CN105404962B - The transformation appraisal procedure of power system relay protection device and its generation system - Google Patents
The transformation appraisal procedure of power system relay protection device and its generation system Download PDFInfo
- Publication number
- CN105404962B CN105404962B CN201510732873.6A CN201510732873A CN105404962B CN 105404962 B CN105404962 B CN 105404962B CN 201510732873 A CN201510732873 A CN 201510732873A CN 105404962 B CN105404962 B CN 105404962B
- Authority
- CN
- China
- Prior art keywords
- cost
- year
- protective relaying
- relaying device
- transformation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000009466 transformation Effects 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 30
- 230000001681 protective effect Effects 0.000 claims abstract description 39
- 230000007774 longterm Effects 0.000 claims abstract description 7
- 230000015556 catabolic process Effects 0.000 claims description 19
- 230000007257 malfunction Effects 0.000 claims description 12
- 230000008901 benefit Effects 0.000 claims description 9
- 230000001186 cumulative effect Effects 0.000 claims description 9
- 238000012423 maintenance Methods 0.000 claims description 8
- 230000008439 repair process Effects 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 4
- 238000003860 storage Methods 0.000 claims description 4
- 230000008859 change Effects 0.000 claims description 3
- 238000005315 distribution function Methods 0.000 claims description 3
- 238000005265 energy consumption Methods 0.000 claims description 3
- 230000001771 impaired effect Effects 0.000 claims description 3
- 230000009931 harmful effect Effects 0.000 claims 1
- 238000007634 remodeling Methods 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 13
- 238000011156 evaluation Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 208000032368 Device malfunction Diseases 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000013210 evaluation model Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000002269 spontaneous effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
A kind of Reconstruc-tion policy of power system relay protection device, is characterized in that comprising the following steps:S1, calculates protective relaying device Life cycle cost;S2, determines Reconstruc-tion policy:Try to achieve the whole life costing year value minima of protective relaying device:F (n)=Min (ALCC).The generation system of above-mentioned power system relay protection device Reconstruc-tion policy, is characterized in that:Generate system (server, data base, safety protection equipment and application software) including protective relaying device Reconstruc-tion policy; it connects input method of operation management data base, medium-term and long-term plans data base, EMS system and the asset management system, output relay protection transformation project and program respectively.Beneficial effect:(1) it is worth according to whole life costing off year and determines the transformation time, reduce the loss that protective relaying device fault is brought.(2) generation system can complete the transformation assessment of protective relaying device automatically according to power system situation and historical information, alleviates the workload of artificial assessment.
Description
Technical field
The present invention relates to a kind of transformation appraisal procedure of power system relay protection device.The invention still further relates to described relay
Protection device transforms the generation system of appraisal procedure.
Background technology
Abbreviation and Key Term definition
Protective relaying device:When the force device (as electromotor, circuit etc.) in power system or power system itself are sent out
When having given birth to fault and having jeopardized safe operation of power system, can send warning signal in time to operator or directly to
The chopper being controlled sends trip signal to terminate a kind of measure of automatization and the equipment of the development of these events.
Power system the first line of defence:For ensureing power system normal operating condition and bearing single failure (probability of occurrence
Higher fault) when safety requirements, be made up of primary system facility, relay protection and safety and stability preventive control etc..
Any equipment has life cycle, and after equipment reaches service life, probability of failure can greatly increase, protection device
Malfunction and tripping all can bring serious consequence to power system it is therefore desirable to whether transform to the protection device putting into operation and what
When transformation be estimated.
In order to improve electric grid investment benefit, the transformation of usual power equipment adopts Life cycle cost management (LCC) to manage
Read, Multi-Objective Decision Theory and value chain management thought combine, working assets lifecycle management (Life Cycle
Asset Management) theory formulate power equipment Reconstruc-tion policy.Protective relaying device belongs to secondary equipment in power system
One kind, its transformation generally also in this way.
Because relay protection belongs to the first line of defence of power system, the safe and stable operation to power system and guarantee supply
Electric reliability is extremely important, and the Reconstruc-tion policy therefore formulated from the angle of equipment itself merely, due to not examining
Consider protective relaying device and be arranged on the impact that in power system, position difference is brought it is impossible to react the urgent journey of transformation completely
Degree, needs the other indexs of increase to be weighed;Also have and be exactly, the Reconstruc-tion policy formulated from the angle of equipment itself merely, also not
Consider difference on different time for the protective relaying device operation risk, often only consider the situation of most serious it is impossible to comprehensively anti-
Reflect the urgent degree of scrap build demand.
Prior art one related to the present invention
The technical scheme of prior art one
Chinese patent is announced and disclosed application publication number on bulletin is CN104063551A, entitled《A kind of aviation electronics
The modeling method of system Life cycle unified model》Chinese invention patent application, this invention is related to a kind of aviation electronics system
The modeling method of system Life cycle unified model, including:Avionics system is resolved into system, subsystem, equipment, module
And element;According to development dimension, set up demand model, framework model, Action logic model, man-machine interaction model, ICD mould
Type, hardware model, software model and test model;Set up the annexation between each model, form system-level model, subsystem
Level model, device level model, module level model and Element-Level model;Integrated system level model, subsystem level model, device level mould
Type, module level model and Element-Level model, form unified model.With it, avionics system can be set up exactly
Life cycle unified model, this unified model can be to the overall software/hardware framework of avionics system, function, interface, behavior
Described etc. effectively, support system-level comprehensive simulating, realize the seamless delivery of data in R&D process.
The shortcoming of prior art one
(1) only from the feature of electronic system itself, set up electronic system Life cycle model, do not consider Department of Electronics
The application places of system, i.e. applied environment;
(2) only from the feature of electronic system itself, do not consider that the system failure or defect cause the cost of consequence;
Prior art two related to the present invention
The technical scheme of prior art two
Chinese patent is announced and disclosed Authorization Notice No. on bulletin is CN204205711U, entitled《Power transformation in transformer station
Primary equipment Life cycle data collecting system》Chinese utility model patent application, this utility model discloses transformer station
Interior power transformation primary equipment Life cycle data collecting system.This system is by radio frequency recognizing electronic label, mobile operation PDA, logical
With universal serial bus, handling of goods and materials work station, production management's work station, backbone switch and device status data collection and management
The server composition of system.This utility model has advantages below:This utility model system makes between power production management personnel
And network interdynamic can be carried out between production management personnel and electrical network and be immediately connected, confluence analysiss are carried out to data message,
Realize data real-time, at a high speed, the general effect of transmitted in both directions, for improving reliability, the availability of power transformation primary equipment, make
Run and management reaches optimization.2. this utility model system promotes the raising further of intelligent grid level, is distributed number
According to collection create necessary condition;And by data interaction realize electrical network Observable, controllable, can spontaneous recovery.
The shortcoming of prior art two
This utility model lays particular emphasis on information gathering and the system design of managed devices, not to how carrying out full Life Cycle
Period management proposes concrete grammar.
Content of the invention
First technical problem to be solved by this invention is it is simply that provide a kind of transformation of power system relay protection device
Appraisal procedure.
Second technical problem to be solved by this invention is it is simply that provide a kind of described protective relaying device to transform assessment side
The generation system of method.
The protective relaying device transformation appraisal procedure that system generates is generated using the transformation appraisal procedure of the present invention, first may be used
Realize the transformation of protective relaying device strategy quantification of targets;Secondly by design relay protection transformation assessment system, enable to continuing
The real-time Risk-warning of electrical protective device running status, system can count and specify risk (such as certain year in the time period as needed
Interior);Can be also finally relay protection improvement project by setting up the comprehensive evaluation index model of relay protection Reconstruc-tion policy
Decision-making foundation is provided.
Solve above-mentioned first technical problem, the technical solution used in the present invention is as follows:
A kind of transformation appraisal procedure of power system relay protection device, is characterized in that comprising the following steps:
S1, calculates protective relaying device Life cycle cost
The LCC cost structure model of protective relaying device is:
CLCC=CI+CO+CM+CF+CD
In formula:
CLCCRepresent overall life cycle cost;
CIRepresent initial outlay cost, including original equipment cost, traffic expense, warehousing charge and installation and debugging expense;
CORepresent operating cost, including energy consumption cost, operations staff's expense and operational and administrative expenses;
CMRepresent repair and maintenance cost, use including the cost of overhaul and change material installation expense;
CFRepresent breakdown loss cost;Including the direct cost causing because of immediate cause or factor, and social bad shadow
Ring and the impaired indirect loss causing of prestige;
Described direct cost includes:Interruption of power supply failure costs, fault restoration expense, equipment performance and life consumption take
With;
CDRepresent retired cost of disposal, refer to remove the residual value of old engineering cost and used equipment;
Carry out failure cost CFDuring calculating, in addition it is also necessary to calculate probability of malfunction in addition to needing to calculate breakdown loss expense;
Probability of malfunction refers to the number of times of device fails in the regular period, and probability of malfunction is annualized;
CF=CFg×CFf
In formula:
CFgFor fault rate;
CFfFor breakdown loss expense;
(1) fault rate
Fault rate is calculated with the reliability of equipment, and the characteristic quantities of equipment have reliability R (t), lost efficacy
Probability density f (t), cumulative failure probability F (t), crash rate λ (t) and average life MTTF/MTBF;
Wherein fault rate to be represented with cumulative failure probability F (t);
Cumulative failure probability F (t) is exactly life distribution function, also referred to as unreliable degree, and it is the condition in regulation for the product
The probability losing efficacy down and in the time of regulation, is expressed as:
F (t)=P (T≤t)=1-R (t);
(2) secondary device breakdown loss expense
The failure costs that secondary device fault produces is personal security incident event, power equipment accident event and power ampere
The loss sum that full accident event causes;
S2, determines transformation appraisal procedure
Year, value class index was according to basic discount rate by Life cycle cost, and the resources flow that each year is occurred is converted and is
The uniform annuity sequence that is equivalent, being distributed in each year end with this net cash flow sequence;
The computing formula that year is worth class index is as follows:
In formula:
ASE represents Life cycle benefit year value;
PSE represents Life cycle benefit present worth;
N represents life cycle;
I represents basic discount rate;
ALCC represents that Life cycle becomes this year value;
PLCC represents Life cycle present value of cost;
It is worth class index from index for year, i.e. whole life costing year value:
LCCjRepresent the income in jth year.
Therefore protective relaying device transformation strategy as try to achieve protective relaying device whole life costing year value
Little value:
F (n)=Min (ALCC).
Solve above-mentioned second technical problem, the technical solution used in the present invention is as follows:
A kind of above-mentioned power system relay protection device transforms the generation system of appraisal procedure, it is characterized in that:Including relay
Protection device Reconstruc-tion policy generates system (server, data base, safety protection equipment and application software) 1, and it connects defeated respectively
Enter method of operation management data base 2, medium-term and long-term plans data base 3, EMS4 and Properties MIS 5, export relay protection
Transformation project and program 6;
Described method of operation management database purchase output power system status information, medium-term and long-term plans data stock
Store up and export information at a specified future date, EMS storage output power system real time status, assets information system to store and export relay protection
Production time (time started of Life cycle), initial outlay cost, operating cost, repair and maintenance cost;
Described protective relaying device Reconstruc-tion policy generates system according to the load condition obtaining from EMS and assets information system
It is calculated breakdown loss cost during the probability of malfunction situation that system obtains, obtained by calculating whole life costing year value minima
To the transformation time of protective relaying device, and according to the real time status information of power system, result is modified.
The beneficial effect that technical solution of the present invention is brought:
(1) formulated the transformation appraisal procedure of protective relaying device, changed according to whole life costing off year value determination
Make the time, reduce the loss that protective relaying device fault is brought.
(2) its generation system is devised according to transformation appraisal procedure, can believe automatically according to power system situation and history
Breath completes the transformation assessment of protective relaying device, alleviates the workload of artificial assessment, automatically generates the item of protection device transformation
Mesh storehouse and program.
Brief description
Fig. 1 is the generation system composition of power system relay protection device transformation appraisal procedure and the annexation of the present invention
Schematic diagram.
Specific embodiment
As shown in figure 1, the power system relay protection device of the present invention transforms the generation system embodiment of appraisal procedure, bag
Include protective relaying device Reconstruc-tion policy and generate system 1, it connects input method of operation management data base 2, medium-term and long-term plans respectively
Data base 3, EMS4 and Properties MIS 5, output relay protection transformation project and program 6.
Method of operation management database purchase output power system status information, medium-term and long-term plans database purchase defeated
Go out information at a specified future date to store and export relay from planning acquisition, EMS storage output power system real time status, assets information system
The production time (time started of Life cycle) of protection, initial outlay cost, operating cost, repair and maintenance cost;Relay
Protection device Reconstruc-tion policy generates the probability of malfunction feelings that system obtains according to the load condition obtaining from EMS and assets information system
It is calculated breakdown loss cost during condition, be worth to changing of protective relaying device by calculating whole life costing year value minimum
Make the time, and according to the real time status information of power system, result is modified.
The transformation appraisal procedure embodiment of the power system relay protection device of the present invention, comprises the following steps:
S1, calculates protective relaying device Life cycle cost
The LCC cost structure model of protective relaying device is:
CLCC=CI+CO+CM+CF+CD
In formula:
CLCCRepresent overall life cycle cost;
CIRepresent initial outlay cost, including original equipment cost, traffic expense, warehousing charge, installation and debugging expense;
CORepresent operating cost, including energy consumption cost, operations staff's expense and operational and administrative expenses;
CMRepresent repair and maintenance cost, use including the cost of overhaul and change material installation expense;
CFRepresent breakdown loss cost;Including the direct cost causing because of immediate cause or factor, and social bad shadow
Ring and the impaired indirect loss causing of prestige;
Described direct cost includes:Interruption of power supply failure costs, fault restoration expense, equipment performance and life consumption take
With;
CDRepresent retired cost of disposal, refer to remove the residual value of old engineering cost and used equipment;
For same type of protective relaying device, such as 500kV line protective devices, its initial outlay cost, run into
Basis, repair and maintenance cost, breakdown loss cost, retired cost of disposal should identical or difference less, breakdown loss cost only
The obvious difference because the installation site of protection equipment, service condition are different.
Carry out failure cost CFDuring calculating, need to calculate breakdown loss expense in addition it is also necessary to calculate probability of malfunction;
Probability of malfunction refers to the number of times of device fails in the regular period, and probability of malfunction is annualized;
CF=CFg×CFf
In formula:
CFgFor fault rate;
CFfFor breakdown loss expense;
(1) fault rate
Fault rate is calculated with the reliability of equipment, and the characteristic quantities of equipment have reliability R (t), lost efficacy
Probability density f (t), cumulative failure probability F (t), crash rate λ (t) and average life MTTF/MTBF;
Wherein fault rate to be represented with cumulative failure probability F (t);
Cumulative failure probability F (t) is exactly life distribution function, also referred to as unreliable degree, and it is the condition in regulation for the product
The probability losing efficacy down and in the time of regulation, is expressed as:
F (t)=P (T≤t)=1-R (t);
(2) breakdown loss expense
Secondary device fault may lead to electric power personal injury event, power equipment accident event and electric power safety accident thing
Part, therefore needs to consider personal safety accident event, power equipment accident event and electric power safety accident thing in failure cost
The loss that part causes;
The failure costs that secondary device fault produces is above-mentioned expense sum;
S2, determines transformation appraisal procedure
Year, value class index was according to basic discount rate by Life cycle cost, and the resources flow that each year is occurred is converted and is
The uniform annuity sequence that is equivalent, being distributed in each year end with this net cash flow sequence;
The computing formula that year is worth class index is as follows:
In formula:
ASE represents Life cycle benefit year value;
PSE represents Life cycle benefit present worth;
N represents life cycle;
I represents basic discount rate;
ALCC represents that Life cycle becomes this year value;
PLCC represents Life cycle present value of cost;
Evaluation criterion for Life cycle benefit present worth index is to be the bigger the better;This year value is become for Life cycle
The evaluation criterion of index is the smaller the better;
In order to overcome the problem of the comparison bore that life cycle difference brings, the index of technological transformation Decision-Making Evaluation model selection is
Year is worth class index, i.e. whole life costing year value:
LCCjRepresent the income in jth year.
This index can overcome different cycles problem, it is contemplated that time value on assets.
Because initial outlay cost (CI) is fixing, operating cost (CO), repair and maintenance cost (CM) and life cycle
It is directly proportional, retired cost of disposal (CD) is reduced with the increase of life cycle, once it is determined that protective relaying device is in systems
Position, the increase with life cycle is increased by breakdown loss cost (CF), because the probability of malfunction of protective relaying device
Increasing.
Therefore protective relaying device transformation strategy as try to achieve protective relaying device whole life costing year value
Little value:
F (n)=Min (ALCC).
Claims (2)
1. a kind of transformation appraisal procedure of power system relay protection device, is characterized in that comprising the following steps:
S1, calculates protective relaying device Life cycle cost
The LCC cost structure model of protective relaying device is:
CLCC=CI+CO+CM+CF+CD;
In formula:
CLCCRepresent overall life cycle cost;
CIRepresent initial outlay cost, including original equipment cost, traffic expense, warehousing charge and installation and debugging expense;
CORepresent operating cost, including energy consumption cost, operations staff's expense and operational and administrative expenses;
CMRepresent repair and maintenance cost, use including the cost of overhaul and change material installation expense;
CFRepresent breakdown loss cost;Including the direct cost causing because of immediate cause or factor, and social harmful effect and letter
Praise the impaired indirect loss causing;
Described direct cost includes:Interruption of power supply failure costs, fault restoration expense, equipment performance and life consumption expense;
CDRepresent retired cost of disposal, refer to remove the residual value of old engineering cost and used equipment;
Carry out breakdown loss cost CFDuring calculating, in addition it is also necessary to calculate probability of malfunction in addition to needing to calculate breakdown loss expense;
Probability of malfunction refers to the number of times of device fails in the regular period, annualized;
CF=CFg×CFf;
In formula:
CFgFor fault rate;
CFfFor breakdown loss expense;
(1) fault rate
Fault rate is calculated with the reliability of equipment, and the characteristic quantities of equipment have reliability R (t), failure probability
Density f (t), cumulative failure probability F (t), crash rate λ (t) and average life MTTF/MTBF;
Wherein fault rate to be represented with cumulative failure probability F (t);
Cumulative failure probability F (t) is exactly life distribution function, also referred to as unreliable degree, it be product under conditions of regulation and
The probability losing efficacy in the time of regulation, is expressed as:
F (t)=P (T≤t)=1-R (t);
(2) secondary device breakdown loss expense
The failure costs that secondary device fault produces is personal security incident event, power equipment accident event and electric power safety thing
The loss sum that story part causes;
S2, determines Reconstruc-tion policy
Year, value class index was according to basic discount rate by Life cycle cost, and the resources flow that each year is occurred is converted and is and is somebody's turn to do
The uniform annuity sequence that net cash flow sequence is equivalent, be distributed in each year end;
The computing formula that year is worth class index is as follows:
In formula:
ASE represents Life cycle benefit year value;
PSE represents Life cycle benefit present worth;
N represents life cycle;
I represents basic discount rate;
ALCC represents that Life cycle becomes this year value;
PLCC represents Life cycle present value of cost;
It is worth class index from index for year, i.e. whole life costing year value:
LCCjRepresent the income in jth year;
The strategy of protective relaying device transformation as tries to achieve the whole life costing year value minima of protective relaying device:
F (n)=Min (ALCC).
2. a kind of generation system of method as claimed in claim 1, is characterized in that:Generate including protective relaying device Reconstruc-tion policy
System (1), it connects input method of operation management data base (2), medium-term and long-term plans data base (3), EMS (4) and assets respectively
Information management system (5), output relay protection transformation project and program (6);
Described method of operation management data base (2) storage output power system status information, medium-term and long-term plans data base (3)
Store and export information at a specified future date, EMS (4) storage output power system real time status, Properties MIS (5) stores simultaneously
The production time of output relay protection, initial outlay cost, operating cost and repair and maintenance cost;
Described protective relaying device remodeling method generates system according to the load condition obtaining from EMS (4) and assets information pipe
It is calculated breakdown loss cost, by calculating whole life costing year value during the probability of malfunction situation that reason system (5) obtains
Minimum is worth to the transformation time of protective relaying device, and according to the real time status information of power system, result is modified.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510732873.6A CN105404962B (en) | 2015-10-30 | 2015-10-30 | The transformation appraisal procedure of power system relay protection device and its generation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510732873.6A CN105404962B (en) | 2015-10-30 | 2015-10-30 | The transformation appraisal procedure of power system relay protection device and its generation system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105404962A CN105404962A (en) | 2016-03-16 |
CN105404962B true CN105404962B (en) | 2017-03-08 |
Family
ID=55470434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510732873.6A Active CN105404962B (en) | 2015-10-30 | 2015-10-30 | The transformation appraisal procedure of power system relay protection device and its generation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105404962B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106779280B (en) * | 2016-11-10 | 2021-05-11 | 广东工业大学 | Decision-making determination method and system for secondary equipment major repair and technical modification |
CN107364739B (en) * | 2017-06-26 | 2020-06-30 | 中交一航局安装工程有限公司 | Transformation process of car pusher of car dumper system |
CN107247815A (en) * | 2017-07-28 | 2017-10-13 | 中国能源建设集团浙江省电力设计院有限公司 | A kind of thermal power plant's host device Database Systems method for building up based on Life cycle cost |
CN113076711B (en) * | 2021-03-09 | 2024-03-12 | 中国电力科学研究院有限公司 | Relay protection platform hardware design method and system based on component reliability |
CN113869538A (en) * | 2021-10-09 | 2021-12-31 | 广东电网有限责任公司 | Value evaluation method and system for direct-current distribution network control and protection device |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101800402A (en) * | 2009-02-06 | 2010-08-11 | 华东电力试验研究院有限公司 | Expense estimation method of prefabricated substation based on whole life cycle cost model |
PE20150579A1 (en) * | 2012-08-22 | 2015-05-22 | White Lion S A | METHOD, SYSTEM AND SOFTWARE FOR THE MANAGEMENT OF PEOPLE, GOODS AND SERVICES THROUGH THE USE OF AUTOMATIC IDENTIFICATION TECHNOLOGY |
CN104281934A (en) * | 2014-11-03 | 2015-01-14 | 南方电网科学研究院有限责任公司 | Operation evaluation method suitable for full life cycle management for distribution network equipment |
-
2015
- 2015-10-30 CN CN201510732873.6A patent/CN105404962B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105404962A (en) | 2016-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105404962B (en) | The transformation appraisal procedure of power system relay protection device and its generation system | |
Volkanovski et al. | Application of the fault tree analysis for assessment of power system reliability | |
Taheri et al. | Enhancing resilience level of power distribution systems using proactive operational actions | |
CN107092222B (en) | Based on the integrated power grid regulation operational administrative system of anti-error check analysis | |
Fu et al. | Risk assessment for special protection systems | |
CN103700025B (en) | A kind of assessment sort method of power system device importance degree based on risk analysis | |
CN103632310A (en) | Risk evaluation method for operation of large power grid | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
CN103618307B (en) | A kind of emergency control method improving safe stability of power system | |
CN102708411A (en) | Method for evaluating risk of regional grid on line | |
CN102737286A (en) | Online risk analysis system and method for regional power grid | |
CN104299116A (en) | Quantitative evaluation method for security risk of operation of power network | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN102737287A (en) | Regional power grid on-line power supply risk assessment system | |
CN106780145A (en) | A kind of appraisal procedure of relay protection Supportability Evaluation index system | |
CN106709651A (en) | Electric power system safety assessment system based on risk theory | |
CN105447657A (en) | Risk-based operation and maintenance management system of 750KV power equipment | |
CN116523294A (en) | Knowledge graph-based power grid risk early warning and decision system, method and equipment | |
CN105184490A (en) | Power grid dispatching operation process risk auxiliary pre-control system | |
Wang et al. | Risk assessment of power imbalance for power systems with wind power integration considering governor ramp rate of conventional units | |
CN104021501A (en) | PRA (Probabilistic Risk Assessment) based partitioning method for coordinating power-system planning with operation | |
You et al. | A study of electrical security risk assessment system based on electricity regulation | |
Kitazawa et al. | RAMI analysis of the ITER CIS | |
Xu et al. | Influential factor analysis of China's unsustainable electric power system: A case study of Chengdu Electric Bureau | |
CN106199251A (en) | A kind of distribution network failure early warning system analyzed based on adaptive modeling and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |