CN106682765A - Charging station optimization layout method and apparatus thereof - Google Patents
Charging station optimization layout method and apparatus thereof Download PDFInfo
- Publication number
- CN106682765A CN106682765A CN201611093209.2A CN201611093209A CN106682765A CN 106682765 A CN106682765 A CN 106682765A CN 201611093209 A CN201611093209 A CN 201611093209A CN 106682765 A CN106682765 A CN 106682765A
- Authority
- CN
- China
- Prior art keywords
- variable
- parameter
- model
- charging station
- decision making
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 57
- 238000005457 optimization Methods 0.000 title claims abstract description 27
- 238000009826 distribution Methods 0.000 claims abstract description 60
- 238000012545 processing Methods 0.000 claims description 36
- 238000004422 calculation algorithm Methods 0.000 claims description 29
- 230000002068 genetic effect Effects 0.000 claims description 17
- 230000004048 modification Effects 0.000 claims description 17
- 238000012986 modification Methods 0.000 claims description 17
- 239000002245 particle Substances 0.000 claims description 15
- 238000010276 construction Methods 0.000 claims description 13
- 238000005070 sampling Methods 0.000 claims description 8
- 238000012423 maintenance Methods 0.000 claims description 3
- 241000208340 Araliaceae Species 0.000 claims description 2
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 claims description 2
- 235000003140 Panax quinquefolius Nutrition 0.000 claims description 2
- 235000008434 ginseng Nutrition 0.000 claims description 2
- 101150067055 minC gene Proteins 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 5
- 230000006870 function Effects 0.000 description 31
- 239000010410 layer Substances 0.000 description 26
- 230000008569 process Effects 0.000 description 12
- 230000005611 electricity Effects 0.000 description 8
- 230000008901 benefit Effects 0.000 description 6
- 230000002093 peripheral effect Effects 0.000 description 5
- 238000003860 storage Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000001965 increasing effect Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000005315 distribution function Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- VUTGNDXEFRHDDC-UHFFFAOYSA-N 2-chloro-n-(2,6-dimethylphenyl)-n-(2-oxooxolan-3-yl)acetamide;2-(trichloromethylsulfanyl)isoindole-1,3-dione Chemical compound C1=CC=C2C(=O)N(SC(Cl)(Cl)Cl)C(=O)C2=C1.CC1=CC=CC(C)=C1N(C(=O)CCl)C1C(=O)OCC1 VUTGNDXEFRHDDC-UHFFFAOYSA-N 0.000 description 1
- 206010061876 Obstruction Diseases 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000012821 model calculation Methods 0.000 description 1
- 238000004549 pulsed laser deposition Methods 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
- G06Q10/043—Optimisation of two dimensional placement, e.g. cutting of clothes or wood
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Public Health (AREA)
- General Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a charging station optimization layout method and an apparatus thereof, and belongs to the new energy technology field. The method comprises the following steps of according to a distribution network basic parameter and a first constraint condition, through a first model, generating a parameter decision variable of a charging station; according to the parameter decision variable, through a second model, acquiring a binary decision variable; updating the parameter decision variable and the binary decision variable for preset times according to a preset rule, wherein the preset rule includes steps of according to the parameter decision variable, through the second model, updating the binary decision variable, and according to the updated binary decision variable and the first constraint condition, through the first model, updating the parameter decision variable; and according to the updated parameter decision variable and the binary decision variable, through the first model, acquiring an investment optimization result, and according to the updated binary decision variable, through the second model, acquiring a satisfaction optimization result. Through mutual influences of the parameter decision variable and the binary decision variable during optimization, an optimal scheme satisfying demands of a user and an investor is acquired.
Description
Technical field
The present invention relates to technical field of new energies, in particular to a kind of charging station Optimal Deployment Method and device.
Background technology
With the development of science and technology, and the increasingly consumption of fossil energy, new energy technology is progressively emerged.New
In energy technology, electric energy is representational new forms of energy, with the life for being applied to people progressively of the electric automobile of electrical energy drive
In work.
In the practical application of current electric automobile, electric automobile needs to fill storage battery after a segment distance is travelled
Electricity is in order to travelling again.Due to the road environment that city is complicated, user additional being charged to electric automobile of being in is not
Applicable.In city, generally require to arrange charging pile in multiple regions in city, can easily enter in order to electric automobile
Row charges.If arranging the website or charging pile of charging pile very little, although can effectively control the construction of enterprise and the money of maintenance
Gold, but the user of electric automobile generally requires to take a long time, and traveling is relatively remote or long-time is queued up and could give oneself
Electric automobile be charged, the suitability of user so as to strong influence.If arrange charging pile website or charging pile compared with
It is many, although the operating range of electric automobile user, traveling duration or queuing time can be effectively reduced, user is met
Demand.But the investment of enterprise needs to spend substantial contribution to be built and safeguarded, from being unable to meet business investor
Demand.
Therefore, the quantity that the website or charging pile of charging pile are set in city how is effectively calculated, is made with obtaining satisfaction
The optimal case of user and investor demand is current industry a great problem.
The content of the invention
In view of this, it is an object of the invention to provide a kind of charging station Optimal Deployment Method and device, it can be effective
Calculate the quantity that the website or charging pile of charging pile are set in city, meet the optimum of user and investor demand to obtain
Scheme.
What embodiments of the invention were realized in:
In a first aspect, embodiments providing a kind of charging station Optimal Deployment Method, methods described includes:Acquisition is matched somebody with somebody
Net basic parameter, according to the distribution basic parameter and the first constraints the Parameter Decision Making of charging station is generated by the first model
Variable, binary decision variable is obtained according to the Parameter Decision Making variable by the second model.By the Parameter Decision Making variable and institute
State binary decision variable and be updated to preset times according to preset rules, wherein, the preset rules include:According to the parameter
Decision variable is by binary decision variable described in second model modification, the binary decision variable and institute further according to renewal
The first constraints is stated by Parameter Decision Making variable described in first model modification.According to the ginseng for being updated to preset times
Number decision variable obtains investment optimum results with the binary decision variable for being updated to preset times by first model,
The binary decision variable according to preset times are updated to obtains satisfaction optimum results by second model.According to institute
State investment optimum results and the satisfaction optimum results obtain charging station optimization layout result.
Second aspect, embodiments provides a kind of charging station optimization placement device, and described device includes:At first
Reason module, for obtaining distribution basic parameter, is given birth to according to the distribution basic parameter and the first constraints by the first model
Into the Parameter Decision Making variable of charging station, binary decision variable is obtained by the second model according to the Parameter Decision Making variable.Second
Processing module, for the Parameter Decision Making variable and the binary decision variable to be updated to into default time according to preset rules
Number, wherein, the preset rules include:According to the Parameter Decision Making variable by binary decision described in second model modification
Variable, further according to the binary decision variable and first constraints for updating by joining described in first model modification
Number decision variable.3rd processing module, is updated to the Parameter Decision Making variable of preset times and is updated to default for basis
The binary decision variable of number of times obtains investment optimum results by first model, according to the institute for being updated to preset times
State binary decision variable and satisfaction optimum results are obtained by second model.Output module;For excellent according to the investment
Change result and the satisfaction optimum results obtain charging station optimization layout result.
The beneficial effect of the embodiment of the present invention is:
By obtaining input distribution basic parameter, and distribution basic parameter and the first constraints are passed through into the first model
Generate the Parameter Decision Making variable of charging station such that it is able to obtain meeting the charging station of distribution basic parameter and the first constraints
Build quantity and corresponding construction position.And according to Parameter Decision Making variable by bringing the second model into, then can pass through second
Model obtains the binary decision variable which charging station certain user selects.
At the same time, Parameter Decision Making variable and binary decision variable are updated to into preset times according to preset rules, with
Obtain stable Parameter Decision Making variable and binary decision variable.Wherein, preset rules include:According to binary decision variable and first
Constraints passes through the second model modification two by the first model modification Parameter Decision Making variable, then by the Parameter Decision Making variable for updating
First decision variable.Parameter Decision Making variable is once updated to into the suboptimization to Parameter Decision Making variable by the first model, and
By once updating for the second model also it is the suboptimization to binary decision variable by binary decision variable.By determining to parameter
Plan variable is logical and binary decision variable constantly updates, and after close preset times, Parameter Decision Making variable is by the first model
Update every time and binary decision variable is tended towards stability by each renewal of the second model, be then updated to preset times in satisfaction
Afterwards, the renewal to Parameter Decision Making variable and binary decision variable is stopped.
Furthermore, led to the binary decision variable for being updated to preset times according to the Parameter Decision Making variable for being updated to preset times
Cross the first model and obtain investment optimum results, and obtained by the second model according to the binary decision variable for being updated to preset times
Satisfaction optimum results.Due to investing optimum results and satisfaction optimum results to continue to optimize renewal, and influence each other and obtain
Optimum structure is taken, so as to charging station optimization layout result just can be obtained according to investment optimum results and satisfaction optimization.
Therefore, the renewal of continuing to optimize by preset times by the first model to Parameter Decision Making variable, the second model pair
The renewal of continuing to optimize by preset times of binary decision variable, and Parameter Decision Making variable and binary decision variable are when updating
Influence each other, so as to finally be obtained in that charging station optimizes layout result, and then can obtain and meet user and investor
The optimal case of demand.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment
The accompanying drawing that needs are used is briefly described, it should be apparent that, drawings in the following description are only some enforcements of the present invention
Example, for those of ordinary skill in the art, on the premise of not paying creative work, can be being obtained according to these accompanying drawings
Obtain other accompanying drawings.By shown in accompanying drawing, the above and other purpose of the present invention, feature and advantage will become apparent from.In whole
Identical reference indicates identical part in accompanying drawing.Not deliberately by actual size equal proportion scaling drafting accompanying drawing, emphasis
It is the purport for illustrating the present invention.
Fig. 1 shows a kind of structured flowchart of local terminal provided in an embodiment of the present invention;
Fig. 2 shows a kind of flow chart of charging station Optimal Deployment Method provided in an embodiment of the present invention;
Fig. 3 shows the sub-process of step S100 in a kind of charging station Optimal Deployment Method provided in an embodiment of the present invention
Figure;
Fig. 4 shows the sub-process of step S200 in a kind of charging station Optimal Deployment Method provided in an embodiment of the present invention
Figure;
Fig. 5 shows the sub-process of step S300 in a kind of charging station Optimal Deployment Method provided in an embodiment of the present invention
Figure;
Fig. 6 shows the structural representation of planning region in a kind of charging station optimization method provided in an embodiment of the present invention;
Fig. 7 shows a kind of analogous diagram of charging station optimization method provided in an embodiment of the present invention;
Fig. 8 shows that a kind of charging station provided in an embodiment of the present invention optimizes the first structure block diagram of device;
Fig. 9 shows that a kind of charging station provided in an embodiment of the present invention optimizes the second structured flowchart of device;
Figure 10 shows that a kind of charging station provided in an embodiment of the present invention optimizes the 3rd structured flowchart of device.
Icon:100- local terminals;200- charging stations optimize placement device;210- first processing modules;211- inputs are single
Unit;212- first processing units;213- second processing units;220- Second processing modules;The processing units of 221- the 3rd;222-
Four processing units;The processing modules of 230- the 3rd;240- output modules;101- memorizeies;102- storage controls;103- process
Device;104- Peripheral Interfaces;105- input-output units;106- audio units;107- display units.
Specific embodiment
To make purpose, technical scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
The a part of embodiment of the present invention, rather than the embodiment of whole.Present invention enforcement generally described and illustrated in accompanying drawing herein
The component of example can be arranged and designed with a variety of configurations.
As shown in figure 1, being the block diagram of the local terminal 100.The local terminal 100 includes:Charging station is excellent
Change placement device 200, memorizer 101, storage control 102, processor 103, Peripheral Interface 104, input-output unit 105,
Audio unit 106, display unit 107.
The memorizer 101, storage control 102, processor 103, Peripheral Interface 104, input-output unit 105, sound
Frequency unit 106, each element of display unit 107 are directly or indirectly electrically connected with each other, to realize the transmission or friendship of data
Mutually.For example, these elements can be realized being electrically connected with by one or more communication bus or holding wire each other.The charging
Optimization placement device 200 of standing can be stored in the memorizer including at least one in the form of software or firmware (firmware)
In 101 or the software function module that is solidificated in the operating system of the local terminal 100 (operating system, OS).
The processor 103 is used to perform the executable module stored in memorizer 101, such as described charging station optimizes placement device
200 software function modules for including or computer program.
Wherein, memorizer 101 may be, but not limited to, random access memory (Random Access Memory,
RAM), read only memory Read Only Memory, ROM), programmable read only memory (Programmable Read-Only
Memory, PROM), erasable read-only memory Erasable Programmable Read-Only Memory, EPROM), electricity
Erasable read-only memory (Electric Erasable Programmable Read-Only Memory, EEPROM) etc..Its
In, memorizer 101 be used for storage program, the processor 103 after execute instruction is received, perform described program, aforementioned
Method performed by the server of the stream process definition that inventive embodiments any embodiment is disclosed can apply to processor 103
In, or realized by processor 103.
A kind of possibly IC chip of processor 103, the disposal ability with signal.Above-mentioned processor 103 can
Being general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network processing unit
(Network Processor, abbreviation NP) etc.;Can also be digital signal processor (DSP), special IC (ASIC),
Ready-made programmable gate array (FPGA) either other PLDs, discrete gate or transistor logic, discrete hard
Part component.Can realize or perform disclosed each method in the embodiment of the present invention, step and logic diagram.General processor
Can be microprocessor or the processor can also be any conventional processor etc..
The Peripheral Interface 104 is by various input/output devices coupled to processor 103 and memorizer 101.At some
In embodiment, Peripheral Interface 104, processor 103 and storage control 102 can be realized in one single chip.Other one
In a little examples, they can be realized respectively by independent chip.
Input-output unit 105 is used to be supplied to user input data to realize interacting for user and the local terminal 100.
The input-output unit 105 may be, but not limited to, mouse and keyboard etc..
Audio unit 106 provides a user with audio interface, and it may include one or more mikes, one or more raises
Sound device and voicefrequency circuit.
Display unit 107 provides interactive interface (such as user operation circle between the local terminal 100 and user
Face) or refer to user for display image data.In the present embodiment, the display unit 107 can be liquid crystal display
Or touch control display.If touch control display, it can be the capacitance type touch control screen or resistance for supporting single-point and multi-point touch operation
Formula touch screen etc..Support that single-point and multi-point touch operation refer to that touch control display can be sensed one on the touch control display
Or the touch control operation produced simultaneously at multiple positions, and transfer to processor 103 to carry out calculating the touch control operation for sensing and
Process.
Fig. 2 is referred to, is the charging station optimization of the local terminal 100 for being applied to Fig. 1 that present pre-ferred embodiments are provided
The flow chart of layout method.In the present embodiment, by the first model to Parameter Decision Making variable by the continuous excellent of preset times
Change and update, continue to optimize renewal by preset times of second model to binary decision variable, and Parameter Decision Making variable and two
First decision variable influencing each other when updating, so as to finally be obtained in that charging station optimizes layout result, and then can obtain
Meet the optimal case of user and investor demand.
Specifically, obtaining the flow process of charging station optimization layout result includes:Step S100, step S200, step S300, step
Rapid S400 and step S500.
Step S100:The benchmark data of electric automobile is obtained, filling day in predeterminable area is obtained according to the benchmark data
Electric peak power, wherein, the day charging peak power is the parameter in the distribution basic parameter.
Obtain the benchmark data of all kinds of electric automobiles in planning region.Wherein, all kinds of electric automobiles include:Electric Transit
Car, electric taxi, electronic private car and electronic officer's car;Benchmark data includes:The quantity of all kinds of electric automobile rows, all kinds of electricity
In journey of the electrical automobile row in one day, running time section and all kinds of electric automobile of all kinds of electric automobiles in one day be in one day
Charging interval section.The purposes of every kind of electric automobile is different, and its benchmark data is also different.By every kind of electric automobile in benchmark data
Data carry out synthesis, then the charging probability, moment probability density function and the duration that obtain electric automobile by probability distribution are general
Rate density function.It is according to the preset charged power of default each electric automobile, the charging probability of electric automobile, moment probability is close
Degree function and duration probability density function carry out multiple sampling with Monte Carlo Analogue Method, so as to obtain the electricity in planning region
The day charging peak power of electrical automobile.And day charging peak power can be used as one of parameter in distribution basic parameter.
Step S200:Distribution basic parameter is obtained, according to the distribution basic parameter and the first constraints first is passed through
Model generates the Parameter Decision Making variable of charging station, obtains binary decision by the second model according to the Parameter Decision Making variable and becomes
Amount.
Distribution basic parameter is obtained, wherein, distribution basic parameter not only includes day charging peak power, distribution basic parameter
Also include:The quantity that the position of charging station can be set up in disjunctive programming region is, the fixed cost and line of setting up charging station
The loss on road.In the present embodiment, the first constraints is the basic demand parameter of electrical network, and the charging station of foundation needs to meet electricity
The requirement of net, therefore obtain in the calculating process of Parameter Decision Making variable, it is necessary to meet the first constraints.First model is upper
The solution that layer model, i.e. upper strata model are obtained can represent the investment optimum results of investor, and Parameter Decision Making variable is in decision
One of variable of the solution of layer, it is the variable that charging station whether is set up in each predeterminated position.By distribution basic parameter and
First constraints generates the Parameter Decision Making variable of charging station by the first model.As a kind of mode, obtain Parameter Decision Making and become
The process of amount can carry out continuing to optimize renewal for Parameter Decision Making variable, therefore, need to be by distribution basic parameter and the first constraint
Condition is first randomly generated a Parameter Decision Making variable in the first model.Second model is underlying model, i.e. underlying model institute
The solution of acquisition can represent the satisfaction optimum results of user.In the present embodiment, the Parameter Decision Making variable band by generating
Enter the second model, and be obtained in that the binary decision variable related to Parameter Decision Making variable.Wherein, binary decision variable represents certain
Individual user selects the variable that certain charging station charges.Therefore, by random generation parameter decision variable, and become according to Parameter Decision Making
Measure and obtain and determine that the optimization that after binary decision variable, just can be iterated is calculated.
Step S300:The Parameter Decision Making variable and the binary decision variable are updated to according to preset rules default
Number of times, wherein, the preset rules include:The binary according to the Parameter Decision Making variable is by second model modification is determined
Plan variable, further according to the binary decision variable and first constraints for updating by described in first model modification
Parameter Decision Making variable.
After get parms decision variable and binary decision variable, can be by Parameter Decision Making variable and binary decision variable root
Preset times are updated to according to preset rules, to obtain stable Parameter Decision Making variable and binary decision variable.In the present embodiment
In, preset rules can be:According to the first constraints and the binary decision variable for obtaining first by the first model so as to more
New parameter decision variable, and again the rear Parameter Decision Making variable for updating is updated into again binary decision variable by the second model.Will
Parameter Decision Making variable is once updated to the suboptimization to Parameter Decision Making variable by the first model, and by binary decision variable
Also it is the suboptimization to binary decision variable by once updating for the second model.By and binary logical to Parameter Decision Making variable
Decision variable constantly updates, after close preset times, each renewal and binary of the Parameter Decision Making variable by the first model
Decision variable is tended towards stability by each renewal of the second model, then after satisfaction is updated to preset times, stopped to parameter
The renewal of decision variable and binary decision variable.
Step S400:The Parameter Decision Making variable of preset times and described the two of preset times are updated to according to being updated to
First decision variable obtains investment optimum results by first model, is become according to the binary decision for being updated to preset times
Amount obtains satisfaction optimum results by second model.
The Parameter Decision Making variable for being updated to preset times and the binary decision variable for being updated to preset times can tend to
It is stable, it is believed that Parameter Decision Making variable and binary decision variable are changed into optimum state by the renewal of preset times.First
In model, Parameter Decision Making variable and binary decision variable are the variable for obtaining investment optimum results.After preset times, will be true
Fixed Parameter Decision Making variable and binary decision variable is brought in the first model, and the first model just can export investment optimum results.
In second model, binary decision variable is the variable for obtaining satisfaction optimum results, after preset times, will determine binary decision
Variable is brought in the second model, and the second model just can export satisfaction optimum results.
Step S500:Charging station optimization layout knot is obtained according to the investment optimum results and the satisfaction optimum results
Really.
After investment optimum results and satisfaction optimum results are obtained, due in the first model and the second model calculation
Influence each other, investing optimum results can represent the prime investment realization side of the investors' interest in the case where user's service condition is met
Formula, and satisfaction optimum results can represent the optimal use satisfaction of the user in the case of investors' interest.So as to throw
Money optimum results and satisfaction optimum results carry out collecting after output, and the result of output is has taken into account investment interests and user's profit
The charging station optimization layout result of benefit.
Fig. 3 is referred to, Fig. 3 is the sub-process of the step of obtaining day charging peak power S100.It is multiple general by setting up
Rate is distributed so as to obtain day charging peak power.
Specifically, the sub-process by setting up multiple probability distribution so as to obtain day charging peak power includes:
Step S110, step S120, step S130 and step S140.
Step S110:According to the benchmark data obtain predeterminable area in the electric automobile day operating range away from
From normal distribution and the moment probability density function for starting to charge up the moment.
Benchmark data may include:In the journey of the quantity of all kinds of electric automobile rows, all kinds of electric automobile rows in one day, it is all kinds of
Charging interval section of running time section and all kinds of electric automobile of the electric automobile in one day in one day.Specifically, electronic public affairs
It is 150~200km to hand over the average daily distance travelled of car predeterminable, if maintaining one day Operational requirements at least must once be charged.It is electronic
Buses service time and place Relatively centralized, can carry out concentration charging in the low power consumption period, in the peak operation period on daytime
(10:30-16:00) fast charge mode, night (22 can be adopted:30-5:30) down time length can adopt trickle charge mode.
For electric taxi is with respect to electric bus, without fixed vehicle line, in the time, spatially have it is stronger with
Machine.The average daily distance travelled of electric taxi is 350~500km, is typically replaced by large and small class's mode by 2 taxi drivers
Drive, top class in a kindergarten driver once class per 24 hours, bottom class driver once class per 12 hours.Predeterminable electric taxi it is specified
Distance travelled is about 300km, is to maintain the requirement of taxi normal operation to be charged at least twice daily.In view of taxi
Operation benefits, typically can select to be charged in the period relieved, daytime (11:30-14:30) quick charge side can be adopted
Formula, night (2:00-5:00) can be using charging modes at a slow speed.
Electronic private car is mainly used in the upper and lower class of car owner and amusement and recreation etc..Electronic officer's car is mainly used in government official
Member exercises a public function.Idle condition is in view of the most of the time in electronic private car and electronic officer's car one day, can be by it
It is classified as a class.When private car car owner and government functionary are not used automobile, can be by automobile parking to concentrated charging station using slow
Fast charging modes carry out electricity supply.
By each benchmark data, so as to can obtain electric automobile in predeterminable area day operating range apart from normal state point
Cloth:
Wherein, d represents the day operating range of electric automobile;μ 1 and σ 1 is respectively the day of electric bus and electric taxi
Operating range is expected and standard deviation;μ 2 and σ 2 is respectively electronic private car and expects and standard with the day operating range of electronic officer's car
Difference.
Furthermore, according to the charging interval distribution of each electric automobile in said reference data, so as to obtain in predeterminable area
Electric automobile starts to charge up the moment probability density function at moment.
Wherein, μ 3 and σ 3 is expectation and the standard deviation for starting to charge up the moment.
Step S120:The charging electric vehicle duration is obtained according to described apart from normal distribution and preset charged power
Duration probability density function.
In the present embodiment, preset various electric automobiles charge power meet in the range of 2 to 3KW be uniformly distributed for
Preset charged power.If meet electric automobile day operating range variable and charge power variable it is separate, so as to can
To obtain charging interval length t of electric automobilecIt is expressed as:
fpc(pc)=1 2≤Pc≤ 3 or fpc(pc)=0
Wherein, ωdRepresent the power consumption of the 100KM of electric automobile;η represents the charge efficiency of charger;PcRepresent charger
Charge power.
By length tcFunction and apart from normal distribution can obtain charging electric vehicle duration duration probability it is close
Degree function:
Wherein, f3(tc) represent the charging duration probability density function of electric bus and electric taxi, f4(tc) represent
The charging duration probability density function of electronic private car and electronic officer's car, and a in formula represents ωd/1.61×η。
Step S130:The duration probability density function is multiplied with the moment probability density function and obtains described electronic
Charging probability of certain moment in charged state in car day.
As a kind of mode, if the charging start time of electric automobile and charging interval length are also separate.And one
Electric automobile can be divided into just in charged state and uncharged state, state X of its certain moment t in one day in the state of a dayt,
Xt=1 is and the X just in charged statet=0 is uncharged state.Such that it is able to obtain the probability P of electric automobile uncharged state
(Xt=0) and electric automobile just in charged state just in the probability P (X of charged statet=1), it is represented by:
P(Xt=0)=F34(t<tb,tb+tc≤t+24)+
F34(tb+tc≤t)
P(Xt=1)=1-P (Xt=0)
In formula, F34Represent the joint probability distribution function of charge start time and charging interval length, you can think electronic
Charging probability of certain moment in charged state in car day.As a kind of mode, F34=F3×F4, wherein, F3Represent split
The moment probability density function at moment of beginning to charge is integrated and obtains the moment probability-distribution function that starts to charge up the moment, and F4
Then represent the duration probability density function to charging duration to be integrated and obtain the duration probability-distribution function of charging duration.Will
F3And F4Probability multiplication superposition, be obtained in that electric automobile in one day certain moment in charged state charging probability.
Step S140:According to the charging probability, the moment probability density function, the preset charged power and described
Duration probability density function carries out multiple sampling and obtains the day charging peak power in predeterminable area, wherein, the day
Charging peak power is the parameter in the distribution basic parameter.
In the present embodiment, according to the preset charged power of default each electric automobile, by the charging probability of electric automobile,
One charging electric vehicle of each moment is needed during moment probability density function and duration probability density function simultaneous get up to obtain one day
Seek the probability distribution of power.Wherein, multiple sampling solution is carried out by Monte Carlo Analogue Method.By many to an electric automobile
Secondary sampling obtains the charge power of sampling every time, then the charge power that multiple sampling is obtained is carried out averagely such that it is able to obtain
The charge power demand of one electric automobile in one day.According in planning region, the quantity of default electric automobile is multiplied by one
Charge power demand of the electric automobile in one day such that it is able to obtain the default day for obtaining the electric automobile in planning region
Charging peak power.And day charging peak power can be used as one of parameter in distribution basic parameter.
Fig. 4 is referred to, Fig. 4 shows the subflow of the step of getting parms decision variable and binary decision variable first S200
Journey.By the particle cluster algorithm in the quantum genetic algorithm in the first model and the second model can get parms first decision-making become
Amount and binary decision variable.
Specifically, can be obtained first by the particle cluster algorithm in the quantum genetic algorithm in the first model and the second model
Taking the sub-process of Parameter Decision Making variable and binary decision variable includes:Step S210, step S220 and step S230.
Step S210:Obtain the distribution basic parameter.
Distribution basic parameter is obtained, wherein, distribution basic parameter not only includes day charging peak power, distribution basic parameter
Also include:The quantity that the position of charging station can be set up in disjunctive programming region is, the fixed cost and line of setting up charging station
The loss on road.
Step S220:According to the distribution basic parameter and first constraints by first model with quantum
Genetic algorithm generates the Parameter Decision Making variable of charging station.
First model is upper layer model, and upper layer model can be used in the investment amount of optimization of investment enterprise.To charging station
During planning, investment enterprise should consider to cause power network line during the Construction and operation cost of newly-built charging station and charging station operation
The cost for being lost and paying, considers again the time-consuming cost that the client of enterprise produces in charging process.Charger is that charging station is consolidated
The deciding factor of fixed investment, charger quantity is more, and the vehicle of service is more, and floor space is bigger, corresponding soil purchase
The investment for being set to this and other auxiliary equipment is also bigger, and operation expense is also bigger.Using Construction and operation cost as charging
The function of machine quantity.Therefore, business investor will be minimised as object function and sets up upper strata mould with the year cost of investment of charging station
Type, and under the constraint of the constraints of charging station capacity, electric network swim and investment budgey etc. first on layer model target letter
Number is solved.Wherein, upper layer model is represented by:
Min C=C1+C2+C3
Wherein, δ i represent Parameter Decision Making variable, λ ij represent binary decision variable, minC represent the gross investment of charging station into
Originally, C1Represent charging station year Construction and operation cost, C2Annual via net loss cost, the C of Utilities Electric Co. is paid in expression3Represent and use
Family charging behavior time-consuming cost, niRepresent charger quantity, f in i-th charging stationi(ni) represent that the year of i-th charging station builds
Cost, gi(ni) represent i-th charging station annual operating and maintenance cost, r0Represent that discount rate, τ represent that the operation time limit, W represent charging station
Fixed cost;q1Represent equivalent factors of investment, the q of charger unit price2Represent equivalent factors of investment, the T of charger quantityyearTable
Show that the natural law of 1 year, e represent circuit identity network cost depletions, Δ Pk,iRepresent that i-th charging station causes in kth bar feeder line 1 day
Active power loss, M represent 1 day in certain number of users, the t that charge at momentijRepresent that j-th user is travelled to i-th from demand point
Desired summation of interior charging interval, C are expected and stood to the running time of seat charging station0Represent long-run cost rate.
In the present embodiment, upper layer model can carry out meeting the computing of the first constraints.First constraints is electricity
The basic demand parameter of net, the charging station of foundation needs the requirement for meeting electrical network, therefore obtains the computing in Parameter Decision Making variable
During, it is necessary to meet the first constraints.First constraints is represented by:
Va min≤Va≤Va max a∈A
|Iab|≤Iab max a,b∈A
C≤Call
Wherein, PmaxFor maximum charge power, V that power distribution network allows to accessaFor the voltage amplitude of urban power distribution network interior joint a
Value, Vamin and Vamax are respectively the upper and lower bound of node a voltage magnitudes, IabAnd IabmaxAb feeder lines respectively in power distribution network
Actual current and the feeder line maximum current, the C that allow to flow throughallFor concentrated charging station overall cost of ownership budget, NmaxTo concentrate
The first formula in maximum, first constraints of the newly-built quantity of type charging station represents day charging peak power no more than electrical network
The second formula in allowable value, the first constraints represent charging station access that point voltage is out-of-limit, in the first constraints the
Three formulas represent the electric current for flowing through feeder line ab less than the 4th formula expression cost of investment in allowable value, the first constraints
Represent the newly-built charging station quantity of enterprise less than the given upper limit less than the 5th formula in given budget, the first constraints.
After distribution basic parameter is obtained, distribution basic parameter is corresponded in upper layer model as preset parameter.It is logical
Cross variable of the quantum genetic algorithm in the case where the first constraints is met in layer model to solve.Quantum genetic is calculated
Method has the characteristic continued to optimize, so as to upper layer model with quantum genetic algorithm can generate charging station position and its capacity,
Charger quantity.Due to also needing follow-up continuation to optimize, the capacity and charger quantity of the charging station for now generating do not do into
The process of one step.And the position for generating charging station is the variable that charging station whether is set up in each predeterminated position, as Parameter Decision Making
Variable.Parameter Decision Making variable is also a variable in the second model, is entered so as to bring Parameter Decision Making variable into second model
Row is solved.It should be noted that the Parameter Decision Making variable that upper layer model is generated for the first time is random generation.
Step S230:According to the Parameter Decision Making variable and the second constraints by second model with population calculation
Method obtains the binary decision variable.
In the present embodiment, the second model is upper layer model, and underlying model can be used in optimizing the satisfaction of user.As
A kind of mode, different according to the experience of the time of user, user is consuming or is receiving to produce satisfaction in various degree in service process
Phenomenon is referred to as Time-satisfaction degree.The time experience of user is an extremely complex process, provided that service time meet use
Expect that user's performance is satisfied with attitude, can otherwise show dissatisfied attitude in family.The present embodiment is by user satisfaction to charge user
Experiencing the satisfactory level of charging service carries out unifying to portray, and represents that unit charges using the improved function of flexure (Sigmoid)
User satisfaction S (t under powerij), it is represented by:
Wherein, S (tij) represent user satisfaction, max T whole user satisfaction.
And according to the improved function of flexure, the underlying model that target is to the maximum with user satisfaction T can be set up, it can be represented
For:
Wherein, λ ij represent the binary decision variable, tijRepresent that j-th user is travelled to i-th charging station from demand point
Running time expect and stand in the charging interval desired summation, PjFor the charge volume of j-th user.
In underlying model, underlying model needs the computing for carrying out meet the constraint condition.Its constraints is the second constraint
Condition.Specifically, the second constraints is represented by:
λij-δi≤0
In formula, Pi maxCharge user is represented for the first formula in i-th charging station maximum charge power, the second constraints
The second formula in charging station charging, second constraints can only be selected to represent that j-th charge user selects i-th charging station
The premise being charged is exactly that the 3rd formula that must be set up in i-th charging station, the second constraints represents j-th charge user
The charge power that i-th charging station is charged is selected no more than the maximum charge power that i-th charging station is provided.
Parameter Decision Making variable is a variable in underlying model, Parameter Decision Making variable is brought into after underlying model, lower floor
Model obtains binary decision variable λ ij by particle cluster algorithm according to Parameter Decision Making variable.Specifically, in particle cluster algorithm
In, each is with tool per family it is considered that being a particle, the speed of user's traveling is the speed of the particle, by speed
Particle continuous computing such that it is able to obtain optimum binary decision variable λ ij, i.e. certain user selects certain charging station to fill
The result of electricity.
Refer to Fig. 5, Fig. 5 show Parameter Decision Making variable and binary decision variable are updated to according to preset rules it is pre-
If the sub-process of number of times.By according to preset rules undated parameter decision variable and binary decision variable to preset times, to obtain
Parameter Decision Making variable that must be stable and binary decision variable.
Specifically, by according to preset rules undated parameter decision variable and binary decision variable to preset times, to obtain
The step of Parameter Decision Making variable that must be stable and binary decision variable, includes:Step S310 and step S320.
Step S310:The Parameter Decision Making variable and the binary decision variable are updated to according to preset rules default
Number of times, wherein, the preset rules include:Second model is passed through according to the second constraints and the Parameter Decision Making variable
The binary decision variable is updated with particle cluster algorithm, and according to the binary decision variable for updating and the first constraint bar
Part updates the Parameter Decision Making variable by first model with quantum genetic algorithm.
When acquisition once gets Parameter Decision Making variable by upper layer model with quantum genetic algorithm, if according to the parameter
Upper strata model solution is obtained investment optimum results by decision variable, then the investment optimum results may be unsatisfactory for the need of user
Ask.And when binary decision variable is once got with particle cluster algorithm by underlying model, if according to the binary decision variable
Underlying model is solved and satisfaction optimum results are obtained, then the satisfaction optimum results may be unsatisfactory for the investment need of enterprise
Ask.Accordingly, it would be desirable to be calculated with population by Parameter Decision Making variable and by underlying model with quantum genetic algorithm by upper layer model
Method binary decision variable is updated to preset times according to preset rules.
Starting for preset rules is after the layer model on gets parms decision variable, by Parameter Decision Making variable and binary
Decision variable updates once.Specifically, Parameter Decision Making variable is got in the case where the first constraints is met by upper layer model
Afterwards, the decision variable that will get parms is brought into underlying model, so as to meet the second constraints under so that binary decision variable
Updated.During due to upper layer model generation parameter decision variable, upper layer model make a living into Parameter Decision Making variable and generate two
The binary decision variable that obtained by Parameter Decision Making variable in first decision variable and underlying model is simultaneously differed.So as to again by lower floor
The binary decision variable that model is obtained brings layer model into, so that the Parameter Decision Making variable in upper layer model is updated, and then
Parameter Decision Making variable and binary decision variable are once updated in preset rules.
Furthermore, its binary decision variable is updated by bringing the Parameter Decision Making variable that upper layer model is obtained into underlying model,
Its binary decision variable will be updated again brings layer model undated parameter decision variable into.So as to after constantly updating, enable to
The optimal solution of upper layer model and the optimal solution of underlying model are close to each other.In the present embodiment, preset times are 100 times.Join
Number decision variable and binary decision variable update 100 times.Parameter Decision Making variable and binary decision variable update preset times energy
Enough regional stabilities, i.e., after preset times are updated, according to the Parameter Decision Making variable and renewal preset times that update after preset times
Upper strata model solution is obtained binary decision variable afterwards investment optimum results can most meet the same of business investor demand
When also meet the demand of user.And underlying model is solved according to the binary decision variable updated after preset times and is satisfied with
Degree optimum results also comply with the interests of business investor while the demand of user is met.
Step S320:When the Parameter Decision Making variable and the binary decision variable are updated to according to the preset rules
During preset times, judgement meets termination condition.
When parameter decision variable and binary decision variable are updated to preset times according to preset rules, i.e., update 100
After secondary.Parameter Decision Making variable and binary decision variable now tends towards stability, so as to judge that the process for updating iteration terminates.
Fig. 6 is referred to, for the implementation procedure of said method, below this is described in detail with a specific embodiment
Bright method.
Setting planning region area is about as a example by certain area of city of 150km2 and is charged station optimization layout, and planning region shows
It is intended to as shown in fig. 6, business investor can arrange charging station, and each charging station in 6 predeterminated positions (being represented with circle)
Usable area it is unfettered.The automobile pollution in default planning level year is about 200,000, and wherein the ratio of electric automobile is about
For 10%, electric bus, electric taxi, electronic private car and electronic officer's car percentage are respectively 6%, 13%,
79% and 2%.
The benchmark data and distribution basic parameter of the electric automobile in acquisition planning region is as shown in the table:
μ1 | σ1 | μ2 | σ2 | μ3 | σ3 |
155.02 | 41.53 | 3.20 | 0.88 | 17.6 | 3.4 |
Nmin | Nmax | ωl | η | r0 | τ |
5 | 15 | 0.15kw*h/km | 0.9 | 0.07 | 1.0 yuan/kw |
e1 | e2 | Tyear | A | c0 | |
100000 yuan | 30000 yuan/platform * platforms | 365 days | 2000000 yuan | 20 yuan/h |
Charging probability, moment probability density function, preset charged power and duration probability density according to each electric automobile
Function, carries out multiple sampling and obtains day charging peak power 12.5MW obtained in predeterminable area by Monte Carlo Analogue Method.
Default business investor provides the user charging service can set up 3 to 5 charging stations in predeterminated position.According to acquired day
Charging peak power 12.5MW, and by above-mentioned upper layer model and underlying model, using quantum genetic algorithm and population
Algorithm updates iteration 100 times according to preset rules, obtains shown in two electric automobile charging station program results following tables (in bracket
Numeral configures quantity for charger):
Scheme | δi(Ni/ platform) | Ten thousand yuan of C/ | Satisfaction |
1 | 1(10)、5(9)、6(9) | 674.22 | 56 |
2 | 2(7)、4(7)、5(8)、6(8) | 722.17 | 79 |
Understand that scheme 1 proposes that the cost of investment of newly-built 3 concentrated charging stations is proposed newly than scheme 2 refering to data in table
Build low during 4 charging stations, but the satisfaction of charge user is substantially low than scheme 2.The position word of charging station is set in scheme 2
Mother will be marked in Fig. 5, would know that 4 charging station locations are distributed evenly in planning region refering to Fig. 5, although charging station construction
Cost increased about 7.11%, but charge user satisfaction greatly improves about 41.07%.
In the case that in charging station year, overall cost of ownership is more or less the same, how newly-built a business investor charging station be more excellent
Gesture and adaptability.For example, charge user easily reaches charging station in planning region, has saved user time cost depletions, can
More consumer's purchase enterprise electric automobiles are encouraged, and then improves enterprise competitiveness;The configuration capacity of each charging station is reduced, just
In the dilatation demand for meeting charging load growth in future.
Furthermore, go up used in the charging station Optimal Deployment Method that provides of the present embodiment layer model and lower floor's mould to verify again
The advantage of type, respectively the single level programming model with cost of investment and user satisfaction as object function be analyzed:1. will charge
The cost of investment stood is added in Prescribed Properties, and with charge user Maximum Satisfaction as object function as constraints,
Set up the model 1 of charging station single level programming model;2. Constrained bar is added using the satisfaction of charge user as constraints
In part, and with the minimum object function of charging station cost of investment, set up the model 2 of charging station single level programming model.
Two above single-layer model is equally using the basic parameter in above-mentioned specific embodiment, the constraints of model 1
It is that the cost of investment of business investor is not higher than 7,000,000 yuan, the constraints of model 2 is that the satisfaction of user is not less than 90 lists
Position.Two above model is solved using quantum genetic algorithm, its result is as shown in the table:
Scene | δi(Ni/ platform) | Ten thousand yuan of C/ | Satisfaction |
1 | 1(9)、5(9)、6(9) | 686.53 | 63 |
2 | 2(7)、4(7)、7(7)、8(7) | 742.36 | 94 |
From the data result in upper table, though scene 1 can guarantee that cost of investment is minimum, user satisfaction is relatively
It is little;Scene 2 can guarantee that user satisfaction reaches maximum (lifting about 49.21% relative to scene 1), but cost of investment increases (increasing
Plus about 8.13%), run counter to business investor theory of investment.Compare with the scheme 2 in above-mentioned specific embodiment, by upper
Coupling Decision-making Function in layer model and underlying model between different policymaker, both can guarantee that company investment cost was in reasonable water
It is flat, also take into account the comfort level of Consumer's Experience, i.e. enterprise and the respective interests of user have obtained equilibrium.
Refer to Fig. 7, in Fig. 7 solid line A be user satisfaction, dotted line B be company investment cost, X be enterprise's gross investment into
This (ten thousand yuan), Y are fixed cost (ten thousand yuan), Z is user satisfaction.
As a kind of mode, for business investor, it is ensured that enterprise getting profit and enhancing enterprise market occupation rate are most
Whole purpose.The newly-built concentrated charging station of enterprise can not only strengthen the desire that consumer buys electric automobile, moreover it is possible to rely on charging station
Charge and obtain operation benefits.The initial stage is promoted in electric automobile, newly-built charging station early stage need to put into substantial amounts of fund, if enterprise's urgency
In cost of recouping capital outlay, high charging service expense, and then the development of obstruction electric automobile can be collected, therefore for enterprise comes
Say that control charging station cost of investment is enterprises pay attention emphasis.Charging station year, Construction and operation cost proportion was heavier, and its middle age transports
Row cost is substantially more or less the same, and fixed cost and equivalent cost of investment can be according to enterprise practical situations in year construction cost
Or program budget determines that is, year construction cost is variable.Therefore, by obtaining different fixed costs to final in the present embodiment
The impact of charging station program results is as shown in Figure 7.
By obtaining refering to Fig. 7, the increase of concentrated charging station fixed cost can be such that charging station overall cost of ownership constantly increases
Plus, charge user satisfaction is also gradually lifted.In other words, enterprise can pass through the investment for increasing charging station (as increased charger number
Amount, update charging technique etc.) improving charging station efficiency of service, and then increase automobile user and charge the satisfaction of experience,
The consumer around existing automobile user can also be stimulated to buy the desire of electric automobile.
Refer to Fig. 7, Fig. 7 is to apply the charging station in the local terminal 100 shown in Fig. 1 to optimize the of placement device 200
One structured flowchart.The charging station optimization placement device 200 includes:At first processing module 210, Second processing module the 220, the 3rd
Reason module 230 and output module 240.
First processing module 210, for obtaining distribution basic parameter, according to the distribution basic parameter and the first constraint bar
Part generates the Parameter Decision Making variable of charging station by the first model, and two are obtained by the second model according to the Parameter Decision Making variable
First decision variable.
Second processing module 220, for by the Parameter Decision Making variable and the binary decision variable according to preset rules
Preset times are updated to, wherein, the preset rules include:Second model is passed through more according to the Parameter Decision Making variable
The new binary decision variable, further according to the binary decision variable and first constraints for updating described first is passed through
Parameter Decision Making variable described in model modification.
3rd processing module 230, is updated to the Parameter Decision Making variable of preset times and is updated to default for basis
The binary decision variable of number of times obtains investment optimum results by first model, according to the institute for being updated to preset times
State binary decision variable and satisfaction optimum results are obtained by second model.
Output module 240;Charging station optimization cloth is obtained according to the investment optimum results and the satisfaction optimum results
Office's result.
Refer to Fig. 8, Fig. 8 is to apply the charging station in the local terminal 100 shown in Fig. 1 to optimize the of placement device 200
Two structured flowcharts.Wherein, first processing module 210 includes:Input block 211, first processing units 212 and second processing unit
213。
Input block 211, for obtaining the distribution basic parameter.
First processing units 212, for according to the distribution basic parameter and first constraints by described the
One model generates the Parameter Decision Making variable of charging station with quantum genetic algorithm.
Second processing unit 213, for passing through second mould according to the Parameter Decision Making variable and the second constraints
Type obtains the binary decision variable with particle cluster algorithm.
Refer to Fig. 9, Fig. 9 is to apply the charging station in the local terminal 100 shown in Fig. 1 to optimize the of placement device 200
Two structured flowcharts.Wherein, Second processing module 220 includes:3rd processing unit 221 and fourth processing unit 222.
3rd processing unit 221, for the Parameter Decision Making variable and the binary decision variable to be preset according to described
Rule is updated to preset times, wherein, the preset rules include:According to the second constraints and the Parameter Decision Making variable
The binary decision variable is updated with the particle cluster algorithm by second model, and according to the binary decision for updating
Variable and first constraints update the Parameter Decision Making variable by first model with the quantum genetic algorithm
User.
Fourth processing unit 222, for when the Parameter Decision Making variable and the binary decision variable are according to described default
When rule is updated to preset times, judgement meets termination condition.
It should be noted that being convenience and the letter of description because those skilled in the art can be understood that
Clean, the specific work process of the system, device and unit of foregoing description may be referred to corresponding in preceding method embodiment
Journey, will not be described here.
In sum, a kind of charging station Optimal Deployment Method and device are being embodiments provided, in the charging station
In Optimal Deployment Method, by obtaining input distribution basic parameter, and distribution basic parameter and the first constraints are passed through
First model generates the Parameter Decision Making variable of charging station such that it is able to obtain meeting distribution basic parameter and the first constraints
The construction quantity of charging station and corresponding construction position.And then can by bringing the second model into according to Parameter Decision Making variable
The binary decision variable which charging station certain user selects is obtained by the second model.Parameter Decision Making variable and binary are determined
Plan variable is updated to preset times according to preset rules, to obtain stable Parameter Decision Making variable and binary decision variable.Its
In, preset rules include:According to binary decision variable and the first constraints by the first model modification Parameter Decision Making variable, then
The Parameter Decision Making variable for updating is passed through into the second model modification binary decision variable.By Parameter Decision Making variable by the first model
The suboptimization to Parameter Decision Making variable is once updated to, and is also by the once renewal that binary decision variable passes through the second model
A suboptimization to binary decision variable.Constantly updated by and binary decision variable logical to Parameter Decision Making variable, be close to
After preset times, Parameter Decision Making variable passes through each renewal of the first model and binary decision variable by each of the second model
Renewal tends towards stability, then after satisfaction is updated to preset times, stop to Parameter Decision Making variable and binary decision variable more
Newly.Furthermore, according to the Parameter Decision Making variable that is updated to preset times and the binary decision variable for being updated to preset times by the
One model obtains investment optimum results, and obtains satisfaction by the second model according to the binary decision variable for being updated to preset times
Degree optimum results.Due to investing optimum results and satisfaction optimum results to continue to optimize renewal, and influence each other and obtain most
Excellent structure, so as to charging station optimization layout result just can be obtained according to investment optimum results and satisfaction optimization.By first
Continue to optimize renewal by preset times of the model to Parameter Decision Making variable, the second model is to binary decision variable by default time
Several continues to optimize renewal, and Parameter Decision Making variable and binary decision variable influencing each other when updating, so as to final energy
Charging station optimization layout result is enough obtained, and then the optimal case for meeting user and investor demand can be obtained.
Claims (10)
1. a kind of charging station Optimal Deployment Method, it is characterised in that methods described includes:
Distribution basic parameter is obtained, charging station is generated by the first model according to the distribution basic parameter and the first constraints
Parameter Decision Making variable, according to the Parameter Decision Making variable by the second model obtain binary decision variable;
The Parameter Decision Making variable and the binary decision variable are updated to into preset times according to preset rules, wherein, institute
Stating preset rules includes:The binary decision variable according to the Parameter Decision Making variable passes through second model modification, then root
Become by Parameter Decision Making described in first model modification according to the binary decision variable and first constraints that update
Amount;
Led to the binary decision variable for being updated to preset times according to the Parameter Decision Making variable for being updated to preset times
Cross first model and obtain investment optimum results, according to being updated to the binary decision variable of preset times by described the
Two models obtain satisfaction optimum results;
Charging station optimization layout result is obtained according to the investment optimum results and the satisfaction optimum results.
2. charging station Optimal Deployment Method according to claim 1, it is characterised in that obtain distribution basic parameter, according to
The distribution basic parameter and the first constraints generate the Parameter Decision Making variable of charging station by the first model, according to the ginseng
The step of number decision variable obtains binary decision variable by the second model, including:
Obtain the distribution basic parameter;
According to the distribution basic parameter and first constraints by first model with quantum genetic algorithm generation
The Parameter Decision Making variable of charging station;
Described two are obtained according to the Parameter Decision Making variable and the second constraints with particle cluster algorithm by second model
First decision variable.
3. charging station Optimal Deployment Method according to claim 2, it is characterised in that by the Parameter Decision Making variable and institute
State binary decision variable and be updated to preset times according to preset rules, wherein, the preset rules include:According to the parameter
Decision variable is by binary decision variable described in second model modification, the binary decision variable and institute further according to renewal
The first constraints is stated by described in first model modification the step of Parameter Decision Making variable, including:
The Parameter Decision Making variable and the binary decision variable are updated to into preset times according to the preset rules, its
In, the preset rules include:According to the second constraints and the Parameter Decision Making variable by second model with described
Particle cluster algorithm updates the binary decision variable, and according to the binary decision variable and first constraints for updating
The Parameter Decision Making variable user is updated with the quantum genetic algorithm by first model;
When the Parameter Decision Making variable and the binary decision variable are updated to preset times according to the preset rules, sentence
Surely termination condition is met.
4. charging station Optimal Deployment Method according to claim 1, it is characterised in that obtaining distribution basic parameter, root
The Parameter Decision Making variable of charging station is generated by the first model according to the distribution basic parameter and the first constraints, according to described
Before the step of Parameter Decision Making variable obtains binary decision variable by the second model, also include:
The benchmark data of electric automobile is obtained, the day charging peak power in predeterminable area is obtained according to the benchmark data, its
In, the day charging peak power is the parameter in the distribution basic parameter.
5. charging station Optimal Deployment Method according to claim 4, it is characterised in that obtain the base value of electric automobile
According to, the day charging peak power in predeterminable area is obtained according to the benchmark data, wherein, the day charging peak power is institute
The step of stating the parameter in distribution basic parameter includes:
According to the benchmark data obtain the electric automobile in predeterminable area day operating range apart from normal distribution and
Start to charge up the moment probability density function at moment;
According to the duration probability density that the charging electric vehicle duration is obtained apart from normal distribution and preset charged power
Function;
The duration probability density function is multiplied certain in the acquisition electric automobile one day with the moment probability density function
Charging probability of the moment in charged state;
According to the charging probability, the moment probability density function, the preset charged power and the duration probability density
Function carries out multiple sampling and obtains the day charging peak power in predeterminable area, wherein, the day charging peak power
For the parameter in the distribution basic parameter.
6. charging station Optimal Deployment Method according to claim 1, it is characterised in that first model is:
Min C=C1+C2+C3
Wherein, δ i represent that the Parameter Decision Making variable, λ ij represent that the binary decision variable, minC represent total throwing of charging station
Money cost, C1Represent charging station year Construction and operation cost, C2Annual via net loss cost, the C of Utilities Electric Co. is paid in expression3Table
Show that user's charging behavior takes cost, niRepresent charger quantity, f in i-th charging stationi(ni) represent i-th charging station year
Construction cost, gi(ni) represent i-th charging station annual operating and maintenance cost, r0Represent that discount rate, τ represent that the operation time limit, W are represented and filled
Power station fixed cost;q1Represent equivalent factors of investment, the q of charger unit price2The equivalent factors of investment of expression charger quantity,
TyearRepresent that the natural law of 1 year, e represent circuit identity network cost depletions, Δ Pk,iRepresent that i-th charging station causes kth bar feeder line
Certain moment charges during active power loss, M are represented 1 day in 1 day number of users, tijRepresent that j-th user travels from demand point
Desired summation of interior charging interval, C are expected and stood to running time to i-th charging station0Represent long-run cost rate.
7. charging station Optimal Deployment Method according to claim 1, it is characterised in that second model is:
Wherein, S (tij) represent that user satisfaction, max T whole user satisfaction, λ ij represent the binary decision variable, tijTable
Show that j-th user travels to the running time of i-th charging station expect and stand desired summation of interior charging interval, P from demand pointj
For the charge volume of j-th user.
8. a kind of charging station optimizes placement device, it is characterised in that described device includes:
First processing module, for obtaining distribution basic parameter, passes through according to the distribution basic parameter and the first constraints
First model generates the Parameter Decision Making variable of charging station, and binary decision is obtained by the second model according to the Parameter Decision Making variable
Variable;
Second processing module, for the Parameter Decision Making variable and the binary decision variable to be updated to according to preset rules
Preset times, wherein, the preset rules include:According to the Parameter Decision Making variable by described in second model modification two
First decision variable, further according to the binary decision variable and first constraints for updating first model modification is passed through
The Parameter Decision Making variable;
3rd processing module, is updated to the Parameter Decision Making variable of preset times and is updated to the institute of preset times for basis
State binary decision variable and investment optimum results are obtained by first model, determined according to the binary for being updated to preset times
Plan variable obtains satisfaction optimum results by second model;
Output module;Charging station optimization layout result is obtained according to the investment optimum results and the satisfaction optimum results.
9. charging station according to claim 8 optimizes placement device, it is characterised in that the first processing module includes:
Input block, for obtaining the distribution basic parameter;
First processing units, for according to the distribution basic parameter and first constraints by first model with
Quantum genetic algorithm generates the Parameter Decision Making variable of charging station;
Second processing unit, for passing through second model with particle according to the Parameter Decision Making variable and the second constraints
Group's algorithm obtains the binary decision variable.
10. charging station according to claim 9 optimizes placement device, it is characterised in that the Second processing module includes:
3rd processing unit, for by the Parameter Decision Making variable and the binary decision variable according to the preset rules more
Newly to preset times, wherein, the preset rules include:According to the second constraints and the Parameter Decision Making variable by described
Second model updates the binary decision variable with the particle cluster algorithm, and according to the binary decision variable and institute for updating
State the first constraints and the Parameter Decision Making variable user is updated with the quantum genetic algorithm by first model;
Fourth processing unit, for when the Parameter Decision Making variable and the binary decision variable according to the preset rules more
When newly to preset times, judgement meets termination condition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611093209.2A CN106682765A (en) | 2016-12-01 | 2016-12-01 | Charging station optimization layout method and apparatus thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611093209.2A CN106682765A (en) | 2016-12-01 | 2016-12-01 | Charging station optimization layout method and apparatus thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106682765A true CN106682765A (en) | 2017-05-17 |
Family
ID=58866311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611093209.2A Pending CN106682765A (en) | 2016-12-01 | 2016-12-01 | Charging station optimization layout method and apparatus thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106682765A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107274035A (en) * | 2017-07-18 | 2017-10-20 | 东南大学 | A kind of transportation network and the method for electric automobile charging station coordinated planning |
CN109460853A (en) * | 2018-09-29 | 2019-03-12 | 中国电力科学研究院有限公司 | A kind of electric car charging workload demand determines method and system |
CN110570050A (en) * | 2019-09-25 | 2019-12-13 | 国网浙江省电力有限公司经济技术研究院 | Road-network-vehicle-related electric vehicle charging guiding method |
CN112823105A (en) * | 2018-10-05 | 2021-05-18 | 戴姆勒股份公司 | Method for controlling a charging station for charging a vehicle, and charging station and vehicle therefor |
CN113609658A (en) * | 2021-07-19 | 2021-11-05 | 华北电力大学 | Optimal configuration calculation method and calculation device for bus junction in power distribution system |
CN118114826A (en) * | 2024-03-05 | 2024-05-31 | 淮阴工学院 | Method and system for optimizing re-layout of charging piles of campus two-wheeled electric vehicle |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104463701A (en) * | 2014-12-07 | 2015-03-25 | 国网浙江省电力公司电动汽车服务分公司 | Coordinated planning method for power distribution system and electromobile charging network |
CN105184420A (en) * | 2015-09-25 | 2015-12-23 | 东南大学 | Charging station planning scheme evaluation method based on grey relational analysis |
CN106004482A (en) * | 2016-05-26 | 2016-10-12 | 国网电力科学研究院武汉南瑞有限责任公司 | Electric vehicle emergency rescue station arrangement method |
CN109636031A (en) * | 2018-12-10 | 2019-04-16 | 国家电网有限公司 | A kind of city charging station integrated planning method |
-
2016
- 2016-12-01 CN CN201611093209.2A patent/CN106682765A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104463701A (en) * | 2014-12-07 | 2015-03-25 | 国网浙江省电力公司电动汽车服务分公司 | Coordinated planning method for power distribution system and electromobile charging network |
CN105184420A (en) * | 2015-09-25 | 2015-12-23 | 东南大学 | Charging station planning scheme evaluation method based on grey relational analysis |
CN106004482A (en) * | 2016-05-26 | 2016-10-12 | 国网电力科学研究院武汉南瑞有限责任公司 | Electric vehicle emergency rescue station arrangement method |
CN109636031A (en) * | 2018-12-10 | 2019-04-16 | 国家电网有限公司 | A kind of city charging station integrated planning method |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107274035A (en) * | 2017-07-18 | 2017-10-20 | 东南大学 | A kind of transportation network and the method for electric automobile charging station coordinated planning |
CN107274035B (en) * | 2017-07-18 | 2021-02-02 | 东南大学 | Method for coordinately planning traffic network and electric vehicle charging station |
CN109460853A (en) * | 2018-09-29 | 2019-03-12 | 中国电力科学研究院有限公司 | A kind of electric car charging workload demand determines method and system |
CN109460853B (en) * | 2018-09-29 | 2021-10-29 | 中国电力科学研究院有限公司 | Method and system for determining charging load demand of electric automobile |
CN112823105A (en) * | 2018-10-05 | 2021-05-18 | 戴姆勒股份公司 | Method for controlling a charging station for charging a vehicle, and charging station and vehicle therefor |
CN112823105B (en) * | 2018-10-05 | 2022-03-04 | 戴姆勒股份公司 | Method for controlling a charging station for charging a vehicle, and charging station and vehicle therefor |
CN110570050A (en) * | 2019-09-25 | 2019-12-13 | 国网浙江省电力有限公司经济技术研究院 | Road-network-vehicle-related electric vehicle charging guiding method |
CN110570050B (en) * | 2019-09-25 | 2022-05-24 | 国网浙江省电力有限公司经济技术研究院 | Road-network-vehicle-related electric vehicle charging guiding method |
CN113609658A (en) * | 2021-07-19 | 2021-11-05 | 华北电力大学 | Optimal configuration calculation method and calculation device for bus junction in power distribution system |
CN113609658B (en) * | 2021-07-19 | 2024-02-27 | 华北电力大学 | Optimal configuration calculation method and calculation equipment for public transport hub in power distribution system |
CN118114826A (en) * | 2024-03-05 | 2024-05-31 | 淮阴工学院 | Method and system for optimizing re-layout of charging piles of campus two-wheeled electric vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106682765A (en) | Charging station optimization layout method and apparatus thereof | |
Noori et al. | Light-duty electric vehicles to improve the integrity of the electricity grid through Vehicle-to-Grid technology: Analysis of regional net revenue and emissions savings | |
Shaheen et al. | Carsharing's impact and future | |
Kazemi et al. | Optimal siting and sizing of distribution system operator owned EV parking lots | |
DE102013202059B4 (en) | CHARGER INFRASTRUCTURE FOR ELECTRIC VEHICLES (EVs) WITH OPTIMUM LOCATION SELECTION FOR CHARGING STATIONS | |
CN116307647B (en) | Electric vehicle charging station site selection and volume determination optimization method and device and storage medium | |
Sheppard et al. | Joint optimization scheme for the planning and operations of shared autonomous electric vehicle fleets serving mobility on demand | |
Jovanovic et al. | A multiobjective analysis of the potential of scheduling electrical vehicle charging for flattening the duck curve | |
CN106022875A (en) | Method, device and system for managing engineering machine equipment leasing platform | |
CN106779176A (en) | Electric taxi fills electrically-charging equipment configuration and constant volume method in station soon | |
CN109800917A (en) | A kind of planing method in electric car parking lot, device and calculate equipment | |
Pantuso | Exact solutions to a carsharing pricing and relocation problem under uncertainty | |
Shi et al. | Efficient energy management of wireless charging roads with energy storage for coupled transportation–power systems | |
CN108921964A (en) | A kind of road electronic ticket sharing method and platform | |
CN105006026B (en) | A kind of taxi expense allocation Talmud methods | |
CN115471007A (en) | Charging station site selection and volume determination method, device, equipment and medium considering comprehensive cost | |
Hu et al. | Locating and sizing charging station in multi-period to promote electric vehicles adoption in urban areas | |
TW202311077A (en) | A method of managing electric vehicle charging based on blockchain | |
Babic et al. | Electricity trading agent for EV-enabled parking lots | |
CN117314038A (en) | Multi-energy complementary charging station scheduling method, system, equipment and medium | |
CN116843121A (en) | Mobile crowd sensing task allocation method and management system based on level matching degree | |
Anchuen et al. | Fleet Optimization of Smart Electric Motorcycle System Using Deep Reinforcement Learning. | |
Feng et al. | Optimising departure intervals for multiple bus lines with a multi‐objective model | |
Mohammad et al. | Transactive energy management of solar-based range anxious electric vehicle integrated parking lots | |
Zheng et al. | Adaptive robust scheduling optimization of a smart commercial building considering joint energy and reserve markets |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |