CN105506522B - A kind of frame clsss aluminium alloy castings heat treatment deformation bearing calibration - Google Patents

A kind of frame clsss aluminium alloy castings heat treatment deformation bearing calibration Download PDF

Info

Publication number
CN105506522B
CN105506522B CN201510980355.6A CN201510980355A CN105506522B CN 105506522 B CN105506522 B CN 105506522B CN 201510980355 A CN201510980355 A CN 201510980355A CN 105506522 B CN105506522 B CN 105506522B
Authority
CN
China
Prior art keywords
casting
aluminum alloy
heat treatment
deformation
adjustable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510980355.6A
Other languages
Chinese (zh)
Other versions
CN105506522A (en
Inventor
李新雷
介万奇
杨光昱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwestern Polytechnical University
Original Assignee
Northwestern Polytechnical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwestern Polytechnical University filed Critical Northwestern Polytechnical University
Priority to CN201510980355.6A priority Critical patent/CN105506522B/en
Publication of CN105506522A publication Critical patent/CN105506522A/en
Application granted granted Critical
Publication of CN105506522B publication Critical patent/CN105506522B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/04Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon

Landscapes

  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

本发明公开了一种框架类铝合金铸件热处理变形校正方法,用于解决现有铝合金铸件热处理变形控制方法实用性差的技术问题。技术方案是在铝合金铸件热处理前,采用可调式工装将铸件前端、铸件中部及铸件后端固定,防止铝合金铸件在固溶及入水过程中出现变形,在固溶完后,在弯曲应力集中的铸件中部区域,施加载荷使铸件中部产生逆弯曲应力方向的变形,然后将铝合金铸件进行人工时效,使铝合金铸件变形区域在铝合金铸件本身结构重力产生的弯曲应力作用下恢复到尺寸误差控制范围内,实现铝合金铸件热处理变形控制,从而有效避免了铝合金铸件的弯曲变形,并使铝合金铸件满足力学性能及尺寸要求。

The invention discloses a method for correcting heat treatment deformation of frame-type aluminum alloy castings, which is used to solve the technical problem that the existing heat treatment deformation control methods of aluminum alloy castings are poor in practicability. The technical solution is to fix the front end, the middle part of the casting and the rear end of the casting with adjustable tooling before the heat treatment of the aluminum alloy casting to prevent the deformation of the aluminum alloy casting during solid solution and water entry. In the middle area of the casting, the load is applied to cause deformation in the middle of the casting in the direction of the reverse bending stress, and then the aluminum alloy casting is subjected to artificial aging, so that the deformed area of the aluminum alloy casting returns to the size error under the action of the bending stress generated by the structural gravity of the aluminum alloy casting itself Within the control range, the heat treatment deformation control of aluminum alloy castings is realized, thereby effectively avoiding the bending deformation of aluminum alloy castings, and making the aluminum alloy castings meet the requirements of mechanical properties and dimensions.

Description

一种框架类铝合金铸件热处理变形校正方法A heat treatment deformation correction method for frame-type aluminum alloy castings

技术领域technical field

本发明涉及一种铝合金铸件热处理变形校正方法,特别涉及一种框架类铝合金铸件热处理变形校正方法。The invention relates to a method for correcting heat treatment deformation of an aluminum alloy casting, in particular to a method for correcting heat treatment deformation of a frame-type aluminum alloy casting.

背景技术Background technique

航空航天领域内随着集成化、整体化、轻量化和精密化的设计理念的深入,一些具有尺寸大、形状结构复杂、薄壁化、性能要求高等特征的框架类铝合金铸件得到越来越广泛的应用。但是此类铸件由于结构复杂且壁厚不均匀,在热处理时容易发生较大尺寸的形状变形及部分局部的复杂变形,给后续的铸件矫形及使用带来困难,为此必须在铸件热处理时进行一定的固定和矫形,防止铸件变形。In the field of aerospace, with the deepening of the design concept of integration, integration, light weight and precision, some frame-type aluminum alloy castings with the characteristics of large size, complex shape structure, thin wall and high performance requirements are getting more and more attention. Wide range of applications. However, due to the complex structure and uneven wall thickness of such castings, large-scale shape deformation and partial complex deformation are prone to occur during heat treatment, which brings difficulties to the subsequent casting and use. Therefore, it must be carried out during the heat treatment of castings. Certain fixation and orthopedics prevent casting deformation.

文献“申请公开号是CN103834883A中国发明专利”公开了一种薄壁马鞍形铝合金铸件热处理变形控制方法。该方法根据铸件特点,加热前在铸件上安装堵盘和卡箍,并使铸件壁厚较厚一端朝下垂直放置的方式入炉,分阶段加热,减少加热时的热应力,固溶阶段采用可调式工装维形,减少淬火时的变形,时效阶段继续施加预紧力,保持工装的约束力。该方法解决了热处理过程中由于铸件前后端固溶入水存在差异造成的铸件变形问题,适用于结构相对简单或形状较为对称的筒体类或马鞍形铸件。但是对于一些复杂框架类铝合金铸件,在热处理过程中除由于固溶入水差异造成的变形外,还由于铸件本身结构原因在局部形成应力集中而导致铸件在热处理过程中弯曲变形,特别对于平均壁厚只有3~5mm的大型框架类铝合金铸件,尺寸大且结构复杂,变形量更大。The document "Application Publication No. CN103834883A Chinese Invention Patent" discloses a heat treatment deformation control method for thin-walled saddle-shaped aluminum alloy castings. According to the characteristics of the casting, this method installs the blocking plate and the clamp on the casting before heating, and puts the thicker side of the casting into the furnace vertically, and heats it in stages to reduce the thermal stress during heating. The shape of the adjustable tooling can reduce the deformation during quenching, and the pre-tightening force will continue to be applied during the aging stage to maintain the binding force of the tooling. This method solves the deformation problem of castings caused by the difference of solid solution into water at the front and rear ends of the castings during the heat treatment process, and is suitable for cylindrical or saddle-shaped castings with relatively simple structures or relatively symmetrical shapes. However, for some complex frame-type aluminum alloy castings, in addition to the deformation caused by the difference of solid solution into water during the heat treatment process, the stress concentration is locally formed due to the structure of the casting itself, which leads to the bending deformation of the casting during the heat treatment process, especially for the average Large-scale frame-type aluminum alloy castings with a wall thickness of only 3 to 5mm have large dimensions, complex structures, and greater deformation.

发明内容Contents of the invention

为了克服现有铝合金铸件热处理变形控制方法实用性差的不足,本发明提供一种框架类铝合金铸件热处理变形校正方法。该方法在铝合金铸件热处理前,采用可调式工装将铸件前端、铸件中部及铸件后端固定,防止铝合金铸件在固溶及入水过程中出现变形,在固溶完后,在弯曲应力集中的铸件中部区域,施加载荷使铸件中部产生逆弯曲应力方向的变形,然后将铝合金铸件进行人工时效,使铝合金铸件变形区域在铝合金铸件本身结构重力产生的弯曲应力作用下恢复到尺寸误差控制范围内,实现铝合金铸件热处理变形控制,从而有效避免了铝合金铸件的弯曲变形,并使铝合金铸件满足力学性能及尺寸要求。In order to overcome the disadvantage of poor practicability of the existing heat treatment deformation control methods of aluminum alloy castings, the present invention provides a correction method for heat treatment deformation of frame-type aluminum alloy castings. In this method, before the heat treatment of aluminum alloy castings, adjustable tooling is used to fix the front end of the casting, the middle of the casting and the rear end of the casting to prevent the deformation of the aluminum alloy casting during solid solution and water entry. In the middle area of the casting, a load is applied to cause deformation in the middle of the casting in the direction of the reverse bending stress, and then the aluminum alloy casting is subjected to artificial aging, so that the deformed area of the aluminum alloy casting is restored to the dimensional error control under the action of the bending stress generated by the gravity of the aluminum alloy casting itself Within the scope, the heat treatment deformation control of aluminum alloy castings is realized, thereby effectively avoiding the bending deformation of aluminum alloy castings, and making the aluminum alloy castings meet the requirements of mechanical properties and dimensions.

本发明解决其技术问题所采用的技术方案:一种框架类铝合金铸件热处理变形校正方法,其特点是包括以下步骤:The technical solution adopted by the present invention to solve the technical problem: a method for correcting heat treatment deformation of a frame-type aluminum alloy casting, which is characterized in that it includes the following steps:

第一步、在靠近铸件前端1部位安装前端可调式工装4,在靠近铸件后端3部位安装后端可调式工装6,在铸件中部2安装中部可调式工装5。三处可调式工装上的定位螺栓10将铸件宽度方向约束紧固,并维持铸件内外侧螺栓的紧固力一致;可调式工装中的上形板8的内腔形状分别与铸件前端1、铸件中部2、铸件后端3放置可调式工装处的铸件外形轮廓尺寸一致,采用紧固螺栓7将上压板9、上形板8和铸件12压紧固定。The first step is to install front-end adjustable tooling 4 near the front end 1 of the casting, install rear-end adjustable tooling 6 near the rear end 3 of the casting, and install middle adjustable tooling 5 at the middle part 2 of the casting. The positioning bolts 10 on the three adjustable tooling constrain and fasten the width direction of the casting, and maintain the same fastening force of the inner and outer bolts of the casting; The castings in the middle part 2 and the rear end 3 of the casting are placed in the same shape and size as the adjustable tooling, and the upper pressing plate 9, the upper forming plate 8 and the casting 12 are compressed and fixed by fastening bolts 7 .

第二步、将固定好的铸件放入热处理炉中水平摆放,并采用耐火砖将铸件前端1及铸件后端3垫实。The second step is to put the fixed casting into the heat treatment furnace and place it horizontally, and use refractory bricks to pad the front end 1 of the casting and the rear end 3 of the casting.

第三步、铸件随炉加热,以50~80℃/h的速度升温至500~510℃,保温0.5~1h,以0.5~1℃/min的升温速度加热到530~540℃,保温8~18h。Step 3: The casting is heated with the furnace, and the temperature is raised to 500-510°C at a rate of 50-80°C/h, kept for 0.5-1h, heated to 530-540°C at a rate of 0.5-1°C/min, and held for 8-5 18h.

第四步、在10~15秒内将铸件取出,将铸件垂直浸入水中淬火,水温要求25~50℃,铸件在水中停留5~10min。The fourth step is to take out the casting within 10-15 seconds, immerse the casting vertically in water for quenching, the water temperature is required to be 25-50°C, and the casting stays in the water for 5-10 minutes.

第五步、将铸件从水中取出,放置在铸铁平台14上,在前端可调式工装4和后端可调式工装6的底部分别放置前垫板13和后垫板15,卸除中部可调式工装5上的紧固螺栓7的预紧力,并在中部可调式工装5的上压板9处采用千斤顶施加逆弯曲应力方向16的均匀载荷,使铸件中部区域在该外力作用下产生变形量。过正量矫形在固溶处理完后1~3h时间内完成。Step 5: Take the casting out of the water, place it on the cast iron platform 14, place the front backing plate 13 and the rear backing plate 15 at the bottom of the front adjustable tooling 4 and the rear adjustable tooling 6 respectively, and remove the middle adjustable tooling 5, the pre-tightening force of the fastening bolt 7 on the middle adjustable tooling 5, and a jack is used to apply a uniform load in the direction of the bending stress 16 on the upper platen 9 of the middle adjustable tooling 5, so that the central area of the casting is deformed under the action of this external force. Overcorrection is completed within 1 to 3 hours after solution treatment.

第六步、将过正量矫形过的铸件卸除三处可调式工装,水平放入热处理炉内进行时效处理,时效温度160~180℃,保温时间12~18h,铸件随炉冷却。随着铸件的冷却收缩,在原施加过正量变形处,由于受到铸件前后两端自身重量产生的弯曲应力作用,过正量矫形部位尺寸恢复到尺寸误差范围内。Step 6: Remove the three adjustable toolings from the overcorrected casting, and place it horizontally in a heat treatment furnace for aging treatment. The aging temperature is 160-180°C, the holding time is 12-18 hours, and the casting is cooled with the furnace. As the casting cools and shrinks, the size of the overcorrected part returns to within the size error range due to the bending stress generated by the weight of the front and rear ends of the casting at the original excessive deformation.

本发明的有益效果是:该方法在铝合金铸件热处理前,采用可调式工装将铸件前端、铸件中部及铸件后端固定,防止铝合金铸件在固溶及入水过程中出现变形,在固溶完后,在弯曲应力集中的铸件中部区域,施加载荷使铸件中部产生逆弯曲应力方向的变形,然后将铝合金铸件进行人工时效,使铝合金铸件变形区域在铝合金铸件本身结构重力产生的弯曲应力作用下恢复到尺寸误差控制范围内,实现铝合金铸件热处理变形控制,从而有效避免了铝合金铸件的弯曲变形,并使铝合金铸件满足力学性能及尺寸要求。The beneficial effects of the present invention are: before the heat treatment of the aluminum alloy casting, the method adopts adjustable tooling to fix the front end, the middle part of the casting and the rear end of the casting, so as to prevent the deformation of the aluminum alloy casting during the process of solid solution and water entry. Finally, in the central area of the casting where the bending stress is concentrated, a load is applied to cause deformation in the middle of the casting in the direction of the reverse bending stress, and then the aluminum alloy casting is artificially aged, so that the deformed area of the aluminum alloy casting is within the bending stress generated by the gravity of the aluminum alloy casting itself. Under the action, it returns to the range of size error control, and realizes the heat treatment deformation control of aluminum alloy castings, thereby effectively avoiding the bending deformation of aluminum alloy castings, and making aluminum alloy castings meet the mechanical properties and size requirements.

本发明采用可调式工装上形板内腔形状与铸件外形相吻合,可快速实现对铸件的紧固约束,不仅节约了校形时间,而且避免了局部应力集中导致的铸件开裂变形现象。The invention adopts the shape of the inner cavity of the adjustable tooling upper plate to match the shape of the casting, which can quickly realize the fastening constraint on the casting, not only saves the time for shape correction, but also avoids the phenomenon of cracking and deformation of the casting caused by local stress concentration.

利用铸件结构的本身受力特点,在易变形区域施加过正量矫形,使铸件在后续时效阶段中自动恢复到初始形态,实现变形过程的可靠控制。Utilizing the stress characteristics of the casting structure itself, the overcorrection is applied to the easily deformable area, so that the casting will automatically return to the original shape in the subsequent aging stage, and the reliable control of the deformation process can be realized.

利用铸件固溶处理后时效处理前处于抗拉强度低、延伸率好、易矫形的特点,实施过正量矫形,避免了因施加外力矫形而导致的铸件开裂现象。Utilizing the characteristics of low tensile strength, good elongation and easy correction after solution treatment and before aging treatment of castings, overcorrection is carried out to avoid cracking of castings caused by external force correction.

减少了热处理完后的铸件内部残余应力的分布,避免铸件在今后使用过程中由于残余应力影响而造成变形或断裂。The distribution of residual stress inside the casting after heat treatment is reduced, and the deformation or fracture of the casting due to the influence of residual stress in the future use process is avoided.

下面结合附图和具体实施方式对本发明作详细说明。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

附图说明Description of drawings

图1是本发明框架类铝合金铸件热处理变形校正方法所针对的框架类铝合金铸件结构示意图及可调式工装安装位置简图。Fig. 1 is a structural schematic diagram of a frame-type aluminum alloy casting and a schematic diagram of the installation position of an adjustable tooling for which the method for correcting heat treatment deformation of a frame-type aluminum alloy casting according to the present invention is.

图2是图1的左视剖视图。Fig. 2 is a left sectional view of Fig. 1 .

图3是本发明方法中铸件施加外力过程量矫形简图。Fig. 3 is a schematic diagram of the process of applying external force to the casting in the method of the present invention.

图中,1-铸件前端,2-铸件中部,3-铸件后端,4-前端可调式工装,5-中部可调式工装,6-后端可调式工装,7-紧固螺栓,8-上形板,9-上压板,10-定位螺栓,11-下底板,12-铸件,13-前垫板,14-铸铁平台,15-后垫板,16-逆弯曲应力方向。In the figure, 1-front end of the casting, 2-middle part of the casting, 3-rear end of the casting, 4-adjustable tooling at the front end, 5-adjustable tooling at the middle part, 6-adjustable tooling at the rear end, 7-fastening bolts, 8-upper Shaped plate, 9-upper plate, 10-locating bolt, 11-bottom plate, 12-casting, 13-front backing plate, 14-cast iron platform, 15-back backing plate, 16-reverse bending stress direction.

具体实施方式detailed description

以下实施例参照图1-3。The following examples refer to Figures 1-3.

以航空领域内某大型隔框类铸造铝合金构件热处理变形控制为例,其呈长方形框架类结构,外形曲面复杂且内部筋条较多,铸件前端呈V形结构,并向上曲面翘起,铸件后端以U形大平面连接并向上翘起,局部壁厚有12mm,铸件全长2930mm,宽1250mm,高420mm,平均壁厚5mm,合金材料为ZL114A。由于铸件前后两端向上呈曲面翘起,铸件中部受到向上弯曲应力的作用易产生变形,也是该类型铸件在铸造成形及后续热处理过程中防变形控制的难点。该件采用石膏型结合真空增压铸造方法成形生产,不仅铸造时对尺寸精度和表面粗糙度要求很高,而且对热处理时铸件变形控制也要求很严,铸件长度方向上关键部位尺寸控制精度要求在0.1~1.8mm范围内,宽度方向上尺寸精度要求在3.5~6.3mm范围内。性能要求σb≥320MPa,δ5≥8%的要求。Take the heat treatment deformation control of a large frame-type cast aluminum alloy component in the aviation field as an example. It has a rectangular frame structure with complex curved surfaces and many internal ribs. The rear end is connected with a U-shaped large plane and tilted upwards. The local wall thickness is 12mm. The total length of the casting is 2930mm, the width is 1250mm, and the height is 420mm. The average wall thickness is 5mm. The alloy material is ZL114A. Since the front and rear ends of the casting are curved upwards, the middle part of the casting is easily deformed by the upward bending stress, which is also a difficult point in the anti-deformation control of this type of casting during casting and subsequent heat treatment. This piece is formed by gypsum mold combined with vacuum pressurized casting method, which not only requires high dimensional accuracy and surface roughness during casting, but also requires strict control of casting deformation during heat treatment, and the dimensional control accuracy requirements of key parts in the length direction of casting Within the range of 0.1-1.8mm, the dimensional accuracy in the width direction is required to be within the range of 3.5-6.3mm. Performance requirements σb≥320MPa, δ5≥8% requirements.

实施例1:Example 1:

第一步,铸件前端1、铸件中部2、铸件后端3附近为铸件的关键尺寸控制部位,在距铸件前端1端部810mm处安装前端可调式工装4,在距铸件后端3端部620mm处安装后端可调式工装6,在铸件中部2安装中部可调式工装5,其距离前端可调式工装4与后端可调式工装6的间距为700mm;可调式工装主要由紧固螺栓7、上形板8、上压板9、紧固螺栓10和下底板11组成,采用定位螺栓10将铸件宽度方向约束紧固,并维持铸件内外侧螺栓的紧固力一致;可调式工装中的上形板8的内腔形状分别与铸件前端1、铸件中部2、铸件后端3放置可调式工装处的铸件外形轮廓一致,并采用紧固螺栓7将上压板9、上形板8和铸件12压紧固定。In the first step, the front end 1 of the casting, the middle part 2 of the casting, and the rear end 3 of the casting are the key dimension control parts of the casting. The front end adjustable tooling 4 is installed at a distance of 810mm from the end of the front end 1 of the casting, and 620mm from the end of the rear end 3 of the casting. The rear adjustable tooling 6 is installed at the middle part of the casting 2, and the middle adjustable tooling 5 is installed at the middle part of the casting. The distance between the front adjustable tooling 4 and the rear end adjustable tooling 6 is 700mm; Forming plate 8, upper pressing plate 9, fastening bolts 10 and lower bottom plate 11, the positioning bolts 10 are used to constrain and fasten the width direction of the casting, and maintain the same fastening force of the inner and outer bolts of the casting; the upper forming plate in the adjustable tooling The shape of the inner cavity of 8 is consistent with the outline of the casting where the adjustable tooling is placed at the front end 1 of the casting, the middle part 2 of the casting, and the rear end 3 of the casting, and the upper pressing plate 9, the upper forming plate 8 and the casting 12 are pressed tightly by fastening bolts 7 fixed.

第二步,将固定好的铸件放入热处理炉中,铸件水平摆放,并采用耐火砖将铸件前端1及后端3垫实。In the second step, the fixed casting is put into the heat treatment furnace, the casting is placed horizontally, and the front end 1 and the rear end 3 of the casting are padded with refractory bricks.

第三步,铸件随炉加热,以50℃/h的速度升温至510℃,保温0.5h,以0.5℃/min的升温速度加热到540℃,保温18h。In the third step, the casting is heated with the furnace, and the temperature is raised to 510°C at a rate of 50°C/h, kept for 0.5h, heated to 540°C at a rate of 0.5°C/min, and kept for 18h.

第四步,在15秒内将铸件取出,将铸件垂直浸入水中淬火,水温要求50℃,铸件在水中停留10min。The fourth step is to take out the casting within 15 seconds, immerse the casting vertically in water for quenching, the water temperature is required to be 50°C, and the casting stays in the water for 10 minutes.

第五步,将铸件从水中取出,放置在铸铁平台14上,在前端可调式工装4、后端可调式工装6的底部分别放置厚度为8mm前垫板13、后垫板15,卸除中部可调式工装5上的紧固螺栓7的预紧力,并在中部可调式工装5的上压板9处采用千斤顶施加逆弯曲应力方向16的均匀载荷,使铸件中部区域在该外力作用下产生4mm的变形量。该变形量取决于铸件的长度及铸件中部受到两端翘曲部位自重作用产生的弯曲应力大小,可依据铸件变形规律确定。The fifth step is to take the casting out of the water, place it on the cast iron platform 14, place the front backing plate 13 and the rear backing plate 15 with a thickness of 8mm on the bottom of the front adjustable tooling 4 and the rear adjustable tooling 6 respectively, and remove the middle part The pre-tightening force of the fastening bolt 7 on the adjustable tooling 5, and a jack is used to apply a uniform load in the direction of the bending stress 16 on the upper platen 9 of the adjustable tooling 5 in the middle, so that the central area of the casting will produce 4mm under the action of this external force. amount of deformation. The amount of deformation depends on the length of the casting and the magnitude of the bending stress generated by the self-weight of the warping parts at both ends in the middle of the casting, which can be determined according to the deformation law of the casting.

过正量矫形在固溶处理完后3h时间内完成。由于此时铸件刚固溶处理完,抗拉强度低延伸率好,易产生弹塑性变形,便于实施过正量矫形。The overcorrection is completed within 3 hours after the solution treatment. Since the casting has just finished solution treatment at this time, the tensile strength is low and the elongation is good, and it is easy to produce elastic-plastic deformation, which is convenient for overcorrection.

第六步,将过正量矫形过的铸件卸除可调式工装,水平放入热处理炉内进行时效处理,时效温度180℃,保温时间12h,铸件随炉冷却。随着铸件的冷却收缩,在原施加过正量变形处,由于受到铸件前后两端自身重量产生的弯曲应力作用,过正量矫形部位尺寸恢复到尺寸误差1mm范围内,满足铸件尺寸精度控制要求,铸件力学性能也满足技术要求。The sixth step is to remove the adjustable tooling from the overcorrected casting and place it horizontally in a heat treatment furnace for aging treatment. The aging temperature is 180°C and the holding time is 12 hours. The casting is cooled with the furnace. As the casting cools and shrinks, at the place where the original excessive deformation is applied, due to the bending stress generated by the weight of the front and rear ends of the casting, the size of the excessive orthopedic part returns to the range of dimensional error within 1mm, which meets the dimensional accuracy control requirements of the casting. The mechanical properties of castings also meet the technical requirements.

实施例2:Example 2:

第一步,铸件前端1、铸件中部2、铸件后端3附近为铸件的关键尺寸控制部位,在距铸件前端1端部810mm处安装前端可调式工装4,在距铸件后端3端部620mm处安装后端可调式工装6,在铸件中部2安装中部可调式工装5,其距离前端可调式工装4与后端可调式工装6的间距为700mm;可调式工装主要由紧固螺栓7、上形板8、上压板9、紧固螺栓10和下底板11组成,采用定位螺栓10将铸件宽度方向约束紧固,并维持铸件内外侧螺栓的紧固力一致;可调式工装中的上形板8的内腔形状分别与铸件前端1、铸件中部2、铸件后端3放置可调式工装处的铸件外形轮廓一致,并采用紧固螺栓7将上压板9、上形板8和铸件12压紧固定。In the first step, the front end 1 of the casting, the middle part 2 of the casting, and the rear end 3 of the casting are the key dimension control parts of the casting. The front end adjustable tooling 4 is installed at a distance of 810mm from the end of the front end 1 of the casting, and 620mm from the end of the rear end 3 of the casting. The rear adjustable tooling 6 is installed at the middle part of the casting 2, and the middle adjustable tooling 5 is installed at the middle part of the casting. The distance between the front adjustable tooling 4 and the rear end adjustable tooling 6 is 700mm; Forming plate 8, upper pressing plate 9, fastening bolts 10 and lower bottom plate 11, the positioning bolts 10 are used to constrain and fasten the width direction of the casting, and maintain the same fastening force of the inner and outer bolts of the casting; the upper forming plate in the adjustable tooling The shape of the inner cavity of 8 is consistent with the outline of the casting where the adjustable tooling is placed at the front end 1 of the casting, the middle part of the casting 2, and the rear end 3 of the casting, and the upper pressing plate 9, the upper forming plate 8 and the casting 12 are pressed tightly by fastening bolts 7 fixed.

第二步,将固定好的铸件放入热处理炉中,铸件水平摆放,并采用耐火砖将铸件前端1及后端3垫实。In the second step, the fixed casting is put into the heat treatment furnace, the casting is placed horizontally, and the front end 1 and the rear end 3 of the casting are padded with refractory bricks.

第三步,铸件随炉加热,以80℃/h的速度升温至500℃,保温1h,以1℃/min的升温速度加热到530℃,保温8h。In the third step, the casting is heated with the furnace, and the temperature is raised to 500°C at a rate of 80°C/h, kept for 1 hour, heated to 530°C at a rate of 1°C/min, and held for 8 hours.

第四步,在10秒内将铸件取出,将铸件垂直浸入水中淬火,水温要求25℃,铸件在水中停留5min。The fourth step is to take out the casting within 10 seconds, immerse the casting vertically in water for quenching, the water temperature is required to be 25°C, and the casting stays in the water for 5 minutes.

第五步,将铸件从水中取出,放置在铸铁平台14上,在前端可调式工装4、后端可调式工装6的底部分别放置厚度为8mm前垫板13、后垫板15,卸除中部可调式工装5上的紧固螺栓7的预紧力,并在中部可调式工装5的上压板9处采用千斤顶施加逆弯曲应力方向16的均匀载荷,使铸件中部区域在该外力作用下产生3.5mm的变形量。过正量矫形在固溶处理完后1h时间内完成。The fifth step is to take the casting out of the water, place it on the cast iron platform 14, place the front backing plate 13 and the rear backing plate 15 with a thickness of 8mm on the bottom of the front adjustable tooling 4 and the rear adjustable tooling 6 respectively, and remove the middle part The pre-tightening force of the fastening bolt 7 on the adjustable tooling 5, and a jack is used to apply a uniform load in the direction of the bending stress 16 on the upper platen 9 of the adjustable tooling 5 in the middle, so that the central area of the casting produces 3.5 The amount of deformation in mm. The overcorrection is completed within 1 hour after the solution treatment.

第六步,将过正量矫形过的铸件卸除可调式工装,水平放入热处理炉内进行时效处理,时效温度160℃,保温时间18h,铸件随炉冷却。随着铸件的冷却收缩,在原施加过正量变形处,由于受到铸件前后两端自身重量产生的弯曲应力作用,过正量矫形部位尺寸恢复到尺寸误差1mm范围内,满足铸件尺寸精度控制要求,铸件力学性能也满足技术要求。The sixth step is to remove the adjustable tooling from the overcorrected casting, and place it horizontally in a heat treatment furnace for aging treatment. The aging temperature is 160°C, the holding time is 18 hours, and the casting is cooled with the furnace. As the casting cools and shrinks, at the place where the excessive deformation was originally applied, due to the bending stress generated by the weight of the front and rear ends of the casting, the size of the excessive orthopedic part returns to within the range of dimensional error of 1mm, which meets the dimensional accuracy control requirements of the casting. The mechanical properties of castings also meet the technical requirements.

实施例3:Example 3:

第一步,铸件前端1、铸件中部2、铸件后端3附近为铸件的关键尺寸控制部位,在距铸件前端1端部810mm处安装前端可调式工装4,在距铸件后端3端部620mm处安装后端可调式工装6,在铸件中部2安装中部可调式工装5,其距离前端可调式工装4与后端可调式工装6的间距为700mm;可调式工装主要由紧固螺栓7、上形板8、上压板9、紧固螺栓10和下底板11组成,采用定位螺栓10将铸件宽度方向约束紧固,并维持铸件内外侧螺栓的紧固力一致;可调式工装中的上形板8的内腔形状分别与铸件前端1、铸件中部2、铸件后端3放置可调式工装处的铸件外形轮廓一致,并采用紧固螺栓7将上压板9、上形板8和铸件12压紧固定。In the first step, the front end 1 of the casting, the middle part 2 of the casting, and the rear end 3 of the casting are the key dimension control parts of the casting. The front end adjustable tooling 4 is installed at a distance of 810mm from the end of the front end 1 of the casting, and 620mm from the end of the rear end 3 of the casting. The rear adjustable tooling 6 is installed at the middle part of the casting 2, and the middle adjustable tooling 5 is installed at the middle part of the casting. The distance between the front adjustable tooling 4 and the rear end adjustable tooling 6 is 700mm; Forming plate 8, upper pressing plate 9, fastening bolts 10 and lower bottom plate 11, the positioning bolts 10 are used to constrain and fasten the width direction of the casting, and maintain the same fastening force of the inner and outer bolts of the casting; the upper forming plate in the adjustable tooling The shape of the inner cavity of 8 is consistent with the outline of the casting where the adjustable tooling is placed at the front end 1 of the casting, the middle part of the casting 2, and the rear end 3 of the casting, and the upper pressing plate 9, the upper forming plate 8 and the casting 12 are pressed tightly by fastening bolts 7 fixed.

第二步,将固定好的铸件放入热处理炉中,铸件水平摆放,并采用耐火砖将铸件前端1及后端3垫实。In the second step, the fixed casting is put into the heat treatment furnace, the casting is placed horizontally, and the front end 1 and the rear end 3 of the casting are padded with refractory bricks.

第三步,铸件随炉加热,以70℃/h的速度升温至505℃,保温1h,以1℃/min的升温速度加热到530℃,保温12h。In the third step, the casting is heated with the furnace, and the temperature is raised to 505°C at a rate of 70°C/h, kept for 1 hour, heated to 530°C at a rate of 1°C/min, and held for 12 hours.

第四步,在10秒内将铸件取出,将铸件垂直浸入水中淬火,水温要求30℃,铸件在水中停留8min。The fourth step is to take out the casting within 10 seconds, immerse the casting vertically in water for quenching, the water temperature is required to be 30°C, and the casting stays in the water for 8 minutes.

第五步,将铸件从水中取出,放置在铸铁平台14上,在前端可调式工装4、后端可调式工装6的底部分别放置厚度为8mm前垫板13、后垫板15,卸除中部可调式工装5上的紧固螺栓7的预紧力,并在中部可调式工装5的上压板9处采用千斤顶施加逆弯曲应力方向16的均匀载荷,使铸件中部区域在该外力作用下产生3.5mm的变形量。过正量矫形在固溶处理完后2h时间内完成。The fifth step is to take the casting out of the water, place it on the cast iron platform 14, place the front backing plate 13 and the rear backing plate 15 with a thickness of 8mm on the bottom of the front adjustable tooling 4 and the rear adjustable tooling 6 respectively, and remove the middle part The pre-tightening force of the fastening bolt 7 on the adjustable tooling 5, and a jack is used to apply a uniform load in the direction of the bending stress 16 on the upper platen 9 of the adjustable tooling 5 in the middle, so that the central area of the casting produces 3.5 The amount of deformation in mm. The overcorrection is completed within 2 hours after the solution treatment.

第六步,将过正量矫形过的铸件卸除可调式工装,水平放入热处理炉内进行时效处理,时效温度170℃,保温时间16h,铸件随炉冷却。随着铸件的冷却收缩,在原施加过正量变形处,由于受到铸件前后两端自身重量产生的弯曲应力作用,过正量矫形部位尺寸恢复到尺寸误差1mm范围内,满足铸件尺寸精度控制要求,铸件力学性能也满足技术要求。The sixth step is to remove the adjustable tooling from the overcorrected casting and place it horizontally in a heat treatment furnace for aging treatment. The aging temperature is 170°C and the holding time is 16 hours. The casting is cooled with the furnace. As the casting cools and shrinks, at the place where the excessive deformation was originally applied, due to the bending stress generated by the weight of the front and rear ends of the casting, the size of the excessive orthopedic part returns to within the range of dimensional error of 1mm, which meets the dimensional accuracy control requirements of the casting. The mechanical properties of castings also meet the technical requirements.

Claims (1)

1.一种框架类铝合金铸件热处理变形校正方法,其特征在于包括以下步骤:1. A method for correcting heat treatment deformation of a frame type aluminum alloy casting, characterized in that it comprises the following steps: 第一步、在靠近铸件前端(1)部位安装前端可调式工装(4),在靠近铸件后端(3)部位安装后端可调式工装(6),在铸件中部(2)安装中部可调式工装(5);三处可调式工装上的定位螺栓(10)将铸件宽度方向约束紧固,并维持铸件内外侧螺栓的紧固力一致;可调式工装中的上形板(8)的内腔形状分别与铸件前端(1)、铸件中部(2)、铸件后端(3)放置可调式工装处的铸件外形轮廓尺寸一致,采用紧固螺栓(7)将上压板(9)、上形板(8)和铸件(12)压紧固定;The first step is to install the front adjustable tooling (4) near the front end (1) of the casting, install the rear adjustable tooling (6) near the rear end (3) of the casting, and install the middle adjustable tooling in the middle of the casting (2). tooling (5); the positioning bolts (10) on the three adjustable toolings constrain and fasten the width direction of the casting, and maintain the same fastening force of the inner and outer bolts of the casting; The shape of the cavity is consistent with the casting profile size at the front end of the casting (1), the middle part of the casting (2), and the rear end of the casting (3). Plate (8) and casting (12) are compressed and fixed; 第二步、将固定好的铸件放入热处理炉中水平摆放,并采用耐火砖将铸件前端(1)及铸件后端(3)垫实;The second step is to put the fixed casting into the heat treatment furnace and place it horizontally, and use refractory bricks to pad the front end (1) and the rear end (3) of the casting; 第三步、铸件随炉加热,以50~80℃/h的速度升温至500~510℃,保温0.5~1h,以0.5~1℃/min的升温速度加热到530~540℃,保温8~18h;Step 3: The casting is heated with the furnace, and the temperature is raised to 500-510°C at a rate of 50-80°C/h, kept for 0.5-1h, heated to 530-540°C at a rate of 0.5-1°C/min, and held for 8-5 18h; 第四步、在10~15秒内将铸件取出,将铸件垂直浸入水中淬火,水温要求25~50℃,铸件在水中停留5~10min;Step 4: Take out the casting within 10-15 seconds, immerse the casting vertically in water for quenching, the water temperature is required to be 25-50°C, and the casting stays in the water for 5-10 minutes; 第五步、将铸件从水中取出,放置在铸铁平台(14)上,在前端可调式工装(4)和后端可调式工装(6)的底部分别放置前垫板(13)和后垫板(15),卸除中部可调式工装(5)上的紧固螺栓(7)的预紧力,并在中部可调式工装(5)的上压板(9)处采用千斤顶施加逆弯曲应力方向(16)的均匀载荷,使铸件中部区域在该外力作用下产生变形量;过正量矫形在固溶处理完后1~3h时间内完成;Step 5: Take the casting out of the water, place it on the cast iron platform (14), place the front backing plate (13) and the rear backing plate on the bottom of the front adjustable tooling (4) and the rear adjustable tooling (6) respectively (15), remove the pretightening force of the fastening bolts (7) on the middle adjustable tooling (5), and apply a reverse bending stress direction ( 16) The uniform load causes the central area of the casting to produce deformation under the action of the external force; the overcorrection is completed within 1 to 3 hours after the solution treatment; 第六步、将过正量矫形过的铸件卸除三处可调式工装,水平放入热处理炉内进行时效处理,时效温度160~180℃,保温时间12~18h,铸件随炉冷却;随着铸件的冷却收缩,在原施加过正量变形处,由于受到铸件前后两端自身重量产生的弯曲应力作用,过正量矫形部位尺寸恢复到尺寸误差范围内。The sixth step is to remove the three adjustable toolings from the overcorrected casting, and place it horizontally in a heat treatment furnace for aging treatment. The aging temperature is 160-180°C, and the holding time is 12-18 hours. The casting is cooled with the furnace; The cooling shrinkage of the casting, at the place where the original excessive deformation is applied, due to the bending stress generated by the weight of the front and rear ends of the casting, the size of the excessive orthopedic part returns to the size error range.
CN201510980355.6A 2015-12-24 2015-12-24 A kind of frame clsss aluminium alloy castings heat treatment deformation bearing calibration Active CN105506522B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510980355.6A CN105506522B (en) 2015-12-24 2015-12-24 A kind of frame clsss aluminium alloy castings heat treatment deformation bearing calibration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510980355.6A CN105506522B (en) 2015-12-24 2015-12-24 A kind of frame clsss aluminium alloy castings heat treatment deformation bearing calibration

Publications (2)

Publication Number Publication Date
CN105506522A CN105506522A (en) 2016-04-20
CN105506522B true CN105506522B (en) 2017-04-05

Family

ID=55714812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510980355.6A Active CN105506522B (en) 2015-12-24 2015-12-24 A kind of frame clsss aluminium alloy castings heat treatment deformation bearing calibration

Country Status (1)

Country Link
CN (1) CN105506522B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106756659B (en) * 2016-12-02 2018-08-28 北京有色金属研究总院 A kind of inductile difficult-to-deformation material plank school shape and heat treatment method
CN109837373A (en) * 2017-11-24 2019-06-04 核工业西南物理研究院 A kind of solution treatment tooling of large size tokamak vacuum room housing curved surface
CN108441793B (en) * 2018-05-23 2021-01-15 山东南山铝业股份有限公司 Heat treatment method for forced setting of aluminum alloy and aviation aluminum alloy section
CN111394564B (en) * 2020-04-29 2023-11-28 天津航天机电设备研究所 High-rigidity platform for heat treatment of large thin-wall light alloy castings and application method thereof
CN112646967B (en) * 2020-12-14 2022-09-02 北京航星机器制造有限公司 Auxiliary supporting device and heat treatment method of aluminum alloy member
CN112795759B (en) * 2020-12-23 2022-04-15 二重(德阳)重型装备有限公司 Method for accurately controlling size of large door-shaped three-dimensional stainless steel bent pipe
CN113249665A (en) * 2021-07-02 2021-08-13 中国航发北京航空材料研究院 Forming method of aluminum alloy component
CN113774204B (en) * 2021-09-08 2023-07-21 中北大学 Clamping device for heat treatment of aluminum alloy castings to prevent warpage and its use
CN115090715B (en) * 2022-06-09 2024-09-06 中国航发北京航空材料研究院 High-strength and high-toughness aluminum alloy casting thermal state mechanical correction device and method with complex curved surface structure
CN116288084B (en) * 2023-04-13 2024-12-24 湖南锆石新材料科技有限公司 Heat treatment fixing method for flat frame type aluminum alloy castings

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000017412A (en) * 1998-07-01 2000-01-18 Furukawa Electric Co Ltd:The Production of aluminum alloy sheet
US6033499A (en) * 1998-10-09 2000-03-07 General Motors Corporation Process for stretch forming age-hardened aluminum alloy sheets
CN100482831C (en) * 2007-04-29 2009-04-29 东北轻合金有限责任公司 Aviation aluminum alloy pre-stretching plate and production method thereof
CN103834883B (en) * 2012-11-20 2016-02-10 北京航星机器制造公司 A kind of thin-walled shape of a saddle aluminum alloy casting method for controlling heat treatment deformation
CN103834886B (en) * 2012-11-22 2016-01-20 北京有色金属研究总院 The method for aligning of a kind of magnesium alloy square-section web
CN103862228B (en) * 2012-12-07 2016-04-27 北京有色金属研究总院 A kind of preparation processing method of aluminum matrix composite large thin-wall housing
CN104694857B (en) * 2013-12-05 2016-08-24 北京航星机器制造有限公司 Thin-walled inlets structure Cast aluminium alloy gold cabin section method for controlling heat treatment deformation
CN104498847B (en) * 2014-12-03 2018-08-24 北京航星机器制造有限公司 Thin-walled cavity structure aluminium alloy post method for controlling heat treatment deformation

Also Published As

Publication number Publication date
CN105506522A (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN105506522B (en) A kind of frame clsss aluminium alloy castings heat treatment deformation bearing calibration
CN103691793B (en) One-step forming method of aging-strengthening aluminum alloy integral wall plate based on autoclave
EP3117019B1 (en) A method of forming parts from aluminium alloy sheet
TWI543858B (en) Annealing method, annealing jig, and annealing device
KR101324715B1 (en) A method for increasing formability of magnesium alloy sheet and magnesium alloy sheet prepared by the same method
CN105344819A (en) Isothermal forming die of large-curvature titanium alloy covering part and forming method of isothermal forming die
CN102615201A (en) Cold-hot compound die molding method for aluminum alloy sheet metal component
CN102121085B (en) Method for preventing hot working warpage and deformation of large titanium alloy isothermal precise thin web plate forge pieces
CN108237155B (en) A kind of manufacturing method that large size tokamak vacuum room housing is complex-curved
CN102965482A (en) Metal piece deformation repair method
CN106676437A (en) Aluminum-alloy tank melon petal punching device and punching method
CN106544607B (en) A kind of method for eliminating high-strength magnesium-rare earth thin-section casting residual stress
CN1230265C (en) Method for shaping structures comprised of aluminium alloys
CN112338002B (en) A local shape correction method for titanium alloy components
CN105689549A (en) Bending and clamping integrated die for creeping, ageing and correcting process and using method
JP5143694B2 (en) Mold apparatus and method for producing molded body using the same
CN102888574A (en) Hot forming method for aluminum alloy pipe parts based on solid solution water quenching
CN204396532U (en) The mould positioning mechanism of a kind of school shape titanium alloy member
CN104178712A (en) Thermal correcting method of magnesium alloy support piece for mobile telephone
US9133539B2 (en) Method and equipment for shaping a cast component
CN115233121A (en) A method for homogenizing residual stress of cryogenic-thermal vibration composite
CN114472650B (en) Aluminum alloy plate body composite-creep aging integrated forming method
Park Quality Evaluations of Induction Motors Bracket Castings during Fabrication Processes
RU2532674C1 (en) Creep-annealing of titanium rolled sheets
Yin et al. Experimental study of hot deep drawing of 5754 aluminum alloy sheets

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant