The method that the drilling presplitting of high seam comprehensive coal face stope drift active workings improves end top coals' recovery ratio
Technical field
The present invention relates to the side that a kind of drilling presplitting of high seam Mining Roadway in Full-mechanized Caving Mining Face improves end top coals' recovery ratio
Method, is particularly suited for the safe and efficient high-recovery exploitation of the thickness hard coal seam fully mechanized coal face containing dirt band.
Background technology
Longwall top coal caving can realize full thickness produce coal, parallel operations, production practice is simple, personnel equipment is few, in China's high seam
And widely used in super high seam.But the coal seam recovery ratio of longwall top coal caving is relatively low, constrains its and larger range of promote the use of.
Field observation shows, top coal of the fully mechanized coal face end in the range of 10~30m of tunnel, due to small by ore deposit pressure function influence, with
And roadway roof coal and termination do not put the influence of coal, cause its destructiveness low, particularly in top coal intensity greatly or containing hard dirt band bar
Under part, top coal rupture is insufficient to be just difficult to release, and causes working face top coals' recovery ratio only 45~60%.And, the top coal being not bled off
It is lost in goaf, causes gas emission to increase, the hidden danger such as heterogeneous goaf is unfavorable for the safe and efficient height of fully mechanized coal face
Recovery ratio is produced.Therefore, the more highly important exactly reinforcement top coal of raising working face recovery ratio emits and puts research, particularly end
Top coal caving characteristics, improve end top coals' recovery ratio, and coal losses is put to reduce.The present invention is to carry that a kind of high seam of arch is comprehensive to put work
The method that stope drift active workings drilling presplitting in face improves end top coals' recovery ratio, can effectively solve end Top coal caving characteristic it is poor, time
The low problem of yield, with important theory significance and practical value.
The content of the invention
Technical problem:Increase crushing voerhead coal it is an object of the invention to provide the drilling presplitting of high seam longwall top coal caving stope drift active workings
The method of degree and top coals' recovery ratio, can effectively improve end Top coal caving characteristic, increase end top coal with this recovery method
The rate of recovery, it is ensured that working face safety and high efficiency, is particularly suitable for the safe and efficient high-recovery exploitation of the thickness hard coal seam containing dirt band.
Technical scheme embodiment is comprised the following steps:
When a, high seam longwall top coal caving, working face top top coal can form the arc triangle top coal of more difficult releasing near end
(8), region top coal scope is b, 5~30m of value;
At a, general value 15m arranges drill site in working face wall side for b, high seam fully mechanized coal face front(2), and
Rig is installed in drill site(7)And auxiliary equipment;
C, in stope drift active workings(9)The drill site of arrangement(2)It is interior, the inclined drill of upper, middle and lower three is got out respectively to top coal using rig
(1), three drillings are respectively α, β, γ with the angle of horizontal direction, and experience value is 20 °, 40 °, 60 °, length be respectively 15m,
25m, 20m, while ensureing three drillings in same vertical plane, by the use of clear water as scouring media in boring procedure;
D, drill site(2)Interior drilling(1)After the completion of being drilled with, using hydrofracturing or CO2Blasting technique carries out presplitting to top coal, in advance
After the completion of splitting, carry out pushing up coal releasing work;
E, as high seam fully mechanized coal face is in flitting(3)Coal, front and rear drag conveyor are put in coal cutting(4)(5)Fortune coal, liquid
Pressure support(6)Under three operation synergies of supporting roof are constantly advanced, along advance of the face direction away from working face 15~20m cloth
Next drill site is put, repeat step c, d completes top coal presplitting releasing work.
Beneficial effect:The present invention combines thickness firmly or the actual conditions containing hard dirt band thick coal-layer mining, and first advance 15~
Drill site is arranged in stope drift active workings rib side in the range of 20m, carries out pushing up coal presplitting by setting drilling to top coal borer in drill site.Pass through
Stope drift active workings drilling presplitting, on the one hand can overcome fully mechanized coal face end top coal to emit and put the low technical barrier of difficult, coal caving ratio,
Formed and be adapted to thickness firmly or containing hard dirt band high seam top coal fracturing technology and the reasonable drawing coal technology of working face, significantly improve working face top
Coal coal caving ratio;On the other hand also improve the production efficiency of working face, can alleviate goaf lose coal breakage charcoal gas emission and
The pressure that spontaneous combustion brings to working face safe working, brings huge economic benefit.
Brief description of the drawings
Fig. 1 is the present invention perpendicular to advance of the face direction A-A profiles;
Fig. 2 is fully mechanized coal face of the invention and drill site arrangement top view;
In figure:1- pre-splitting holes, 2- drill sites, 3- flittings, 4- front scrapping plate conveyers, drag conveyor after 5-, 6- hydraulic pressure
Support, 7- rigs, 8- arc gable-top coals, 9- stope drift active workings, a- drill sites away from working face distance, b- terminations arc gable-top coal scope,
The inclination angle of α, β, γ-drilling.
Specific embodiment
Implementation of the invention is further described below in conjunction with the accompanying drawings:
The method that high seam Mining Roadway in Full-mechanized Caving Mining Face drilling fracturing of the invention improves end top coals' recovery ratio, specific steps
It is as follows:
When a, high seam longwall top coal caving, working face top top coal can form the arc triangle top coal of more difficult releasing near end
(8), region top coal scope is b, 5~30m of value;
At a, general value 15m arranges drill site in working face wall side for b, high seam fully mechanized coal face front(2), and
Rig is installed in drill site(7)And auxiliary equipment;
C, in stope drift active workings(9)The drill site of arrangement(2)It is interior, the inclined drill of upper, middle and lower three is got out respectively to top coal using rig
(1), three drillings are respectively α, β, γ with the angle of horizontal direction, and experience value is 20 °, 40 °, 60 °, length be respectively 15m,
25m, 20m, while ensureing three drillings in same vertical plane, by the use of clear water as scouring media in boring procedure;
D, drill site(2)Interior drilling(1)After the completion of being drilled with, using hydrofracturing or CO2Blasting technique carries out presplitting to top coal, in advance
After the completion of splitting, carry out pushing up coal releasing work;
E, as high seam fully mechanized coal face is in flitting(3)Coal, front and rear drag conveyor are put in coal cutting(4)(5)Fortune coal, liquid
Pressure support(6)Under three operation synergies of supporting roof are constantly advanced, along advance of the face direction away from working face 15~20m cloth
Next drill site is put, repeat step c, d completes top coal presplitting releasing work.