Nothing Special   »   [go: up one dir, main page]

CN105951605A - Apparatus and method for blanking steel strand stably and accurately on deck - Google Patents

Apparatus and method for blanking steel strand stably and accurately on deck Download PDF

Info

Publication number
CN105951605A
CN105951605A CN201610445184.1A CN201610445184A CN105951605A CN 105951605 A CN105951605 A CN 105951605A CN 201610445184 A CN201610445184 A CN 201610445184A CN 105951605 A CN105951605 A CN 105951605A
Authority
CN
China
Prior art keywords
steel strand
strand wires
steel
concrete
bridge floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610445184.1A
Other languages
Chinese (zh)
Other versions
CN105951605B (en
Inventor
项伟康
娄永平
陈丽凤
刘倩
李华军
张家华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI (GROUP) HOLDING Corp FOR FOREIGN ECONOMIC & TECHNOLOGICAL COOPERATION
HANGZHOU TRAFFIC ENGINEERING GROUP Co Ltd
Original Assignee
SHANGHAI (GROUP) HOLDING Corp FOR FOREIGN ECONOMIC & TECHNOLOGICAL COOPERATION
HANGZHOU TRAFFIC ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI (GROUP) HOLDING Corp FOR FOREIGN ECONOMIC & TECHNOLOGICAL COOPERATION, HANGZHOU TRAFFIC ENGINEERING GROUP Co Ltd filed Critical SHANGHAI (GROUP) HOLDING Corp FOR FOREIGN ECONOMIC & TECHNOLOGICAL COOPERATION
Priority to CN201610445184.1A priority Critical patent/CN105951605B/en
Publication of CN105951605A publication Critical patent/CN105951605A/en
Application granted granted Critical
Publication of CN105951605B publication Critical patent/CN105951605B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to an apparatus and method for blanking a steel strand stably and accurately on a deck. The steel strand is fixed to the deck through a fixing frame, a pad is disposed 3 m in the front of a release end of the steel strand, and the middle of pad is provided with a hole Phi30 mm; a fixed pulley is disposed at the top of the front end of concrete that has been cast, a grinding wheel cutter is disposed 2.2 m from a new and old concrete junction to a new casting direction, and vertical rebars are disposed 0.5 m from the new and old concrete junction to an old casting direction. The method includes: first, attaching front and rear frames to the steel strand; passing fastening bolts through the front and rear frames, and fastening with nuts; pulling the steel strand out of the front frame, passing it sequentially by a constraint ring, the hole Phi30 mm of the pad and the fixed pulley, and pulling forward via the vertical rebars; pulling the steel strand all the way to an end of the newly cast concrete; pulling forward again from the new and old concrete junction so that the front end of the steel strand is out of the end face; cutting the steel strand for accurate blanking with the grinding wheel cutter at a deck cutting position.

Description

Steel strand wires are steady on bridge floor, the device and method of accurate blanking
Technical field
The present invention relates to the device of the blanking of steel strand wires in a kind of construction, a kind of steel on bridge floor The device and method of twisted wire blanking.
Background technology
The RB-06 grand bridge of the north, Teheran highway first stage of the project is positioned at 9 degree of earthquakes of Iran Mountainous Area of North District.For alleviating bridge deadweight, improve this bridge construction anti-seismic performance further, compare through multi-scheme.Design is adopted With 3 across Wavelike steel webplate prestressed concrete continuous beam.Bridge lateral double width is arranged, left and right width bridge is clean Away from 2m.Single width bridge floor width 13.1m, its span setting is 83+153+83=319m, bridge main across 153m across Mulberry koris, connects the tunnel entrance between 2 seat height mountains, outlet.Hillside, Mulberry koris 2 side is precipitous.1# Pier is positioned on hillside, side, river valley, pier shaft left panel height 28m, right panel height 31m.2# pier is positioned at the foot of the hill, opposite, river valley Under.Left and right width pier shaft height 65.5m.Single chamber list box beam center height 8.8m.Therefore there are more than 80 m in bridge floor to river valley High.RB-06 grand bridge 1# pier collapses all cross over existing highway across, 2# pier limit.Construction period must not affect friendship Logical.Therefore construction site can only be in the narrowest and small mountain valley between river valley and 2# pier.Cause difficulty of construction pole Its difficulty.Completing project progress, RB-06 grand bridge becomes whole engineering and executes the position of most critical on schedule.
Steel web Construction of continuous beam order (see Fig. 1), (0,1# sections except) 2#~16# section uses Hanging Basket to execute Work.I.e. one sections of Hanging Basket, sections is pushed ahead.The concreting of each sections of box beam completes, After dependence is arranged on high intensity on bridge floor, underrelaxation steel strand tension completes, the reach that could meet Hanging Basket is executed Work load.Bridge floor longitudinal direction steel strand wires increase along with sections, and length is continuously increased.It is 46.3m from 5# segmental length, 152m is reached to 16# segmental length.
Steel strand wires are that producer is bundled packages the scene of transporting to.General one is bundled between 3~4 tons.(see Fig. 2). Pre-stress construction first has to steel wire.High intensity, the steel strand wires of underrelaxation, one leaves packaging, it is simply that Straight one, also can beat " strand ".For preventing from hurting sb.'s feelings.The most all carry out on spacious ground.R L6 especially big The construction site of bridge is narrow and small, and bridge pier is again the highest.To steel strand wires length at below 40m, after blanking completes, Vertical transport is to the most inadequate on bridge floor high for more than 80 m.To reach (the 22 of 152m by root length degree every to 16# sections Root) steel strand wires be difficult to the imagination.To this end, for the steel wire of more than 40m, need after 4# sections Steel strand wires be put into bridge floor and get on blanking.
Summary of the invention
The present invention is to provide for that a kind of steel strand wires are steady on bridge floor, the device and method of accurate blanking, utilizes work Current material makes the framework of fixing steel strand wires on the ground, narrow and small for construction site, bridge pier height high, vertical The bridge construction of transport difficult.
For achieving the above object, the technical solution used in the present invention is: a kind of steel strand wires are steady on bridge floor, accurate The really device of blanking, including steel strand wires, fixed frame, bearing beam, fixed pulley, abrasive wheel cutting machine, vertical steel Muscle, described steel strand wires are fixed on bridge floor by fixed frame, and described fixed frame side is provided with constraint circle; The bearing beam of one cradle construction is set at 3m before steel strand wires discharge end, in the middle of bearing beam, is provided with one Hole;Described fixed pulley is arranged on the concrete front top newly poured, at novel concrete and old concrete The boundary poured arranges an abrasive wheel cutting machine at the direction 2.2m of the concrete newly poured, at new coagulation The boundary that soil and old concrete pour arranges vertical reinforcement at the 0.5m that old concrete pours.
Described fixed frame passes through tight after placing steel strand wires in including front baffle, afterframe, front baffle and afterframe Gu screw rod and nut fasten and regulation steel strand wires, outside front baffle, then welding constraint is enclosed.
When steel wire, described steel strand wires are released from fixed frame and are passed sequentially through in the middle of constraint circle, bearing beamHole, pulley, the end of vertical reinforcement to other end young concrete.
When steel strand wires not blanking time, described steel strand wires iron wire is tied up pull-out steel strand wires head on constraint circle.
Described constraint circle byReinforcement fabrication, constraint circle outside diameterSmall end A length of 600mm.
Described front baffle, afterframe are made up of vertical channel-section steel, transverse channel steels, longitudinal channel-section steel, diagonal brace respectively, and two Welded together by two transverse channel steels of upper and lower layout between the vertical channel-section steel of root, at the bottom of two vertical channel-section steels Longitudinal channel-section steel of portion's weld horizontal respectively, forms L-type and erects framework, weld between longitudinal channel-section steel and vertical channel-section steel Connecing diagonal brace, in L-type erects framework, welded reinforcement forms intersecting parallels, has at described vertical channel-section steel two ends 160mm Wide 24mm, the rectangular opening of long 80mm.
Described front baffle, the height of afterframe are 1400mm, and width is 960mm.
A kind of steel strand wires baiting method steady on bridge floor, accurate, it is characterised in that concretely comprise the following steps:
Steel strand wires are hung and are put on bridge floor by the first step;
Second step, is attached to forward and backward framework on steel strand wires;
3rd step, fastening screw fastens through forward and backward framework nut;
4th step, steel strand wires pull out through Planar Mechanisms circle from front baffle, make steel strand wires retraining before circle's Upper and lower play in circle, then through bearing beamHole;
5th step, steel strand wires start to bend through fixed pulley, draw forward through vertical reinforcement again;
Steel strand wires are moved to the termination of young concrete by the 6th step always;
7th step, again draws forward from casting concrete intersection new, old, brings out end face before making steel strand wires;
8th step, with the abrasive wheel cutting machine accurate blanking of cutting of steel twisted wire being fixed on bridge floor cutting position.
The invention has the beneficial effects as follows: the present invention utilizes current material on building site to make the framework of fixing steel strand wires, Use the steel wire device blanking steel strand wires of the present invention, unlike generally taking dipstick metering to go out to need length, carry out Mark.And the active length of absolute guarantee's steel strand wires, do not waste.And construction does not the most find Too short and long.For construction site is narrow and small, on the water surface, construction provides good apparatus and method for this.
Accompanying drawing explanation
Fig. 1 is steel web Construction of continuous beam sequential schematic;
Fig. 2 is for becoming bale packaging steel strand wires schematic diagram;
Fig. 3 is front baffle structural front view;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is afterframe structural front view;
Fig. 6 is the left view of Fig. 5;
Fig. 7 is constraint coil structures floor map;
Fig. 8 is the left view of Fig. 7;
Fig. 9 is stationary frame structure front view;
Figure 10 is the left view of Fig. 9;
Figure 11 is the top view of Fig. 9;
Figure 12 is fixed pulley schematic diagram;
Figure 13 is abrasive wheel cutting machine schematic diagram;
Figure 14 is bearing beam structural front view;
Figure 15 is the left view of Figure 14;
Figure 16 is that steel strand wires prepare pull-out blanking view;
Figure 17 is the sectional view in Figure 16 along A-A;
Figure 18 is that steel strand wires are pulled out to young concrete end view;
Figure 19 is that steel strand wires return to new and old intersection and move casting concrete end view again to.
Detailed description of the invention
As shown in Fig. 1 to Figure 19, a kind of steel strand wires are steady on bridge floor, the device of accurate blanking, including Steel strand wires 1, fixed frame 2, bearing beam 3, fixed pulley 4, abrasive wheel cutting machine 5, vertical reinforcement 6 etc..
As shown in Figure 16 to Figure 19, steel strand wires 1 are fixed on bridge floor by fixed frame 2, fixed frame 2 Side is provided with constraint circle 14;The bearing beam 3 of one cradle construction is set at 3m before steel strand wires 1 discharge end, It is provided with one in the middle of bearing beam 3Hole;Fixed pulley 4 is arranged on the top, Concrete front end newly poured Portion, the boundary poured at novel concrete A and old concrete B is to the direction 2.2m of the Concrete newly poured Place arranges an abrasive wheel cutting machine 5, and the boundary poured at novel concrete A and old concrete B is to old concrete Vertical reinforcement 6 is set at the 0.5m that B pours.
As shown in Figures 9 to 11, fixed frame 2 includes front baffle 20, afterframe 21, front baffle 20 and after Fasten and regulate steel strand wires, front frame by fastening screw 16 and nut 17 after placing steel strand wires 1 in framework 21 Frame 20 outer then welding constraint circle 14.
Front baffle 20, afterframe 21 make main material 10# channel-section steel, high 1400mm two.Long 960mm Two, 500mm two, welding fabrication (see Fig. 3 to Fig. 6).The vertical channel-section steel 10 of long 1400mm in figure At the 160mm of two ends, have wide 24mm, the rectangular opening of long 80mm, for fastening steel strand wires regulation.Long 760mm Transverse channel steels 11 be welded between two vertical channel-section steels of 1400mm 10 formation framework, long in base of frame Longitudinal channel-section steel 12 level welding of 500mm so that it is l-shaped erects framework.Between diagonal brace 13 useSteel Muscle so that it is become a tripod stabilizer stands in ground.Use in frameworkReinforcement welding intersecting parallels, perpendicular To spacing 550mm, level is to spacing 520mm.(see Fig. 3,5).Front baffle is distinguished at intersecting parallels with afterframe Frame 15, between welding constraint a circle 14.Other all as.Such as Fig. 7, shown in 8, constraint circle 14 use Reinforcement fabrication, outside diameterSmall endA length of 600.
During use, packaged steel strand wires 1 hang outside the Hanging Basket of bridge floor, first afterframe 21 are twisted against steel Line 1.?Fastening screw 16 pass in rectangular opening, one end is first pad 18, the nut of M20 17 install.Again front baffle 20 is touched steel strand wires 1.Fastening screw 16 is gone through, adjusts the most empty Gap.Backing plate 18, nut 17 are first-class.Firm being fixed on bridge floor of steel strand wires 1.Steel strand wires 1 fix (see Figure 16,17) the most just can remove strap, pulls out steel strand wires 1.When steel strand wires 1 not blanking With iron wire, pull-out steel strand wires head can be tied up on constraint circle 14.
Concrete+the active length of the length of steel strand wires 1 blanking=poured (jack at two ends, work anchor, 3cm etc. is exposed) after limiting plate, moveable anchor, intermediate plate equal length and installation intermediate plate.
Steel strand wires length 2.2m longer than bridge floor for this each sections.In the novel concrete A front end poured Top arranges a fixed pulley 4 (Figure 12), and the boundary poured at novel concrete A and old concrete B is to newly One abrasive wheel cutting machine 5 is set at the direction 2.2m of the Concrete poured, and maintains static.At new coagulation The boundary that soil A and old concrete B pours arranges reinforcing bar 6 at old concrete 0.5m, releases at steel strand wires Before end, about 3m place is arranged has in the middle of the bearing beam 3 (see Figure 14,15) of a cradle construction, bearing beam 3 OneHole.So steel strand wires 1 just stir in the hole retraining circle 14, bearing beam 3, Bu Huiying Ring and arrive surrounding.
When steel wire, circle 14 → bearing beam 3 → fixed is released → retrained to steel strand wires 1 from fixed frame 2 Pulley 4 → vertical reinforcement 6 → to other end top (see Figure 18).After putting down, return to new and old intersection Again this 4.8m is moved to the top (see Figure 19) of young concrete.Last workman cuts at emery wheel At machine, steel strand wires are cut off.After cut-out, this workman continues to draw the 2nd.Six workmans just can be complete at bridge floor Become the task of blanking.First man pulls out 30 meters of the followed by the 2nd people and draws such circulation below, last emery wheel Cutting machine 5 cuts off steel strand wires 1.
The steel strand wires of present invention baiting method steady on bridge floor, accurate, concretely comprises the following steps:
Steel strand wires 1 are hung and are put on bridge floor (Figure 16,17) by the first step;
Second step, is attached on steel strand wires 1 (Fig. 9,10,11) forward and backward framework 20,21;
3rd step, fastening screw 16 through forward and backward framework 20,21 nut 17 fasten (Fig. 9,10, 11);
4th step, steel strand wires 1 pull out through Planar Mechanisms circle 14 from front baffle 20, can only be before constraint circle 14Circle in upper and lower play, then through bearing beam 3Hole, the most not play (Figure 18);
5th step, steel strand wires 1 start to bend through fixed pulley 4, draw forward (figure through vertical reinforcement 6 again 18);
Steel strand wires 1 are moved to the termination (Figure 18) of young concrete by the 6th step always;
7th step, again from casting concrete A new, old, B intersection draws forward, and front end allows steel strand wires 1 go out End face 9 (Figure 19);
8th step, with the accurate blanking of abrasive wheel cutting machine 5 cutting of steel twisted wire 1 being fixed on bridge floor cutting position.

Claims (8)

1. steel strand wires are steady on bridge floor, a device for accurate blanking, including steel strand wires (1), fixed frame (2), Bearing beam (3), fixed pulley (4), abrasive wheel cutting machine (5), vertical reinforcement (6), it is characterised in that: described steel twists Line (1) is fixed on bridge floor by fixed frame (2), and described fixed frame (2) side is provided with constraint circle (14); Arrange at 3m before steel strand wires (1) discharge end and set in the middle of the bearing beam (3) of a cradle construction, bearing beam (3) There is oneHole;Described fixed pulley (4) is arranged on concrete (A) front top newly poured, The boundary that novel concrete (A) and old concrete (B) pour is to the direction 2.2m of the concrete (A) newly poured Place arranges an abrasive wheel cutting machine (5), the boundary poured at novel concrete (A) and old concrete (B) to Vertical reinforcement (6) is set at the 0.5m that old concrete (B) pours.
Steel strand wires the most according to claim 1 are steady on bridge floor, the device of accurate blanking, it is characterised in that: Described fixed frame (2) is put in including front baffle (20), afterframe (21), front baffle (20) and afterframe (21) Putting steel strand wires (1) and fasten and regulate steel strand wires by fastening screw (16) and nut (17) afterwards, front baffle (20) is outward Then welding constraint circle (14).
Steel strand wires the most according to claim 1 are steady on bridge floor, the device of accurate blanking, it is characterised in that: When steel wire, described steel strand wires (1) are released from fixed frame (2) and are passed sequentially through constraint circle (14), pad In the middle of beam (3)Hole, fixed pulley (4), vertical reinforcement (6) arrive other end young concrete A's End.
Steel strand wires the most according to claim 1 are steady on bridge floor, the device of accurate blanking, it is characterised in that: When steel strand wires not blanking time, described steel strand wires (1) iron wire ties up pull-out steel strand wires head in constraint circle (14) On.
Steel strand wires the most according to claim 1 are steady on bridge floor, the device of accurate blanking, it is characterised in that: Described constraint circle (14) byReinforcement fabrication, constraint circle outside diameterSmall end A length of 600mm.
Steel strand wires the most according to claim 2 are steady on bridge floor, the device of accurate blanking, it is characterised in that: Described front baffle (20), afterframe (21) are respectively by vertical channel-section steel (10), transverse channel steels (11), longitudinal channel-section steel (12), diagonal brace (13) is constituted, by two transverse channel steels of upper and lower layout between two vertical channel-section steels (10) (11) welding together, two vertical channel-section steel (10) bottoms are respectively welded longitudinal channel-section steel (12) of level, form L Type erects framework, welds diagonal brace (13) between longitudinal channel-section steel (12) and vertical channel-section steel (10), and L-type erects in framework Welded reinforcement forms intersecting parallels frame (15), has wide 24mm, length at described vertical channel-section steel (10) two ends 160mm The rectangular opening of 80mm.
Steel strand wires the most according to claim 2 are steady on bridge floor, the device of accurate blanking, it is characterised in that: Described front baffle (20), the height of afterframe (21) are 1400mm, and width is 960mm.
8. a steel strand wires baiting method steady on bridge floor, accurate, it is characterised in that concretely comprise the following steps:
Steel strand wires (1) are hung and are put on bridge floor by the first step;
Second step, is attached to forward and backward framework (20,21) on steel strand wires (1);
3rd step, fastening screw (16) is through forward and backward framework (20,21) nut (17) fastening;
4th step, steel strand wires (1) pull out through Planar Mechanisms circle (14) from front baffle (20), make steel strand wires (1) only Can be before constraint circle (14)Circle in upper and lower play, then through bearing beam (3)Hole;
5th step, steel strand wires (1) start to bend through fixed pulley (4), draw forward through vertical reinforcement (6) again; Steel strand wires (1) are moved to the termination of young concrete by the 6th step always;
7th step, again draws forward from casting concrete (A, B) intersection new, old, makes steel strand wires (1) front end Go out end face;
8th step, with abrasive wheel cutting machine (5) cutting of steel twisted wire (1) the accurately blanking being fixed on bridge floor cutting position.
CN201610445184.1A 2016-06-20 2016-06-20 Steel strand wires are steady on bridge floor, accurate blanking device and method Active CN105951605B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610445184.1A CN105951605B (en) 2016-06-20 2016-06-20 Steel strand wires are steady on bridge floor, accurate blanking device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610445184.1A CN105951605B (en) 2016-06-20 2016-06-20 Steel strand wires are steady on bridge floor, accurate blanking device and method

Publications (2)

Publication Number Publication Date
CN105951605A true CN105951605A (en) 2016-09-21
CN105951605B CN105951605B (en) 2017-06-23

Family

ID=56907080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610445184.1A Active CN105951605B (en) 2016-06-20 2016-06-20 Steel strand wires are steady on bridge floor, accurate blanking device and method

Country Status (1)

Country Link
CN (1) CN105951605B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008280730A (en) * 2007-05-10 2008-11-20 Sumitomo Denko Steel Wire Kk Feeding device and laying method for prestressed steel strand
CN204751678U (en) * 2015-06-18 2015-11-11 中建八局第三建设有限公司 A charging tray fastener for steel strand wires unloading
CN105110069A (en) * 2015-08-07 2015-12-02 中铁五局(集团)有限公司 Support for unbundling and fixed-length cutting of steel strands of whole bundle
CN205240695U (en) * 2015-11-10 2016-05-18 浙江兴土桥梁临时钢结构工程有限公司 Steel strand wires scale unloader for bridge
CN205775875U (en) * 2016-06-20 2016-12-07 杭州市交通工程集团有限公司 Steel strand wires are steady on bridge floor, the device of accurate blanking

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008280730A (en) * 2007-05-10 2008-11-20 Sumitomo Denko Steel Wire Kk Feeding device and laying method for prestressed steel strand
CN204751678U (en) * 2015-06-18 2015-11-11 中建八局第三建设有限公司 A charging tray fastener for steel strand wires unloading
CN105110069A (en) * 2015-08-07 2015-12-02 中铁五局(集团)有限公司 Support for unbundling and fixed-length cutting of steel strands of whole bundle
CN205240695U (en) * 2015-11-10 2016-05-18 浙江兴土桥梁临时钢结构工程有限公司 Steel strand wires scale unloader for bridge
CN205775875U (en) * 2016-06-20 2016-12-07 杭州市交通工程集团有限公司 Steel strand wires are steady on bridge floor, the device of accurate blanking

Also Published As

Publication number Publication date
CN105951605B (en) 2017-06-23

Similar Documents

Publication Publication Date Title
CN107119574B (en) A kind of Cantilever Construction Method of arch rib bridge girder
CN106677070B (en) A kind of high-altitude long-span heavy duty construction of beam bracket and construction method
CN203066232U (en) Building structure without form removal
CN104831818B (en) The connecting node of precast reinforced concrete beam and superposed column
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN104294767B (en) A kind of semi girder cast-in-place construction spreading Hanging Basket and construction method thereof
CN205775875U (en) Steel strand wires are steady on bridge floor, the device of accurate blanking
CN107574762A (en) A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities
CN208472543U (en) CFST Arch Bridge
CN107905124A (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN107227814A (en) Sectional construction method for large cantilever concrete structure
CN204753836U (en) Connected node of precast reinforced concrete roof beam and coincide post
CN103938871B (en) A kind of construction method adopting the steel core concrete column bonded prestress frame beam structure of reinforced concrete ring beam joint
CN206815376U (en) Open cut type is without post Metro Station Structure across arch greatly
CN106088412A (en) L-type steel beam column
CN206070792U (en) A kind of assembled steel lath band combined concrete shear wall
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN104213728B (en) Oblique beam for grandstand of stadium and construction process for oblique beam
CN104295001B (en) The construction technology of variable cross-section prestressing force cant beam
CN106120565B (en) Large span bias Recumbent steel box tied arch bridge Buoys arrangement construction system
CN105951605A (en) Apparatus and method for blanking steel strand stably and accurately on deck
CN107761575A (en) Ultra-wide box beam Hanging Basket and its bottom basket system
CN204691068U (en) A kind of overlength ring orientation prestress ring beam
CN204139075U (en) A kind of semi girder cast-in-place construction spreading Hanging Basket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant