is also included Following steps:
- step B. sends uplink reference signals, and the up reference channel is distributed in first in short-term On P wideband symbol in gap, P is positive integer.
Used as one embodiment, the first wideband symbol in short-term in gap is used to transmit the upward signal Or the uplink reference signals.
Used as one embodiment, the P is equal to 1, and the uplink reference signals are short positioned at first On first wideband symbol in time slot in time domain.
Used as one embodiment, the P is equal to 1, and the uplink reference signals are short positioned at first On last wideband symbol in time slot in time domain.
Used as one embodiment, the P is equal to 1, and the uplink reference signals are short positioned at first Two wideband symbols for being used to transmit between the wideband symbol of upward signal in time slot.
Used as one embodiment, the P is equal to 2, and the uplink reference signals are wide positioned at first Tape symbol and the second wideband symbol.First wideband symbol be first in short-term gap in time domain One wideband symbol, second wideband symbol be first in short-term last of gap in time domain it is wide Tape symbol.And be used for including at least one between first wideband symbol and the second wideband symbol The wideband symbol of row signal transmission.
Used as one embodiment, the uplink reference signals and the upward signal are by identical one Or multiple antenna ports send.
The advantage of above-mentioned uplink reference signals design is to be evenly distributed in uplink reference signals Gap can share position in one N number of gap in short-term of LTE subframes and adjacent in time domain two in short-term Uplink reference signals between described two gaps in short-term, upload control and data transfer are ensured with this When channel estimation and demodulation performance.
Specifically, according to an aspect of the present invention, it is characterised in that the uplink reference signals The frequency band that the frequency band of occupancy takes on frequency domain with the upward signal is identical.
Used as one embodiment, the frequency band that the uplink reference signals take is less than 1 band of PRB It is wide.
Used as a sub- embodiment of the embodiment, the frequency band that the uplink reference signals take is one The frequency band that individual subband is included, and the frequency band that the subband takes is less than 1 bandwidth of PRB.
Used as one embodiment, the frequency band that the uplink reference signals take is equal to 1 band of PRB Comprising carrying out channel estimation and demodulation with reference to the uplink reference signals on width, and the bandwidth The corresponding modulation symbol of upward signal.
The design of the frequency band that above-mentioned uplink reference signals take is advantageous in that, when the subband Frequency band of the shared frequency band less than PRB, and the information transmitted of upward signal it is less when, Or a upward signal number for needing simultaneous transmission in gap in short-term it is less when.Can use less Uplink frequency domain resources and uplink reference signals support uplink, improve flexibility and the frequency of system Spectrum efficiency.
The invention discloses a kind of method in base station for supporting low latency radio communication, wherein, including Following steps:
- step A. receives upward signal.The upward signal take first in short-term the part of gap or Whole wideband symbols.
Wherein, first in short-term gap duration be less than 1 millisecond, first in short-term gap it is upper in time domain In a LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term is included just Integer wideband symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE Position in subframe is relevant.
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap and first last wideband symbol that gap includes in a LTE subframes in short-term, the first gap in short-term In wideband symbol number be not less than K;If first in short-term gap be last in N number of gap in short-term One gap and first last wideband symbol for not including in gap in short-term in a LTE subframes in short-term, First wideband symbol number in short-term in gap is not less than K-1.The K is removed in N number of gap in short-term Go the minimum value of the first N-1 wideband symbol numbers in short-term in gap of gap in short-term.
- third condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, and last wideband symbol of a LTE subframes is reserved for SRS, and target gap in short-term Compare, first has lacked last wideband symbol of a LTE subframes in gap in short-term.The mesh Gap is last gap in short-term in the 2nd LTE subframes to mark in short-term.Wherein described second LTE subframes Do not include keeping for the wideband symbol of SRS.
- fourth condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, last wideband symbol of reference signal in the upward signal in a LTE subframes Outside wideband symbol on transmit.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Specifically, according to an aspect of the present invention, it is characterised in that characterized in that, described Step A is also comprised the following steps:
- step A0. sends the first signaling, and first signaling indicates target sub-band set.It is described Target sub-band set includes positive integer subband.
- step A1. sends downlink data.The upward signal is included for the lower line number According to HARQ-ACK information.
Wherein, the frequency domain resource shared by the upward signal belongs to target sub-band set.
Specifically, according to an aspect of the present invention, it is characterised in that the HARQ-ACK letters Breath takes M resource units.The M is unrelated just with wideband symbol number in first in short-term gap Integer.
Specifically, according to an aspect of the present invention, it is characterised in that the upward signal is also wrapped Include CSI.The CSI includes at least one of { CQI, PMI, RI, PTI, CRI }.It is described CSI takes Q resource units.The Q is unrelated with wideband symbol number in first in short-term gap Positive integer.
Specifically, according to an aspect of the present invention, it is characterised in that the step A is also included Following steps:
- step B. receives uplink reference signals, and the up reference channel is distributed in first in short-term On P wideband symbol in gap, P is positive integer.
Specifically, according to an aspect of the present invention, it is characterised in that the uplink reference signals The frequency band that the frequency band of occupancy takes on frequency domain with the upward signal is identical.
The invention discloses a kind of UE equipment for supporting low latency radio communication, it includes:
- the first module:The first signaling and downlink data are received, first signaling indicates target Band set.The target sub-band set includes positive integer subband.
- the second module:Send upward signal and uplink reference signals.The upward signal takes the The part wideband symbol of one gap in short-term.The uplink reference signals are distributed in the first P in short-term in gap On individual wideband symbol, P is positive integer.The upward signal is included for the downlink data HARQ-ACK information.
Wherein, first in short-term gap duration be less than 1 millisecond, first in short-term gap it is upper in time domain In a LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term is included just Integer wideband symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE Position in subframe is relevant.
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap and first last wideband symbol that gap includes in a LTE subframes in short-term, the first gap in short-term In wideband symbol number be not less than K;If first in short-term gap be last in N number of gap in short-term One gap and first last wideband symbol for not including in gap in short-term in a LTE subframes in short-term, First wideband symbol number in short-term in gap is not less than K-1.The K is removed in N number of gap in short-term Go the minimum value of the first N-1 wideband symbol numbers in short-term in gap of gap in short-term.
- third condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, and last wideband symbol of a LTE subframes is reserved for SRS, and target gap in short-term Compare, first has lacked last wideband symbol of a LTE subframes in gap in short-term.The mesh Gap is last gap in short-term in the 2nd LTE subframes to mark in short-term.Wherein described second LTE subframes Do not include keeping for the wideband symbol of SRS.
- fourth condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, last wideband symbol of reference signal in the upward signal in a LTE subframes Outside wideband symbol on transmit.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Frequency domain resource shared by the upward signal belongs to target sub-band set.Specifically, according to The one side of this equipment, it is characterised in that the HARQ-ACK information takes M resource list Position.The M is the positive integer unrelated with wideband symbol number in first in short-term gap.
Specifically, according to the one side of this equipment, it is characterised in that the upward signal is also wrapped Include CSI.The CSI includes at least one of { CQI, PMI, RI, PTI, CRI }.It is described CSI takes Q resource units.The Q is unrelated with wideband symbol number in first in short-term gap Positive integer.
Specifically, according to the one side of this equipment, it is characterised in that the uplink reference signals The frequency band that the frequency band of occupancy takes on frequency domain with the upward signal is identical.
The invention discloses a kind of base station equipment for supporting low latency radio communication, it includes:
- the first module:The first signaling and downlink data are sent, first signaling indicates target Band set.The target sub-band set includes positive integer subband.
- the second module:Receive upward signal and uplink reference signals.The upward signal takes the The part wideband symbol of one gap in short-term.The upward signal is included for the downlink data HARQ-ACK information, the uplink reference signals are distributed in the first P wideband symbol in short-term in gap On, P is positive integer.
Wherein, first in short-term gap duration be less than 1 millisecond, first in short-term gap it is upper in time domain In a LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term is included just Integer wideband symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE Position in subframe is relevant
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap and first last wideband symbol that gap includes in a LTE subframes in short-term, the first gap in short-term In wideband symbol number be not less than K;If first in short-term gap be last in N number of gap in short-term One gap and first last wideband symbol for not including in gap in short-term in a LTE subframes in short-term, First wideband symbol number in short-term in gap is not less than K-1.The K is removed in N number of gap in short-term Go the minimum value of the first N-1 wideband symbol numbers in short-term in gap of gap in short-term.
- third condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, and last wideband symbol of a LTE subframes is reserved for SRS, and target gap in short-term Compare, first has lacked last wideband symbol of a LTE subframes in gap in short-term.The mesh Gap is last gap in short-term in the 2nd LTE subframes to mark in short-term.Wherein described second LTE subframes Do not include keeping for the wideband symbol of SRS.
- fourth condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, last wideband symbol of reference signal in the upward signal in a LTE subframes Outside wideband symbol on transmit.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Frequency domain resource shared by the upward signal belongs to target sub-band set.
Specifically, according to the one side of this equipment, it is characterised in that the HARQ-ACK letters Breath takes M resource units.The M is unrelated just with wideband symbol number in first in short-term gap Integer.
Specifically, according to the one side of this equipment, it is characterised in that the upward signal is also wrapped Include CSI.The CSI includes at least one of { CQI, PMI, RI, PTI, CRI }.It is described CSI takes Q resource units.The Q is unrelated with wideband symbol number in first in short-term gap Positive integer.
Specifically, according to the one side of this equipment, it is characterised in that the uplink reference signals The frequency band that the frequency band of occupancy takes on frequency domain with the upward signal is identical.
Compared to existing public technology, the present invention has following technical advantage:
- is the gap distribution in short-term of low latency wireless communication system design, and considers LTE simultaneously Whether last wideband symbol of frame is reserved for SRS.The present invention has considered up reference The transmission performance of signal density and upward signal, gives the wideband symbol that uplink reference signals are occupied Number and uplink reference signals are distributed corresponding design, to ensure the overall spectral efficiency of system.
- design objects sets of subbands is transmitted for upstream control signaling, and by the up of UE Control channel, is distributed on multiple subbands and sends, and effectively obtains frequency diversity gain, and then Ensure the robustness of ascending control channel.
Be evenly distributed in uplink reference signals in a N number of gap in short-term for LTE subframes by-, and In time domain adjacent two in short-term gap can share up ginseng between described two gaps in short-term Signal is examined, the performance of channel estimation when ensureing upload control and data transfer with this and demodulation.
- is realized by way of uplink reference signals are mapped into the frequency band as upward signal Uplink is supported using less uplink frequency domain resources and uplink reference signals, system is improved Flexibility and spectrum efficiency.
Brief description of the drawings
The detailed description made to non-limiting example made with reference to the following drawings by reading, this The other features, objects and advantages of invention will become more apparent:
Fig. 1 shows the one of the invention flow chart of the embodiment for sending and receiving.
Fig. 2 (a) to Fig. 2 (d) show one of the invention in short-term gap be distributed in LTE subframes Schematic diagram.Wherein described LTE subframes are transmitted comprising 4 wideband symbols for uplink reference signals, and 4 wideband symbols for being used for uplink reference signals transmission belong to four different gaps in short-term.Wherein Fig. 2 (a) It is directed under N-CP (Normal-Cyclic Prefix, normal Cyclic Prefix) scene with Fig. 2 (b) and is not wrapped Situation containing SRS and comprising SRS.Wherein Fig. 2 (c) and Fig. 2 (d) are directed to SRS and bag are not included under E-CP (Extended-Cyclic Prefix, the Cyclic Prefix of extension) scene Situation containing SRS.
Fig. 3 (a) to Fig. 3 (d) show one of the invention in short-term gap be distributed in LTE subframes Schematic diagram.Wherein described LTE subframes are transmitted comprising 4 wideband symbols for uplink reference signals, and 4 wideband symbols for being used for uplink reference signals transmission can be shared by different gaps in short-term.Wherein scheme 3 (a) and Fig. 3 (b) do not include SRS and the situation comprising SRS under being directed to N-CP scenes.Wherein Fig. 3 (c) With Fig. 3 (d) for the situation not comprising SRS and comprising SRS under E-CP scenes.
Fig. 4 (a) to Fig. 4 (d) show one of the invention in short-term gap be distributed in LTE subframes Schematic diagram.Wherein described LTE subframes are transmitted comprising 4 wideband symbols for uplink reference signals, and Each in short-term gap be only used to transmit the wideband symbol of upload control or upstream data comprising one.Wherein scheme 4 (a) and Fig. 4 (b) do not include SRS and the situation comprising SRS under being directed to N-CP scenes.Wherein Fig. 4 (c) With Fig. 4 (d) for the situation not comprising SRS and comprising SRS under E-CP scenes.
Fig. 5 (a) shows the schematic diagram of a subband of the invention.
Fig. 5 (b) shows the schematic diagram of a subband pair of the invention.Wherein described subband to by Two continuous subband compositions on frequency domain.
Fig. 5 (c) shows the schematic diagram of a subband pair of the invention.Wherein described subband to by Two discrete subband compositions on frequency domain.
Fig. 6 (a) shows the schematic diagram of a target sub-band set of the invention.Wherein constitute institute The subband for stating target sub-band set is continuous on frequency domain.
Fig. 6 (b) shows the schematic diagram of a target sub-band set of the invention.Wherein described mesh Mark sets of subbands is by two son band subsets and constitutes.
Fig. 6 (c) shows the schematic diagram of a target sub-band set of the invention.Wherein constitute institute The subband for stating target sub-band set is discrete on frequency domain.
Fig. 7 (a) shows the schematic diagram of the mode that the modulation symbol of upward signal is mapped in subband.Its In, the sub-carrier number that the subband takes is equal to 12.
Fig. 7 (b) shows the schematic diagram of the mode that the modulation symbol of upward signal is mapped in subband.Its In, the sub-carrier number that the subband takes is equal to 6.
Fig. 7 (c) shows the schematic diagram of the mode that the modulation symbol of upward signal is mapped in subband.Its In, the intersubband that is mapped in is discrete.
Fig. 8 shows the schematic diagram of sTTI-PUCCH resources and the mapping mode of target sub-band set.
Fig. 9 shown inside a sTTI-PUCCH resource, the corresponding modulation symbol of uplink control signal With the schematic diagram of resource units mapping mode.
Figure 10 shows that a upstream control signaling of the invention is transmitted in sTTI-PUSCH Resource impact mode.
Figure 11 shows the structured flowchart of the processing unit in UE according to an embodiment of the invention.
Figure 12 shows the structural frames of the processing unit in base station according to an embodiment of the invention Figure.
Specific embodiment
Technical scheme is described in further detail below in conjunction with accompanying drawing, it is necessary to illustrate It is that, in the case where not conflicting, the feature in embodiments herein and embodiment can be arbitrarily mutual Combination.
Embodiment 1
Embodiment 1 illustrates a flow chart for the embodiment for sending and receiving, as shown in Figure 1. In accompanying drawing 1, base station N1 is the maintenance base station of the Serving cell of UE U2.
For base station N1, the first signaling is sent in step s 11.First signaling indicates target Band set.The target sub-band set includes positive integer subband.
Used as one embodiment, the upward signal is transmitted on physical layer control channel.As this One sub- embodiment of embodiment, the physical layer control channel is PUCCH.As the embodiment Another sub- embodiment, the physical layer control channel is sTTI-PUCCH.Wherein, it is described STTI-PUCCH is used for transmitting uplink control information, and positioned at a corresponding wideband symbol of gap in short-term It is interior.
Used as one embodiment, the upward signal is in physical layer data channel.As this One sub- embodiment of embodiment, the physical layer data channel is PUSCH.As the embodiment Another sub- embodiment, the physical layer data channel is sTTI-PUSCH.Wherein, it is described STTI-PUSCH is used to transmit upstream data information, and positioned at a corresponding wideband symbol of gap in short-term It is interior.
Used as one embodiment, the target sub-band set is located at a system bandwidth for LTE carrier waves It is interior.
Used as one embodiment, the target sub-band set includes the frequency band of positive integer PRB.
Used as one embodiment, the target sub-band set is by E subband group continuous on frequency domain Into.E is positive integer.
As one embodiment, the target sub-band set by two with affiliated LTE carrier centers frequently The subband subset of point symmetry is combined into.Described two subband subclass connect comprising D on frequency domain Continuous subband composition.D is positive integer.
Used as one embodiment, the frequency band shared by the subband is a frequency band of PRB.
Used as one embodiment, the frequency band shared by the subband is F continuous subcarrier.Institute It is positive integer to state F, and equal at least one of { 2,3,4,6 }.
Used as one embodiment, the frequency domain resource shared by the upward signal is target sub-band set In a subband.
Used as one embodiment, the frequency domain resource shared by the upward signal is distributed in target sub-band G son of set takes.The G be greater than 1 positive integer and, and the value of G and gap institute in short-term Comprising the wideband symbol number for uplink signal transmissions, and the resource list shared by upward signal The number of position is relevant.
Used as a sub- embodiment of the embodiment, the resource units are the RE (Resource of LTE Element, Resource Unit).
Used as a sub- embodiment of the embodiment, the resource units are that frequency domain occupies 3.75kHz, Time domain occupies one Resource Unit of SC-FDMA symbols of LTE system.
As a sub- embodiment of the embodiment, the gap in short-term included for upward signal The wideband symbol number of transmission is S, and the number of the Resource Unit shared by the upward signal is M. Wherein M is equal to the product of S and G, and each subband in the G subband is included and belonged to S Resource Unit of row signal.
Used as one embodiment, the frequency domain resource shared by the upward signal is a PRB correspondence Frequency band.
Used as a sub- embodiment of the embodiment, the corresponding frequency band of one PRB is by positive integer Individual continuous subband composition.
Used as one embodiment, first signaling is high-level signaling.
Used as a sub- embodiment of the embodiment, first signaling is indicated in target sub-band set The number of subband and initial frequency domain position.
Used as a sub- embodiment of the embodiment, first signaling is indicated in target sub-band set, Subband number and initial frequency domain position that one son is included with subclass.Another subband subclass The subband number for being included it is identical with the subband subclass being instructed to, and another subband subclass Comprising subband, on frequency domain position, the subband included with the subband subclass being instructed to, Center frequency point on affiliated LTE carrier waves is symmetrical.
For UE U2, the first signaling is received in the step s 21.First signaling indicates target Band set.The target sub-band set includes positive integer subband.
For base station N1, downlink data is sent in step s 12.The upward signal includes being directed to The HARQ-ACK information of the downlink data.
Used as one embodiment, the upward signal is transmitted on physical layer control channel.As this One sub- embodiment of embodiment, the physical layer control channel is PUCCH.As the embodiment Another sub- embodiment, the physical layer control channel is sTTI-PUCCH.Wherein, it is described STTI-PUCCH is used for transmitting uplink control information, and positioned at a corresponding wideband symbol of gap in short-term It is interior.
Used as one embodiment, the upward signal is in physical layer data channel.As this One sub- embodiment of embodiment, the physical layer data channel is PUSCH.As the embodiment Another sub- embodiment, the physical layer data channel is sTTI-PUSCH.Wherein, it is described STTI-PUSCH is used to transmit upstream data information, and positioned at a corresponding wideband symbol of gap in short-term It is interior.
For UE U2, downlink data is received in step S22.The upward signal includes being directed to The HARQ-ACK information of the downlink data.
For UE U2, upward signal is sent in step S23.It is short that the upward signal takes first The some or all of wideband symbol of time slot.
Wherein, first in short-term gap duration be less than 1 millisecond, first in short-term gap it is upper in time domain In a LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term is included just Integer wideband symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE Position in subframe is relevant.
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap and first last wideband symbol that gap includes in a LTE subframes in short-term, the first gap in short-term In wideband symbol number be not less than K;If first in short-term gap be last in N number of gap in short-term One gap and first last wideband symbol for not including in gap in short-term in a LTE subframes in short-term, First wideband symbol number in short-term in gap is not less than K-1.The K is removed in N number of gap in short-term Go the minimum value of the first N-1 wideband symbol numbers in short-term in gap of gap in short-term.
- third condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, and last wideband symbol of a LTE subframes is reserved for SRS, and target gap in short-term Compare, first has lacked last wideband symbol of a LTE subframes in gap in short-term.The mesh Gap is last gap in short-term in the 2nd LTE subframes to mark in short-term.Wherein described second LTE subframes Do not include keeping for the wideband symbol of SRS.
- fourth condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, last wideband symbol of reference signal in the upward signal in a LTE subframes Outside wideband symbol on transmit.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Used as one embodiment, the wideband symbol is SC-FDMA (Single Carrier-Frequency Division Multiple Access, single-carrier frequency division multiple access) symbol Number.
Used as one embodiment, the wideband symbol is OFDM (Orthogonal Frequency Division Multiplexing, OFDM) symbol.
Used as one embodiment, the wideband symbol is the OFDM symbol based on sub-band filter.
Used as one embodiment, the subcarrier spacing of the wideband symbol is 15kHz.
Used as one embodiment, the subcarrier spacing of the wideband symbol is 3.75kHz.
As one embodiment, first in short-term gap meet { first condition, second condition, Article 3 Part, fourth condition }.
As one embodiment, first in short-term gap to be only used for low latency comprising wideband symbol wireless The transmission of communication system upward signal.
Used as one embodiment, the SRS is believed by LTE Cell-specific (cell is distinctive) Make SoundingRS-UL-ConfigCommon configure, and sent by high-level signaling.
Used as one embodiment, the SRS is by LTE UE-specific (UE is distinctive) signaling {SoundingRS-UL-ConfigDedicated,SoundingRS-UL-ConfigDedicatedA Periodic-r10 } at least one of configuration, and by high-level signaling send.
For base station N1, upward signal is received in step s 13.The upward signal takes first The some or all of wideband symbol of gap in short-term.
Wherein, first in short-term gap duration be less than 1 millisecond, first in short-term gap it is upper in time domain In a LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term is included just Integer wideband symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE Position in subframe is relevant.
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap and first last wideband symbol that gap includes in a LTE subframes in short-term, the first gap in short-term In wideband symbol number be not less than K;If first in short-term gap be last in N number of gap in short-term One gap and first last wideband symbol for not including in gap in short-term in a LTE subframes in short-term, First wideband symbol number in short-term in gap is not less than K-1.The K is removed in N number of gap in short-term Go the minimum value of the first N-1 wideband symbol numbers in short-term in gap of gap in short-term.
- third condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, and last wideband symbol of a LTE subframes is reserved for SRS, and target gap in short-term Compare, first has lacked last wideband symbol of a LTE subframes in gap in short-term.The mesh Gap is last gap in short-term in the 2nd LTE subframes to mark in short-term.Wherein described second LTE subframes Do not include keeping for the wideband symbol of SRS.
- fourth condition:If first in short-term gap be in N number of gap in short-term last in short-term Gap, last wideband symbol of reference signal in the upward signal in a LTE subframes Outside wideband symbol on transmit.
The upward signal includes at least one of { upstream data, upstream control signaling }.
For UE U2, uplink reference signals, the uplink reference signals point are sent in step s 24 On the P wideband symbol in first in short-term gap, P is positive integer to cloth.
Used as one embodiment, the P is equal to 1, and the uplink reference signals are short positioned at first On first wideband symbol in time slot in time domain.
Used as one embodiment, the P is equal to 1, and the uplink reference signals are short positioned at first On last wideband symbol in time slot in time domain.
Used as one embodiment, the P is equal to 1, and the uplink reference signals are short positioned at first Two wideband symbols for being used to transmit between the wideband symbol of upward signal in time slot.
Used as one embodiment, the P is equal to 2, and the uplink reference signals are wide positioned at first Tape symbol and the second wideband symbol.First wideband symbol be first in short-term gap in time domain One wideband symbol, second wideband symbol be first in short-term last of gap in time domain it is wide Tape symbol.And be used for including at least one between first wideband symbol and the second wideband symbol The wideband symbol of row signal transmission.
Used as one embodiment, the uplink reference signals and the upward signal are by identical one Or multiple antenna ports send.
For base station N1, uplink reference signals, the uplink reference signals point are received in step S14 On the P wideband symbol in first in short-term gap, P is positive integer to cloth.
Embodiment 2
Embodiment 2 shows to show one of the invention showing of being distributed in LTE subframes of gap in short-term It is intended to.Wherein described LTE subframes are transmitted comprising 4 wideband symbols for uplink reference signals, and 4 The individual wideband symbol for uplink reference signals transmission belongs to four different gaps in short-term.Fig. 2 (a) and figure 2 (b) does not configure SRS under being directed to N-CP (Normal-Cyclic Prefix, normal Cyclic Prefix) scene With the situation of configuration SRS.Wherein Fig. 2 (c) and Fig. 2 (d) is directed to E-CP (Extended-Cyclic Prefix, the Cyclic Prefix of extension) situation of SRS and configuration SRS is not configured under scene.Such as Fig. 2 (a) To Fig. 2 (d) Suo Shi, a LTE subframe includes 4 gaps in short-term.The part correspondence of figure acceptance of the bid " x " Resource units shared by x-th upward signal in short-term in gap, x-th up letter in short-term in gap Number and uplink reference signals Y constitute x-th gap in short-term, and by identical (one or more) Antenna port sends that (i.e. uplink reference signals Y can be used for the letter of x-th upward signal in short-term in gap Estimate and demodulate in road).(1, I) in (x, Y) respective figure 2 (a) to Fig. 2 (d), (2, II), (3, III), (4, IV).
Used as an attached sub- embodiment of the sub- embodiment, under N-CP scenes, UE is by reading High-level signaling SoundingRS-UL-ConfigCommon, SoundingRS-UL-ConfigDedicated, SoundingRS-UL-ConfigDedicatedAperiodic-r10 } at least SoundingRS-UL-ConfigCommon signalings, judge that the short time slot configuration is reference picture 2 (a) Or Fig. 2 (b).
Used as an attached sub- embodiment of the sub- embodiment, under E-CP scenes, UE is by reading High-level signaling SoundingRS-UL-ConfigCommon, SoundingRS-UL-ConfigDedicated, SoundingRS-UL-ConfigDedicatedAperiodic-r10 } at least SoundingRS-UL-ConfigCommon signalings, judge that the short time slot configuration is reference picture 2 (c) Or Fig. 2 (d).
Embodiment 3
Embodiment 3 shows the one of the invention schematic diagram that gap is distributed in LTE subframes in short-term. Wherein described LTE subframes are transmitted comprising 4 wideband symbols for uplink reference signals, and 4 are used for The wideband symbol of uplink reference signals transmission can be shared by different gaps in short-term.Wherein Fig. 3 (a) and figure 3 (b) is for the situation for not configuring SRS and configuration SRS under N-CP scenes.Wherein Fig. 3 (c) and Fig. 3 (d) For the situation for not configuring SRS and configuration SRS under E-CP scenes.As shown in Fig. 3 (a) to Fig. 3 (d), One LTE subframe includes 4 gaps in short-term.
As a sub- embodiment, x-th of the part correspondence of figure acceptance of the bid " x " up letter in short-term in gap Resource units shared by number, x-th upward signal and uplink reference signals Y composition in short-term in gap First gap in short-term, and (i.e. up ginseng is sent by identical (one or more) antenna port Examining signal Y can be used for channel estimation and the demodulation of first upward signal in short-term in gap).(x, Y) is right Answer (1, I) in accompanying drawing 2 (a) to Fig. 2 (d), (2, II), (3, III), (4, IV).
Used as another sub- embodiment, x-th of the part correspondence of figure acceptance of the bid " x " is up in gap in short-term Resource units shared by signal.X-th upward signal in short-term in gap, uplink reference signals Y and Uplink reference signals Z constitutes x-th gap in short-term, and by identical (one or more) antenna Port sends that (i.e. the channel that uplink reference signals Y can be used for x-th upward signal in short-term in gap is estimated Meter and demodulation).(1, I, II) in (x, Y, Z) respective figure 3 (a) to Fig. 3 (d), (2, II, III), (3, III, IV).When (4, IV) in (x, Y) respective figure 3 (a) to Fig. 3 (d), In the absence of uplink reference signals Z (i.e. the 4th 4 groups of upward signal and uplink reference signals in short-term in gap Into the 4th gap in short-term).
Used as an attached sub- embodiment of the sub- embodiment, under N-CP scenes, UE is by reading High-level signaling SoundingRS-UL-ConfigCommon, SoundingRS-UL-ConfigDedicated, SoundingRS-UL-ConfigDedicatedAperiodic-r10 } at least SoundingRS-UL-ConfigCommon signalings, judge that the short time slot configuration is reference picture 3 (a) Or Fig. 3 (b).
Used as an attached sub- embodiment of the sub- embodiment, under E-CP scenes, UE is by reading High-level signaling SoundingRS-UL-ConfigCommon, SoundingRS-UL-ConfigDedicated, SoundingRS-UL-ConfigDedicatedAperiodic-r10 } at least SoundingRS-UL-ConfigCommon signalings, judge that the short time slot configuration is reference picture 3 (c) Or Fig. 3 (d).
Embodiment 4
Embodiment 4 shows the one of the invention schematic diagram that gap is distributed in LTE subframes in short-term. Wherein described LTE subframes are transmitted comprising 5 wideband symbols for uplink reference signals, the gap in short-term A wideband symbol for being used for uplink signal transmissions is only included, and 5 pass for uplink reference signals Defeated wideband symbol can be shared by different gaps in short-term.Wherein Fig. 4 (a) and Fig. 4 (b) is directed to N-CP The situation of SRS and configuration SRS is not configured under scene.Wherein Fig. 4 (c) and Fig. 4 (d) is directed to E-CP The situation of SRS and configuration SRS is not configured under scape.
As a sub- embodiment, x-th of the part correspondence of figure acceptance of the bid " x " up letter in short-term in gap Resource units shared by number, x-th upward signal and uplink reference signals Y composition in short-term in gap First gap in short-term, and (i.e. up ginseng is sent by identical (one or more) antenna port Examining signal Y can be used for channel estimation and the demodulation of first upward signal in short-term in gap).
In Fig. 4 (a), (x, Y) correspondence (1, I), (2, II), (3, II), (4, III), (5, III), (6, IV), (7, IV), (8, V), (9, V).
In Fig. 4 (b), (x, Y) correspondence (1, I), (2, II), (3, II), (4, III), (5, III), (6, IV), (7, IV), (8, V).
In Fig. 4 (c), (x, Y) correspondence (1, I), (2, I), (3, II), (4, II), (5, III), (6, III), (7, IV), (8, IV).
In Fig. 4 (d), (x, Y) correspondence (1, I), (2, I), (3, I), (4, II), (5, II), (6, III), (7, III), (8, III).
Used as an attached sub- embodiment of the sub- embodiment, under N-CP scenes, UE is by reading High-level signaling SoundingRS-UL-ConfigCommon, SoundingRS-UL-ConfigDedicated, SoundingRS-UL-ConfigDedicatedAperiodic-r10 } at least SoundingRS-UL-ConfigCommon signalings, judge that the short time slot configuration is reference picture 4 (a) Or Fig. 4 (b).
Used as an attached sub- embodiment of the sub- embodiment, under E-CP scenes, UE is by reading High-level signaling SoundingRS-UL-ConfigCommon, SoundingRS-UL-ConfigDedicated, SoundingRS-UL-ConfigDedicatedAperiodic-r10 } at least SoundingRS-UL-ConfigCommon signalings, judge that the short time slot configuration is reference picture 4 (c) Or Fig. 4 (d).
Embodiment 5 (a)
Embodiment 5 (a) shows the schematic diagram of a subband of the invention.
Used as one embodiment, the frequency band shared by the subband is a frequency band of PRB.
Used as one embodiment, the frequency band shared by the subband is half frequency band of PRB, i.e., 90kHz。
Used as one embodiment, the frequency band shared by the subband is 45kHz.
Used as one embodiment, the frequency band shared by the subband is 22.5kHz.
Embodiment 5 (b)
Embodiment 5 (b) shows the schematic diagram of a subband pair of the invention.Wherein described subband To by two on frequency domain continuous subband constitute.
Used as one embodiment, two subbands of the subband centering belong to target sub-band set.
Used as one embodiment, two subbands of the subband centering are continuous on frequency domain.
Embodiment 5 (c)
Embodiment 5 (c) shows the schematic diagram of a subband pair of the invention.Wherein described son Band two discrete subbands on frequency domain to being made up of.
Used as one embodiment, two center frequency points of subband of the subband centering are on affiliated LTE The center frequency point of carrier wave is symmetrical.
Used as one embodiment, the frequency band shared by the subband is a frequency band of PRB, described The corresponding sequence numbers of PRB occupied by two subbands are respectively i and j, and i with j's and equal to N_RB. N_RB is equal to the number of the PRB that subband is included to affiliated LTE carrier waves.
Embodiment 6 (a)
Embodiment 6 (a) shows the schematic diagram of a target sub-band set of the invention.Wherein group Subband into the target sub-band set is continuous on frequency domain.
Used as a sub- embodiment of the embodiment, for indicating the target sub-band set first believes Order comprises at least at least one of:
Subband number in the set of-target sub-band;
The frequency domain position of initial subband in the set of-target sub-band;
The frequency domain position of the PRB comprising initial subband in the set of-target sub-band;
The width of the frequency band in the set of-target sub-band shared by subband;
Embodiment 6 (b)
Embodiment 6 (b) shows the schematic diagram of a target sub-band set of the invention.Wherein institute Target sub-band set is stated to be made up of two son band subclass.
Used as a sub- embodiment of the embodiment, the target sub-band set includes 2D subband, and Each subband subclass includes D subband.D is positive integer.
Used as an accompanying Examples of the sub- embodiment, the subband subclass is carried on affiliated LTE The center frequency point of ripple is symmetrical.
Used as an accompanying Examples of the sub- embodiment, the frequency band shared by the subband is one Subband numbering in the frequency band of PRB, the subband subclass positioned at low-frequency range is i, i be more than etc. In 0 even number less than or equal to 2D-2.Subband in the subband subclass positioned at high band is numbered and is J, j are the odd number less than or equal to 2D-1 more than or equal to 1.PRB occupied by subband i and subband j Corresponding sequence number is respectively m and n.Specifically, the difference of j and i is 1, and m is with n's and is equal to N_RB.N_RB is equal to the number of the PRB that subband is included to affiliated LTE carrier waves.
Used as a sub- embodiment of the embodiment, for indicating the target sub-band set first believes Order comprises at least at least one of:
Subband number in the set of-target sub-band;
A frequency domain position for initial subband of the son with subclass in the set of-target sub-band;
A frequency domain position of the PRB of initial subband of the son with subclass in the set of-target sub-band;
The width of the frequency band in the set of-target sub-band shared by subband;
Embodiment 6 (c)
Embodiment 6 (c) shows the schematic diagram of a target sub-band set of the invention.Wherein The subband for constituting the target sub-band set is discrete on frequency domain.
Used as a sub- embodiment of the embodiment, the target sub-band set includes E subband, and In the E subband, the frequency domain interval of each two intersubband is G kHz.
Used as an accompanying Examples of the sub- embodiment, the frequency bandwidth shared by the subband is G1 KHz, and G is the integral multiple of G1.
Embodiment 7 (a)
Embodiment 7 (a) shows the signal of the mode that the modulation symbol of upward signal is mapped in subband Figure.The grid of oblique line mark is the resource units for transmitting uplink reference signal.
Wherein, the sub-carrier number that the subband takes is equal to 12.The upward signal generates M modulation Symbol.Used as a sub- embodiment, the M is equal to 12.As one embodiment, in Fig. 7 (a) Mapping mode (I) shows that a kind of modulation symbol of upward signal is mapped to the mapping mode in subband.It is described Mapping mode is that the corresponding modulation symbol sequence of upward signal is sequentially mapped to { 0,1 ..., M-1 } in order On the resource units for being identified, i.e., according to the mode of { time domain first, frequency domain second }, in a subband In since minimum subcarrier resource units mapping.
Used as another embodiment, the mapping mode (II) in Fig. 7 (a) shows a kind of tune of upward signal Symbol processed is mapped to another mapping mode in subband.The mapping mode is corresponding upward signal Modulation symbol sequence is sequentially mapped on the resource units that { 0,1 ..., M-1 } is identified in order, i.e., According to the mode of { frequency domain first, time domain second }, provided since minimum subcarrier in a subband Source unit mapping.
Embodiment 7 (b)
Embodiment 7 (b) shows the signal of the mode that the modulation symbol of upward signal is mapped in subband Figure.The grid of oblique line mark is the resource units for transmitting uplink reference signal.
Wherein, the sub-carrier number that the subband takes is equal to 6.The upward signal generates M modulation Symbol.Used as a sub- embodiment, the M is equal to 12.
Used as a sub- embodiment, the mapping mode (I) in Fig. 7 (b) shows a kind of tune of upward signal Symbol processed is mapped to the mapping mode in subband.The mapping mode is the corresponding modulation symbol of upward signal Number sequence is sequentially mapped on the resource units that { 0,1 ..., M-1 } is identified in order, i.e., according to when Domain first, frequency domain second } mode, in a subband pair since minimum subcarrier resource units Mapping.
Used as another sub- embodiment, the mapping mode (II) in Fig. 7 (b) shows a kind of upward signal Modulation symbol is mapped to another mapping mode in subband.The mapping mode is upward signal correspondence Modulation symbol sequence be sequentially mapped in order on the resource units that { 0,1 ..., M-1 } is identified, I.e. according to the mode of { frequency domain first, time domain second }, opened from minimum subcarrier in a subband pair Beginning resource units map.
Embodiment 7 (c)
Embodiment 7 (c) shows the signal of the mode that the modulation symbol of upward signal is mapped in subband Figure.The grid of oblique line mark is the resource units for transmitting uplink reference signal.
Wherein, the intersubband that is mapped in is discrete.The upward signal generates M modulation symbol.
Used as a sub- embodiment, the M is equal to 12.
Used as a sub- embodiment, it is that a subband occupies 6 son loads on frequency domain that scene 1 is corresponding The mapping mode of ripple.And the mapping mode be the corresponding modulation symbol sequence of upward signal in order according to It is secondary to be mapped on the resource units that { 0,1 ..., M-1 } is identified, i.e., according to { time domain first, subband Second } mode, M modulation symbol is mapped on the D1 continuous subband of sequence number.
Used as an accompanying Examples of the sub- embodiment, the subband is up for transmitting comprising K1 The wideband symbol of signal, and D1 is equal to business of the M divided by K1.
Specifically, used as the subordinate embodiment of the accompanying Examples, the D1 is equal to 4, and the K1 Equal to 3.
Used as an accompanying Examples of the sub- embodiment, the continuous subband of D1 sequence number is in frequency domain On be discrete.
Used as a sub- embodiment, it is that a subband occupies 12 son loads on frequency domain that scene 2 is corresponding The mapping mode of ripple.And the mapping mode be the corresponding modulation symbol sequence of upward signal in order according to It is secondary to be mapped on the resource units that { 0,1 ..., M-1 } is identified, i.e., according to { time domain first, subband Second } mode, M modulation symbol is mapped on the D2 continuous subband of sequence number.
Used as an accompanying Examples of the sub- embodiment, the subband is up for transmitting comprising K2 The wideband symbol of signal, and D2 is equal to business of the M divided by K1.
Specifically, used as the subordinate embodiment of the accompanying Examples, the D2 is equal to 4, and the K2 Equal to 3.
Used as an accompanying Examples of the sub- embodiment, the continuous subband of D2 sequence number is in frequency domain On be discrete.
Embodiment 8
Embodiment 8 shows the schematic diagram of sTTI-PUCCH resources and the mapping mode of target sub-band set. The grid of oblique line mark is the resource units for transmitting uplink reference signal.
Used as a sub- embodiment, as shown in the left figure of Fig. 8, uplink control signal is on running time-frequency resource It is orthogonal.The subband #i and subband # (i+1) constitutes a target sub-band set, for transmitting correspondence HARQ-ACK information in gap in short-term.The English lower case a represents a sTTI-PUCCH Resource, and resource units shared by the sTTI-PUCCH are used to transmit a HARQ-ACK letter Breath;By that analogy, the English lower case f represents a sTTI-PUCCH resource, and institute Stating the resource units shared by sTTI-PUCCH is used to transmit a HARQ-ACK information.Figure acceptance of the bid The money that uplink reference signals referenced by the resource units correspondence sTTI-PUCCH resources #x of " x " take Source unit.X is the integer less than or equal to 5 more than or equal to 0.
The target sub-band collection of 2 subband compositions is amounted to comprising 6 sTTI-PUCCH resources in figure, Most 6 HARQ-ACK information, and each corresponding Resource Unit of HARQ-ACK information can be carried It is orthogonal on time-frequency domain.
Specifically, as a sub- embodiment, one in short-term gap be used for uplink signal transmissions comprising S Wideband symbol, and HARQ-ACK packet contains M modulation symbol, and a target sub-band collection Close and include E subband, and the subband includes continuous F subcarrier, can in the sets of subbands Comprising sTTI-PUCCH resource number be equal to R.R is positive integer, and equal to (S*E*F/M). Wherein, S, E, F and M are positive integer.
Specifically, as illustrated, as an accompanying Examples, the R sTTI-PUCCH Resource is ranked up according to the order of { frequency domain first, subband second }.
Specifically, as an accompanying Examples, the corresponding HARQ-ACK of downlink data of user The index of the modulation symbol shared by information is used by the transmission HARQ-ACK information The sequence number of sTTI-PUCCH resources.The sequence number of the sTTI-PUCCH resources and the downlink data Initial frequency domain position it is relevant.Specifically, the sequence number and n_sTTI_PUCCH of sTTI-PUCCH resources Linear, the n_sTTI_PUCCH is equal to the sequence number mould R of the initial PRB of downlink data Remainder.
Used as a sub- embodiment, as shown in the right figure of Fig. 8, uplink control signal is on running time-frequency resource Multiplexing.The subband #j and subband # (j+1) constitutes a target sub-band set, for transmitting correspondence HARQ-ACK information in gap in short-term.The English lower case a represent one for transmit 4 The sTTI-PUCCH resource groups of individual user HARQ-ACK information, the sTTI-PUCCH resources group Each interior sTTI-PUCCH resource is multiplexed by orthogonal coding.By that analogy, the English is small Female f that writes represent one for transmit 4 sTTI-PUCCH resources of user's HARQ-ACK information Group, each sTTI-PUCCH resource in the sTTI-PUCCH resources group is multiple by orthogonal coding With.Up ginseng referenced by the resource units correspondence sTTI-PUCCH resource groups #y of figure acceptance of the bid " y " Examine the resource units of signal occupancy.Y is the integer less than or equal to 5 more than or equal to 0.
The target sub-band collection of 2 subband compositions is amounted to comprising 6 sTTI-PUCCH resource groups in figure, Each sTTI-PUCCH resources group includes 4 sTTI-PUCCH resources, the target sub-band set Most 24 sTTI-PUCCH resources, 24 HARQ-ACK information of correspondence can be carried.
Specifically, as a sub- embodiment, it is reusable in the sTTI-PUCCH resources group STTI-PUCCH resource numbers, the wideband symbol number included with the gap in short-term, and subband institute The number of the corresponding continuous subcarrier of frequency band of occupancy is relevant.It is described as a sub- embodiment Reusable sTTI-PUCCH resources number is configured by high-level signaling in sTTI-PUCCH resource groups.
Specifically, as a sub- embodiment, one in short-term gap be used for uplink signal transmissions comprising S Wideband symbol, and HARQ-ACK packet contains M modulation symbol, and a target sub-band collection Close and include E subband, and the subband includes continuous F subcarrier, and the sTTI-PUCCH C sTTI-PUCCH resource of resource group most reusables, what can be included in the sets of subbands is maximum The number of sTTI-PUCCH resources is equal to R.R is positive integer, and equal to (C*S*E*F/M).Wherein, S, E, F, M and C are positive integer.
Specifically, as illustrated, as an accompanying Examples, the R sTTI-PUCCH Resource is ranked up according to the order of { orthogonal code first, frequency domain second, subband the 3rd }.
Specifically, as an accompanying Examples, the corresponding HARQ-ACK of downlink data of user The index of the modulation symbol shared by information is that the HARQ-ACK modulation symbols are corresponding The sequence number of sTTI-PUCCH resources.The sequence number of the sTTI-PUCCH resources and the downlink data Initial frequency domain position it is relevant.Specifically, the sequence number and n_sTTI_PUCCH of sTTI-PUCCH resources Linear, the n_sTTI_PUCCH is equal to the sequence number mould R of the initial PRB of downlink data Remainder.
Embodiment 9
Embodiment 9 shown inside a sTTI-PUCCH resource, the corresponding modulation of uplink control signal The schematic diagram of symbol and resource units mapping mode.The grid of oblique line mark is for transmitting up reference Resource units occupied by signal, the uplink reference signals be used for sTTI-PUCCH resources #i and The channel estimation of sTTI-PUCCH resource groups #j and demodulation.
Used as a sub- embodiment, the sub- embodiment 1 shows uplink control signal in running time-frequency resource Upper orthogonal mapping mode.I.e. in the Resource Unit shared by a sTTI-PUCCH resource, The corresponding modulation symbol sequence of HARQ-ACK information is sequentially mapped to { 0,1 ..., 12 } and is marked in order On the resource units of knowledge, i.e., according to the mode of { time domain first, frequency domain second }, from minimum subcarrier Start resource units mapping.
Used as a sub- embodiment, the sub- embodiment 2 shows uplink control signal in running time-frequency resource The mapping mode of upper multiplexing.I.e. in the Resource Unit shared by a sTTI-PUCCH resource, The corresponding modulation symbol sequences of HARQ-ACK are sequentially mapped to { 0,1 ..., 12 } and are identified in order Resource units on, i.e., according to the mode of { time domain first, frequency domain second }, from minimum subcarrier Start resource units mapping.Multiple sTTI-PUCCH resources are in a sTTI-PUCCH resource group pair Code division multiplexing on the resource units answered.
Embodiment 10
Embodiment 10 shows a upstream control signaling of the invention in sTTI-PUSCH The mode of the resource impact of transmission.As illustrated, mapping mode (I) to mapping mode (IV) is four The system of kind can be used, and interchangeable sub- embodiment.
Wherein, mapping mode (I) is used as a sub- embodiment, one short slot reference of correspondence it is upper Before wideband symbol occupied by row reference signal is located at gap in short-term.
Mapping mode (II) is used as a sub- embodiment, one up ginseng of short slot reference of correspondence The wideband symbol occupied by signal is examined to be located at after gap in short-term.
Mapping mode (III) is used as a sub- embodiment, one up ginseng of short slot reference of correspondence The wideband symbol occupied by signal is examined to be located among gap in short-term.
Mapping mode (IV) is used as a sub- embodiment, one up ginseng of short slot reference of correspondence Examine signal and occupy 2 wideband symbols, and described two wideband symbols positioned at the anterior with after of gap in short-term Portion.
As shown in Figure 10, the upstream control signaling includes HARQ-ACK information and CSI.It is described HARQ-ACK packets contain M modulation symbol.The CSI includes Q modulation symbol.Wherein M and Q is positive integer.Used as a sub- embodiment, the M is equal to 12.As a sub- embodiment, The Q is equal to 12.The HARQ-ACK information and the corresponding modulation symbol sequences of CSI are in order It is sequentially mapped on the resource units that { 0,1 ..., 12 } are identified, since minimum subcarrier The mapping of resource units.
Embodiment 11
Embodiment 11 shows the structure of the processing unit in UE according to an embodiment of the invention Block diagram;As shown in Figure 11.In accompanying drawing 11, UE processing units 200 are main by the first module 201 Constituted with the second module 202.
- the first module 201:The first signaling and downlink data are received, first signaling indicates target Sets of subbands.The target sub-band set includes positive integer subband.
- the second module 202:Send upward signal and uplink reference signals.The upward signal takes The part wideband symbol of the first gap in short-term.The uplink reference signals are distributed in the first P in short-term in gap On individual wideband symbol, P is positive integer.The upward signal is included for the downlink data HARQ-ACK information.
Wherein, first in short-term gap duration be less than 1 millisecond, first in short-term gap be located in time domain In first LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term includes positive integer Individual wideband symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in LTE Position in frame is relevant.
- second condition:If first in short-term gap be last gap in short-term in N number of gap in short-term And first last wideband symbol that gap includes in a LTE subframes in short-term, first in short-term in gap Wideband symbol number is not less than K;If first in short-term gap be short last in N number of gap in short-term Time slot and first last wideband symbol for not including in gap in short-term in a LTE subframes, first is short Wideband symbol number in time slot is not less than K-1.The K is that first is removed in N number of gap in short-term is short The minimum value of the wideband symbol number in the individual gaps in short-term of the N-1 of time slot.
- third condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, And the first last wideband symbols of LTE subframes be reserved for SRS, gap is compared in short-term with target, First last wideband symbol for having lacked a LTE subframes in gap in short-term.Target gap in short-term It is last gap in short-term in the 2nd LTE subframes.Wherein described second LTE subframes do not include reserved To the wideband symbol of SRS.
- fourth condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, Outside last wideband symbol of reference signal in the upward signal in a LTE subframes Transmitted on wideband symbol.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Frequency domain resource shared by the upward signal belongs to target sub-band set.As one embodiment, The wideband symbol is SC-FDMA (Single Carrier-Frequency Division Multiple Access, single-carrier frequency division multiple access) symbol.And between the subcarrier of the wideband symbol Every being 15kHz.
As one embodiment, first in short-term gap meet { second condition, third condition }.
As one embodiment, first in short-term gap to be only used for low latency comprising wideband symbol wireless The transmission of communication system upward signal.
As one embodiment, the first broadband symbol for uplink signal transmissions that gap is included in short-term Number is not less than the second wideband symbol number for uplink signal transmissions that gap is included in short-term.It is described Second in short-term gap be that LTE subframes remove the N-1 of the first gap in short-term in short-term in gap, comprising minimum use In the gap in short-term of the wideband symbol number of uplink signal transmissions.
Used as one embodiment, the LTE subframes support various different gap configuration modes in short-term, The different gap configuration mode in short-term, including at least one of difference:
The short number of time slots that-LTE subframes are included
The wideband symbol number for including of-each gap in short-term
Wideband symbol number and position that-uplink reference signals take
And various different configuration modes of gap in short-term are predefined, using which kind of gap configuration mode in short-term By high-level signaling and reading LTE Cell-specific (cell is distinctive) signaling SoundingRS-UL-ConfigCommon is obtained jointly.Wherein, signaling SoundingRS-UL-ConfigCommon is obtained by high-level signaling.
Embodiment 12
Embodiment 12 shows the knot of the processing unit in base station according to an embodiment of the invention Structure block diagram;As shown in Figure 12.In accompanying drawing 12, base station processing unit 300 is main by the first module 301 and second module 302 constitute.
- the first module 301:The first signaling and downlink data are sent, first signaling indicates target Sets of subbands.The target sub-band set includes positive integer subband.
- the second module 302:Receive upward signal and uplink reference signals.The upward signal takes The part wideband symbol of the first gap in short-term.The upward signal is included for the downlink data HARQ-ACK information, the uplink reference signals are distributed on the first P wideband symbol in short-term in gap, P is positive integer.
Wherein, first in short-term gap duration be less than 1 millisecond, first in short-term gap be located in time domain In first LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term includes positive integer Individual wideband symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in LTE Position in frame is relevant
- second condition:If first in short-term gap be last gap in short-term in N number of gap in short-term And first last wideband symbol that gap includes in a LTE subframes in short-term, first in short-term in gap Wideband symbol number is not less than K;If first in short-term gap be short last in N number of gap in short-term Time slot and first last wideband symbol for not including in gap in short-term in a LTE subframes, first is short Wideband symbol number in time slot is not less than K-1.The K is that first is removed in N number of gap in short-term is short The minimum value of the wideband symbol number in the individual gaps in short-term of the N-1 of time slot.
- third condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, And the first last wideband symbols of LTE subframes be reserved for SRS, gap is compared in short-term with target, First last wideband symbol for having lacked a LTE subframes in gap in short-term.Target gap in short-term It is last gap in short-term in the 2nd LTE subframes.Wherein described second LTE subframes do not include reserved To the wideband symbol of SRS.
- fourth condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, Outside last wideband symbol of reference signal in the upward signal in a LTE subframes Transmitted on wideband symbol.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Frequency domain resource shared by the upward signal belongs to target sub-band set.As one embodiment, The wideband symbol is SC-FDMA (Single Carrier-Frequency Division Multiple Access, single-carrier frequency division multiple access) symbol.And between the subcarrier of the wideband symbol Every being 15kHz.
As one embodiment, first in short-term gap meet { second condition, third condition }.
As one embodiment, first in short-term gap to be only used for low latency comprising wideband symbol wireless The transmission of communication system upward signal.
As one embodiment, the first broadband symbol for uplink signal transmissions that gap is included in short-term Number is not less than the second wideband symbol number for uplink signal transmissions that gap is included in short-term.It is described Second during gap is the N number of gap in short-term of LTE subframes in short-term, comprising the minimum width for being used for uplink signal transmissions The gap in short-term of signed number.
Used as one embodiment, the LTE subframes support various different gap configuration modes in short-term, The different gap configuration mode in short-term, including at least one of difference:
The short number of time slots that-LTE subframes are included
The wideband symbol number for including of-each gap in short-term
Wideband symbol number and position that-uplink reference signals take
And various different configuration modes of gap in short-term are predefined, using which kind of gap configuration mode in short-term By high-level signaling and reading LTE Cell-specific (cell is distinctive) signaling SoundingRS-UL-ConfigCommon is obtained jointly.Wherein, signaling SoundingRS-UL-ConfigCommon is obtained by high-level signaling.
One of ordinary skill in the art will appreciate that all or part of step in the above method can be with Related hardware is instructed to complete by program, described program can be stored in computer-readable storage medium In matter, such as read-only storage, hard disk or CD etc..Optionally, the whole of above-described embodiment or Part steps can also be realized using one or more integrated circuit.Accordingly, above-mentioned implementation Each modular unit in example, can be realized, it is also possible to by software function module using example, in hardware Form realizes that the application is not limited to the combination of the software and hardware of any particular form.In the present invention UE include but is not limited to mobile phone, panel computer, notebook, card of surfing Internet, vehicular communication equipment Deng Wireless Telecom Equipment.Base station in the present invention includes but is not limited to macrocell base stations, microcellulor base Stand, Home eNodeB, the Wireless Telecom Equipment such as relay base station.
The above, only presently preferred embodiments of the present invention is not intended to limit of the invention Protection domain.All any modifications within the spirit and principles in the present invention, made, equivalent, Improve etc., should be included within the scope of the present invention.

Claims (14)

1. a kind of method in UE for supporting low latency radio communication, wherein, comprise the following steps:
- step A. sends upward signal.The upward signal takes some or all of width of the first gap in short-term Tape symbol.
Wherein, the duration of the first gap in short-term be less than 1 millisecond, first in short-term gap the is located in time domain In one LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term includes that positive integer is wide Tape symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE subframes In position it is relevant.
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term gap and First last wideband symbol that gap includes in a LTE subframes in short-term, the first broadband in short-term in gap Symbolic number is not less than K;If first in short-term gap be in N number of gap in short-term last in short-term gap and First does not include last wideband symbol in a LTE subframes in gap in short-term, and first in short-term in gap Wideband symbol number is not less than K-1.The K is the N-1 that the first gap in short-term is removed in N number of gap in short-term The minimum value of the wideband symbol number in individual gap in short-term.
- third condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, And the first last wideband symbols of LTE subframes be reserved for SRS, gap is compared in short-term with target, One last wideband symbol for having lacked a LTE subframes in gap in short-term.Gap is to the target in short-term Last gap in short-term in two LTE subframes.Wherein described second LTE subframes do not include keeping for SRS Wideband symbol.
- fourth condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, Width outside last wideband symbol of reference signal in the upward signal in a LTE subframes Transmitted on tape symbol.
The upward signal includes at least one of { upstream data, upstream control signaling }.
2. method according to claim 1, it is characterised in that the step A is also comprised the following steps:
- step A0. receives the first signaling, and first signaling indicates target sub-band set.Target Band set includes positive integer subband.
- step A1. receives downlink data.The upward signal is included for the downlink data HARQ-ACK information.
Wherein, the frequency domain resource shared by the upward signal belongs to target sub-band set.
3. method according to claim 2, it is characterised in that the HARQ-ACK information takes M Individual resource units.The M is the positive integer unrelated with wideband symbol number in first in short-term gap.
4. method according to claim 2, it is characterised in that the upward signal also includes CSI. The CSI includes at least one of { CQI, PMI, RI, PTI, CRI }.The CSI takes Q money Source unit.The Q is the positive integer unrelated with wideband symbol number in first in short-term gap.
5. the method according to claim 1-4, it is characterised in that the step A is also comprising following step Suddenly:
- step B. sends uplink reference signals, and the uplink reference signals are distributed in the first P in short-term in gap On individual wideband symbol, P is positive integer.
6. method according to claim 5, it is characterised in that the frequency that the uplink reference signals take The frequency band that band takes on frequency domain with the upward signal is identical.
7. a kind of method in base station for supporting low latency radio communication, wherein, comprise the following steps:
- step A. receives upward signal.The upward signal takes some or all of width of the first gap in short-term Tape symbol.
Wherein, the duration of the first gap in short-term be less than 1 millisecond, first in short-term gap the is located in time domain In one LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term includes that positive integer is wide Tape symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE subframes In position it is relevant
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term gap and First last wideband symbol that gap includes in a LTE subframes in short-term, the first broadband in short-term in gap Symbolic number is not less than K;If first in short-term gap be in N number of gap in short-term last in short-term gap and First does not include last wideband symbol in a LTE subframes in gap in short-term, and first in short-term in gap Wideband symbol number is not less than K-1.The K is the N-1 that the first gap in short-term is removed in N number of gap in short-term The minimum value of the wideband symbol number in individual gap in short-term.
- third condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, And the first last wideband symbols of LTE subframes be reserved for SRS, gap is compared in short-term with target, One last wideband symbol for having lacked a LTE subframes in gap in short-term.Gap is to the target in short-term Last gap in short-term in two LTE subframes.Wherein described second LTE subframes do not include keeping for SRS Wideband symbol.
- fourth condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, Width outside last wideband symbol of reference signal in the upward signal in a LTE subframes Transmitted on tape symbol.
The upward signal includes at least one of { upstream data, upstream control signaling }.
8. method according to claim 7, it is characterised in that the step A is also comprised the following steps:
- step A0. sends the first signaling, and first signaling indicates target sub-band set.Target Band set includes positive integer subband.
- step A1. sends downlink data.The upward signal is included for the downlink data HARQ-ACK information.
Wherein, the frequency domain resource shared by the upward signal belongs to target sub-band set.
9. method according to claim 8, it is characterised in that the HARQ-ACK information takes M Individual resource units.The M is the positive integer unrelated with wideband symbol number in first in short-term gap.
10. method according to claim 8, it is characterised in that the upward signal also includes CSI. The CSI includes at least one of { CQI, PMI, RI, PTI, CRI }.The CSI takes Q money Source unit.The Q is the positive integer unrelated with wideband symbol number in first in short-term gap.
11. method according to claim 7-10, it is characterised in that the step A is also comprising as follows Step:
- step B. receives uplink reference signals, and the uplink reference signals are distributed in the first P in short-term in gap On individual wideband symbol, P is positive integer.
12. methods according to claim 11, it is characterised in that what the uplink reference signals took The frequency band that frequency band takes on frequency domain with the upward signal is identical.
13. a kind of UE equipment for supporting narrow band communication, it is characterised in that the equipment includes:
- the first module:The first signaling and downlink data are received, first signaling indicates target sub-band set. The target sub-band set includes positive integer subband.
- the second module:Send upward signal and uplink reference signals.The upward signal takes first in short-term The part wideband symbol of gap.The uplink reference signals are distributed on the first P wideband symbol in short-term in gap, P is positive integer.The upward signal includes the HARQ-ACK information for the downlink data.
Wherein, the duration of the first gap in short-term be less than 1 millisecond, first in short-term gap the is located in time domain In one LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term includes that positive integer is wide Tape symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE subframes In position it is relevant.
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term gap and First last wideband symbol that gap includes in a LTE subframes in short-term, the first broadband in short-term in gap Symbolic number is not less than K;If first in short-term gap be in N number of gap in short-term last in short-term gap and First does not include last wideband symbol in a LTE subframes in gap in short-term, and first in short-term in gap Wideband symbol number is not less than K-1.The K is the N-1 that the first gap in short-term is removed in N number of gap in short-term The minimum value of the wideband symbol number in individual gap in short-term.
- third condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, And the first last wideband symbols of LTE subframes be reserved for SRS, gap is compared in short-term with target, One last wideband symbol for having lacked a LTE subframes in gap in short-term.Gap is to the target in short-term Last gap in short-term in two LTE subframes.Wherein described second LTE subframes do not include keeping for SRS Wideband symbol.
- fourth condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, Width outside last wideband symbol of reference signal in the upward signal in a LTE subframes Transmitted on tape symbol.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Frequency domain resource shared by the upward signal belongs to target sub-band set.
14. a kind of base station equipments for supporting narrow band communication, it is characterised in that the equipment includes:
- the first module:The first signaling and downlink data are sent, first signaling indicates target sub-band set. The target sub-band set includes positive integer subband.
- the second module:Receive upward signal and uplink reference signals.The upward signal takes first in short-term The part wideband symbol of gap.The upward signal includes the HARQ-ACK information for the downlink data, The uplink reference signals are distributed on the first P wideband symbol in short-term in gap, and P is positive integer.
Wherein, the duration of the first gap in short-term be less than 1 millisecond, first in short-term gap the is located in time domain In one LTE subframes, a LTE subframes include N number of gap in short-term.The gap in short-term includes that positive integer is wide Tape symbol.First in short-term gap meet in following condition one or more:
- first condition:First wideband symbol number in short-term in gap and first in short-term gap in a LTE subframes In position it is relevant
- second condition:If first in short-term gap be in N number of gap in short-term last in short-term gap and First last wideband symbol that gap includes in a LTE subframes in short-term, the first broadband in short-term in gap Symbolic number is not less than K;If first in short-term gap be in N number of gap in short-term last in short-term gap and First does not include last wideband symbol in a LTE subframes in gap in short-term, and first in short-term in gap Wideband symbol number is not less than K-1.The K is the N-1 that the first gap in short-term is removed in N number of gap in short-term The minimum value of the wideband symbol number in individual gap in short-term.
- third condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, And the first last wideband symbols of LTE subframes be reserved for SRS, gap is compared in short-term with target, One last wideband symbol for having lacked a LTE subframes in gap in short-term.Gap is to the target in short-term Last gap in short-term in two LTE subframes.Wherein described second LTE subframes do not include keeping for SRS Wideband symbol.
- fourth condition:If first in short-term gap be last gap in short-term in N number of gap in short-term, Width outside last wideband symbol of reference signal in the upward signal in a LTE subframes Transmitted on tape symbol.
The upward signal includes at least one of { upstream data, upstream control signaling }.
Frequency domain resource shared by the upward signal belongs to target sub-band set.
CN201510831297.0A 2015-11-25 2015-11-25 A kind of wireless communications method and device reducing network delay Active CN106788926B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510831297.0A CN106788926B (en) 2015-11-25 2015-11-25 A kind of wireless communications method and device reducing network delay
CN201910734251.5A CN110557237B (en) 2015-11-25 2015-11-25 Wireless communication method and device for reducing network delay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510831297.0A CN106788926B (en) 2015-11-25 2015-11-25 A kind of wireless communications method and device reducing network delay

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201910734251.5A Division CN110557237B (en) 2015-11-25 2015-11-25 Wireless communication method and device for reducing network delay

Publications (2)

Publication Number Publication Date
CN106788926A true CN106788926A (en) 2017-05-31
CN106788926B CN106788926B (en) 2019-09-06

Family

ID=58964775

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510831297.0A Active CN106788926B (en) 2015-11-25 2015-11-25 A kind of wireless communications method and device reducing network delay
CN201910734251.5A Active CN110557237B (en) 2015-11-25 2015-11-25 Wireless communication method and device for reducing network delay

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201910734251.5A Active CN110557237B (en) 2015-11-25 2015-11-25 Wireless communication method and device for reducing network delay

Country Status (1)

Country Link
CN (2) CN106788926B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019011168A1 (en) * 2017-07-10 2019-01-17 索尼公司 Electronic device and wireless communication method
WO2019024711A1 (en) * 2017-08-03 2019-02-07 维沃移动通信有限公司 Method for transmitting demodulation reference signal, network device, and computer readable storage medium
CN109428699A (en) * 2017-08-28 2019-03-05 上海朗帛通信技术有限公司 A kind of method and apparatus in the user equipment for being used for narrow band communication, base station
CN109586868A (en) * 2017-09-29 2019-04-05 中国移动通信有限公司研究院 Information transferring method, device, sending device and computer readable storage medium
CN110710148A (en) * 2017-06-09 2020-01-17 高通股份有限公司 Frequency division duplex hybrid automatic repeat request with mini-slots
CN110999184A (en) * 2017-08-10 2020-04-10 高通股份有限公司 Dynamic scheduling of data patterns for shortened transmission time intervals
CN111835478A (en) * 2019-04-23 2020-10-27 大唐移动通信设备有限公司 PUCCH resource allocation method and device
CN111865518A (en) * 2019-04-26 2020-10-30 普天信息技术有限公司 Downlink transmission method and device of 5G unlicensed spectrum
CN111917524A (en) * 2019-05-10 2020-11-10 华为技术有限公司 Method and device for sending and receiving HARQ-ACK message
CN112511272A (en) * 2020-11-18 2021-03-16 中国联合网络通信集团有限公司 Communication method and device
WO2021114173A1 (en) * 2019-12-12 2021-06-17 华为技术有限公司 Wireless communication method and apparatus
WO2022017127A1 (en) * 2020-07-20 2022-01-27 上海朗帛通信技术有限公司 Method and apparatus used in user equipment and base station for wireless communication

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102946295A (en) * 2012-10-23 2013-02-27 福建先创通信有限公司 Frame structure capable of being matched with different carrier bandwidth and application thereof

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI336572B (en) * 2007-01-05 2011-01-21 Univ Nat Chiao Tung A joint channel estimation and data detection method for stbc/ofdm systems
CN100589369C (en) * 2007-02-13 2010-02-10 中国科学院上海微系统与信息技术研究所 Method for multi-user transmission in ultra-short wave OFDM mobile multimedia sensor network TDMA
JP4465374B2 (en) * 2007-08-14 2010-05-19 株式会社エヌ・ティ・ティ・ドコモ Wireless communication system, base station apparatus, and transmission method
CN101222273A (en) * 2008-01-29 2008-07-16 中兴通讯股份有限公司 Signal transmission method of physical control format indication channel in descending pilot frequency time slot
CN100576285C (en) * 2008-09-02 2009-12-30 南京厚华通信设备有限责任公司 Large-scale short wave communication network ship monitor location and emergent alarm Apparatus for () and method therefor
WO2010151196A1 (en) * 2009-06-26 2010-12-29 Telefonaktiebolaget L M Ericsson (Publ) Method and arrangement in a wireless communications network for adaptation of power control setting
CN102685915B (en) * 2012-05-02 2014-12-17 北京交通大学 Self-adaptive dispatching method of uplink signal channel detection pilot frequency
CN102984112B (en) * 2012-11-30 2015-04-15 南通大学 Synchronizing method of high-speed mobile OFDM (orthogonal frequency division multiplexing) system
CN104079390A (en) * 2013-03-25 2014-10-01 北京三星通信技术研究有限公司 Method and equipment for transmitting HARQ-ACK (Hybrid Automatic Repeat-Request Acknowledgement) feedback information in inter-eNB carrier aggregation system
CN104767594A (en) * 2014-01-03 2015-07-08 北京三星通信技术研究有限公司 Method and equipment for performing uplink transmission in LTE (Long Term Evolution) system
CN104378319A (en) * 2014-11-21 2015-02-25 河海大学 Channel estimation method based on short wave channel MIMO-OFDM communication system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102946295A (en) * 2012-10-23 2013-02-27 福建先创通信有限公司 Frame structure capable of being matched with different carrier bandwidth and application thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ERICSSON: "Study of shorter TTI for latency reduction", 《3GPP 3GPP TSG-RAN WG2 #91 R2-153493》 *
ERICSSON: "Study of shorter TTI for latency reduction", 《3GPP TSG-RAN WG2 #91BIS R2-154740 》 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110710148A (en) * 2017-06-09 2020-01-17 高通股份有限公司 Frequency division duplex hybrid automatic repeat request with mini-slots
CN110710148B (en) * 2017-06-09 2022-05-24 高通股份有限公司 Frequency division duplex hybrid automatic repeat request with mini-slots
WO2019011168A1 (en) * 2017-07-10 2019-01-17 索尼公司 Electronic device and wireless communication method
US11096192B2 (en) 2017-07-10 2021-08-17 Sony Corporation Electronic device and wireless communication method for proximity based communications via a sidelink
WO2019024711A1 (en) * 2017-08-03 2019-02-07 维沃移动通信有限公司 Method for transmitting demodulation reference signal, network device, and computer readable storage medium
CN109391387A (en) * 2017-08-03 2019-02-26 维沃移动通信有限公司 Demodulated reference signal transmissions method, the network equipment and computer readable storage medium
US11476991B2 (en) 2017-08-03 2022-10-18 Vivo Mobile Communication Co., Ltd. Demodulation reference signal transmission method, network device and computer-readable storage medium
CN109391387B (en) * 2017-08-03 2022-05-17 维沃移动通信有限公司 Demodulation reference signal transmission method, network device, and computer-readable storage medium
CN110999184B (en) * 2017-08-10 2022-08-19 高通股份有限公司 Dynamic scheduling of data patterns for shortened transmission time intervals
CN110999184A (en) * 2017-08-10 2020-04-10 高通股份有限公司 Dynamic scheduling of data patterns for shortened transmission time intervals
CN109428699B (en) * 2017-08-28 2021-03-09 上海朗帛通信技术有限公司 Method and device in user equipment and base station used for narrow-band communication
CN109428699A (en) * 2017-08-28 2019-03-05 上海朗帛通信技术有限公司 A kind of method and apparatus in the user equipment for being used for narrow band communication, base station
CN109586868B (en) * 2017-09-29 2021-09-14 中国移动通信有限公司研究院 Information transmission method, device, sending equipment and computer readable storage medium
CN109586868A (en) * 2017-09-29 2019-04-05 中国移动通信有限公司研究院 Information transferring method, device, sending device and computer readable storage medium
CN111835478B (en) * 2019-04-23 2021-07-23 大唐移动通信设备有限公司 PUCCH resource allocation method and device
CN111835478A (en) * 2019-04-23 2020-10-27 大唐移动通信设备有限公司 PUCCH resource allocation method and device
CN111865518A (en) * 2019-04-26 2020-10-30 普天信息技术有限公司 Downlink transmission method and device of 5G unlicensed spectrum
CN111917524A (en) * 2019-05-10 2020-11-10 华为技术有限公司 Method and device for sending and receiving HARQ-ACK message
CN111917524B (en) * 2019-05-10 2021-11-09 华为技术有限公司 Method and device for sending and receiving HARQ-ACK message
WO2021114173A1 (en) * 2019-12-12 2021-06-17 华为技术有限公司 Wireless communication method and apparatus
WO2022017127A1 (en) * 2020-07-20 2022-01-27 上海朗帛通信技术有限公司 Method and apparatus used in user equipment and base station for wireless communication
CN112511272A (en) * 2020-11-18 2021-03-16 中国联合网络通信集团有限公司 Communication method and device
CN112511272B (en) * 2020-11-18 2022-08-02 中国联合网络通信集团有限公司 Communication method and device

Also Published As

Publication number Publication date
CN106788926B (en) 2019-09-06
CN110557237B (en) 2021-10-29
CN110557237A (en) 2019-12-10

Similar Documents

Publication Publication Date Title
CN106788926B (en) A kind of wireless communications method and device reducing network delay
CN109743081B (en) Reference signal transmission method and device
CN111555999B (en) Communication device and method for OFDM with flexible subcarrier spacing and symbol duration
CN107483166B (en) A kind of method and apparatus in wireless communication
RU2447600C2 (en) Method and device for control channel resources allocation in mobile communication system using orthogonal frequency division multiplexing
EP2720392B1 (en) Method for transmitting and receiving control information of a mobile communication system
CN109565489B (en) Method and transmitter for transmitting data with symbol and subframe alignment in a wireless communication system
CN104641583B (en) Base station apparatus, mobile station apparatus, communication means and integrated circuit
KR20180121406A (en) Method for transmitting and receiving downlink channel and reference signal in communication system
EP2649851B1 (en) Resource allocation in a wireless communication system
CN107819714B (en) Method and equipment in UE (user equipment) supporting variable subcarrier spacing and base station
CN106411486B (en) Method and device for sending and receiving uplink demodulation pilot frequency
CN107801247B (en) Method and equipment in UE (user equipment) supporting variable subcarrier spacing and base station
CN102263616A (en) Method and device of indicator control channel
CN109997395A (en) The method and system that parameter set for wireless communication system determines
CN108111270A (en) Pilot signal sending, receiving method and device
CN106656446A (en) Reference signal transmitting method and device and receiving method and device
CN104969486A (en) Method and device for transmitting signal
US10237035B2 (en) Operation method of communication node supporting superposition transmission in cellular communication system
CN110636622A (en) Method and device in wireless communication
US20130286966A1 (en) Method of allocating radio resources for control channel and method for receiving the control channel
WO2018121123A1 (en) Method for sending/receiving reference signal, and terminal device and network device
JP2013118586A (en) Base station apparatus, radio communication system, radio communication apparatus, frequency bandwidth allocation method and program
CN106877984A (en) A kind of arrowband be wirelessly transferred in method and apparatus
JP2018207520A (en) Method and device for transmitting data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant