CN105356595B - A kind of intensive remote-control system - Google Patents

A kind of intensive remote-control system Download PDF

Info

Publication number
CN105356595B
CN105356595B CN201510537874.5A CN201510537874A CN105356595B CN 105356595 B CN105356595 B CN 105356595B CN 201510537874 A CN201510537874 A CN 201510537874A CN 105356595 B CN105356595 B CN 105356595B
Authority
CN
China
Prior art keywords
equipment
remote
tour
module
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510537874.5A
Other languages
Chinese (zh)
Other versions
CN105356595A (en
Inventor
董祖晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Jiangsu Fangtian Power Technology Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Jiangsu Fangtian Power Technology Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Jiangsu Fangtian Power Technology Co Ltd, Changzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201510537874.5A priority Critical patent/CN105356595B/en
Publication of CN105356595A publication Critical patent/CN105356595A/en
Application granted granted Critical
Publication of CN105356595B publication Critical patent/CN105356595B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of intensive managing and control systems, including:Remote virtualization terminal, remote virtualization tour module, stipulations adaptive access module, equipment automatic sign in publishes module on the spot;Remote virtualization terminal makes an inspection tour module by remote virtualization and makes an inspection tour whole transformer station automated system, and automatically will be by the status information real-time display of tour equipment;When discovering device exception, the start and stop of soft and hardware are carried out to corresponding equipment by the remote virtualization terminal remote, that is, realize remote-control;Simultaneously to taking turn daily record is written by the status information of tour equipment;When carrying out the remote-control, to multiple equipment using different communication protocols, according to the condition code in each communication protocol, various communication protocols are simultaneously converted into a kind of communication protocol by the various communication protocols of automatic identification, then carry out the start and stop of soft and hardware.Equipment automatic sign in, which publishes module, on the spot can realize the automated log on of remote equipment.

Description

A kind of intensive remote-control system
The application be application No. is:201110332684.1 invention and created name is《Unattended substation it is intensive The stipulations self-adaptive access method of managing and control system》, the applying date is:The division Shen of the application for a patent for invention on October 28th, 2011 Please.
Technical field
The present invention relates to the technical field of unattended substation remote-control, specifically a kind of unattended substation Intensive managing and control system.
Background technology
Existing unattended substation is equipped with complex automatic system background devices, Fault Recorder Information system etc. and sets It is standby, situations such as details, working condition, event information of the equipment of all accesses can be acquired, but communication aspects are confined to Teletransmission is not accomplished by this substation.Therefore, the operating condition of some system background equipment lacks effectively monitoring, failure or crash Often it cannot find and timely processing should there is effect to bring hidden danger for its performance for a long time afterwards.When unit exception, lead to The operation maintenance personnels such as the signal that normal main station monitoring receives is too simple, and detailed fault message only has are on the scene and could obtain, nothing Method judges analysis at the first time.The failure of 220kV major networks is when it come to arrived, higher level's scheduling requirement quickly submits event detailed Information is reported, has accident in the case that being related to multiple substations, larger pressure is brought to O&M unit.Simultaneously because main website It monitors the failure received or exception information is limited, it is whether problematic to automation equipment to be difficult to judge, to the standard of repairing spare unit part Standby work brings certain blindness, often influences the working efficiency of repairing.
Regular visit, verification definite value, operating status are carried out by the way of going work on the spot to automated system in station to comment Estimate and also occupies a large amount of manpowers, vehicle, time resource.
Invention content
The technical problem to be solved in the present invention is to provide a kind of intensive managing and control systems of unattended substation, to improve Abnormal to unattended substation automation equipment, power system fault analysis and processing working efficiency, shortens exception and thing Therefore equipment stop use as a servant the time.
In order to solve the above technical problems, a kind of intensive managing and control system of unattended substation provided by the invention, packet It includes:Remote virtualization terminal:For realizing the remote emulation of unattended substation automated system, and remotely to substation Automated system carries out the start and stop of soft and hardware;
Remote virtualization makes an inspection tour module:It is automatic by preset taking turn plan tour whole transformer station for simulating operator on duty Change system;During tour, will the aobvious of the remote virtualization terminal be passed through by the status information of tour equipment in real time automatically Show that device is shown;For the unusual condition during tour, controls the remote virtualization terminal and carry out audible and visual alarm;It will be maked an inspection tour Taking turn daily record is written in the status information of equipment;
Stipulations adaptive access module:For multiple using different logical in remote-control electric substation automation system When interrogating the equipment of stipulations, according to the condition code in each communication protocol, various communication protocols of automatic identification and by various communication protocols It is converted into a kind of communication protocol;
Equipment automatic sign in publishes module on the spot:Isa secret files in Windows systems are implanted by management and control by the module Equipment on the spot in, and believed by the keyboard of the equipment on the spot of management and control and mouse using described in 256 SSLv3 technology secrecies of standard Number, by being communicated with the Isa secrets file, realize the automated log on of equipment on the spot;
Remote virtualization terminal makes an inspection tour module by remote virtualization and makes an inspection tour whole transformer station automated system;It was making an inspection tour Cheng Zhong will be shown by the display of the remote virtualization terminal in real time by the status information of tour equipment automatically;Work as discovery When unit exception in electric substation automation system, by the remote virtualization terminal remote to corresponding equipment carry out it is soft, The start and stop of hardware, that is, realize remote-control;To taking turn daily record be written by the status information of tour equipment.
The technique effect that the present invention has:(1)The unattended substation automated system of the present invention it is intensive long-range Managing and control system, using advanced IP-Based KVM technologies, according to unattended substation automated system novel maintenance demand, In conjunction with secondary Safe Protection requirement, the unattended substation based on wide area network and remote virtualization terminal technology is provided Automated system novel maintenance system, formulated electric substation automation system novel maintenance related management standard, work Flow etc..Abnormal to unattended substation automation equipment, power system fault analysis and processing working efficiency is improved, Full and accurate data are provided for the analysis of main equipment health status, synergic system and auxiliary system, are conducive to transformer plant automatic System repair based on condition of component work is carried out in a deep going way comprehensively.Reduce and automated system in station is determined by the way of going work on the spot Phase inspection, verification definite value, operating status assess occupied a large amount of manpowers, vehicle, time resource.(2)The present invention based on wide The automation of transformation substations novel maintenance system of domain net and remote virtualization terminal technology realizes electric substation automation system concentration The problem of changing, the unified management of hardware and software platform, effectively simplifying the managerial confusion brought since equipment is disperseed;It provides to remote " localization " management mode of end equipment, substantially increases the response speed of problem, reduces and safeguards into cost, reduce personnel without The labor intensity of meaning.System provides the management means of safety, ensure that safe operation, the operation behavior of specification operation maintenance personnel are protected Demonstrate,prove automated system safe and reliable operation.The effect of electric substation automation system O&M can be greatly improved in the use of novel maintenance system Rate, reduces human cost, and being widely used for system will also promote operating standard, modification regulation further to develop.Using long-range After operational system, inspection, operation distant place controlled device, information verification and modification etc. will all have larger with previous workflow Difference, need to work out related operation, maintenance procedure, meet the equipment safety under new situation.
Specific implementation mode
The intensive managing and control system of the unattended substation of the present embodiment includes:
Remote virtualization terminal(When it is implemented, the remote virtualization terminal, which is one, is equipped with remote dummy terminal system The computer of system software):The remote terminal emulation for providing the Telnet agreements similar to Internet, can be embedded into no interface Service system in, allow user by being remotely logged into virtual terminal, be connected to destination service system.Pass through the technology Using the remote emulation that unattended substation automated system may be implemented, soft and hardware remotely is carried out to automated system Start and stop.
Remote virtualization polling module:It provides and is similar to the management module that operator on duty makes an inspection tour behavior, simulate operator on duty The whole process of tour customizes out the taking turn plan for meeting regulatory requirements according to the tour requirement of operator on duty.In the mistake of taking turn Cheng Zhong will be presented in a manner of live table in face of operator on duty automatically by the status information of tour equipment.For taking turn Unusual condition in the process provides the alarms mode such as acousto-optic.Taking turn daily record is written in facility information when all taking turns.
Equipment automatic sign in publishes module on the spot:In the remote-control of equipment, under normal circumstances, remote equipment is logged on to When, it needs to input user's name and login password.In the present system, it by technological means, is stepped on using configured in advance is good Record account number and password(The username and password is bound with the account title of user in systems), realize the automatic of remote equipment It logs in.In addition, when exiting certain equipment, the function of locking the device screen automatically is provided, has been effectively ensured and has been set by supervision Standby information security.
Stipulations adaptive access module:The equipment that remote-control is needed in substation is numerous, is related to different producers, no Same stipulations.Equipment in order to adapt to various different stipulations, this system have developed stipulations adaptation module.For certain needs The equipment of access carries out simple stipulations configuration, then if the stipulations of the equipment are not declared in the stipulations storehouse of system The equipment can easily be accessed.Former, the access of this difference stipulations equipment is realized by hardware module, this System utilizes the function of software realization hardware.
In above-mentioned remote dummy terminal module, core is to be detected measurement equipment by instrument board or monitoring scene displaying Information.Electric substation automation system unification is arranged into multiple virtual terminal instrument boards according to the wish of user, each shows certain The key message of automated system acquisition, each virtual terminal interface can scale, and can move transposition, display operation watch The content of member's concern, and abundant virtual terminal information customization function is provided.
In above-mentioned remote virtualization polling module, core is, by computer picture, actively to call the various of equipment It is concerned information, according to significance level, actively in face of " push " to administrative staff so that administrative staff need not set to substation Standby scene, can also complete the tour work of equipment.For abnormal situation, additionally it is possible to automatically record and report, eliminate pipe The various work that reason personnel are carried out by abnormality processing.
The above-mentioned automatic sign in of equipment on the spot is published in module, and core is to analyze and record various server apparatus Login mode, the function privilege certification in conjunction with system and equipment purview certification, establish the matching between user, equipment, lander Relationship, and using the bottom communication of server apparatus rule, the instruction of screen locking reconciliation screen is sent to server.To effectively keep away Security risk is exempted from.
Module in above-mentioned stipulations adaptive access, core are the condition code based on electric power automation communication protocol, from The dynamic conversion identified and complete various stipulations, to handle various stipulations in one agreed form.When the equipment of different vendor When being docked with this system, can the used stipulations of the automatic identification vendor equipment, load automatically and configure the stipulations.It eliminates complicated Human configuration, reduce system deployment cost, avoid causing system to be unable to operate normally because mistake occurs in configuration.
The implementation of unattended substation remote centralized supervising platform, not only so that the skills such as KVM over IP and internet Art is implemented in the power system, and its advantage is also fully reflected on the system administration of electric system:
(1)One-point technique management is transitioned into comprehensive centralized management
The quantity of each rank substation and various kinds of equipment increasingly increases, to substation management, more stringent requirements are proposed. After using remote centralized supervising platform, way to manage is by the original a set of mouse-keyboard display of every platform substation equipment One-point technique management has been transitioned into the comprehensive centralized management for only needing a control terminal that can manage global substation equipment Mode.
(2)Conventional system management is transitioned into safe systematical administration
Authorization administrative mechanism is perfected:In current management mode, the mandate pipe of the technical staff of participative management Reason mechanism is unsound, and most systems management is built upon in the foundation of trust basic to administrative staff, but is objectively not section It learns.And after using concentrated controling management software, detailed division can be carried out to the management of each user and operating right, Different administration authorities is set according to different administrative staff's responsibilities, it then follows " permission is minimum " principle improves security of system.
(3)Region local management is transitioned into the remote control management
In electric power enterprise generally using today of open IT frameworks, managerial island phenomenon remains generally existing, And it is a main cause for influencing Electric Power Enterprise Information systems technology tenability, this is mainly that no comprehensively solve is remote Journey technical support issue.After using ivr platform, just solves the problems, such as the remote control management.
(4)" passive " system monitoring management is transitioned into " active " system monitoring management
At present the technical support personnel at center many times play the part of be a fireman role.It is each when being distributed in When various catastrophic failures occur in network, work station or the application of substation, technical staff must rapidly have found and solve to ask Topic, otherwise producing business will be affected, or even will produce serious consequence.Due to there is too many potential enchancement factor can shadow The availability and performance of the business of sound, system maintenance personnel have to carry out the work in a manner of " problematic drive ", are in management It is also managed by system while system, it is difficult to ensure that " grade of service " or " service quality " of entire operation system.Cause this The reason of problem, is lagged to the mode of system implementing monitoring management.Traditional system monitoring management tool generally uses " passive Formula " operating mode:The characteristic parameter for monitoring various systems, according to monitoring management strategy(Policy)Situation is judged and is located Reason.Obviously, it " solves " to be it is difficult to adapt to " business key type " requirement again after going wrong.The approach for solving the problems, such as such is exactly Intelligentized means are introduced, so as to " active " monitoring management system.And after introducing novel maintenance system, administrative staff The server being managed is monitored at any time, once pinpointing the problems can at once be solved by remote management, to protect The normal operation of regulation and control center service is hindered.
Novel maintenance system main website hardware includes mainly 3 application server, database server and certificate server portions Point, it is deployed in city's control centre of company computer room.The novel maintenance service based on C/S frameworks, data are run on the application server DB2 database is run on the server of library, and authenticating user identification service is run on certificate server.
Novel maintenance equipment in system mainly has IP-Based KVM Server and IP-Based KVM Client. IP-Based KVM Server are deployed in city's control centre of company computer room, and IP-Base is disposed in the substation of access monitoring KVM Client equipment is connected by optical fiber private network between KVM Server and KVM Client, is formed from control centre to each The outer novel maintenance network of band of a substation.Complex automatic system, interchanger, remote power supply management in substation, backstage Protective device, video monitoring will access IP-Base KVM terminals, realize the remote maintenance to these equipment and system.
It logs in novel maintenance system by controlling main and need to ensure that safe operation by physical security authentication device, advise The operation behavior of model operation maintenance personnel ensures automated system safe and reliable operation.
Power management is carried out to equipment such as supervisory control of substation main website, interchangers using remote power supply managing device, works as main website When delay machine situation occurs in system, server can be restarted by remote power supply management, substantially increase the response speed of problem, reduced Maintenance cost reduces the meaningless labor intensity of personnel.
View layer is mainly realized with ExtJs combinations JSP.On ways of presentation, by CSS come specification style sheet.Control Preparative layer realizes that the control with the page circulates with Struts frames.Business Logic is made of a series of Service, is substantially carried out Business processing, each Service are the business functions of one group of tight association, these business functions call data service layer interface complete At persistence.
Business Logic is concerned about service logic.It is designed to thread-safe, and is single instance mode, with JavaBean come real It is existing.
Data access layer is mainly responsible for the data sources such as access relational databases, and converts the data into Java object for application Program uses.Here it is interacted by ibatis and database, defines data object with JavaBean, and combine spring frames Frame realizes the access and operation to data.
Obviously, the above embodiment is merely an example for clearly illustrating the present invention, and is not to the present invention The restriction of embodiment.For those of ordinary skill in the art, it can also be made on the basis of the above description Its various forms of variation or variation.There is no necessity and possibility to exhaust all the enbodiments.And these belong to this hair The obvious changes or variations that bright spirit is extended out are still in the protection scope of this invention.

Claims (1)

1. a kind of intensive managing and control system, it is characterised in that:
Including:Remote virtualization terminal:For realizing the remote emulation of unattended substation automated system, and it is long-range right Electric substation automation system carries out the start and stop of soft and hardware;
Remote virtualization makes an inspection tour module:For simulating operator on duty whole transformer station Department of Automation is maked an inspection tour by preset taking turn plan System;During tour, will the display of the remote virtualization terminal be passed through by the status information of tour equipment in real time automatically Display;For the unusual condition during tour, controls the remote virtualization terminal and carry out audible and visual alarm;It will be by tour equipment Status information be written taking turn daily record;
Stipulations adaptive access module:For multiple using different communication rule in remote-control electric substation automation system When equipment about, according to the condition code in each communication protocol, the various communication protocols of automatic identification simultaneously convert various communication protocols At a kind of communication protocol;
Equipment automatic sign in publishes module on the spot:Isa secret files in Windows systems are implanted by management and control just by the module In ground equipment, and using described in 256 SSLv3 technology secrecies of standard by the keyboard and mouse signal of the equipment on the spot of management and control, By being communicated with the Isa secrets file, the automated log on of equipment on the spot is realized;
Remote virtualization terminal makes an inspection tour module by remote virtualization and makes an inspection tour whole transformer station automated system;In the process of tour In, it will be shown in real time by the display of the remote virtualization terminal by the status information of tour equipment automatically;When discovery becomes When unit exception in power station automation system, corresponding equipment is carried out by the remote virtualization terminal remote soft, hard The start and stop of part, that is, realize remote-control;To taking turn daily record be written by the status information of tour equipment;
Novel maintenance equipment in system has IP-Based KVM Server and IP-Based KVM Client;IP-Based KVM Server are deployed in city's control centre of company computer room, the deployment IP-Based KVM in the substation of access monitoring Client equipment is connected by optical fiber private network between KVM Server and KVM Client, is formed from control centre to each change The outer novel maintenance network of band in power station;Complex automatic system, interchanger, remote power supply managing device in substation, backstage Protective device, video monitoring will access IP-Based KVM Client, realize the remote maintenance to these equipment and system.
CN201510537874.5A 2011-10-28 2011-10-28 A kind of intensive remote-control system Active CN105356595B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510537874.5A CN105356595B (en) 2011-10-28 2011-10-28 A kind of intensive remote-control system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201110332684.1A CN102403796B (en) 2011-10-28 2011-10-28 The stipulations self-adaptive access method of the intensive managing and control system of unattended substation
CN201510537874.5A CN105356595B (en) 2011-10-28 2011-10-28 A kind of intensive remote-control system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201110332684.1A Division CN102403796B (en) 2011-10-28 2011-10-28 The stipulations self-adaptive access method of the intensive managing and control system of unattended substation

Publications (2)

Publication Number Publication Date
CN105356595A CN105356595A (en) 2016-02-24
CN105356595B true CN105356595B (en) 2018-09-21

Family

ID=45885702

Family Applications (6)

Application Number Title Priority Date Filing Date
CN201510538075.XA Active CN105356597B (en) 2011-10-28 2011-10-28 The intensive managing and control system of unattended substation
CN201510537874.5A Active CN105356595B (en) 2011-10-28 2011-10-28 A kind of intensive remote-control system
CN201510537821.3A Active CN105356594B (en) 2011-10-28 2011-10-28 Intensive managing and control system
CN201510538144.7A Active CN105356598B (en) 2011-10-28 2011-10-28 A kind of intensive managing and control system of unattended substation
CN201510537896.1A Active CN105356596B (en) 2011-10-28 2011-10-28 The intensive remote-control system of unattended substation
CN201110332684.1A Active CN102403796B (en) 2011-10-28 2011-10-28 The stipulations self-adaptive access method of the intensive managing and control system of unattended substation

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201510538075.XA Active CN105356597B (en) 2011-10-28 2011-10-28 The intensive managing and control system of unattended substation

Family Applications After (4)

Application Number Title Priority Date Filing Date
CN201510537821.3A Active CN105356594B (en) 2011-10-28 2011-10-28 Intensive managing and control system
CN201510538144.7A Active CN105356598B (en) 2011-10-28 2011-10-28 A kind of intensive managing and control system of unattended substation
CN201510537896.1A Active CN105356596B (en) 2011-10-28 2011-10-28 The intensive remote-control system of unattended substation
CN201110332684.1A Active CN102403796B (en) 2011-10-28 2011-10-28 The stipulations self-adaptive access method of the intensive managing and control system of unattended substation

Country Status (1)

Country Link
CN (6) CN105356597B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105515186B (en) * 2011-10-28 2018-11-02 国网江苏省电力有限公司常州供电分公司 A kind of working method of remote-control system
CN108024090B (en) * 2016-11-02 2020-01-17 杭州海康威视系统技术有限公司 Abnormity positioning method and device for video monitoring platform
CN106558917B (en) * 2016-11-30 2019-04-30 国家电网公司 A kind of secondary operational system protective relaying device inspection method
CN108494737A (en) * 2018-02-24 2018-09-04 浙江远望通信技术有限公司 A kind of video monitoring safety cut-in method based on equipment feature recognition
CN108873778A (en) * 2018-07-03 2018-11-23 巴中云创空间科技服务有限公司 A kind of remote supervisory station point operating condition monitoring equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200950557Y (en) * 2006-09-18 2007-09-19 中国南方电网有限责任公司超高压输电公司 Unattended remote monitor system for 500kV transformer station
CN102194262A (en) * 2011-03-21 2011-09-21 安徽省电力公司阜阳供电公司 Intelligent inspection system and inspecting method for substation

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4459733B2 (en) * 2004-06-25 2010-04-28 株式会社日立製作所 Power system monitoring control system and information management method
EP2279465B1 (en) * 2008-04-17 2014-04-02 Siemens Aktiengesellschaft Method and system for cyber security management of industrial control systems
US8121618B2 (en) * 2009-10-28 2012-02-21 Digimarc Corporation Intuitive computing methods and systems
CN201853256U (en) * 2009-12-10 2011-06-01 北京国际系统控制有限公司 Intelligent scheduling system
CN101789630B (en) * 2010-02-11 2012-07-11 江苏方天电力技术有限公司 Monitoring system uniform platform of on-line monitoring and auxiliary equipment of transformer substation
CN101854269B (en) * 2010-04-06 2013-04-17 珠海市鸿瑞信息技术有限公司 Information safety operation and maintenance supervising platform of electric power secondary system
CN105515186B (en) * 2011-10-28 2018-11-02 国网江苏省电力有限公司常州供电分公司 A kind of working method of remote-control system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200950557Y (en) * 2006-09-18 2007-09-19 中国南方电网有限责任公司超高压输电公司 Unattended remote monitor system for 500kV transformer station
CN102194262A (en) * 2011-03-21 2011-09-21 安徽省电力公司阜阳供电公司 Intelligent inspection system and inspecting method for substation

Also Published As

Publication number Publication date
CN105356598B (en) 2018-11-06
CN105356597A (en) 2016-02-24
CN105356596B (en) 2018-11-23
CN105356596A (en) 2016-02-24
CN102403796A (en) 2012-04-04
CN105356594A (en) 2016-02-24
CN105356597B (en) 2018-11-23
CN102403796B (en) 2015-09-16
CN105356598A (en) 2016-02-24
CN105356594B (en) 2018-09-21
CN105356595A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105515186B (en) A kind of working method of remote-control system
US8595831B2 (en) Method and system for cyber security management of industrial control systems
CN105356595B (en) A kind of intensive remote-control system
CN111047143A (en) Power grid OMS-based regional and county team index management system
Wu et al. Enterprise Digital Intelligent Remote Control System Based on Industrial Internet of Things
CN104750095B (en) Regulation and control center inspection pilot system and method
de Carvalho et al. Analyzing impact of communication network topologies on reconfiguration of networked microgrids, impact of communication system on smart grid reliability, security and operation
CN202363972U (en) Remote operation and maintenance platform of substation secondary system
CN106781917A (en) It is a kind of to support a pair of power distribution automation Training Simulation Systems of multi-mode
CN104537090A (en) User information standardization data processing method and device
Balducelli et al. A middleware improved technology (MIT) to mitigate interdependencies between critical infrastructures
Xiangqian et al. Model design for big data clustering analysis of power dispatch automation system based on cloud computing platform
Ivanković et al. SCADA maintenance and refurbishment with security issue in modern IT and OT environment
Özçelik et al. Testbed Infrastructure Proposal (Center Energy) for Electricity Power Grid and Defence in Depth Practice on The Proposal
van der Velde et al. Towards a control system simulator based on a digital twin for cyber-physical power systems
CN115914884A (en) Remote operation and maintenance system for secondary equipment of power monitoring system based on trusted private network
Sufian et al. TNB M10x–In-house Developed Tool for Learning IEC 60870-5-101/104 SCADA Communication Protocols
Tian Study on the Application of Microcomputer Remote Control Technology in Unattended Substation
Nan A hybrid modeling/simulation approach for identification of hidden vulnerabilities due to interdependencies within and among critical infrastructures
CN113949533A (en) Offline auditing platform for scheduling data network
KR20200071812A (en) Next Generation Network Device Remote Control System Using Iot Technology
Hou et al. Development strategy of grid security and reliability in the new period
Kowalik et al. Remote control of power system protection devices requirements and tests of tomorrows solution
Haberler et al. Intruding a substation?-IT network security in power systems a guide for practical IT based architectures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant