CN106638954B - Bolt of long stem widens the bean column node connection method in area through beam side - Google Patents
Bolt of long stem widens the bean column node connection method in area through beam side Download PDFInfo
- Publication number
- CN106638954B CN106638954B CN201610895523.6A CN201610895523A CN106638954B CN 106638954 B CN106638954 B CN 106638954B CN 201610895523 A CN201610895523 A CN 201610895523A CN 106638954 B CN106638954 B CN 106638954B
- Authority
- CN
- China
- Prior art keywords
- area
- prefabricated post
- precast beam
- bolt
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
Bolt of long stem widens the bean column node and joint connecting method in area through beam side, to solve the connection of existing prefabricated beam and prefabricated Column border node using in the form of cast-in-place, situ wet operation is more, and the duration is longer, difficulty of construction and labor intensity are larger, the problem of increasing the construction cost of precast construction.Node:Side setting beam widens area before and after precast beam and prefabricated post connecting pin, and multiple prestressing force bolt of long stem widen area and prefabricated post through beam, and each prestressing force bolt of long stem both ends are fastened with high-strength nut.Joint connecting method:One, bolt hole is beaten on precast beam and prefabricated post;Two, precast beam and prefabricated post, and the reserved last-cost joint between precast beam and prefabricated post are connected;Three, silicone weather resistant glue will be smeared along edge circumferential direction at the last-cost joint between precast beam and prefabricated post;Four, mortar is poured into a mould;Five, high-strength nut is installed;Six, multiple stirrups are installed, so far, the node for completing precast beam and prefabricated post connects.The present invention is connect for precast beam with prefabricated post.
Description
Technical field
The present invention relates to a kind of bean column node and joint connecting methods, and in particular to a kind of bolt of long stem is widened through beam side
The bean column node and joint connecting method in area.
Background technology
Precast beam, prefabricated post needed for fabricated construction need to carry out live splicing, the connecting node of precast beam and prefabricated post
It, i.e., need to be to beam column node area formwork, laying framework of steel reinforcement, casting concrete, when node concrete reaches frequently with cast-in-place form
After desired strength, then remove node area correlate template and support etc..This traditional prefabricated beam column connection operation method, essence
On be still the thinking for continuing to use cast-in-place concrete, situ wet operation is more, and the duration is longer, and difficulty of construction and labor intensity are larger,
The construction cost for increasing precast construction is unfavorable for promoting the efficiency of construction of precast construction.
Invention content
The present invention is to solve the connection of existing prefabricated beam and prefabricated Column border node using cast-in-place form, situ wet operation
More, the duration is longer, and difficulty of construction and labor intensity are larger, increases the construction cost of precast construction, is unfavorable for being promoted pre-
The problem of efficiency of construction of structure processed, it is proposed that a kind of bolt of long stem widens bean column node and the node connection side in area through beam side
Method.
The bolt of long stem of the present invention widens the bean column node in area through beam side, composition include prefabricated post, precast beam, two
Anchor slab, multiple prestressing force bolt of long stem, multiple high-strength nuts and multiple stirrups, the side before and after precast beam and prefabricated post connecting pin
Setting beam widens area, precast beam connect with prefabricated post the back rest widen area end face outside be arranged there are one anchor slab, multiple prestressing force
Bolt of long stem widens area and prefabricated post through beam, and each prestressing force bolt of long stem both ends are fastened with high-strength nut, and multiple stirrups are equal
Cloth is arranged on the upper surface in precast beam local widening area.
The bolt of long stem of the present invention widens the bean column node connection method in area through beam side, and the method is by following step
Suddenly it realizes:
Step 1: beating bolt hole on precast beam and prefabricated post:The beam of precast beam is widened into area and beats multiple beam spiral shells along longitudinal direction
Keyhole beats multiple stud bolt holes in the region that prefabricated post is connect with precast beam, and multiple stud bolt holes and multiple beam bolt holes are one by one
It is corresponding;
Step 2: connection precast beam and prefabricated post:Precast beam is lifted into the join domain of prefabricated post, and is made on precast beam
Multiple beam bolt holes be aligned one by one with multiple stud bolt holes in prefabricated post, prestressing force bolt of long stem pass through beam bolt hole and column
Bolt hole, and the reserved last-cost joint between precast beam and prefabricated post;
Step 3: smearing silicone weather resistant glue:At last-cost joint between precast beam and prefabricated post silicon will be smeared along edge circumferential direction
Ketone weather-resistant glue, there are openings at the silicone weather resistant glue that top edge is smeared;
Step 4: cast mortar:Hollow light wall pipe is inserted between prestressing force bolt of long stem and beam bolt hole and stud bolt hole,
Mortar is continuously noted into last-cost joint from opening, and is filled;
Step 5: installation high-strength nut:After body condensation, high-strength spiral shell is installed at prestressing force bolt of long stem both ends
Mother, and tighten;
Step 6: installing multiple stirrups:Multiple stirrups are uniformly arranged on the upper surface in precast beam local widening area, and
Stirrup is fixed on precast beam by casting concrete, and so far, the node for completing precast beam and prefabricated post connects.
The present invention has the advantages that compared with prior art:
One, node of the invention is to be additionally arranged beam in precast beam and prefabricated post join domain to widen area, passes through bolt of long stem
Beam through beam side widens the beam-column connection in area, reduces existing difficulty of construction and working strength, it is easier to structural elements
Installation positioning, and then reduce project cost, accelerate speed of application.
Two, method of the invention is to devise last-cost joint in precast beam and prefabricated post junction, by noting sand to last-cost joint
Slurry comes reinforced cementitious so that the connection of precast beam and prefabricated post is more solid and reliable, strengthens the globality of beam-to-column joint.
Three, method construction technology of the invention is simple, does not need complicated construction machinery.
Description of the drawings
When Fig. 1 is that prefabricated post A is prefabricated side column in specific implementation mode one, prefabricated post A is surveyed with precast beam B node connecting shaft
Figure;
When Fig. 2 is that prefabricated post A is prefabricated center pillar in specific implementation mode two, prefabricated post A is surveyed with precast beam B node connecting shaft
Figure;
When Fig. 3 is that prefabricated post A is prefabricated side column in specific implementation mode three, prefabricated post A is surveyed with precast beam B node connecting shaft
Figure;
When Fig. 4 is that prefabricated post A is prefabricated center pillar in specific implementation mode three, prefabricated post A is surveyed with precast beam B node connecting shaft
Figure;
Fig. 5 is the connection relation stereogram of anchor slab 5, prestressing force bolt of long stem 3 and high-strength nut 4;
Fig. 6 is the vertical view of Fig. 1;
In the step of Fig. 7 is specific implementation mode six one on precast beam B multiple beam bolt hole B-1 position view;
In the step of Fig. 8 is specific implementation mode six three after silicone weather resistant glue 8 has been smeared at 7 edge of last-cost joint, silicone is resistance to
Wait the cross sectional shape schematic diagram of glue 8;
Fig. 9 is the left view of Fig. 8.
Specific implementation mode
Specific implementation mode one:Illustrate present embodiment in conjunction with Fig. 1 and Fig. 5, present embodiment includes prefabricated post A, prefabricated
Beam B, two anchor slabs 5, multiple prestressing force bolt of long stem 3, multiple high-strength nuts 4 and multiple stirrups 6, in precast beam B and prefabricated post A
The front and back side setting beam of connecting pin widens area 2, and precast beam B, which connect the back rest with prefabricated post A and widens the end face outside in area 2, is provided with one
A anchor slab 5, multiple prestressing force bolt of long stem 3 widen area 2 and prefabricated post A through beam, and each 3 both ends of prestressing force bolt of long stem are high
Strong nut 4 fastens, and multiple stirrups 6 are uniformly arranged on the upper surface in precast beam local widening area 1.Stirrup 6 is answered for resisting to cut
The effect of power.Prefabricated post A in present embodiment is prefabricated side column.What the beam of the both sides the precast beam B widened area 2 widens width
For S.Beam widen area 2 to widen area height W2 equal with the depth of beam W3 of precast beam B.Beam widen area 2 widen sector width S2 and
The requirement of bearing capacity due to local compression of concrete should be met by widening section length L2.It is that nut is directly made in order to prevent that anchor slab 5, which is arranged,
The office of causing crushes bad on concrete.3 one end of prestressing force bolt of long stem in present embodiment is fixed with precast beam B, another
End is fixed with prefabricated post A.
Specific implementation mode two:Embodiment is described with reference to Fig. 2, and the quantity of the precast beam B of present embodiment is two,
Two precast beam B are symmetricly set on the left and right sides of prefabricated post A.Prefabricated post A in present embodiment is prefabricated center pillar, this embodiment party
The both ends of prestressing force bolt of long stem 3 in formula are fixed on unidirectional two precast beam B.Anchor slab 5 in present embodiment
Quantity be four.Other compositions and connection relation are same as the specific embodiment one.
Specific implementation mode three:Illustrate present embodiment in conjunction with Fig. 3 and Fig. 4, present embodiment prefabricated post A with it is prefabricated
The region surrounding setting column thickened area 1 of beam B connections, beam widen the thickened area thickness for widening sector width S2 less than column thickened area 1 in area 2
Spend S1.When a precast beam B is connect with a prefabricated post A, prefabricated post A is prefabricated side column;When two precast beam B are symmetrically connected
At the prefabricated post both sides A, prefabricated post A is prefabricated center pillar.In order to enable prefabricated post A is good to bear to come from precast beam B
The thickened area thickness S1 of column should be arranged in the load at end according to mechanical characteristic.If prefabricated post A and precast beam B linkage interfaces can expire
The requirement of the compression bearing of sufficient concrete can be not provided with column thickened area 1;If not satisfied, column thickening need to be arranged around column
Area 1, thickened area thickness S1 should be required to be calculated according to the compression bearing of concrete.Prestressing force stock in present embodiment
Bolt 3 widens area 2 and column thickened area 1 through beam.Other compositions and connection relation are the same as one or two specific embodiments.
Specific implementation mode four:Embodiment is described with reference to Fig. 3, and the thickened area of the column thickened area 1 of present embodiment is high
Degree W1 and beam widen area 2 to widen area height W2 equal.Other compositions and connection relation are the same as the specific implementation mode 3.
Specific implementation mode five:Embodiment is described with reference to Fig. 3, and what the beam of present embodiment widened area 2 widens the head of district
Spend the thickening section length L1 that L2 is less than column thickened area 1.Other compositions and connection relation are identical as specific implementation mode four.
Specific implementation mode six:Illustrate present embodiment in conjunction with Fig. 1~Fig. 9, present embodiment is through the following steps that reality
Existing:
Step 1: beating bolt hole on precast beam B and prefabricated post A:By the beam of precast beam B widen area 2 beat along longitudinal direction it is multiple
Beam bolt hole B-1 beats multiple stud bolt holes, multiple stud bolt holes and multiple beam spiral shells in prefabricated post A with the regions connecting precast beam B
Keyhole B-1 is corresponded;
Step 2: connection precast beam B and prefabricated post A:Precast beam B is lifted into the join domain of prefabricated post A, and is made prefabricated
Multiple beam bolt hole B-1 on beam B are aligned one by one with multiple stud bolt holes on prefabricated post A, and prestressing force bolt of long stem 3 passes through beam
Bolt hole B-1 and stud bolt hole, and the reserved last-cost joint 7 between precast beam B and prefabricated post A;
Step 3: smearing silicone weather resistant glue 8:It will be applied along edge circumferential direction at last-cost joint 7 between precast beam B and prefabricated post A
Silicone weather resistant glue 8 is smeared, there are opening 8-1 at the silicone weather resistant glue 8 that top edge is smeared;Silicone weather resistant glue 8 is commercial product;
Step 4: cast mortar:Hollow light wall pipe is inserted into prestressing force bolt of long stem 3 and beam bolt hole B-1 and stud bolt hole
Between, mortar is continuously noted into last-cost joint 7 from opening 8-1, and fill;Hollow light wall pipe prevent slurry flow into beam bolt hole B-1 and
In stud bolt hole;
Step 5: installation high-strength nut 4:After body condensation, high-strength spiral shell is installed at 3 both ends of prestressing force bolt of long stem
Mother 4, and it is screwed to regulation torque;
Step 6: installing multiple stirrups 6:Multiple stirrups 6 are uniformly arranged in the upper surface in precast beam local widening area 1
On, and stirrup 6 is fixed on precast beam B by casting concrete, so far, is completed precast beam B and is connect with the node of prefabricated post A.
Specific implementation mode seven:Illustrate present embodiment in conjunction with Fig. 6, Fig. 8 and Fig. 9, present embodiment be in step 2 after
The width T for pouring seam 7 is 20mm~30mm.Other steps are identical as specific implementation mode six.
Specific implementation mode eight:Illustrate present embodiment in conjunction with Fig. 6, Fig. 8 and Fig. 9, present embodiment be in step 2 after
The width T for pouring seam 7 is 25mm.Other steps are identical as specific implementation mode six or seven.
Claims (3)
1. a kind of bolt of long stem widens the bean column node connection method in area through beam side, bean column node includes prefabricated post (A), prefabricated
Beam (B), two anchor slabs (5), multiple prestressing force bolt of long stem (3), multiple high-strength nuts (4) and multiple stirrups (6), in precast beam
(B) widen area (2) with the front and back side of the connecting pin prefabricated post (A) setting beam, precast beam (B) connect the back rest with prefabricated post (A) and widens
There are one anchor slab (5), multiple prestressing force bolt of long stem (3) widen area (2) and prefabricated post through beam for the end face outside setting in area (2)
(A), each prestressing force bolt of long stem (3) both ends are fastened with high-strength nut (4), and multiple stirrups (6) are uniformly arranged in precast beam office
Portion is widened on the upper surface of area (1);The quantity of the precast beam (B) is two, and two precast beams (B) are symmetricly set on prefabricated post
(A) column thickened area (1) is arranged in the region surrounding that prefabricated post (A) is connect with precast beam (B) in left and right sides, and beam widens area (2)
Widen the thickened area thickness (S1) that sector width (S2) is less than column thickened area (1);The thickened area height (W1) and beam of column thickened area (1)
Widen area (2) to widen area's height (W2) equal;The section length (L2) of widening that beam widens area (2) is less than adding for column thickened area (1)
Thick section length (L1), it is characterised in that:The method through the following steps that realize:
Step 1: beating bolt hole on precast beam (B) and prefabricated post (A):The beam of precast beam (B) is widened area (2) to beat along longitudinal direction
Multiple beam bolt holes (B-1) beat multiple stud bolt holes, multiple stud bolt holes in the region that prefabricated post (A) is connect with precast beam (B)
It is corresponded with multiple beam bolt holes (B-1);
Step 2: connection precast beam (B) and prefabricated post (A):Precast beam (B) is lifted into the join domain of prefabricated post (A), and is made
Multiple beam bolt holes (B-1) on precast beam (B) are aligned one by one with multiple stud bolt holes in prefabricated post (A), prestressing force stock
Bolt (3) passes through beam bolt hole (B-1) and stud bolt hole, and the reserved last-cost joint between precast beam (B) and prefabricated post (A)
(7);
Step 3: smearing silicone weather resistant glue (8):By at the last-cost joint (7) between precast beam (B) and prefabricated post (A) along edge ring
To silicone weather resistant glue (8) is smeared, there are opening (8-1) at the silicone weather resistant glue (8) that top edge is smeared;
Step 4: cast mortar:Hollow light wall pipe is inserted into prestressing force bolt of long stem (3) and beam bolt hole (B-1) and stud bolt hole
Between, mortar is continuously noted into last-cost joint (7) from opening (8-1), and fill;
Step 5: installation high-strength nut (4):After body condensation, high-strength spiral shell is installed at prestressing force bolt of long stem (3) both ends
Female (4), and tighten;
Step 6: installing multiple stirrups (6):Multiple stirrups (6) are uniformly arranged in the upper surface in precast beam local widening area (1)
On, and stirrup (6) is fixed on precast beam (B) by casting concrete, so far, completes the node of precast beam (B) and prefabricated post (A)
Connection.
2. bolt of long stem according to claim 1 widens the bean column node connection method in area through beam side, it is characterised in that:
The width (T) of last-cost joint (7) is 20mm~30mm in the step 2.
3. bolt of long stem according to claim 2 widens the bean column node connection method in area through beam side, it is characterised in that:
The width (T) of last-cost joint (7) is 25mm in the step 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610895523.6A CN106638954B (en) | 2016-10-13 | 2016-10-13 | Bolt of long stem widens the bean column node connection method in area through beam side |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610895523.6A CN106638954B (en) | 2016-10-13 | 2016-10-13 | Bolt of long stem widens the bean column node connection method in area through beam side |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106638954A CN106638954A (en) | 2017-05-10 |
CN106638954B true CN106638954B (en) | 2018-10-02 |
Family
ID=58855979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610895523.6A Active CN106638954B (en) | 2016-10-13 | 2016-10-13 | Bolt of long stem widens the bean column node connection method in area through beam side |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638954B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867861B (en) * | 2017-05-12 | 2021-05-07 | 吴方华 | Bolt reinforcing bar bolt prefabricated assembly concrete beam column side node |
CN109098277B (en) * | 2017-06-20 | 2021-05-11 | 吴方华 | Bolt reinforcing bar bolt assembled concrete frame beam column node |
CN109183986A (en) * | 2018-11-08 | 2019-01-11 | 安徽建筑大学 | A kind of assembling frame Structure Beam-column connecting node and construction method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101024975A (en) * | 2007-03-16 | 2007-08-29 | 北京城建设计研究总院有限责任公司 | Shaped-steel concrete frame-steel supporting structure section-changeable conversion node |
CN103422576A (en) * | 2013-09-10 | 2013-12-04 | 南京工业大学 | Reinforcement and energy dissipation damping device for wood structure mortise and tenon joint |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0715181B2 (en) * | 1989-09-01 | 1995-02-22 | 鹿島建設株式会社 | Method of joining closed-section steel columns to steel beams |
JPH0830360B2 (en) * | 1990-03-27 | 1996-03-27 | 三菱建設株式会社 | Connection method for columns and beams |
KR101132213B1 (en) * | 2005-03-25 | 2012-03-30 | 동국대학교 산학협력단 | Improved Rigid Joint Structure of CFT Precast Concrete Column Unit and Steel Beam |
-
2016
- 2016-10-13 CN CN201610895523.6A patent/CN106638954B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101024975A (en) * | 2007-03-16 | 2007-08-29 | 北京城建设计研究总院有限责任公司 | Shaped-steel concrete frame-steel supporting structure section-changeable conversion node |
CN103422576A (en) * | 2013-09-10 | 2013-12-04 | 南京工业大学 | Reinforcement and energy dissipation damping device for wood structure mortise and tenon joint |
Also Published As
Publication number | Publication date |
---|---|
CN106638954A (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3670778B1 (en) | Prefabricated frame | |
CN105735112B (en) | Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier | |
KR101204763B1 (en) | Structure of sandwich pannel with precast concrete and cast in place concrete for pipe utility conduit | |
CN106284655B (en) | Precast concrete beam stud connects connecting node and connection method | |
KR101225661B1 (en) | Concrete shear key strengthened with steel cover plate and tension member and the construction method therewith | |
CN109183986A (en) | A kind of assembling frame Structure Beam-column connecting node and construction method | |
CN107152104B (en) | Assembled cavity shear wall horizontal joint tooth socket rotating vane type connection structure | |
CN205894313U (en) | Prefabricated assembled steel pipe retrains frame node entirely | |
CN106638954B (en) | Bolt of long stem widens the bean column node connection method in area through beam side | |
CN208363404U (en) | A kind of prefabricated panel and its connection structure | |
CN203452228U (en) | Frame-shear wall architectural structure | |
JP2004108034A (en) | Foundation structure, construction method and steel-pipe-mounted precast concrete pile for steel-framed building | |
CN108505647A (en) | A kind of prefabricated assembled profiled sheet concrete shear force wall and its construction method | |
CN106869008A (en) | The composite bridge prefabricated bridge of dry type connection and its dry type connection method | |
CN108775084B (en) | Steel-concrete combined precast beam and precast column connecting structure and construction method | |
CN209066596U (en) | A kind of assembling frame Structure Beam-column connecting node | |
CN110107019A (en) | A kind of combined type precast floor slab for assembled architecture | |
CN109113171A (en) | A kind of Novel bolt connection Precast Concrete Frame | |
CN210597875U (en) | Cross beam | |
CN210562663U (en) | Connecting structure of prefabricated plate and prefabricated column | |
CN107201782A (en) | A kind of wall of assembled architecture, floor connecting node and method | |
CN209854778U (en) | Post-cast strip support-free structure | |
CN208884728U (en) | Steel-concrete combines precast beam and prefabricated post connection structure | |
CN109881777B (en) | Assembled high-toughness cement-based composite material beam column joint | |
CN209523217U (en) | A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |