CN105449392B - A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method - Google Patents

A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method Download PDF

Info

Publication number
CN105449392B
CN105449392B CN201510740519.8A CN201510740519A CN105449392B CN 105449392 B CN105449392 B CN 105449392B CN 201510740519 A CN201510740519 A CN 201510740519A CN 105449392 B CN105449392 B CN 105449392B
Authority
CN
China
Prior art keywords
pressing plate
line
pressure screw
insulation
wsm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510740519.8A
Other languages
Chinese (zh)
Other versions
CN105449392A (en
Inventor
罗文军
何海清
王林春
杨枝添
陶云春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lincang Power Supply Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Lincang Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lincang Power Supply Bureau of Yunnan Power Grid Co Ltd filed Critical Lincang Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority to CN201510740519.8A priority Critical patent/CN105449392B/en
Publication of CN105449392A publication Critical patent/CN105449392A/en
Application granted granted Critical
Publication of CN105449392B publication Critical patent/CN105449392B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R11/00Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts
    • H01R11/11End pieces or tapping pieces for wires, supported by the wire and for facilitating electrical connection to some other wire, terminal or conductive member
    • H01R11/12End pieces terminating in an eye, hook, or fork
    • H01R11/14End pieces terminating in an eye, hook, or fork the hook being adapted for hanging on overhead or other suspended lines, e.g. hot line clamp
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R43/00Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/14Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for joining or terminating cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Electric Cable Installation (AREA)

Abstract

A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method, wherein, device includes WSM points of ditch wire clamps and live line work insulating operation instruments.The beneficial effects of the invention are as follows, WSM points of ditch wire clamps realize the technology that drainage thread and main traverse line point ditch are fixed and insulating bar can be used to carry out livewire work, further meet 10kV distribution lines and can not have a power failure and overlapped and removed drainage thread, improve operating efficiency, reduction operation labor intensity, the transport for reducing distribution line live working respective items purpose and the cost such as artificial.Operation person risk will arrive minimum, and the activity duration is greatly shortened while reduce operating cost, improves operating efficiency.Charged insulating operation instrument is suitably operated in multiprocessing thought of as industry, and insulation distance is enough, easy to operate, personnel feel that safe light, construction technology is reliable;The implement overlapped using this method, is easy to powered dismounting, and operation can be carried out by being equally not required to power failure.

Description

A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method
Technical field
The invention belongs to power industry, distribution line insulation operation, in particular for 10kV distribution line live workings Overlap joint and remove drainage thread apparatus for work and its method, this device and its operational method can medial potential working again can ground it is electric Position carries out operation.
Background technology
Requirement with user to supply of electric power is improved constantly, to ensure qualified quality of voltage, reliable power supplying efficiency Direct services client, service society are each power supply personnel obligations one can't decline.Demand therewith, power industry updates work Industry technology to power network, equipment live operation, strive power off time and scope to be reduced to and do small.But led for distribution Domain, power distribution network operating load weight, line facility aging speed aggravates, Adds User and access the reasons such as many, is body in real work Reveal continuous power supply and the sharp imbalance between supply and demand of power failure operation maintenance work, and deteriorate increasingly.Therefore, we carry out band energetically Electric operation is overhauled and safeguarded, accomplishes not have a power failure and less have a power failure as far as possible, it is ensured that power supply reliability and company interest, society Meeting benefit is not suffered a loss.And we are in the work of 10kV live working of distribution network, with reference to 10kV power distribution networks, line facility design And construction old and new standard is different, safe spacing is small, operation takes many, operation apart from limited, current work mode cost height, work consuming Difficult point and the reality such as labor intensity is limited greatly, easily by operating environment, job safety risk height, so having carried out 10kV distribution lines WSM wire clamps and insulation operative employee's appliance operation bar working system overlap joint, the innovation research and development for removing drainage thread.
The content of the invention
The purpose of the present invention is precisely in order to overcome the 10kV power distribution networks that above-mentioned prior art is present, and line facility is designed and built If old and new standard is different, safe spacing is small, operation is apart from limited, current work mode cost height, time-consuming many, the operation work of work consuming There is provided a kind of WSM points of ditch wire clamps insulation for the difficult points such as intensity is limited greatly, easily by operating environment, job safety risk height and reality Operation instrument overlaps and removed drainage thread apparatus for work and method.
To achieve these goals, the technical solution adopted by the present invention is:
A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work, the invention is characterised in that, device includes WSM points Ditch wire clamp and live line work insulating operation instrument, wherein:
WSM points of ditch wire clamps include:It is main to press screw, partial pressure screw, S type partial pressures piece, upper main pressing plate, lower main pressing plate totally 5 portions Part;Wherein, upper main pressing plate is a rectangle, and twice wire casing is offered upwards in upper main pressing plate length, uniform between twice wire casing Main pressure screw hole is offered, partial pressure screw hole is further opened between upper main pressure screw hole;Lower main pressing plate is a rectangle, Twice wire casing is offered upwards in lower main pressing plate length, lower main pressure screw hole is uniformly offered between twice wire casing, in lower main pressure Lower partial pressure screw hole is further opened between screw hole, lower main pressing plate is with upper main pressing plate structurally corresponding;S type partial pressure pieces are in integrally Rectangle, section is S types, and partial pressure screw hole is further opened between the distribution of S type partial pressures piece opens up main pressure screw hole;Both sides are provided with In symmetrically not opposite semicircular arc wire casing;Make-up is connected the wire casing of upper main pressing plate and lower main pressing plate respectively inwards, twice wire casing The arc-shaped hole of make-up formation is used for the drainage line end and leading line end for clamping wire clamp overlapped points, and S type partial pressure pieces are located at main pressure Between plate and lower main pressing plate, separately fixed and for wire for adjusting current-carrying part and its tight ness rating;Main pressure screw is worn respectively Cross main pressure screw hole, lower main pressure screw hole, upper and lower main pressing plate connected, at the same with S type partial pressures piece realize point ditch function and with Lower main pressing plate realizes that integrated connection reinforces function;Partial pressure screw is each passed through partial pressure screw hole, lower partial pressure screw hole, main spiral shell Hole, S type partial pressure pieces and upper and lower main pressing plate are fixed, and play the fixation separated to wire ditch, realize drainage thread and main traverse line It is reliably connected;
WSM points of ditch wire clamps realize drainage thread and main traverse line point ditch is fixed and insulating bar can be used to carry out livewire work Technology, further meet 10kV distribution lines and can not have a power failure and overlapped and removed drainage thread, improve operating efficiency, reduction Operation labor intensity, the transport for reducing distribution line live working respective items purpose and the cost such as artificial.WSM points of ditch wire clamp designs Model and the requirement of parameter active response current device, data combine current universal fastener parameter, and applicable data span is bigger, cleverer Work is handy.WSM point ditch wire clamps mainly have tetra- kinds of models of WSM-1, WSM-2, WSM-3, WSM-4 be applicable line footpath fromExtremely
Live line work insulating operation instrument, includes the ratchet-type of the insulating sleeve at top, the insulation tube at middle part and bottom The big part of torque boosting-rod three is constituted;Wherein:
Insulating sleeve is a cylindrical tube, and its outer layer sets expoxy glass insulation or insulation vinyl chloride insulation, and top is interior Hexagonal openend, interior shared seven kinds of 14mm, 17mm, 19mm, 21mm, 24mm, 27mm of hexagonal connection opening;Bottom is blind end, Openend is along cylinder provided with prismatic connection socket in one section, and blind end carries the shank of an external threading;
Insulation tube is round tube, and two ends are tapped with internal thread, and every group 5 is saved, and often saves 1200mm;Often section insulation tube two ends are by adopting It is attached with externally threaded transition joint;Transition joint two ends are threaded slotting cervical part of esophagus, are offered on cervical part of esophagus is inserted slotting Pin-and-hole, the slotting cervical part of esophagus at transition joint two ends is socketed with insulation tube respectively, passes through the set pin-and-hole pin opened up on pin hole and insulation tube Fixation is connect, the connector that insulation tube lowermost is connected with torque boosting-rod uses ratchet translation interface, and the interface is square, rule Lattice are 12mm*12mm, and interior set spring steel ball anticreep groove;
Insulation tube uses damp-proof epoxy resin pulling pipe, diameter phi 30mm, wall thickness 2.5mm, every group of insulation tube overall length 6000mm。
Operating personnel can operation again can be on bar on insulation carrying tool when in use for live line work insulating operation instrument Or ground potential operation, technical research, which is designed, combines powered job behavior, meets intermediate potential and earth potential working method, when using only Find appropriate job position accurately, coordinate WSM points of ditch wire clamp operating personnel that bolt is tightened and reinforced, operating personnel with it is powered The distance of body is beyond safe distance, and operation person risk will arrive minimum, and the activity duration is greatly shortened while reducing work Industry cost, improves operating efficiency.
The present invention is, using WSM points of ditch wire clamps and charged insulating operation instruments, to fix drainage thread and main traverse line point ditch, after It is moved to after main traverse line lap position and blocks main traverse line, then passes through carrying tool or the ground potential of insulating with charged insulating operation instrument Carry out stepping up fixing bolt away from electrical body;Its step is:
(1) first WSM wire clamps are first fixed on the drainage thread handled well, while main traverse line overlap joint mouth unclamps, are easy to be caught in Guide line;(2) ditch lines are divided by drainage thread and WSM using instruments such as insulated lock lever, fixing-line device action bars during band electrical bonding drainage thread Folder is transferred to guide line lap position and is caught in main traverse line;(3) live-wire insulation tool operating personnel insulation carrying tool, on bar or Ground carries out tightening WSM bolts at a distance.
The beneficial effects of the invention are as follows WSM points of ditch wire clamps realize drainage thread and main traverse line point ditch is fixed and can be used absolutely Edge action bars carries out the technology of livewire work, further meets 10kV distribution lines and can not have a power failure and is overlapped and removed drainage Line, improves operating efficiency, reduction operation labor intensity, the transport for reducing distribution line live working respective items purpose and artificial etc. Cost.WSM points of ditch wire clamp design models and the requirement of parameter active response current device, data combine current universal fastener parameter, Applicable data span is bigger, more flexible handy.WSM points of ditch wire clamps mainly have tetra- kinds of models of WSM-1, WSM-2, WSM-3, WSM-4 Be applicable line footpath fromExtremely
Operating personnel can operation again can be on bar on insulation carrying tool when in use for live line work insulating operation instrument Or ground potential operation, technical research, which is designed, combines powered job behavior, meets intermediate potential and earth potential working method, when using only Find appropriate job position accurately, coordinate WSM points of ditch wire clamp operating personnel that bolt is tightened and reinforced, operating personnel with it is powered The distance of body is beyond safe distance, and operation person risk will arrive minimum, and the activity duration is greatly shortened while reducing work Industry cost, improves operating efficiency.
Charged insulating operation instrument is suitably operated in multiprocessing thought of as industry, and insulation distance is enough, easy to operate, personnel Feel that safe light, construction technology is reliable;(4) implement overlapped using this method, is easy to powered dismounting, is equally not required to stop Electricity can carry out operation.
Brief description of the drawings
Fig. 1 is WSM of the present invention points of ditch cable clamp structure schematic diagrames;
Fig. 2 is Figure 1A-A sectional view;
Fig. 3 is live line work insulating operation instrument structural representation;
This 10kV of Fig. 4 circuits band electrical bonding and dismounting drainage thread apparatus for work schematic diagram.
Embodiment
A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and its operational method, the invention is characterised in that, Device includes WSM points of ditch wire clamps and live line work insulating operation instruments, wherein:
WSM points of ditch wire clamps include:Main pressure screw 4, partial pressure screw 5, S type partial pressures piece 3, upper main pressing plate 1, lower main pressing plate 2 totally 5 Individual part;Wherein, upper main pressing plate is a rectangle, twice wire casing 1.1 is offered upwards in upper main pressing plate length, in twice wire casing Main pressure screw hole 1.2 is uniformly offered between 1.1, partial pressure screw hole is further opened between upper main pressure screw hole 1.2 1.3;Lower main pressing plate 2 is a rectangle, and twice wire casing 2.1 is offered upwards in lower main pressing plate length, between twice wire casing 2.1 Cloth offers lower main pressure screw hole 2.2, and lower partial pressure screw hole 2.3, lower main pressing plate are further opened between lower main pressure screw hole 2.2 2 with upper main pressing plate 1 structurally corresponding;S type partial pressure pieces are integrally rectangle, and section is S types, are opened up in the distribution of S type partial pressures piece Partial pressure screw hole 3.2 is further opened between main pressure screw hole 3.1;Both sides are provided with symmetrical not opposite semicircular arc wire casing 3.3; Make-up is connected the wire casing of upper main pressing plate 1 and lower main pressing plate 2 respectively inwards, and the arc-shaped hole of twice wire casing make-up formation is used to clamp The drainage line end and leading line end of wire clamp overlapped points, S type partial pressures piece 3 are located between main pressing plate 1 and lower main pressing plate 2, for leading Line is separately fixed and for adjusting current-carrying part and its tight ness rating;Main pressure screw 4 is each passed through main pressure screw hole 1.2, lower master Screw hole 2.2 is pressed, upper and lower main pressing plate is connected, while realizing point ditch function with S type partial pressures piece 3 and being realized with lower main pressing plate 2 whole Body reinforcement by connection function;Partial pressure screw 5 is each passed through partial pressure screw hole 1.3, lower partial pressure screw hole 2.3, main screw 3.3, by S Type partial pressure piece 3 and upper and lower main pressing plate are fixed, and play the fixation separated to wire ditch, realize the reliable of drainage thread and main traverse line Connection.
Live line work insulating operation instrument, including the insulating sleeve 6 at top, the insulation tube 7 at middle part and the ratchet-type of bottom The big part of torque boosting-rod 8 three composition;Wherein:
Insulating sleeve 6 is a cylindrical tube, and its outer layer sets expoxy glass insulation or insulation vinyl chloride insulation, and top is interior Hexagonal openend, interior shared seven kinds of 14mm, 17mm, 19mm, 21mm, 24mm, 27mm of hexagonal connection opening;Bottom is blind end, Openend is along cylinder provided with prismatic connection socket 6.1 in one section, and blind end carries the shank 6.2 of an external threading;
Insulation tube 7 is round tube, and two ends are tapped with internal thread, and every group 5 is saved, and often saves 1200mm;Often section insulation tube 7 two ends pass through It is attached using with externally threaded transition joint 9;The two ends of transition joint 9 are threaded slotting cervical part of esophagus 9.1, in slotting cervical part of esophagus 9.1 On offer pin hole 9.2, the slotting cervical part of esophagus 9.1 at the two ends of transition joint 9 is socketed with insulation tube 7 respectively, by pin hole 9.2 and absolutely The pin joint of set pin-and-hole 7.1 opened up on edge pipe 7 is fixed, and the connector that insulation tube lowermost is connected with torque boosting-rod 8 uses ratchet Translation interface, the interface is square, and specification is 12mm*12mm, and interior sets spring steel ball anticreep groove;
Insulation tube 7 uses damp-proof epoxy resin pulling pipe, diameter phi 30mm, wall thickness 2.5mm, every group of insulation tube overall length 6000mm。
The present invention is, using WSM points of ditch wire clamps and charged insulating operation instruments, to fix drainage thread and main traverse line point ditch, after It is moved to after main traverse line lap position and blocks main traverse line, then passes through carrying tool or the ground potential of insulating with charged insulating operation instrument Carry out stepping up fixing bolt away from electrical body;Its step is:
(1) first WSM wire clamps are first fixed on the drainage thread handled well, while main traverse line overlap joint mouth unclamps, are easy to be caught in Guide line;(2) ditch lines are divided by drainage thread and WSM using instruments such as insulated lock lever, fixing-line device action bars during band electrical bonding drainage thread Folder is transferred to guide line lap position and is caught in main traverse line;(3) live-wire insulation tool operating personnel insulation carrying tool, on bar or Ground carries out tightening WSM bolts at a distance;
Charged insulating operation instrument is suitably operated in multiprocessing thought of as industry, and insulation distance is enough, easy to operate, personnel Feel that safe light, construction technology is reliable;(4) implement overlapped using this method, is easy to powered dismounting, is equally not required to stop Electricity can carry out operation.
The inventive method is, using WSM points of ditch wire clamps and charged insulating operation instruments, to consolidate drainage thread and main traverse line point ditch It is fixed, after be moved to after main traverse line lap position and block main traverse line, then with charged insulating operation instrument by insulate carrying tool or Ground potential carries out stepping up fixing bolt away from electrical body.
Operational method:
1. operating personnel 2 to 3, WSM wire clamps operating personnel 1, insulated operating tool operating personnel 1, work commander People one, other staff are increased and decreased according to operation field complex situations.
2. operation key step:
(1) first WSM wire clamps are first fixed on the drainage thread handled well, while main traverse line overlap joint mouth unclamps, are easy to be caught in Guide line;
(2) ditch lines are divided by drainage thread and WSM using instruments such as insulated lock lever, fixing-line device action bars during band electrical bonding drainage thread Folder is transferred to guide line lap position and is caught in main traverse line;
(3) live-wire insulation tool operating personnel are on insulation carrying tool, bar or ground carries out tightening WSM spiral shells at a distance Bolt;
(4) insulated operating tool and locking wire bar are recalled.
3. different type job requirements and technical measures:
(1) charged insulating operation instrument is suitably operated in multiprocessing thought of as industry, insulation distance is enough, easy to operate, Personnel feel that safe light, construction technology is reliable;The implement overlapped using this method, is easy to powered dismounting, is equally not required to Power failure can carry out operation.
(2) operating personnel selects suitable job position, and 0.4m is cannot be less than apart from 10kV electrical body distances, operates bar portion Part insulated lengths cannot be less than 0.7 meter, and air humidity is not more than 80% during operation, and wind speed is less than 10.7m/S, and optionally takes Prevent the control measure of drainage thread elastics wing and windage yaw;
(3) drainage thread is fixed using instruments such as insulated lock lever, fixing-line device action bars, prevents it from arbitrarily swinging, regard simultaneously Situation takes the measure for preventing that wire from swinging.
(4) the main pressure bolt of insulated operating tool alignment WSM wire clamps, rotate counterclockwise, to accomplish when firmly " steady, even, Just ", after after bolt Hui Song, WSM wire clamps and drainage thread is removed with locking bar, is finally discharged and is grounded.
(5) instrument and insulation masking for preventing that wire from swinging are removed, end-of-job is removed.
4. earth potential working method uses WSM wire clamps and the powered overlap joint of operation Work tool, dismounting drainage thread:
Librarian use ascending tool station on shaft tower or ground carry out using WSM wire clamps and operation Work tool it is powered overlap joint, Drainage thread operation is removed, human-body potential is equal with the earth, operation instrument insulating bar part is phase ground major insulation, and the air gap is phase Between major insulation, other personal protection apparatus and insulation masking apparatus be supplementary insulation.
(1) step on before bar, pole-footing, bracing wire should be checked, do impact test to safety belt and climbers, it is qualified after can just step on bar work Industry;
(2) high-rise working answers proper use of safety belt, climbers, and the protection of safety belt must not be lost when indexable.Safety belt should The principle being of use by high extension is fastened on firm component;
(3) fence is installed around workplace, and traffic warning board is installed in corresponding site, all staff on board, which enters, to be made Industry scene must correct safe wearing cap;
(4) it must fasten and surely toggle during lifting tool material, lift by crane long part instrument application tail rope control;
(5) livewire work personnel must use kit, prevent instrument from dropping, and must not have personnel to be teased immediately below setting Stay and pass through;
(6) insulating bar used, insulated shielding cover, personal protection utensil must assure that the pass the test phase by operation It is interior, before instrument, should go through its whether damage, deform, failure;
(7) livewire work personnel should should use insulating glove, wear insulation safety cap;
(8) the minimum electrical safety distance of livewire work personnel reply electrical body, and effective insulation of insulation ropes are long Degree cannot be less than 0.4m, and effective insulated lengths of insulating bar cannot be less than 0.7m, use preceding progress insulating tool segmentation Insulation monitoring (the wide 2cm of electrode, the wide 2cm of interpolar), resistance cannot be less than 700M Ω, within the pass the test phase, and no breakage is placed in On the moistureproof cushion dry, cleaned, it is to avoid damage, insulating tool, metal Work tool, material, which should classify, to be put, and operating personnel is not Bare-handed contact insulating tool is obtained, insulating tool is wiped and uses cotton towels;
(9) tool for transmitting, material should use insulating cord;
(10) livewire work should be carried out under good weather, in case of thunder and lightning (hear thunder, see lightning), snow, hail, Rain, thick fog etc., should not carry out livewire work.Wind-force is more than 10m/s, when humidity is more than 80%, should not carry out livewire work;
(11) if meeting change in weather during livewire work, it is possible to when jeopardizing the person or equipment safety, should stop immediately Work, should restorer normal condition, or take other measures as early as possible on the premise of ensuring personal safety;
(12) to the electrical body that the person gets an electric shock may be caused to carry out insulation masking in job area, masking intersection is many In 15cm;
(13) insulation masking should be according to from closely to remote, principle from top to bottom;Dismounting order is opposite;
(14) branch line capacitance current is not more than 0.3A when (stream) line is drawn in breaking and connecting;
(15) before working, it should be ensured that branched line is no ground, insulation is good, nobody works, phase is correct, and disjunction equipment is equal Disconnect.On-load breaking and connecting are forbidden to draw (stream) line;
(16) when drawing (stream) line and being fixed on shaft tower, phase spacing cannot be less than 0.3m, and mutually distance cannot be less than 0.25m;
(17) breaking and connecting draw the safe distance of electrical body and grounding body in (stream) line process and cannot be less than 0.4m, adjacent powered Safe distance cannot be less than 0.6m between body;
(18) wire clamp is removed;
(19.1) breaking should be first near rear remote when drawing (stream) line, gets on, get off;
(19.2) livewire work personnel #1 electrician pins near-end wire clamp with wire clamp supporting rod, and draws (stream) line with locking bar pinning Top, #2 electrician removes cable clip bolt with wire clamp assembly and disassembly bar;
(19.3) draw (stream) line during dismounting wire clamp keeps 0.6m, grounding body to keep more than 0.4m's with adjacent electrical body Safe distance;
(19.4) (stream) line that draws disconnected will be powered because of sensing, not forbid bare-handed touch before taking measures.
(19.5) livewire work personnel #1, #2 electricians cooperation will draw (stream) line and ground connection is slowly put down along line direction and is fixed On cross-arm or shaft tower;
(19.6) draw (stream) line do not forbid before taking measures it is bare-handed touch, the distance after ground connection with adjacent electrical body must not be small In 0.4m.
(20) wire clamp is overlapped:
(20.1) connecing should be first remote rear near when drawing (stream) line, first up and then down;
(20.2) livewire work personnel #1 electrician removes to be pinned with locking bar after main line oxide layer at overlapped points and drawn on (stream) line Portion, and parallel groove clamp is delivered into overlapped points with wire clamp supporting rod, and main line is put into wire clamp groove.#1 electrician keeps control wire clamp Supporting rod;
(20.3) locked (stream) line that draws is delivered to overlapped points by livewire work personnel #2 electrician, and is put into another groove of wire clamp It is interior, locking bar is handed over after #1 electrician's control with wire clamp assembly and disassembly bar fastening wire clamp bolt.#2 electrician is completed after fastening, and #1 electrician exits line Press from both sides supporting rod insulated lock lever;
(20.4) livewire work personnel #1 electrician with wire clamp supporting rod by another parallel groove clamp deliver to overlapped points and by main line, Draw (stream) line to be put into wire clamp groove, #2 electrician assembles and disassembles bar fastening wire clamp bolt with wire clamp;
(20.5) draw after the connection of (stream) line, (stream) line that draws not connect will be powered because of sensing, not forbid before taking measures red Hand is touched.
(21) when overlapping or removing drainage thread operation, it is necessary to take the reliable measure for preventing wire from swinging.
5. medial potential working method uses WSM wire clamps and the powered overlap joint of operation Work tool, dismounting drainage thread:Aerial lift device with insulated arm Working system:
(1) aerial lift device with insulated arm reliable ground, ground wire should using have transparent sheath be not less than 25mm2Multiply soft copper Line, temporary grounding body buried depth should be not less than 0.6m;
(2) check that insulation bucket, insulation arm ensure its cleaning, flawless, not damaged;
(3) empty bucket examination operation is carried out in the case where special messenger guards, hydraulic drive, revolution, lifting, telescopic system work is being confirmed just Often, operate flexibly, brake apparatus is reliable;
(4) stand should avoid nearby power line and barrier, and when can guarantee that operation aerial lift device with insulated arm insulation arm Effective insulated lengths are not less than 1.0m;
(5) supporting leg, which should not be propped up, is placed on raceway groove cover plate;
(6) soft ground should use backing plate or sleeper;
(7) it is in level around vehicle, four-wheel should be liftoff;
(8) note avoiding neighbouring high and low pressure circuit and all kinds of barriers during examination operation, with its safe enough distance.
Insulate scaffold, insulating ladder working system:
(1) scaffold that insulate should be cleaned, flawless, not damaged;
(2) suitable position is selected to build, insulation scaffold, insulating ladder must carry out levelling to four leg positions before building;
(3) each several part connection hasp in place, and must be plugged safety plug;
(4) it should prevent from riding over the places such as ditch, bank when insulation scaffold, insulating ladder are built;
(5) insulation scaffold, insulating ladder, which are built, must set special messenger commander, and the personnel of building should be from insulation scaffold inner frame Under.
Other safety notices:
(1) operation must assure that in the pass the test phase using insulating tool, personal protection utensil, before instrument, Should go through its whether damage, deform, failure;
(2) livewire work personnel should dress insulating protection apparatus, keep being dielectrically separated from surrounding objects, insulating glove and anti- Piercing through gloves must use simultaneously;
(3) safe distance of electrical body and grounding body cannot be less than safe distance between 0.4m, adjacent electrical body and cannot be less than 0.6m, operating personnel forbids to contact different potentials simultaneously, forbids to break end while contacting two, wire that is access failure or having disconnected, Circuit is sealed in prevent human body;
(4) tool for transmitting, material should use insulating cord, and effective insulated lengths of insulating cord cannot be less than 0.4m.
(5) livewire work should be carried out under good weather, in case of thunder and lightning (hear thunder, see lightning), snow, hail, rain, Thick fog etc., should not carry out livewire work.When wind-force is more than 10m/s, or humidity more than 80%, livewire work should not be carried out;
(6) if meeting change in weather during livewire work, it is possible to when jeopardizing the person or equipment safety, work should be stopped immediately Make, on the premise of ensuring personal safety, restorer normal condition, or take other measures as early as possible;
(7) installing insulation measures should defer near to remote, principle from top to bottom;Remove insulation measures principle opposite;
(8) when using insulating glove working system, no matter operating personnel and the air gap of grounding body and adjacent electrical body are Electrical body and grounding body in the range of being both needed to that human body may be touched before safe distance as defined in no satisfaction, operation carry out insulation screening Cover.Junction between masking apparatus should have the intersection more than 15cm, and wire rocks unsuitable excessive;
(9) safe distance of electrical body and grounding body cannot be less than safe distance between 0.4m, adjacent electrical body and cannot be less than 0.6m, operating personnel forbids while contacting different potentials;
(10) breaking and connecting should estimate circuit no-load current before drawing (stream) line, it is ensured that meet job requirements;
(11) on-load breaking and connecting are forbidden to draw (stream) line.
(12) fence is installed around workplace, and traffic warning board is installed in corresponding site, all staff on board enters Operation field must correct safe wearing cap;
(13) bearing tool must not excess constant load use;
(14) it must fasten and surely toggle during lifting tool material, using tail rope control during the long part instrument of colligation;
(15) operating personnel must use kit, prevent instrument from dropping, and must not have personnel to be stayed immediately below setting With pass through.

Claims (2)

1. a kind of 10kV circuits band electrical bonding and remove drainage thread apparatus for work, it is characterised in that including WSM points of ditch wire clamps and Live line work insulating operation instrument, wherein:
WSM points of ditch wire clamps include:Main pressure screw (4), partial pressure screw (5), S type partial pressure pieces (3), upper main pressing plate (1), lower main pressing plate (2) totally 5 parts;Wherein, upper main pressing plate is a rectangle, twice wire casing (1.1) is offered upwards in upper main pressing plate length, two Main pressure screw hole (1.2) is uniformly offered between road wire casing (1.1), is further opened between upper main pressure screw hole (1.2) Partial pressure screw hole (1.3);Lower main pressing plate (2) is a rectangle, and twice wire casing (2.1) is offered upwards in lower main pressing plate length, Lower main pressure screw hole (2.2) is uniformly offered between twice wire casing (2.1), is further opened between lower main pressure screw hole (2.2) Lower partial pressure screw hole (2.3), lower main pressing plate (2) is with upper main pressing plate (1) structurally corresponding;S type partial pressure pieces are integrally rectangle, Section is S types, and partial pressure screw hole (3.2) is further opened between the distribution of S type partial pressures piece opens up main pressure screw hole (3.1);Both sides Provided with symmetrically not opposite semicircular arc wire casing (3.3);The wire casing of upper main pressing plate (1) and lower main pressing plate (2) is right respectively inwards Button connection, the arc-shaped hole of twice wire casing make-up formation is used for the drainage line end and leading line end for clamping wire clamp overlapped points, S types point Tabletting (3) is located between main pressing plate (1) and lower main pressing plate (2), for wire it is separately fixed and for adjust current-carrying part and Its tight ness rating;Main pressure screw (4) is each passed through main pressure screw hole (1.2), lower main pressure screw hole (2.2), by upper and lower main pressing plate Connection, while realizing point ditch function with S type partial pressure pieces (3) and realizing that integrated connection reinforces function with lower main pressing plate (2);Partial pressure spiral shell Silk (5) is each passed through partial pressure screw hole (1.3), lower partial pressure screw hole (2.3), main screw (3.3), by S type partial pressure pieces (3) and Upper and lower main pressing plate is fixed, and plays the fixation separated to wire ditch, realizes being reliably connected for drainage thread and main traverse line;
Live line work insulating operation instrument, including the insulating sleeve (6) at top, the insulation tube (7) at middle part and lower ratchet formula The big part of torque boosting-rod (8) three is constituted;Wherein:
Insulating sleeve (6) is a cylindrical tube, and its outer layer sets expoxy glass insulation or insulation vinyl chloride insulation, and top is interior six Angle openend, interior shared six kinds of 14mm, 17mm, 19mm, 21mm, 24mm, 27mm of hexagonal connection opening;Bottom is blind end, is opened Mouth end is along cylinder provided with prismatic connection socket (6.1) in one section, and blind end carries the shank (6.2) of an external threading;
Insulation tube (7) is round tube, and two ends are tapped with internal thread, and every group 5 is saved, and often saves 1200mm;Often section insulation tube (7) two ends pass through It is attached using with externally threaded transition joint (9);Transition joint (9) two ends are threaded slotting cervical part of esophagus (9.1), in slotting neck Pin hole (9.2) is offered in section (9.1), the slotting cervical part of esophagus (9.1) at transition joint (9) two ends is socketed with insulation tube (7), led to respectively Cross set pin-and-hole (7.1) pin joint opened up on pin hole (9.2) and insulation tube (7) to fix, insulation tube lowermost and torque boosting-rod (8) connector of connection uses ratchet translation interface, and the interface is square, and specification is 12mm*12mm, and interior sets spring steel ball Anticreep groove;
Insulation tube (7) uses damp-proof epoxy resin pulling pipe, diameter phi 30mm, wall thickness 2.5mm, every group of insulation tube overall length 6000mm。
2. a kind of operational method of the 10kV circuits according to claim 1 with electrical bonding and dismounting drainage thread apparatus for work, Characterized in that, be, using WSM points of ditch wire clamps and charged insulating operation instruments, to fix drainage thread and main traverse line point ditch, it is rear to move Move to main traverse line lap position and block main traverse line, then with charged insulating operation instrument by insulate carrying tool or ground potential it is remote Carry out stepping up fixing bolt from electrical body;Its step is:
(1) first WSM wire clamps are first fixed on the drainage thread handled well, while main traverse line overlap joint mouth unclamps, are easy to be caught in guidance Line;
(2) drainage thread and WSM points of ditch wire clamps are moved using instruments such as insulated lock lever, fixing-line device action bars during band electrical bonding drainage thread Deliver to guide line lap position and be caught in main traverse line;
(3) live-wire insulation tool operating personnel are on insulation carrying tool, bar or ground carries out tightening WSM bolts at a distance.
CN201510740519.8A 2015-10-23 2015-11-04 A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method Active CN105449392B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510740519.8A CN105449392B (en) 2015-10-23 2015-11-04 A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN2015106956386 2015-10-23
CN201510695638 2015-10-23
CN201510740519.8A CN105449392B (en) 2015-10-23 2015-11-04 A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method

Publications (2)

Publication Number Publication Date
CN105449392A CN105449392A (en) 2016-03-30
CN105449392B true CN105449392B (en) 2017-08-29

Family

ID=55559336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510740519.8A Active CN105449392B (en) 2015-10-23 2015-11-04 A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method

Country Status (1)

Country Link
CN (1) CN105449392B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106058764B (en) * 2016-06-27 2018-06-19 国网山东省电力公司商河县供电公司 A kind of livewire work drainage thread and method using its drainage of cultrating
CN107171162B (en) * 2017-07-02 2024-02-27 深圳市智荷能源科技有限公司 Parallel groove clamp assembling and disassembling operation tool
CN107370079A (en) * 2017-09-21 2017-11-21 国网冀北电力有限公司技能培训中心 It is a kind of to connect and hook the livewire work method of clip lead
CN109921335A (en) * 2019-03-25 2019-06-21 云南电网有限责任公司昆明供电局 Pylon route uses extinguishing arc rope ground potential breaking and connecting drainage thread working system
CN110635392B (en) * 2019-10-15 2020-09-04 国网湖南省电力有限公司 Distribution network live disconnection and connection method based on remote operation
CN110912023A (en) * 2019-12-04 2020-03-24 云南电网有限责任公司带电作业分公司 Operation method for breaking or connecting 10kV drop fuse drainage wire of insulating short rod
CN110797796A (en) * 2019-12-05 2020-02-14 云南电网有限责任公司带电作业分公司 Streamline operation method for breaking or connecting breaker of insulating short rod
CN111055294B (en) * 2019-12-13 2021-08-10 国网浙江嘉善县供电有限公司 Live working manipulator
CN110994454B (en) * 2019-12-16 2021-03-16 国网北京市电力公司 Insulating operation tool and method for temporary wire clamping hook
CN113572079B (en) * 2021-09-27 2021-12-14 天津滨电电力工程有限公司 Lead lapping device of live working robot and wire clamp installation method
CN114094495B (en) * 2021-12-08 2023-10-31 云南电网有限责任公司临沧供电局 Installation method of wire clamp device with insulation shield type without power outage
CN114725827A (en) * 2022-02-28 2022-07-08 云南电网有限责任公司红河供电局 10kV line live-line breaker live-line voltage transformer disconnection and connection operation method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008172924A (en) * 2007-01-11 2008-07-24 Toko Electric Corp Wire loosening correcting tool
CN101640392A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit
CN103746314A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN103746315A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line

Also Published As

Publication number Publication date
CN105449392A (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN105449392B (en) A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method
CN101771247B (en) Tool for jointing temporary lead wire under live working on rainy day for distribution line and method thereof
CN101640391B (en) Live-wire operation method for replacing insulator for 35kV distribution circuit
CN104868403A (en) Portable 120-to-400mm2 aluminum conductor steel reinforced cable shunting clamp and use method thereof
CN203734209U (en) Live working device for cable bypass
CN205070117U (en) Earthing pole structure
CN103618249A (en) technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower
CN104505763B (en) UHVDC Transmission Lines charged for replacement duplex V string composite insulator operational methods
CN204068050U (en) Electrical lead live line working insulated shielding cover
CN108306215A (en) It is a kind of to tear the unmanned plane for hanging function open with high-voltage circuit grounding line high-altitude
CN204886003U (en) Unmanned aerial vehicle with high voltage transmission lines earth connection high altitude is torn open and is hung function
CN105186338A (en) Construction method of employing insulation bucket arm vehicle insulating gloves with load to change pole top switch device
CN106356758B (en) 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly
CN106207885B (en) The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps
CN104659710B (en) A kind of 500kV power transmission lines roadside phase conductor aerial lift device with insulated arm livewire work method
CN201466574U (en) Device for isoelectrically replacing insulator and accessory of iron tower of transmission line
CN106786146B (en) Tri- identical tower window list back transmission line compact linear towers of 500kV enter equipotential operational method
CN108390311A (en) A kind of V-type insulator chain charged for replacement method of electric power line pole tower
CN104113007A (en) Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN106785521A (en) A kind of combined type ground wire group
CN208024045U (en) A kind of novel power transmission and distribution electric pole
CN206293858U (en) A kind of power equipment lightning arrester
CN104218342B (en) Electric temporary lapping joint device applied to 10kV distribution network
CN208401405U (en) 220kV conductors on quad bundled V-type replacing insulator string tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant