Nothing Special   »   [go: up one dir, main page]

CN106411555A - Communication link configuration method, apparatus and correlation system - Google Patents

Communication link configuration method, apparatus and correlation system Download PDF

Info

Publication number
CN106411555A
CN106411555A CN201510479265.9A CN201510479265A CN106411555A CN 106411555 A CN106411555 A CN 106411555A CN 201510479265 A CN201510479265 A CN 201510479265A CN 106411555 A CN106411555 A CN 106411555A
Authority
CN
China
Prior art keywords
sublink
business datum
communication link
information
changed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510479265.9A
Other languages
Chinese (zh)
Other versions
CN106411555B (en
Inventor
袁自诚
连琨
曹刚
魏强
樊宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Advanced New Technologies Co Ltd
Advantageous New Technologies Co Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Priority to CN201510479265.9A priority Critical patent/CN106411555B/en
Publication of CN106411555A publication Critical patent/CN106411555A/en
Application granted granted Critical
Publication of CN106411555B publication Critical patent/CN106411555B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Information Transfer Between Computers (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses a communication link configuration method, an apparatus and a correlation system. The method comprises the following steps that a decision server collects corresponding relation information of a sublink of a communication link and service data; when changed information of the communication link is received, according to the corresponding relation information of the sublink and the service data, configuration information is generated; and the configuration information is sent to a sublink to be changed in the communication link so as to reconfigure the service data of the sublink to be changed. Compared to the prior art, by using the technical scheme of the invention, the decision server collects the corresponding relation information of each sublink and the service data and system management is performed on the communication link, the service data and equipment corresponding to the service data so that when the communication link is changed, configuration information can be timely generated according to systematic relation information, and modes of manual analysis and data gathering are replaced; and efficiency for configuring the communication link is high and an error risk can be reduced.

Description

Communication link collocation method, device and related system
Technical field
The present invention relates to Internet technical field, more specifically, it is related to a kind of communication link collocation method, device and phase Pass system.
Background technology
With the development of Internet technology, the network platform has generalized in all trades and professions, and, between platform and platform Business datum exchange also can be completed by network communication link.Generally, in order to ensure the business datum energy between platform Enough quick securities transmitted, improve business datum simultaneously, generally access special line and carry out business datum exchange between platform, Wherein, special line refers to that two network platforms carry out the dedicated communication link of business datum exchange.With Alipay platform with arbitrary As a example bank, between this bank and Alipay platform access bank's dedicated communication link (hereinafter referred to as bank's special line), when with When Alipay platform produces the transaction data with bank, Alipay platform passes through bank's special line by transmission of transaction data extremely at family Bank, and the data message of bank's feedback is received by bank's special line.
Generally, Alipay platform is connected by intermediate server with bank special line, and wherein, intermediate server is used for as bank Special line configures communication interface information, transformation service data form etc..When transaction data produces, Alipay platform will be concluded the business To intermediate server, transaction data is entered row format by intermediate server to be changed data is activation, is processed into what bank was capable of identify that Data type, and the transaction data after changing is inputted by bank's special line by the corresponding communication interface of bank's special line, it is transferred to Bank.When bank's feedback data, transfer data to intermediate server, intermediate server again by bank's special line The data that bank is fed back enters row format conversion, and is sent to Alipay platform.
As can be seen here, in the business datum exchange process with bank for the Alipay platform, by intermediate server to business datum Processed, therefore, when the business datum amount of bank is larger, intermediate server load can be caused larger.Prior art In order to solve this problem, generally a communication link is split as many sub-links, every sub-links correspond to a centre Server, makes a communication link correspond to multiple stage intermediate server, every intermediate server processes the partial service of this bank Data.When wherein one intermediate server fault or needs are offline, the sublink connecting this intermediate server will be no Method communicates, and needs manually to collect, analyzes the data that this sub-links is transmitted, and then communication link is reconfigured.So And, the transfer process of business datum is related to multiple links, and each link is related to multiple devices so that the business of communication link It is in the relation of multi-to-multi between data and equipment, corresponding relation heavy fragmentation, the time not only resulting in analyze data is long, The efficiency of configuration communication link is low, and error rate is higher, and risk is larger.
Content of the invention
In order to solve above-mentioned technical problem, the embodiment of the present invention provides a kind of communication link collocation method, device and phase relation System, can solve the problem that due to the corresponding relation fragmentation between business datum and equipment, when communication link changes, by people The efficiency that the mode of work analyze data configures communication link is low, error-prone and risk is high.
In a first aspect, embodiments providing a kind of communication link collocation method, including:Policy server gathers institute State the sublink of communication link and the correspondence relationship information of business datum;When receiving the modification information of described communication link, Configuration information is generated according to the correspondence relationship information of described sublink and business datum;Described configuration information is sent to described Sublink to be changed in communication link, with the business datum of sublink to be changed described in reconfiguring.
In conjunction with a first aspect, in the first possible embodiment of first aspect, described gather described communication link Sublink and the correspondence relationship information of business datum, including:Obtain sublink and the intermediate server of described communication link Corresponding relation;According to the corresponding relation of described sublink and intermediate server, read accordingly son from every intermediate server The business datum content of link and business datum flow;By described business datum content and business datum flow and corresponding subchain The corresponding storage in road.
In conjunction with above-mentioned in a first aspect, in the possible embodiment of the second of first aspect, according to described sublink and industry The correspondence relationship information of business data generates configuration information, including:Sublink to be changed is determined according to described modification information;Read The business datum of sublink to be changed described in taking;Business datum according to described sublink to be changed generates configuration information.
In conjunction with above-mentioned in a first aspect, in the third possible embodiment of first aspect, described configuration information is being sent out After delivering to the sublink to be changed in described communication link, also include:Configuration item number is obtained from described configuration information According to;Generate the change daily record of described communication link according to described configuration project data.
In conjunction with above-mentioned in a first aspect, in the 4th kind of possible embodiment of first aspect, described configuration information is being sent out After delivering to the sublink to be changed in described communication link, also include:Calculate the business number of described communication link after changing According to flow;Contrast the business datum flow after described communication link change and business datum flow before changing;When described logical When business datum flow after letter link change is less than business datum flow before changing, obtain described change daily record;According to The business datum of sublink to be changed described in every is reverted to business datum before changing by described change daily record.
In conjunction with above-mentioned in a first aspect, in the 5th kind of possible embodiment of first aspect, described configuration information is being sent out After delivering to the sublink to be changed in described communication link, also include:Receive and recover described communication link to before changing Recovery information;Obtain described change daily record;According to described change daily record by the business datum of sublink to be changed described in every Revert to business datum before changing.
Second aspect, embodiments provides a kind of communication link configuration device, including:Acquisition module, is used for adopting Collect the sublink of described communication link and the correspondence relationship information of business datum;Generation module, for receiving described leading to During the modification information of letter link, the sublink according to the collection of described acquisition module is generated with the correspondence relationship information of business datum Configuration information;Sending module, the configuration information for generating described generation module is sent to treating in described communication link Change sublink, with the business datum of sublink to be changed described in reconfiguring.
In conjunction with second aspect, in the first possible embodiment of second aspect, described acquisition module includes obtaining list Unit, reading unit and memory cell, wherein, described acquiring unit, for obtain the sublink of described communication link with Between server corresponding relation;Described reading unit, for the sublink that obtained according to described acquiring unit and intermediary service The corresponding relation of device, reads business datum content and the business datum flow of corresponding sublink from every intermediate server; Described memory cell, for the business datum content that reads described reading unit and business datum flow and corresponding sublink Corresponding storage.
In conjunction with above-mentioned second aspect, in the possible embodiment of the second of second aspect, described generation module includes really Order unit and signal generating unit, wherein, described determining unit, for determining sublink to be changed according to described modification information; Described reading unit, is additionally operable to read the business datum of the sublink to be changed that described determining unit determines;Described generation is single Unit, the business datum of the sublink to be changed for being read according to described reading unit generates configuration information.
In conjunction with above-mentioned second aspect, in the third possible embodiment of second aspect, also include acquisition module, its In, described acquisition module, for obtaining configuration project data from described configuration information;Described generation module, is additionally operable to Generate the change daily record of described communication link according to the configuration project data that described acquisition module obtains.
In conjunction with above-mentioned second aspect, in the 4th kind of possible embodiment of second aspect, also include computing module, right Ratio module and business datum recovery module, wherein, described computing module, for calculating the industry of described communication link after change Business data traffic;Described contrast module, for contrasting the business after the change of described computing module calculated communication link Data traffic and business datum flow before changing;Business datum flow after described communication link changes is less than before changing Business datum flow when, described acquisition module, be additionally operable to obtain described change daily record;Described business datum recovery module, The business datum of sublink to be changed described in every is reverted to change by the change daily record for obtaining according to described acquisition module Front business datum.
In conjunction with above-mentioned second aspect, in the 5th kind of possible embodiment of second aspect, also include receiver module, its In, described receiver module, recovers described communication link to recovery information before changing for receiving.
The third aspect, embodiments provides a kind of communication link configuration system, including:Policy server, centre Server and O&M server, wherein, described policy server is as described in second aspect;Described intermediate server, is used for Determine sublink to be changed, and the corresponding configuration information of sublink to be changed described in receiving and recovery information, wherein, described Configuration information and described recovery information are sent by described policy server;Described O&M server, for described decision-making clothes Business device sends the sublink of communication link and the correspondence relationship information of business datum.
In conjunction with the third aspect, in the first possible embodiment of the third aspect, when the change of described communication link completes When, described policy server is sent to described O&M server by changing object information;And when described communication link recovers When successful, restoration result information is sent to described O&M server by described policy server.
As seen from the above description, for because of business datum and problem produced by equipment corresponding relation fragmentation, the present invention is real Apply communication link collocation method, device and the related system that example is provided, pre-set policy server, described decision-making clothes Business device gathers the sublink of described communication link and the correspondence relationship information of business datum, when the change receiving communication link During information, policy server generates configuration information according to the correspondence relationship information of described sublink and business datum, will be described Configuration information is sent to the sublink to be changed in described communication link, with the business of sublink to be changed described in reconfiguring Data.Compared with prior art, the correspondence relationship information of every sub-links and business datum is gathered by policy server, System administration is carried out to communication link, business datum and the corresponding equipment of business datum, thus when communication link changes, Configuration information can be generated in time according to systematized relation information, instead of the mode of manual analysis, combined data, no Only configure the efficiency high of communication link, and risk of error can be reduced.
It should be appreciated that above general description and detailed description hereinafter are merely illustrative and explanatory description, to this Inventive technique scheme is not construed as limiting.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to required in embodiment Accompanying drawing to be used be briefly described it should be apparent that, drawings in the following description be only the present invention some enforcement Example, for those of ordinary skill in the art, on the premise of not paying creative work, can also be attached according to these Figure obtains other accompanying drawings.By, shown in accompanying drawing, the above and other purpose of the present invention, feature and advantage will become apparent from. Identical reference instruction identical part in whole accompanying drawings.Deliberately press the scaling drafting of actual size equal proportion attached Figure, it is preferred that emphasis is illustrate the purport of the present invention.
Fig. 1 is the flow chart of communication link collocation method provided in an embodiment of the present invention;
Fig. 2 is that communication link configuration information provided in an embodiment of the present invention interacts schematic diagram;
Fig. 3 is the structural representation of communication link configuration device provided in an embodiment of the present invention;
Fig. 4 is the structural representation of another kind communication link configuration device provided in an embodiment of the present invention;
Fig. 5 is the structural representation that communication link provided in an embodiment of the present invention configures system.
Specific embodiment
Generally, when corresponding certain intermediate server of the sublink of communication link breaks down or offline, or increase During sublink, it is required to this communication link is reconfigured, thus corresponding for communication link business datum is redistributed. In analysis and collect communication link business datum when, need to coordinate O&M server end, the multiple stage such as intermediate server end sets Standby, employ the common cooperation of multi-party network engineer, not only flow process is tediously long, and take a large amount of manpowers and time.Base In prior art variety of problems it is proposed that the technical scheme of the embodiment of the present invention.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Description it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiment.Base Embodiment in the present invention, it is all that those of ordinary skill in the art are obtained under the premise of not making creative work Other embodiment, broadly falls into the scope of protection of the invention.
Refer to Fig. 1, Fig. 1 is the flow chart of communication link collocation method provided in an embodiment of the present invention.As shown in figure 1, The method comprises the following steps.
Step S101, policy server gathers the sublink of described communication link and the correspondence relationship information of business datum.
Wherein, because a communication link includes many sub-links, cause corresponding relation ratio between sublink and business datum More at random, in order to system administration is carried out to the scattered information of corresponding relation such as the sublink of communication link, business datum, this It is previously provided with policy server, described policy server gathers the sublink information of every communication link in inventive embodiments, And the service data information handled by sublink, then, the corresponding relation according to sublink and business datum is stored, Corresponding every communication link defines the relation information storehouse of system, thus the various information system managements to communication link, with When also serve as configure communication link basic data.
Specifically, because sublink is accessed by the interface message that intermediate server provides, i.e. sublink and intermediary service Device corresponds, and therefore, policy server can obtain the corresponding relation of sublink and intermediate server first.Wherein, For the ease of safeguarding, O&M server is every intermediate server setting mark, and the subchain that intermediate server is connected Road information identifies corresponding storage with it, and therefore, policy server can obtain sublink and intermediary service from O&M server The corresponding relation of device.
Secondly, the content of the business datum that sublink is transmitted and flow, are joined by the intermediate server that it is connected Put, for example, it is assumed that China Merchants Bank's special line is provided with three sub-links taking China Merchants Bank's special line as a example, connection identifier respectively For 1,2 and 3 intermediate server, wherein, being designated 1 intermediate server by the curriculum offering of business datum can be Reimbursement data, data processing amount is 50%.Therefore, according to corresponding relation, policy server can determine that sublink is corresponding Intermediate server, then, obtains corresponding sublink corresponding business datum content and flow from intermediate server, finally, By corresponding with corresponding sublink to business datum content and flow storage, form the corresponding relation of sublink and business datum.
It should be noted that an intermediate server can access one or more of sublinks, when the many sub-links of access When, any two sub-links are not admitted to same communication link, for example, when accessing three sub-links, first subchain Road belongs to China Merchants Bank's special line, and the second sub-links belong to Construction Bank's special line, and it is special that Article 3 sublink belongs to Bank of China Line.For the ease of management, every communication link arranges the identification information of oneself, and the sublink of this communication link is all with this mark The form of knowledge information mark-on number is marked, and therefore, when accessing many sub-links, intermediate server can be by sublink Identification information interface the corresponding storage of information.
Additionally, in the embodiment of the present invention, policy server can execute collection information after receiving Notification of Changes , it is also possible to carry out information gathering according to predetermined period, the embodiment of the present invention is without limitation for step.
Step S102 is when receiving the modification information of described communication link, right according to described sublink and business datum Relation information is answered to generate configuration information.
Sublink due to communication link is accessed by intermediate server, when intermediate server occurs change, will cause portion The change of molecule link, thus causing the change of communication link, therefore, in the present embodiment, described communication link change letter Breath is substantially intermediate server adjustment information.Wherein, communication link modification information includes two classes, and a class is that sublink is deleted Subtract information, another kind of is that sublink increases information, and sublink is deleted Informational Expression and is, the intermediary service that sublink is connected Device fault or the offline adjustment of needs, need to close this sublink;Sublink increases Informational Expression, clothes in the middle of other The new sublink of this communication link is introduced on business device.
Wherein, in the present embodiment, for the situation whether intermediate server is out of service, can be carried out by designated symbol Represent, for example, if by the modification information of intermediate server generation out of service, designated symbol can be set to " 0 "; If intermediate server running status is constant, but communication link change, designated symbol can be set to " 1 ", this Bright embodiment is without limitation.
Additionally, the running status of O&M every intermediate server of server monitoring, when the running status of certain intermediate server When changing, its corresponding service data can change, and engineering staff can determine quilt according to the change of service data The intermediate server of adjustment, then inputs, to O&M server, the order generating modification information.O&M server is receiving work After the order of Cheng personnel input, the mark reading this intermediate server generates modification information, is sent to policy server.Certainly After plan server receives the modification information of communication link, become it is possible, firstly, to be determined according to the designated symbol in modification information More type, then, determines sublink to be changed according to intermediate server mark, and right according to sublink and business datum Should be related to, read the business datum of sublink to be changed, the business datum according to sublink to be changed generates communication link Configuration information.Further include two types due to becoming, with reference to example, two kinds of change is described in detail.
When change type is to delete sublink, policy server can read intermediate server mark from modification information, And sublink to be deleted is determined according to intermediate server mark, read the business datum of sublink to be deleted, analyze other The business datum of sublink, determines the allocation strategy distributing sublink business datum to be deleted, and is generated according to allocation strategy and joins Confidence ceases.
For example, it is assumed that China Merchants Bank's special line includes three sub-links, when the first sub-links need to be deleted it should by its Corresponding business datum is assigned in second and/or Article 3 sublink.Assume that the data that the first sub-links are processed is 50% reimbursement data and 20% payment data;The data that second sub-links are processed is 30% reimbursement data and 40% Payment data;Article 3 sublink process data be 20% reimbursement data and 40% payment data, can be by first The partial data of sublink is separately dispensed into the second sub-links, and other data distributions are to Article 3 sublink, now, three Sub-links are sublink to be changed;Can also be according to the handling capacity of Article 2 and Article 3 sublink, by total data It is assigned in wherein one sub-links, now, the first sub-links and the sublink receiving its data are sublink to be changed. After policy server determines allocation strategy, generate corresponding configuration information.
When change type is to add new sublink, policy server reads new sublink corresponding intermediate server mark, It is then possible to the sublink shunting is determined according to the business datum flow of other sublinks and handling capacity, and every sub-links The data content of shunting and flow, then generate configuration information.At this time, it may be necessary to the sublink of shunting is sublink to be changed.
For example, increase China Merchants Bank's sublink, can be according to the handling capacity of other three sub-links, by a part of number According to being diverted in this new sublink.Assume to be diverted to new sublink by the 30% of the first sub-links reimbursement data, by the 3rd The 10% of sub-links payment data is assigned to new sublink.
Certainly, above-mentioned business datum allocation strategy is example, and the technical scheme of the embodiment of the present invention is not construed as limiting. In the technical scheme of the embodiment of the present invention, the formulation of business datum allocation strategy, the attribute according to business datum and every strip The data traffic of link is carried out, and the embodiment of the present invention is without limitation.
It should be noted that, although the business datum of sublink is processed by intermediate server, but business data flow direction and connecing Message breath etc. is controlled by different system, for example, the content of the corresponding business datum of sublink by operation system management and Setting, operation system is transmitted to different data contents by different interfaces simultaneously;The business data flow of sublink Amount is set by management system.Therefore, when distributing business datum, need to change the parameter of multiple systems that is to say, that joining Confidence breath includes the command information of corresponding multiple systems, and policy server, can be according to order letter when generating command information Cease corresponding system and add respective identification, after the completion of generating, arranged command information for multiple orders according to different identification Collection, and set correlated identities for each command set.
Step S103, described configuration information is sent to the sublink to be changed in described communication link.
Wherein, from the description of above-mentioned steps, the configuration process to communication link, need to change the ginseng of each related system Number, therefore, corresponding different system arranges configuration information for multiple command sets.Accordingly, configuration information is sent out by this step Deliver to intermediate server, specifically include, respectively command set is sent to corresponding system, after each system receives command set Execution corresponding operating, thus realize the configuration to communication link.
For example, the operation system of sublink to be deleted should execute business shutoff operation;Receive other sublink business datums Sublink, its management system should traffic adjustment operation.The rest may be inferred, and the operation performed by other system is with fixed Inhibition and generation order is carried out, and the embodiment of the present invention repeats no more.
It should be noted that because change reason is probably the offline adjustment of intermediate server, when intermediate server adjustment completes Afterwards, still can continue to run with, then, the corresponding sublink of this intermediate server also needs to recover to business data processing. Additionally, the configuration information that policy server generates is only tactic information, the business datum total flow after configuration may relatively be joined Put front little, now it is also desirable to return to the configuration of communication link before adjustment.Therefore, policy server is to middle clothes After business device send configuration information, configuration project data can also be obtained according to configuration information, and project data will be configured and make Stored for change daily record.Wherein, change the forward and backward business datum of log recording every sub-links change.
In order to avoid configuration after business datum total flow relatively configure front little, in sending configuration information to communication link Also include after sublink to be changed, calculate the business datum flow of communication link after change, after contrast communication link change Business datum flow and business datum flow before changing, if the business datum flow after change is more than industry before changing Business data traffic, before need not returning to configuration;If the business datum flow after change is less than business data flow before changing Amount, reads the change daily record of communication link, reverts to before changing the business datum of every sub-links according to change daily record Business datum.
Certainly, if change reason is the offline adjustment of intermediate server, after the completion of intermediate server adjustment, O&M service Device sends recovery information to policy server, after policy server receives recovery information, reads described change daily record, and According to change daily record, the business datum of every sub-links is reverted to business datum before changing.Wherein, business datum is extensive The multiple method arriving before changing is similar with foregoing description, including according to changing daily record generation configuration information, and by configuration information It is sent to intermediate server, carry out communication link configuration, the embodiment of the present invention in order to intermediate server according to configuration information Here is omitted.
Seen from the above description, the technical scheme of the embodiment of the present invention, by default policy server to communication link Sublink and business datum carry out system administration, thus when communication link changes, can be according to business datum and equipment system The corresponding relation of systemization generates configuration information in time, not only configures the efficiency high of communication link, and can reduce error wind Danger.
The description that above-described embodiment is carried out to technical scheme from the angle of policy server itself, in order that ability Field technique personnel carry out more comprehensive, more detailed understanding to the technical scheme of the embodiment of the present invention, below based on above-mentioned Embodiment, carries out to technical scheme launching description from the angle of policy server and other server interactions.
Because the present embodiment is the description to technical solution of the present invention from another one angle, it is the supplement to above-described embodiment Description, therefore, in the present embodiment, is related to the description referring to above-described embodiment for the part of above-described embodiment content, this reality Here is omitted to apply example.
Refer to Fig. 2, Fig. 2 is that communication link configuration information provided in an embodiment of the present invention interacts schematic diagram, the present embodiment In, default policy server is connected with the communication interface of O&M server and intermediate server respectively, forms network, Premise as communication link configuration.
The present embodiment is described with the offline scene that is adjusted to of intermediate server, when certain intermediate server needs offline, Communication link modification information is generated by O&M server, and is sent to policy server.Policy server receives change After information, operation system, the management system of each intermediate server etc. by way of interface polls, can be scanned Information, the sublink of collection communication link with business datum and carries out system administration, then, sends to O&M server and is subject to Reason successful information, to notify O&M server to finish data acquisition.
Wherein, modification information include intermediate server mark, policy server read intermediate server mark, according in Between server identification determine sublink to be closed, and its corresponding business datum, then, from the data being gathered, adjust Take other data of the affiliated communication link of sublink to be closed, allocation strategy determined according to the business datum of other sublinks, Configuration information is generated according to allocation strategy, configuration information is organized into command set, command set is sent respectively intermediate server Corresponding system in, detection change result, and record change daily record.
It should be noted that when offline intermediate server connects many sub-links, because every sub-links belong to different Communication link, intermediate server send command set when, command set can be sent in units of communication link, and detect Result after current communications link change, then retransmits the command set of next communication link, so circulates.
After the completion of communication link is configured by policy server, change result is sent to O&M server, in order to O&M The current running status of server monitoring intermediate server.
When offline intermediate server debugging completes, when resuming operation, O&M server generates recovery information, and is sent to Policy server, policy server obtains change daily record, inversely generates configuration information according to the record of change daily record, equally Configuration information is organized into command set, is subsequently sent to the corresponding system of intermediate server, and detect change result, and After communication link recovers, restoration result is sent to O&M server, works as in order to O&M server monitoring intermediate server Front running status.
If likewise, intermediate server connects many sub-links, when recovering change, still circulate operation, this enforcement Here is omitted for example.
It should be noted that the process such as policy server gathered data, generation configuration information refers to the description of above-described embodiment, Here is omitted for the present invention.
Additionally, a kind of technology that the present embodiment is only the present invention realizes scene, the technical scheme not structure to the embodiment of the present invention Become to limit, the technical scheme of the embodiment of the present invention can also be applied in other feasible scenes, and the embodiment of the present invention is herein Repeat no more.
To sum up state, for because of business datum and problem produced by equipment corresponding relation fragmentation, the embodiment of the present invention is carried For communication link collocation method, pre-set policy server, described policy server gathers the son of described communication link Link and the correspondence relationship information of business datum, when receiving the modification information of communication link, policy server is according to institute The correspondence relationship information stating sublink with business datum generates configuration information, and described configuration information is sent to described communication chain Sublink to be changed in road, with the business datum of sublink to be changed described in reconfiguring.Compared with prior art, lead to Cross the correspondence relationship information that policy server gathers every sub-links and business datum, to communication link, business datum and industry The business corresponding equipment of data carries out system administration, thus when communication link changes, can be according to systematized relation information Generate configuration information in time, instead of the mode of manual analysis, combined data, not only configure the efficiency high of communication link, And risk of error can be reduced.
Corresponding with above-mentioned implementation method, the embodiment of the present invention additionally provides a kind of communication link configuration device, refers to Fig. 3, Fig. 3 are the structural representation of communication link configuration device provided in an embodiment of the present invention, and described device includes:Collection Module 11, generation module 12 and sending module 13, wherein, acquisition module 11, for gathering the son of described communication link Link and the correspondence relationship information of business datum;Generation module 12, in the modification information receiving described communication link When, the sublink according to acquisition module 11 collection generates configuration information with the correspondence relationship information of business datum;Sending module 13, the configuration information for generating generation module 12 is sent to the sublink to be changed in described communication link, with again The business datum of sublink to be changed described in configuration.
In described device the function of modules and effect realize process refer to corresponding in said method realize process, This repeats no more.
Compared with prior art, the device described in the present embodiment, by the subchain to communication link for the default policy server Road and business datum carry out system administration, thus when communication link changes, can be according to business datum and device systems Corresponding relation generate configuration information in time, not only configure the efficiency high of communication link, and risk of error can be reduced.
Additionally, being based on above-described embodiment, the embodiment of the present invention additionally provides another kind of embodiment party of communication link configuration device Formula, referring to Fig. 4, Fig. 4 is the structural representation of another kind communication link configuration device provided in an embodiment of the present invention, institute State device to include:Acquisition module 21, generation module 22, sending module 23, acquisition module 24, computing module 25, right Than module 26, business datum recovery module 27 and receiver module 28.Wherein, acquisition module 21, generation module 2 and send out Send the function of module 23 and act on similar with the description of above-described embodiment, the embodiment of the present invention no longer describes in detail herein.
Acquisition module 24, for obtaining configuration project data, in the present embodiment, generation module from described configuration information 22, it is additionally operable to generate the change daily record of described communication link according to the configuration project data that described acquisition module obtains.Calculate Module 25, for calculating the business datum flow of described communication link after change;Contrast module 26, for comparing calculation mould Business datum flow after the change of block 25 calculated communication link and business datum flow before changing, when described communication When business datum flow after link change is less than business datum flow before changing, acquisition module 24, it is additionally operable to obtain institute State change daily record;Business datum recovery module 27, for the change daily record that obtains according to acquisition module 24 by described in every The business datum of sublink to be changed reverts to business datum before changing.Receiver module 28, recovers described logical for receiving Letter link is to recovery information before changing.
It should be noted that in the present embodiment, acquisition module 21 includes acquiring unit, reading unit and memory cell, Wherein, described acquiring unit, for obtaining the sublink of described communication link and the corresponding relation of intermediate server;Described Reading unit, for the corresponding relation of the sublink that obtained according to described acquiring unit and intermediate server, from every centre Business datum content and the business datum flow of corresponding sublink is read in server;Described memory cell, for will be described Business datum content and the storage corresponding with corresponding sublink of business datum flow that reading unit reads.
In another embodiment, generation module 22 includes determining unit and signal generating unit, wherein, described determining unit, For sublink to be changed is determined according to described modification information;In the present embodiment, described reading unit, is additionally operable to read The business datum of the sublink to be changed that described determining unit determines;Described signal generating unit, for according to described reading unit The business datum of the sublink to be changed reading generates configuration information.
In described device the function of modules and effect realize process refer to corresponding in said method realize process, This repeats no more.
As seen from the above description, the communication link configuration device that the embodiment of the present invention is provided, pre-sets policy server, Described policy server gathers the sublink of described communication link and the correspondence relationship information of business datum, when receiving communication During the modification information of link, policy server generates configuration letter according to the correspondence relationship information of described sublink and business datum Breath, described configuration information is sent to sublink change in described communication link, sub to treat change described in reconfiguring The business datum of link.Compared with prior art, every sub-links are gathered by policy server corresponding with business datum Relation information, carries out system administration to communication link, business datum and the corresponding equipment of business datum, thus in communication chain During the change of road, configuration information can be generated in time according to systematized relation information, instead of manual analysis, combined data Mode, not only configure the efficiency high of communication link, and risk of error can be reduced.
Corresponding with foregoing description, the embodiment of the present invention additionally provides a kind of communication link configuration system, referring to Fig. 5, Fig. 5 is the structural representation that communication link provided in an embodiment of the present invention configures system, and described system includes:Decision service Device 1, intermediate server 2 and O&M server 3.Wherein, policy server 1 includes device described above, its function Refer to foregoing description with effect, here is omitted for the present invention.Intermediate server 2, for determining sublink to be changed, And the corresponding configuration information of sublink to be changed described in receiving and recovery information, wherein, described configuration information and described recovery Information is sent by described policy server.O&M server 3, for sending the son of communication link to described policy server Link and the correspondence relationship information of business datum.
Additionally, when communication link change completes, policy server 1 also needs to for change object information to be sent to O&M clothes Business device 3, likewise, when communication link is successfully recovered, restoration result information is sent to O&M clothes by policy server 1 Business device 3.The process of implementing refers to foregoing description, and the embodiment of the present invention repeats no more.
Summary, for because of business datum and problem produced by equipment corresponding relation fragmentation, embodiment of the present invention institute Communication link collocation method, device and the related system providing, pre-sets policy server, described policy server is adopted Collect the sublink of described communication link and the correspondence relationship information of business datum, when receiving the modification information of communication link, Policy server generates configuration information according to the correspondence relationship information of described sublink and business datum, by described configuration information It is sent to the sublink to be changed in described communication link, with the business datum of sublink to be changed described in reconfiguring.With Prior art is compared, and gathers the correspondence relationship information of every sub-links and business datum by policy server, to communication chain Road, business datum and the corresponding equipment of business datum carry out system administration, thus when communication link changes, being capable of basis Systematized relation information generates configuration information in time, instead of the mode of manual analysis, combined data, not only configures logical The efficiency high of letter link, and risk of error can be reduced.
Those skilled in the art, after considering specification and putting into practice invention disclosed herein, will readily occur to other of the present invention Embodiment.It is contemplated that covering any modification, purposes or the adaptations of the present invention, these modifications, purposes Or adaptations follow the present invention general principle and include the present invention undocumented in the art known often Know or conventional techniques.Description and embodiments be considered only as exemplary, true scope and spirit of the invention by under The claim in face is pointed out.
It is described above and precision architecture illustrated in the accompanying drawings it should be appreciated that the invention is not limited in, and Various modifications and changes can carried out without departing from the scope.The scope of the present invention only to be limited by appended claim.

Claims (14)

1. a kind of communication link collocation method is it is characterised in that include:
Policy server gathers the sublink of described communication link and the correspondence relationship information of business datum;
When receiving the modification information of described communication link, according to the correspondence relationship information of described sublink and business datum Generate configuration information;
Described configuration information is sent to the sublink to be changed in described communication link, to treat change described in reconfiguring The business datum of link.
2. method according to claim 1 is it is characterised in that the sublink of the described communication link of described collection and industry The correspondence relationship information of business data, including:
Obtain the sublink of described communication link and the corresponding relation of intermediate server;
According to the corresponding relation of described sublink and intermediate server, read corresponding sublink from every intermediate server Business datum content and business datum flow;
By corresponding with corresponding sublink to described business datum content and business datum flow storage.
3. method according to claim 1 it is characterised in that according to described sublink corresponding with business datum close It is that information generates configuration information, including:
Sublink to be changed is determined according to described modification information;
The business datum of sublink to be changed described in reading;
Business datum according to described sublink to be changed generates configuration information.
4. the method according to claim arbitrary in claims 1 to 3 is it is characterised in that sending out described configuration information After delivering to the sublink to be changed in described communication link, also include:
Configuration project data is obtained from described configuration information;
Generate the change daily record of described communication link according to described configuration project data.
5. method according to claim 4 is it is characterised in that be sent to described communication chain by described configuration information After sublink to be changed in road, also include:
Calculate the business datum flow of described communication link after changing;
Contrast the business datum flow after described communication link change and business datum flow before changing;
When the business datum flow after the change of described communication link is less than business datum flow before changing, obtain described change More daily record;
According to described change daily record, the business datum of sublink to be changed described in every is reverted to business datum before changing.
6. method according to claim 4 is it is characterised in that be sent to described communication chain by described configuration information After sublink to be changed in road, also include:
Receive and recover described communication link to recovery information before changing;
Obtain described change daily record;
According to described change daily record, the business datum of sublink to be changed described in every is reverted to business datum before changing.
7. a kind of communication link configuration device is it is characterised in that include:
Acquisition module, for gathering the sublink of described communication link and the correspondence relationship information of business datum;
Generation module, for when receiving the modification information of described communication link, according to the son of described acquisition module collection Link generates configuration information with the correspondence relationship information of business datum;
Sending module, the configuration information for generating described generation module is sent to treating in described communication link, and change is sub Link, with the business datum of sublink to be changed described in reconfiguring.
8. device according to claim 7 is it is characterised in that described acquisition module includes acquiring unit, reads list Unit and memory cell, wherein,
Described acquiring unit, for obtaining the sublink of described communication link and the corresponding relation of intermediate server;
Described reading unit, for the corresponding relation of the sublink that obtained according to described acquiring unit and intermediate server, from Business datum content and the business datum flow of corresponding sublink is read in every intermediate server;
Described memory cell, for the business datum content that reads described reading unit and business datum flow and accordingly son Link pair should store.
9. device according to claim 7 is it is characterised in that described generation module includes determining unit and generates single Unit, wherein,
Described determining unit, for determining sublink to be changed according to described modification information;
Described reading unit, is additionally operable to read the business datum of the sublink to be changed that described determining unit determines;
Described signal generating unit, the business datum of the sublink to be changed for being read according to described reading unit generates configuration letter Breath.
10. the device according to claim arbitrary in claim 7 to 9 is it is characterised in that also include acquisition module, its In,
Described acquisition module, for obtaining configuration project data from described configuration information;
Described generation module, is additionally operable to generate described communication link according to the configuration project data that described acquisition module obtains Change daily record.
11. devices according to claim 10 are it is characterised in that also include computing module, contrast module and business Data recovery module, wherein,
Described computing module, for calculating the business datum flow of described communication link after change;
Described contrast module, for contrasting the business datum flow after the change of described computing module calculated communication link With business datum flow before changing;Business datum flow after described communication link changes is less than business number before changing During according to flow, described acquisition module, it is additionally operable to obtain described change daily record;
Described business datum recovery module, the change daily record for obtaining according to described acquisition module will be waited described in every to change The business datum of sublink reverts to business datum before changing.
12. devices according to claim 10 it is characterised in that also including receiver module, wherein,
Described receiver module, recovers described communication link to recovery information before changing for receiving.
A kind of 13. communication link configuration systems are it is characterised in that include:Policy server, intermediate server and O&M clothes Business device, wherein,
Described policy server is as described in claim arbitrary in claim 7 to 12;
Described intermediate server, for determining sublink to be changed, and the corresponding configuration letter of sublink to be changed described in receiving Breath and recovery information, wherein, described configuration information and described recovery information are sent by described policy server;
Described O&M server, the sublink for sending communication link to described policy server is corresponding with business datum Relation information.
14. systems according to claim 13 it is characterised in that
When the change of described communication link completes, described policy server is sent to described O&M service by changing object information Device;And
When described communication link is successfully recovered, restoration result information is sent to described O&M service by described policy server Device.
CN201510479265.9A 2015-08-03 2015-08-03 Communication link configuration method, device and related system Active CN106411555B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510479265.9A CN106411555B (en) 2015-08-03 2015-08-03 Communication link configuration method, device and related system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510479265.9A CN106411555B (en) 2015-08-03 2015-08-03 Communication link configuration method, device and related system

Publications (2)

Publication Number Publication Date
CN106411555A true CN106411555A (en) 2017-02-15
CN106411555B CN106411555B (en) 2020-02-14

Family

ID=58007528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510479265.9A Active CN106411555B (en) 2015-08-03 2015-08-03 Communication link configuration method, device and related system

Country Status (1)

Country Link
CN (1) CN106411555B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115225493A (en) * 2022-07-11 2022-10-21 上海焜耀网络科技有限公司 Wiraguard-based configuration generation method and equipment for networking nodes

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1091530A3 (en) * 1999-10-05 2002-09-11 Alcatel Traffic allocation on virtual trunks
CN101547082A (en) * 2009-04-22 2009-09-30 华为技术有限公司 Active/standby link switching method and network device
CN102271048A (en) * 2010-06-02 2011-12-07 中兴通讯股份有限公司 Method and device for protecting services of aggregated link
CN102480368A (en) * 2010-11-22 2012-05-30 中兴通讯股份有限公司 Protection method and system for aggregated link
CN103534996A (en) * 2012-11-29 2014-01-22 华为技术有限公司 Method and device for implementing load balance

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1091530A3 (en) * 1999-10-05 2002-09-11 Alcatel Traffic allocation on virtual trunks
CN101547082A (en) * 2009-04-22 2009-09-30 华为技术有限公司 Active/standby link switching method and network device
CN102271048A (en) * 2010-06-02 2011-12-07 中兴通讯股份有限公司 Method and device for protecting services of aggregated link
CN102480368A (en) * 2010-11-22 2012-05-30 中兴通讯股份有限公司 Protection method and system for aggregated link
CN103534996A (en) * 2012-11-29 2014-01-22 华为技术有限公司 Method and device for implementing load balance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115225493A (en) * 2022-07-11 2022-10-21 上海焜耀网络科技有限公司 Wiraguard-based configuration generation method and equipment for networking nodes
CN115225493B (en) * 2022-07-11 2023-11-28 上海焜耀网络科技有限公司 Configuration generation method and device of networking node based on wireless

Also Published As

Publication number Publication date
CN106411555B (en) 2020-02-14

Similar Documents

Publication Publication Date Title
DE69733266T2 (en) FAILSAFE AND EVENT-CONTROLLED TRANSACTION SYSTEM AND METHOD
CN106375384A (en) Management system of mirror network flow in virtual network environment and control method
CN101714932A (en) MAD testing method and device for IRF stacker
CN105306557A (en) Bridge health monitoring system based on cloud platform
CN106952157A (en) A kind of management system that financial move transaction is realized with block chain
CN105516292A (en) Hot standby method of cloud platform of intelligent substation
CN109376011A (en) The method and apparatus of resource are managed in virtualization system
CN107153950A (en) A kind of workform management system based on workflow
CN107249027A (en) A kind of intelligent device management system based on internet
CN107979651A (en) A kind of new city rail traffic ticket automatic selling and checking system based on cloud platform
CN106254379A (en) The processing system of network security policy and processing method
CN107249182A (en) A kind of note transmission method and its device, terminal device
CN107094091A (en) A kind of intelligent substation station level network configuration method of calibration and system
CN109743202A (en) Management method, device, equipment and the readable storage medium storing program for executing of data
CN102592374B (en) Intelligent terminal for network invoices
CN115348126A (en) Network target range entity equipment access method, device and implementation system
CN106411555A (en) Communication link configuration method, apparatus and correlation system
CN106790411A (en) The non-polymeric port cascade system and method for virtual switch and physical switches
CN107277652A (en) Across the disk LACP link aggregation methods and device of PON access systems
CN207731322U (en) One kind managing system for auto parts flow line production
CN109544827A (en) Cash register and its application method with data backup device
CN105553865B (en) A kind of FC exchanger chips credit management test method
CN106445776A (en) Transaction processing method and system
CN109507922B (en) Port data acquisition method based on intelligent Internet of things
CN109711842B (en) Account book accounting method of block chain network with regularly converged parallel chains

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200923

Address after: Grand Cayman Islands

Patentee after: Innovative advanced technology Co.,Ltd.

Address before: Grand Cayman Islands

Patentee before: Advanced innovation technology Co.,Ltd.

Effective date of registration: 20200923

Address after: Grand Cayman Islands

Patentee after: Advanced innovation technology Co.,Ltd.

Address before: Grand Cayman Islands

Patentee before: Alibaba Group Holding Ltd.

TR01 Transfer of patent right