CN106533705A - Data service flow quota allocation method and data service flow quota allocation device - Google Patents

Data service flow quota allocation method and data service flow quota allocation device Download PDF

Info

Publication number
CN106533705A
CN106533705A CN201510587278.8A CN201510587278A CN106533705A CN 106533705 A CN106533705 A CN 106533705A CN 201510587278 A CN201510587278 A CN 201510587278A CN 106533705 A CN106533705 A CN 106533705A
Authority
CN
China
Prior art keywords
quota
flow
flow quota
boss
application value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510587278.8A
Other languages
Chinese (zh)
Inventor
孙翠锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201510587278.8A priority Critical patent/CN106533705A/en
Publication of CN106533705A publication Critical patent/CN106533705A/en
Pending legal-status Critical Current

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention provides a data service flow quota allocation method and a data service flow quota allocation device. The data service flow allocation method comprises steps that when a flow quota allocation updating condition is satisfied, a flow quota parameter of a user is determined, and the flow quota parameter is a quotient of a flow consumption value of a user and flow quota application times in a preset time period; a current flow quota application value is calculated according to the flow quota parameter; a gateway general packet radio service support node GGSN/data gateway P-GW is used to transmit a credit control request CCR message provided with the current flow quota application value to a business operation support system BOSS, and a new flow quota is applied to the BOSS. By adopting the above mentioned technical scheme, the flow quota application value is customized according to the Internet-surfing requirement of the user, and the rationality of the flow quota application value is guaranteed, and at the same time, the BOSS is not required to calculate, and is only required to determine whether the application of the flow quota is allowed, and therefore the processing load of the BOSS is reduced.

Description

A kind of distribution method of data service flow quota and distributor
Technical field
The present invention relates to data service technical field, more particularly to a kind of distribution side of data service flow quota Method and distributor.
Background technology
As shown in figure 1, existing data service online charging flow process is usually:
1st, user initiates packet data protocol (PDP) context and sets up request, gateway general packet nothing Line serving GPRS support node (GGSN)/data gateway (P-GW) is in the request message ChargingCharacteristics fields are judged, if content charging online charging targeted customer, Triggering following content charging online charging flow process;
2nd, GGSN/P-GW sends credit control request (CCR) to business operation support system (BOSS) Message, for setting up DCC connections;
3rd, BOSS is authenticated to user and authorizes;
4th, BOSS sends Credit Control Answer (CCA) and replies message, and during CCA is replied message Result code Result Code are set to " Success ";
5th, GGSN/P-GW receives the CCA and replies message rear authorization terminal user and uses respective service, Send PDP Context and create response;
6th, user initiates content charging data service request;
7th, GGSN/P-GW applies for flow quota by CCR message to BOSS;
8th, BOSS make sures the quota of consumption, wholesale price according to the preliminary distribution business of the information such as rate group, goes forward side by side Row account controls, and judges the business usage amount quota allowed by account balance, and from inside user account Make funds reservation;
9th, BOSS sends CCA and replies message, and the CCA is replied message including flow quota; After GGSN/P-GW receives CCA, authorization terminal user uses respective service;
10th, get that the reserved quota of user is soon finished or expired (this quota use time surpasses Cross Validity-Time) situations such as occur;
11st, GGSN/P-GW sends new quota reservation request to BOSS again, and reports and make With quota, reason is reported to be to reach minimum quota threshold values using flow Or quota mandate effective time terminates (reporting-reason=THRESHOLD) (reporting-reason=VALIDITY_TIME) etc.;In addition, when quota is in certain period of time It is not used by, specified idle timers Quota-Holding-Time in the last CCA message of arrival During value, can also send the CCR and update (CCR_Update) message;
12nd, BOSS carries out allocation of quota again and makees funds reservation from user account;
13rd, corresponding quota is passed through CCA message to GGSN/P-GW, GGSN/P-GW by BOSS Receive after CCA replies message, authorization terminal user uses respective service;
14th, when user initiates PDP context deactivation to be asked, GGSN/P-GW sends and terminates letter With control service message to BOSS, in message, there should be the mark end of service time Event-Timestamp AVP, and identify the actually used quota of the business;
15th, BOSS such as carries out returning, withholds at account's operation;
16th, BOSS sends CCA to GGSN/P-GW and responds CCR.
From the foregoing, what the process frequency of online charging was determined by service request number of times, and business please Ask the frequency related to user's internet behavior, existing online meter related to system authentication request burst size Expense burst size is system-level, generally uses and arranges fixed flow quota in BOSS systems Size, generally 2M-10M;Simultaneously in order to reduce arrears risk, burst should not arrange excessive;But Burst arranges too small and system loading can be significantly greatly increased, such as when customer volume increases or user is using stream When amount is uprushed, the service request between GGSN/P-GW and BOSS can roll up, it is possible to super The disposal ability upper limit of GGSN/P-GW and BOSS is crossed, causes the system failure.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of distribution method of data service flow quota and distribution Device, is configured by BOSS in advance to solve existing flow quota, but when customer volume increases or user When being uprushed using flow, GGSN/P-GW is communicated with BOSS and frequently easily causes the problem of the system failure.
In order to solve above-mentioned technical problem, the embodiment of the present invention provides a kind of distribution of data service flow quota Method, including:
When flow quota update condition is set up, the flow quota parameter of user, the flow quota ginseng is determined The business of flow consumption figures and flow quota request times of the number for the user in the first preset time period before;
Present flow rate quota application value is calculated according to the flow quota parameter;
By gateway general packet wireless service support node GGSN/ data gateways P-GW to service operation Support system BOSS sends the credit control request CCR message for carrying the present flow rate quota application value, to BOSS applies for new flow quota.
Further, the distribution method of the data service flow quota also includes:
Distribute an initial flow quota for the user;
The initial flow quota is more than or equal to the following business of the two:
The flow value that all users in second preset time period consume;And
The maximum of the flow quota request quantity that the BOSS can be processed in second preset time period.
Further, the step for being calculated present flow rate quota application value according to the flow quota parameter It is rapid to be specially:
Judge that the flow quota parameter, whether more than or equal to pre-determined threshold, obtains a judged result;
When the judged result indicates that the flow quota parameter is more than or equal to pre-determined threshold, match somebody with somebody in flow Increase by the first adjustment amount on the basis of volume basic value, obtain the present flow rate quota application value.
Further, the step for being calculated present flow rate quota application value according to the flow quota parameter Suddenly also include:
When the judged result indicates that the flow modulation of quotas parameter is less than pre-determined threshold, in flow quota The second adjustment amount is deducted on the basis of basic value, obtains the present flow rate quota application value.
Further, the flow quota basic value is determined or by data industry by last flow quota application value The type of service of business determines.
Further, it is described by gateway general packet wireless service support node GGSN/ data gateways P-GW sends the credit control for carrying the present flow rate quota application value to business operation support system BOSS System request CCR message, is specially the step of apply for new flow quota to BOSS:
The CCR message for carrying the present flow rate quota application value is sent by GGSN/P-GW to BOSS, Apply for new flow quota to BOSS, wherein, carry in the CCR message and be entered as present flow rate and match somebody with somebody The field of volume application value.
Further, the RG fields in the CCR message are entered as present flow rate quota application value.
The embodiment of the present invention provides a kind of distributor of data service flow quota, including:
Parameter determination module, for when flow quota update condition is set up, determining that the flow quota of user is joined Number, the flow quota parameter be before the user in the first preset time period flow consumption figures and stream The business of amount quota request times;
Computing module, for being calculated present flow rate quota application value according to the flow quota parameter;
Sending module, for by gateway general packet wireless service support node GGSN/ data gateways P-GW sends the credit control for carrying the present flow rate quota application value to business operation support system BOSS System request CCR message, applies for new flow quota to BOSS.
Further, the distributor of the data service flow quota also includes:
Quota original allocation module, for distributing an initial flow quota for the user;
The initial flow quota is more than or equal to the following business of the two:
The flow value that all users in second preset time period consume;And
The maximum of the flow quota request quantity that the BOSS can be processed in second preset time period.
Further, the computing module includes:
Judging unit, for judging that the flow quota parameter, whether more than or equal to pre-determined threshold, obtains one Judged result;
First arithmetic element, for indicating the flow quota parameter more than or equal to pre- when the judged result Gating is prescribed a time limit, and on the basis of flow quota basic value increases by the first adjustment amount, obtains the present flow rate and matches somebody with somebody Volume application value.
Further, the computing module also includes:
Second arithmetic element, for indicating the flow modulation of quotas parameter less than default when the judged result During thresholding, the second adjustment amount is deducted on the basis of flow quota basic value, obtain the present flow rate quota Application value.
Further, the flow quota basic value is determined or by data industry by last flow quota application value The type of service of business determines.
Further, the sending module is specially:
The CCR message for carrying the present flow rate quota application value is sent by GGSN/P-GW to BOSS, Apply for new flow quota to BOSS, wherein, carry in the CCR message and be entered as present flow rate and match somebody with somebody The field of volume application value.
Further, the RG fields in the CCR message are entered as present flow rate quota application value.
The invention has the beneficial effects as follows:
1st, the calculating of flow quota application value is carried out according to the internet content of user, it is ensured that flow quota application The reasonability of value;
2nd, as the size of flow quota is calculated by distributor, BOSS need not be calculated, only The application of the flow quota need to be determined whether, therefore reduces the treating capacity of BOSS;
3rd, rational flow quota application value is calculated according to the internet content of user, it is to avoid user is to BOSS The application of flow quota carried out frequently, it is to avoid when customer volume increases or user is uprushed using flow, GGSN/P-GW is communicated with BOSS and frequently easily causes the problem of the system failure, it is ensured that charge system works Stability;
4th, the application of flow quota is carried out using the distributor, need not change GGSN/P-GW and BOSS Communication interface, reduce network rebuilding cost;
5th, the formulation of flow quota is carried out according to the disposal ability of BOSS, is not affecting BOSS service behaviours On the premise of, also can guarantee that the stability of charge system work.
Description of the drawings
Fig. 1 represents existing data service online charging schematic flow sheet;
Fig. 2 represents that the overall procedure of the distribution method of the data service flow quota of the embodiment of the present invention shows It is intended to;
Fig. 3 represents the module diagram of the distributor of the data service flow quota of the embodiment of the present invention;
Fig. 4 represents the data service online charging of the distributor of the data service flow quota using the present invention Schematic flow sheet.
Specific embodiment
It is for making the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing and specifically real Apply example to describe the present invention.
The present invention is configured by BOSS in advance for existing flow quota, but when customer volume increases or user When being uprushed using flow, GGSN/P-GW is communicated with BOSS and frequently easily causes the problem of the system failure, is carried For a kind of distribution method of data service flow quota and distributor.
Embodiment one
As shown in Fig. 2 the distribution method of the data service flow quota of the embodiment of the present invention one, including:
Step 100, when flow quota update condition is set up, determines the flow quota parameter of user;
It should be noted that the flow quota parameter be before the user in the first preset time period The business of flow consumption figures and flow quota request times;
Step 200, is calculated present flow rate quota application value according to the flow quota parameter;
Step 300, by gateway general packet wireless service support node GGSN/ data gateways P-GW to Business operation support system BOSS sends the credit control request for carrying the present flow rate quota application value CCR message, applies for new flow quota to BOSS.
It should be noted that the flow quota update condition establishment refers to the reserved quota of user being soon finished The use time of (can be less than or equal to a preset value with amount) or the reserved quota of user will expired (this Secondary quota use time exceedes default use time) etc..
It should be noted that the distribution method of the data service flow quota is applied to data service flow quota Distributor.
The determination of the flow quota parameter be by when this flow quota update condition is set up, statistics it The flow consumption figures of the user in front Preset Time is determined with the business of flow quota request times, for example, is existed When this flow quota update condition is set up, statistics obtains the user within before this moment ten minutes Flow consumption figures be 100M, and count obtain the user within the time period flow quota request times be 5 It is secondary, thus, it can be known that the corresponding average discharge consumption figures of flow quota application within the time period is 20M, Therefore the flow quota of this application flow quota can be set according to the average discharge consumption figures in previous time period Parameter is 20M;Flow quota parameter according to obtaining calculates present flow rate quota application value, then foundation This application value applies for new flow quota to BOSS;This kind of mode, it is not necessary to carry out flow in BOSS The calculating of quota, BOSS only need to distribute corresponding flow quota according to request.
The embodiment of the present invention one, carries out the distribution of flow quota by disposing the distributor of flow quota, should Distributor independently of GGSN/P-GW and BOSS, using the flow actual consumption value before user and stream The business of amount quota request times carries out the formulation of flow quota application value so that the formulation of flow quota application value It is more reasonable.
Embodiment two
On the basis of embodiment one, the step 300 concrete implementation mode is the present embodiment two:
The CCR message for carrying the present flow rate quota application value is sent by GGSN/P-GW to BOSS, Apply for new flow quota to BOSS, wherein, carry in the CCR message and be entered as present flow rate and match somebody with somebody The field of volume application value.
It should be noted that in the present embodiment, the field for being entered as present flow rate quota application value can be CCR Reserved field or existing field in the field increased newly in message, or CCR message.
The transmission of present flow rate quota application value is carried out by this kind of mode, vary without GGSN/P-GW and Interface between BOSS, reduces network rebuilding cost.
Embodiment three
On the basis of embodiment one, the step 300 concrete implementation mode is the present embodiment three:
The CCR message for carrying the present flow rate quota application value is sent by GGSN/P-GW to BOSS, Apply for new flow quota to BOSS, wherein, the RG fields in the CCR message are entered as current stream Amount quota application value.
It should be noted that RG fields are rate group field, what is transmitted in original use is the mark of charging Information, but in practical application, the content of the RG fields transmission is not effectively utilized, therefore, at this The RG fields will also be retained in invention, but the RG fields will no longer carry out the transmission of the label information of charging, But present flow rate quota application value is entered as, BOSS is directly parsed when CCR message is received The RG fields obtain the present flow rate quota application value of user, carry out the distribution of flow quota, this kind of mode, The interface between GGSN/P-GW and BOSS is varied without, while without CCR message is changed, reducing Network rebuilding cost.
Example IV
It should be noted that above-described embodiment one is being used for the distributor of data service flow quota On the basis of, the method flow realized, and when the first accounting access system of the distributor is used, In order to solve the distributor because the flow service condition of accessing user's previous time period cannot be known, it is impossible to enter Row flow quota parameter formulate problem, the present embodiment four on the basis of embodiment one, the data service The distribution method of flow quota, also includes:
Distribute an initial flow quota for the user;
The initial flow quota is more than or equal to the following business of the two:
The flow value that all users in second preset time period consume;And
The maximum of the flow quota request quantity that the BOSS can be processed in second preset time period.
It should be noted that when the distributor is used for the first time, in order to can guarantee that its normal work, needing Distribute an initial flow quota for which.
In order to ensure the stability of whole charge system work, the initial flow quota is needed according to BOSS's Disposal ability is formulated, and generally obtains total flow and this that all accessing users consume in preset time period In time period, the maximum of the flow quota request quantity that BOSS is processed, then obtains the business of the two, this business Show the minimum of a value of the manageable flow quotas of BOSS.
For example, the flow quota request quantity that BOSS can be processed in 1 minute is 10,000 times, and this time Total flow value that the user of DPI collections consumes in section is 1,000,000 M, then the distributor is each user The initial flow quota of distribution should be greater than or equal to 100M;The acquisition modes of this kind of initial flow quota, it is considered to To the slowly varying behavior that all customer flows are consumed, the flow quota request quantity in ensuing 1 minute Number of times can be less than 10,000 times, without departing from the disposal ability of BOSS.
It should be noted that the embodiment of the present invention four, it is ensured that the distributor in firm accounting access system, On the premise of BOSS service behaviours are not affected, the stability of charge system work is also can guarantee that.
Embodiment five
On the basis of embodiment one or example IV, the step 200 includes the embodiment of the present invention five:
Step 201, judges that the flow quota parameter, whether more than or equal to pre-determined threshold, obtains one and judges knot Really;
Step 202, when the judged result indicates that the flow quota parameter is more than or equal to pre-determined threshold, Increase by the first adjustment amount on the basis of flow quota basic value, obtain the present flow rate quota application value.
It should be noted that the pre-determined threshold is that user is set in advance according to the disposal ability of BOSS Threshold value, adjusting step of first adjustment amount for flow quota, can be according to the processing accuracy of BOSS Formulated.
The embodiment of the present invention five can be understood in terms of following two:
When the request number of times that user consumes certain flow (such as 100M) is more, then need to reduce request number of times, So that total flow quota request times of all users are now needed without departing from the disposal ability of BOSS Improve the application value of flow quota;
The corresponding actual flow consumption figures of user's single request is lower, represents that user is consumed required for specific discharge The number of times of application is more, now needs to improve the application value of flow quota, to reduce request times, so that Disposal ability of the total flow quota request times of all users without departing from BOSS.
Under this mode, when the flow quota parameter for getting is more than or equal to pre-determined threshold, show now to use The flow at family consumes more, and user needs the request for repeatedly carrying out flow quota meet which normally to be carried out Data service, now in order to reduce the request number of times of flow quota, needs to improve flow quota application value, from And reduce the flow quota request times that BOSS is processed.
Also, it should be noted that the determination of the flow quota basic value can count industry according to historical data Average discharge consumption figures of the service type within the unit interval, the average discharge consumption figures in the unit interval are bigger, Then flow quota basic value is bigger.
The flow quota basic value can also be the stream for directly setting up each type of service according to type of service Amount quota basic value, the flow quota basic value of such as video traffic are more than the flow quota of live chat business The flow quota basic value of video traffic such as can be set to 50M, by live chat business by basic value Flow quota basic value is set to 20M.
Under normal circumstances, user is when data service is carried out, it is believed that the stream of previous moment and later moment in time Amount use will not occur significantly change, therefore, in the embodiment of the present invention, can also be by flow quota basis Value is set to the flow quota application value of last time.
Alternatively, when specifying in the present embodiment five that the data service that this is carried out as user is identical with last time, The timing of flow quota system is carried out at this, is entered as flow quota basic value using the flow quota application value of last time The formulation of capable this flow quota application value;The data service that this is carried out as user and when differing of last time, The timing of flow quota system is carried out at this, flow quota basic value is carried out really with the type of service of data service It is fixed.
It should be noted that the embodiment of the present invention five, when flow quota parameter is more than or equal to pre-determined threshold, The flow quota application value of user is properly increased, so as to reduce request times of the user to flow quota, is kept away Having exempted from BOSS frequently carries out the distribution of flow quota.
Embodiment six
On the basis of embodiment one or example IV, the step 200 includes the embodiment of the present invention six:
Step 201, judges that the flow quota parameter, whether more than or equal to pre-determined threshold, obtains one and judges knot Really;
Step 202, when the judged result indicates that the flow quota parameter is more than or equal to pre-determined threshold, Increase by the first adjustment amount on the basis of flow quota basic value, obtain the present flow rate quota application value;
Step 203, when the judged result indicates that the flow modulation of quotas parameter is less than pre-determined threshold, The second adjustment amount is deducted on the basis of flow quota basic value, the present flow rate quota application value is obtained.
It should be noted that second adjustment amount can be according to the formulation of the first adjustment amount in embodiment five Mode is formulated.
It should be noted that when flow quota parameter is more than or equal to pre-determined threshold, improving the flow of user Quota application value, so that reduce request times of the user to flow quota, it is to avoid BOSS frequently enters The process of row flow quota application;And when flow quota parameter is less than pre-determined threshold, in order to ensure BOSS Control accuracy, when BOSS has enough disposal abilities, reduce user flow quota application value, with This ensure that the billing accuracy of BOSS.
Embodiment seven
As shown in figure 3, the embodiment of the present invention seven provides a kind of distributor of data service flow quota, bag Include:
Parameter determination module 10, for when flow quota update condition is set up, determining the flow quota of user Parameter, the flow quota parameter be before the user in the first preset time period flow consumption figures with The business of flow quota request times;
Computing module 20, for being calculated present flow rate quota application value according to the flow quota parameter;
Sending module 30, for by gateway general packet wireless service support node GGSN/ data gateways P-GW sends the credit control for carrying the present flow rate quota application value to business operation support system BOSS System request CCR message, applies for new flow quota to BOSS.
Alternatively, the distributor of the data service flow quota also includes:
Quota original allocation module, for distributing an initial flow quota for the user;
The initial flow quota is more than or equal to the following business of the two:
The flow value that all users in second preset time period consume;And
The maximum of the flow quota request quantity that the BOSS can be processed in second preset time period.
Specifically, the computing module 20 includes:
Judging unit, for judging that the flow quota parameter, whether more than or equal to pre-determined threshold, obtains one Judged result;
First arithmetic element, for indicating the flow quota parameter more than or equal to pre- when the judged result Gating is prescribed a time limit, and on the basis of flow quota basic value increases by the first adjustment amount, obtains the present flow rate and matches somebody with somebody Volume application value.
Alternatively, the computing module 20 also includes:
Second arithmetic element, for indicating the flow modulation of quotas parameter less than default when the judged result During thresholding, the second adjustment amount is deducted on the basis of flow quota basic value, obtain the present flow rate quota Application value.
It should be noted that the flow quota basic value is determined by last flow quota application value or by counting Determine according to the type of service of business.
Further, the sending module 30 is specially:
The CCR message for carrying the present flow rate quota application value is sent by GGSN/P-GW to BOSS, Apply for new flow quota to BOSS, wherein, carry in the CCR message and be entered as present flow rate and match somebody with somebody The field of volume application value.
Alternatively, the RG fields in the CCR message are entered as present flow rate quota application value.
As shown in figure 4, the data service of the distributor of the data service flow quota of the application present invention is online Charging flow is:
101st, user initiates PDP Context and sets up request, and Jing DPI equipment passes to GGSN/P-GW, GGSN/P-GW judged to the ChargingCharacteristics fields in the request message, if Content charging online charging targeted customer, triggering following content charging online charging flow process;
102nd, GGSN/P-GW sends CCR message to BOSS, for setting up DCC connections;
103rd, BOSS is authenticated to user and authorizes;
104th, BOSS sends the result code Result Code replied message in CCA, and CCA and is set to “Success”;
105th, after GGSN/P-GW receives the CCA message, authorization terminal user uses respective service, sends PDP Context creates response;
106th, user initiates content charging data service request, the distributor of data service flow quota according to Customer service and flow service condition are calculated flow quota application value;
107th, GGSN/P-GW is fed back according to the distributor of data service flow quota by CCR message Flow quota application value, to BOSS apply flow quota, the RG field assignment wherein in CCR message For this flow quota application value;
108th, BOSS distribution businesses are make sure the quota of consumption, wholesale price, and carry out account's control, judge more than account The business usage amount quota allowed by volume, and make funds reservation from inside user account;
109th, BOSS sends and replies message CCA, and the message includes flow quota;GGSN/P-GW is received After CCA, authorization terminal user uses respective service;
110th, get when the reserved quota of user is soon finished or wants expired that (this quota use time exceedes Validity-Time) situations such as, occurs;
111st, the customer flow quota that GGSN/P-GW please look for novelty to the distributor of data service flow quota, The distributor of the data service flow quota carries out the calculating of the new flow quota application value of user;
112nd, GGSN/P-GW sends new quota reservation request to BOSS again, and reports using matching somebody with somebody Volume;
113rd, BOSS carries out allocation of quota again and makees funds reservation from user account;
114th, corresponding quota is passed through CCA message backs to GGSN/P-GW, GGSN/P-GW by BOSS After receiving CCA, authorization terminal user uses respective service;
115th, when user initiates PDP context deactivation to be asked, GGSN/P-GW sends and terminates credit control Service message processed should have the Event-Timestamp AVP of mark end of service time to BOSS in message, And identify the actually used quota of the business;
116th, BOSS such as carries out returning, withholds at account's operation;
117th, BOSS sends CCA to GGSN/P-GW and responds CCR.
Above example of the present invention, carries out the distribution of flow quota by disposing the distributor of flow quota, The distributor can not change GGSN/P-GW and BOSS independently of GGSN/P-GW and BOSS The online quota of flow is realized on the premise of interface;The distributor carries out flow quota with reference to DPI equipment Dynamically distributes, reduce the flash pressure of GGSN/P-GW and BOSS;While the distributor foundation The actual content of user's online dynamically carries out the distribution of flow quota, is that each user's distribution is corresponding Flow quota, improves network efficiency with this, also assures that while user's use demand is met The accurate billing of BOSS;Simultaneously The present invention reduces information exchange between network side and charging side Number of times, it is ensured that the stability of charge system work, reduces the maintenance cost of charge system.
Above-described is the preferred embodiment of the present invention, it should be pointed out that for the ordinary people of the art For member, some improvements and modifications can also be made under the premise of without departing from principle of the present invention, these Improvements and modifications are also within the scope of the present invention.

Claims (14)

1. a kind of distribution method of data service flow quota, it is characterised in that include:
When flow quota update condition is set up, the flow quota parameter of user, the flow quota ginseng is determined The business of flow consumption figures and flow quota request times of the number for the user in the first preset time period before;
Present flow rate quota application value is calculated according to the flow quota parameter;
By gateway general packet wireless service support node GGSN/ data gateways P-GW to service operation Support system BOSS sends the credit control request CCR message for carrying the present flow rate quota application value, to BOSS applies for new flow quota.
2. the distribution method of data service flow quota according to claim 1, it is characterised in that institute The distribution method for stating data service flow quota also includes:
Distribute an initial flow quota for the user;
The initial flow quota is more than or equal to the following business of the two:
The flow value that all users in second preset time period consume;And
The maximum of the flow quota request quantity that the BOSS can be processed in second preset time period.
3. the distribution method of data service flow quota according to claim 1 and 2, it is characterised in that It is described to be specially the step of be calculated present flow rate quota application value according to the flow quota parameter:
Judge that the flow quota parameter, whether more than or equal to pre-determined threshold, obtains a judged result;
When the judged result indicates that the flow quota parameter is more than or equal to pre-determined threshold, match somebody with somebody in flow Increase by the first adjustment amount on the basis of volume basic value, obtain the present flow rate quota application value.
4. the distribution method of data service flow quota according to claim 3, it is characterised in that institute Stating the step of being calculated present flow rate quota application value according to the flow quota parameter also includes:
When the judged result indicates that the flow modulation of quotas parameter is less than pre-determined threshold, in flow quota The second adjustment amount is deducted on the basis of basic value, obtains the present flow rate quota application value.
5. the distribution method of data service flow quota according to claim 4, it is characterised in that institute State flow quota basic value to be determined or determined by the type of service of data service by last flow quota application value.
6. the distribution method of data service flow quota according to claim 1, it is characterised in that institute State and supported to service operation by gateway general packet wireless service support node GGSN/ data gateways P-GW System BOSS sends the credit control request CCR message for carrying the present flow rate quota application value, to The step of BOSS applies for new flow quota is specially:
The CCR message for carrying the present flow rate quota application value is sent by GGSN/P-GW to BOSS, Apply for new flow quota to BOSS, wherein, carry in the CCR message and be entered as present flow rate and match somebody with somebody The field of volume application value.
7. the distribution method of data service flow quota according to claim 6, it is characterised in that institute State the RG fields in CCR message and be entered as present flow rate quota application value.
8. a kind of distributor of data service flow quota, it is characterised in that include:
Parameter determination module, for when flow quota update condition is set up, determining that the flow quota of user is joined Number, the flow quota parameter be before the user in the first preset time period flow consumption figures and stream The business of amount quota request times;
Computing module, for being calculated present flow rate quota application value according to the flow quota parameter;
Sending module, for by gateway general packet wireless service support node GGSN/ data gateways P-GW sends the credit control for carrying the present flow rate quota application value to business operation support system BOSS System request CCR message, applies for new flow quota to BOSS.
9. the distributor of data service flow quota according to claim 8, it is characterised in that institute The distributor for stating data service flow quota also includes:
Quota original allocation module, for distributing an initial flow quota for the user;
The initial flow quota is more than or equal to the following business of the two:
The flow value that all users in second preset time period consume;And
The maximum of the flow quota request quantity that the BOSS can be processed in second preset time period.
10. the distributor of data service flow quota according to claim 8 or claim 9, its feature exist In the computing module includes:
Judging unit, for judging that the flow quota parameter, whether more than or equal to pre-determined threshold, obtains one Judged result;
First arithmetic element, for indicating the flow quota parameter more than or equal to pre- when the judged result Gating is prescribed a time limit, and on the basis of flow quota basic value increases by the first adjustment amount, obtains the present flow rate and matches somebody with somebody Volume application value.
The distributor of 11. data service flow quotas according to claim 10, it is characterised in that The computing module also includes:
Second arithmetic element, for indicating the flow modulation of quotas parameter less than default when the judged result During thresholding, the second adjustment amount is deducted on the basis of flow quota basic value, obtain the present flow rate quota Application value.
The distributor of 12. data service flow quotas according to claim 11, it is characterised in that The flow quota basic value is determined by last flow quota application value or true by the type of service of data service It is fixed.
The distributor of 13. data service flow quotas according to claim 8, it is characterised in that The sending module is specially:
The CCR message for carrying the present flow rate quota application value is sent by GGSN/P-GW to BOSS, Apply for new flow quota to BOSS, wherein, carry in the CCR message and be entered as present flow rate and match somebody with somebody The field of volume application value.
The distributor of 14. data service flow quotas according to claim 13, it is characterised in that RG fields in the CCR message are entered as present flow rate quota application value.
CN201510587278.8A 2015-09-15 2015-09-15 Data service flow quota allocation method and data service flow quota allocation device Pending CN106533705A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510587278.8A CN106533705A (en) 2015-09-15 2015-09-15 Data service flow quota allocation method and data service flow quota allocation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510587278.8A CN106533705A (en) 2015-09-15 2015-09-15 Data service flow quota allocation method and data service flow quota allocation device

Publications (1)

Publication Number Publication Date
CN106533705A true CN106533705A (en) 2017-03-22

Family

ID=58348689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510587278.8A Pending CN106533705A (en) 2015-09-15 2015-09-15 Data service flow quota allocation method and data service flow quota allocation device

Country Status (1)

Country Link
CN (1) CN106533705A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110798410A (en) * 2019-11-06 2020-02-14 中国联合网络通信集团有限公司 Flow distribution method and device
WO2020063970A1 (en) * 2018-09-30 2020-04-02 中兴通讯股份有限公司 Service control method, network device, and storage medium
CN111356103A (en) * 2018-12-21 2020-06-30 中国移动通信集团山西有限公司 Flow quota distribution method and device, server and computer storage medium
CN112020025A (en) * 2019-05-30 2020-12-01 中国移动通信集团宁夏有限公司 Online charging message access layer authorization and call ticket instantiation method and device
CN112352400A (en) * 2018-05-16 2021-02-09 诺基亚通信公司 Adaptive quota allocation
CN113015116A (en) * 2019-12-20 2021-06-22 中国移动通信集团陕西有限公司 Dynamic quota method and device based on flow prediction
CN114422449A (en) * 2020-10-10 2022-04-29 中国联合网络通信集团有限公司 Mobile data management and control method, device, equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101106464A (en) * 2006-07-14 2008-01-16 中兴通讯股份有限公司 A method for prepaying code division multi-address packet data service
CN102612086A (en) * 2012-04-06 2012-07-25 华为技术有限公司 Method, device and system for authorizing data service flow of terminal
CN103079236A (en) * 2013-01-29 2013-05-01 华为软件技术有限公司 Traffic flow authorization method, device and system
CN103685072A (en) * 2013-11-27 2014-03-26 中国电子科技集团公司第三十研究所 Method for quickly distributing network flow
CN103974221A (en) * 2013-01-25 2014-08-06 中国移动通信集团广东有限公司 Method and device for distributing packet domain real-time charging flow quotas
CN104469728A (en) * 2014-11-17 2015-03-25 华为技术有限公司 Charging method, device and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101106464A (en) * 2006-07-14 2008-01-16 中兴通讯股份有限公司 A method for prepaying code division multi-address packet data service
CN102612086A (en) * 2012-04-06 2012-07-25 华为技术有限公司 Method, device and system for authorizing data service flow of terminal
CN103974221A (en) * 2013-01-25 2014-08-06 中国移动通信集团广东有限公司 Method and device for distributing packet domain real-time charging flow quotas
CN103079236A (en) * 2013-01-29 2013-05-01 华为软件技术有限公司 Traffic flow authorization method, device and system
CN103685072A (en) * 2013-11-27 2014-03-26 中国电子科技集团公司第三十研究所 Method for quickly distributing network flow
CN104469728A (en) * 2014-11-17 2015-03-25 华为技术有限公司 Charging method, device and system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112352400A (en) * 2018-05-16 2021-02-09 诺基亚通信公司 Adaptive quota allocation
CN112352400B (en) * 2018-05-16 2023-10-20 诺基亚通信公司 Adaptive quota allocation
WO2020063970A1 (en) * 2018-09-30 2020-04-02 中兴通讯股份有限公司 Service control method, network device, and storage medium
CN111356103A (en) * 2018-12-21 2020-06-30 中国移动通信集团山西有限公司 Flow quota distribution method and device, server and computer storage medium
CN111356103B (en) * 2018-12-21 2021-08-31 中国移动通信集团山西有限公司 Flow quota distribution method and device, server and computer storage medium
CN112020025A (en) * 2019-05-30 2020-12-01 中国移动通信集团宁夏有限公司 Online charging message access layer authorization and call ticket instantiation method and device
CN112020025B (en) * 2019-05-30 2021-12-07 中国移动通信集团宁夏有限公司 Online charging message access layer authorization and call ticket instantiation method and device
CN110798410A (en) * 2019-11-06 2020-02-14 中国联合网络通信集团有限公司 Flow distribution method and device
CN113015116A (en) * 2019-12-20 2021-06-22 中国移动通信集团陕西有限公司 Dynamic quota method and device based on flow prediction
CN114422449A (en) * 2020-10-10 2022-04-29 中国联合网络通信集团有限公司 Mobile data management and control method, device, equipment and storage medium
CN114422449B (en) * 2020-10-10 2024-03-01 中国联合网络通信集团有限公司 Mobile data management and control method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN106533705A (en) Data service flow quota allocation method and data service flow quota allocation device
CN103974221B (en) The distribution method and device of packet domain real time billing flow quota
CN102083035B (en) Method and system for implementing usage monitoring control
CN102075897B (en) Method and system for charging mobile data service
CN101132289B (en) Integrated billing method, billing system, application server and integrated billing system
CN102075900B (en) Method and system for realizing quantity monitoring and controlling
US9826103B2 (en) Offload of service charging from an online charging system
CN103765814B (en) The method of charging control and trigger function, Online Charging System
EP2798865B1 (en) Method and apparatus for controlling charging in a communication network
EP1894403A1 (en) Controlling provision of services in a communications network
CN102572768B (en) Charging method, authentication method, counting equipment and authenticating device
JP2013504909A (en) Distributing dynamic policy rules to end users according to end user account balances and service subscription levels in a communication network
CN101378323B (en) Method for implementing on-line charging of control business stream and network system thereof
CN101183956B (en) Intelligent network online charging interactive system and method
CN102340758B (en) Charging method, device and system, and authentication device
EP1627522B1 (en) Method and system for controlling prepaid data services
CN101908966A (en) Broadband charging method, device and system
CN100521720C (en) Packet prepayment service realization based on flow/time length and service quality
CN101094080A (en) Charging method for system of putting call through immediately after connection
CN101394452A (en) Pre-payment type communication method and network appliance
CN102870441A (en) management method and apparatus for billing package before and after package time limit
CN101959166A (en) Method and system for controlling online charging
CN101442733A (en) Processing method, apparatus and system for charging communication network
CN100365983C (en) Method for realizing packet data prepayment service
CN108270697A (en) A kind of method of adjustment, device and the server of flow quota

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322

RJ01 Rejection of invention patent application after publication