The interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement and
It is used for the method for suspender replacement
Technical field
It is especially a kind of for steel pipe truss concrete arch-type bridge suspender replacement the present invention relates to a kind of bridge construction equipment
Interim pocket device for hoisting and its method replaced for arch bridge suspender.
Background technology
It is hung currently, most of CFST Arch Bridge suspender replacement rope power conversion devices are mainly interim sunpender or interim pocket
Device, part need to take welding manner to fix leveling wedge block or antiskid block on arch, reach the upper leveling of arch convenient for setting crossbeam
Or the purpose of antiskid;When interim sunpender or interim pocket device for hoisting need to be transferred at next suspender replacement, arch upper beam needs large size
Lifting appliance lifting operation;Disadvantage:Engineer operation intensity is big, and site welding quality is difficult to control, is easy to damage raw steel pipe concrete
Arch rib and application, wedge block cannot be used in turn, and dismounting resumes operation, and progress is slow, and large-scale lifting appliance machine-team consumption is big, applies
Work cost is higher;In addition, for the arched bridge pre-stressed boom across existing railway line, existing operation height is high by railway boundary safety under bridge
Degree is affected, and most of interim pocket device for hoisting take steel joist support floor beam mode under beam, construction and installation needed for which
Operation height and space are larger, are easily limited by railway boundary safe altitude, safe distance, implement more difficult.
Application publication number is:102926332 A of CN, entitled " the tool derrick rig of steel arch bridge suspender replacement
And its replacing options " a kind of tool derrick rig of steel arch bridge suspender replacement is disclosed, shortcoming is still need to be every
Place replaces boom location welded limiting device nearby, and site welding quality is difficult to control, to raw steel structure arch rib and is coated with damage,
Limiting device material cannot be used in turn, and replaced sunpender and finished and need to carry out repair place to the position of steel structure surface local welding
It is slow to remove the progress that resumes operation for reason.In addition, steel member support floor beam mode under beam, required construction and installation operation height and sky
Between it is relatively large.
To solve the above problems, the applicant has successively applied for Patent No. 201520814605.4, it is entitled:
" a kind of towed tool derrick rig for steel pipe truss concrete arch-type bridge suspender replacement ", the patent No.
201521046495.8 entitled:" a kind of frictional anchoring suspender replacement device of traction " successively discloses two kinds of " arch bridges
Suspender replacement rope power conversion device " solves above-mentioned technical problem of the existing technology, but all exists and be related to mach structure
Part is more, the higher problem of manufacturing cost, especially vault setting towed vault anchoring anti-slip system construction size compared with
Greatly, less practical in some areas.
For this purpose, the applicant again in application in 2016 " number of patent application 201610664498.0, it is entitled:
《Hood type tool derrick rig for steel pipe truss concrete arch-type bridge suspender replacement》", patent of invention, further solve
The above problem, but in implementation process, the place it has been found that the patent application technology comes with some shortcomings, for example it is related to mach structure
Part is more, and manufacturing cost is also higher, and especially leveling steel case processing installation needs field lofting, blanking, welding, on-site installation work
Intensity is larger.
Invention content
The purpose of the present invention is be directed to the applicant " number of patent application 201610664498.0, it is entitled:《With
In the hood type tool derrick rig of steel pipe truss concrete arch-type bridge suspender replacement》" be further improved, one kind is provided and is used for
The interim pocket device for hoisting of steel wire rope of steel pipe truss concrete arch-type bridge suspender replacement and its method for suspender replacement, this is used for steel
The interim pocket device for hoisting of steel wire rope of tubular truss concrete arch-type bridge suspender replacement is simple in structure, size is smaller, is related to mach structure
Part is less, and scene be not required to welding antiskid embrace, hoop arc-shaped steel case and antiskid block, these components can be used in turn, letter of constructing
Just, work efficiency is high.
The technical solution to solve the above problems is:A kind of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement faces
When pocket device for hoisting, including:Four upper steel wire ropes, anchored end rope clamp I, axis pin I, limiting device I, conversion beam I, conversion beams II, thousand
Jin top, lower prestress fining twisted steel, stretching end anchorage, fixing end anchorage, four attachment devices,FourLower steel wire rope, anchoring
Hold rope clamp II, pin shaft II, limiting device II, protection backing plate;It is characterized in that:The interim pocket device for hoisting of the steel wire rope includes two peaces
Hood type vault on steel pipe truss concrete arch bridge arch anchors anti-slip system, and each hood type vault anchors anti-slip system
By 2 antiskid anchor ears, 2 rubber pads, prestretching screw rod, 2 arc-shaped steel casees and the antiskid block group on arc-shaped steel case
At;
The arc-shaped steel case is arc-shaped steel box structure, and top surface is curved plate, and longitudinal curved plate lower section is 4 rectangle steels
Plate surrounds 3 chambers, if arterial highway lateral stiffening steel plate is arranged in each chamber, arc-shaped steel case surrounding is with antiskid anchor ear with weld seam
It is fixedly connected;
The end face of the antiskid block is shape of a saddle steel plate, and as the antiskid reaction supporting point of upper steel wire rope, side is logical
It crosses three pieces of triangular steel plates and reinforces support, be solder design with arc-shaped steel case;
The antiskid anchor ear is two halves formula steel hoop structure, is connected by prestretching screw rod, pre-tightens prestretching screw rod and realizes antiskid;
The rubber pad is mounted between antiskid anchor ear and tubular arch top surface, increases friction coefficient between the two;
The conversion beam I is steel plate butt welding compound section, wherein symmetrical two sides are bi-lug plate, are provided with and are used on otic placode
The pin hole for installing axis pin I, is convenient for, and upper steel wire rope one end is anchored around axis pin I by anchored end rope clamp I;
The attachment device is steel plate butt welding compound section, and lower end is ears harden structure, is provided with for mounting pin on otic placode
The pin hole of axis II, lower steel wire rope one end are anchored around pin shaft II by anchored end rope clamp II;Attachment device upper end is provided with through-hole, under
Prestressing force fining twisted steel lower end is anchored across the through-hole by fixing end anchorage, and attachment device realizes lower prestress finish rolling screw thread
The connection of steel and lower steel wire rope;
The protection backing plate is mach " ∪ " shape structure, and it is flat to realize that protection floor beam chamfering and lower steel wire rope turn to
Along transition;
Under working condition, upper steel wire rope one end is anchored around the axis pin I of I side of conversion beam by rope clamp I, and the other end bypasses
Antiskid block is worn down on arch, is anchored by rope clamp I further around the axis pin I for crossing I other side of conversion beam;Lower prestress fining twisted steel
Upper end sequentially passes through conversion beam II, jack, is anchored with stretching end anchorage, and lower prestress fining twisted steel lower end passes through connection to fill
It sets and is anchored with fixing end anchorage;Lower steel wire rope one end is anchored around the pin shaft II of attachment device by rope clamp II, and the other end bypasses
Protection backing plate below suspender crossbeam is up worn, and is anchored by rope clamp II further around the pin shaft II for crossing another attachment device;Lower steel
Cord catches suspender crossbeam lower surface around protection backing plate, and rubber pad is arranged between antiskid anchor ear and tubular arch, arc-shaped steel case
With antiskid anchor ear by solder design, antiskid block passes through solder design with arc-shaped steel case.
Relevant another technical solution is:A kind of method of steel pipe arch bridge suspender replacement, it is using the above-mentioned use of the present invention
In the method that the interim pocket device for hoisting of the steel wire rope of steel pipe truss concrete arch-type bridge suspender replacement realizes steel pipe arch bridge suspender replacement,
Replacing options include the following steps:
A, steel wire rope interim pocket device for hoisting of the installation for steel pipe truss concrete arch-type bridge suspender replacement:
A1, it is longitudinally asymmetric on tubular arch one hood type vault be installed respectively in former sunpender anchor anti-slip system, often
A hood type vault anchoring anti-slip system by 2 antiskid anchor ears, 2 rubber pads, prestretching screw rod, 2 arc-shaped steel casees and is located at
Antiskid block composition on arc-shaped steel case;Rubber pad is arranged between antiskid anchor ear and tubular arch, arc-shaped steel case and antiskid anchor ear
By solder design, antiskid block passes through solder design with arc-shaped steel case;
Bar lazy halyard is changed in A2, installation --- upper steel wire rope and lower steel wire rope:
A21, two upper steel wire rope one end are anchored around the axis pin I of I side of conversion beam by rope clamp I, two upper steel wires
The other end of rope is worn down around the upper antiskid block of arch, is anchored by rope clamp I further around the axis pin I for crossing I other side of conversion beam;
A22, lower prestress fining twisted steel upper end is sequentially passed through into conversion beam II, stretch-draw jack, with stretching end anchorage
Anchoring, lower prestress fining twisted steel lower end pass through attachment device to be anchored with fixing end anchorage;
A23, the pin shaft II that four lower steel wire rope one end are bypassed to two attachment devices for being located at suspender crossbeam side respectively
It is anchored by rope clamp II, the other end of four lower steel wire ropes is up worn around the protection backing plate below suspender crossbeam, further around position excessively
It is anchored by rope clamp II in the pin shaft II of two attachment devices of the suspender crossbeam other side;Lower steel wire rope pad protection backing plate is caught
Suspender crossbeam lower surface;Rubber pad is arranged between antiskid anchor ear and tubular arch top surface, and arc-shaped steel case passes through weldering with antiskid anchor ear
Seam connection, antiskid block pass through solder design with arc-shaped steel case;
A3, check that the connection of the interim each component of pocket device for hoisting of steel wire rope of steel pipe truss concrete arch-type bridge suspender replacement is safe
Property and stabilization hold lotus ability:
By driving jack tension lower prestress fining twisted steel slowly to carry out examination tensioning step by step, check that steel wire rope is interim
The connection safety and stabilization of each component of pocket device for hoisting hold lotus ability;
B, it removes former sunpender, complete conversion of the Suo Li systems to the interim pocket device for hoisting of steel wire rope:
When former sunpender is formally removed, former sunpender steel wire, synchronous tensioning lower prestress finish rolling screw thread step by step are cut off step by step
Steel is realized and converts former suspender force to the interim pocket device for hoisting of steel wire rope, completes Suo Li system transforms;Suo Li is converted step by step
The variation control of journey floor elevation after former sunpender cut-out, anchors lower prestress fining twisted steel, removes later within ± 5mm
Former sunpender;
C, new sunpender is installed, complete conversion of the Suo Li systems to new sunpender:
New sunpender is installed to finish, step by step the new sunpender of tensioning, it is synchronous to put a lower prestress fining twisted steel step by step, it realizes steel
The interim pocket device for hoisting Suo Li of cord is converted to new sunpender, completes Suo Li system transforms, and Suo Li transfer processes floor elevation becomes step by step
Change control within ± 5mm, new suspender tension in place after, pass through anchor head nut and anchor new sunpender;
D, hood type anchor is removed, is transferred at next former sunpender;
The interim pocket device for hoisting of steel wire rope is removed, is transferred at next former sunpender;
E, every suspender replacement repeats step A~step D, completes other suspender replacements.
Due to the adoption of the above technical scheme, the hood type work for steel pipe truss concrete arch-type bridge suspender replacement of the present invention
Tool derrick rig and its method for suspender replacement have the advantages that:
1. the device does not change original structure stress system in suspender replacement Suo Li transfer processes, to original structure stress shadow
Sound is smaller:
The present invention for steel pipe truss concrete arch-type bridge suspender replacement the interim pocket device for hoisting of steel wire rope there are one being mounted on
Hood type vault on steel pipe truss concrete arch bridge arch anchors anti-slip system, which anchors anti-slip system by antiskid
Anchor ear, rubber pad, prestretching screw rod, arc-shaped steel case, antiskid block composition;By pre-tightening antiskid anchor ear prestretching screw rod to realize on arch
Anchor antiskid, the antiskid reaction supporting point additionally by antiskid block as upper steel wire rope.
The interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement of the present invention is used for sunpender
When replacement, anti-slip system is anchored using the hood type being arranged on arch, is connect with bridge floor conversion beam I by upper steel wire rope, sunpender is horizontal
Neonychium plate is set under beam, and lower steel wire rope pad protection backing plate catches suspender crossbeam lower surface, connected by lower steel wire rope and bridge floor
Connection device connects, and attachment device is connect with lower prestress fining twisted steel, and lower prestress fining twisted steel sequentially passes through conversion beam
II, jack realizes suspender force conversion by the jack on tensioning bridge floor conversion beam II;The device is in suspender replacement rope
In power transfer process, do not change original structure stress system, smaller to original structure stressing influence, manual work intensity is small, and work efficiency is high,
It is fast that construction peace tears progress open, not damaged to former steel tube arch rib and application, is convenient for standardized construction.
2. simple in structure, construction cost is low:
The interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement of the present invention is used and is mounted on
Hood type vault on steel pipe truss concrete arch bridge arch anchors anti-slip system, and rubber pad is arranged in antiskid anchor ear and steel pipe vault
Between face, for arc-shaped steel case with antiskid anchor ear by solder design, antiskid block passes through solder design, antiskid block with arc-shaped steel case
As the antiskid reaction supporting point of upper steel wire rope, leveling is not needed;
Relative to " a kind of towed tool derrick rig for steel pipe truss concrete arch-type bridge suspender replacement ", " one kind
The frictional anchoring suspender replacement device of traction ", " the hood type tool sunpender for steel pipe truss concrete arch-type bridge suspender replacement fills
Set ", apparatus of the present invention need not be realized on arch jointly by the way that draft gear, adjustable screw, walking mechanism, levelling mechanism is arranged
Antiskid and leveling need not also be realized on arch jointly by the way that hauling rope, horseback riding type friction anchoring device, rotary type suspender is arranged
Antiskid and leveling need not also be replaced at boom location being moved to every time, take the device and vault of welding leveling different angle
Leveling is realized in connection, and structure is simpler, size is smaller, is related to that mach component is less, and manufacturing cost is relatively low, to raw steel pipeline overhead lifting
Rib and application are not damaged, are convenient for standardized construction.
3. steel wire rope pad protection backing plate catches suspender crossbeam mode under beam, horizontal relative to other utility model steel member supports
Beam mode, required construction and installation operation height and space are smaller, are particularly suitable for the arched bridge pre-stressed boom across existing railway line.
Due to the above feature, the present invention is used for the hood type tool derrick rig of steel pipe truss concrete arch-type bridge suspender replacement
And its method for suspender replacement can be suitably used for the former suspender replacement of various arch bridges, and it is applied widely, there is preferably society
Economic benefit.
In the following, in conjunction with the accompanying drawings and embodiments to the hood type for steel pipe truss concrete arch-type bridge suspender replacement of the present invention
Tool derrick rig and its technical characteristic of method for suspender replacement are further described.
Description of the drawings
Fig. 1 is the entirety of the interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement of the present invention
Structure and install and use status diagram;
Fig. 2 is the A direction views of Fig. 1;
Fig. 3 is the B direction views of Fig. 1;
Fig. 4 is the C direction views of Fig. 1;
Fig. 5 is the entirety of the interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement of the present invention
Structural schematic diagram;
Fig. 6 is the D direction views of Fig. 5;
Fig. 7 is the E direction views of Fig. 5;
Fig. 8 is the F direction views of Fig. 5;
Fig. 9 is hood type vault anchoring anti-slip system structural schematic diagram;
Figure 10 is antiskid anchor ear, arc-shaped steel case assembling schematic diagram;
Figure 11 is antiskid stop block structure schematic diagram;
Figure 12 is arc-shaped steel box structure schematic diagram;
Figure 13 is antiskid hooping structure schematic diagram.
In figure:
1- tubular archs, 2- antiskid blocks, 3- arc-shaped steel casees, 4- antiskid anchor ears, 5- prestretching screw rods, the upper steel wire ropes of 6-, 7- turn
Change beam II, 8- jack, 9- stretching end anchorages, 10- anchored ends rope clamp I, 11- limiting devices I, 12- conversion beams I, 13- axis pins I,
14- prestressing force fining twisted steels, 15- attachment devices, 16- pin shaft IIs, 17- limiting devices II, 18- anchored ends rope clamp II, 19- are protected
Protection pad plate, steel wire rope under 20-, 21- floor beams, 22- fixing end anchorages, 23- rubber pads, the former sunpenders of 24-.
Specific implementation mode
Embodiment one:
A kind of interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement:
As shown in Figure 1, the interim pocket device for hoisting of the steel wire rope includes:Four upper steel wire ropes 6, anchored end rope clamp I 10, axis pins I
13, limiting device I 11, conversion beam I 12, conversion beam II 7, jack 8, lower prestress fining twisted steel 14, stretching end anchorage 9,
Fixing end anchorage 22, four attachment device 15, four lower steel wire rope 20, anchored end rope clamp II 18, pin shaft II 16, limiting device II
17、Protect backing plate 19;
The interim pocket device for hoisting of the steel wire rope further includes two hood type being mounted on steel pipe truss concrete arch bridge arch 1 arches
Top anchoring anti-slip system, each hood type vault anchor anti-slip system by 2 antiskid anchor ears 4,2 rubber pads 23, prestretching screw rods
5,2 arc-shaped steel casees 3 and the antiskid block 2 on arc-shaped steel case 3 form;
The arc-shaped steel case 3 is arc-shaped steel box structure, and top surface is curved plate, and longitudinal curved plate lower section is 4 rectangles
Steel plate surrounds 3 chambers, if arterial highway lateral stiffening steel plate is arranged in each chamber, is solder design with antiskid anchor ear 4, can increase
In addition steel wire rope 6 bypasses the turning radius of tubular arch 1(Referring to Fig. 9, Figure 10, Figure 12);
The end face 201 of the antiskid block 2 is shape of a saddle steel plate, as the antiskid reaction supporting point of upper steel wire rope 6, side
Support is reinforced in face by three pieces of triangular steel plates 202, is solder design with arc-shaped steel case 3(Referring to Figure 10);
The antiskid anchor ear 4 is two halves formula steel hoop structure, is connected by prestretching screw rod 5, and it is anti-to pre-tighten 5 realization of prestretching screw rod
It is sliding(Referring to Figure 11);
The rubber pad 23 is mounted between 1 top surface of antiskid anchor ear 4 and tubular arch, increases friction coefficient between the two;
The conversion beam I 12 is steel plate butt welding compound section, wherein symmetrical two sides are bi-lug plate, use is provided on otic placode
In the pin hole of installation axis pin I 13, it is convenient for, 6 one end of upper steel wire rope is anchored around axis pin I 13 by anchored end rope clamp I 10;
The attachment device 15 is steel plate butt welding compound section, and lower end is ears harden structure, is provided on otic placode for installing
The pin hole of pin shaft II 16, lower 20 one end of steel wire rope are anchored around pin shaft II 16 by anchored end rope clamp II 18;In attachment device 15
End is provided with through-hole, and 14 lower end of lower prestress fining twisted steel passes through the through-hole to be anchored by fixing end anchorage 22, attachment device 15
Realize the connection of lower prestress fining twisted steel 14 and lower steel wire rope 20;
The protection backing plate 19 is mach " ∪ " shape structure, realizes protection 21 chamfering of floor beam and lower steel wire rope 20
Steering smoothly transits;
Under working condition, 6 one end of upper steel wire rope is anchored around the axis pin I 13 of I 12 side of conversion beam by rope clamp I 10, separately
Around arch, above antiskid block 2 is worn down for one end, and passing through rope clamp I 10 further around the axis pin I 13 for crossing I 12 other side of conversion beam anchors;Under
14 upper end of prestressing force fining twisted steel sequentially passes through conversion beam II 16, jack 8, is anchored with stretching end anchorage 9, lower prestress essence
14 lower end of screw-thread steel is rolled to anchor across the fixing end anchorage 22 of attachment device 15;Lower 20 one end of steel wire rope is around attachment device 15
Pin shaft II 16 is anchored by rope clamp II 18, and the other end is up worn around the protection backing plate 19 of 21 lower section of suspender crossbeam, further around excessively another
The pin shaft II 16 of one attachment device 15 is anchored by rope clamp II 18;Lower steel wire rope 20 catches suspender crossbeam around protection backing plate 19
21 lower surfaces.
In the embodiment of the present invention, conversion beam I 12, attachment device 15, the concrete structure for protecting backing plate 19 and production method are all
Being those skilled in the art can realize that details are not described herein again using the prior art.
Embodiment two:
A kind of method of steel pipe arch bridge suspender replacement, it is to use to be used for steel pipe truss concrete arch-type bridge described in embodiment one
The method that the interim pocket device for hoisting of steel wire rope of suspender replacement realizes steel pipe arch bridge suspender replacement, replacing options include following step
Suddenly:
A, steel wire rope interim pocket device for hoisting of the installation for steel pipe truss concrete arch-type bridge suspender replacement:
A1, it is longitudinally asymmetric on tubular arch 1 one hood type vault be installed respectively in former sunpender anchor anti-slip system, often
A hood type vault anchoring anti-slip system by 2 antiskid anchor ears, 4,2 rubber pads 23,5,2 arc-shaped steel casees 3 of prestretching screw rod, with
And the antiskid block 2 on arc-shaped steel case 3 forms;Rubber pad 23 is arranged between antiskid anchor ear 4 and tubular arch 1, arc-shaped steel
For case 3 with antiskid anchor ear 4 by solder design, antiskid block 2 passes through solder design with arc-shaped steel case 3;
Bar lazy halyard is changed in A2, installation --- upper steel wire rope 6 and lower steel wire rope 20:
A21, two upper 6 one end of steel wire rope are anchored around the axis pin I 13 of I 12 side of conversion beam by rope clamp I 10, two
The other end of upper steel wire rope 6 around arch, above wear down by antiskid block 2, passes through rope further around the axis pin I 13 for crossing I 12 other side of conversion beam
Press from both sides I 10 anchorings;
A22,14 upper end of lower prestress fining twisted steel is sequentially passed through into conversion beam II 16, stretch-draw jack 8, uses stretching end
Anchorage 9 anchors, and 14 lower end of lower prestress fining twisted steel passes through attachment device 15 to be anchored with fixing end anchorage 22;
A23, four 20 one end of lower steel wire rope are bypassed to two attachment devices 15 for being located at 21 side of suspender crossbeam respectively
Pin shaft II 16 is anchored by rope clamp II 18, and the other end of four lower steel wire ropes 20 is around the protection backing plate 19 below suspender crossbeam 21
It up wears, is anchored by rope clamp II 18 further around the pin shaft II 16 for crossing two attachment devices 15 positioned at 21 other side of suspender crossbeam;
Lower 20 pad of steel wire rope protection backing plate 19 catches 21 lower surface of suspender crossbeam;Rubber pad 23 is arranged in antiskid anchor ear 4 and tubular arch 1
Between top surface, for arc-shaped steel case 3 with antiskid anchor ear 4 by solder design, antiskid block 2 passes through solder design with arc-shaped steel case 3(Ginseng
See Fig. 1-Fig. 8).
A3, check that the connection of the interim each component of pocket device for hoisting of steel wire rope of steel pipe truss concrete arch-type bridge suspender replacement is safe
Property and stabilization hold lotus ability:
By driving 8 tensioning lower prestress fining twisted steel 14 of jack slowly to carry out examination tensioning step by step, steel wire rope is checked
The connection safety and stabilization of each component of interim pocket device for hoisting hold lotus ability;
B, it removes former sunpender, complete conversion of the Suo Li systems to the interim pocket device for hoisting of steel wire rope:
When former sunpender is formally removed, former sunpender steel wire, synchronous tensioning lower prestress finish rolling screw thread step by step are cut off step by step
Steel 14 is realized and converts former suspender force to the interim pocket device for hoisting of steel wire rope, completes Suo Li system transforms;Suo Li is converted step by step
The variation control of process floor elevation is within ± 5mm, after former sunpender cut-out, anchoring lower prestress fining twisted steel 14, later
Remove former sunpender;
C, new sunpender is installed, complete conversion of the Suo Li systems to new sunpender:
New sunpender is installed to finish, step by step the new sunpender of tensioning, synchronous to put a lower prestress fining twisted steel 14 step by step, realizing will
The interim pocket device for hoisting Suo Li of steel wire rope is converted to new sunpender, completes Suo Li system transforms, step by step Suo Li transfer processes floor elevation
Variation control within ± 5mm, new suspender tension in place after, pass through anchor head nut and anchor new sunpender;
D, hood type anchor is removed, is transferred at next former sunpender;
The interim pocket device for hoisting of steel wire rope is removed, is transferred at next former sunpender;
E, every suspender replacement repeats step A~step D, completes other suspender replacements.