CN106703808A - Method for increasing end top coal recovery rate by means of thick coal seam fully-mechanized caving face mining roadway drilling presplitting - Google Patents

Method for increasing end top coal recovery rate by means of thick coal seam fully-mechanized caving face mining roadway drilling presplitting Download PDF

Info

Publication number
CN106703808A
CN106703808A CN201610523484.7A CN201610523484A CN106703808A CN 106703808 A CN106703808 A CN 106703808A CN 201610523484 A CN201610523484 A CN 201610523484A CN 106703808 A CN106703808 A CN 106703808A
Authority
CN
China
Prior art keywords
coal
drilling
thick
working face
mechanized caving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610523484.7A
Other languages
Chinese (zh)
Inventor
王方田
赵宾
张村
梁宁宁
白庆升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201610523484.7A priority Critical patent/CN106703808A/en
Publication of CN106703808A publication Critical patent/CN106703808A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/12Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by injecting into the borehole a liquid, either initially at high pressure or subsequently subjected to high pressure, e.g. by pulses, by explosive cartridges acting on the liquid
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/14Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by compressed air; by gas blast; by gasifying liquids

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Revetment (AREA)

Abstract

一种厚煤层综放工作面回采巷道钻孔预裂提高端部顶煤放出率的方法,用于厚煤层特别是厚硬或含硬夹矸厚煤层综放开采提高煤炭采出率。主要特征是:确定端部难放出顶煤范围,在回采巷道超前工作面一定距离进行预裂钻孔参数合理设计,采用水压致裂或CO2爆破等技术进行顶煤有效预裂,实现顶煤的松动破裂以便顺利放出。该方法同时有利于减小瓦斯涌出量、避免采空区大量遗煤自燃等隐患,具有工艺简单、设备投资少、操作安全、效果明显等优点,特别适合于坚硬含夹矸厚煤层综放工作面安全高效高回收率开采。

The invention discloses a method for pre-cracking the mining roadway drilling of a thick coal seam fully mechanized caving face to increase the discharge rate of top coal at the end, which is used for fully mechanized caving mining of thick coal seams, especially thick hard or thick coal seams containing gangue, to increase the coal recovery rate. The main features are: determine the range of the top coal that is difficult to release at the end, reasonably design the pre-splitting drilling parameters at a certain distance ahead of the working face of the mining roadway, and use technologies such as hydraulic fracturing or CO2 blasting to perform effective pre-splitting of the top coal and realize the top coal. The loosening and cracking of coal for smooth release. At the same time, this method is beneficial to reduce the amount of gas emission and avoid hidden dangers such as spontaneous combustion of a large amount of residual coal in goafs. It has the advantages of simple process, low equipment investment, safe operation, and obvious effect. It is especially suitable for fully mechanized caving in hard thick coal seams containing gangue The working face is mined safely, efficiently and with high recovery rate.

Description

The method that the drilling presplitting of high seam comprehensive coal face stope drift active workings improves end top coals' recovery ratio
Technical field
The present invention relates to the side that a kind of drilling presplitting of high seam Mining Roadway in Full-mechanized Caving Mining Face improves end top coals' recovery ratio Method, is particularly suited for the safe and efficient high-recovery exploitation of the thickness hard coal seam fully mechanized coal face containing dirt band.
Background technology
Longwall top coal caving can realize full thickness produce coal, parallel operations, production practice is simple, personnel equipment is few, in China's high seam And widely used in super high seam.But the coal seam recovery ratio of longwall top coal caving is relatively low, constrains its and larger range of promote the use of. Field observation shows, top coal of the fully mechanized coal face end in the range of 10~30m of tunnel, due to small by ore deposit pressure function influence, with And roadway roof coal and termination do not put the influence of coal, cause its destructiveness low, particularly in top coal intensity greatly or containing hard dirt band bar Under part, top coal rupture is insufficient to be just difficult to release, and causes working face top coals' recovery ratio only 45~60%.And, the top coal being not bled off It is lost in goaf, causes gas emission to increase, the hidden danger such as heterogeneous goaf is unfavorable for the safe and efficient height of fully mechanized coal face Recovery ratio is produced.Therefore, the more highly important exactly reinforcement top coal of raising working face recovery ratio emits and puts research, particularly end Top coal caving characteristics, improve end top coals' recovery ratio, and coal losses is put to reduce.The present invention is to carry that a kind of high seam of arch is comprehensive to put work The method that stope drift active workings drilling presplitting in face improves end top coals' recovery ratio, can effectively solve end Top coal caving characteristic it is poor, time The low problem of yield, with important theory significance and practical value.
The content of the invention
Technical problem:Increase crushing voerhead coal it is an object of the invention to provide the drilling presplitting of high seam longwall top coal caving stope drift active workings The method of degree and top coals' recovery ratio, can effectively improve end Top coal caving characteristic, increase end top coal with this recovery method The rate of recovery, it is ensured that working face safety and high efficiency, is particularly suitable for the safe and efficient high-recovery exploitation of the thickness hard coal seam containing dirt band.
Technical scheme embodiment is comprised the following steps:
When a, high seam longwall top coal caving, working face top top coal can form the arc triangle top coal of more difficult releasing near end (8), region top coal scope is b, 5~30m of value;
At a, general value 15m arranges drill site in working face wall side for b, high seam fully mechanized coal face front(2), and Rig is installed in drill site(7)And auxiliary equipment;
C, in stope drift active workings(9)The drill site of arrangement(2)It is interior, the inclined drill of upper, middle and lower three is got out respectively to top coal using rig (1), three drillings are respectively α, β, γ with the angle of horizontal direction, and experience value is 20 °, 40 °, 60 °, length be respectively 15m, 25m, 20m, while ensureing three drillings in same vertical plane, by the use of clear water as scouring media in boring procedure;
D, drill site(2)Interior drilling(1)After the completion of being drilled with, using hydrofracturing or CO2Blasting technique carries out presplitting to top coal, in advance After the completion of splitting, carry out pushing up coal releasing work;
E, as high seam fully mechanized coal face is in flitting(3)Coal, front and rear drag conveyor are put in coal cutting(4)(5)Fortune coal, liquid Pressure support(6)Under three operation synergies of supporting roof are constantly advanced, along advance of the face direction away from working face 15~20m cloth Next drill site is put, repeat step c, d completes top coal presplitting releasing work.
Beneficial effect:The present invention combines thickness firmly or the actual conditions containing hard dirt band thick coal-layer mining, and first advance 15~ Drill site is arranged in stope drift active workings rib side in the range of 20m, carries out pushing up coal presplitting by setting drilling to top coal borer in drill site.Pass through Stope drift active workings drilling presplitting, on the one hand can overcome fully mechanized coal face end top coal to emit and put the low technical barrier of difficult, coal caving ratio, Formed and be adapted to thickness firmly or containing hard dirt band high seam top coal fracturing technology and the reasonable drawing coal technology of working face, significantly improve working face top Coal coal caving ratio;On the other hand also improve the production efficiency of working face, can alleviate goaf lose coal breakage charcoal gas emission and The pressure that spontaneous combustion brings to working face safe working, brings huge economic benefit.
Brief description of the drawings
Fig. 1 is the present invention perpendicular to advance of the face direction A-A profiles;
Fig. 2 is fully mechanized coal face of the invention and drill site arrangement top view;
In figure:1- pre-splitting holes, 2- drill sites, 3- flittings, 4- front scrapping plate conveyers, drag conveyor after 5-, 6- hydraulic pressure Support, 7- rigs, 8- arc gable-top coals, 9- stope drift active workings, a- drill sites away from working face distance, b- terminations arc gable-top coal scope, The inclination angle of α, β, γ-drilling.
Specific embodiment
Implementation of the invention is further described below in conjunction with the accompanying drawings:
The method that high seam Mining Roadway in Full-mechanized Caving Mining Face drilling fracturing of the invention improves end top coals' recovery ratio, specific steps It is as follows:
When a, high seam longwall top coal caving, working face top top coal can form the arc triangle top coal of more difficult releasing near end (8), region top coal scope is b, 5~30m of value;
At a, general value 15m arranges drill site in working face wall side for b, high seam fully mechanized coal face front(2), and Rig is installed in drill site(7)And auxiliary equipment;
C, in stope drift active workings(9)The drill site of arrangement(2)It is interior, the inclined drill of upper, middle and lower three is got out respectively to top coal using rig (1), three drillings are respectively α, β, γ with the angle of horizontal direction, and experience value is 20 °, 40 °, 60 °, length be respectively 15m, 25m, 20m, while ensureing three drillings in same vertical plane, by the use of clear water as scouring media in boring procedure;
D, drill site(2)Interior drilling(1)After the completion of being drilled with, using hydrofracturing or CO2Blasting technique carries out presplitting to top coal, in advance After the completion of splitting, carry out pushing up coal releasing work;
E, as high seam fully mechanized coal face is in flitting(3)Coal, front and rear drag conveyor are put in coal cutting(4)(5)Fortune coal, liquid Pressure support(6)Under three operation synergies of supporting roof are constantly advanced, along advance of the face direction away from working face 15~20m cloth Next drill site is put, repeat step c, d completes top coal presplitting releasing work.

Claims (1)

1.一种厚煤层综放开采提高端部顶煤破碎度同时提高顶煤放出率的方法,其特征在于采用顶煤预裂技术使得端头顶煤产生大量裂隙以增加顶煤破碎度提高顶煤放出率,包括如下步骤:1. A method for increasing top-coal fragmentation at the top coal in fully mechanized caving mining of thick coal seams while increasing the top-coal discharge rate, characterized in that the top-coal pre-splitting technology is used to generate a large number of cracks in the top-coal to increase the top-coal fragmentation and improve the top-coal release rate, including the following steps: a、厚煤层综放开采时,工作面上方顶煤靠近端头处会形成较难放出的弧形三角顶煤(8),该区域顶煤范围为b,取值5~30m;a. When fully mechanized caving mining in thick coal seams, an arc-shaped triangular top coal (8) that is difficult to discharge will be formed near the top coal above the working face. The range of top coal in this area is b, and the value is 5 to 30m; b、厚煤层综放工作面前方距离a处,一般取值15m,在工作面煤壁一侧布置钻场(2),并在钻场内安设钻机(7)及辅助设备;b. At the distance a in front of the fully mechanized caving working face in thick coal seams, generally 15m, the drilling site (2) is arranged on the side of the coal wall of the working face, and the drilling machine (7) and auxiliary equipment are installed in the drilling site; c、在回采巷道(9)布置的钻场(2)内,利用钻机向顶煤分别钻出上、中、下三个倾斜钻孔(1),三个钻孔与水平方向的夹角分别为α、β、γ,经验取值为20°、40°、60°,长度分别为15m、25m、20m,同时保证三个钻孔在同一竖直面内,钻孔过程中利用清水作为冲洗介质;c. In the drilling field (2) arranged in the mining roadway (9), use the drilling rig to drill the upper, middle and lower three inclined boreholes (1) to the top coal respectively, and the angles between the three boreholes and the horizontal direction are respectively α, β, γ, the empirical values are 20°, 40°, 60°, and the lengths are 15m, 25m, 20m respectively. At the same time, ensure that the three drilling holes are in the same vertical plane. Clean water is used as flushing during the drilling process. medium; d、钻场(2)内的钻孔(1)钻设完成后,利用水压致裂或CO2爆破技术对顶煤进行预裂,预裂完成后,进行顶煤放出工作;d. After the drilling of the borehole (1) in the drilling site (2) is completed, the top coal is pre-splitting using hydraulic fracturing or CO2 blasting technology, and the top coal is released after the pre-splitting is completed; e、随着厚煤层综放工作面在滚筒采煤机(3)割煤放煤、前后刮板输送机(4)(5)运煤、液压支架(6)支护顶板三个工序协同作用不断推进下,沿工作面推进方向距工作面15~20m布置下一个钻场,重复步骤c、d,完成顶煤预裂放出工作。e. With the thick coal seam fully mechanized caving working face, the three processes of drum shearer (3) coal cutting and coal discharge, front and rear scraper conveyor (4) (5) coal transportation, and hydraulic support (6) supporting the roof are synergistic With continuous advancement, arrange the next drilling site 15-20m away from the working face along the advancing direction of the working face, and repeat steps c and d to complete the top-coal pre-splitting work.
CN201610523484.7A 2016-07-06 2016-07-06 Method for increasing end top coal recovery rate by means of thick coal seam fully-mechanized caving face mining roadway drilling presplitting Pending CN106703808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610523484.7A CN106703808A (en) 2016-07-06 2016-07-06 Method for increasing end top coal recovery rate by means of thick coal seam fully-mechanized caving face mining roadway drilling presplitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610523484.7A CN106703808A (en) 2016-07-06 2016-07-06 Method for increasing end top coal recovery rate by means of thick coal seam fully-mechanized caving face mining roadway drilling presplitting

Publications (1)

Publication Number Publication Date
CN106703808A true CN106703808A (en) 2017-05-24

Family

ID=58940640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610523484.7A Pending CN106703808A (en) 2016-07-06 2016-07-06 Method for increasing end top coal recovery rate by means of thick coal seam fully-mechanized caving face mining roadway drilling presplitting

Country Status (1)

Country Link
CN (1) CN106703808A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442929A (en) * 2018-03-21 2018-08-24 中国矿业大学(北京) Wrong formula longwall top coal caving is along top arrangement drilling presplitting top coal outside high seam staggered floor position
CN109026001A (en) * 2018-09-25 2018-12-18 中国矿业大学 A kind of drawing coal technology and parameter regulation means and device improving top coals' recovery ratio
CN112253116A (en) * 2020-10-27 2021-01-22 山西三元煤业股份有限公司 Method for caving coal at end of lagging working face
CN112302654A (en) * 2020-10-12 2021-02-02 天地科技股份有限公司 Method for determining actual measurement of rapid coal caving parameters of ultra-thick coal seam
CN112709575A (en) * 2019-10-24 2021-04-27 西安闪光能源科技有限公司 Hard thick coal seam top coal caving method based on controllable shock wave pre-splitting
CN112983422A (en) * 2021-03-17 2021-06-18 西安科技大学 Ore drawing mining method for inclined layered solid deposit
CN115012934A (en) * 2022-05-31 2022-09-06 晋能控股煤业集团有限公司 Pre-splitting method for coal jacking at end of fully mechanized caving face

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1763351A (en) * 2003-12-12 2006-04-26 肖自立 Four-control type comprehensive coal mining method
CN101967975A (en) * 2010-09-30 2011-02-09 大同煤矿集团有限责任公司 Fully-mechanized caving mining process technology with large mining height in super-high seam (14-20m)
CN102678117A (en) * 2012-05-28 2012-09-19 中国矿业大学 Directional hydraulic fracturing method based on energizing blasting
CN102691502A (en) * 2012-05-22 2012-09-26 山东科技大学 Method for improving recovery rate of fully mechanized top coal caving
CN103334790A (en) * 2013-07-23 2013-10-02 辽宁工程技术大学 High-pressure gas blasting-based coal seam roof advance presplitting method
CN103498680A (en) * 2013-10-16 2014-01-08 大同煤矿集团有限责任公司 Method for increasing top-coal recovery rate in primary mining period of fully-mechanized caving face
CN104005766A (en) * 2014-05-12 2014-08-27 山西蓝焰煤层气集团有限责任公司 Chemical method for weakening of top coal

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1763351A (en) * 2003-12-12 2006-04-26 肖自立 Four-control type comprehensive coal mining method
CN101967975A (en) * 2010-09-30 2011-02-09 大同煤矿集团有限责任公司 Fully-mechanized caving mining process technology with large mining height in super-high seam (14-20m)
CN102691502A (en) * 2012-05-22 2012-09-26 山东科技大学 Method for improving recovery rate of fully mechanized top coal caving
CN102678117A (en) * 2012-05-28 2012-09-19 中国矿业大学 Directional hydraulic fracturing method based on energizing blasting
CN103334790A (en) * 2013-07-23 2013-10-02 辽宁工程技术大学 High-pressure gas blasting-based coal seam roof advance presplitting method
CN103498680A (en) * 2013-10-16 2014-01-08 大同煤矿集团有限责任公司 Method for increasing top-coal recovery rate in primary mining period of fully-mechanized caving face
CN104005766A (en) * 2014-05-12 2014-08-27 山西蓝焰煤层气集团有限责任公司 Chemical method for weakening of top coal

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
天地科技股份有限公司开采设计事业部: "《综采放顶煤技术理论与实践的创新发展--综放开采30周年科技论文集》", 31 October 2012, 煤炭工业出版社 *
张晓宇: "《煤矿开采方法》", 30 April 2015, 冶金工业出版社 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442929A (en) * 2018-03-21 2018-08-24 中国矿业大学(北京) Wrong formula longwall top coal caving is along top arrangement drilling presplitting top coal outside high seam staggered floor position
CN109026001A (en) * 2018-09-25 2018-12-18 中国矿业大学 A kind of drawing coal technology and parameter regulation means and device improving top coals' recovery ratio
CN109026001B (en) * 2018-09-25 2024-01-23 中国矿业大学 Coal caving process for improving top coal caving rate and parameter adjusting method and device
CN112709575A (en) * 2019-10-24 2021-04-27 西安闪光能源科技有限公司 Hard thick coal seam top coal caving method based on controllable shock wave pre-splitting
CN112302654A (en) * 2020-10-12 2021-02-02 天地科技股份有限公司 Method for determining actual measurement of rapid coal caving parameters of ultra-thick coal seam
CN112253116A (en) * 2020-10-27 2021-01-22 山西三元煤业股份有限公司 Method for caving coal at end of lagging working face
CN112253116B (en) * 2020-10-27 2022-05-31 山西三元煤业股份有限公司 Method for caving coal at end of lagging working face
CN112983422A (en) * 2021-03-17 2021-06-18 西安科技大学 Ore drawing mining method for inclined layered solid deposit
CN115012934A (en) * 2022-05-31 2022-09-06 晋能控股煤业集团有限公司 Pre-splitting method for coal jacking at end of fully mechanized caving face

Similar Documents

Publication Publication Date Title
CN106703808A (en) Method for increasing end top coal recovery rate by means of thick coal seam fully-mechanized caving face mining roadway drilling presplitting
CN103670496B (en) Single low permeability outburst coal seam gob side entry retaining with take out section coal-bed gas method in advance
CN103016053B (en) Method of local filling to control surface subsidence in gob
CN106930763B (en) A method of the filling residual mining area roadway support coal column of second mining super high seam
CN105569659B (en) A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method
CN102080525B (en) High-pressure gas injection hole-drilling pressure-releasing outburst prevention method
CN108518222A (en) Paste body filling combination top plate presplitting second mining super high seam stops the method for adopting line coal column
CN107313777A (en) The main return channel hydraulic fracturing pressure relief method of fully-mechanized mining working and device
CN105735993A (en) Method for preventing hard top plate type rock burst on basis of carbon dioxide blasting
CN103939101B (en) A kind of lump coal exploitation method
CN104047629B (en) The method that thin coal bed fully-mechanized mining gob side entry retaining directional drilling extraction closes on lower coal-bed gas
CN105134286B (en) L-type well goaf gas pumping method
CN102251774B (en) Fully mechanized coal mining method combining steeply inclined long-wall drilling type coal mining machine with hydraulic shield type supports
CN105863639B (en) The coal-mining method of soft coal level
CN112983418A (en) Method for hydraulic fracturing pressure relief of coal mine underground coal face withdrawal channel
CN102777180A (en) Method for actively and regionally preventing and controlling rock burst in coal mines
CN109139012A (en) A kind of mining chain arm saw is continuous to cut top seam method
CN103089269B (en) Method for cutting and pre-breaking top coal to improve mining efficiency by utilizing water power
CN110359910B (en) Fully mechanized caving high-level filling mining method for thick coal seam strips under coal mine railway
CN113006796B (en) Coal and contact symbiotic oil shale fracturing co-production method
CN102536238A (en) Mining method for large-inclined angle laminar non-coal solid mineral deposit
CN103953339A (en) Coal mining machine for lump coal mining and coal mining method
CN113090264A (en) Horizontal deep borehole CO for hard coal seam and hard rock stratum2Fracturing safety roof control method
CN106014411B (en) Deep fractures, which are cut to split, adopts integrated process for stoping
CN101737051A (en) Covering layer forming method of blind ore bodies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170524

WD01 Invention patent application deemed withdrawn after publication