CN106639106A - Steel structure flexible shed frame - Google Patents
Steel structure flexible shed frame Download PDFInfo
- Publication number
- CN106639106A CN106639106A CN201710124737.8A CN201710124737A CN106639106A CN 106639106 A CN106639106 A CN 106639106A CN 201710124737 A CN201710124737 A CN 201710124737A CN 106639106 A CN106639106 A CN 106639106A
- Authority
- CN
- China
- Prior art keywords
- longeron
- track
- column
- steel construction
- flexible
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 24
- 239000010959 steel Substances 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 claims abstract description 22
- 230000000694 effects Effects 0.000 claims description 18
- 238000007689 inspection Methods 0.000 claims description 7
- 239000011230 binding agent Substances 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 claims description 4
- 239000004035 construction material Substances 0.000 abstract description 8
- 239000000463 material Substances 0.000 abstract description 3
- 239000002699 waste material Substances 0.000 abstract description 3
- 230000005611 electricity Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
- IXHBTMCLRNMKHZ-LBPRGKRZSA-N levobunolol Chemical compound O=C1CCCC2=C1C=CC=C2OC[C@@H](O)CNC(C)(C)C IXHBTMCLRNMKHZ-LBPRGKRZSA-N 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/022—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/04—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/16—Roof structures with movable roof parts
- E04B7/166—Roof structures with movable roof parts characterised by a translation movement of the movable roof part, with or without additional movements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a steel structure flexible shed frame. The steel structure flexible shed frame comprises stand columns, track longitudinal beams and flexible ceilings. The two rows of stand columns are fixed to a foundation in a symmetry arrangement mode to enable the stability of the whole shed frame to be ensured. The track longitudinal beams are divided into an upper layer and a lower layer which are connected to the upper portions and the top portions of the stand columns, an upper flexible ceiling is connected with the track longitudinal beams on the two sides of the top portions, a lower flexible ceiling is connected with the track longitudinal beams on the two sides of the upper portions, the spans of the two layers of the flexible ceilings both can be adjusted, and the two layers of the flexible ceilings both can move along the corresponding track longitudinal beams. When construction materials in different positions are hoisted, only the flexible ceilings need to be moved to other positions of the track longitudinal beams, the whole shed frame does not need to be moved, and while working efficiency is greatly improved, man power and material resources are saved; the shed frame has universality owing to the fact that the spans of the flexible ceilings are adjustable and can be reused in different construction sites, and waste caused by the fact that the shed frames are not universal among different construction projects is avoided.
Description
Technical field
The present invention relates to a kind of steel construction frame, particularly a kind of steel construction activity frame.
Background technology
In Construction of Engineering Projects building-site, frame is used by wide variety of, and providing for construction material can block sun
The space of light, rainwater.Needing to be lifted by gantry crane construction material more, the scope covered needed for the gantry crane of a building-site compared with
Greatly, and frame need to only be arranged on regional area, therefore, be normally placed in during frame gantry crane cover space in.When Building wood in frame
It is to be customized according to place mostly the frame that current building site uses to realize the function when material needs lifting, it is necessary to remove frame
Simple movable frame, head room is low, stable type is poor, without wind loading rating, and use range is limited.
Limit because Construction of Engineering Projects mostly is short-period beta site, when certain project is completed, because arranging place
System, the frame span of newly built construction project very likely needs to be adjusted according to place situation, and original frame cannot be recycled
New building site, causes very big waste.
The content of the invention
Present invention is primarily targeted at providing a kind of receiving wide ranges, good stability, the steel construction canopy with versatility
Frame.
This steel construction activity frame disclosed by the invention, including column, track longeron and false ceiling, two row's columns pair
Arrangement is claimed to be fixed on ground, the upper and lower two-layer of track longeron point is connected to the top and top of column, top both sides
Upper strata false ceiling is installed on track longeron, lower floor's false ceiling, two-layer activity are installed on the track longeron of top both sides
The span of ceiling is adjustable, can move along corresponding track longeron, and the length of track longeron is more than or equal to two-layer movable top
The overall length of canopy.
The top of the column and upper inner are respectively arranged with bracket, and the track longeron on upper strata is connected to the top of column
Portion, the track longeron of lower floor is connected on the bracket on column top.
The upper strata false ceiling and lower floor's false ceiling are the low A font ceilings in middle high both sides, if respectively including
Dry A fonts crossbeam, traveling longeron, binder and electric roller, traveling longeron is arranged in the top of the track longeron, each A fonts
Beam vertical arranged in the track longeron, is detachably connected by connecting seat respectively between each A fonts crossbeam and traveling longeron,
Electric roller is connected to the downside of traveling longeron, and two false ceilings are up in corresponding track longeron by electric roller respectively
Walk.
The A fonts crossbeam includes the intermediate standard section of A fonts and is symmetrically removably connected to intermediate standard section both sides
Active segment, the two ends of A font crossbeams and the connecting seat are connected as a single entity.
It is connected as a single entity by binder between the A fonts crossbeam.
The track longeron includes H profile steel longeron and is attached to the traveling rail of side.
Track longeron fixture is provided with the column.
Inspection platform is respectively arranged with the bracket on the column top and top, inspection platform is configured with maintenance ladder.
The bottom of the column is fixed by foundation bolt with ground, and oblique is provided between the adjacent upright posts of homonymy
Support.
The column of the present invention is fixed on ground, it is ensured that the stability of whole frame.Distinguish at the top of column and top
Track longeron is set, false ceiling is respectively mounted on track longeron, two-layer false ceiling can respectively along corresponding track longeron
It is mobile.When construction material is lifted, false ceiling is moved to into the other positions on track longeron, without the need for whole frame is moved
Dynamic position, uses manpower and material resources sparingly while greatly improving work efficiency.By the way that the A font crossbeams of false ceiling are designed as into standard
The splicing construction of section and active segment realizes that the span of false ceiling is adjustable, when needing to change the span of frame, only need to change work
Dynamic section, so makes frame have versatility, can reuse in different construction site, it is to avoid current disparity items it
Between frame be unable to the waste of generalized ribbon.
Description of the drawings
Fig. 1 is the structural representation of one embodiment of the invention.
Fig. 2 is the schematic side view of Fig. 1.
Fig. 3 is the A portions enlarged diagram in Fig. 1.
Fig. 4 is the dimensional structure diagram of Fig. 1 skeletons(The picture seen in document).
Specific embodiment
As shown in figure 1, this steel construction activity frame disclosed in the present embodiment, including the work of column 1, track longeron 2, upper strata
Dynamic ceiling 3 and lower floor's false ceiling 4.
As shown in figure 1, two row's columns 1 are arranged symmetrically, the bottom of each column 1 is fixed by foundation bolt with ground, it is ensured that
The stability of whole frame.The top of each column 1 and inside top are respectively arranged with bracket 11, maintenance are provided with bracket 11 flat
Platform 13.The setting of inspection platform 13 makes attendant easily to be maked an inspection tour, it is to avoid the phenomenon generation of jumping onto the tracks of false ceiling.
As shown in Fig. 2 arranging skewed horizontal load 14 between the column 1 of homonymy, the stability of whole frame is further improved.Inspection
Equating platform is configured with maintenance ladder 15.
As shown in figures 1 and 3, track longeron 2 includes H profile steel longeron 21 and is attached to the traveling rail 22 of side.Rail
Road longeron 2 has a upper and lower two-layer, and the H profile steel longeron 21 of upper strata track longeron 2 is connected to the top of column 1, lower floor track longeron 2
H profile steel longeron 21 be connected on the bracket 11 on the top of column 1.The top outer and upper inner respective carter longeron 2 of column
Place is respectively arranged with track longeron fixture 12.
As shown in figure 1, upper strata false ceiling 3 is identical with the structure of lower floor false ceiling 4, due to upper strata track longeron connection
In the top of column, lower floor's track longeron is connected to the inner side of column, so the span of upper strata false ceiling is more than lower floor's activity
The span of ceiling.
As shown in figures 1 and 3, two false ceilings include respectively some A fonts crossbeams I, traveling longeron II, binder III and electricity
Dynamic roller IV.
Each A fonts crossbeam I arranges that each A fonts crossbeam I is respectively including the intermediate standard section of A fonts perpendicular to track longeron 2
I 1 and the active segment I 2 at intermediate standard section two ends is removably connected to by connecting plate and connecting bolt.Traveling longeron II is H types
Girder steel, electric roller IV is connected to the downside of row longeron II.Traveling longeron II is by connecting seat and connecting bolt and A font crossbeams
I active segment I 2 connects.It is connected as a single entity by binder III between adjacent A fonts crossbeam I.The A font crossbeams of the present embodiment are adopted
With three, the frame of different length can adopt the A font crossbeams of varying number.
The electricity that the traveling longeron of lower floor's false ceiling 4 is arranged in parallel on the downside of the top of lower floor's track longeron, traveling longeron
Dynamic roller is using the traveling rail of lower floor's track longeron as walking track.
The electricity that the traveling longeron of upper strata false ceiling 3 is arranged in parallel on the downside of the top of upper strata track longeron, traveling longeron
Dynamic roller is using the traveling rail of upper strata track longeron as walking track.
When this frame is used, the active length assembling A font crossbeams of appropriate length are selected according to span demand.Frame
Overall length determines that the length of track longeron is identical with the length of whole frame according to practical situation, and the length of track longeron is according to building
The lifting direction for building material determines.
When the construction material under two-layer false ceiling in frame is lifted respectively toward the two ends of frame, the length of track longeron
The length of two-layer false ceiling is only need to be equal to, when such as lifting the construction material under lower floor's false ceiling, the activity of control lower floor
Ceiling is moved to the lower section of upper strata false ceiling, when lifting the construction material under the false ceiling of upper strata certainly, the activity of control upper strata
Ceiling is moved to the top of lower floor's false ceiling.When the construction material in frame be both needed to toward same direction lift when, then need by
Two-layer false ceiling is all removed, so the length of this kind of situation lower railway longeron need to be more than the overall length of two-layer false ceiling.Operation
Personnel can drive corresponding false ceiling movement in ground control electric roller, easy and safe to operate.
Claims (9)
1. a kind of steel construction activity frame, it is characterised in that:It includes column, track longeron and false ceiling, two row's columns pair
Arrangement is claimed to be fixed on ground, the upper and lower two-layer of track longeron point is connected to the top and top of column, top both sides
Upper strata false ceiling is installed on track longeron, lower floor's false ceiling, two-layer activity are installed on the track longeron of top both sides
The span of ceiling is adjustable, can move along corresponding track longeron, and the length of track longeron is more than or equal to two-layer movable top
The overall length of canopy.
2. steel construction as claimed in claim 1 activity frame, it is characterised in that:The top of the column and upper inner are distinguished
Bracket is provided with, the track longeron on upper strata is connected to the top of column, and the track longeron of lower floor is connected to the bracket on column top
On.
3. steel construction as claimed in claim 2 activity frame, it is characterised in that:The upper strata false ceiling and lower floor's movable top
Canopy is the low A font ceilings in middle high both sides, respectively including some A fonts crossbeams, traveling longeron, binder and electric roller,
Traveling longeron is arranged in the top of the track longeron, and each A fonts beam vertical is arranged in the track longeron, and each A fonts are horizontal
It is detachably connected by connecting seat respectively between beam and traveling longeron, electric roller is connected to the downside of traveling longeron, and two is movable
Ceiling is walked respectively by electric roller on corresponding track longeron.
4. steel construction as claimed in claim 3 activity frame, it is characterised in that:The A fonts crossbeam includes the centre of A fonts
Standard paragraphs and the active segment of intermediate standard section both sides is symmetrically removably connected to, the two ends of A font crossbeams and the connecting seat connect
It is integrated.
5. steel construction as claimed in claim 4 activity frame, it is characterised in that:Connected by binder between the A fonts crossbeam
It is integrated.
6. steel construction as claimed in claim 1 activity frame, it is characterised in that:The track longeron include H profile steel longeron and
It is attached to the traveling rail of side.
7. steel construction as claimed in claim 1 activity frame, it is characterised in that:It is provided with track longeron on the column to fix
Part.
8. steel construction as claimed in claim 2 activity frame, it is characterised in that:Divide on the bracket on the column top and top
Inspection platform is not provided with, inspection platform is configured with maintenance ladder.
9. steel construction as claimed in claim 1 activity frame, it is characterised in that:The bottom of the column by foundation bolt with
Ground is fixed, and between the adjacent upright posts of homonymy skewed horizontal load is provided with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710124737.8A CN106639106A (en) | 2017-03-03 | 2017-03-03 | Steel structure flexible shed frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710124737.8A CN106639106A (en) | 2017-03-03 | 2017-03-03 | Steel structure flexible shed frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106639106A true CN106639106A (en) | 2017-05-10 |
Family
ID=58846993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710124737.8A Pending CN106639106A (en) | 2017-03-03 | 2017-03-03 | Steel structure flexible shed frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106639106A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108382755A (en) * | 2018-03-29 | 2018-08-10 | 山西尚风科技股份有限公司 | A kind of totally-enclosed removable feed bin of nested type |
CN109208803A (en) * | 2018-10-11 | 2019-01-15 | 中国人民解放军63921部队 | A kind of large span light steel flexible activity roof |
CN109518865A (en) * | 2019-01-08 | 2019-03-26 | 贵州建工集团第四建筑工程有限责任公司 | Combine the building roof structure and its installation method of gapless |
CN110984600A (en) * | 2019-12-11 | 2020-04-10 | 中建四局第六建设有限公司 | Movable protective shed for construction on running light rail and using method thereof |
CN112302383A (en) * | 2020-10-29 | 2021-02-02 | 中国建筑土木建设有限公司 | Adjustable light multifunctional industrial factory building system and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1991744A1 (en) * | 2006-03-03 | 2008-11-19 | V & M Deutschland GmbH | Steel support system for roof constructions |
CN201195947Y (en) * | 2008-05-12 | 2009-02-18 | 中冶成工上海五冶建设有限公司 | Gate type frame of combination type coke oven booth |
CN201809856U (en) * | 2010-07-23 | 2011-04-27 | 四川公路桥梁建设集团有限公司 | Double-layer movable steel frame ceiling |
CN103122667A (en) * | 2011-11-18 | 2013-05-29 | 中国水电顾问集团成都勘测设计研究院 | Light-weight steel structure plafond of large-span underground powerhouse of hydroelectric station |
CN202968034U (en) * | 2012-11-20 | 2013-06-05 | 张爱霞 | Greenhouse cherry planting auxiliary device |
CN204456986U (en) * | 2014-12-25 | 2015-07-08 | 中铁大桥局集团有限公司 | A kind of ceiling open-type factory building |
-
2017
- 2017-03-03 CN CN201710124737.8A patent/CN106639106A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1991744A1 (en) * | 2006-03-03 | 2008-11-19 | V & M Deutschland GmbH | Steel support system for roof constructions |
CN201195947Y (en) * | 2008-05-12 | 2009-02-18 | 中冶成工上海五冶建设有限公司 | Gate type frame of combination type coke oven booth |
CN201809856U (en) * | 2010-07-23 | 2011-04-27 | 四川公路桥梁建设集团有限公司 | Double-layer movable steel frame ceiling |
CN103122667A (en) * | 2011-11-18 | 2013-05-29 | 中国水电顾问集团成都勘测设计研究院 | Light-weight steel structure plafond of large-span underground powerhouse of hydroelectric station |
CN202968034U (en) * | 2012-11-20 | 2013-06-05 | 张爱霞 | Greenhouse cherry planting auxiliary device |
CN204456986U (en) * | 2014-12-25 | 2015-07-08 | 中铁大桥局集团有限公司 | A kind of ceiling open-type factory building |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108382755A (en) * | 2018-03-29 | 2018-08-10 | 山西尚风科技股份有限公司 | A kind of totally-enclosed removable feed bin of nested type |
CN109208803A (en) * | 2018-10-11 | 2019-01-15 | 中国人民解放军63921部队 | A kind of large span light steel flexible activity roof |
CN109518865A (en) * | 2019-01-08 | 2019-03-26 | 贵州建工集团第四建筑工程有限责任公司 | Combine the building roof structure and its installation method of gapless |
CN109518865B (en) * | 2019-01-08 | 2024-05-31 | 贵州建工集团第四建筑工程有限责任公司 | Combined seamless building roof structure and installation method thereof |
CN110984600A (en) * | 2019-12-11 | 2020-04-10 | 中建四局第六建设有限公司 | Movable protective shed for construction on running light rail and using method thereof |
CN112302383A (en) * | 2020-10-29 | 2021-02-02 | 中国建筑土木建设有限公司 | Adjustable light multifunctional industrial factory building system and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106639106A (en) | Steel structure flexible shed frame | |
CN208430687U (en) | Self-anchored type suspended-cable structure support construction and system | |
CN111038940A (en) | Rail mounted is used for hoist and mount traction system of transportation | |
CN201046889Y (en) | Bailey truss assembling door frame | |
WO2022252829A1 (en) | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building | |
CN203296361U (en) | Long-span steel structure cross assembling hoisting platform | |
CN108547225A (en) | A kind of assembly moving type security construction of prevention work job platform and construction method and application | |
CN210597630U (en) | Net rack integral lifting structure | |
CN205257792U (en) | Bridge crane with triangular support girder | |
CN204126297U (en) | A kind of temporary support of steel truss roof | |
CN206681230U (en) | A kind of steel construction activity frame | |
CN202899639U (en) | Concrete column structure | |
CN208167484U (en) | The steel construction overline bridge being easily installed | |
CN110886225A (en) | Construction method of cable tower stay cable installation system | |
CN216889750U (en) | Detachable movable portal frame for improving hoisting operation safety | |
CN217078420U (en) | Linear girder steel self-propelled installation device that slides of adjustable bridge | |
CN107700363B (en) | Bridge tower rack with lifting system and construction method | |
CN211711873U (en) | Rail mounted is used for hoist and mount traction system of transportation | |
CN211712455U (en) | Steel-concrete combined beam lifting station | |
CN208814466U (en) | Mining steel structure derrick | |
CN212295636U (en) | High strength building templates's strutting arrangement | |
CN210217080U (en) | Self-walking door type scaffold | |
CN211142816U (en) | Construction platform | |
CN211644382U (en) | Tower crane attached stay bar walkway platform system | |
CN210289206U (en) | Telescopic safety guardrail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |
|
RJ01 | Rejection of invention patent application after publication |