Nothing Special   »   [go: up one dir, main page]

CN106284428A - A kind of concrete column method for supporting of building structure post-cast strip - Google Patents

A kind of concrete column method for supporting of building structure post-cast strip Download PDF

Info

Publication number
CN106284428A
CN106284428A CN201610785411.5A CN201610785411A CN106284428A CN 106284428 A CN106284428 A CN 106284428A CN 201610785411 A CN201610785411 A CN 201610785411A CN 106284428 A CN106284428 A CN 106284428A
Authority
CN
China
Prior art keywords
concrete
post
cast strip
pvc pipe
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610785411.5A
Other languages
Chinese (zh)
Inventor
陈芝轩
向万军
张杨
田昌凤
陈先豪
杨绍光
周守琼
俞志明
徐宇光
杨跃文
李红英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction and Investment Holding Group Co Ltd
Priority to CN201610785411.5A priority Critical patent/CN106284428A/en
Publication of CN106284428A publication Critical patent/CN106284428A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Electromagnetism (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of concrete column method for supporting of building structure post-cast strip, it is before the roof beam board concrete carrying out xoncrete structure pours, in top board bridge (2) direction perpendicular with post-cast strip (1), corresponding at the template of support post to be arranged, circular hole is offered below bridge bed die, inserting, from this circular hole, the pvc pipe (3) that external diameter is the most identical with circular hole, the bottom support of pvc pipe is under the stirrup of bottom bridge;When pouring roof beam board concrete, pour in pvc pipe and the concrete of bridge ad eundem the most simultaneously, after beam slab concrete reaches maintenance criteria and removes the support internal frame bottom bridge, self-assembling formation concrete column in pvc pipe, both sides, post-cast strip are supported;Carry out pouring of post-cast strip afterwards, after post-cast strip concrete reaches design strength, column is removed.It is firm, safe and reliable that the inventive method is prone to construction, low cost, support.

Description

A kind of concrete column method for supporting of building structure post-cast strip
Technical field
The present invention relates to a kind of cast-in-place concrete horizontal structure temporary support technical field, especially monolayer and multi-layer underground The cast-in-place concrete structure late poured band support technology of room.
Background technology
In cast-in-place concrete structure designs, sink for eliminating the flexible impact of Overlong Concrete Structure temperature and process difference Fall, generally uses and stays the measure setting post-cast strip.At present, cast-in-place concrete structure late poured band support, main employing retains post-cast strip One across form bracing system and two kinds of methods of steel pipe support.But, use the shuttering supporting body retaining post-cast strip one cross-module plate Being this method, due to supported design, set up and managerial defect, supporting loosely, supporting often occur in late poured band support Bearing capacity is inadequate, void support occur or the phenomenon not supportted, and makes post-cast strip structure on two sides be in before post-cast strip is closed cantilever-shaped , there is larger structure potential safety hazard in state;Use steel pipe as late poured band support, because of its cost height, installation difficulty, poor universality Reason, promotes highly difficult.
Summary of the invention
The invention aims to solve the deficiencies in the prior art, it is provided that a kind of low cost, be prone to construction and installation, safety The concrete column method for supporting of building structure post-cast strip reliably.
The purpose of the present invention is achieved through the following technical solutions:
The concrete column method for supporting of a kind of post-cast strip, is to pour at the roof beam board concrete carrying out xoncrete structure Before, in the top board bridge direction perpendicular with post-cast strip, corresponding at the template of support post to be arranged, below bridge bed die Offering circular hole, insert, from this circular hole, the pvc pipe that external diameter is the most identical with circular hole, the bottom support of pvc pipe is at the hoop of bottom bridge Under muscle;When pouring roof beam board concrete, pour in pvc pipe and the concrete of bridge ad eundem the most simultaneously, treat beam slab concrete After reaching maintenance criteria and removing the support internal frame bottom bridge, self-assembling formation concrete column in pvc pipe, to both sides, post-cast strip It is supported;Carry out pouring of post-cast strip afterwards, after post-cast strip concrete reaches design strength, column is removed.
The present invention uses pvc pipe that price is more cheap than steel pipe as support column template, significantly reduces Construction of Supporting and pipe Reason difficulty and construction cost.Casting concrete in pipe, for the temporary support of cast-in-place concrete structure post-cast strip.And in managing The beam slab of concreting and building structure body pour simultaneously, self-assembling formation post-cast strip concrete support column in pipe, Working procedure is the easiest.Pipe inner concrete and beam slab concrete one-time-concreting molding, support system consolidates safety, does not haves Empty support or the phenomenon not supportted, thoroughly solve the integrity problem of late poured band support.
Accompanying drawing explanation
Fig. 1 is the late poured band support elevation using the inventive method;
Fig. 2 is the late poured band support plane graph using the inventive method.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the concrete column method for supporting of post-cast strip of the present invention, is to carry out xoncrete structure Roof beam board concrete pour before, in top board bridge 2 direction perpendicular with post-cast strip 1, corresponding at support post to be arranged Template at, below bridge bed die, offer a circular hole, insert, from this circular hole, the pvc pipe 3 that external diameter is the most identical with circular hole, The bottom support of pvc pipe is under the stirrup of bottom bridge;When pouring roof beam board concrete, pour in pvc pipe the most simultaneously with across The concrete of beam ad eundem, after beam slab concrete reaches maintenance criteria and removes the support internal frame bottom bridge, in pvc pipe certainly So form concrete column, both sides, post-cast strip are supported;Carry out pouring of post-cast strip afterwards, treat that post-cast strip concrete reaches After design strength, column is removed.
Specific construction step is as follows:
A. line setting: in the unwrapping wire location, one group of top board bridge 2 direction perpendicular with post-cast strip, determine support to be arranged The position A of column;
B.PVC pipe die is processed: select PVC pipe, intercepts the length needed.During processing PVC pipe die, should ensure that pvc pipe mould Otch is smooth, flawless;
C. top board beam bottom mother plate perforate: offer circular hole below the end template of every top board bridge respectively, during perforate, application Hole making drill is carried out, and ensures that institute's perforate matches with pvc pipe footpath;
D.PVC pipe die is laid, calibrates, is fixed: lays and fixing PVC pipe, and calibrates so that it is perpendicularity deviation meets The requirement of pvc pipe detached column axial compression, and ensure that pvc pipe mould is solid and reliable when casting concrete.If multilamellar post-cast strip Time, the PVC pipe concrete detached column at the same position of position, multilamellar post-cast strip should be made in same axle center;The bottom support of pvc pipe Under the stirrup of bottom bridge 5;
E. casting concrete: pour and beam slab concrete, when pouring top board 4 and bridge, pour in pvc pipe the most simultaneously with The concrete of bridge ad eundem.During casting concrete, placer should be had with rubber hammer to tap pvc pipe mould gently, make concrete Fall closely knit;Forbid to carry out pvc pipe mould inner concrete with poker vibrator when pouring to vibrate.Pipe inner concrete label is high, difficult In the case of closely knit, gas can be released at hollow position chisel aperture, to ensure pipe inner concrete degree of compaction, but need to block in time Steam vent.When beam steel is intensive, PVC pipe concrete pours and should carry out before beam steel bar colligation;
F. remove frame: after beam slab concrete reaches maintenance criteria, in pvc pipe, formed concrete column, remove across Support internal frame bottom beam, and on pvc pipe, put up warning reflection bar, to guarantee construction safety;
G. post-cast strip pours: carries out the concreting of post-cast strip, after design strength to be achieved, is torn open by concrete column Remove.The concrete pillar removed, after simple processing, can be used in community scenery design.

Claims (1)

1. the concrete column method for supporting of a building structure post-cast strip, it is characterised in that the method is to carry out concrete Before the roof beam board concrete of structure pours, in top board bridge (2) direction perpendicular with post-cast strip (1), correspondence to be arranged At the template of support post, below bridge bed die, offer circular hole, insert, from this circular hole, the pvc pipe that external diameter is the most identical with circular hole (3), the bottom support of pvc pipe is under the stirrup of bottom bridge;When pouring roof beam board concrete, pour in pvc pipe the most simultaneously With the concrete of bridge ad eundem, after beam slab concrete reaches maintenance criteria and removes the support internal frame bottom bridge, pvc pipe Both sides, post-cast strip are supported by interior self-assembling formation concrete column;Carry out pouring of post-cast strip afterwards, treat post-cast strip concrete After reaching design strength, column is removed.
CN201610785411.5A 2016-08-31 2016-08-31 A kind of concrete column method for supporting of building structure post-cast strip Pending CN106284428A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610785411.5A CN106284428A (en) 2016-08-31 2016-08-31 A kind of concrete column method for supporting of building structure post-cast strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610785411.5A CN106284428A (en) 2016-08-31 2016-08-31 A kind of concrete column method for supporting of building structure post-cast strip

Publications (1)

Publication Number Publication Date
CN106284428A true CN106284428A (en) 2017-01-04

Family

ID=57673214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610785411.5A Pending CN106284428A (en) 2016-08-31 2016-08-31 A kind of concrete column method for supporting of building structure post-cast strip

Country Status (1)

Country Link
CN (1) CN106284428A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593311A (en) * 2019-10-23 2019-12-20 中国建筑第七工程局有限公司 Post-cast strip concrete temporary support column
CN110759748A (en) * 2019-11-15 2020-02-07 河北建设集团股份有限公司 Movable beam and slab curing device and beam and slab curing process
CN112459474A (en) * 2020-11-27 2021-03-09 上海宝冶集团有限公司 Method for supporting single post of post-cast strip PVC pipe mould plain concrete
CN113389379A (en) * 2021-06-25 2021-09-14 深圳市建设(集团)有限公司 Construction method of post-cast strip floor with independent support

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587659A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN203080705U (en) * 2013-01-10 2013-07-24 浙江建设职业技术学院 Concrete post-cast strip supporting top
CN203855988U (en) * 2014-05-15 2014-10-01 浙江乔兴建设集团有限公司 Post-cast strip steel pipe supporting structure
CN204059420U (en) * 2014-08-27 2014-12-31 中国建筑第八工程局有限公司 Late poured band support structure
CN104389430A (en) * 2014-11-24 2015-03-04 中设建工集团有限公司 Application of plain concrete columns to later-poured strip supporting
CN204825965U (en) * 2015-08-28 2015-12-02 中建三局第三建设工程有限责任公司 Support system for basement roof subsides post -cast strip department
JP2016069927A (en) * 2014-09-30 2016-05-09 高周波熱錬株式会社 Reinforced concrete structure design method and reinforced concrete structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587659A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN203080705U (en) * 2013-01-10 2013-07-24 浙江建设职业技术学院 Concrete post-cast strip supporting top
CN203855988U (en) * 2014-05-15 2014-10-01 浙江乔兴建设集团有限公司 Post-cast strip steel pipe supporting structure
CN204059420U (en) * 2014-08-27 2014-12-31 中国建筑第八工程局有限公司 Late poured band support structure
JP2016069927A (en) * 2014-09-30 2016-05-09 高周波熱錬株式会社 Reinforced concrete structure design method and reinforced concrete structure
CN104389430A (en) * 2014-11-24 2015-03-04 中设建工集团有限公司 Application of plain concrete columns to later-poured strip supporting
CN204825965U (en) * 2015-08-28 2015-12-02 中建三局第三建设工程有限责任公司 Support system for basement roof subsides post -cast strip department

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593311A (en) * 2019-10-23 2019-12-20 中国建筑第七工程局有限公司 Post-cast strip concrete temporary support column
CN110759748A (en) * 2019-11-15 2020-02-07 河北建设集团股份有限公司 Movable beam and slab curing device and beam and slab curing process
CN112459474A (en) * 2020-11-27 2021-03-09 上海宝冶集团有限公司 Method for supporting single post of post-cast strip PVC pipe mould plain concrete
CN113389379A (en) * 2021-06-25 2021-09-14 深圳市建设(集团)有限公司 Construction method of post-cast strip floor with independent support

Similar Documents

Publication Publication Date Title
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN106284428A (en) A kind of concrete column method for supporting of building structure post-cast strip
CN104727223B (en) A kind of hoop platform for bridge pier column construction and construction method
CN108755984A (en) Late poured band support construction method based on concrete square column
CN104389430B (en) Element concrete post application in late poured band support
CN108149709A (en) Underground pipe gallery precast assembly construction method
CN102535849B (en) Constructional column top concreting method
CN114150766B (en) Prefabricated reinforced concrete column connecting node and construction method thereof
CN107083804B (en) A kind of wall structure column joint bar construction method
CN105926672A (en) Mined metro station steel pipe column construction method
CN207469307U (en) A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline
CN104153573B (en) V-type cylinder concrete pour mould and construction method
CN206220489U (en) Concrete post formwork for placing tightening device
CN208830444U (en) Inspection shaft steel combined template
CN106894345A (en) Continuous beam end bay closing device and method
CN108532939A (en) Shear wall single side formwork method
CN207177286U (en) Add region mould after fabricated shear wall is reserved
KR101908811B1 (en) Concrete form for bridge
CN108193684A (en) Cast-in-situ bored pile pile crown detaches removing method
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN107859061A (en) A kind of construction method of box culvert primary concreting
CN201835524U (en) Pouring device for concrete beam with top embedded part
CN103882994B (en) Ring beam steel bar connecting structure and ring beam construction method
CN106759966A (en) Pouring after settlement shaped steel transition mast temporary support construction method
CN206655477U (en) Wall opening template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104