Nothing Special   »   [go: up one dir, main page]

CN105927249B - A kind of construction method for pouring tunnel double-lining self-compacting concrete - Google Patents

A kind of construction method for pouring tunnel double-lining self-compacting concrete Download PDF

Info

Publication number
CN105927249B
CN105927249B CN201610346501.4A CN201610346501A CN105927249B CN 105927249 B CN105927249 B CN 105927249B CN 201610346501 A CN201610346501 A CN 201610346501A CN 105927249 B CN105927249 B CN 105927249B
Authority
CN
China
Prior art keywords
observation window
concrete
template
pump line
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610346501.4A
Other languages
Chinese (zh)
Other versions
CN105927249A (en
Inventor
施笋
杨富强
王坡
张颍辉
孟晓龙
樊继丰
商伟阳
刘俊
王振东
张文旭
张楠
李征
庄晶晶
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHUZONG GROUP Co Ltd
Original Assignee
BEIJING ZHUZONG GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHUZONG GROUP Co Ltd filed Critical BEIJING ZHUZONG GROUP Co Ltd
Priority to CN201610346501.4A priority Critical patent/CN105927249B/en
Publication of CN105927249A publication Critical patent/CN105927249A/en
Application granted granted Critical
Publication of CN105927249B publication Critical patent/CN105927249B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a kind of construction method for pouring tunnel double-lining self-compacting concrete, i.e., first unilateral poured from waist window is put in storage, then shifts to the method that top pours, and step includes:Ground pump pump line puts in storage setting steps, after the completion of chassis formwork, pump line is accessed in chassis, unilateral observation window is led to by flexible pipe and puts in storage;Template lower concrete pours step, and the unilateral concrete poured that puts in storage flows to opposite side from side, until side-lower observation window is closed;Pipe step is changed, flexible pipe is poured into window from side removes, and is connected with corresponding top pouring hole, until pouring completion.One aspect of the present invention solves self-compacting concrete in wholecircle formwork jumbo casting process, the problem of applicable Sexual behavior mode of the power of ground pump, on the other hand the dew muscle of the concrete of bottom and the phenomenon of delay be effectively prevent, the final construction quality for improving concrete structure shaping, improves efficiency of construction.

Description

A kind of construction method for pouring tunnel double-lining self-compacting concrete
Technical field
The invention belongs to underground engineering, the construction method of particularly a kind of cast-in-place two linings self-compacting concrete in tunnel.
Background technology
With the continuous development of China's underground engineering, self-compacting concrete is with its good mobility, stability, anti-isolation Property and uniformity are in tunnel(Hole)It is widely used in liner structure, particularly in water-conveyance tunnel, one section of tunnel knot Shuttering supporting built in structure use, self-compacting concrete one-time-concreting are molded, and reduce the horizontal joint of structure.Self-compacting concrete First ground is transported to underground, then is transported to from underground and pours the scope of operation, is pumped to by ground pump and pours mouth and put in storage, selected different Mode of putting in storage has a certain impact for the effect of concreting process and shaping structures.
In underground engineering, the technology of liner structure, concrete warehousing side are poured by underground haulage self-compacting concrete Formula mainly has three kinds:One kind is first to be poured from trolley formwork bottom pouring hole, then shifts to top pouring hole and pour;Second is first From trolley formwork both sides, waist observation window symmetrically pours, and then shifts to top pouring hole and pours;The third, top sets and poured Hole, concrete directly put in storage from top, are changed without pouring mouth.Practice have shown that the self-compacting concrete poured for one-shot forming Structure, three kinds of concrete warehousing modes appearance different degrees of in construction influence construction continuity and are molded tunnel quality Problem, first method, bottom squeeze formula pour needed for pump pressure it is larger, easily occur because of pump pressure deficiency and " suppressing pump ", and then cause Pour formation of concrete structure caused by interruption and cold seam occur, and pipe time length is changed in midway from bottom to up;Second enters with the third Storehouse mode principle is identical, belongs to symmetrically pour, the concrete that both sides are put in storage is unfavorable for the row of air when template bottom is met Go out, cause lower concrete to be locally filled with leakiness, the problem of local retention and dew muscle occur, while also cause bottom bubble More phenomenon, in addition second method change the pipe time length, the third method easily caused under conditions of drop is big concrete from Analysis.Whether the leakiness of cold seam, delay, dew muscle and concrete caused by concrete disintegration all have impact on the outward appearance of concrete Quality and entity structure quality.
The content of the invention
It is an object of the invention to provide a kind of construction method for pouring tunnel double-lining self-compacting concrete, to solve existing Concrete warehousing mode exist bottom squeeze formula pour needed for pump pressure it is larger, easily occur because pump pressure deficiency and the technology of " suppressing pump " is asked Topic, also wants lower concrete to be locally filled with leakiness, local retention occurs and reveals the technical problem of muscle, also to solve concrete Drop easily causes greatly the technical problem of concrete disintegration.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of construction method for pouring tunnel double-lining self-compacting concrete, construction procedure are as follows:
Step 1, observation window and top pouring hole are set on trolley formwork;
Step 2, open the door of whole observation windows;
Step 3, interior placement ground pump is served as a contrast in the front of chassis direct of travel, tunnel one;
Step 4, ground pump pump line put in storage:After the completion of chassis formwork, ground pump is accessed in chassis by hard pump line, and passes through The middle observation window that soft pump line leads to side puts in storage;
Step 5, after pump line installation, open ground switch pump and pour self-compacting concrete to pumping on the outside of trolley formwork;
Step 6, template lower concrete pour:The one side concrete poured that puts in storage flows to opposite side from side, until The door of lower observation window is closed;
Step 7, change pipe:Continue casting concrete, therefrom observation window removes by soft pump line, and is closed on observation window in this The connection of top pouring hole, the door of observation window continues to pour in closing;
Step 8, when concrete liquid level is close to upper observation window, observation window in closing is until pour completion.
In the step 1, observation window under being set in the both sides obliquely downward of trolley formwork, in the both sides waist of trolley formwork Observation window in setting, observation window and top pouring hole are set at the top of trolley formwork, and all observation windows are equipped with retractable Door, the top pouring hole at least provided with two, it is at least one positioned at trolley formwork constructed tunnel two lining one end, extremely One end of few one lining of tunnel two of not constructed positioned at trolley formwork.
In the step 4, picked out using hard pump line from ground pump discharge, extension is laid in the bottom that hard pump line serves as a contrast along tunnel one To trolley formwork, horizontally enter into inside chassis needle beam and extend to after 90 ° of elbows conversion elevation of two hard pump lines Hole site is poured at the top of close or corresponding trolley formwork, then reconnects 90 ° of elbow conversion directions upward, it is curved at 90 ° The soft pump line of sufficient length is connected on the connector of head, soft pump line is upwardly into above chassis needle beam and is somebody's turn to do to curving, introducing The middle observation window of side, the then hard short tube of spreading on soft pump line, and hard short tube is temporarily fixed on middle observation window.
In the step 6, self-compacting concrete puts in storage from the middle observation window one side in step 4 and poured, concrete slurry Therefrom observation window side flows to opposite side, and observation template both sides concrete liquid level discrepancy in elevation situation, when both sides, liquid level rises to down During the lower edge of observation window, the door of the lower observation window of both sides is closed;
It is further comprising the steps of in the step 7:
Step a, continue casting concrete, until concrete liquid level is raised above the top edge about 10cm of lower observation window position Put, stop when the template both sides liquid level discrepancy in elevation is no more than 30cm pouring;
Step b, hard short tube is dismantled from the middle observation window in step 4 and leaves soft pump line, by soft pump line with being observed in this Window approaches or corresponding top pouring hole is connected firmly, and closes the door of observation window in both sides.
It is further comprising the steps of in the step 8:
Step c, self-compacting concrete continue to put in storage from top pouring hole to pour, and treat that concreting extremely will be with template top When portion flushes, the anti-floating jack for stretching out upper observation window is removed, the door of observation window in closing, until pouring completion;
Step d, the top pouring hole is closed, removes soft pump line;
Step e, the length of hard pump line is adjusted, so as near the next close or corresponding top pouring hole that marches to Middle observation window, the construction of next construction position in storehouse is carried out, until whole constructing tunnel finishes.
In the step 1, upper observation window and top pouring hole are arranged at intervals in units of the single-chip template of trolley formwork.
In the step 1, the absolute altitude of the lower observation window is equal, and in units of the single-chip template of trolley formwork, In template both sides, space crossings are set, and the absolute altitude of the middle observation window is equal, and using the single-chip template of trolley formwork to be single Position, set in template both sides space crossings, the lower observation window and middle observation window are set in the non-homonymy of same single-chip template.
Hard pump line, 90 ° of elbows and hard short tube in the step 4 are steel pipe, and the soft pump line is rubber tube, steel pipe Between, connected using buckle merogenesis between rubber tube and between steel pipe and rubber tube.
The selection of top pouring hole in the step 4 need to take into account the flow distance of concrete and the length of construction position in storehouse, The selection of the middle observation window need to close on the top pouring hole.
In the step 6, after self-compacting concrete is full of template bottom space, continues one side and pour, template both sides liquid level Synchronous to rise, the opposite side rate of climb can be slightly larger than by pouring the liquid level rate of climb for side of putting in storage, and cause both sides liquid level to occur one The liquid level discrepancy in elevation of the fixed discrepancy in elevation, therefrom observation window observation template both sides, the mode for handling the discrepancy in elevation have:
If the self-compacting concrete mobility is poor, vibrating spear can be used to drain when flowing to opposite side from side;
If the both sides liquid level discrepancy in elevation is larger, hard short tube need to only be taken apart from the middle observation window of the side, and move to opposite side It is interim fixed again on middle observation window, then pour to both sides liquid level and flush.
Compared with prior art the invention has the characteristics that and beneficial effect:
The present invention, which solves the appearance different degrees of in construction of existing three kinds of concrete warehousing modes, influences construction company The problem of continuing property and shaping tunnel quality, first pour from waist side and poured at the top of then directly changing, pour the concrete to put in storage It is to lean on from side to flow to opposite side, smoothly can squeezes away the air of template bottom from opposite side, until trolley formwork bottom Closely knit, good exhaust effect is filled, shaping tunnel floor Concrete Filled is closely knit, avoids the occurrence of dew muscle, delay and a large amount of bubbles Problem.
The concrete that the present invention is put in storage is that the principle for leaning on Gravitative Loads and U-shaped linker is depressed into opposite side from template side, Self-compacting concrete has high fluidity and good clearance through energy, without vibrating, one side pours put in storage after, can quickly to Template opposite side and the flowing of template both ends, are pressed into by force without the pressure by ground pump, therefore pump pressure requires relatively low over the ground, can fit Answer the phenomenon for pouring work, avoiding appearance pump pressure deficiency in casting process in the case of each range pressure of ground pump.The present invention solves Self-compacting concrete is in the wholecircle formwork jumbo casting process, the problem of the applicable Sexual behavior mode of the power of ground pump, on the other hand Also the dew muscle of the concrete of bottom and the phenomenon of delay are effectively prevent, finally improves the construction quality of concrete structure shaping, Improve efficiency of construction.
Concrete drop of the present invention is small not to easily cause concrete disintegration, ensures the presentation quality and entity structure matter of concrete Amount.
It is simple to operate that pipe is changed when pouring hole is changed in casting process of the present invention, without dismounting, is only needed directly by flexible pipe from side Face moves to top pouring hole installation, shortens the engineering time and reduces manpower and materials, substantially increases effect.
Present invention tunnel suitable for the engineering such as subway or water conservancy(Hole)Lining cutting using self-compacting concrete pour once into The construction operation of type structure, especially suitable for tunnel(Hole)Clear height is less than 10m, the freely falling body maximum height of self-compacting concrete For 5m tunnel(Hole).
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the sectional structure chart that observation window is set in embodiment.
Fig. 2 is the three-dimensional structure diagram that top pouring hole and observation window are set in embodiment.
Fig. 3 is that formwork jumbo inner concrete pump line puts in storage the side block diagram of set-up mode.
Fig. 4 is Fig. 3 cross section structure diagram.
Fig. 5 is that unilateral put in storage pours the structural representation of lower concrete.
Fig. 6 be it is unilateral put in storage pour to template under the structural representation closed of observation window.
Fig. 7, which is concrete liquid level, shifts to the structural representation of top pouring hole close to pump line during the door of lower observation window.
Fig. 8 is the structural representation from casting concrete at the top of trolley formwork to waist.
Fig. 9 is structural representation of the concreting to die head.
Reference:Observation window under 1- trolley formworks, 2-, 3- chassis needle beam, 4- top pourings hole, the hard pump lines of 5-, The soft pump lines of 6-, 7-90 ° of elbow, 8- tunnels one serve as a contrast, 9- has constructed, and tunnel two serves as a contrast, 10- self-compacting concretes, 11- are firmly short Observation window, the upper observation windows of 13- in pipe, 12-.
Embodiment
Embodiment serves as a contrast self-compact concrete in construction referring to shown in Fig. 1-9 to pour tunnel two in whole-circle needle beam formwork jumbo Exemplified by provide a kind of construction method for pouring tunnel double-lining self-compacting concrete.The lining of tunnel two is that the lining construction of tunnel one is completed Afterwards, that is constructed on the lining basal plane of tunnel one has certain thickness reinforced concrete lining layer structure.Need to be during the lining construction of tunnel two Tunnel one carries out formwork on the basis of serving as a contrast, and is the formwork side that current circular tunnel generally uses using whole-circle needle beam formwork jumbo formwork Formula, at the same it is difficult in view of circular branch modular space concrete vibrating, poured using the self-compacting concrete of without vibration.
Specific construction step is as follows:
Step 1, observation window and top pouring hole are set on trolley formwork 1:Set in the both sides obliquely downward of trolley formwork 1 Lower observation window 2 is put, the observation window 12 in the both sides waist of trolley formwork 1 is set, observation window is set at the top of trolley formwork 1 13 and top pouring hole 4.
It is shown in Figure 1, in terms of cross section, observation is respectively provided with both sides obliquely downward, waist and the top of trolley formwork 1 Window, size are 450mm × 500mm, configure the door that can be opened and closed, and observation window is mainly used in observing concrete in platform Car template and tunnel one serve as a contrast between mobility status and put in storage for concreting.
It is shown in Figure 2, with 112m(Lap of splice 20cm)Trolley formwork 1 exemplified by, by the wide templates of 1 piece of 1.7m and 7 pieces The wide template compositions of 1.5m, template is respectively 1-8 blocks from left to right.Wherein, the wide template one end of 1.7m serves as a contrast with lined tunnel two Structure overlaps 20cm, and therefore, effective adjoining rock is 12m.
The absolute altitude of the lower observation window 2 is equal, and in units of the single-chip template of trolley formwork, between template both sides Every arranged in a crossed manner, the absolute altitude of the middle observation window 12 is equal, and in units of the single-chip template of trolley formwork, in template two Side space crossings are set, and the lower observation window 2 and middle observation window 12 are set in the non-homonymy of same single-chip template.
In the present embodiment, 8 lower observation windows 2 and 8 middle observation windows are respectively set in trolley formwork both sides obliquely downward and waist 12, top sets 2 observation windows 2.Calculated from the wide template one end of 1.7m, the 1st, 3,5,7 piece of template left side lumbar and right side it is oblique under Side is respectively provided with 1 observation window, and the 2nd, 4,6,8 piece of template left lumbar and left side obliquely downward are respectively provided with 1 observation window.
Upper observation window 13 and top pouring hole 4 are arranged at intervals in units of the single-chip template of trolley formwork.Pour at the top Hole 4 is built at least provided with two, one end of at least one lining of tunnel two of having been constructed positioned at trolley formwork is at least one to be located at chassis mould Plate do not construct tunnel two lining one end, for the longer template of lining cutting close to centre position set one, top is used in the method What is poured is generally lining cutting end and centre position pouring hole.In the present embodiment, the 3rd, 6 piece of die head respectively sets 1 upper sight Examine the 13, the 2nd, 4,7 piece of die head of window and 1 top pouring hole 4, bore dia 100mm are respectively set.
Step 2, open the door of whole observation windows;
Step 3, the placement ground pump in the front of chassis direct of travel, the lining of tunnel one 8;
Step 4, ground pump pump line put in storage:Referring to shown in Fig. 3-4, after the completion of chassis formwork, ground pump is accessed by hard pump line In chassis, and the middle observation window for leading to by soft pump line side puts in storage.Picked out using hard pump line 5 from ground pump discharge, the hard edge of pump line 5 The bottom laying of the lining of tunnel one 8 is extended near trolley formwork 1, horizontal after 90 ° of elbows 7 conversion elevation of two hard pump lines Inside into chassis needle beam 3 and extend close to or corresponding trolley formwork constructed the lining of tunnel two one end top pouring hole 4 Position, then reconnect 90 ° of conversion directions of elbow 7 upward, the soft of sufficient length is connected on the connector of 90 ° of elbows 7 Pump line 6, soft pump line be upwardly into the top of chassis needle beam 3 and to curving, be introduced into the middle observation window 12 of the side, then in soft pump line The hard short tube 11 of spreading on 6, and hard short tube 11 is temporarily fixed on middle observation window 12.
In this example, hard 5,90 ° of elbows 7 of pump line and hard short tube 11 are steel pipe, and the soft pump line is rubber tube, steel pipe it Between, connected using buckle merogenesis between rubber tube and between steel pipe and rubber tube.The selection of top pouring hole 4 need to take into account mixed The flow distance of soil and the length of construction position in storehouse are coagulated, the selection of the middle observation window 12 need to close on the top pouring hole 4.
Step 5, after pump line installation, open ground switch pump and pour self-compacting concrete to pumping on the outside of trolley formwork;
Step 6, template lower concrete pour:Self-compacting concrete puts in storage from the one side of middle observation window 12 in step 4 Pouring, therefrom the side of observation window 12 flows to opposite side to concrete slurry, observes template both sides concrete liquid level discrepancy in elevation situation, when When both sides liquid level rises to the lower edge of lower observation window 2, the door of the lower observation window 2 of both sides is closed.
After self-compacting concrete is full of template bottom space, continues one side and pour, template both sides liquid level synchronously rises, and pours The liquid level rate of climb of side of putting in storage can be slightly larger than the opposite side rate of climb, cause both sides liquid level certain discrepancy in elevation occur, therefrom Observation window 12 observes the liquid level discrepancy in elevation of template both sides, and the mode for handling the discrepancy in elevation has:
If the self-compacting concrete mobility is poor, vibrating spear can be used to drain when flowing to opposite side from side;
If the both sides liquid level discrepancy in elevation is larger, hard short tube 11 need to only be taken apart from the middle observation window 12 of the side, and move to another It is interim fixed again on observation window 12 in side, then pour to both sides liquid level and flush.
Step 7, change pipe:Continue casting concrete, until concrete liquid level is raised above the top edge of lower observation window 2 about Stop pouring when 10cm position, the template both sides liquid level discrepancy in elevation are no more than 30cm;By hard short tube 11 from middle in step 4 Dismounting leaves soft pump line 6 on window 12, and soft pump line is approached with observation window in this 12 or corresponding top pouring hole 4 is connected firmly, And close the door of observation window 12 in both sides.
Step 8, self-compacting concrete continue to put in storage from top pouring hole 4 to pour, and treat that concreting extremely will be with mould When being flushed at the top of plate, the anti-floating jack for stretching out upper observation window 13 is removed, the door of observation window 13 in closing, until having poured Into;
The top pouring hole 4 is closed, removes soft pump line 6;
The length of hard pump line 5 is adjusted, so as to the middle sight near the next close or corresponding top pouring hole that marches to Window 12 is examined, the construction of next construction position in storehouse is carried out, until whole constructing tunnel finishes.
It should be understood that the embodiment described in description above is merely to illustrate the present invention rather than limitation originally The scope of invention.After the present invention has been read, modification of the those skilled in the art to the various equivalents of the present invention falls In the application appended claims limited range.

Claims (6)

1. a kind of construction method for pouring tunnel double-lining self-compacting concrete, it is characterised in that construction procedure is as follows:
Step 1, in trolley formwork(1)Upper setting observation window and top pouring hole;
In trolley formwork(1)Both sides obliquely downward lower observation window is set(2), in trolley formwork(1)Both sides waists set in see Examine window(12), in trolley formwork(1)Top upper observation window is set(13)With top pouring hole(4), all observation windows are equipped with Retractable door, the top pouring hole(4)It is at least one to be served as a contrast positioned at trolley formwork tunnel two of having constructed at least provided with two One end, it is at least one positioned at trolley formwork do not construct tunnel two lining one end;
Step 2, open the door of whole observation windows;
Step 3, served as a contrast in the front of chassis direct of travel, tunnel one(8)Interior placement ground pump;
Step 4, ground pump pump line put in storage:After the completion of chassis formwork, ground pump is accessed in chassis by hard pump line, and pass through soft pump The middle observation window that pipe leads to side puts in storage;
Step 5, after pump line installation, open ground switch pump and pour self-compacting concrete to pumping on the outside of trolley formwork;
Step 6, template lower concrete pour:The one side concrete poured that puts in storage flows to opposite side from side, until lower sight Examine window(2)Door close;
Self-compacting concrete is from the middle observation window in step 4(12)One side, which is put in storage, to be poured, concrete slurry therefrom observation window(12) Side flows to opposite side, and observation template both sides concrete liquid level discrepancy in elevation situation, when both sides, liquid level rises to lower observation window(2)'s During lower edge, the lower observation window of both sides is closed(2)Door;
Step 7, change pipe:Continue casting concrete, therefrom observation window removes by soft pump line, and the top closed on observation window in this Portion's pouring hole(4)Connection, observation window in closing(12)Door continue to pour;
In the step 7, comprise the following steps:
Step a, continue casting concrete, until concrete liquid level is raised above lower observation window(2)Top edge about 10cm position Put, stop when the template both sides liquid level discrepancy in elevation is no more than 30cm pouring;
Step b, by hard short tube(11)From the middle observation window in step 4(12)Upper dismounting leaves soft pump line(6), by soft pump line with Observation window in this(12)Close or corresponding top pouring hole(4)It is connected firmly, and closes observation window in both sides(12)Door;
Step 8, when concrete liquid level is close to upper observation window(13)When, observation window in closing(13)Until pouring completion;
In the step 8, comprise the following steps:
Step c, self-compacting concrete continue from top pouring hole(4)Put in storage and pour, treat that concreting extremely will be with template top When portion flushes, upper observation window will be stretched out(13)Anti-floating jack remove, observation window in closing(13)Door, until poured Into;
Step d, close the top pouring hole(4), remove soft pump line(6);
Step e, adjust hard pump line(5)Length, so as near the next close or corresponding top pouring hole that marches to Middle observation window(12), the construction of next construction position in storehouse is carried out, until whole constructing tunnel finishes.
2. the construction method according to claim 1 for pouring tunnel double-lining self-compacting concrete, it is characterised in that:The step In rapid four, hard pump line is used(5)From ground, pump discharge picks out, hard pump line(5)Served as a contrast along tunnel one(8)Bottom laying extend to chassis Template(1)Near, by 90 ° of elbows of two hard pump lines(7)Chassis needle beam is horizontally entered into after conversion elevation(3)Simultaneously prolong inside Extend the top pouring hole of close or corresponding trolley formwork(4)Position, then reconnect 90 ° of elbows(7)Conversion direction court On, in 90 ° of elbows(7)Connector on connect sufficient length soft pump line(6), soft pump line is upwardly into chassis needle beam(3)Top And to curving, be introduced into the middle observation window of the side(12), then in soft pump line(6)The upper hard short tube of spreading(11), and will be hard short Pipe(11)It is temporarily fixed on middle observation window(12)On.
3. the construction method according to claim 1 for pouring tunnel double-lining self-compacting concrete, it is characterised in that:The step In rapid one, upper observation window(13)With top pouring hole(4)It is arranged at intervals in units of the single-chip template of trolley formwork;The lower sight Examine window(2)Absolute altitude it is equal, and in units of the single-chip template of trolley formwork, template both sides space crossings set, institute State middle observation window(12)Absolute altitude it is equal, and in units of the single-chip template of trolley formwork, in template both sides space crossings Set, the lower observation window(2)With middle observation window(12)Set in the non-homonymy of same single-chip template.
4. the construction method according to claim 2 for pouring tunnel double-lining self-compacting concrete, it is characterised in that:The step Hard pump line in rapid four(5), 90 ° of elbows(7)With hard short tube(11)It is steel pipe, the soft pump line is rubber tube, between steel pipe, Connected between rubber tube and between steel pipe and rubber tube using buckle merogenesis.
5. the construction method for pouring tunnel double-lining self-compacting concrete according to claim 2 or 4, it is characterised in that:Institute State the top pouring hole in step 4(4)Selection need to take into account concrete flow distance and construction position in storehouse length, in described Observation window(12)Selection need to close on the top pouring hole(4).
6. the construction method according to claim 2 for pouring tunnel double-lining self-compacting concrete, it is characterised in that:The step In rapid six, after self-compacting concrete is full of template bottom space, continues one side and pour, template both sides liquid level synchronously rises, and pours The liquid level rate of climb of side of putting in storage can be slightly larger than the opposite side rate of climb, cause both sides liquid level certain discrepancy in elevation occur, therefrom Observation window(12)The liquid level discrepancy in elevation of template both sides is observed, the mode for handling the discrepancy in elevation has:
If the self-compacting concrete mobility is poor, vibrating spear can be used to drain when flowing to opposite side from side;
, only need to be by hard short tube if the both sides liquid level discrepancy in elevation is larger(11)Middle observation window from the side(12)On take apart, and move to another Observation window in side(12)On it is interim fixed again, then pour to both sides liquid level and flush.
CN201610346501.4A 2016-05-24 2016-05-24 A kind of construction method for pouring tunnel double-lining self-compacting concrete Expired - Fee Related CN105927249B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610346501.4A CN105927249B (en) 2016-05-24 2016-05-24 A kind of construction method for pouring tunnel double-lining self-compacting concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610346501.4A CN105927249B (en) 2016-05-24 2016-05-24 A kind of construction method for pouring tunnel double-lining self-compacting concrete

Publications (2)

Publication Number Publication Date
CN105927249A CN105927249A (en) 2016-09-07
CN105927249B true CN105927249B (en) 2018-03-20

Family

ID=56841576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610346501.4A Expired - Fee Related CN105927249B (en) 2016-05-24 2016-05-24 A kind of construction method for pouring tunnel double-lining self-compacting concrete

Country Status (1)

Country Link
CN (1) CN105927249B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499408B (en) * 2016-11-02 2019-04-30 北京翔鲲水务建设有限公司 Wholecircle full section of tunnel one-pass molding self-compacting concrete pouring construction method
CN106968698B (en) * 2017-04-13 2019-07-30 中煤能源研究院有限责任公司 Gob side entry retaining pours the template hydraulic support and its application method of pier stud by lane
CN107060830A (en) * 2017-06-09 2017-08-18 中铁十七局集团第五工程有限公司 Single-track tunnel secondary lining concrete pours device and its construction method by window
CN109236324A (en) * 2018-08-01 2019-01-18 中铁十九局集团第二工程有限公司 A kind of lining trolley injected hole improved method
CN110735651B (en) * 2019-09-11 2022-01-28 北京清河水利建设集团有限公司 Self-compacting concrete pouring construction method for through-hole pipe
CN110939463B (en) * 2019-11-21 2023-07-18 中铁隧道局集团有限公司 Movable full-section integral steel mould lining trolley and application thereof in pumping pouring of secondary lining concrete
CN111236975A (en) * 2020-01-19 2020-06-05 中铁三局集团有限公司 Large-section tunnel secondary lining separated-bin pouring construction equipment and construction method
CN117069424B (en) * 2023-07-03 2024-06-11 广东粤海珠三角供水有限公司 Prestressed lining concrete and preparation method and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04176998A (en) * 1990-11-09 1992-06-24 Fudo Constr Co Ltd Quality control method for tunnel lining using cast-in-place concrete
CN2921281Y (en) * 2006-05-17 2007-07-11 孟平 Byoyancy self-balancing tunnel two-lining concrete shuttering trolley
CN101614124B (en) * 2008-06-27 2011-12-07 中铁隧道集团有限公司 Method for synchronic construction of tunnelling of open-type hard rock tunnel boring machine and secondary lining
CN103867214A (en) * 2013-11-21 2014-06-18 上海市基础工程集团有限公司 Construction method for carrying out secondary lining and casting in shielded tunnel
CN104763443A (en) * 2015-01-22 2015-07-08 张进军 Full-circle tunnel shoring system
CN104895587B (en) * 2015-05-28 2017-01-11 广西建工集团第五建筑工程有限责任公司 Construction method for pressure pouring of concrete for tunnel secondary lining

Also Published As

Publication number Publication date
CN105927249A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN105927249B (en) A kind of construction method for pouring tunnel double-lining self-compacting concrete
CN107435544A (en) A kind of construction method of one-tunnel two-tracks composite lining shield tunnel internal structure
CN105019326A (en) Roadbed structure applied to road widening and construction method
CN103244130A (en) Quick excavation and expanding construction method of herringbone tunnel section
CN105134009B (en) Sill coping concrete structure of frame structure infilled wall and construction method
CN206616585U (en) Prefabricated formula utility tunnel of split component
CN110761808A (en) Large-section loess tunnel supporting system and supporting construction method
CN107974942B (en) A kind of abrupt slope side rigid frame-continuous girder end bay construction method
CN106014456A (en) Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN207177929U (en) Arc adhesion type two serves as a contrast concrete and pours elephant trunk by window
CN106979021A (en) Large-section loess tunnel is excavated and preliminary bracing quick closure looping technique
CN108086353A (en) Hollow wall plate mixed prefabricated assembly type comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof
CN110485218A (en) It is a kind of to help wide construction method for railway bed
CN204783052U (en) Tunnel platform truck lining cutting slant chute multiwindow is feeding device simultaneously
CN104790381B (en) Lining wall concrete pouring inversing method based on UEA micro-expanding agent
CN106087671A (en) A kind of concreting template
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN113803092B (en) Supporting device and method for broken soft rock roadway based on steel pipe concrete support
CN109235419A (en) Ke Xunhuanliyong steel diaphram wall unit and its construction method
CN109750832A (en) A kind of construction method of constructional column concrete self-compaction
CN108979663A (en) A kind of main structure of subway station construction method using interim middle spacer post support
CN107448217A (en) A kind of practical tunnel lining trolley vibrating system
CN207582763U (en) Two-way close spelling laminated floor slab connecting joint structure with groove type embedded part
CN206070541U (en) Upper-soft lower-hard ground Metro station excavation support system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180320

Termination date: 20200524