CN105530794B - Wire arranging frame - Google Patents
Wire arranging frame Download PDFInfo
- Publication number
- CN105530794B CN105530794B CN201410507490.4A CN201410507490A CN105530794B CN 105530794 B CN105530794 B CN 105530794B CN 201410507490 A CN201410507490 A CN 201410507490A CN 105530794 B CN105530794 B CN 105530794B
- Authority
- CN
- China
- Prior art keywords
- cable management
- support
- rail
- arm
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 305
- 230000000903 blocking effect Effects 0.000 claims description 11
- 238000003780 insertion Methods 0.000 claims description 11
- 230000037431 insertion Effects 0.000 claims description 11
- 238000010586 diagram Methods 0.000 description 15
- 238000009434 installation Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Drawers Of Furniture (AREA)
- Installation Of Indoor Wiring (AREA)
Abstract
本发明有关一种理线架,适用于整理电子设备的机箱的二个区域的线缆。该理线架包含一第一理线机构、一第一支撑机构、一第二理线机构、及一第二支撑机构。该第一理线机构用以整理该机箱的其中一区域的线缆,该第一理线机构包含一支撑架;该第一支撑机构用以支撑该第一理线机构,该第一支撑机构包含一扣件;该第二理线机构用以整理该机箱的另一区域的线缆,该第二理线机构包含一支撑架可释放地安装至该第一支撑机构的扣件,该第二支撑机构用以支撑该第二理线机构,该第二支撑机构包含一扣件可释放地安装至该第一理线机构的支撑架。
The present invention relates to a cable management rack, which is suitable for organizing cables in two areas of a chassis of an electronic device. The cable management rack includes a first cable management mechanism, a first support mechanism, a second cable management mechanism, and a second support mechanism. The first cable management mechanism is used to organize cables in one area of the chassis, and the first cable management mechanism includes a support frame; the first support mechanism is used to support the first cable management mechanism, and the first support mechanism includes a fastener; the second cable management mechanism is used to organize cables in another area of the chassis, and the second cable management mechanism includes a fastener that can be releasably mounted on the support frame of the first support mechanism, and the second support mechanism is used to support the second cable management mechanism, and the second support mechanism includes a fastener that can be releasably mounted on the support frame of the first cable management mechanism.
Description
技术领域technical field
本发明涉及一种理线架,特别是指一种用于服务器机箱,且能够用于服务器机箱的至少二个不同区域的理线架。The invention relates to a cable management frame, in particular to a cable management frame which is used in a server cabinet and can be used in at least two different areas of the server cabinet.
背景技术Background technique
随着信息科技与通讯产业的蓬勃发展,服务器系统的需求也随之增加。其中,服务器系统中包含一服务器是用来储存大量的电子信息。一般而言,该服务器的机箱(chassis)的对应两侧分别藉助一滑轨总成而被安装在机架(rack)的机柱。该机箱是用以保护该服务器的相关电子装置或零件。其中,这些电子装置或零件通常具有线缆(cable),以维持服务器的正常运作。因此,为了满足线缆的理线需求,通常于服务器系统中会包含有一理线架(Cable Management Arm,CMA)供该线缆置放。With the vigorous development of information technology and communication industry, the demand for server system is also increasing. Wherein, the server system includes a server for storing a large amount of electronic information. Generally speaking, the corresponding two sides of the chassis of the server are respectively installed on the machine column of the rack by means of a slide rail assembly. The chassis is used to protect related electronic devices or parts of the server. Wherein, these electronic devices or components usually have cables to maintain the normal operation of the server. Therefore, in order to meet the cable management requirements, a cable management arm (CMA) is usually included in the server system for placing the cables.
如美国专利公告号US 7,554,819B2案的说明书揭露一种理线架,该理线架是用于一般的服务器的机箱。该理线架包含一线架主体(1)、一支撑架(2)、二滑动件(3,4)、及二组接件(5,6)、及一插接座(7)。该理线架的线架主体(1)的前理线臂(11)与后理线臂(12)能够用以供服务器的线缆置放(例如,线缆能够被穿过且置放在每一理线臂的线座(15)内)。于此,将该前案并入本文以供参考。For example, the specification of US Patent Publication No. US 7,554,819B2 discloses a cable management frame, which is used for a general server chassis. The wire management frame includes a frame main body (1), a support frame (2), two sliding parts (3, 4), two assembly parts (5, 6), and a socket (7). The front cable management arm (11) and the rear cable management arm (12) of the cable frame main body (1) of the cable management frame can be used for the cables of the server to be placed (for example, the cables can be passed through and placed on the inside the cable holder (15) of each cable management arm). This prior application is hereby incorporated by reference.
然而,在某些特定的需求下,有些具有大型体积的服务器的机箱通常会被设计成上、下两层的结构,以分成不同的工作区,这也意味着位于该机箱的上层的线缆与位于该机箱的下层的线缆,必须要有经过特殊设计的理线架,才能满足此上、下两层的理线需求。因此,开发一种能够同时供机箱的不同区域的线缆置放,且能够快速地被安装或拆卸的理线架成为一项重要的议题。However, under certain specific requirements, some server cabinets with large volumes are usually designed with upper and lower layers to divide them into different work areas, which also means that cables located on the upper layer of the cabinet For the cables located on the lower layer of the chassis, a specially designed cable management frame is required to meet the cable management requirements of the upper and lower layers. Therefore, it has become an important issue to develop a cable management frame that can be used to place cables in different areas of the chassis at the same time and that can be quickly installed or removed.
发明内容Contents of the invention
本发明的目的在于提供一种能够用于服务器机箱的至少二个不同区域的理线架。It is an object of the present invention to provide a cable management rack that can be used in at least two different areas of a server cabinet.
根据本发明一方面的理线架,适用于一机箱,该机箱包含一上层区域与一下层区域,该机箱的相对两侧各自藉助一第一滑轨总成与一第二滑轨总成而被安装至一机架,该每一滑轨总成包含一固定轨与一活动轨可纵向地相对该固定轨活动位移,该机箱的两侧各自安装至对应的该每一滑轨总成的活动轨,该理线架包含一第一理线机构,包含一第一理线臂;一第二理线臂活动地连接该第一理线臂,该第一理线臂与该第二理线臂的位置是大致对应于该机箱的上层区域;一第一连接装置活动地连接该第一理线臂,该第一连接装置包含一第一连接段、一第二连接段、及一通道,该通道位于该第一连接段,该第一连接装置可释放地安装至该第一滑轨总成的固定轨;一支撑架连接在该第二连接段;一第二连接装置活动地连接该第二理线臂,该第二连接装置可释放地安装至该机箱;一第一支撑机构,包含一第一支撑轨用以支撑该第一理线机构的第一理线臂与第二理线臂的其中之一;一第二支撑轨可伸缩地连接该第一支撑轨;一活动件连接该第一支撑轨,该活动件活动地安装至该第一理线机构的第一连接装置的通道;一扣件连接该第二支撑轨;一第二理线机构,包含一第一理线臂;一第二理线臂活动地连接该第一理线臂,该第一理线臂与该第二理线臂的位置是大致对应于该机箱的下层区域;一第一连接装置活动地连接该第一理线臂,该第一连接装置包含一延伸部,其中该第一连接装置的第一连接段可释放地安装至该第二滑轨总成的固定轨;一支撑架连接在该延伸部,该支撑架可释放地连接至该第一支撑机构的扣件;一第二连接装置活动地连接该第二理线臂,该第二连接装置可释放地安装至该机箱;一第二支撑机构,包含一第一支撑轨,用以支撑该第一理线臂与第二理线臂的其中之一;一第二支撑轨可伸缩地连接该第一支撑轨;一活动件连接该第一支撑轨,该活动件活动地安装至该第二理线机构的第一连接装置;以及一扣件连接该第二支撑轨,该扣件可释放地安装至该第一理线机构的支撑架。A cable management rack according to one aspect of the present invention is suitable for use in a cabinet comprising an upper region and a lower region, the opposite sides of the cabinet are respectively connected by a first slide rail assembly and a second slide rail assembly To be mounted to a rack, each slide rail assembly includes a fixed rail and a movable rail that can be moved longitudinally relative to the fixed rail, and the two sides of the chassis are mounted to the corresponding sides of each slide rail assembly The movable rail, the cable management frame includes a first cable management mechanism, including a first cable management arm; a second cable management arm is movably connected to the first cable management arm, and the first cable management arm is connected to the second cable management arm. The position of the wire arm is approximately corresponding to the upper area of the chassis; a first connection device is movably connected to the first wire management arm, and the first connection device includes a first connection section, a second connection section, and a channel , the channel is located at the first connection section, the first connection device is releasably mounted to the fixed rail of the first slide rail assembly; a support frame is connected to the second connection section; a second connection device is movably connected The second cable management arm, the second connecting device is releasably installed to the chassis; a first support mechanism includes a first support rail for supporting the first cable management arm and the second cable management arm of the first cable management mechanism One of the cable management arms; a second support rail is telescopically connected to the first support rail; a movable part is connected to the first support rail, and the movable part is movably installed to the first connection of the first cable management mechanism The channel of the device; a fastener is connected to the second support rail; a second cable management mechanism includes a first cable management arm; a second cable management arm is movably connected to the first cable management arm, and the first cable management arm The position of the arm and the second cable management arm is roughly corresponding to the lower area of the chassis; a first connection device is movably connected to the first cable management arm, and the first connection device includes an extension, wherein the first connection The first connection section of the device is releasably mounted to the fixed rail of the second slide rail assembly; a support frame is connected to the extension, and the support frame is releasably connected to the fastener of the first support mechanism; Two connection devices are movably connected to the second cable management arm, and the second connection device is releasably installed to the chassis; a second support mechanism includes a first support rail for supporting the first cable management arm and the second cable management arm. One of the two wire management arms; a second support rail is telescopically connected to the first support rail; a movable part is connected to the first support rail, and the movable part is movably installed to the first of the second wire management mechanism. a connection device; and a fastener connected to the second support rail, the fastener releasably installed on the support frame of the first cable management mechanism.
附图说明Description of drawings
为进一步说明证实本发明的上述目的、结构特点和效果,以下将结合附图对本发明进行详细的描述,其中:To further illustrate and confirm the above-mentioned purpose, structural features and effects of the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
图1显示本发明一实施例理线架适用于机箱的不同区域的示意图。FIG. 1 shows a schematic diagram of a cable management rack applicable to different areas of a cabinet according to an embodiment of the present invention.
图2显示本发明一实施例理线架运用于机箱与滑轨总成的分解示意图。FIG. 2 shows an exploded view of the cable management rack applied to the chassis and slide rail assembly according to an embodiment of the present invention.
图3显示本发明一实施例理线架的第一理线机构的理线臂的分解图。Fig. 3 shows an exploded view of the cable management arm of the first cable management mechanism of the cable management frame according to an embodiment of the present invention.
图4显示本发明一实施例理线架的第一理线机构的立体图。Fig. 4 shows a perspective view of a first cable management mechanism of the cable management frame according to an embodiment of the present invention.
图5显示本发明一实施例理线架的第一理线机构的第一连接装置与支撑架的分解图。FIG. 5 shows an exploded view of the first connection device and the supporting frame of the first cable management mechanism of the cable management frame according to an embodiment of the present invention.
图5A显示图5的第一理线机构的局部图,用以显示第一理线机构的支撑架。FIG. 5A shows a partial view of the first cable management mechanism of FIG. 5 , showing the supporting frame of the first cable management mechanism.
图6显示本发明一实施例理线架的第一理线机构的第二连接装置的分解示意图。FIG. 6 is an exploded schematic diagram of the second connection device of the first cable management mechanism of the cable management frame according to an embodiment of the present invention.
图7显示本发明一实施例理线架的第一支撑机构的分解图。Fig. 7 shows an exploded view of the first supporting mechanism of the cable management frame according to an embodiment of the present invention.
图8显示本发明一实施例理线架的第一支撑机构的立体图。Fig. 8 shows a perspective view of the first supporting mechanism of the cable management frame according to an embodiment of the present invention.
图9显示本发明一实施例理线架的第一理线机构与第一支撑机构的分解示意图,其中第一理线机构的第二连接装置能够被可释放地安装至第一底座,且第一理线机构的第一连接装置与第一支撑机构的活动件能够一起被可释放地安装至第一滑轨总成。Fig. 9 shows an exploded schematic diagram of the first cable management mechanism and the first support mechanism of the cable management frame according to an embodiment of the present invention, wherein the second connecting device of the first cable management mechanism can be releasably installed on the first base, and the second A first connecting device of a cable management mechanism and a movable member of a first supporting mechanism can be releasably mounted to the first slide rail assembly.
图10显示本发明一实施例理线架的第一理线机构的第一连接装置与第一支撑机构的活动件能够一起被可释放地安装至第一滑轨总成的局部示意图。Fig. 10 shows a partial schematic diagram of the first connecting device of the first cable management mechanism of the cable management frame and the movable part of the first support mechanism can be releasably installed on the first slide rail assembly together according to an embodiment of the present invention.
图11显示本发明一实施例理线架的第一理线机构的第一连接装置与第一支撑机构的活动件一起被安装至第一滑轨总成的局部立体图。Fig. 11 shows a partial perspective view of the first connecting device of the first cable management mechanism of the cable management frame and the movable part of the first support mechanism being installed on the first slide rail assembly according to an embodiment of the present invention.
图12显示本发明一实施例理线架的第一理线机构的第二连接装置与第一底座的分解图。Fig. 12 shows an exploded view of the second connection device and the first base of the first cable management mechanism of the cable management frame according to an embodiment of the present invention.
图13显示本发明一实施例理线架的第一理线机构的第二连接装置与第一底座的组合立体图。Fig. 13 shows a combined perspective view of the second connection device and the first base of the first cable management mechanism of the cable management frame according to an embodiment of the present invention.
图14显示本发明一实施例理线架的第一理线机构的第二连接装置被安装至第一底座,以及第一理线机构的第一连接装置与第一支撑机构的活动件一起被安装至第一滑轨总成的组合立体图。Figure 14 shows that the second connecting device of the first cable management mechanism of the cable management frame according to an embodiment of the present invention is installed on the first base, and the first connecting device of the first cable management mechanism is fixed together with the movable part of the first support mechanism The combined perspective view of the installation to the first slide rail assembly.
图15显示本发明一实施例理线架的第二理线机构的立体图。Fig. 15 shows a perspective view of a second cable management mechanism of the cable management frame according to an embodiment of the present invention.
图16显示本发明一实施例理线架的第二支撑机构的立体图。Fig. 16 shows a perspective view of the second supporting mechanism of the cable management frame according to an embodiment of the present invention.
图17显示本发明一实施例理线架随着机箱被拉出机架外而处于展开状态的立体示意图。FIG. 17 shows a schematic perspective view of the cable management frame in an unfolded state as the chassis is pulled out of the rack according to an embodiment of the present invention.
图18A显示本发明一实施例理线架的理线机构的第一连接装置与滑轨总成的固定轨的组装操作图(一)。FIG. 18A shows an assembly operation diagram (1) of the first connecting device of the cable management mechanism of the cable management frame and the fixed rail of the slide rail assembly according to an embodiment of the present invention.
图18B显示本发明一实施例理线架的理线机构的第一连接装置与滑轨总成的固定轨的组装操作图(二)。FIG. 18B shows an assembly operation drawing (2) of the first connecting device of the cable management mechanism of the cable management frame and the fixed rail of the slide rail assembly according to an embodiment of the present invention.
图18C显示本发明一实施例理线架的理线机构的第一连接装置与滑轨总成的固定轨的组装操作图(三)。FIG. 18C shows an assembly operation diagram (3) of the first connecting device of the cable management mechanism of the cable management frame and the fixed rail of the slide rail assembly according to an embodiment of the present invention.
图19A显示本发明一实施例理线架的理线机构的第二连接装置与底座的组装操作图(一)。FIG. 19A shows an assembly operation diagram (1) of the second connection device and the base of the cable management mechanism of the cable management frame according to an embodiment of the present invention.
图19B显示本发明一实施例理线架的理线机构的第二连接装置与底座的组装操作图(二)。FIG. 19B shows an assembly operation diagram (2) of the second connection device and the base of the cable management mechanism of the cable management frame according to an embodiment of the present invention.
图19C显示本发明一实施例理线架的理线机构的第二连接装置与底座的组装操作图(三)。FIG. 19C shows an assembly operation diagram (3) of the second connection device and the base of the cable management mechanism of the cable management frame according to an embodiment of the present invention.
图20A显示本发明一实施例理线架的支撑机构的扣件与理线机构的支撑架的组装操作图(一)。FIG. 20A shows an assembly operation diagram (1) of the fastener of the support mechanism of the cable management frame and the support frame of the cable management mechanism according to an embodiment of the present invention.
图20B显示本发明一实施例理线架的支撑机构的扣件与理线机构的支撑架的组装操作图(二)。FIG. 20B shows an assembly operation diagram (2) of the fastener of the support mechanism of the cable management frame and the support frame of the cable management mechanism according to an embodiment of the present invention.
图20C显示本发明一实施例理线架的支撑机构的扣件与理线机构的支撑架的组装操作图(三)。FIG. 20C shows an assembly operation diagram (3) of the fastener of the support mechanism of the cable management frame and the support frame of the cable management mechanism according to an embodiment of the present invention.
图21显示本发明一实施例理线架运用于被安装至机架的机箱的动作示意图,用以显示理线架处于收合状态。FIG. 21 shows a schematic diagram of the operation of the cable management rack applied to the chassis installed in the rack according to an embodiment of the present invention, which is used to show that the cable management rack is in a retracted state.
图22显示本发明一实施例理线架运用于被安装至机架的机箱的动作示意图,用以显示理线架从收合状态逐渐成为展开状态。FIG. 22 shows a schematic diagram of the operation of the cable management rack applied to the chassis installed in the rack according to an embodiment of the present invention, which is used to show that the cable management rack gradually changes from the folded state to the unfolded state.
图23显示本发明一实施例理线架运用于被安装至机架的机箱的动作示意图,用以显示理线架处于展开状态。FIG. 23 shows a schematic diagram of the operation of the cable management rack applied to the chassis installed in the rack according to an embodiment of the present invention, which is used to show that the cable management rack is in an unfolded state.
具体实施方式detailed description
图1显示本发明一实施例包括一机架30、一机箱32、一第一滑轨总成34、一第二滑轨总成36及一理线架38。其中,该机架30具有复数个支撑柱40a、40b、40c及40d。该机箱32包含一上层区域42a与一下层区域42b。该第一滑轨总成34是安装在该机箱32的一侧与该机架30的复数个支撑柱40a及40b之间(例如,该机箱32的一侧是安装在该第一滑轨总成34的一活动轨35)。该第二滑轨总成36是安装在该机箱32的另一侧与该机架30的复数个支撑柱40c及40d之间(例如,该机箱32的另一侧是安装在该第二滑轨总成36的一活动轨(未显示))。藉此,该机箱32能够藉助该第一滑轨总成34及第二滑轨总成36易于自该机架30拉出或推入该机架30内。该理线架38是连接在该第一滑轨总成34与该第二滑轨总成36之间,用以整理该机箱32后侧所连接或延伸的线材。FIG. 1 shows an embodiment of the present invention including a frame 30 , a cabinet 32 , a first slide rail assembly 34 , a second slide rail assembly 36 and a cable management frame 38 . Wherein, the rack 30 has a plurality of support columns 40a, 40b, 40c and 40d. The chassis 32 includes an upper area 42a and a lower area 42b. The first slide rail assembly 34 is installed between one side of the cabinet 32 and a plurality of support columns 40a and 40b of the rack 30 (for example, one side of the cabinet 32 is installed on the first slide rail assembly Become a movable rail 35 of 34). The second slide rail assembly 36 is installed between the other side of the cabinet 32 and a plurality of support columns 40c and 40d of the frame 30 (for example, the other side of the cabinet 32 is installed on the second slide a movable rail (not shown) of the rail assembly 36). Thereby, the chassis 32 can be easily pulled out from the rack 30 or pushed into the rack 30 by means of the first slide rail assembly 34 and the second slide rail assembly 36 . The cable management frame 38 is connected between the first slide rail assembly 34 and the second slide rail assembly 36 for organizing the cables connected or extending from the rear of the chassis 32 .
图2显示包括一第一底座44固定地安装在相邻该第一滑轨总成34的机箱32的一侧,以及一第二底座46固定地安装在相邻该第二滑轨总成36的机箱32的另一侧。该理线架38包含一第一理线机构48、一第一支撑机构50、一第二理线机构52及一第二支撑机构54。该第一理线机构48包含一第一理线臂56、一第二理线臂58、一第一连接装置60、一支撑架62、一第二连接装置64、及一滑座66。该第二理线臂58连接该第一理线臂56;该第一连接装置60及该支撑架62连接在该第一理线臂56的一端;该第二连接装置64连接该第二理线臂58;该滑座66连接该第一理线臂56的臂部。其中,该第二连接装置64能够连接至该第一底座44。该第一支撑机构50包含一第一支撑轨68、一第二支撑轨70、一扣件72、及一活动件74。该第二支撑轨70可伸缩地连接该第一支撑轨68;该扣件72连接该第二支撑轨70(例如,该扣件72能够连接在位于相邻该第二支撑轨70的端部);该活动件74连接该第一支撑轨68。其中,前述第一理线机构48的滑座66是可活动地连接该第一支撑机构50的第一支撑轨68且能够在该第一支撑机构50的第一支撑轨68上活动位移,该第一支撑机构50的第一支撑轨68能够支撑该第一理线机构48的第一理线臂56与该第二理线臂58的其中之一(例如,该第一理线机构48的第一理线臂56)。该活动件74是能够先与该第一理线机构48的第一连接装置60组合,之后再一起连接至该第一滑轨总成34。该第二理线机构52包含一第一理线臂76、一第二理线臂78、一第一连接装置80、一支撑架82、一第二连接装置84、及一滑座86。该第二理线臂78连接该第一理线臂76;该第一连接装置80及该支撑架82连接该第一理线臂76的一端;该第二连接装置84连接该第二理线臂78;该滑座86连接该第一理线臂76的臂部。其中,该第二连接装置84能够连接至该第二底座46。该第二支撑机构54包含一第一支撑轨88、一第二支撑轨90、一扣件92、及一活动件94。该第二支撑轨90可伸缩地连接该第一支撑轨88;该扣件92连接该第二支撑轨90(例如,该扣件92能够连接在位于相邻该第二支撑轨90的端部);该活动件94连接该第一支撑轨88。其中,前述第二理线机构52的滑座86是可活动地连接该第二支撑机构54的第一支撑轨88,该第二支撑机构54的第一支撑轨88能够支撑该第二理线机构52的第一理线臂76与该第二理线臂78的其中之一(例如,该第二理线机构52的第一理线臂76)。该活动件94是能够先与该第二理线机构52的第一连接装置80组合,之后再一起连接至该第二滑轨总成36。其中,该第二理线机构52的支撑架82与该第一支撑机构50的扣件72是相互可释放地组装在一起;该第二支撑机构54的扣件92与该第一理线机构48的支撑架62是相互可释放地组装在一起。据此,使该第一理线机构48、该第一支撑机构50与该第二理线机构52、该第二支撑机构54能够被可释放地组装在一起。在一较佳实施例中,该第一理线机构48与该第二理线机构52的结构大致相同,惟,差异大致在于该第一理线机构48的支撑架62是位于邻近该第一理线机构48的第一连接装置60的下方位置,而该第二理线机构52的支撑架82是位于邻近该第二理线机构52的第一连接装置80的上方位置。另一方面,该第一理线机构48的第一连接装置60与该第一支撑机构50的活动件74的组合以及其一起被可释放地安装至第一滑轨总成34的方式,是大致相同于该第二理线机构52的第一连接装置80与该第二支撑机构54的活动件94的组合以及其一起被可释放地安装至第二滑轨总成36的方式。此外,该第一理线机构48的第二连接装置64可释放地安装至该第一底座44的方式,是大致相同于该第二理线机构52的第二连接装置84可释放地安装至该第二底座46的方式。以及该第二支撑机构54的扣件92可释放地安装至该第一理线机构48的支撑架62的方式,是大致相同于该第一支撑机构50的扣件72可释放地安装至该第二理线机构52的支撑架82。2 shows a first base 44 fixedly mounted on one side of the chassis 32 adjacent to the first slide rail assembly 34, and a second base 46 fixedly mounted adjacent to the second slide rail assembly 36 the other side of the chassis 32. The cable management frame 38 includes a first cable management mechanism 48 , a first support mechanism 50 , a second cable management mechanism 52 and a second support mechanism 54 . The first cable management mechanism 48 includes a first cable management arm 56 , a second cable management arm 58 , a first connection device 60 , a support frame 62 , a second connection device 64 , and a sliding seat 66 . The second cable management arm 58 is connected to the first cable management arm 56; the first connection device 60 and the support frame 62 are connected to one end of the first cable management arm 56; the second connection device 64 is connected to the second cable management arm 56; The wire arm 58 ; the sliding seat 66 is connected to the arm portion of the first wire management arm 56 . Wherein, the second connecting device 64 can be connected to the first base 44 . The first support mechanism 50 includes a first support rail 68 , a second support rail 70 , a fastener 72 , and a movable part 74 . The second support rail 70 is telescopically connected to the first support rail 68; ); the movable part 74 is connected to the first support rail 68. Wherein, the slide seat 66 of the aforementioned first wire management mechanism 48 is movably connected to the first support rail 68 of the first support mechanism 50 and can move on the first support rail 68 of the first support mechanism 50. The first support rail 68 of the first support mechanism 50 can support one of the first cable management arm 56 and the second cable management arm 58 of the first cable management mechanism 48 (for example, the first cable management mechanism 48 first cable management arm 56). The movable part 74 can be combined with the first connecting device 60 of the first cable management mechanism 48 first, and then connected to the first sliding rail assembly 34 together. The second cable management mechanism 52 includes a first cable management arm 76 , a second cable management arm 78 , a first connection device 80 , a support frame 82 , a second connection device 84 , and a sliding seat 86 . The second cable management arm 78 is connected to the first cable management arm 76; the first connection device 80 and the support frame 82 are connected to one end of the first cable management arm 76; the second connection device 84 is connected to the second cable management arm arm 78 ; the sliding seat 86 is connected to the arm portion of the first cable management arm 76 . Wherein, the second connection device 84 can be connected to the second base 46 . The second support mechanism 54 includes a first support rail 88 , a second support rail 90 , a fastener 92 , and a movable part 94 . The second support rail 90 is telescopically connected to the first support rail 88; ); the movable part 94 is connected to the first support rail 88. Wherein, the slide seat 86 of the aforementioned second wire management mechanism 52 is movably connected to the first support rail 88 of the second support mechanism 54, and the first support rail 88 of the second support mechanism 54 can support the second wire management. One of the first wire management arm 76 and the second wire management arm 78 of the mechanism 52 (for example, the first wire management arm 76 of the second wire management mechanism 52 ). The movable part 94 can be combined with the first connecting device 80 of the second cable management mechanism 52 first, and then connected to the second slide rail assembly 36 together. Wherein, the support frame 82 of the second wire management mechanism 52 and the fastener 72 of the first support mechanism 50 are releasably assembled together; the fastener 92 of the second support mechanism 54 and the first wire management mechanism The supporting frame 62 of 48 is releasably assembled with each other. Accordingly, the first wire management mechanism 48 , the first support mechanism 50 , the second wire management mechanism 52 , and the second support mechanism 54 can be releasably assembled together. In a preferred embodiment, the structure of the first wire management mechanism 48 is substantially the same as that of the second wire management mechanism 52, but the difference is that the support frame 62 of the first wire management mechanism 48 is located adjacent to the first wire management mechanism. The lower position of the first connecting device 60 of the cable management mechanism 48 , and the support frame 82 of the second cable management mechanism 52 is located adjacent to the upper position of the first connecting device 80 of the second cable management mechanism 52 . On the other hand, the combination of the first connection device 60 of the first cable management mechanism 48 and the movable part 74 of the first support mechanism 50 and the way they are releasably mounted to the first slide rail assembly 34 are It is substantially the same as the combination of the first connection device 80 of the second cable management mechanism 52 and the movable member 94 of the second support mechanism 54 and the manner in which they are releasably mounted to the second slide rail assembly 36 together. In addition, the second connection device 64 of the first cable management mechanism 48 is releasably mounted to the first base 44 in substantially the same manner as the second connection device 84 of the second cable management mechanism 52 is releasably mounted to the base 44. The second base 46 by way of. And the buckle 92 of the second support mechanism 54 is releasably mounted to the support frame 62 of the first wire management mechanism 48 in a manner that is substantially the same as the buckle 72 of the first support mechanism 50 is releasably mounted to the first support mechanism 50. The supporting frame 82 of the second wire management mechanism 52 .
图3与图4分别显示该第一理线机构48的分解示图及其组合立体图。本实施例中,藉助一第一枢纽构造96(hinge structure)连接在该第一理线臂56与该第二理线臂58之间,使该第一理线臂56与该第二理线臂58能相互收合成一靠拢的状态(或从该靠拢的状态展开至一类似V型的延伸状态)。藉助一第二枢纽构造98连接在该第一理线臂56与该第一连接装置60之间,使该第一连接装置60相对该第一理线臂56能够活动的旋转位移。藉助一第一枢接件100连接该滑座66至该第一理线臂56,使该第一理线臂56相对该滑座66能够活动的旋转位移。藉助一第二枢接件102连接该第二连接装置64至该第二理线臂58,使该第二连接装置64相对该第二理线臂58能够活动的旋转位移。每一理线臂56及58具有一线缆支撑特征104,例如设成U形状,用以方便收纳整理线缆。3 and 4 respectively show an exploded view and a combined perspective view of the first cable management mechanism 48 . In this embodiment, by means of a first hinge structure 96 (hinge structure) connected between the first cable management arm 56 and the second cable management arm 58, the first cable management arm 56 and the second cable management arm 56 are connected to each other. The arms 58 are collapsible to each other into a closed position (or unfolded from the closed position to a V-like extended position). A second hinge structure 98 is connected between the first cable management arm 56 and the first connection device 60 , so that the first connection device 60 can move and rotate relative to the first cable management arm 56 . The sliding seat 66 is connected to the first cable management arm 56 by means of a first pivot member 100 , so that the first cable management arm 56 can move relative to the sliding seat 66 to rotate and displace. The second connection device 64 is connected to the second cable management arm 58 by a second pivot member 102 , so that the second connection device 64 can move relative to the second cable management arm 58 to rotate and displace. Each of the cable management arms 56 and 58 has a cable support feature 104 , such as a U-shape, for conveniently storing and organizing cables.
图5显示该第一连接装置60包含一第一连接段106;一第二连接段108自该第一连接段106纵向地延伸;一上墙110a与一下墙110b分别自该第一连接段106的上、下边缘延伸,该上墙110a与该下墙110b的其中之一与该第一连接段106之间共同定义一通道112;一挡部114设置在该第一连接段106与该第二连接段108之间;一第三连接段116自该第二连接段108向上地延伸且高于该上墙110a,该第三连接段116藉助前述第二枢纽构造98而活动地连接该第一理线机构48的该第一理线臂56;一插入部118自该第一连接段106延伸局部超出该通道112外,且该通道112外的插入部118具有至少一卡掣孔120;以及一卡掣件122弹性地连接该插入部118,该卡掣件122包含至少一卡掣部124对应于该插入部118的该至少一卡掣孔120、一释放部126、及一弹力部128位于该至少一卡掣部124与该释放部126之间。详细地说,该卡掣件122是藉助该弹力部128而弹性地连接该插入部118,该至少一卡掣部124回应该弹力部128所提供的弹力而卡掣在该插入部118的该至少一卡掣孔120内。配合如图5A所示,该第一理线机构48的支撑架62是连接且自该第二连接段108横向地延伸,在一实施例中,该支撑架62具有一定位孔130及一安装孔132,该安装孔132与该定位孔130相通;一定位件134弹性地连接该支撑架62,该定位件134能够视为该支撑架62的一部分且具有一阻挡部136对应于该定位孔130与该安装孔132之间。5 shows that the first connecting device 60 includes a first connecting section 106; a second connecting section 108 extends longitudinally from the first connecting section 106; an upper wall 110a and a lower wall 110b respectively extend from the first connecting section 106 The upper and lower edges of the upper wall 110a and the lower wall 110b define a channel 112 between one of the upper wall 110a and the lower wall 110b and the first connecting section 106; Between the two connecting sections 108; a third connecting section 116 extends upwards from the second connecting section 108 and is higher than the upper wall 110a, and the third connecting section 116 is movably connected to the first connecting section 116 by means of the aforementioned second hinge structure 98 The first wire management arm 56 of a wire management mechanism 48; an insertion portion 118 extending from the first connecting section 106 partially beyond the passage 112, and the insertion portion 118 outside the passage 112 has at least one locking hole 120; And a locking member 122 is elastically connected to the insertion portion 118, the locking member 122 includes at least one locking portion 124 corresponding to the at least one locking hole 120 of the insertion portion 118, a release portion 126, and an elastic portion 128 is located between the at least one engaging portion 124 and the releasing portion 126 . In detail, the locking part 122 is elastically connected to the insertion part 118 by means of the elastic part 128, and the at least one locking part 124 responds to the elastic force provided by the elastic part 128 and is locked on the insertion part 118. Inside at least one locking hole 120 . As shown in FIG. 5A, the support frame 62 of the first cable management mechanism 48 is connected and extends laterally from the second connection section 108. In one embodiment, the support frame 62 has a positioning hole 130 and a mounting Hole 132, the installation hole 132 communicates with the positioning hole 130; a positioning piece 134 elastically connects the support frame 62, the positioning piece 134 can be regarded as a part of the support frame 62 and has a blocking portion 136 corresponding to the positioning hole 130 and the mounting hole 132.
图6显示该第二连接装置64包含一连接件138、及一卡掣件140,该卡掣件140弹性地连接该连接件138,其中,该连接件138具有一插入部142及一卡掣孔144,该卡掣件140的配置与前述卡掣件122大致相同,包含至少一卡掣部146、一释放部148、及一弹力部150。该至少一卡掣部146对应于该连接件138的卡掣孔144;该弹力部150位于该卡掣部146与该释放部148之间。Figure 6 shows that the second connecting device 64 includes a connecting piece 138 and a locking piece 140, the locking piece 140 elastically connects the connecting piece 138, wherein the connecting piece 138 has an insertion portion 142 and a locking piece The hole 144 has substantially the same configuration as the aforementioned engaging member 122 , and includes at least one engaging portion 146 , one releasing portion 148 , and one elastic portion 150 . The at least one locking portion 146 corresponds to the locking hole 144 of the connecting member 138 ; the elastic portion 150 is located between the locking portion 146 and the releasing portion 148 .
图7及图8分别显示该第一支撑机构50的分解示意图及其立体组合示意图,还包括一枢纽构造152及一摆臂154,其中,该枢纽构造152连接在该第一支撑轨68与该摆臂154之间,且该摆臂154连接在该枢纽构造152与该活动件74之间,使该活动件74相对该第一支撑轨68能够活动的旋转位移。详细地说,该摆臂154具有一卡掣凸体156、及一对卡槽158。该一对卡槽158位于该卡掣凸体156的两侧。该活动件74是以可挠性材质例如塑料材质成型,其包括一对边墙160及一侧墙162,该侧墙162延伸在该一对边墙160之间。其中,该侧墙162具有一上卡掣特征164、一下卡掣特征166、及一操作部168。组装时,该摆臂154的卡掣凸体156能够与该上卡掣特征164与该下卡掣特征166之一卡掣定位。进一步来说,每一卡掣特征164及166具有一弹性块170及一槽孔172,该槽孔172位于该弹性块170的周缘,以本实施例而言,藉助该卡掣凸体156插入该上卡掣特征164的槽孔172后,利用该卡槽158扺于该活动件74的壁体,以及该弹性块170扺于该卡掣凸体156,使该活动件74与该摆臂154能够相互卡掣定位。因此,该第一支撑机构50是位于高于该活动件74。解掣时,只要按压该弹性块170脱离与该卡掣凸体156之间的扺接,该活动件74即可自该摆臂154上卸下。此外,该扣件72固定地连接在该第一支撑机构50的第二支撑轨70,该扣件72具有一头部176及一身部178,该身部178自该头部176延伸。其中,该头部176的外径尺寸大于该身部178的外径尺寸。7 and 8 respectively show an exploded schematic view and a three-dimensional combined schematic view of the first support mechanism 50, which also includes a hinge structure 152 and a swing arm 154, wherein the hinge structure 152 is connected between the first support rail 68 and the Between the swing arm 154 , and the swing arm 154 is connected between the hinge structure 152 and the movable part 74 , so that the movable part 74 can move relative to the first support rail 68 to rotate and displace. In detail, the swing arm 154 has a locking protrusion 156 and a pair of locking slots 158 . The pair of locking slots 158 are located on two sides of the locking protrusion 156 . The movable part 74 is formed by flexible material such as plastic material, and includes a pair of side walls 160 and a side wall 162 , and the side wall 162 extends between the pair of side walls 160 . Wherein, the side wall 162 has an upper locking feature 164 , a lower locking feature 166 , and an operating portion 168 . When assembled, the locking protrusion 156 of the swing arm 154 can be locked and positioned with one of the upper locking feature 164 and the lower locking feature 166 . Further, each locking feature 164 and 166 has an elastic block 170 and a slot 172, and the slot 172 is located at the periphery of the elastic block 170. In this embodiment, the locking protrusion 156 is inserted into Behind the slot 172 of the upper locking feature 164, the locking groove 158 is used to touch the wall of the movable part 74, and the elastic block 170 is pressed against the locking protrusion 156, so that the movable part 74 and the swing arm 154 can lock each other for positioning. Therefore, the first supporting mechanism 50 is located higher than the movable part 74 . When releasing the latch, as long as the elastic block 170 is pressed to disengage from the contact with the locking protrusion 156, the movable part 74 can be dismounted from the swing arm 154. In addition, the fastener 72 is fixedly connected to the second support rail 70 of the first support mechanism 50 , the fastener 72 has a head 176 and a body 178 , and the body 178 extends from the head 176 . Wherein, the outer diameter of the head 176 is larger than the outer diameter of the body 178 .
图9显示该第一理线机构48的第一连接装置60的第一连接段106与该第一支撑机构50的活动件74是能够一起被安装至该第一滑轨总成34,以及显示该第一理线机构48的第二连接装置64是能够被安装至相邻前述机箱32的一侧的第一底座44。此外,该第一支撑机构50的第一支撑轨68包含一第一部位69a与一第二部位69b。该第一部位69a与该第二部位69b皆具有一限位件(例如第一限位件71a与第二限位件71b),使该第一理线机构48的滑座66在该第一支撑机构50的第一支撑轨68上活动位移时,能够被限位在该些限位件之间。Fig. 9 shows that the first connecting section 106 of the first connecting device 60 of the first cable management mechanism 48 and the movable part 74 of the first support mechanism 50 can be installed to the first slide rail assembly 34 together, and shows The second connection device 64 of the first cable management mechanism 48 is capable of being mounted to the first base 44 adjacent to one side of the aforementioned chassis 32 . In addition, the first support rail 68 of the first support mechanism 50 includes a first portion 69 a and a second portion 69 b. Both the first position 69a and the second position 69b have a limiter (such as the first limiter 71a and the second limiter 71b), so that the slide seat 66 of the first wire management mechanism 48 is positioned on the first limiter. When the first support rail 68 of the support mechanism 50 is movable and displaced, it can be limited between these limit pieces.
如图10与图11所示,该第一理线机构48的第一连接装置60与该第一支撑机构50的活动件74是能够一起被安装至该第一滑轨总成34的其中一轨件(例如是一固定轨180)。该固定轨180具有一对连接孔182,最好是,该固定轨180还包含至少一对弯折的固定件184,该一对固定件184定义一槽道186。于组装时,该第一支撑机构50的活动件74能够藉助该一对边墙160先被安装至该第一理线机构48的第一连接装置60的通道112内,然后该第一支撑机构50的活动件74即可扺于该第一连接装置60的挡部114且相对该第一连接装置60与该第一滑轨总成34的固定轨180处于一收合位置。于此状态下,该卡掣件122的至少一卡掣部124是能够对应地卡掣在该固定轨180的该一对连接孔182,且该第一理线机构48的第一连接装置60的插入部118是能够被对应地插入至该第一滑轨总成34的固定轨180的槽道186且被该一对固定件184所阻挡,以提升该第一理线机构48的第一连接装置60安装至该第一滑轨总成34的固定轨180的稳固性,从而令该第一支撑机构50的活动件74能够保持在该第一理线机构48的第一连接装置60内与该第一滑轨总成34的固定轨180内。As shown in FIGS. 10 and 11 , the first connecting device 60 of the first cable management mechanism 48 and the movable part 74 of the first supporting mechanism 50 are one of the components that can be installed on the first slide rail assembly 34 together. rails (such as a fixed rail 180). The fixing rail 180 has a pair of connecting holes 182 . Preferably, the fixing rail 180 further includes at least one pair of bent fixing pieces 184 , and the pair of fixing pieces 184 define a channel 186 . When assembling, the movable part 74 of the first supporting mechanism 50 can be installed in the channel 112 of the first connecting device 60 of the first cable management mechanism 48 first by means of the pair of side walls 160, and then the first supporting mechanism The movable part 74 of 50 can be abutted against the blocking portion 114 of the first connecting device 60 and is in a retracted position relative to the first connecting device 60 and the fixed rail 180 of the first sliding rail assembly 34 . In this state, at least one locking portion 124 of the locking member 122 can be correspondingly locked in the pair of connecting holes 182 of the fixing rail 180 , and the first connecting device 60 of the first cable management mechanism 48 The insertion portion 118 is capable of being correspondingly inserted into the groove 186 of the fixing rail 180 of the first slide rail assembly 34 and blocked by the pair of fixing pieces 184, so as to lift the first cable management mechanism 48 of the first cable management mechanism 48. The connection device 60 is installed to the stability of the fixed rail 180 of the first slide rail assembly 34 , so that the movable part 74 of the first support mechanism 50 can be kept in the first connection device 60 of the first cable management mechanism 48 and the fixed rail 180 of the first slide rail assembly 34 .
如图12与图13所示,前述机箱32的一侧的第一底座44包含一挡部188,最好是,还包含一插口190、及一挡壁192。于组装时,该第一理线机构48的第二连接装置64的卡掣部146是对应地卡掣在该第一底座44的挡部188,且该第一理线机构48的第二连接装置64的插入部142能够被对应地插入至该第一底座44的插口190且被该挡壁192所阻挡,如此能够提升该第一理线机构48的第二连接装置64安装至该第一底座44的稳固性。As shown in FIGS. 12 and 13 , the first base 44 on one side of the chassis 32 includes a blocking portion 188 , and preferably, also includes a socket 190 and a blocking wall 192 . During assembly, the catch portion 146 of the second connection device 64 of the first cable management mechanism 48 is correspondingly locked on the stop portion 188 of the first base 44, and the second connection of the first cable management mechanism 48 The insertion portion 142 of the device 64 can be correspondingly inserted into the socket 190 of the first base 44 and blocked by the blocking wall 192, so that the second connecting device 64 of the first cable management mechanism 48 can be lifted to be installed on the first base 44. The stability of the base 44.
如图14显示该第一理线机构48的第一连接装置60与第二连接装置64已分别安装至该第一滑轨总成34的固定轨180以及该第一底座44。此外,该第二支撑机构54是安装至该第一理线机构48的支撑架62。FIG. 14 shows that the first connecting device 60 and the second connecting device 64 of the first cable management mechanism 48 have been installed on the fixing rail 180 of the first sliding rail assembly 34 and the first base 44 respectively. In addition, the second support mechanism 54 is a support frame 62 installed to the first cable management mechanism 48 .
图15显示该第二理线机构52的立体组合图。该第二理线机构52与前述第一理线机构48的差异大致上在于:该第二理线机构52包含一第一延伸部194连接该第二连接装置84,使该第二连接装置84的高度高于该第二理线机构52的第二理线臂78。以及一第二延伸部196连接该支撑架82,使该支撑架82位于该第二理线机构52的第一连接装置80的上方。FIG. 15 shows a three-dimensional assembled view of the second cable management mechanism 52 . The difference between the second wire management mechanism 52 and the aforementioned first wire management mechanism 48 is generally that: the second wire management mechanism 52 includes a first extension 194 connected to the second connection device 84, so that the second connection device 84 The height is higher than the second wire management arm 78 of the second wire management mechanism 52 . And a second extending portion 196 is connected to the supporting frame 82 , so that the supporting frame 82 is located above the first connecting device 80 of the second cable management mechanism 52 .
图16显示该第二支撑机构54的组合示意图。该第二支撑机构54与前述第一支撑机构50的差异大致上在于:该第二支撑机构54的一摆臂198是活动地连接在该活动件94与该第二支撑机构54的第一支撑轨88之间,该摆臂198的一端部是卡掣至该活动件94的一下卡掣特征200。因此,该活动件94是高于该第二支撑机构54。FIG. 16 shows a combined schematic view of the second supporting mechanism 54 . The difference between the second support mechanism 54 and the aforementioned first support mechanism 50 is generally that: a swing arm 198 of the second support mechanism 54 is movably connected to the movable member 94 and the first support of the second support mechanism 54 Between the rails 88 , one end of the swing arm 198 is a lower detent feature 200 that detents to the movable member 94 . Therefore, the movable member 94 is higher than the second supporting mechanism 54 .
如图17所示,该第一理线机构48的第一连接装置60的位置是大致上平行该第二理线机构52的第一连接装置80的位置(例如,该第一理线机构48的第一连接装置60与该第二理线机构52的第一连接装置80是位于同一水平上),该第一理线机构48的支撑架62是位于相邻该第一理线机构48的第一连接装置60的下方,使该第二理线机构52藉助该第二支撑机构54的扣件92安装至该第一理线机构48的支撑架62而位于该第一理线机构48的下方;相较地,该第二理线机构52的支撑架82是位于相邻该第二理线机构52的第一连接装置80的上方,使该第一理线机构48藉助该第一支撑机构50的扣件72安装至该第二理线机构52的支撑架82而位于该第二理线机构52的上方。据此,该第一理线机构48的第一理线臂56与该第二理线臂58是大致对应且能够用以供该机箱32的上层区域42a使用,以置放该机箱32后侧的上层区域42a所连接或延伸的线材;相较地,该第二理线机构52的第一理线臂76与该第二理线臂78是大致对应且能够用以供该机箱32的下层区域42b使用,以置放该机箱32后侧的下层区域42b所连接或延伸的线材。As shown in Figure 17, the position of the first connection device 60 of the first wire management mechanism 48 is substantially parallel to the position of the first connection device 80 of the second wire management mechanism 52 (for example, the first wire management mechanism 48 The first connecting device 60 of the first connecting device 60 and the first connecting device 80 of the second cable management mechanism 52 are located on the same level), the support frame 62 of the first cable management mechanism 48 is located adjacent to the first cable management mechanism 48 Below the first connection device 60 , the second wire management mechanism 52 is mounted to the support frame 62 of the first wire management mechanism 48 by means of the fastener 92 of the second support mechanism 54 and is positioned at the bottom of the first wire management mechanism 48 . Below; In contrast, the support frame 82 of the second wire management mechanism 52 is located above the first connecting device 80 adjacent to the second wire management mechanism 52, so that the first wire management mechanism 48 is supported by the first support The fastener 72 of the mechanism 50 is mounted on the supporting frame 82 of the second cable management mechanism 52 and is located above the second cable management mechanism 52 . Accordingly, the first cable management arm 56 of the first cable management mechanism 48 roughly corresponds to the second cable management arm 58 and can be used for the upper area 42a of the chassis 32 to place the rear side of the chassis 32 The wires connected or extended by the upper layer area 42a; in comparison, the first wire management arm 76 and the second wire management arm 78 of the second wire management mechanism 52 are roughly corresponding and can be used for the lower layer of the chassis 32 The area 42b is used to place the cables connected or extended to the lower area 42b on the rear side of the chassis 32 .
图18A至图18C显示该第一理线机构48的第一连接装置60与该第一支撑机构50的活动件74一起被可释放地安装至该第一滑轨总成34的一固定轨180,当欲解除此安装状态时,操作者能够于该第一支撑机构50的活动件74相对该第一理线机构48的第一连接装置60处于一收合位置时,藉助该第一支撑机构50的活动件74的操作部168去间接地施加一力量F去操作该卡掣件122的释放部126,使该卡掣件122的至少一卡掣部124自该固定轨180的至少一连接孔182与该第一连接装置60的至少一卡掣孔120中解掣脱离,于此状态下,该第一理线机构48的第一连接装置60与该第一支撑机构50的活动件74能够往一方向D一起从该第一滑轨总成34的固定轨180被拆卸下来。18A to 18C show that the first connection device 60 of the first cable management mechanism 48 is releasably mounted to a fixed rail 180 of the first slide rail assembly 34 together with the movable part 74 of the first support mechanism 50 , when the installation state is to be released, the operator can use the first support mechanism to The operating part 168 of the movable part 74 of 50 indirectly exerts a force F to operate the release part 126 of the locking part 122, so that at least one locking part 124 of the locking part 122 is connected to at least one of the fixed rail 180. The hole 182 is disengaged from at least one locking hole 120 of the first connecting device 60 , and in this state, the first connecting device 60 of the first cable management mechanism 48 and the movable part 74 of the first supporting mechanism 50 It can be disassembled from the fixing rail 180 of the first sliding rail assembly 34 in a direction D together.
图19A至图19C显示当欲解除该第一理线机构48的第二连接装置64与该第一底座44之间的安装状态时,操作者能够施加一力量F去操作该第二连接装置64的释放部148以克服该第二连接装置64的弹力部150所提供的弹力,使该第二连接装置64的至少一卡掣部146自该连接件138的卡掣孔144以及该第一底座44的挡部188中解掣,于此状态下,该第一理线机构48的第二连接装置64能够往一方向D从该第一底座44被拆卸下来。19A to 19C show that when the installation state between the second connecting device 64 of the first cable management mechanism 48 and the first base 44 is to be released, the operator can apply a force F to operate the second connecting device 64 The release part 148 of the second connecting device 64 overcomes the elastic force provided by the elastic part 150, so that at least one latching part 146 of the second connecting device 64 is released from the latching hole 144 of the connecting member 138 and the first base In this state, the second connecting device 64 of the first cable management mechanism 48 can be detached from the first base 44 in a direction D.
由此可知,当该第一理线机构48的第二连接装置64自该机箱32的第一底座44释放后,能够方便使用者更换、检修或维护该机箱32的上层区域42a内所配置的电子零组件及/或设备;同样地,当该第二理线机构52的第二连接装置84自该机箱32的第二底座46释放后,能够方便使用者更换、检修或维护该机箱32的下层区域42b内所配置的电子零组件及/或设备。It can be seen that, when the second connecting device 64 of the first cable management mechanism 48 is released from the first base 44 of the chassis 32, it is convenient for the user to replace, overhaul or maintain the components arranged in the upper region 42a of the chassis 32. Electronic components and/or equipment; Similarly, when the second connection device 84 of the second cable management mechanism 52 is released from the second base 46 of the chassis 32, it is convenient for the user to replace, overhaul or maintain the chassis 32 The electronic components and/or equipment arranged in the lower area 42b.
图20A至图20C显示当该第二支撑机构54的扣件92的头部270被安装于第一理线机构48的支撑架62的定位孔130(此部分可配合参阅图5与图5A),且欲解除该第二支撑机构54的扣件92与该第一理线机构48的支撑架62之间的此安装状态时,操作者能够施加一力量F去操作该第一理线机构48的第一连接装置60的定位件134,使该定位件134的阻挡部136不再阻挡该第二支撑机构54的扣件92的头部270,于此状态下,该第二支撑机构54能够往一方向D从该第一理线机构48的支撑架62被拆卸下来。20A to 20C show when the head 270 of the fastener 92 of the second support mechanism 54 is installed in the positioning hole 130 of the support frame 62 of the first cable management mechanism 48 (this part can be referred to in FIG. 5 and FIG. 5A) , and want to release the installation state between the fastener 92 of the second support mechanism 54 and the support frame 62 of the first cable management mechanism 48, the operator can apply a force F to operate the first cable management mechanism 48 The positioning piece 134 of the first connecting device 60 makes the blocking portion 136 of the positioning piece 134 no longer block the head 270 of the fastener 92 of the second supporting mechanism 54, and in this state, the second supporting mechanism 54 can The supporting frame 62 of the first cable management mechanism 48 is disassembled in a direction D.
如图21所示,当该每一滑轨总成的活动轨(例如,该第一滑轨总成34的活动轨35与第二滑轨总成36的活动轨37)相对该每一滑轨总成的固定轨(例如,该第一滑轨总成34的固定轨180与第二滑轨总成36的固定轨202)处于一收合位置时,该理线架38是处于一收合状态。As shown in FIG. 21 , when the movable rail of each slide rail assembly (for example, the movable rail 35 of the first slide rail assembly 34 and the movable rail 37 of the second slide rail assembly 36 ) is relatively When the fixed rails of the rail assembly (for example, the fixed rail 180 of the first slide rail assembly 34 and the fixed rail 202 of the second slide rail assembly 36) are in a retracted position, the cable management frame 38 is in a retracted position. combined state.
如图22所示,当该每一滑轨总成的活动轨(例如,该第一滑轨总成34的活动轨35与第二滑轨总成36的活动轨37)相对固定轨(例如,该第一滑轨总成34的固定轨180与第二滑轨总成36的固定轨202)从该收合位置往一延伸位置的方向D1纵向地活动位移时,机箱32随之位移,而该第一理线机构48的第二理线臂58相对第一理线臂56逐渐地展开,同样地,该第二理线机构52的第二理线臂78相对该第一理线臂76逐渐地展开。据此,该滑座66与该滑座86(未显示)分别带动该第一支撑机构50的第一支撑轨68与该第二支撑机构54的第一支撑轨88,且该活动件74与该活动件94分别在该第一滑轨总成34的固定轨180内与该第二滑轨总成36的固定轨202内各自地相对第一连接装置60与第一连接装置80往该延伸位置的方向D1活动位移。另一方面,该第一支撑机构50的第一支撑轨68与第二支撑机构54的第一支撑轨88分别相对该第二支撑轨70与该第二支撑轨90线性地展开而分别同步地支撑该第一理线机构48的第一理线臂56与该第二理线机构52的第一理线臂76。As shown in Figure 22, when the movable rail of each slide rail assembly (for example, the movable rail 35 of the first slide rail assembly 34 and the movable rail 37 of the second slide rail assembly 36) is relatively fixed rail (such as When the fixed rail 180 of the first slide rail assembly 34 and the fixed rail 202 of the second slide rail assembly 36 move longitudinally in the direction D1 from the retracted position to an extended position, the chassis 32 is displaced accordingly, The second wire management arm 58 of the first wire management mechanism 48 is gradually launched relative to the first wire management arm 56. Similarly, the second wire management arm 78 of the second wire management mechanism 52 is relative to the first wire management arm. 76 unfolds gradually. Accordingly, the sliding seat 66 and the sliding seat 86 (not shown) respectively drive the first supporting rail 68 of the first supporting mechanism 50 and the first supporting rail 88 of the second supporting mechanism 54, and the movable member 74 and The movable member 94 extends toward the first connecting device 60 and the first connecting device 80 in the fixed rail 180 of the first slide rail assembly 34 and in the fixed rail 202 of the second slide rail assembly 36 respectively. The direction of position D1 is active displacement. On the other hand, the first support rail 68 of the first support mechanism 50 and the first support rail 88 of the second support mechanism 54 are linearly deployed relative to the second support rail 70 and the second support rail 90 respectively and synchronously. The first wire management arm 56 of the first wire management mechanism 48 and the first wire management arm 76 of the second wire management mechanism 52 are supported.
如图23所示,当该每一滑轨总成的活动轨相对固定轨(例如,该第一滑轨总成34的固定轨180与第二滑轨总成36的固定轨202)进一步地往该延伸位置的方向D1活动位移时,该第一理线机构48的第二理线臂58相对第一理线臂56更进一步地展开,同样地,该第二理线机构52的第二理线臂78相对该第一理线臂76更进一步地展开。据此,该滑座66与该滑座86分别进一步地带动该第一支撑机构50的第一支撑轨68与该第二支撑机构54的第一支撑轨88,且该活动件74与该活动件94进一步地分别在第一滑轨总成34的固定轨180内与第二滑轨总成36的固定轨202内各自地相对第一连接装置60与第一连接装置80往该延伸位置的方向D1活动位移。另一方面,该第一支撑机构50的第一支撑轨68与该二支撑机构54的第一支撑轨88分别进一步地相对该第二支撑轨70与该第二支撑轨90线性地展开而分别同步地支撑该第一理线机构48的第一理线臂56与该第二理线机构52的第一理线臂76。As shown in FIG. 23 , when the movable rail of each slide rail assembly is further relative to the fixed rail (for example, the fixed rail 180 of the first slide rail assembly 34 and the fixed rail 202 of the second slide rail assembly 36 ) When moving towards the direction D1 of the extended position, the second wire management arm 58 of the first wire management mechanism 48 is further expanded relative to the first wire management arm 56. Similarly, the second wire management arm 52 of the second wire management mechanism 52 is further expanded. The cable management arm 78 is further extended relative to the first cable management arm 76 . Accordingly, the slide seat 66 and the slide seat 86 respectively further drive the first support rail 68 of the first support mechanism 50 and the first support rail 88 of the second support mechanism 54, and the movable member 74 and the movable member The member 94 is further respectively in the fixed rail 180 of the first slide rail assembly 34 and the fixed rail 202 of the second slide rail assembly 36 respectively relative to the first connecting device 60 and the first connecting device 80 toward the extended position. Direction D1 active displacement. On the other hand, the first support rail 68 of the first support mechanism 50 and the first support rail 88 of the two support mechanisms 54 are further linearly extended relative to the second support rail 70 and the second support rail 90 respectively. The first wire management arm 56 of the first wire management mechanism 48 and the first wire management arm 76 of the second wire management mechanism 52 are supported synchronously.
值得一提的是,当每一滑轨总成的活动轨相对固定轨(例如,该第一滑轨总成34的固定轨180与第二滑轨总成36的固定轨202)往收合位置的方向(相反于该延伸位置的方向D1)活动位移时,该第一理线机构48的第二理线臂58与该第二理线机构52的第二理线臂78各自相对该第一理线机构48的第一理线臂56与该第二理线机构52的第一理线臂76收合时,该第一支撑机构50的第一支撑轨68与该第二支撑机构54的第一支撑轨88各自相对该第一支撑机构68的第二支撑轨70与该第二支撑机构54的第二支撑轨90能够再度处于收合状态。It is worth mentioning that when the movable rail of each slide rail assembly is retracted relative to the fixed rail (for example, the fixed rail 180 of the first slide rail assembly 34 and the fixed rail 202 of the second slide rail assembly 36 ) When the direction of the position (opposite to the direction D1 of the extended position) is movable, the second wire arm 58 of the first wire management mechanism 48 and the second wire management arm 78 of the second wire management mechanism 52 are respectively relative to the first wire management arm 78. When the first wire management arm 56 of a wire management mechanism 48 is folded with the first wire management arm 76 of the second wire management mechanism 52, the first support rail 68 of the first support mechanism 50 and the second support mechanism 54 Each of the first support rails 88 of the first support mechanism 68 and the second support rail 90 of the second support mechanism 54 can be in a retracted state again.
根据以上的说明,可知本发明的增进功效与优点即在于:理线架能够用于服务器机箱的至少二个不同区域,而用以整理从服务器机箱的不同区域所连接或延伸的线缆。According to the above description, it can be seen that the enhanced efficacy and advantages of the present invention are that the cable management rack can be used in at least two different areas of the server cabinet to organize cables connected or extended from different areas of the server cabinet.
虽然本发明已参照当前的具体实施例来描述,但是本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本发明,在没有脱离本发明精神的情况下还可作出各种等效的变化和修改,因此,只要在本发明的实质精神范围内对上述实施例的变化、变型都将落在本申请权利要求书的范围内。Although the present invention has been described with reference to the current specific embodiments, those of ordinary skill in the art should recognize that the above embodiments are only used to illustrate the present invention, and other modifications can be made without departing from the spirit of the present invention. Various equivalent changes and modifications, therefore, as long as the changes and modifications to the above embodiments are within the true spirit of the present invention, they will all fall within the scope of the claims of the present application.
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410507490.4A CN105530794B (en) | 2014-09-28 | 2014-09-28 | Wire arranging frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410507490.4A CN105530794B (en) | 2014-09-28 | 2014-09-28 | Wire arranging frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105530794A CN105530794A (en) | 2016-04-27 |
CN105530794B true CN105530794B (en) | 2018-01-16 |
Family
ID=55772677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410507490.4A Active CN105530794B (en) | 2014-09-28 | 2014-09-28 | Wire arranging frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105530794B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106708191A (en) * | 2016-12-22 | 2017-05-24 | 广东星徽精密制造股份有限公司 | Separating device of wire sorting frame for servers |
CN110742425B (en) * | 2018-07-23 | 2022-01-11 | 川湖科技股份有限公司 | Connecting device |
CN111065231B (en) * | 2018-10-16 | 2021-01-26 | 川湖科技股份有限公司 | Wire management assembly |
CN111263553B (en) * | 2018-12-03 | 2021-04-09 | 川湖科技股份有限公司 | Cable management assembly |
TWI725461B (en) * | 2019-06-25 | 2021-04-21 | 川湖科技股份有限公司 | Cable management assembly |
CN112188784B (en) * | 2019-07-02 | 2021-11-30 | 川湖科技股份有限公司 | Wire management assembly |
CN111246704A (en) * | 2020-02-17 | 2020-06-05 | 加弘科技咨询(上海)有限公司 | Wire arranging frame and frame applying same |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200638649A (en) * | 2005-04-19 | 2006-11-01 | King Slide Works Co Ltd | Cable management arm assembly |
JP3180813U (en) * | 2011-12-23 | 2013-01-10 | 川湖科技股▲フン▼有限公司 | Cable support device for cable management frame |
CN203289798U (en) * | 2012-11-22 | 2013-11-13 | 金竣企业股份有限公司 | Ball bush positioning device of server slide rail |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2886993Y (en) * | 2006-01-03 | 2007-04-04 | 鸿富锦精密工业(深圳)有限公司 | Cable arranging device |
-
2014
- 2014-09-28 CN CN201410507490.4A patent/CN105530794B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200638649A (en) * | 2005-04-19 | 2006-11-01 | King Slide Works Co Ltd | Cable management arm assembly |
JP3180813U (en) * | 2011-12-23 | 2013-01-10 | 川湖科技股▲フン▼有限公司 | Cable support device for cable management frame |
CN203289798U (en) * | 2012-11-22 | 2013-11-13 | 金竣企业股份有限公司 | Ball bush positioning device of server slide rail |
Also Published As
Publication number | Publication date |
---|---|
CN105530794A (en) | 2016-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105530794B (en) | Wire arranging frame | |
TWI522030B (en) | Cable management arm | |
CN104735944B (en) | Adjustable brackets for slide rail assemblies | |
US9668372B2 (en) | Cable management device | |
CN105530793B (en) | Wire arranging supporting device and mounting assembly | |
US10910804B2 (en) | Cable management device and coupling assembly for rack system | |
CN104720390B (en) | Slide rail assembly | |
JP6224178B2 (en) | Slide rail kit | |
TWI601472B (en) | Slide rail assembly | |
US8387933B2 (en) | Cable management apparatus | |
TWI692288B (en) | Cable management assembly | |
US20090294393A1 (en) | Slide assembly for a rack | |
TWI524615B (en) | Support device for cable management arm and mounting assembly thereof | |
US9861193B2 (en) | Bracket device | |
CN103462387B (en) | Slide rail assembly | |
JP6817348B2 (en) | Connecting assembly and its cable management device | |
JP7037470B2 (en) | Connecting device for cable management device and slide rail assembly | |
JP6783356B2 (en) | Slide rail mechanism and its supporting assembly | |
TW201909791A (en) | Slide rail assembly and rail kit thereof | |
JP5565760B2 (en) | Pull-out storage device | |
JP6721728B2 (en) | Support assembly and cable management kit | |
EP3041329B1 (en) | Cable management arm | |
CN105323999B (en) | Slide rail assembly | |
TW201138600A (en) | Rack of electronic device and cable management apparatus thereof | |
TWI684396B (en) | Slide rail mechanism and supporting assembly thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |