CN105264850B - Trigger method, terminal and the system of power headroom reporting (PHR) - Google Patents
Trigger method, terminal and the system of power headroom reporting (PHR) Download PDFInfo
- Publication number
- CN105264850B CN105264850B CN201380002347.3A CN201380002347A CN105264850B CN 105264850 B CN105264850 B CN 105264850B CN 201380002347 A CN201380002347 A CN 201380002347A CN 105264850 B CN105264850 B CN 105264850B
- Authority
- CN
- China
- Prior art keywords
- power headroom
- phr
- base station
- downlink
- headroom reporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/14—Two-way operation using the same type of signal, i.e. duplex
- H04L5/1469—Two-way operation using the same type of signal, i.e. duplex using time-sharing
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signaling, i.e. of overhead other than pilot signals
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0091—Signaling for the administration of the divided path
- H04L5/0092—Indication of how the channel is divided
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/36—TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
- H04W52/365—Power headroom reporting
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention provides a kind of method, terminal and system for triggering power headroom reporting (PHR), wherein, configuration information is flexibly matched by receiving the Time Division Duplex TDD uplink and downlink that base station is sent, trigger power headroom reporting (PHR), if judging to have ascending resource available in a Transmission Time Interval, and power headroom reporting (PHR) can be accommodated, then reported to base station reporting power margin, the power margin information of flexible sub-frame can be obtained to realize base station, so as to more accurately carry out uplink scheduling to terminal, the frequency spectrum resource utilization rate of system is improved.
Description
Technical field
The present embodiments relate to field of communication technology more particularly to a kind of method, terminals for triggering power headroom reporting (PHR)
And system.
Background technique
For time division duplex (the Time Division of long term evolution (Long Term Evolution, LTE)
Duplexing, TDD) system, time resource is allocated in up-downlink direction, and specifically, 7 kinds of tdd frame structural support are different
Uplink and downlink time scale distribution (being seen below shown in table 1 in detail, i.e. configuration 0-6)),
Table 1
Base station can be configured according to the characteristic of portfolio, and referring to table 1, this 7 kinds configurations include 4 kinds of 5ms periods and 3 kinds
The case where 10ms period, in the configuration in 5ms period, every 5ms includes the conversion interval of a downstream-to-upstream;And 10ms's
In period assignment, every 10ms includes the conversion interval of a downstream-to-upstream, wherein " D " indicates downlink subframe, " U " is expressed as
Row subframe, " S " are expressed as the special subframe comprising conversion interval.In the prior art, base station is according to the characteristic pair of cell business volume
Cell carries out static configuration, and still, in practical applications, the portfolio of cell can dynamically change, and LTE is being begged at present
Can be based on the service condition dynamic community adjusting TDD uplink and downlink proportional arrangement of uplink and downlink resource by base station the problem of, to make
Obtain terminal can be used the different TDD proportions enumerated in table 1 within the different periods, for example terminal is adopted in first 40ms
It is uplink and downlink proportion 0, in next 40ms using uplink and downlink proportion 2, to realize when uplink service is more system just
0 can be such as configured using the configuration of more sub-frame of uplink, can matched using downlink subframe configuration is more when downlink business is more
It sets, such as configuration 2.It can be seen that will not only can be used as uplink when the TDD of cell proportion information changes but also can make
Be called uplink and downlink flexible sub-frame for the subframe of downlink, in contrast, all can only be at any time the subframe of upstream or downstream then
For fixed subframe.Such as by system dynamic configuration, terminal can be matched in uplink and downlink and be converted between 0 and uplink and downlink proportion 2, that
3,4,8,9 work song frames are just flexible sub-frame, remaining is fixed subframe.
In LTE wireless communication system, when terminal meets preset trigger condition and certain report condition Shi Huixiang base
It stands reporting power margin, referred to as power headroom reporting (Power Headroom Report, PHR).PHR is used for terminal most
Big transmission power and the difference of the uplink power of estimation are reported to base station, to make base station according to the power headroom reported to end
End carries out power control and uplink scheduling.In the prior art, the triggering that PHR is reported mainly includes following several situations: 1, period
PHR timer is then;2, forbid reporting PHR timer then or time-out, and report rear path loss variation more than one from last PHR
Determine thresholding;3, activating upstream auxiliary carriers, etc..However for PHR is reported in the prior art trigger condition, be all terminal according to
Base station is that the PHR of the fixation subframe sent under the premise of cell static configuration TDD matches information is reported, and the information of acquisition has one
Fixed limitation, therefore be that district dynamic configures TDD and matches the application scenarios of information and needs on a kind of corresponding PHR for base station
The triggering method of report, so that base station more accurately carries out uplink scheduling.
Summary of the invention
In view of the above drawbacks of the prior art, the embodiment of the present invention provides a kind of method of triggering power headroom reporting (PHR), end
End and system.
In a first aspect, the present invention provides a kind of method for triggering power headroom reporting (PHR), comprising:
Terminal receives the Time Division Duplex TDD uplink and downlink that base station is sent and flexibly matches configuration information, triggers power headroom reporting (PHR);
If the terminal judges have ascending resource can be used in a Transmission Time Interval, and can accommodate the power headroom
Report, then report the power headroom reporting (PHR) to the base station.
Implementation with reference to first aspect, in the first possible implementation, it is described receive base station send when
Duplex TDD uplink and downlink is divided flexibly to match configuration information, triggering power headroom reporting (PHR) specifically includes:
When the TDD uplink and downlink that terminal reception base station is sent by high-level signaling flexibly matches configuration information, trigger more than power
Amount report.
Implementation with reference to first aspect, in the second possible implementation, it is described receive base station send when
Duplex TDD uplink and downlink is divided flexibly to match configuration information, triggering power headroom reporting (PHR) specifically includes:
Terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and by the base
When station is configured with power headroom reporting (PHR) function, power headroom reporting (PHR) is triggered.
Implementation with reference to first aspect, in the third possible implementation, it is described receive base station send when
Duplex TDD uplink and downlink is divided flexibly to match configuration information, triggering power headroom reporting (PHR) specifically includes:
Terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and described in reception
TDD uplink and downlink proportional arrangement information that base station is sent by physical downlink control channel PDCCH, being used to indicate the terminal
When, trigger power headroom reporting (PHR).
Implementation with reference to first aspect, in the fourth possible implementation, it is described receive base station send when
Duplex TDD uplink and downlink is divided flexibly to match configuration information, triggering power headroom reporting (PHR) specifically includes:
Terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and described in reception
It is that base station is sent by physical downlink control channel PDCCH, be used to indicate the terminal TDD uplink and downlink proportional arrangement information;
If the terminal is flexibly matched according to the TDD uplink and downlink proportional arrangement information and currently used TDD uplink and downlink
Configuration information judgement know flexible sub-frame will be converted to sub-frame of uplink from downlink subframe in use, triggering power headroom reporting (PHR).
Any of the above-described implementation with reference to first aspect, in a fifth possible implementation, the reception base station
The Time Division Duplex TDD uplink and downlink of transmission flexibly matches configuration information, and triggering power headroom reporting (PHR) specifically includes:
Terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and described in reception
When the switching command that base station is sent or when being switched to Target cell or when media intervention control resets MAC reset, function is triggered
Rate headroom reporting.
Any of the above-described implementation with reference to first aspect, in a sixth possible implementation, the ascending resource
It can be with specifically including:
There is ascending resource available in fixed subframe, or in flexible sub-frame.
Any of the above-described implementation with reference to first aspect, in the 7th kind of possible implementation, the triggering power
Headroom reporting includes:
The power headroom reporting (PHR) of flexible sub-frame, or fix the power headroom reporting (PHR) of subframe or the power headroom of flexible sub-frame
The power headroom reporting (PHR) of report and fixed subframe.
7th kind of possible implementation with reference to first aspect, in the 8th kind of possible implementation, if only to described
Base station reports the power headroom of flexible sub-frame, carries the MAC layer control unit MAC CE subheader and content lattice of the power headroom
Formula are as follows: the logical channel number LCID in corresponding MAC CE subheader reports corresponding LCID, content format using current power surplus
For the length of a byte, first bit be used to identify be flexible sub-frame power headroom;
If reporting the power headroom of fixed subframe and flexible sub-frame simultaneously to base station, the MAC CE subheader of power headroom is carried
And content format are as follows: LCID needs to distribute a new LCID, content format in corresponding MAC CE subheader are as follows: the first byte is spirit
The power headroom of subframe living, the second byte be fixed subframe power headroom or the first byte be fixation subframe power more than
Amount, the second byte are the power headroom of flexible sub-frame.
Second aspect, the present invention provide a kind of terminal, comprising:
Trigger module, the Time Division Duplex TDD uplink and downlink for receiving base station transmission flexibly match configuration information, trigger power
Headroom reporting;
Reporting module, if for judging there is ascending resource can be used in a Transmission Time Interval, and the function can be accommodated
Rate headroom reporting then reports the power headroom reporting (PHR) to the base station.
In conjunction with the implementation of second aspect, in the first possible implementation, the trigger module is specifically used for:
When the TDD uplink and downlink that reception base station is sent by high-level signaling flexibly matches configuration information, power headroom report is triggered
It accuses.
In conjunction with the implementation of second aspect, in the second possible implementation, the trigger module is specifically used for:
It receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and matched by the base station
When having set power headroom reporting (PHR) function, power headroom reporting (PHR) is triggered.
In conjunction with the implementation of second aspect, in the third possible implementation, the trigger module is specifically used for:
It receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receive the base station
When TDD uplink and downlink proportional arrangement information being sent by physical downlink control channel PDCCH, being used to indicate the terminal, touching
Send out power headroom reporting (PHR).
In conjunction with the implementation of second aspect, in the fourth possible implementation, the trigger module is specifically used for:
It receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receive the base station
By physical downlink control channel PDCCH send, be used to indicate the terminal TDD uplink and downlink proportional arrangement information;
If flexibly matching configuration information according to the TDD uplink and downlink proportional arrangement information and currently used TDD uplink and downlink
Judgement know flexible sub-frame will be converted to sub-frame of uplink from downlink subframe in use, triggering power headroom reporting (PHR).
In conjunction with the implementation of second aspect, in a fifth possible implementation, the trigger module is specifically used for:
It receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receive the base station
When the switching command of transmission or when being switched to Target cell or when media intervention control resets MAC reset, trigger more than power
Amount report.
In conjunction with any of the above-described implementation of second aspect, in a sixth possible implementation, the ascending resource
It can be with specifically including:
There is ascending resource available in fixed subframe, or in flexible sub-frame.
In conjunction with any of the above-described implementation of second aspect, in the 7th kind of possible implementation, the triggering power
Headroom reporting includes:
The power headroom reporting (PHR) of flexible sub-frame, or fix the power headroom reporting (PHR) of subframe or the power headroom of flexible sub-frame
The power headroom reporting (PHR) of report and fixed subframe.
It is described to report mould in the 8th kind of possible implementation in conjunction with the 7th kind of possible implementation of second aspect
Block is specifically used for:
If only reporting the power headroom of flexible sub-frame to the base station, the MAC layer control unit of the power headroom is carried
MAC CE subheader and content format are as follows: logical channel number LCID in corresponding MAC CE subheader is reported pair using current power surplus
The LCID answered, content format are the length of a byte, first bit be used to identify be flexible sub-frame power headroom;
If reporting the power headroom of fixed subframe and flexible sub-frame simultaneously to base station, the MAC CE subheader of power headroom is carried
And content format are as follows: LCID needs to distribute a new LCID, content format in corresponding MAC CE subheader are as follows: the first byte is spirit
The power headroom of subframe living, the second byte be fixed subframe power headroom or the first byte be fixation subframe power more than
Amount, the second byte are the power headroom of flexible sub-frame.
The third aspect, the present invention provide a kind of system for triggering power headroom reporting (PHR), comprising: base station and any of the above-described
Terminal.
Method, terminal and the system of triggering power headroom reporting (PHR) provided in an embodiment of the present invention, receive base station by terminal
The Time Division Duplex TDD uplink and downlink of transmission flexibly matches configuration information, triggers power headroom reporting (PHR), if terminal judges to transmit at one
It is available that time interval has ascending resource, and can accommodate power headroom reporting (PHR), then reports to base station reporting power margin, thus real
The power margin information of flexible sub-frame can be obtained by having showed base station, so as to more accurately carry out uplink scheduling to terminal,
Improve the frequency spectrum resource utilization rate of system.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair
Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the flow chart of the method for one provided in an embodiment of the present invention triggering power headroom reporting (PHR);
Fig. 2 is the structural schematic diagram of a terminal provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the system of one provided in an embodiment of the present invention triggering power headroom reporting (PHR).
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Fig. 1 is the flow chart of the method for one provided in an embodiment of the present invention triggering power headroom reporting (PHR), as shown in Figure 1,
This method comprises:
Step 100, the Time Division Duplex TDD uplink and downlink that terminal receives that base station is sent flexibly matches configuration information, triggers power
Headroom reporting;
Base station, which passes through high-level signaling or broadcasts the message, flexibly matches configuration information to terminal transmission TDD uplink and downlink, wherein
The concrete form of high-level signaling can be selected such as radio resource control (Radio according to actual application
Resource Control, RRC) signaling.Configuration information is flexibly matched to which terminal obtains the TDD uplink and downlink that base station issues, and
And triggering power headroom reporting (PHR), wherein triggering power headroom reporting (PHR) includes: the power headroom reporting (PHR) or stator of flexible sub-frame
The power headroom reporting (PHR) of the power headroom reporting (PHR) of frame or the power headroom reporting (PHR) of flexible sub-frame and fixed subframe.Wherein, triggering spirit
Power headroom reporting, that is, terminal of subframe living is calculated more than the power of flexible sub-frame according to the power control parameters that flexible sub-frame configures
Amount and/or the power headroom that flexible sub-frame is calculated in flexible sub-frame.It should be noted that TDD flexibly matches confidence
Breath includes the set of possible TDD uplink and downlink proportional arrangement, the TDD uplink and downlink proportional arrangement of downlink HARQ timing reference, uplink
The TDD uplink and downlink proportional arrangement of HARQ timing reference, the period that TDD uplink and downlink proportional arrangement changes send TDD uplink and downlink ratio
It is one or more in parameters at the time of configuration change order etc..
Step 101, there is ascending resource can be used in a Transmission Time Interval if the terminal judges, and can accommodate described
Power headroom reporting (PHR) then reports the power headroom reporting (PHR) to the base station.
After terminal triggers power headroom reporting (PHR), judge have ascending resource available in a Transmission Time Interval, wherein available
Ascending resource specifically include: base station authorizes fixed subframe instruction terminal that fixed subframe is used as ascending resource or base station is awarded
It weighs flexible sub-frame instruction terminal and flexible sub-frame is used as ascending resource or the fixed subframe of base station authorization or flexible sub-frame, and
Fixed subframe or flexible sub-frame are used as ascending resource by instruction terminal.Know have ascending resource available when terminal judgement
When, determine whether the ascending resource can accommodate power headroom reporting (PHR) according to dispatching priority, if so, reporting power to base station
Headroom reporting.Specifically, if terminal only reports the power headroom of flexible sub-frame to base station, the MAC layer control of power headroom is carried
Unit MAC CE subheader and content format are as follows: the logical channel number LCID in corresponding MACCE subheader is using in current power surplus
Report corresponding LCID, content format is the length of a byte, first bit be used to identify be flexible sub-frame power headroom;
If terminal reports the power headroom of fixed subframe and flexible sub-frame simultaneously to base station, the MAC CE subheader of power headroom and interior is carried
Hold format are as follows: LCID needs to distribute a new LCID, content format in corresponding MAC CE subheader are as follows: the first byte is flexibly sub
The power headroom of frame, the second byte is the power headroom of fixed subframe or the first byte is to fix the power headroom of subframe, the
Two bytes are the power headroom of flexible sub-frame.
Triggering power headroom reporting (PHR) method provided in this embodiment receives the Time Division Duplex TDD that base station is sent by terminal
Uplink and downlink flexibly matches configuration information, power headroom reporting (PHR) is triggered, if judging to have ascending resource can in a Transmission Time Interval
With, and power headroom reporting (PHR) can be accommodated, then it is reported to base station reporting power margin, so that realizing base station can obtain flexibly
The power margin information of subframe improves the frequency spectrum resource of system so as to more accurately carry out uplink scheduling to terminal
Utilization rate.
Flexibly match it should be noted that receiving the TDD uplink and downlink that base station is sent for the terminal in above-described embodiment
Confidence breath, the process for triggering power headroom reporting (PHR) includes the time point of a variety of triggerings, is described as follows:
Situation one: when the TDD uplink and downlink that terminal reception base station is sent by high-level signaling flexibly matches configuration information, triggering
Power headroom reporting (PHR);
Situation two: terminal receives the TDD uplink and downlink that sends by high-level signaling of base station and flexibly matches configuration information, and by
When the base station is configured with power headroom reporting (PHR) function, power headroom reporting (PHR) is triggered;
Situation three: terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and connects
Receive TDD uplink and downlink proportional arrangement that the base station is sent by physical downlink control channel PDCCH, being used to indicate the terminal
When information, power headroom reporting (PHR) is triggered;
Situation four: terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and connects
Receive it is that the base station is sent by physical downlink control channel PDCCH, be used to indicate terminal TDD uplink and downlink proportional arrangement letter
Breath;
If the terminal is flexibly matched according to the TDD uplink and downlink proportional arrangement information and currently used TDD uplink and downlink
Configuration information judgement know flexible sub-frame will be converted to sub-frame of uplink from downlink subframe in use, triggering power headroom reporting (PHR);
Situation five: terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and connects
When receiving the switching command that the base station is sent or when being switched to Target cell or when media intervention control resets MAC reset,
Trigger power headroom reporting (PHR).
It is understood that being directed to the time point of above-mentioned a variety of triggerings, system can need to select according to actual application
Select one or more kinds of trigger condition triggering power headroom reporting (PHR)s.
Further, terminal is configured with power headroom reporting (PHR) function by the base station, then in activation configured with the auxiliary of uplink
When carrier wave, triggering power control headroom report.Described to be configured with power control headroom function of reporting, a kind of mode is configuration power control headroom report
Function, another way be allocation activation be configured with uplink secondary carrier when, triggering power control headroom report function.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through
The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer readable storage medium, the program
When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes: ROM, RAM, magnetic disk or light
The various media that can store program code such as disk.
Fig. 2 is the structural schematic diagram of a terminal provided in an embodiment of the present invention, as shown in Fig. 2, the terminal includes: triggering
Module 11 and reporting module 12, wherein the Time Division Duplex TDD uplink and downlink that trigger module 11 is used to receive base station transmission flexibly matches
Configuration information triggers power headroom reporting (PHR);If reporting module 12 is for judging have ascending resource can in a Transmission Time Interval
With, and the power headroom reporting (PHR) can be accommodated, then the power headroom reporting (PHR) is reported to the base station.
The function and process flow of each module in terminal provided in this embodiment, may refer to above-mentioned method shown in FIG. 1
Embodiment, realization principle is similar, and details are not described herein again.
Terminal provided in this embodiment flexibly matches confidence by receiving the Time Division Duplex TDD uplink and downlink that base station is sent
Breath triggers power headroom reporting (PHR), if judging to have ascending resource can be used in a Transmission Time Interval, and can accommodate power headroom
Report is then reported to base station reporting power margin, so that the power margin information of flexible sub-frame can be obtained by realizing base station, from
And uplink scheduling more accurately can be carried out to terminal, improve the frequency spectrum resource utilization rate of system.
Flexibly match it should be noted that receiving the TDD uplink and downlink that base station is sent for the terminal in above-described embodiment
Confidence breath, the process for triggering power headroom reporting (PHR) includes the time point of a variety of triggerings, is described as follows:
Situation one: trigger module 11 is specifically used for: receiving the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches
When configuration information, power headroom reporting (PHR) is triggered;
Situation two: trigger module 11 is specifically used for: receiving the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches
Configuration information, and when being configured with power headroom reporting (PHR) function by the base station, trigger power headroom reporting (PHR);
Situation three: trigger module 11 is specifically used for: receiving the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches
Configuration information, and receive it is that the base station is sent by physical downlink control channel PDCCH, be used to indicate the terminal
When TDD uplink and downlink proportional arrangement information, power headroom reporting (PHR) is triggered;
Situation four: trigger module 11 is specifically used for: receiving the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches
Configuration information, and receive it is that the base station is sent by physical downlink control channel PDCCH, be used to indicate the terminal TDD
Uplink and downlink proportional arrangement information;If flexibly being matched according to the TDD uplink and downlink proportional arrangement information and currently used TDD uplink and downlink
Than configuration information judgement know flexible sub-frame will be converted to sub-frame of uplink from downlink subframe in use, triggering power headroom report
It accuses;
Situation five: trigger module 11 is specifically used for: receiving the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches
Configuration information, and when receiving the switching command that the base station is sent or when being switched to Target cell or media intervention control weight
When setting MAC reset, power headroom reporting (PHR) is triggered.
It is understood that being directed to the time point of above-mentioned a variety of triggerings, system can need to select according to actual application
Select one or more kinds of trigger condition triggering power headroom reportings.
Based on the above embodiment, the triggering power headroom reporting (PHR) includes: the power headroom reporting (PHR) of flexible sub-frame, or fixed
The power headroom reporting (PHR) of the power headroom reporting (PHR) of subframe or the power headroom reporting (PHR) of flexible sub-frame and fixed subframe.
Reporting module 12 is specifically used for: if only reporting the power headroom of flexible sub-frame to the base station, carrying the power
The MAC layer control unit MAC CE subheader and content format of surplus are as follows: the logical channel number LCID in corresponding MAC CE subheader is adopted
Corresponding LCID is reported with current power surplus, content format is the length of a byte, and first bit is spirit for identifying
The power headroom of subframe living;If reporting the power headroom of fixed subframe and flexible sub-frame simultaneously to base station, power headroom is carried
MAC CE subheader and content format are as follows: LCID needs to distribute a new LCID, content format in corresponding MAC CE subheader are as follows: the
One byte is the power headroom of flexible sub-frame, and the second byte is the power headroom of fixed subframe or the first byte is stator
The power headroom of frame, the second byte are the power headroom of flexible sub-frame.
Fig. 3 is the structural schematic diagram of the system of one provided in an embodiment of the present invention triggering power headroom reporting (PHR), such as Fig. 3 institute
Show, which includes: base station 1 and terminal 2, wherein terminal 2 is the terminal that the above embodiment of the present invention provides, and base station 1 is this hair
The base station being related in bright above-described embodiment.
The function and process flow of each device in power headroom reporting system provided in this embodiment, may refer to above-mentioned institute
The embodiment of the method shown, it is similar that the realization principle and technical effect are similar, and details are not described herein again.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (17)
1. a kind of method for triggering power headroom reporting (PHR) characterized by comprising
Terminal receives the Time Division Duplex TDD uplink and downlink that base station is sent and flexibly matches configuration information, triggers power headroom reporting (PHR);
If the terminal judges have ascending resource can be used in a Transmission Time Interval, and can accommodate the power headroom report
It accuses, then reports the power headroom reporting (PHR) to the base station;
Wherein, the power headroom reporting (PHR) includes:
The power headroom reporting (PHR) of flexible sub-frame, or fix the power headroom reporting (PHR) of subframe or the power headroom reporting (PHR) of flexible sub-frame
With the power headroom reporting (PHR) of fixed subframe.
2. the method for triggering power headroom reporting (PHR) according to claim 1, which is characterized in that described to receive what base station was sent
Time Division Duplex TDD uplink and downlink flexibly matches configuration information, and triggering power headroom reporting (PHR) specifically includes:
When the TDD uplink and downlink that terminal reception base station is sent by high-level signaling flexibly matches configuration information, power headroom report is triggered
It accuses.
3. the method for triggering power headroom reporting (PHR) according to claim 1, which is characterized in that described to receive what base station was sent
Time Division Duplex TDD uplink and downlink flexibly matches configuration information, and triggering power headroom reporting (PHR) specifically includes:
Terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and is matched by the base station
When having set power headroom reporting (PHR) function, power headroom reporting (PHR) is triggered.
4. the method for triggering power headroom reporting (PHR) according to claim 1, which is characterized in that described to receive what base station was sent
Time Division Duplex TDD uplink and downlink flexibly matches configuration information, and triggering power headroom reporting (PHR) specifically includes:
Terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receives the base station
When TDD uplink and downlink proportional arrangement information being sent by physical downlink control channel PDCCH, being used to indicate the terminal, touching
Send out power headroom reporting (PHR).
5. the method for triggering power headroom reporting (PHR) according to claim 1, which is characterized in that described to receive what base station was sent
Time Division Duplex TDD uplink and downlink flexibly matches configuration information, and triggering power headroom reporting (PHR) specifically includes:
Terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receives the base station
By physical downlink control channel PDCCH send, be used to indicate the terminal TDD uplink and downlink proportional arrangement information;
If the terminal flexibly matches configuration according to the TDD uplink and downlink proportional arrangement information and currently used TDD uplink and downlink
Information judgement know flexible sub-frame will be converted to sub-frame of uplink from downlink subframe in use, triggering power headroom reporting (PHR).
6. the method for triggering power headroom reporting (PHR) according to claim 1, which is characterized in that described to receive what base station was sent
Time Division Duplex TDD uplink and downlink flexibly matches configuration information, and triggering power headroom reporting (PHR) specifically includes:
Terminal receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receives the base station
When the switching command of transmission or when being switched to Target cell or when media intervention control resets MAC reset, trigger more than power
Amount report.
7. the method for -5 any triggering power headroom reporting (PHR)s according to claim 1, which is characterized in that the ascending resource
It can be with specifically including:
There is ascending resource available in fixed subframe, or in flexible sub-frame.
8. the method for triggering power headroom reporting (PHR) according to claim 1, which is characterized in that
If only reporting the power headroom of flexible sub-frame to the base station, the MAC layer control unit MAC of the power headroom is carried
CE subheader and content format are as follows: the logical channel number LCID in corresponding MAC CE subheader is reported corresponding using current power surplus
LCID, content format are the length of a byte, first bit be used to identify be flexible sub-frame power headroom;
If reporting the power headroom of fixed subframe and flexible sub-frame simultaneously to base station, the MAC CE subheader of power headroom and interior is carried
Hold format are as follows: LCID needs to distribute a new LCID, content format in corresponding MAC CE subheader are as follows: the first byte is flexibly sub
The power headroom of frame, the second byte is the power headroom of fixed subframe or the first byte is to fix the power headroom of subframe, the
Two bytes are the power headroom of flexible sub-frame.
9. a kind of terminal characterized by comprising
Trigger module, the Time Division Duplex TDD uplink and downlink for receiving base station transmission flexibly match configuration information, trigger power headroom
Report;
Reporting module, if for judging there is ascending resource can be used in a Transmission Time Interval, and can accommodate more than the power
Amount report, then report the power headroom reporting (PHR) to the base station;
Wherein, the power headroom reporting (PHR) includes:
The power headroom reporting (PHR) of flexible sub-frame, or fix the power headroom reporting (PHR) of subframe or the power headroom reporting (PHR) of flexible sub-frame
With the power headroom reporting (PHR) of fixed subframe.
10. terminal according to claim 9, which is characterized in that the trigger module is specifically used for:
When the TDD uplink and downlink that reception base station is sent by high-level signaling flexibly matches configuration information, power headroom reporting (PHR) is triggered.
11. terminal according to claim 9, which is characterized in that the trigger module is specifically used for:
It receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and be configured with by the base station
When power headroom reporting (PHR) function, power headroom reporting (PHR) is triggered.
12. terminal according to claim 9, which is characterized in that the trigger module is specifically used for:
It receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receive the base station and pass through
When TDD uplink and downlink proportional arrangement information that physical downlink control channel PDCCH is sent, being used to indicate the terminal, function is triggered
Rate headroom reporting.
13. terminal according to claim 9, which is characterized in that the trigger module is specifically used for:
It receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receive the base station and pass through
Physical downlink control channel PDCCH send, be used to indicate the terminal TDD uplink and downlink proportional arrangement information;
If flexibly matching configuration information judgement according to the TDD uplink and downlink proportional arrangement information and currently used TDD uplink and downlink
Know flexible sub-frame will be converted to sub-frame of uplink from downlink subframe in use, triggering power headroom reporting (PHR).
14. terminal according to claim 9, which is characterized in that the trigger module is specifically used for:
It receives the TDD uplink and downlink that base station is sent by high-level signaling and flexibly matches configuration information, and receive the base station and send
Switching command when or when being switched to Target cell or when media intervention control resetting MAC reset, trigger power headroom report
It accuses.
15. according to any terminal of claim 9-14, which is characterized in that the ascending resource is available to be specifically included:
There is ascending resource available in fixed subframe, or in flexible sub-frame.
16. terminal according to claim 9, which is characterized in that the reporting module is specifically used for:
If only reporting the power headroom of flexible sub-frame to the base station, the MAC layer control unit MAC of the power headroom is carried
CE subheader and content format are as follows: the logical channel number LCID in corresponding MAC CE subheader is reported corresponding using current power surplus
LCID, content format are the length of a byte, first bit be used to identify be flexible sub-frame power headroom;
If reporting the power headroom of fixed subframe and flexible sub-frame simultaneously to base station, the MAC CE subheader of power headroom and interior is carried
Hold format are as follows: LCID needs to distribute a new LCID, content format in corresponding MAC CE subheader are as follows: the first byte is flexibly sub
The power headroom of frame, the second byte is the power headroom of fixed subframe or the first byte is to fix the power headroom of subframe, the
Two bytes are the power headroom of flexible sub-frame.
17. a kind of system for triggering power headroom reporting (PHR) characterized by comprising base station, and as claim 9-16 is any
The terminal.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2013/083311 WO2015035572A1 (en) | 2013-09-11 | 2013-09-11 | Method, terminal and system for triggering power headroom report |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105264850A CN105264850A (en) | 2016-01-20 |
CN105264850B true CN105264850B (en) | 2019-05-10 |
Family
ID=52664927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201380002347.3A Active CN105264850B (en) | 2013-09-11 | 2013-09-11 | Trigger method, terminal and the system of power headroom reporting (PHR) |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105264850B (en) |
WO (1) | WO2015035572A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115348655A (en) | 2016-08-19 | 2022-11-15 | 北京三星通信技术研究有限公司 | Method and device for reporting space on power head |
WO2019028815A1 (en) | 2017-08-11 | 2019-02-14 | Oppo广东移动通信有限公司 | Wireless communication method, terminal device, network device and network node |
CN115211186A (en) * | 2020-04-09 | 2022-10-18 | 中兴通讯股份有限公司 | System and method for power headroom reporting |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102075949A (en) * | 2010-12-22 | 2011-05-25 | 大唐移动通信设备有限公司 | Carrier aggregation (CA) technology-based data transmission method and device |
CN102123437A (en) * | 2011-03-03 | 2011-07-13 | 电信科学技术研究院 | Method, system and equipment for reporting power headroom (PH) and scheduling sub-frame |
WO2012177037A2 (en) * | 2011-06-20 | 2012-12-27 | Samsung Electronics Co., Ltd. | Method and apparatus for transmitting and receiving time division duplex frame configuration information in wireless communication system |
CN103168443A (en) * | 2010-08-13 | 2013-06-19 | 高通股份有限公司 | Feedback bundling for power-limited devices in wireless communications |
-
2013
- 2013-09-11 CN CN201380002347.3A patent/CN105264850B/en active Active
- 2013-09-11 WO PCT/CN2013/083311 patent/WO2015035572A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103168443A (en) * | 2010-08-13 | 2013-06-19 | 高通股份有限公司 | Feedback bundling for power-limited devices in wireless communications |
CN102075949A (en) * | 2010-12-22 | 2011-05-25 | 大唐移动通信设备有限公司 | Carrier aggregation (CA) technology-based data transmission method and device |
CN102123437A (en) * | 2011-03-03 | 2011-07-13 | 电信科学技术研究院 | Method, system and equipment for reporting power headroom (PH) and scheduling sub-frame |
WO2012177037A2 (en) * | 2011-06-20 | 2012-12-27 | Samsung Electronics Co., Ltd. | Method and apparatus for transmitting and receiving time division duplex frame configuration information in wireless communication system |
Also Published As
Publication number | Publication date |
---|---|
CN105264850A (en) | 2016-01-20 |
WO2015035572A1 (en) | 2015-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112534888B (en) | Uplink transmission power allocation | |
EP3242515B1 (en) | Resource pool configuration method and device, and computer storage medium | |
CN107836134B (en) | Method and device for sending uplink information and user equipment | |
CN102291760B (en) | Method, system and equipment for reporting and confirming buffer memory state information | |
CN108781143A (en) | The method and apparatus transmitted for dispatching the uplink with reduced delay | |
US20210250878A1 (en) | Method and apparatus for reporting power headroom report, and method and apparatus for obtaining power headroom report | |
CN103945541B (en) | Trigger method and equipment that SRS signal is sent | |
KR20160048907A (en) | Method and system for configuring a sounding reference signal power control parameter in a time-division duplexing system | |
CN107113749A (en) | System and method for power control | |
CN106559844A (en) | A kind of uplink transmission resource scheduling and ascending transmission method, device | |
CN102088303A (en) | SRS (sounding reference signal) transmitting method, and triggering method and device for triggering SRS transmitting | |
CN113302963B (en) | Scheduling serving cells with signaling messages | |
KR20200080259A (en) | Resource determination methods, devices, network elements and systems | |
CN105230096B (en) | Passive intermodulation signal interference dispatching method and device | |
CN105393608A (en) | User equipment and power allocation method | |
CN103916867A (en) | Method and apparatus for determining capacity of control channel | |
CN110167173A (en) | A kind of sending method of upstream data, method of reseptance and device | |
CN107431942A (en) | A kind of report method of channel condition information, user equipment and base station | |
CN108293245B (en) | Data communication method, terminal equipment and network equipment | |
CN104184569A (en) | Method and device for processing flexible subframe | |
CN105264850B (en) | Trigger method, terminal and the system of power headroom reporting (PHR) | |
CN107105502B (en) | Method and device for allocating persistent scheduling resources and transmitting data by using persistent scheduling resources | |
CN103298134B (en) | Multi-terminal competition conflict resolution method, terminal and base station | |
CN102595424A (en) | Processing method and terminal device for avoiding WLAN beacon | |
CN103262638A (en) | Wireless base station, wireless terminal, and communication control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |