Nothing Special   »   [go: up one dir, main page]

CN106181241A - Hot plate automatic processing method - Google Patents

Hot plate automatic processing method Download PDF

Info

Publication number
CN106181241A
CN106181241A CN201610576414.8A CN201610576414A CN106181241A CN 106181241 A CN106181241 A CN 106181241A CN 201610576414 A CN201610576414 A CN 201610576414A CN 106181241 A CN106181241 A CN 106181241A
Authority
CN
China
Prior art keywords
hot plate
semi
finished product
rod
milling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610576414.8A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610576414.8A priority Critical patent/CN106181241A/en
Publication of CN106181241A publication Critical patent/CN106181241A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05BELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
    • H05B3/00Ohmic-resistance heating
    • H05B3/20Heating elements having extended surface area substantially in a two-dimensional plane, e.g. plate-heater
    • H05B3/22Heating elements having extended surface area substantially in a two-dimensional plane, e.g. plate-heater non-flexible

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automatic Assembly (AREA)

Abstract

The invention provides an automatic hot plate processing method. The automatic processing method of the hot plate comprises the following steps: conveying the semi-finished product hot plate to first leading rod processing equipment, and carrying out shaping correction, polishing, milling ash, dispensing, rubber cap adding and iron sheet adding processing on the first leading rod; the hot plate rotating device rotates the semi-finished hot plate to swap the positions of the first leading rod and the second leading rod; the conveying belt conveys the semi-finished product hot plate to second leading rod processing equipment, and the second leading rod is subjected to shaping correction, milling, dispensing, rubber cap adding and iron sheet adding processing; the detection device detects a finished product hot plate. According to the hot plate processing equipment provided by the invention, a series of automatic processing procedures such as correction, polishing, milling, dispensing, adding a rubber cap, welding an iron sheet, detection and the like are sequentially carried out on the upward leading rod of the semi-finished hot plate, so that the processing production efficiency is improved; meanwhile, the positioning device can position the hot plates of different types, so that the hot plates of different types can be processed, and the utilization rate of the equipment is improved.

Description

热盘自动加工方法Hot plate automatic processing method

【技术领域】【Technical field】

本发明涉及家用电器零部件加工领域,尤其涉及一种热盘自动加工方法。The invention relates to the field of processing parts of household electrical appliances, in particular to an automatic processing method for a hot plate.

【背景技术】【Background technique】

随着用户对电气类产品的使用要求不断提高,尤其对家用电器产品的质量要求越来越高,生产制造商需要通过精密加工以实现用户的要求。热盘作为加热元器件,是多数家用电器的主要零部件,其质量要求也需满足用户的需求。With the continuous improvement of users' requirements for the use of electrical products, especially the higher and higher quality requirements for household electrical appliances, manufacturers need to achieve users' requirements through precision processing. As a heating element, the hot plate is the main component of most household appliances, and its quality requirements must also meet the needs of users.

现有技术中,家用电器件为人工手动组装,其主要零部件热盘的加工同样采用手动组装,手动组装热盘具有组装精度低、工序步骤繁琐等缺点,以致于组装的产品精度低、产品合格率不高,且生产效率低、人工劳动强度大。In the prior art, household electrical devices are manually assembled, and the processing of the main components of the hot plate is also manually assembled. The manual assembly of the hot plate has the disadvantages of low assembly accuracy and cumbersome process steps, so that the assembled products have low precision and low product quality. The qualification rate is not high, and the production efficiency is low, and the labor intensity is high.

因此,有必要提供一种新的热盘自动加工方法解决上述问题。Therefore, it is necessary to provide a new hot plate automatic processing method to solve the above problems.

【发明内容】【Content of invention】

本发明的目的在于提供一种可加工不同类型热盘的热盘自动加工方法。The object of the present invention is to provide an automatic hot plate processing method capable of processing different types of hot plates.

本发明的技术方案如下:Technical scheme of the present invention is as follows:

一种热盘的加工方法,用于具有引棒的半成品热盘的加工,所述引棒包括第一引棒及第二引棒,其包括如下步骤:A method for processing a hot plate is used for processing a semi-finished hot plate with a lead rod, the lead rod includes a first lead rod and a second lead rod, and comprises the following steps:

步骤S1:提供输送带、分布于所述输送带且与每个加工工位相对应设置的定位装置及第一引棒加工设备,所述半成品热盘输送至第一引棒加工设备,所述定位装置夹住所述半成品热盘,所述第一引棒加工设备对所述第一引棒进行整形校正、打磨、铣灰、点胶、加胶帽及加铁皮加工;Step S1: Provide a conveyor belt, a positioning device distributed on the conveyor belt and corresponding to each processing station, and the first lead rod processing equipment, the semi-finished hot plate is transported to the first lead rod processing equipment, the positioning The device clamps the semi-finished hot plate, and the first lead rod processing equipment performs shaping correction, grinding, dust milling, glue dispensing, rubber cap and iron sheet processing on the first lead rod;

步骤S2:提供热盘旋转装置,所述热盘旋转装置旋转所述半成品热盘,对换所述第一引棒与所述第二引棒的位置;Step S2: providing a hot plate rotating device, the hot plate rotating device rotates the semi-finished hot plate, and exchanges the positions of the first lead rod and the second lead rod;

步骤S3:提供第二引棒加工设备,所述输送带将所述半成品热盘输送至第二引棒加工设备,所述定位装置定位所述半成品热盘,所述第二引棒加工设备对所述第二引棒进行整形校正、铣灰、点胶、加胶帽及加铁皮加工;Step S3: providing second lead rod processing equipment, the conveyor belt transports the semi-finished hot plate to the second lead rod processing equipment, the positioning device positions the semi-finished hot plate, and the second lead rod processing equipment The second lead rod is processed for plastic correction, dust milling, glue dispensing, rubber capping and iron sheeting;

步骤S4:提供检测装置,所述检测装置检测成品热盘。Step S4: providing a detection device, the detection device detects the finished hot plate.

优选的,所述步骤S1中,所述第一引棒加工设备包括依次设置的第一整形校正装置、第一打磨装置、第一铣灰装置、第一点胶装置、第一胶帽组装装置及第一铁片组装装置,包括如下步骤:Preferably, in the step S1, the first lead rod processing equipment includes a first shaping correction device, a first grinding device, a first dust milling device, a first glue dispensing device, and a first rubber cap assembly device arranged in sequence And the first iron sheet assembling device, comprises the steps:

步骤S11,所述第一整形校正装置包括第一校正机构及校正气缸,所述输送带输送所述半成品热盘至所述第一校正机构的正下方,所述定位装置夹住所述半成品热盘,所述校正气缸驱动所述第一校正机构向下运动,径向调整所述第一引棒,所述定位装置松开;Step S11, the first shaping and correcting device includes a first correcting mechanism and a correcting cylinder, the conveyor belt transports the semi-finished hot plate to directly below the first correcting mechanism, and the positioning device clamps the semi-finished hot plate. disc, the correction cylinder drives the first correction mechanism to move downward, radially adjusts the first lead rod, and releases the positioning device;

步骤S12,所述第一打磨装置包括磨头及磨头气缸,所述输送带输送所述半成品热盘至所述磨头的正下方,所述定位装置夹紧所述半成品热盘,所述磨头气缸驱动所述磨头向下运动,所述磨头绕所述第一引棒径向旋转返回运动,所述定位装置松开;Step S12, the first grinding device includes a grinding head and a grinding head cylinder, the conveyor belt transports the semi-finished hot plate to directly below the grinding head, the positioning device clamps the semi-finished hot plate, the The grinding head cylinder drives the grinding head to move downward, the grinding head rotates and moves back radially around the first lead rod, and the positioning device is released;

步骤S13,所述第一铣灰装置包括铣灰旋转机构、铣灰气缸及设于所述旋转机构的铣刀,所述输送带输送所述半成品热盘至所述铣灰旋转机构正下方,所述定位装置夹紧所述半成品热盘,所述铣灰气缸驱动所述铣灰旋转机构绕所述第一引棒径向旋转,带动所述铣刀绕所述第一引棒运动,所述定位装置松开;Step S13, the first ash milling device includes a soot milling rotary mechanism, a soot milling cylinder, and a milling cutter provided on the rotary mechanism, and the conveyor belt transports the semi-finished hot plate to directly below the ash milling rotary mechanism, The positioning device clamps the semi-finished hot plate, the ash milling cylinder drives the ash milling rotating mechanism to rotate radially around the first lead rod, and drives the milling cutter to move around the first lead rod, so The positioning device is released;

步骤S14,所述第一点胶装置包括点胶头及点胶气缸,所述输送带所述半成品热盘至所述点胶头正下方,所述定位装置夹紧所述半成品热盘,所述点胶气缸驱动所述点胶头向下运动点胶,所述定位装置松开;Step S14, the first glue dispensing device includes a glue dispensing head and a glue dispensing cylinder, the conveyer belts the semi-finished hot plate directly below the glue dispensing head, and the positioning device clamps the semi-finished hot plate, so The dispensing cylinder drives the dispensing head to move downward to dispense glue, and the positioning device is released;

步骤S15,所述第一加胶帽装置包括胶帽振盘送料装置及胶帽吸取装置,所述胶帽振盘送料装置输送胶帽,所述输送带输送所述半成品热盘至所述吸取装置处,所述定位装置夹紧所述半成品热盘,所述胶帽吸取装置将所述胶帽吸取至所述第一引棒处组装,所述定位装置松开。Step S15, the first rubber cap adding device includes a rubber cap vibrating plate feeding device and a rubber cap suction device, the rubber cap vibrating plate feeding device transports the rubber cap, and the conveyor belt transports the semi-finished hot plate to the suction At the device, the positioning device clamps the semi-finished hot plate, the rubber cap suction device sucks the rubber cap to the first guide rod for assembly, and the positioning device is released.

步骤S16,所述第一铁片组装装置包括铁片振盘送料装置及铁片吸取装置,所述铁片振盘送料装置输送铁片,所述输送带输送所述半成品热盘至所述铁片吸取装置处,所述定位装置夹紧所述半成品热盘,所述铁片吸取装置将所述铁片吸取至第一引棒处组装,所述定位装置松开。Step S16, the first iron sheet assembly device includes an iron sheet vibrating plate feeding device and an iron sheet suction device, the iron sheet vibrating plate feeding device conveys the iron sheet, and the conveyor belt conveys the semi-finished hot plate to the iron sheet At the sheet suction device, the positioning device clamps the semi-finished hot plate, the iron sheet suction device sucks the iron sheet to the first lead rod for assembly, and the positioning device is released.

优选的,在所述步骤S2中,所述热盘旋转装置包括旋转夹取机构、夹取气缸、上下气缸及旋转气缸,所述上下气缸驱动所述旋转夹取机构向下运动,所述夹取气缸驱动所述旋转夹取机构夹取所述半成品热盘向上运动,所述旋转气缸驱动所述旋转夹取机构旋转到预设角度,使所述第一引棒与所述第二引棒的位置对换;Preferably, in the step S2, the hot plate rotating device includes a rotating clamping mechanism, a clamping cylinder, an upper and lower cylinder, and a rotating cylinder, the upper and lower cylinders drive the rotating clamping mechanism to move downward, and the clamping The fetching cylinder drives the rotary clamping mechanism to clamp the semi-finished hot plate to move upward, and the rotary cylinder drives the rotary clamping mechanism to rotate to a preset angle, so that the first lead rod and the second lead rod swap the position of

优选的,所述检测装置铁片点焊装置及高压测试装置,所述点焊装置分别焊接所述铁片于所述第一引棒及所述第二引棒,所述高压测试装置通电测试。Preferably, the detection device includes an iron sheet spot welding device and a high-voltage testing device, the spot welding device welds the iron sheet to the first lead rod and the second lead rod respectively, and the high-voltage testing device conducts a power test .

优选的,所述高压测试装置包括弹性检测头和驱动所述弹性检测头伸缩运动的检测头气缸。Preferably, the high voltage testing device includes an elastic testing head and a testing head cylinder that drives the elastic testing head to expand and contract.

本发明的有益效果在于:The beneficial effects of the present invention are:

相较于现有技术,本发明提供的热盘自动加工方法,通过对半成品热盘上引棒的自动加工,实现了从人工加工到自动化的升级,所述半成品热盘依次经过对所述引棒进行校正、打磨、铣灰、点胶、加胶帽、焊接铁片及检测等一系列的自动加工工序,从而提高了加工的生产效率,保证了组装精度,不会出现人工组装的遗漏组装或错误组装,焊接不良或虚焊产品;同时,定位装置可以对不同类型的热盘进行定位,从而可以加工不同类型的热盘,提高了设备的使用率,降低了加工成本。Compared with the prior art, the hot plate automatic processing method provided by the present invention realizes an upgrade from manual processing to automatic processing through the automatic processing of the lead rods on the semi-finished hot plate. A series of automatic processing procedures such as calibration, grinding, milling, dispensing, rubber capping, welding iron sheets and testing, etc., improve the production efficiency of processing, ensure the assembly accuracy, and there will be no missing assembly due to manual assembly. Or wrong assembly, poor welding or false welding products; at the same time, the positioning device can locate different types of hot plates, so that different types of hot plates can be processed, which improves the utilization rate of the equipment and reduces the processing cost.

【附图说明】【Description of drawings】

图1为本发明热盘自动加工设备用于加工半成品热盘的结构示意图;Fig. 1 is the structural representation of the hot plate automatic processing equipment of the present invention being used for processing semi-finished product hot plate;

图2为图1所示半成品热盘加工完成后的成品热盘的结构示意图;Fig. 2 is the schematic structural view of the finished hot plate after the semi-finished hot plate shown in Fig. 1 has been processed;

图3为本发明热盘自动加工设备立体结构示意图;Fig. 3 is a three-dimensional structural schematic diagram of the hot plate automatic processing equipment of the present invention;

图4为图3所示热盘自动加工设备部分的结构示意图;Fig. 4 is a structural schematic diagram of the hot plate automatic processing equipment part shown in Fig. 3;

图5为图3所示热盘自动加工设备部分的结构示意图;Fig. 5 is a structural schematic diagram of the hot plate automatic processing equipment part shown in Fig. 3;

图6为图3所示热盘自动加工设备部分的结构示意图。FIG. 6 is a structural schematic diagram of part of the hot plate automatic processing equipment shown in FIG. 3 .

【具体实施方式】【detailed description】

下面结合附图和实施方式对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

请同时参阅图1和图2,图1为本发明热盘自动加工设备用于加工半成品热盘的结构示意图,图2为图1所示半成品热盘加工完成后的成品热盘的结构示意图。所述半成品热盘2包括设于所述半成品热盘2上的引棒21,所述引棒21包括第一引棒211和第二引棒212,所述第一引棒211包括沉台部2111。所述半成品热盘2经过引棒处理工序、胶帽安装工序、铁片安装工序、检测工序后得到成品热盘2'。所述成品热盘2'包括引棒21'、胶帽22'及铁片23'。Please refer to FIG. 1 and FIG. 2 at the same time. FIG. 1 is a schematic diagram of the structure of the automatic hot plate processing equipment of the present invention for processing a semi-finished hot plate, and FIG. The semi-finished hot plate 2 includes a lead rod 21 arranged on the semi-finished heat plate 2, the lead rod 21 includes a first lead rod 211 and a second lead rod 212, and the first lead rod 211 includes a sinking portion 2111. The semi-finished hot plate 2 is processed into a finished hot plate 2' after undergoing the rod processing process, the rubber cap installation process, the iron sheet installation process, and the testing process. The finished hot plate 2' includes a lead rod 21', a rubber cap 22' and an iron sheet 23'.

请同时参阅图3-6,所述热盘自动加工设备100包括架体10、输送带11、第一引棒加工设备12、热盘旋转装置13、第二引棒加工设备14、定位装置15、检测装置16、电气控制箱17、信号灯18及人机交互面板19。所述输送带11贯穿于所述架体10,所述第一引棒加工设备12、热盘旋转装置13、第二引棒加工设备14及检测装置16分别设于所述输送带11的两侧。Please refer to Figures 3-6 at the same time, the hot plate automatic processing equipment 100 includes a frame body 10, a conveyor belt 11, a first lead rod processing device 12, a hot plate rotating device 13, a second lead rod processing device 14, and a positioning device 15 , a detection device 16, an electrical control box 17, a signal lamp 18 and a human-computer interaction panel 19. The conveyer belt 11 runs through the frame body 10, and the first lead rod processing equipment 12, the hot plate rotating device 13, the second lead rod processing device 14 and the detection device 16 are respectively arranged on two sides of the conveyer belt 11. side.

所述第一引棒加工设备12及所述第二引棒加工设备13由所述输送带11依次连接。所述电器控制箱17、所述信号灯18及所述人机交互面板19分别设于所述架体10,其中,所述电器控制箱17用于控制整个设备的工作状态,所述信号灯18和所述人机交互面板19分别电连接所述电气控制箱15,用于指示工作状态和操作显示。The first lead rod processing equipment 12 and the second lead rod processing device 13 are sequentially connected by the conveyor belt 11 . The electrical control box 17, the signal lamp 18 and the human-computer interaction panel 19 are respectively arranged on the frame body 10, wherein the electrical control box 17 is used to control the working state of the entire equipment, and the signal lamp 18 and The man-machine interaction panel 19 is electrically connected to the electrical control box 15 respectively, and is used for indicating working status and operation display.

所述输送带11包括伺服电机111、输送台112、进料口113和出料口114,所述伺服电机111安装于所述架体10上,所述半成品热盘2由所述进料口113进料,所述伺服电机111驱动所述输送带11将所述半成品热盘2输送至每一个工位,最后由所述出料口114排料。The conveyor belt 11 includes a servo motor 111, a conveyor table 112, a feed port 113 and a discharge port 114, the servo motor 111 is installed on the frame body 10, and the semi-finished hot plate 2 is fed by the feed port 113 feeding, the servo motor 111 drives the conveyor belt 11 to transport the semi-finished hot plate 2 to each station, and finally discharges through the discharge port 114.

所述第一引棒加工设备12包括依次设于所述输送带11侧边的第一整形校正装置122、第一打磨装置123、第一铣灰装置124、第一点胶装置125、第一加胶帽装置126及第一加铁片装置127。The first lead rod processing equipment 12 includes a first shaping correction device 122, a first grinding device 123, a first ash milling device 124, a first glue dispensing device 125, a first The rubber cap adding device 126 and the first iron adding device 127.

所述半成品热盘10由所述输送带11输送至所述第一整形校正装置122,所述整形校正装置122包括第一校正机构1221及驱动所述第一校正机构1221的校正气缸1222,所述旋转校正机构1221环设于所述第一引棒211,并通过其径向旋转校正所述第一引棒211。所述校正气缸1222驱动所述第一校正机构1221向下运动,所述旋转校正机构1221与所述第一引棒211接触,所述旋转校正机构1221的四个夹紧块(未图示)从四个方向以所述第一引棒211为中心向内夹紧,从而实现调整所述第一引棒211的形状,使其保持竖直。The semi-finished hot plate 10 is conveyed to the first shaping and correcting device 122 by the conveyor belt 11, and the shaping and correcting device 122 includes a first correcting mechanism 1221 and a correcting cylinder 1222 for driving the first correcting mechanism 1221, so The rotation correction mechanism 1221 is disposed around the first lead rod 211 and corrects the first lead rod 211 through its radial rotation. The correction cylinder 1222 drives the first correction mechanism 1221 to move downward, the rotation correction mechanism 1221 is in contact with the first lead rod 211, and the four clamping blocks (not shown) of the rotation correction mechanism 1221 Clamping inward from four directions with the first lead rod 211 as the center, so as to adjust the shape of the first lead rod 211 to keep it vertical.

所述半成品热盘2由所述输送带11输送至所述第一打磨装置123,所述第一打磨装置123用于打磨抛光所述第一引棒211及所述第二引棒212上的氧化层。所述第一打磨装置123包括磨头1231及驱动所述磨头1231的磨头气缸1232,所述第一打磨装置123安装于所述输送带11的一侧,所述磨头1231设于所述第一引棒211的一侧,所述磨头气缸1232带动所述磨头1231横向运动。The semi-finished hot plate 2 is conveyed to the first grinding device 123 by the conveyor belt 11, and the first grinding device 123 is used for grinding and polishing the first guide rod 211 and the second guide rod 212. oxide layer. The first grinding device 123 includes a grinding head 1231 and a grinding head cylinder 1232 that drives the grinding head 1231. The first grinding device 123 is installed on one side of the conveyor belt 11, and the grinding head 1231 is located on the One side of the first guide rod 211, the grinding head cylinder 1232 drives the grinding head 1231 to move laterally.

进行打磨工艺后,所述半成品热盘2被输送至所述第一铣灰装置124。After the grinding process, the semi-finished hot plate 2 is transported to the first milling device 124 .

所述第一铣灰装置124包括旋转机构1241、铣刀1242及铣灰气缸1243,所述旋转机构1241设于所述输送带11的上方,所述铣灰气缸1243驱动所述旋转机构带动所述铣刀1242旋转。所述铣刀1242与所述第一引棒211的所述沉台部2111相对应。所述铣刀1242进行圆周运动加工所述沉台部2111,以铣去所述沉台部2111上的石灰。The first ash milling device 124 includes a rotating mechanism 1241, a milling cutter 1242 and an ash milling cylinder 1243. The rotating mechanism 1241 is arranged above the conveyor belt 11, and the ash milling cylinder 1243 drives the rotating mechanism to drive the ash milling cylinder 1243. The milling cutter 1242 rotates. The milling cutter 1242 corresponds to the sunken portion 2111 of the first lead rod 211 . The milling cutter 1242 performs circular motion to process the sunken platform portion 2111 to mill off the lime on the sunken platform portion 2111 .

铣灰工艺处理后,所述半成品热盘2被输送至所述点胶装置125进行点胶,所述点胶装置125设于所述输送带11的一侧,所述点胶装置125包括点胶气缸1251及点胶头1252,所述点胶气缸1251用于驱动所述点胶头1252伸缩运动。所述点胶气缸1251带动所述点胶头1252上下运动,通过所述点胶头1252将胶水滴入所述第一引棒211的所述沉台部2111以及所述第二引棒212的所述沉台部(未图示)。After the ash milling process, the semi-finished hot plate 2 is transported to the dispensing device 125 for dispensing. The dispensing device 125 is arranged on one side of the conveyor belt 11. A glue cylinder 1251 and a glue dispensing head 1252, the glue dispensing cylinder 1251 is used to drive the glue dispensing head 1252 to move telescopically. The glue dispensing cylinder 1251 drives the glue dispensing head 1252 to move up and down, through which the glue dispensing head 1252 drips glue into the sinking portion 2111 of the first lead rod 211 and the bottom of the second lead rod 212 The sunken platform (not shown).

进行点胶工艺后,所述半成品热盘2被输送至所述加胶帽装置126,用于对所述引棒21进行自动加胶帽工艺。After the glue dispensing process, the semi-finished hot plate 2 is transported to the glue capping device 126 for automatic glue capping process on the lead rod 21 .

所述第一加胶帽装置126包括胶帽振盘进料装置1261及胶帽吸取装置1263。所述胶帽振盘送料装置1261设于所述输送带11的一侧,用于输送所述胶帽22';所述胶帽吸取装置1263的位置与所述引棒21的位置相对应,其中所述夹紧装置1262环设于所述第一引棒211,用于夹紧所述第一引棒211;所述胶帽吸取装置1263置于所述胶帽振盘送料装置1261的一侧,用于将所述胶帽22'吸取至所述第一引棒211处。The first rubber cap adding device 126 includes a rubber cap vibrating plate feeding device 1261 and a rubber cap suction device 1263 . The rubber cap vibrating plate feeding device 1261 is arranged on one side of the conveyor belt 11 for conveying the rubber cap 22'; the position of the rubber cap suction device 1263 corresponds to the position of the guide rod 21, Wherein the clamping device 1262 is arranged on the first lead rod 211 for clamping the first lead rod 211; the rubber cap suction device 1263 is placed on one side of the rubber cap vibrating plate feeding device 1261 side, for sucking the rubber cap 22 ′ to the first drawing rod 211 .

进行自动加胶帽工艺后,所述半成品热盘2被输送至所述第一加铁片装置127,所述第一加铁片装置127包括铁片振盘送料装置1271及铁片吸取装置1272,所述铁片振盘送料装置1271设于所述输送带11的一侧,所述铁片吸取装置1272设于所述引棒21的上方,所述铁片振盘送料装置1271振动送料,将所述铁片23'送至所述铁片夹吸取装置1272,所述铁片吸取装置1272吸取所述铁片103安装至所述第一引棒211上。After the automatic rubber capping process, the semi-finished hot plate 2 is transported to the first iron adding device 127, and the first iron adding device 127 includes an iron vibrating plate feeding device 1271 and an iron sucking device 1272 , the iron sheet vibrating plate feeding device 1271 is arranged on one side of the conveyor belt 11, the iron sheet absorbing device 1272 is arranged above the guide rod 21, and the iron sheet vibrating plate feeding device 1271 vibrates and feeds, Send the iron sheet 23 ′ to the iron clip suction device 1272 , and the iron sheet suction device 1272 sucks the iron sheet 103 and installs it on the first lead rod 211 .

所述第二引棒加工设备14用于加工所述第二引棒212,其包括沿所述输送带11依次设置的第二整形校正装置141、第二铣灰装置142、第二点胶装置143、第二加胶帽装置144及第二加铁片装置145。The second guide rod processing equipment 14 is used to process the second guide rod 212, which includes a second shaping correction device 141, a second milling device 142, and a second glue dispensing device arranged in sequence along the conveyor belt 11. 143 , the second rubber cap adding device 144 and the second iron sheet adding device 145 .

所述第二整形校正装置141与所述第一整形校正装置122的加工方法相同,所述第二铣灰装置142与所述第一铣灰装置124的加工方法相同,所述第二点胶装置143与所述第一点胶装置125的加工方法相同,所述第二加胶帽装置144与所述第一加胶帽装置126的加工方法相同,所述第二加铁片装置145与所述第一加铁片装置127的加工方法相同。The processing method of the second shaping correction device 141 is the same as that of the first shaping correction device 122, the processing method of the second milling device 142 is the same as that of the first milling device 124, and the second dispensing The processing method of the device 143 is the same as that of the first dispensing device 125, the processing method of the second rubber cap device 144 is the same as that of the first rubber cap device 126, and the second iron sheet device 145 is the same as that of the first rubber cap device 126. The processing method of the first iron adding piece device 127 is the same.

所述定位装置15包括沿所述输送带11均匀分布的多个热盘夹具151及对应驱动多个所述热盘夹具151的多个夹具气缸152。所述热盘夹具151用于夹紧所述半加工热盘2在各个加工工位上进行加工。The positioning device 15 includes a plurality of hot plate clamps 151 evenly distributed along the conveyor belt 11 and a plurality of clamp cylinders 152 correspondingly driving the plurality of hot plate clamps 151 . The hot plate clamp 151 is used to clamp the semi-processed hot plate 2 to be processed at each processing station.

所述检测装置16包括高压测试装置161及点焊装置162。经过已装置铁片的半成品热盘2进行高压测试,经所述高压测试装置161测试后在所述引棒21上进行点焊,把所述铁片23'焊接在所述引棒21上,最后进行良率的分类排放。The testing device 16 includes a high voltage testing device 161 and a spot welding device 162 . After the semi-finished hot plate 2 with the iron sheet installed is subjected to a high-voltage test, spot welding is performed on the lead rod 21 after being tested by the high-voltage test device 161, and the iron sheet 23' is welded on the lead rod 21, Finally, the classified discharge of the yield is carried out.

所述高压测试装置161设于所述输送带11的一侧,所述高压测试装置141包括检测头气缸1611和弹性检测头1612,所述检测头气缸1611用于驱动所述弹性检测头1612伸缩运动,所述检测头气缸1611设于所述输送带11的上方,所述弹性检测头1612设置位置与所述引棒21相对应。所述弹性检测头1612为弹性材料制成,其前后弹性接触所述引棒21,可以更好的检测所述引棒21的连接效果。The high-voltage testing device 161 is arranged on one side of the conveyor belt 11, the high-voltage testing device 141 includes a detection head cylinder 1611 and an elastic detection head 1612, and the detection head cylinder 1611 is used to drive the elastic detection head 1612 to expand and contract movement, the detection head cylinder 1611 is arranged above the conveyor belt 11 , and the installation position of the elastic detection head 1612 corresponds to the guide rod 21 . The elastic detection head 1612 is made of elastic material, and elastically contacts the lead rod 21 front and back, so as to better detect the connection effect of the lead rod 21 .

所述半成品热盘2经过加工后为成品热盘2',所述成品热盘2'再经出料口排出去。The semi-finished hot plate 2 is processed into a finished hot plate 2', and the finished hot plate 2' is discharged through the discharge port.

基于本发明提供的热盘自动加工设备100,所述半成品热盘2加工成成品热盘2'的加工方法包括如下步骤:Based on the hot plate automatic processing equipment 100 provided by the present invention, the processing method for processing the semi-finished hot plate 2 into a finished hot plate 2' includes the following steps:

步骤S1,所述输送带11输送所述半成品热盘2至所述第一校正机构1221的正下方,所述夹具气缸152驱动所述热盘夹具151夹住所述半成品热盘2,所述校正气缸1222驱动所述第一校正机构1221向下运动,径向调整所述第一引棒211,所述夹取气缸152驱动所述热盘夹具151松开;Step S1, the conveyer belt 11 transports the semi-finished hot plate 2 to directly below the first correction mechanism 1221, the clamp cylinder 152 drives the hot plate clamp 151 to clamp the semi-finished hot plate 2, the The correction cylinder 1222 drives the first correction mechanism 1221 to move downward, adjusts the first lead rod 211 radially, and the clamping cylinder 152 drives the hot plate clamp 151 to loosen;

步骤S2,所述输送带11输送所述半成品热盘2至所述磨头1231的正下方,所述夹取气缸152驱动所述热盘夹具151夹住所述半成品热盘,所述磨头气缸1232驱动所述磨头1231向下运动,所述磨头1231绕所述第一引棒211径向旋转返回运动,所述夹取气缸152驱动所述热盘夹具151松开;Step S2, the conveyor belt 11 transports the semi-finished hot plate 2 to directly below the grinding head 1231, the clamping cylinder 152 drives the hot plate clamp 151 to clamp the semi-finished hot plate, and the grinding head The cylinder 1232 drives the grinding head 1231 to move downward, the grinding head 1231 rotates radially around the first lead rod 211 and moves back, and the clamping cylinder 152 drives the hot plate clamp 151 to loosen;

步骤S3,所述输送带11输送所述半成品热盘2至所述铣灰旋转机构1241正下方,所述夹取气缸152驱动所述热盘夹具151夹住所述半成品热盘2,所述铣灰气缸1243驱动所述铣灰旋转机构1241绕所述第一引棒211径向旋转,带动所述铣刀1242绕所述第一引棒211运动,所述夹取气缸152驱动所述热盘夹具151松开;Step S3, the conveyer belt 11 transports the semi-finished hot plate 2 to directly below the milling rotating mechanism 1241, the clamping cylinder 152 drives the hot plate clamp 151 to clamp the semi-finished hot plate 2, the The ash milling cylinder 1243 drives the ash milling rotating mechanism 1241 to rotate radially around the first lead rod 211, drives the milling cutter 1242 to move around the first lead rod 211, and the clamping cylinder 152 drives the thermal Disc clamp 151 is loosened;

步骤S4,所述输送带11所述半成品热盘2至所述点胶头1252正下方,所述夹取气缸152驱动所述热盘夹具151夹住所述半成品热盘2,所述点胶气缸1251驱动所述点胶头1252向下运动点胶,所述夹取气缸152驱动所述热盘夹具151松开;Step S4, the conveyer belt 11 and the semi-finished hot plate 2 are directly below the dispensing head 1252, the clamping cylinder 152 drives the hot plate fixture 151 to clamp the semi-finished hot plate 2, and the dispensing Cylinder 1251 drives the dispensing head 1252 to move downward to dispense glue, and the clamping cylinder 152 drives the hot plate clamp 151 to loosen;

步骤S5,所述胶帽振盘送料装置1261输送胶帽,所述输送带11输送所述半成品热盘2至所述胶帽吸取装置1263处,所述夹取气缸152驱动所述热盘夹具151夹住所述半成品热盘2,所述胶帽吸取装置1263将所述胶帽22'吸取至所述第一引棒211处组装,所述夹取气缸152驱动所述热盘夹具151松开;Step S5, the rubber cap vibrating plate feeding device 1261 transports the rubber cap, the conveyor belt 11 transports the semi-finished hot plate 2 to the rubber cap suction device 1263, and the clamping cylinder 152 drives the hot plate clamp 151 clamps the semi-finished hot plate 2, the rubber cap suction device 1263 sucks the rubber cap 22 ′ to the first lead rod 211 for assembly, and the clamping cylinder 152 drives the hot plate clamp 151 to loosen open;

步骤S6,所述铁片振盘送料装置1271输送铁片,所述输送带11输送所述半成品热盘2至所述铁片吸取装置1272处,所述夹取气缸152驱动所述热盘夹具151夹住所述半成品热盘2,所述铁片吸取装置1272将所述铁片吸取至第一引棒211处组装,所述夹取气缸152驱动所述热盘夹具151松开;Step S6, the iron sheet vibrating plate feeding device 1271 transports the iron sheet, the conveyor belt 11 transports the semi-finished hot plate 2 to the iron sheet suction device 1272, and the clamping cylinder 152 drives the hot plate clamp 151 clamps the semi-finished hot plate 2, the iron sheet suction device 1272 absorbs the iron sheet to the first lead rod 211 for assembly, and the clamping cylinder 152 drives the hot plate clamp 151 to loosen;

步骤S7,所述半成品热盘2输送至所述热盘旋转装置13,所述上下气缸驱动所述旋转夹取机构131向下运动,所述夹取气缸驱动132所述旋转夹取机构131夹取所述半成品热盘2向上运动,所述旋转气缸134驱动所述旋转夹取机构131旋转到预设角度,使所述第一引棒211与所述第二引棒的位置对换;Step S7, the semi-finished hot plate 2 is transported to the hot plate rotating device 13, the upper and lower cylinders drive the rotary clamping mechanism 131 to move downward, and the clamping cylinder drives 132 and the rotary clamping mechanism 131 clamps Taking the semi-finished hot plate 2 to move upward, the rotating cylinder 134 drives the rotating clamping mechanism 131 to rotate to a preset angle, so that the positions of the first lead rod 211 and the second lead rod are reversed;

步骤S8,所述半成品热盘2再输送至所述第二整形校正装置141、所述第二铣灰装置142、所述第二点胶装置143、所述第二加胶帽装置144及所述第二加铁片装置145,对所述第二引棒212进行整修校正、铣灰、点胶、加胶帽及加铁片的加工。Step S8, the semi-finished hot plate 2 is transported to the second shaping and correcting device 141, the second ash milling device 142, the second dispensing device 143, the second glue capping device 144 and the The second iron-adding device 145 is used to repair and correct the second lead rod 212, mill ash, dispense glue, add glue caps, and add iron.

本发明提供的热盘自动加工方法:Hot plate automatic processing method provided by the invention:

通过对半成品热盘上引棒的自动加工,实现了从人工加工到自动化的升级,所述半成品热盘依次经过对所述引棒进行校正、打磨、铣灰、点胶、加胶帽、焊接铁片及检测等一系列的自动加工工序,从而提高了加工的生产效率,保证了组装精度,不会出现人工组装的遗漏组装或错误组装,焊接不良或虚焊产品;同时,定位装置可以对不同类型的热盘进行定位,从而可以加工不同类型的热盘,提高了设备的使用率,降低了加工成本。The upgrade from manual processing to automation is realized through the automatic processing of the lead rods on the semi-finished hot plate. The semi-finished hot plate undergoes correction, grinding, milling, glue dispensing, capping, and welding of the lead rods in sequence. A series of automatic processing procedures such as iron sheets and inspections, thereby improving the production efficiency of processing, ensuring the assembly accuracy, and there will be no missing or wrong assembly of manual assembly, poor welding or false welding products; at the same time, the positioning device can Different types of hot plates are positioned, so that different types of hot plates can be processed, which improves the utilization rate of the equipment and reduces the processing cost.

上所述的仅是本发明的实施方式,在此应当指出,对于本领域的普通技术人员来说,在不脱离本发明创造构思的前提下,还可以做出改进,但这些均属于本发明的保护范围。What has been described above is only the embodiment of the present invention. It should be pointed out that for those skilled in the art, improvements can be made without departing from the creative concept of the present invention, but these all belong to the present invention. scope of protection.

Claims (5)

1. a hot plate automatic processing method, for having the processing of semi-finished product hot plate drawing rod, described in draw rod and include that first draws Rod and second draws rod, it is characterised in that comprise the steps:
Step S1: provide conveyer belt, be distributed in described conveyer belt and the positioner of setting corresponding with each processing stations and First draws rod process equipment, and described semi-finished product hot plate is delivered to first and draws rod process equipment, and described positioner clamps described half Finished product hot plate, described first draws rod process equipment draws rod and carries out shaping correction, polishing, milling ash, puts glue, adds Capsule described first And add iron sheet processing;
Step S2: provide hot plate rotary apparatus, described hot plate rotary apparatus rotates described semi-finished product hot plate, exchanges described first and draws The excellent position drawing rod with described second;
Step S3: provide second to draw rod process equipment, described semi-finished product hot plate is delivered to second and draws rod processing by described conveyer belt Equipment, described positioner positions described semi-finished product hot plate, and described second draws rod process equipment draws rod to described second and carry out whole Shape corrects, milling is grey, put glue, add Capsule and add iron sheet processing;
Step S4: detection device, described detection device detection finished product hot plate are provided.
Hot plate automatic processing method the most according to claim 1, it is characterised in that in described step S1, described first draws The first shaping correcting unit that rod process equipment includes setting gradually, the first sanding apparatus, the first milling apparatus for ash, first mucilage binding Put, the first Capsule assembling device and the first iron plate assembling device, comprise the steps:
Step S11, described first shaping correcting unit includes the first aligning gear and correction cylinder, described in described tape transport The underface of semi-finished product hot plate extremely described first aligning gear, described positioner clamps described semi-finished product hot plate, described correction Described in air cylinder driven, the first aligning gear moves downward, and radially adjusting described first draws rod, and described positioner unclamps;
Step S12, described first sanding apparatus includes bistrique and bistrique cylinder, and described in described tape transport, semi-finished product hot plate is extremely The underface of described bistrique, described positioner clamps described semi-finished product hot plate, and bistrique described in described bistrique air cylinder driven is downward Motion, described bistrique draws rod radial rotary return movement around described first, and described positioner unclamps;
Step S13, described first milling apparatus for ash includes milling ash rotating mechanism, milling ash cylinder and is located at the milling of described rotating mechanism Cutter, immediately below semi-finished product hot plate described in described tape transport to described milling ash rotating mechanism, the clamping of described positioner is described Semi-finished product hot plate, milling ash rotating mechanism described in described milling ash air cylinder driven draws rod radial rotary around described first, drives described milling Cutter draws rod motion around described first, and described positioner unclamps;
Step S14, described first point glue equipment includes Glue dripping head and some glue cylinder, and described in described conveyer belt, semi-finished product hot plate is to institute Stating immediately below Glue dripping head, described positioner clamps described semi-finished product hot plate, and Glue dripping head described in described some glue air cylinder driven is downward Motor point glue, described positioner unclamps;
Step S15, described first adds Capsule device includes that Capsule shakes dish pay-off and Capsule suction means, and described Capsule shakes dish Pay-off carries Capsule, and at semi-finished product hot plate described in described tape transport to described suction means, described positioner presss from both sides Tight described semi-finished product hot plate, described Capsule is drawn extremely described first and is drawn assembling, described location at rod by described Capsule suction means Device unclamps.
Step S16, described first iron plate assembling device includes that iron plate shakes dish pay-off and iron plate suction means, and described iron plate shakes Dish pay-off carries iron plate, at semi-finished product hot plate described in described tape transport to described iron plate suction means, and described location Device clamps described semi-finished product hot plate, and described iron plate is drawn to first to draw and assembled at rod by described iron plate suction means, described fixed Position device unclamps.
Hot plate automatic processing method the most according to claim 1, it is characterised in that in described step S2, described hot plate Rotary apparatus includes rotating gripping body, gripping cylinder, upper and lower air cylinders and rotary cylinder, and described upper and lower air cylinders drives described rotation Gripping body moves downward, and rotates the described semi-finished product hot plate of gripping body gripping and move upward described in described gripping air cylinder driven, Described rotary cylinder drive described rotation gripping body rotate to predetermined angle, make described first draw excellent with described second draw rod Position is exchanged.
Hot plate automatic processing device the most according to claim 1, it is characterised in that described detection device iron plate spot welding device And high-voltage testing device, described spot welding device is respectively welded described iron plate and draws excellent and described second in described first and draw rod, described High-voltage testing device energising test.
Hot plate automatic processing device the most according to claim 4, it is characterised in that described high-voltage testing device includes elasticity Detection head and the detection head cylinder of the described elastomeric check head stretching motion of driving.
CN201610576414.8A 2016-07-19 2016-07-19 Hot plate automatic processing method Pending CN106181241A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610576414.8A CN106181241A (en) 2016-07-19 2016-07-19 Hot plate automatic processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610576414.8A CN106181241A (en) 2016-07-19 2016-07-19 Hot plate automatic processing method

Publications (1)

Publication Number Publication Date
CN106181241A true CN106181241A (en) 2016-12-07

Family

ID=57491120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610576414.8A Pending CN106181241A (en) 2016-07-19 2016-07-19 Hot plate automatic processing method

Country Status (1)

Country Link
CN (1) CN106181241A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109445038A (en) * 2018-10-30 2019-03-08 广东硕泰智能装备有限公司 A kind of optical fiber head assembly line
CN109746162A (en) * 2019-03-18 2019-05-14 南京灵雀智能制造有限公司 A kind of automation dispensing drying equipment and its working method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3545424A1 (en) * 1985-12-20 1987-07-02 Ego Elektro Blanc & Fischer Tubular heater/heating unit and method for producing it
CN204498392U (en) * 2015-04-07 2015-07-22 海盐东海电器有限公司 Push-in cast iron heat-generating disc
CN105619080A (en) * 2014-10-29 2016-06-01 江苏汤辰机械装备制造有限公司 Automatic production line and production method for pile connectors
CN205325180U (en) * 2016-01-22 2016-06-22 广东硕泰智能装备有限公司 Hot plate automatic processing equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3545424A1 (en) * 1985-12-20 1987-07-02 Ego Elektro Blanc & Fischer Tubular heater/heating unit and method for producing it
CN105619080A (en) * 2014-10-29 2016-06-01 江苏汤辰机械装备制造有限公司 Automatic production line and production method for pile connectors
CN204498392U (en) * 2015-04-07 2015-07-22 海盐东海电器有限公司 Push-in cast iron heat-generating disc
CN205325180U (en) * 2016-01-22 2016-06-22 广东硕泰智能装备有限公司 Hot plate automatic processing equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109445038A (en) * 2018-10-30 2019-03-08 广东硕泰智能装备有限公司 A kind of optical fiber head assembly line
CN109445038B (en) * 2018-10-30 2023-10-03 广东硕泰智能装备有限公司 Optical fiber head assembly production line
CN109746162A (en) * 2019-03-18 2019-05-14 南京灵雀智能制造有限公司 A kind of automation dispensing drying equipment and its working method

Similar Documents

Publication Publication Date Title
CN105564761B (en) The swinging production line and method of backlight assembly automatic detection, labeling and pad pasting
CN106914694B (en) An ultrasonic automatic welding machine for power battery safety cap tab orifice plate
CN104828282B (en) A kind of multistation laminator
CN201262967Y (en) Automatic bottom-lighting welding machine for cylindrical battery
CN109249120B (en) Multi-station full-automatic welding method for machining fan impeller
CN104505486B (en) A kind of cylindrical battery automatic welding block machine
CN106826165B (en) Kettle body and upper connector automatic assembling machine
CN109433523A (en) Automatic dispensing detector
CN204241191U (en) Auxiliary device used to detect the luminous quality of LED lamp beads
CN108983014B (en) Aging testing machine
CN211763566U (en) Full-automatic ultrasonic welding system for filter
CN102069469A (en) Rubber stopper pressing-in automaton
CN110170466A (en) A kind of potsherd detection device and detection method
CN202729383U (en) Feeder
CN203714811U (en) Conveying device for bearing roller testing equipment
CN112845151B (en) Battery final inspection equipment
CN103929887B (en) Fully automatic reinforcing machine
CN106181241A (en) Hot plate automatic processing method
CN104668410B (en) Automatic wire welding machine for DC (direct current) straight plug
CN207680916U (en) A lamp head gluer for LED lamp tubes
CN111113184B (en) A vacuum flask assembly production line
CN109317358B (en) Full-automatic electromagnetic element production line with dispensing system
CN110919228B (en) Automatic welding production line for air conditioner chassis
CN103394904A (en) Heating element and clamp assembling equipment
CN104708245A (en) Rotating table type multi-station progressive lifting ring welding machine and welding method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207