CN106013632B - It is a kind of to split discharge structure in prefabricated cabin and its set roof - Google Patents
It is a kind of to split discharge structure in prefabricated cabin and its set roof Download PDFInfo
- Publication number
- CN106013632B CN106013632B CN201610516307.6A CN201610516307A CN106013632B CN 106013632 B CN106013632 B CN 106013632B CN 201610516307 A CN201610516307 A CN 201610516307A CN 106013632 B CN106013632 B CN 106013632B
- Authority
- CN
- China
- Prior art keywords
- skeleton
- rhone
- plate
- prefabricated cabin
- hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 39
- 238000003032 molecular docking Methods 0.000 claims description 5
- 210000000988 bone and bone Anatomy 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 13
- 230000000903 blocking effect Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 4
- 238000005194 fractionation Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 206010021036 Hyponatraemia Diseases 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000005493 welding type Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
- E04D13/068—Means for fastening gutter parts together
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
- E04D13/072—Hanging means
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
- E04D13/072—Hanging means
- E04D13/0727—Hanging means situated mainly at the rear side of the gutter
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Body Structure For Vehicles (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
Discharge structure in prefabricated cabin and its set roof is split the invention discloses a kind of, discharge structure includes the skeleton that length direction extends along the longitudinal direction in prefabricated cabin set roof, the arranged on left and right sides of skeleton is equipped with the rhone for collecting the rainwater at the top of prefabricated cabin that length extends along the longitudinal direction, hanging plate is equipped between rhone and skeleton, hanging plate is fixed on skeleton, and rhone is fixed on the hanging plate.The arranged on left and right sides of skeleton is provided with the rhone for collecting the rainwater at the top of prefabricated cabin that length extends along the longitudinal direction, when in use, it can be connected to rhone using drainpipe, rainwater is flowed to from nacelle roof in rhone, is then concentrated and is discharged through drainpipe again.
Description
Technical field
Discharge structure in prefabricated cabin and its set roof is split the present invention relates to a kind of.
Background technology
Currently, country makes the very important decision built a resource-conserving and environment-friendly society, make great efforts to accelerate economic development
Mode changes, and breaks through developing resource environment bottleneck with all strength.This transformation also brings electric power industry development far-reaching shadow
It rings, substation's construction mode must move towards to reduce land seizure, reduce cost, shorten the construction period, realize with ambient enviroment more
Coordinate, run the development model of more reliable property.The use of prefabricated cabin design pattern, advances the module of substation's construction
Change, shortens site operation and test period.
For example, Chinese patent CN204804198U(Authorized announcement date 2015.11.25)A kind of disclosed prefabricated cabin is ventilative anti-
Water-bound, including nacelle, the head cover that is arranged at the top of nacelle, nacelle includes nacelle frame, sealing plate and door-plate.Top frame is by side
Steel is made.Head cover includes herringbone Roof Frame and top plate, and top plate is welded at the top of the skeleton formed by herringbone head cover, top plate
It is spliced by several top plate jigsaw, top plate top surface is at concaveconvex structure.Air permeable waterproof part is additionally provided between nacelle and head cover.But
The waterproof construction of the type, or drained using distributing.With prefabricated cabin applied on electricity power engineering at present it is more and more,
The mode that the structure substitution of prefabricated cabin rainwater central drainage dissipates row has become a kind of trend.With the prefabricated cabin structure phase of fractionation
Than whole welding type prefabricated cabin is not easy to realize roof central drainage.
Invention content
The object of the present invention is to provide a kind of prefabricated cabin set roofs that central drainage can be carried out to the rainwater in prefabricated cabin
Middle discharge structure.The present invention also provides a kind of prefabricated cabins of the fractionation using the discharge structure simultaneously
In order to achieve the goal above, the technical solution of discharge structure is as follows in prefabricated cabin set roof in the present invention:Prefabricated cabin
The arranged on left and right sides of discharge structure in set roof, including skeleton that length direction extends along the longitudinal direction, skeleton is equipped with length before
The rhone for collecting the rainwater at the top of prefabricated cabin that rear direction extends, is equipped with hanging plate, institute between the rhone and skeleton
It states hanging plate to be fixed on skeleton, the rhone is fixed on the hanging plate.
The rhone includes multistage drain tank, is provided with for preventing water leakage at the docking of two neighboring drain tank
Backing plate.
The drain tank be in opening up U-shaped shape, each drain tank far from the skeleton side on
It is correspondingly arranged on water fender, the water fender is tilted towards the side of the skeleton.
The supply and discharge sink that the hanging plate includes hanging buckle plate for hanging buckle on the skeleton, vertically extends is fixed
The fixed connecting plate of connection.
Fixed connecting plate lower end fold inward forms U-shaped flange, and the bottom of the U-shaped flange is equipped with draining, breathes freely
Through-hole.
The technical solution that the present invention splits prefabricated cabin is as follows:Including discharge structure in set roof, arranged in set roof
Water-bound includes the skeleton that length direction extends along the longitudinal direction, and the arranged on left and right sides of skeleton extends along the longitudinal direction equipped with length
The rhone for collecting rainwater at the top of prefabricated cabin, hanging plate is equipped between the rhone and skeleton, the hanging plate is fixed
On skeleton, the rhone is fixed on the hanging plate.
The rhone includes multistage drain tank, is provided with for preventing water leakage at the docking of two neighboring drain tank
Backing plate.
The drain tank be in opening up U-shaped shape, each drain tank far from the skeleton side on
It is correspondingly arranged on water fender, the water fender is tilted towards the side of the skeleton.
The supply and discharge sink that the hanging plate includes hanging buckle plate for hanging buckle on the skeleton, vertically extends is fixed
The fixed connecting plate of connection.
Fixed connecting plate lower end fold inward forms U-shaped flange, and the bottom of the U-shaped flange is equipped with draining, breathes freely
Through-hole.
Beneficial effects of the present invention:Discharge structure in prefabricated cabin set roof of the present invention is provided in the arranged on left and right sides of skeleton
The rhone for collecting the rainwater at the top of prefabricated cabin that length extends along the longitudinal direction when in use can the row of using
Water pipe is connected to rhone, and rainwater is flowed to from nacelle roof in rhone, is then concentrated and is discharged through drainpipe again.Rhone with
Hanging plate is equipped between skeleton, convenient for rhone to be clamped securely on skeleton.
Description of the drawings
Fig. 1 is the structural schematic diagram in the prefabricated cabin of fractionation of the present invention;
Fig. 2 is the structural schematic diagram on the nacelle roof in Fig. 1;
Fig. 3 is the structural schematic diagram of the skeleton in Fig. 1;
Fig. 4 is the structural schematic diagram of the hanging plate in Fig. 1;
Fig. 5 is the structural schematic diagram of roof boarding in Fig. 1;
Fig. 6 is the structural schematic diagram of the drain tank in Fig. 1;
Fig. 7 is the structural schematic diagram of backing plate;
Fig. 8 is the structural schematic diagram of water fender in Fig. 1;
Fig. 9 is the structural schematic diagram of water blocking board mount;
Figure 10 is the structural schematic diagram of Fig. 1 cover boards;
Figure 11 is that hanging plate hangs over structural schematic diagram on skeleton;
Figure 12 is the enlarged drawing at A in Figure 11;
Figure 13 is the structural schematic diagram that roof boarding compresses hanging plate;
Figure 14 is the enlarged drawing at B in Figure 13;
Figure 15 is the structural schematic diagram after water fender installation;
Figure 16 is the enlarged drawing at C in Figure 15.
Specific implementation mode
The present invention splits the embodiment in prefabricated cabin:As illustrated in figs. 1-16:Including nacelle 1, nacelle roof, nacelle room
Top is equipped with discharge structure in set roof, and discharge structure includes the skeleton 7 that length direction extends along the longitudinal direction, bone in set roof
The cross section of frame 7 is triangular in shape.The arranged on left and right sides of skeleton 7 is used to collect prefabricated cabin top equipped with what length extended along the longitudinal direction
The rhone of the rainwater in portion is equipped with hanging plate 8 between rhone and skeleton 7, hanging plate 8 is fixed on skeleton 7, and rhone is fixed on extension
On plate 8.
Rhone is segmented, including multistage drain tank 2, is provided with and is used at the docking of two neighboring drain tank 2
The backing plate 11 of preventing water leakage.Drain tank 2 is in opening up U-shaped shape, and the upper end of the left and right side plates of drain tank 2 is inwardly curved
Folding, the length direction of the flanging upper edge drain tank after bending are equipped at intervals with row's mounting hole.The also U-shaped shape of backing plate 11, passes through
The mode of welding and the drain tank of both sides are fixed.Multistage drain tank forms a length with cabin by the connection of backing plate 11
The rhone consistent in length of body.At interval of a drain tank or two drain tanks, water falling hole is set on drain tank
21, to be connected to drainpipe 6, the water in rhone is concentrated by drainpipe 6 to be discharged.
It is correspondingly arranged on water fender 4 on the side of the separate skeleton of each drain tank, water fender 4 is towards the side of skeleton
It tilts.The quantity of water fender 4 is consistent with the quantity of drain tank, and water fender 4 is formed by two parts hang plate, i.e., upper hang plate
41, lower hang plate 42, upper hang plate 41 is consistent with the angle of inclination for the roof boarding being arranged on skeleton, the inclination of lower hang plate 42
Angle is more than the angle of inclination of upper hang plate, and the lower end of lower hang plate 42 is equipped with the installation for being fixedly mounted on drain tank
Hole.Water fender 4 is fixed on by water blocking board mount 9 on roof boarding 5, and water blocking board mount 9 is fixed to by rivet on water fender 4
End, water blocking board mount 9 are fixed to by rivet on roof boarding.The section of water blocking board mount 9 is Z-shaped.Upper hang plate 41 is located at room
The top of panel 5, to be formed into hydrospace.The top surface of roof boarding 5 is arranged to concaveconvex structure, is the tongue and groove 51 at concave-convex interval,
Roof boarding 5 is fixed on by jumping chisel tailfiber on skeleton 7.The outside of roof boarding 5 is sheet metal structural, and intermediate course is plastics.It uses
When, rainwater and melt after snow-broth along roof boarding tongue and groove flow out, directed water into rhone by water fender.
Further, it is additionally provided with square hole 43 on water fender and blocks the cover board 3 of square hole 43, cover board 3 is fixed by self threading pin
On rhone.Cover board 3 can be removed when cleaning out a drain, be installed after cleaning out.
The supply and discharge sink that hanging plate 8 includes hanging buckle plate 81 for hanging buckle on skeleton, vertically extends is fixedly connected
Fixed connecting plate 82.Hanging buckle plate 81 is consistent with the angle of inclination of skeleton, and after 81 hanging buckle of hanging buckle plate is good, roof boarding 5 is to be fitted in
On hanging buckle plate 81.82 lower end fold inward of fixed connecting plate forms U-shaped flange 83, and the bottom of U-shaped flange is equipped with draining, breathes freely
Through-hole 84, through-hole 84 have one group it is multiple.The lateral surface of fixed connecting plate 82 is formed to be consolidated for the welding for being welded and fixed rhone
Determine face.In the present embodiment, hanging plate is set, following factor is allowed for;If rhone is directly weldingly fixed on outside skeleton
On the rectangular steel pipe 10 enclosed, fixation is not firm, and especially heavy rain rainstorm weather, the weight of rhone are bigger;Due to prefabricated cabin
To split assembled, has gas permeability between nacelle and roof boarding, be not closed, when the dilutional hyponatremia of rhone overflows
When, water may enter inside nacelle, and after hanging plate is arranged, the water of spilling can be discharged by the through-hole on hanging plate.Not
Sometimes When It Rains, the through-hole on hanging plate can play ventilative effect.
In other embodiments, rhone can also be used the U-type groove of an entirety, and rhone is also not limited to U-shaped, also may be used
Using V-type.One piece of tablet being obliquely installed towards roof boarding side can also be used in water fender on rhone.In addition, water fender
It can be directly anchored to roof boarding, without using water blocking board mount.
In other embodiments, hanging plate also can only play the role of for fixing rhone, and be not provided with logical accordingly
Hole is not provided with U-shaped flange naturally.
The embodiment of discharge structure in prefabricated cabin set roof of the present invention, discharge structure is implemented with above-mentioned prefabricated cabin in set roof
Discharge structure is identical in set roof in example, is no longer described in detail to concrete structure.
Claims (6)
1. discharge structure in prefabricated cabin set roof, including skeleton that length direction extends along the longitudinal direction, it is characterised in that:Skeleton
Arranged on left and right sides be equipped with the rhone for collecting rainwater at the top of prefabricated cabin that length extends along the longitudinal direction, the draining
Hanging plate is equipped between slot and skeleton, the hanging plate is fixed on skeleton, and the rhone is fixed on the hanging plate;The bone
Frame is for installing roof boarding;The hanging plate includes hanging buckle plate for hanging buckle on the skeleton, the confession vertically extended
The fixed connecting plate that rhone is fixedly connected;Fixed connecting plate lower end fold inward forms U-shaped flange, the U-shaped flange
Bottom be equipped with draining, ventilative through-hole;On the left and right directions away from rhone, roof boarding is under rhone
End, the setting of hanging plate sequence interval;The roof boarding is for being fitted in hanging buckle plate top surface.
2. discharge structure in prefabricated cabin set roof according to claim 1, it is characterised in that:The rhone includes multistage
Drain tank is provided with the backing plate for preventing water leakage at the docking of two neighboring drain tank.
3. discharge structure in prefabricated cabin set roof according to claim 2, it is characterised in that:The drain tank is in opening
U-shaped shape upward, each drain tank far from the skeleton side on be correspondingly arranged on water fender, the water fender
It is tilted towards the side of the skeleton.
4. splitting prefabricated cabin, including discharge structure in set roof, discharge structure includes length direction before in set roof
The skeleton that rear direction extends, it is characterised in that:The arranged on left and right sides of skeleton extends pre- for collecting along the longitudinal direction equipped with length
The rhone of rainwater at the top of cabin processed is equipped with hanging plate between the rhone and skeleton, the hanging plate is fixed on skeleton, described
Rhone is fixed on the hanging plate;The skeleton is for installing roof boarding;The hanging plate includes for hanging buckle in the bone
The fixed connecting plate that hanging buckle plate on frame, the supply and discharge sink vertically extended are fixedly connected;The fixed connecting plate lower end
Fold inward forms U-shaped flange, and the bottom of the U-shaped flange is equipped with draining, ventilative through-hole;Away from rhone
On left and right directions, roof boarding is arranged close to the lower end of rhone, hanging plate sequence interval;The roof boarding is fitted on hanging buckle plate
's.
5. according to claim 4 split prefabricated cabin, it is characterised in that:The rhone includes multistage rhone
Body is provided with the backing plate for preventing water leakage at the docking of two neighboring drain tank.
6. according to claim 5 split prefabricated cabin, it is characterised in that:The drain tank is in opening up
U-shaped shape is correspondingly arranged on water fender on the side far from the skeleton of each drain tank, and the water fender is towards institute
The side for stating skeleton tilts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610516307.6A CN106013632B (en) | 2016-07-04 | 2016-07-04 | It is a kind of to split discharge structure in prefabricated cabin and its set roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610516307.6A CN106013632B (en) | 2016-07-04 | 2016-07-04 | It is a kind of to split discharge structure in prefabricated cabin and its set roof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106013632A CN106013632A (en) | 2016-10-12 |
CN106013632B true CN106013632B (en) | 2018-10-30 |
Family
ID=57106473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610516307.6A Active CN106013632B (en) | 2016-07-04 | 2016-07-04 | It is a kind of to split discharge structure in prefabricated cabin and its set roof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106013632B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237375A (en) * | 2017-07-12 | 2017-10-10 | 温州振华建设有限公司 | A kind of architectural drainage system and construction method |
CN107842150B (en) * | 2017-11-30 | 2023-08-18 | 中建科工集团有限公司 | Overlength eaves gutter that uses in assembled steel construction building |
CN108468447A (en) * | 2018-03-30 | 2018-08-31 | 深圳市怡富通讯科技有限公司 | The cabin of prefabricated cabin is pushed up and prefabricated cabin |
CN113853995A (en) * | 2020-06-30 | 2021-12-31 | 福州市华夏屋顶农业技术开发有限公司 | Glass curtain wall plastic greenhouse original ecological greenhouse |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4951430A (en) * | 1989-09-11 | 1990-08-28 | David Gottlieb | Removable gutter and fastener system |
JP2610780B2 (en) * | 1994-04-15 | 1997-05-14 | 太陽工業株式会社 | Rain gutter mounting structure for membrane structures |
DE29714562U1 (en) * | 1997-08-14 | 1997-10-16 | Dorenwendt Wolfgang | Fixing system for gutters |
JP3136128B2 (en) * | 1997-12-26 | 2001-02-19 | 株式会社冨士工芸社 | Rain gutter |
CN201193383Y (en) * | 2007-09-29 | 2009-02-11 | 王晓华 | Water collecting trough glass fibre reinforced plastic |
CN104947861B (en) * | 2015-06-30 | 2018-03-02 | 许继电气股份有限公司 | Prefabricated cabin air-penetrable waterproof structure |
CN206174325U (en) * | 2016-07-04 | 2017-05-17 | 许继电气股份有限公司 | Prefabricated cabin of split assembled and roof concentrated drainage structure thereof |
-
2016
- 2016-07-04 CN CN201610516307.6A patent/CN106013632B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106013632A (en) | 2016-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013632B (en) | It is a kind of to split discharge structure in prefabricated cabin and its set roof | |
CN207433228U (en) | A kind of automobile installing structure of top cover | |
CN202416721U (en) | Lower-hidden upper-seam fixed high standing side hidden-interlocking roof panel structure | |
CN207469609U (en) | Improve the Double-layer roof system of wind uplift resistance | |
CN206174325U (en) | Prefabricated cabin of split assembled and roof concentrated drainage structure thereof | |
CN104481087A (en) | Light firm canopy easy for discharging water | |
CN109457876B (en) | Metal roof system with hidden maintenance horse way | |
CN207453284U (en) | A kind of roofing bottom plate and roof board system for improving water resistance | |
CN203113513U (en) | Box type moving house | |
CN207427037U (en) | A kind of photovoltaic generating system stent | |
CN203160564U (en) | Steel-structure wall face flashing structure, and flashing assembly and flashing support plate thereof | |
CN207453290U (en) | A kind of laterally attached roofing bottom plate and roof board system | |
CN207469610U (en) | A kind of roof boarding hold-down support | |
CN209211742U (en) | A kind of roof truss and roof with grid structure | |
CN209585739U (en) | A kind of prefabricated cabin assembled roof structure | |
CN208792519U (en) | External wall stop water | |
CN208884801U (en) | Metal plate curtain wall | |
CN208329326U (en) | Water proof type steel structural roof structure | |
CN207453287U (en) | Double-deck roof boarding | |
JP2022087880A (en) | Eaves structure | |
CN104612341A (en) | Canopy | |
CN107842147A (en) | A kind of roofing bottom plate and roof board system for improving water resistance | |
CN205369742U (en) | A roofing system of falling into water for steel construction | |
CN108952019A (en) | A kind of novel chamfering is speeded type color steel tile structure and photovoltaic module | |
JP2020084486A (en) | Eaves edge structure and method for constructing the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |